Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ESTUDIO HIDROLÓGICO DEL SISTEMA


INTEGRAL LAGUNILLAS

COMPONENTE 1: DETERMINACIÓN DEL ESQUEMA ÓPTIMO DE


AFIANZAMIENTO

CONTENIDO

I. GENERALIDADES ............................................................................................... 5
1.1. Introducción ........................................................................................................... 5
1.2. Objetivo ................................................................................................................. 6
1.3. Antecedentes .......................................................................................................... 6
II. PLANTEAMIENTO DE ESQUEMAS ALTERNATIVOS DE
AFIANZAMIENTO ...................................................................................................... 8
2.1. Alternativa 1........................................................................................................... 8
2.1.1. Descripción general de la alternativa de afianzamiento ......................................... 8
2.1.2. Presa verde........................................................................................................... 8
2.1.3. Descripción de las estructuras hidráulicas........................................................... 15
2.1.4. Costos y presupuestos ........................................................................................ 17
2.2. Alternativa 2......................................................................................................... 18
2.2.1. Descripción general de la alternativa de afianzamiento ....................................... 18
2.2.2. Captación rio verde ............................................................................................ 18
2.2.3. Canal de derivación verde .................................................................................. 20
2.2.4. Descripción de las estructuras hidráulicas........................................................... 23
2.2.5. Costos y presupuestos ........................................................................................ 24
2.3. Alternativa 3......................................................................................................... 25
2.3.1. Descripción general de la alternativa de afianzamiento....................................... 25
2.3.2. Presa paratía ....................................................................................................... 25
2.3.3. Captación rio jarpaña ......................................................................................... 32
2.3.4. Descripción de las obras civiles .......................................................................... 37
2.3.5. Costos y presupuestos ........................................................................................ 41
2.4. Alternativa 4......................................................................................................... 41
2.4.1. Descripción general de la alternativa de afianzamiento....................................... 41
2.4.2. Presa paratía ....................................................................................................... 41
2.4.3. Presa jarpaña ...................................................................................................... 42
2.4.4. Descripción de las obras civiles .......................................................................... 49
2.4.5. Costos y presupuestos ........................................................................................ 51
2.5. Alternativa 5......................................................................................................... 51
2.5.1. Descripción general de la alternativa de afianzamiento....................................... 51
2.5.2. Presa paratía ....................................................................................................... 51
2.5.3. Presa millo ......................................................................................................... 52
2.5.4. Descripción de las obras civiles .......................................................................... 58
2.5.5. Costos y presupuestos ........................................................................................ 60
III. SELECCIÓN DEL ESQUEMA ÓPTIMO DE AFIANZAMIENTO ................. 61
IV. CONCLUSIONES Y RECOMENDACIONES ................................................... 63
4.1. Conclusiones ........................................................................................................ 63
4.1.1. Sobre los aspectos de geología y geotecnia......................................................... 63

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 1
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

4.1.2. Sobre los aspectos de hidrología......................................................................... 63


4.1.3. Sobre los aspectos de diseño, costos y presupuestos ........................................... 64
4.1.4. De la viabilidad hidrológica de las alternativas de afianzamiento........................ 65
4.1.5. Sobre la selección de la alternativa óptima ......................................................... 65
4.2. Recomendaciones ................................................................................................. 65
V. REFERENCIAS BIBLIOGRÁFICAS ................................................................. 66
VI. ANEXOS ............................................................................................................... 68

1.1. Estudio geológico preliminar de los planteamientos alternativos de afianzamiento


del Sistema Integral Lagunillas
1.2. Generación de caudales medios mensuales para las alternativas de afianzamiento
del Sistema Integral Lagunillas.
1.3. Diseño hidrológico de los embalses considerados en las alternativas de
afianzamiento del Sistema Integral Lagunillas.
1.4. Determinación del volumen muerto de los embalses considerados en las
alternativas de afianzamiento del Sistema Integral Lagunillas.
1.5. Determinación de los caudales de derivación de las alternativas de afianzamiento
del Sistema Integral Lagunilla.
1.6. Diseño de obras hidráulicas mayores para las alternativas de afianzamiento del
Sistema Integral Lagunillas.
1.7. Metrados, costos y presupuestos de las alternativas de afianzamiento del Sistema
Integral Lagunillas.
1.8. Topografía con GPS Diferencial
1.9. Planos

LISTA DE FOTOGRAFÍAS

Foto 1.1: Zona de inundación del embalse Verde ......................................................................... 9


Foto 1.2: Zona de cierre del embalse Verde ............................................................................... 11
Foto 1.3: Zona de emplazamiento de la bocatoma Verde – Alternativa 2. ................................... 19
Foto 1.4: Zona de cierre del embalse Paratía .............................................................................. 26
Foto 1.5: Zona de inundación del embalse Paratía ...................................................................... 27
Foto 1.6: Zona de emplazamiento de la bocatoma Verde – Alternativa 2. ................................... 33
Foto 1.7: Zona de cierre del embalse Jarpaña ............................................................................. 42
Foto 1.8: Zona de inundación del embalse Paratía ...................................................................... 44
Foto 1.9: Zona de cierre del embalse Millo ................................................................................ 52
Foto 1.10: Zona de inundación del embalse Millo ...................................................................... 54

LISTA DE FIGURAS

Figura 1.1: Zona de inundación del embalse Verde (Fuente: Imagen Google Earth) ....... 10
Figura 1.2: Embalse Verde: Relación altura – área – volumen ....................................... 12
Figura 1.3: Caudales medios mensuales embalse Verde (m3/s), periodo 1964 – 2009..... 13
Figura 1.4: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa Verde. 15

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 2
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Figura 1.5: Caudales medios mensuales bocatoma Verde (m3/s), periodo 1964 – 2009, Qx
= 10.88 m3/s (Vx = 338.53 hm3) .................................................................................... 20
Figura 1.6: Curva de utilización: Enero.......................................................................... 22
Figura 1.7: Curva de utilización: Febrero ....................................................................... 22
Figura 1.8: Curva de utilización: Marzo ......................................................................... 22
Figura 1.9: Sección típica del canal de derivación Verde ............................................... 24
Figura 1.10: Zona de inundación del embalse Paratía (Fuente: Imagen Google Earth) ... 27
Figura 1.11: Embalse Paratía: Relación altura – área – volumen .................................... 29
Figura 1.12: Caudales medios mensuales embalse Paratía (m3/s), periodo 1964 – 2009,
Qx = 5.79 m3/s (Vx = 180.26 hm3) ................................................................................ 30
Figura 1.13: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa
Paratía. .......................................................................................................................... 32
Figura 1.14: Caudales medios mensuales bocatoma Jarpaña (m3/s), periodo 1964 – 2009,
Qx = 4.00 m3/s (Vx = 124.52 hm3) ................................................................................ 34
Figura 1.15: Curva de utilización: Enero........................................................................ 36
Figura 1.16: Curva de utilización: Febrero ..................................................................... 36
Figura 1.17: Curva de utilización: Marzo ....................................................................... 36
Figura 1.18: Sección típica del canal de derivación Jarpaña ........................................... 40
Figura 1.19: Zona de inundación del embalse Paratía (Fuente: Imagen Google Earth) ... 43
Figura 1.20: Embalse Jarpaña: Relación altura – área – volumen ................................... 46
Figura 1.21: Caudales medios mensuales embalse Jarpaña (m3/s), periodo 1964 – 2009,
Qx = 4.20 m3/s (Vx = 130.67 hm3) ................................................................................ 47
Figura 1.22: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa
Jarpaña. ......................................................................................................................... 48
Figura 1.23: Zona de inundación del embalse Millo (Fuente: Imagen Google Earth)...... 53
Figura 1.24: Embalse Millo: Relación altura – área – volumen ...................................... 55
Figura 1.25: Caudales medios mensuales embalse Millo (m3/s), periodo 1964 – 2009, Qx
= 2.33 m3/s (Vx = 72.38 hm3) ........................................................................................ 56
Figura 1.26: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa
Millo. ............................................................................................................................ 58

LISTA DE CUADROS

Cuadro 1.1: Embalse Verde: Relación altura – área – volumen ...................................... 12


Cuadro 1.2: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Verde, periodo 1964-2009................................................................................ 13
Cuadro 1.3: Disponibilidad de los recursos hídricos totales regulables en el embalse
Verde, periodo: 1964-2009 ............................................................................................ 14
Cuadro 1.4: Simulación del embalse Verde.................................................................... 14
Cuadro 1.5: Costo total de la alternativa 1 ..................................................................... 17
Cuadro 1.6: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
Bocatoma Verde, periodo 1964- 2009............................................................................ 19

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 3
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7: Disponibilidad de los recursos hídricos totales en la bocatoma Verde,


periodo: 1964-2009 ....................................................................................................... 20
Cuadro 1.8: Resumen de cálculos para la obtención de curvas de utilización ................. 21
Cuadro 1.9: Características hidráulicas del canal de derivación Verde ........................... 24
Cuadro 1.10: Costo total de la alternativa 2.................................................................... 25
Cuadro 1.11: Embalse Paratía: Relación altura – área – volumen ................................... 29
Cuadro 1.12: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Paratía, periodo 1964- 2009. ............................................................................ 30
Cuadro 1.13: Disponibilidad de los recursos hídricos totales regulables en el embalse
Paratía, periodo: 1964-2009........................................................................................... 31
Cuadro 1.14: Simulación del embalse Paratía ................................................................ 31
Cuadro 1.15: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
Bocatoma Jarpaña, periodo 1964- 2009. ........................................................................ 33
Cuadro 1.16: Disponibilidad de los recursos hídricos totales en la bocatoma Jarpaña,
periodo: 1964-2009 ....................................................................................................... 34
Cuadro 1.17: Resumen de cálculos para la obtención de curvas de utilización ............... 35
Cuadro 1.18: Características hidráulicas del canal de derivación Verde ......................... 40
Cuadro 1.19: Detalle del canal de derivación Jarpaña .................................................... 41
Cuadro 1.20: Costo total de la alternativa 3.................................................................... 41
Cuadro 1.21: Embalse Jarpaña: Relación altura – área – volumen .................................. 45
Cuadro 1.22: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Jarpaña, periodo 1964- 2009. ........................................................................... 46
Cuadro 1.23: Disponibilidad de los recursos hídricos totales regulables en el embalse
Jarpaña, periodo: 1964-2009.......................................................................................... 47
Cuadro 1.24: Simulación del embalse Jarpaña ............................................................... 48
Cuadro 1.25: Costo total de la alternativa 4.................................................................... 51
Cuadro 1.26: Embalse Millo: Relación altura – área – volumen ..................................... 55
Cuadro 1.27: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Millo, periodo 1964- 2009 ............................................................................... 56
Cuadro 1.28: Disponibilidad de los recursos hídricos totales regulables en el embalse
Millo, periodo: 1964-2009 ............................................................................................. 57
Cuadro 1.29: Simulación del embalse Millo .................................................................. 57
Cuadro 1.30: Costo total de la alternativa 5.................................................................... 60
Cuadro 1.31: Características de las alternativas de afianzamiento .................................. 62
Cuadro 1.32: Priorización de alternativas de afianzamiento ........................................... 62

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 4
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

I. GENERALIDADES
1.1. INTRODUCCIÓN
El Sistema Integral Lagunillas es el principal proyecto de riego de la región Puno,
fue concebido inicialmente para el riego de 31,041 ha de terrenos agrícolas, y como
principal obra de regulación a la presa Lagunillas, con una capacidad de
almacenamiento útil de 500 hm3.

Efectuado el balance hídrico del Sistema Integral Lagunillas (componente 6) en las


situaciones actual y proyectada (demandas de uso poblacional, ecológico, agrícola,
industrial y minero), se determinó que con la implementación del embalse Lagunillas
como única infraestructura de regulación o derivación, no se logrará satisfacer todas
las demandas futuras de riego previstas en la cuenca; registrándose fuertes déficit,
por lo que la superficie de zonas regables tendría que verse reducida de forma
importante.

En razón a ello, en esta componente se presentan cinco (05) planteamientos


alternativos de afianzamiento del Sistema Integral Lagunillas que consideran tres
enfoques distintos: 1) Esquemas hidráulicos de derivación de las aguas del río Verde
al embalse Lagunillas, 2) Esquemas hidráulicos de regulación de las aguas del río
Verde en su propia cuenca y 3) Esquemas hidráulicos combinados.

Es necesario aclarar que en el marco del planteamiento de las alternativas de


afianzamiento del Sistema Integral Lagunillas, el Proyecto Especial Binacional Lago
Titicaca (PELT), elaboró el estudio de las presas, bocatomas y canales de derivación
para cada una de las alternativas de afianzamiento consideradas, con un nivel de
detalle preliminar (referenciales), con la finalidad de permitir efectuar comparaciones
entre las distintas alternativas de afianzamiento planteados, debiéndose definir su
viabilidad mediante una evaluación técnico-económica cuando se efectúen los
estudios respectivos.

Los planteamientos alternativos de afianzamiento hídrico del Sistema Integral


Lagunillas, presentados en esta componente mejorarían claramente la situación de
déficit, permitiendo abastecer las distintas demandas hídricas existentes en el Sistema
Integral Lagunillas con niveles de garantía aceptables, por lo que, es necesario iniciar
los estudios de los futuros proyectos de afianzamiento hídrico de dicho sistema
hidráulico.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 5
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.2. OBJETIVO
Determinar el esquema de afianzamiento óptimo del Sistema Integral Lagunillas con
aguas del río Verde, buscando satisfacer la mayor demanda hídrica posible de los
distintos usos y usuarios del sistema.

1.3. ANTECEDENTES
Los antecedentes más resaltantes relacionados al uso del recurso hídrico dentro del
Sistema Integral Lagunillas podemos citar:

 En los años 1961 - 1964, ELECTROCONSULT desarrolló un estudio que


contemplaba la regulación de las lagunas Lagunillas y Saracocha, y la
construcción de un túnel para unir ambas lagunas, con el objeto de derivar las
aguas de las cuencas del río Verde, Lagunillas y Saracocha hacia la cuenca del río
Tambo vertiente del Pacífico y de esta manera permitir el riego de las pampas de
la Joya.

 En 1983 ELECTROPERU, realizó los estudios de factibilidad de la Central


Hidroeléctrica Lagunillas, habiendo determinado un potencial de 12 MW,
correspondiente a una caída neta de 93.7 m y un caudal máximo de 15 m3/s, se
determino un volumen de presa de 550 hm3, se consideraba en este esquema el
trasvase del río Verde a la cuenca Lagunillas y su regulación complementaria.

 En 1984 la firma CyA, realizó para la EX-CORPUNO el estudio esta vez con
criterio de uso múltiple del Sistema Hidráulico Lagunillas, determinando que un
volumen de 300 hm3 en el embalse Lagunillas permitirá el riego de 48,136 ha, esto
con una eficiencia del 60%, se concluye en este estudio que la derivación del río
Verde no es conveniente ya que el costo por hectárea se tríplica respecto a las
áreas sin derivación y la energía que se gana es poco significativa, además de que
se dio mayor impulso a los estudios de la Central Hidroeléctrica San Gaban,
descartándose en este estudio el componente energético.

 En 1985 la EX-CORPUNO aprueba la construcción de la presa lagunillas, para lo


cual contrata los servicios del Ing. Elmer Evangelista, para informarse de las
condiciones geológicas y geotécnicas de la sección de cierre, el cual concluye que
la sección de cierre propuesta es la que reúne mejores condiciones para la
ubicación del eje de represamiento. El problema es que dicha sección no contaba
con sondajes diamantinos y por tanto los parámetros geológicos y geotécnicos
iban a ser asumidos por correlación.

 En el año 1986, la EX-CORPUNO encarga la ejecución de un programa de


sondajes diamantinos al EX-PEREHATI.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 6
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 En el año 1987 la EX-CORPUNO en convenio con el EX-REHATI realizan la


revisión de los estudios básicos (hidrología, planeamiento hidráulico y estudio de
demandas) así como el diseño a nivel definitivo de la presa Lagunillas, llegando a
la conclusión que los valores de eficiencias globales en los diferentes módulos
estaban sobrestimados, asumiéndose con fines de diseño de la presa un volumen
de 500 hm3.

 En el año 1993 en la perspectiva de un aprovechamiento integral de los recursos


de la cuenca del Lago Titicaca, denominada Sistema TDPS (Sistema Titicaca,
Desaguadero, Poopo y Salar de Coipasa), los gobiernos de Perú y Bolivia
conforman la SUBCOMILAGO el que encarga a un consorcio europeo la
elaboración de un Plan Director Binacional, dentro del cual está incluido el
Proyecto del Sistema Integral Lagunillas como parte de la gestión de recursos en
la cuenca del río Coata.

 En el año de 1995 el PELT, concluye la construcción de la presa Lagunillas.

 En diciembre del 2007 la Intendencia de Recursos Hídricos a través de la


Administración Técnica del Distrito de Riego Juliaca (hoy Administración Local
del Agua Juliaca), realiza el Estudio de Evaluación de los Recursos Hídricos en
las Cuencas de los Ríos Cabanillas y Lampa, determinándose que en la situación
actual solamente se lograría satisfacer el 48% del total de la demanda hídrica
existente, y en un escenario proyectado (con regulación del río Verde en el
embalse Lagunillas) la satisfacción de la demanda solo alcanzaría al 74%.

 En el año 2010 el Programa Regional de Riego y Drenaje – PRORRIDRE, elaboró


el Estudio Hidrológico: “Evaluación de Recursos Hídricos del Sistema Integral
Hídrico Lagunillas”, estudio en el cual se incorpora un nuevo módulo de riego al
SIL, denominado Santa Lucia – Cabanilla – Lampa, con un área total de 6,340.00
ha, concluyéndose que en la situación actual (demanda total del SIL) se
presentaría un déficit de 91.32 hm3 y en la situación proyectada con afianzamiento
(derivación de 30 m3/s del río Verde al embalse Lagunillas), se presentaría un
déficit de 19.49 hm3.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 7
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

II. PLANTEAMIENTO DE ESQUEMAS ALTERNATIVOS DE


AFIANZAMIENTO

La conceptualización y planteamiento de los esquemas alternativos de afianzamiento


del Sistema Integral Lagunillas se efectuaron teniendo en consideración aspectos
referidos a las condiciones topográficas, geológicas, geomorfológicas e hidrológicas,
que se consignan en los estudios respectivos que se presentan en los anexos. Las
alternativas de afianzamiento hídrico del Sistema Integral Lagunillas propuestos,
analizados y desarrollados están basados en uno de los tres enfoques que se detallan
a continuación:
 Esquemas alternativos de derivación de aguas del río Verde al embalse Lagunillas
(Alternativa 2).
 Esquemas alternativos de regulación de aguas (embalses) en la cuenca del río
Verde (Alternativas 1, 4 y 5).
 Esquemas alternativos combinados de afianzamiento (Alternativa 3).

2.1. ALTERNATIVA 1
2.1.1. DESCRIPCIÓN GENERAL DE LA ALTERNATIVA DE AFIANZAMIENTO
Esta alternativa de afianzamiento hídrico del Sistema Integral Lagunillas considera
el enfoque de la regulación de las aguas del río Verde en su propia cuenca,
sustentándose en el hecho de que con esta alternativa se podría regular la totalidad
de la oferta hídrica de la cuenca del río Verde.

Esta alternativa contempla la regulación del río Verde mediante la construcción de


una presa denominada “Verde”, localizada aguas abajo de la confluencia de los ríos
Jarpaña y Paratía, con un volumen útil de almacenamiento estimado de 283 hm3.

2.1.2. PRESA VERDE


a) Zona de cierre
El eje de la presa Verde fue ubicado en el curso del río Verde, aproximadamente en
la cota de 4,190 msnm y coordenadas UTM estimadas de 316,454 Este y 8’277,384
Norte, ver Foto 1.1.

La morfología local corresponde a un pequeño cañón, en sección transversal presenta


la forma de una "U", ambos estribos tienen pendientes sub-verticales y elevados. El
ancho a nivel de cauce es de 15 m aproximadamente, ampliándose la abertura a
medida que aumente la altura de la presa, la pendiente del cauce en el tramo
correspondiente a la zona de cierre es llana menor de 1 %. Ver Plano PV-PG.

Las consideraciones para la elección del cierre de la presa Verde fueron: 1) La


sección transversal debe de ser lo más estrecha posible, 2) Debe permitir almacenar
el mayor volumen posible. En la zona de cierre elegido, el estribo derecho está

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 8
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

conformado por un tipo de roca del grupo Palca, que presenta características de
resistencia un tanto deficientes, sin embargo, el estribo izquierdo está constituido por
roca Ignimbrita con mejores condiciones de resistencia en comparación al estribo
derecho.

De acuerdo a los estudios geofísicos efectuados en la zona de cierre, se ha estimado


que la potencia del material gravoso depositado en el río Verde tiene una potencia
variada de 30 a 50 m, situación condicionante en el tipo y diseño de la presa, así
mismo, se presume que las mismas características encontradas en la zona de cierre
propuesta se presentarían a lo largo del río Verde, si se eligiera otra zona de cierre
aguas arriba o abajo del propuesto, para mayor detalle revisar el Estudio Geológico
Preliminar de los Planteamientos Alternativos de Afianzamiento del Sistema Integral
Lagunillas que se presenta en el Anexo 1.1.

b) Zona de inundación
La zona de inundación comprende zonas adyacentes a los cursos de los ríos Jarpaña
y Paratía, siendo en mayor porcentaje en la subcuenca Paratía, donde las aguas
embalsadas cubrirán en mayor medida terrazas conformadas por material morrénico
y coluvial y en menor proporción áreas de bofedales, en comparación a la subcuenca
Jarpaña donde se inundará terrazas bajas, medias y altas conformadas por material
morrénico y coluvial, así mismo se llegará a inundar vías de acceso del tipo afirmadas
a los centros poblados de Pampahuta – Paratía y Jarpaña – Quillisani, en una longitud
aproximada de 9.34 y 1.78 km, respectivamente, ver Figura 1.1, Foto 1.2 y Planos
PV-PG.

Zona de Inundación
Embalse Verde

Foto 1.1: Zona de inundación del embalse Verde

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 9
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Centro Poblado
Pampahuta

Terrazas Bajas,
Medias y Altas

Río Paratía

Bofedales

Río Jarpaña

Río Verde
Presa Verde

Figura 1.1: Zona de inundación del embalse Verde (Fuente: Imagen Google Earth)

La zona de inundación está limitada por ambas márgenes por cerros rocosos muy
elevados, formando un valle amplio, con sección transversal en forma de "U" abierta
y perfil asimétrico, si tomamos como referencia el curso principal del río Paratía en
ambas márgenes la geomorfología de las laderas corresponde a Laderas Suaves (L-
s) las que se caracterizan por presentar pendientes inferiores a 30% y ausencia de
inestabilidad y deslizamientos, a lo largo del curso principal de los ríos Jarpaña y
Verde en la margen derecha la geomorfología de laderas corresponde a Laderas
Abruptas (L-a) con pendientes entre 50 – 70% y presencia de frecuentes escarpas, y
en la margen izquierda corresponde a Laderas Suaves (L-s), ver Foto 1.2 y Plano
GG-01.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 10
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Zona de Cierre
Embalse Verde

Río Verde

Foto 1.2: Zona de cierre del embalse Verde

A esta área confluyen dos cursos de drenaje: los ríos Paratía y Jarpaña, ambos
importantes porque conducen agua permanentemente, se ha observado también que
el río Paratía transporta muy poco material de arrastre y suspensión, lo que se
evidencia en el lecho del cauce donde se aprecia el depósito de material grueso y
poco fino y en la claridad del agua; a diferencia del río Jarpaña que sí carga abundante
sedimento fino en suspensión como se observó durante la fase de reconocimiento.

El material de basamento de esta estructura está constituido por formaciones del


Grupo Palca y Tacaza, ver Plano GG-01.

Para mayor detalle revisar el Estudio Geológico Preliminar de los Planteamientos


Alternativos de Afianzamiento del Sistema Integral Lagunillas que se presenta en el
Anexo 1.1.

Al no disponerse de un levantamiento topográfico detallado de la zona de inundación


(vaso) del embalse Verde, se ha construido la curva altura – área y volumen en base
a la topografía disponible del vaso obtenida por restitución, los datos se presentan en
el Cuadro 1.1 y se visualiza en el Figura 1.2, de donde se deduce que el área del
espejo de agua embalsada para una altura de presa de 56.00 m es de 16.86 km2 y
permite almacenar un volumen de 343.58 hm3. Se debe indicar que las cotas deben
ser asumidas como relativas. Ver Plano PV-PG.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 11
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.1: Embalse Verde: Relación altura – área – volumen


ALTURA AREA VOLUMEN
COTA
Nº Desnivel Acum ulada Acumulada Acum ulado
(m.s.n.m .) (m) (m) (km2) (hm 3)
1 4,190.00 0.00 0.00 0.00 0.00
2 4,192.00 2.00 2.00 0.02 0.02
3 4,194.00 2.00 4.00 0.06 0.11
4 4,196.00 2.00 6.00 0.14 0.31
5 4,198.00 2.00 8.00 0.25 0.70
6 4,200.00 2.00 10.00 0.35 1.30
7 4,202.00 2.00 12.00 0.47 2.12
8 4,204.00 2.00 14.00 0.72 3.31
9 4,206.00 2.00 16.00 1.15 5.18
10 4,208.00 2.00 18.00 1.75 8.08
11 4,210.00 2.00 20.00 2.25 12.09
12 4,212.00 2.00 22.00 3.00 17.34
13 4,214.00 2.00 24.00 3.61 23.95
14 4,216.00 2.00 26.00 4.36 31.92
15 4,218.00 2.00 28.00 5.05 41.32
16 4,220.00 2.00 30.00 5.84 52.22
17 4,222.00 2.00 32.00 6.57 64.64
18 4,224.00 2.00 34.00 7.42 78.63
19 4,226.00 2.00 36.00 8.14 94.19
20 4,228.00 2.00 38.00 8.89 111.22
21 4,230.00 2.00 40.00 9.72 129.83
22 4,232.00 2.00 42.00 10.70 150.24
23 4,234.00 2.00 44.00 11.66 172.60
24 4,236.00 2.00 46.00 12.46 196.73
25 4,238.00 2.00 48.00 13.37 222.56
26 4,240.00 2.00 50.00 14.27 250.19
27 4,242.00 2.00 52.00 15.16 279.62
28 4,244.00 2.00 54.00 15.97 310.75
29 4,246.00 2.00 56.00 16.86 343.58

Área (km2)

18.000 16.000 14.000 12.000 10.000 8.000 6.000 4.000 2.000 0.000
4250.00

4240.00

4230.00
Cota (msnm)

4220.00

4210.00

4200.00

VOLUMEN
AREA
4190.00
0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00
Volumen (hm3)

Figura 1.2: Embalse Verde: Relación altura – área – volumen

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 12
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para el Embalse Verde según el Plano PV-PG, tiene una
extensión de 759.57 Km2, el mismo que está conformado por las subcuencas de los
ríos Paratía y Jarpaña. Mediante la utilización del método de Similitud de Cuencas y
a partir del registro de caudales de la estación hidrométrica río Verde correspondiente
al periodo 1964 - 2009, se generaron los caudales medios mensuales del río Verde en
el punto de interés (zona de cierre de la presa Verde), estimándose que el caudal
medio multianual es 10.88 m3/s, que es igual a un volumen total anual promedio de
338.52 hm3, para mayor detalle ver el Anexo 1.2.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.2 y su representación en el Figura 1.3.

Cuadro 1.2: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Verde, periodo 1964-2009.
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m 3/s ) 27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88
Volumen (hm3) 74.58 87.21 77.03 34.81 9.28 4.20 3.28 2.96 3.14 4.50 10.72 26.82 338.53

40.00

35.00

30.00
Caudal medio mensual (m3/s)

25.00

20.00

15.00
Qx
10.00

5.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

Meses

Figura 1.3: Caudales medios mensuales embalse Verde (m3/s), periodo 1964 – 2009
Qx = 10.88 m3/s (Vx = 338.53 hm3)

d) Recursos hídricos totales regulables


Los recursos hídricos totales medios regulables en el embalse Verde, para un
rendimiento hídrico estimado o asumido de R = 14.32 l/s/km2, lo constituyen los
recursos propios de la cuenca del río Verde hasta el punto de interés (zona de cierre
del embalse Verde), provenientes de un área total de cuenca colectora de A = 759.57
km2, siendo entonces el caudal medio multianual para el periodo 1964 – 2009 y su
correspondiente equivalente en volumen, igual a:

Q Total Verde = 10.88 m3/s; V Total Verde = 338.53 hm3/año

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 13
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Como toda estimación, los resultados obtenidos, estarían sujetos a validación


(confirmar o ajustar), cuando se disponga de información hidrométrica, suficiente y
confiable.

e) Disponibilidad de los recursos hídricos totales regulables en el embalse Verde


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales regulables, en el embalse Verde:

Cuadro 1.3: Disponibilidad de los recursos hídricos totales regulables en el embalse


Verde, periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88 Media
37.86 53.04 37.95 17.23 3.82 1.80 1.33 1.23 1.28 2.01 4.65 14.01 14.69 25%
CAUDAL (m3/s ) 25.67 32.92 27.15 9.84 2.81 1.52 1.20 1.04 1.02 1.55 2.75 8.06 9.63 50%
14.41 17.43 18.89 6.92 2.06 1.25 1.03 0.91 0.87 1.04 1.52 3.73 5.84 75%
10.74 10.37 7.18 4.11 1.65 1.09 0.87 0.75 0.71 0.81 1.10 2.41 3.48 90%
74.58 87.21 77.03 34.81 9.28 4.20 3.28 2.96 3.14 4.50 10.72 26.82 338.52 Media
101.41 128.32 101.65 44.66 10.24 4.67 3.56 3.30 3.33 5.38 12.05 37.54 456.11 25%
VOLUMEN (hm3) 68.75 79.63 72.72 25.50 7.54 3.94 3.21 2.78 2.64 4.15 7.13 21.58 299.58 50%
38.59 42.16 50.58 17.95 5.52 3.24 2.76 2.45 2.26 2.79 3.93 10.00 182.22 75%
28.76 25.08 19.24 10.65 4.42 2.83 2.32 2.02 1.84 2.16 2.84 6.46 108.61 90%

f) Diseño hidrológico del embalse Verde mediante simulación del balance hídrico
Para la simulación de la Alternativa 1, se ha considerado un volumen muerto de 57
hm3 (ver detalle en Anexo 1.4) y para el cálculo de volumen útil se ha variado en el
análisis desde 100 a 350 hm3, a fin de obtener los criterios de garantía y seguridad de
la satisfacción de la demanda esperados (ver detalle en Anexo 1.3).

En el Cuadro 1.4 se presenta un resumen de la simulación del embalse Verde y su


representación gráfica en la Figura 1.4, donde observamos que con una garantía de
91.85%, la capacidad del embalse debe ser de 100 hm3, al 98.73% de garantía el
volumen es de 350 hm3, razón por la cual se ha seleccionado una presa con un
volumen útil de 283 hm3. (98.55% de garantía mensual).

Cuadro 1.4: Simulación del embalse Verde.


Volumen
Volumen Total Volumen Útil
Muerto del Nº de Meses Garantía Índice de Balance
del Embalse del Embalse
Embalse Deficitarios Mensual (%) Déficit (ID) Hídrico
(MMC) (MMC)
(MMC)
57 157 100 45 91.85 3.45 De fi ci ta ri o
57 182 125 33 94.02 2.61 De fi ci ta ri o
57 207 150 24 95.65 1.99 Sa ti s fa ctori o
57 232 175 19 96.56 1.43 Sa ti s fa ctori o
57 257 200 16 97.10 0.88 Sa ti s fa ctori o
57 282 225 12 97.83 0.51 Sa ti s fa ctori o
57 307 250 10 98.19 0.33 Sa ti s fa ctori o
57 332 275 8 98.55 0.26 Sa ti s fa ctori o
57 340 283 8 98.55 0.24 Sa ti s fa ctori o
57 357 300 8 98.55 0.21 Sa ti s fa ctori o
57 382 325 8 98.55 0.19 Sa ti s fa ctori o
57 407 350 7 98.73 0.19 Sa ti s fa ctori o
Fuente: Elaboración propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 14
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

100.00

99.00

98.00

97.00

% Garantía 96.00

95.00

94.00

93.00

92.00

91.00
50 100 150 200 250 300 350 400
Volumen Útil (MMC)

Figura 1.4: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa Verde.

2.1.3. DESCRIPCIÓN DE LAS ESTRUCTURAS HIDRÁULICAS


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles
que permitirán regular los aportes hídricos del río Verde y su cuenca principalmente
durante el periodo de avenidas, para almacenar un volumen total de 340 hm3, de los
cuales 283 hm3 corresponden al volumen útil y 57 hm3 al volumen muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen
a continuación:

a) Presa Verde
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en
el paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en
la cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta
una profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son
suficientes para satisfacer las exigencias técnicas internacionales. El Talud aguas
arriba se recomienda se prolongue hasta una profundidad de 15.00 m
aproximadamente, por debajo del terreno natural hasta encontrar un material mucho
más compacto para el inicio de las excavaciones de la pantalla impermeable. Luego
del relleno del material que se encontrara sobre el concreto armado, se deberá de
colocar una cobertura de arcilla a manera de colchón de 1.00 m de espesor como
mínimo que se extenderá hacia aguas arriba de la presa, cuya función será la de evitar
que la presión del agua esté en contacto directo con la pantalla plástica de la
cimentación y reducir las pérdidas de agua por filtración. Ver Plano PV-ST.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 15
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Los principales parámetros de la presa Verde serían:


Nivel de la Corona : 4249.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4247.78 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,245.78 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,216.87 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,176.17 msnm.
Borde Libre : 1.30 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 1,185.00 m.
Altura máxima de presa (sobre el cauce) : 59.00 m.
Ancho máximo en la base de la presa : 243.00 m.
Espesor de los filtros : 1.00 m.
Espesor de Pantalla de concreto f’c = 245kg/cm2 : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 340 hm3.
Volumen útil : 283 hm3.
Volumen muerto (sedimentos) : 57 hm3.

b) Túnel de Desvío
El túnel de desvío, está proyectado en el estribo derecho, con una longitud total
aproximada de 850.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m
de base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m, siendo la cota de inicio del túnel 4,202.02 y la final 4,192.77 msnm.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía cuyo fondo alcanza la cota 4,187.84 msnm conformada de concreto armado
con resistencia de 245 kg/cm2, longitud igual a 61.88 m, ancho de 10.00 m y 8.38 m
de altura, además se ha previsto considerar a continuación de esta estructura,
enrocado de protección pesado, en una longitud de 25.00 m, 27.00 m de ancho y 2.00
m de espesor, colocado a una cota de 4,192.22 msnm.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 16
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Vertedero de Demasías, Canal de Fuga y Poza Disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de
25.00 m de longitud, el mismo que estará emplazado en el estribo derecho, externo
al cuerpo de la presa. La longitud total del vertedero de demasías será de 875.00 m,
longitud que considera al vertedero propiamente dicho y el canal de fuga (rápida) de
sección rectangular, a la poza disipadora de energía (Km 0+060 al Km 0+875). Ver
Plano PV-DD.

El vertedero de demasías permitirá evacuar un caudal máximo de 200 m3/s con un


tirante de 2.00 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se
presente el caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,245.78 msnm; tiene tres (03) vanos
de 8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual
se emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 655.00 m (km 0+120 a km 0+775), y será
de sección rectangular, con 15.00 m de ancho y altura de 5.00 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m (km 0+775 a


km 0+875), un ancho variable entre 15.00 y 25.00 m y altura máxima de 8.00 m con
taludes de 2:1 (H: V). Inmediatamente después de esta estructura, se ha considerado
la colocación de enrocado de protección en una longitud de 25.00 m y 2.00 m de
espesor.

2.1.4. COSTOS Y PRESUPUESTOS


El costo total estimado de esta alternativa de afianzamiento asciende a S/.
190’445,006.23, monto que incluye los gastos generales (12%), Gastos de
Supervisión (5%), Utilidad (10%) e IGV (19%), tal como se presenta en el Cuadro
1.5.

Cuadro 1.5: Costo total de la alternativa 1


Descripción Costo (S/.)
Costo Directo 126,014,031.78
Gastos Generales (12%) 15,121,683.81
Gastos de Supervisión (5%) 6,300,701.59
Utilidad (10%) 12,601,403.18
Presupuesto Parcial 160,037,820.36
IGV (19%) 30,407,185.87
Presupuesto Total 190,445,006.23

El detalle de los metrados y presupuesto de esta alternativa de afianzamiento se


presenta en el Anexo 1.7.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 17
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.2. ALTERNATIVA 2
2.2.1. DESCRIPCIÓN GENERAL DE LA ALTERNATIVA DE AFIANZAMIENTO
Esta alternativa de afianzamiento hídrico del Sistema Integral Lagunillas considera
el enfoque de la derivación de las aguas del río hacia el embalse Lagunillas,
sustentándose en el hecho de que actualmente en el Sistema Integral Lagunillas se
cuenta con infraestructura de regulación, como es la presa Lagunillas, la misma que
tiene un capacidad de almacenamiento total de 817.46 hm3, de los cuales 583.13 hm3
corresponden al volumen útil y 232.34 hm3 al volumen muerto (PELT, 2008).

Así mismo, se ha estimado que la oferta hídrica total anual promedio regulada en el
embalse Lagunillas es de 311.39 hm3, lo que hace evidente que en una situación
futura (100% del área bajo riego) el volumen almacenado en el embalse Lagunillas
siempre será inferior a su capacidad útil de almacenamiento, en razón a ello esta
alternativa de afianzamiento considera la derivación de 30 m3/s de las aguas del río
Verde (únicamente en los meses de mayor producción hídrica como enero, febrero y
marzo) hacia el embalse Lagunillas mediante la construcción de una bocatoma, un
canal de derivación y obras hidráulicas necesarias a lo largo del recorrido del canal
de derivación.
2.2.2. CAPTACIÓN RIO VERDE
a) Ubicación
Esta estructura estará ubicada en la margen derecha del curso del río Verde, aguas
abajo de la confluencia de los ríos Paratía y Jarpaña, a una altitud de 4,190 msnm y
coordenadas UTM estimadas de 316,454 Este y 8’277,384 Norte, Ver Plano BV-PG.

Para la determinación del lugar de emplazamiento de la estructura de captación


(bocatoma Verde), se ha considerado una cota de 4,169.80 msnm, para el punto de
entrega del canal de derivación río Verde – embalse Lagunillas (un metro adicional
a la cota de la cresta del vertedero de demasías de la presa Lagunillas, esto es 4,168.80
msnm), a esta cota se le ha adicionado la diferencia de desnivel entre el inicio y fin
del canal de derivación río Verde – embalse Lagunillas (canal diseñado con pendiente
no sedimentable) que es de 20.00 m aproximadamente, resultando una cota de 4,190
msnm, que es la cota que corresponde a la zona de emplazamiento de la bocatoma
Verde. Ver Foto 1.3.

De acuerdo a los estudios geofísicos efectuados en la zona de cierre de la alternativa


1(muy próximo a la zona de emplazamiento de la bocatoma Verde), se ha estimado
que la potencia del material gravoso depositado en el río Verde tiene una potencia
variada de 30 a 50 m, por lo que se presume que las mismas características
encontradas en la zona de cierre propuesta en la alternativa 1, se presentaría en el
lugar de emplazamiento de la bocatoma Verde, para mayor detalle revisar el Estudio
Geológico Preliminar de los Planteamientos Alternativos de Afianzamiento del
Sistema Integral Lagunillas que se presenta en el Anexo 1.1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 18
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Zona de
emplazamiento
Bocatoma Verde

Foto 1.3: Zona de emplazamiento de la bocatoma Verde – Alternativa 2.

b) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para la bocatoma Verde según el Plano BV-PG, tiene
una extensión de 759.57 Km2, el mismo que está conformado por las subcuencas de
los ríos Paratía y Jarpaña. Mediante la utilización del método de Similitud de Cuencas
y a partir del registro de caudales de la estación hidrométrica río Verde
correspondiente al periodo 1964 - 2009, se generaron los caudales medios mensuales
del río Verde en el punto de interés (zona de emplazamiento de la bocatoma Verde),
estimándose que el caudal medio multianual es 10.88 m3/s, que es igual a un volumen
total anual promedio de 338.52 hm3, para mayor detalle ver Anexo 1.2.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.6 y su representación en el Figura 1.5.

Cuadro 1.6: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
Bocatoma Verde, periodo 1964- 2009.
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m3/s) 27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88
Volumen (hm3) 74.58 87.21 77.03 34.81 9.28 4.20 3.28 2.96 3.14 4.50 10.72 26.82 338.53

Río Verde

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 19
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

40.00

35.00

30.00

Caudal medio mensual (m3/s)


25.00

20.00

15.00

Qx
10.00

5.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

Meses

Figura 1.5: Caudales medios mensuales bocatoma Verde (m3/s), periodo 1964 – 2009, Qx
= 10.88 m3/s (Vx = 338.53 hm3)

c) Disponibilidad de los recursos hídricos totales en la bocatoma Verde


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales disponibles en la bocatoma Verde:

Cuadro 1.7: Disponibilidad de los recursos hídricos totales en la bocatoma Verde,


periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88 Media
37.86 53.04 37.95 17.23 3.82 1.80 1.33 1.23 1.28 2.01 4.65 14.01 14.69 25%
CAUDAL (m3/s) 25.67 32.92 27.15 9.84 2.81 1.52 1.20 1.04 1.02 1.55 2.75 8.06 9.63 50%
14.41 17.43 18.89 6.92 2.06 1.25 1.03 0.91 0.87 1.04 1.52 3.73 5.84 75%
10.74 10.37 7.18 4.11 1.65 1.09 0.87 0.75 0.71 0.81 1.10 2.41 3.48 90%
74.58 87.21 77.03 34.81 9.28 4.20 3.28 2.96 3.14 4.50 10.72 26.82 338.52 Media
101.41 128.32 101.65 44.66 10.24 4.67 3.56 3.30 3.33 5.38 12.05 37.54 456.11 25%
VOLUMEN (hm3) 68.75 79.63 72.72 25.50 7.54 3.94 3.21 2.78 2.64 4.15 7.13 21.58 299.58 50%
38.59 42.16 50.58 17.95 5.52 3.24 2.76 2.45 2.26 2.79 3.93 10.00 182.22 75%
28.76 25.08 19.24 10.65 4.42 2.83 2.32 2.02 1.84 2.16 2.84 6.46 108.61 90%

2.2.3. CANAL DE DERIVACIÓN VERDE


a) Capacidad de conducción del canal de derivación Verde
Para la determinación de la capacidad de conducción del canal de derivación Verde,
en primer lugar, se determinó las curvas de duración para los meses de mayor
producción hídrica como enero, febrero y marzo, que en forma conjunta representan
el 70.55% del volumen total anual que discurre por el río Verde, en segundo lugar se
construyeron las curvas de utilización, y es a partir de estas que se definió la
capacidad de conducción del canal de derivación Verde.

 Curvas de duración para el canal de derivación Verde


Los caudales medios mensuales generados mediante el método de Similitud de
Cuencas, para los meses enero, febrero y marzo, fueron ordenados
descendentemente, calculándose sus probabilidades o niveles de persistencia
mediante el Método de Weibull, las mismas que se muestran en el Cuadro 1.5.2 del
Anexo 1.5, destacándose los valores de caudales al 50, 75 y 90% de persistencia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 20
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 Curvas de utilización para el canal de derivación Verde


Para obtener las Curvas de Utilización del canal de derivación Verde, se solucionó la
integral de cada una de las curvas de duración respectivas para los meses de mayor
producción hídrica como enero, febrero y marzo.

En los Cuadros 1.5.3 a 1.5.11 (enero), 1.5.12 a 1.5.21 (febrero) y 1.5.22 a 1.5.31
(marzo) del Anexo 1.5, se presenta el cálculo mes a mes de los valores respectivos
para la obtención de las Curvas de Utilización para diferentes capacidades de
conducción que van desde 15 a 60 m3/s, el resumen se muestra en el Cuadro 1.8 y los
diagramas en las Figuras 1.6 a 1.8.

Cuadro 1.8: Resumen de cálculos para la obtención de curvas de utilización


CAUDAL
CAUDAL CAPACIDAD CAUDAL
NO VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
MES EXISTENTE DEL CANAL CAPTADO
CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
27.22 15.00 13.78 13.44 3,353.57 100.00 1,697.81 50.63 1,655.77 49.37
27.22 20.00 17.14 10.08 3,353.57 100.00 2,111.55 62.96 1,242.03 37.04
27.22 25.00 20.01 7.21 3,353.57 100.00 2,465.35 73.51 888.22 26.49
27.22 30.00 22.20 5.02 3,353.57 100.00 2,735.69 81.58 617.89 18.42
27.22 35.00 23.91 3.31 3,353.57 100.00 2,945.59 87.83 407.98 12.17
ENERO
27.22 40.00 25.14 2.08 3,353.57 100.00 3,097.46 92.36 256.12 7.64
27.22 45.00 26.15 1.06 3,353.57 100.00 3,222.46 96.09 131.12 3.91
27.22 50.00 26.65 0.57 3,353.57 100.00 3,283.56 97.91 70.01 2.09
27.22 55.00 26.93 0.29 3,353.57 100.00 3,317.35 98.92 36.23 1.08
27.22 60.00 27.13 0.09 3,353.57 100.00 3,342.53 99.67 11.04 0.33
35.24 15.00 13.92 21.32 3,921.58 100.00 1,549.12 39.50 2,372.46 60.50
35.24 20.00 17.66 17.58 3,921.58 100.00 1,965.49 50.12 1,956.10 49.88
35.24 25.00 21.08 14.16 3,921.58 100.00 2,345.80 59.82 1,575.78 40.18
35.24 30.00 23.94 11.30 3,921.58 100.00 2,664.57 67.95 1,257.01 32.05
35.24 35.00 26.43 8.81 3,921.58 100.00 2,941.22 75.00 980.37 25.00
FEBRERO
35.24 40.00 28.48 6.76 3,921.58 100.00 3,169.43 80.82 752.16 19.18
35.24 45.00 30.13 5.11 3,921.58 100.00 3,353.33 85.51 568.25 14.49
35.24 50.00 31.50 3.74 3,921.58 100.00 3,505.25 89.38 416.33 10.62
35.24 55.00 32.70 2.54 3,921.58 100.00 3,639.05 92.80 282.53 7.20
35.24 60.00 33.65 1.59 3,921.58 100.00 3,744.81 95.49 176.77 4.51
28.11 15.00 13.77 14.35 3,463.82 100.00 1,696.42 48.98 1,767.40 51.02
28.11 20.00 17.61 10.51 3,463.82 100.00 2,169.40 62.63 1,294.42 37.37
28.11 25.00 20.95 7.17 3,463.82 100.00 2,580.72 74.50 883.11 25.50
28.11 30.00 23.32 4.80 3,463.82 100.00 2,872.71 82.93 591.11 17.07
28.11 35.00 25.13 2.99 3,463.82 100.00 3,095.90 89.38 367.93 10.62
MARZO
28.11 40.00 26.24 1.88 3,463.82 100.00 3,232.49 93.32 231.33 6.68
28.11 45.00 26.91 1.21 3,463.82 100.00 3,315.16 95.71 148.66 4.29
28.11 50.00 27.45 0.67 3,463.82 100.00 3,381.60 97.63 82.22 2.37
28.11 55.00 27.77 0.34 3,463.82 100.00 3,421.78 98.79 42.05 1.21
28.11 60.00 28.03 0.09 3,463.82 100.00 3,452.95 99.69 10.87 0.31

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 21
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

110
98.92 99.67
96.09 97.91
100 92.36
87.83
90 81.58
80 73.51
70 62.96

Volumen Captado (%)


60
50.63
50
40
30
20
10
0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Capacidad del Canal (m3/s)

Figura 1.6: Curva de utilización: Enero

110

100 95.49
92.80
89.38
90 85.51
80.82
80 75.00
67.95
70
Volumen Captado (%)

59.82
60
50.12
50
39.50
40

30

20

10

0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Capacidad del Canal (m3/s)

Figura 1.7: Curva de utilización: Febrero

110
97.63 98.79 99.69
100 93.32 95.71
89.38
90 82.93
80 74.50

70 62.63
60
Volumen Captado (%)

48.98
50

40
30

20

10
0
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00
Capacidad del Canal (m3/s)

Figura 1.8: Curva de utilización: Marzo


De los Gráficos 1.6 a 1.8 (Curvas de Utilización), puede decirse que con una
capacidad de conducción del canal de derivación Verde de 30.00 m3/s, se podría

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 22
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

captar al 81.58%, 67.95% y 82.93% los recursos hídricos de la cuenca para los meses
de: enero, febrero y marzo.

Asumiendo un 20% adicional de caudal para bordo libre, el canal de derivación verde
en su tramo final sería de 35 m3/s.

2.2.4. DESCRIPCIÓN DE LAS ESTRUCTURAS HIDRÁULICAS


Esta alternativa de afianzamiento está conformada por un conjunto de obras civiles
que permitirán derivar los aportes hídricos del río Verde y su cuenca, principalmente
durante el periodo de avenidas, con un caudal máximo de 30.00 m3/s.

Esta alternativa considera una serie de obras principales, las mismas que se describen
a continuación:

a) Barraje móvil y compuertas de limpia


El barraje será perpendicular al cauce y tendrá una longitud de 15.00 m, así mismo
estará implementando con cuatro (04) compuertas, cuya cota de fondo será 4,190.00
msnm, ya que esta misma estructura cumplirá la función de compuerta de limpia.

El canal de limpia tendrá un ancho promedio de 15.00 m, pendiente de 1.1%, y


espesor de 0.30 m, esta estructura se construirá de concreto armado de f’c = 175
kg/cm2, sobre este canal se ubicaran las compuertas de limpia o regulación, que
estarán apoyadas sobre pilares y el muro guía, las compuertas tendrán un ancho de
3.25 m y altura de 2.00 m, sobre los muros guía descansará el puente de maniobra, y
sobre este el mecanismo de izaje de las compuertas, que serán del tipo Tándem con
capacidad de izaje CP-12. El equipo de izaje será accionado manualmente o por un
grupo electrógeno que proporcionará energía para el accionamiento del sistema de
motoreductores con velocidad mínima de 1,750 RPM. Ver Plano BV-PG.

b) Estructura de captación u obra de toma


Es el orificio que permitirá el acceso del agua del río Verde al canal de derivación,
esta estructura permitirá derivar un caudal de 30.00 m3/s.

El sistema de captación estará compuesto por cinco (05) ventanas de captación, cuyas
dimensiones serán: 3.00 m de base y 0.85 m de altura, y se localizarán en una cota
de 4,190.40 msnm (cota de fondo de la ventana de captación), inmediatamente
después de las ventanas de captación, se ubicará una transición de 5.45 m de longitud
y la estructura de regulación que estará implementada con una compuerta de
regulación de 4.00 x 2.00 m, cuyo sistema de izaje será accionado manualmente o
por un grupo electrógeno. Ver Plano BV-PG

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 23
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Enrocado de protección
El enrocado de protección se localizará inmediatamente después del canal de limpia
y barraje móvil, este tendrá una longitud de 15.00 m y 1.00 m de espesor, asimismo
se le dotara de dos (02) uñas en los extremos con profundidades de 2.50 m cada una,
los mismos que llegaran hasta el nivel de cimentación proyectado.

El ancho de este enrocado de protección será igual a la suma del ancho del barraje
móvil y canal de limpia gruesa, estimándose que el diámetro nominal de la roca a
emplearse para esta estructura sería de 0.75 m.

d) Muros guía
Los muros guía son estructuras que permitirán controlar las aguas antes y después de
la estructura de capación, serán construidas de concreto armado de f’c= 175 Kg/cm2,
y cuyas dimensiones serán: 6.55 m de una altura, 0.75 m de ancho de corona y 2.75
m de base con una cota de cimentación igual a 4,187.45 msnm.

e) Canal de derivación
En el Cuadro 1.9 y Figura 1.9, se presenta las principales características hidráulicas
del canal de derivación Verde, el mismo que derivará hasta 30.00 m3/s de las aguas
del río Verde hasta el embalse Lagunillas, este canal estará revestido con concreto de
175 kg/cm2 y tendrá un espesor de 0.20 m.

Cuadro 1.9: Características hidráulicas del canal de derivación Verde


Progresi va Q S n b y A P R v H Z
Ca nal
De A m3/s (m/m) - (m) (m) (m2) (m) (m) (m/s ) (m) -
Deriva ci ón 0+000 32+200 30.00 0.001 0.02 3 2.287 12.09 9.468 1.277 2.4813 3 1

Figura 1.9: Sección típica del canal de derivación Verde

2.2.5. COSTOS Y PRESUPUESTOS


El costo total estimado de esta alternativa de afianzamiento asciende a S/.
156’989,574.21, monto que incluye los gastos generales (12%), Gastos de
Supervisión (5%), Utilidad (10%) e IGV (19%), tal como se presenta en el Cuadro
1.10.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 24
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.10: Costo total de la alternativa 2


Descripción Costo (S/.)
Costo Directo 103,877,174.76
Gastos Generales (12%) 12,465,260.97
Gastos de Supervisión (5%) 5,193,858.74
Utilidad (10%) 10,387,717.47
Presupuesto Parcial 131,924,011.79
IGV (19%) 25,065,562.27
Presupuesto Total 156,989,574.21
El detalle de los metrados y presupuesto de esta alternativa de afianzamiento se
presenta en el Anexo 1.7.

2.3. ALTERNATIVA 3
2.3.1. DESCRIPCIÓN GENERAL DE LA ALTERNATIVA DE AFIANZAMIENTO
Esta alternativa de afianzamiento hídrico del Sistema Integral Lagunillas considera
el enfoque de afianzamiento combinado, es decir la regulación de las aguas del río
Paratía en su propia cuenca mediante la construcción de una presa denominada
“Paratía”, localizada aguas arriba de la confluencia de los ríos Jarpaña y Paratía, con
un volumen útil de almacenamiento estimado de 200 hm3, y la derivación de 12 m3/s
de las aguas del río Jarpaña (únicamente en los meses de mayor producción hídrica
como enero, febrero y marzo) hacia el embalse Lagunillas mediante la construcción
de una bocatoma, un canal de derivación y obras hidráulicas necesarias a lo largo del
recorrido del canal de derivación.

2.3.2. PRESA PARATÍA


a) Zona de cierre
El eje de la presa Paratía fue ubicado en el curso del río Paratía, aproximadamente
en la cota 4,204 msnm y coordenadas UTM estimadas de 316,809 Este y 8’279,981
Norte, ver Foto 1.4.

La morfología local corresponde a un pequeño cañón, en sección transversal presenta


la forma de una "U", ambos estribos tienen pendientes sub-verticales y elevados. El
ancho a nivel de cauce es de 32 m aproximadamente, ampliándose la abertura a
medida que aumente la altura de la presa, la pendiente del cauce en el tramo
correspondiente a la zona de cierre es llana menor de 1 %. Ver Plano PP-PG.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 25
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Estribo Izquierdo

Área entre estribos

Estribo Derecho

Foto 1.4: Zona de cierre del embalse Paratía

Las consideraciones para la elección del cierre de la presa Verde fueron: 1) La


sección transversal debe de ser lo más estrecha posible, 2) Debe permitir almacenar
el mayor volumen posible. En la zona de cierre elegido, como resultado de la
evaluación geotécnica, se ha definido que el estribo izquierdo de 0.00 a ±2.00 m está
conformado por material coluvial (arena limosa con clastos y bloques subangulosos
de roca) y de 2.00 m a más, se observa la presencia de un substrato rocoso
conformado por ignimbritas rosado pálido blanquesino, la zona entre estribos de 0.00
a ±30.00 m está conformado por relleno aluvial (gravas y arena) del río Paratía, y de
30.00 m a más, se deduce la presencia de un substrato rocoso, conformado por
ignimbritas rosado pálido blanquesino, blanda con clastos de pumita color crema y
fragmentos de andesita lítica. El perfil estratigráfico del estribo derecho está
conformado por material morrénico y coluvial (arena limosa con clastos y bloques
subangulosos de roca), y de acuerdo a la configuración geomorfológica, en
profundidad se presumen se encontrará el mismo material, para mayor detalle revisar
el Estudio Geológico Preliminar de los Planteamientos Alternativos de
Afianzamiento del Sistema Integral Lagunillas que se presenta en el Anexo 1.1.

b) Zona de inundación
La zona de inundación comprende zonas adyacentes al curso del río Paratía, las aguas
embalsadas cubrirán en mayor medida terrazas conformadas por material morrénico
y coluvial y en menor proporción áreas de bofedales, así mismo se llegará a inundar
vías de acceso del tipo afirmadas a los centros poblados de Pampahuta – Paratía, en
una longitud aproximada de 5.70 km, ver Figura 1.10, Foto 1.5 y Planos PP-PG.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 26
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Centro Poblado
Pampahuta

Terrazas Bajas,
Río Paratía
Medias y Altas

Bofedales

Río Jarpaña Presa Paratía

Río Verde

Figura 1.10: Zona de inundación del embalse Paratía (Fuente: Imagen Google Earth)

Zona de Inundación
Embalse Paratía

Foto 1.5: Zona de inundación del embalse Paratía


La zona de inundación está limitada por ambas márgenes por cerros rocosos muy
elevados, formando un valle amplio, con sección transversal en forma de "U" abierta
y perfil asimétrico, si tomamos como referencia el curso principal del río Paratía en

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 27
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ambas márgenes la geomorfología de las laderas corresponde a Laderas Suaves (L-


s) las que se caracterizan por presentar pendientes inferiores a 30% y ausencia de
inestabilidad y deslizamientos, ver Foto 1.5 y Plano PP-PG.

El curso principal de drenaje es el río Paratía, el que conduce agua permanentemente,


durante la fase de reconocimiento de campo, se observó que el río Paratía transporta
muy poco material de arrastre y en suspensión, lo que se evidencia en la existencia
de poco material fino y bastante material grueso depositado en el lecho del cauce y
en la transparencia del agua del río Paratía.

El material de basamento de esta estructura está constituido por formaciones del


Grupo Palca y Tacaza, ver Plano GG-01.

Para mayor detalle revisar el Estudio Geológico Preliminar de los Planteamientos


Alternativos de Afianzamiento del Sistema Integral Lagunillas que se presenta en el
Anexo 1.1.

Al no disponerse de un levantamiento topográfico detallado de la zona de inundación


(vaso) del embalse Paratía, se ha construido la curva altura – área y volumen en base
a la topografía disponible del vaso obtenida por restitución, los datos se presentan en
el Cuadro 1.11 y se visualiza en la Figura 1.11, de donde se deduce que el área del
espejo de agua embalsada para una altura de presa de 50.48 m es de 12.60 km2 y
permite almacenar un volumen de 240 hm3. Se debe indicar que las cotas deben ser
asumidas como relativas. Ver Plano PV-PG.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 28
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.11: Embalse Paratía: Relación altura – área – volumen


ALTURA AREA VOLUMEN
COTA
Nº Desnivel Acumulada Acumulada Acumulado
(m.s.n.m.) (m) (m) (km2) (hm3)
1 4,204.00 0.00 0.00 0.00 0.00
2 4,206.00 2.00 2.00 0.05 0.06
3 4,208.00 2.00 4.00 0.16 0.27
4 4,210.00 2.00 6.00 0.36 0.79
5 4,212.00 2.00 8.00 0.53 1.67
6 4,214.00 2.00 10.00 0.90 3.11
7 4,216.00 2.00 12.00 1.33 5.33
8 4,218.00 2.00 14.00 1.77 8.43
9 4,220.00 2.00 16.00 2.19 12.38
10 4,222.00 2.00 18.00 2.58 17.14
11 4,224.00 2.00 20.00 2.92 22.64
12 4,226.00 2.00 22.00 3.25 28.82
13 4,228.00 2.00 24.00 3.59 35.66
14 4,230.00 2.00 26.00 3.98 43.23
15 4,232.00 2.00 28.00 4.45 51.66
16 4,234.00 2.00 30.00 4.97 61.08
17 4,236.00 2.00 32.00 5.59 71.63
18 4,238.00 2.00 34.00 6.26 83.48
19 4,240.00 2.00 36.00 6.96 96.70
20 4,242.00 2.00 38.00 7.70 111.36
21 4,244.00 2.00 40.00 8.63 127.69
22 4,246.00 2.00 42.00 9.49 145.81
23 4,248.00 2.00 44.00 10.25 165.55
24 4,250.00 2.00 46.00 11.04 186.85
25 4,252.00 2.00 48.00 11.77 209.66
26 4,254.00 2.00 50.00 12.44 233.88
27 4,256.00 2.00 52.00 13.12 259.43
28 4,258.00 2.00 54.00 13.86 286.42
29 4,260.00 2.00 56.00 14.67 314.95
30 4,262.00 2.00 58.00 15.46 345.09
31 4,264.00 2.00 60.00 16.24 376.79
32 4,266.00 2.00 62.00 16.96 410.00
33 4,268.00 2.00 64.00 17.61 444.57
34 4,270.00 2.00 66.00 18.24 480.42

Área (Km2)
20.00 18.00 16.00 14.00 12.00 10.00 8.00 6.00 4.00 2.00 0.00
4280.00

4270.00

4260.00

4250.00
Cota (msnm)

4240.00

4230.00

4220.00

4210.00
VOLUMEN
AREA
4200.00
0.00 50.00 100.00 150.00 200.00 250.00 300.00 350.00 400.00 450.00 500.00

Volumen (hm3)

Figura 1.11: Embalse Paratía: Relación altura – área – volumen

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 29
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para el Embalse paratía según el Plano PH-03, tiene una
extensión de 403.13 Km2, mediante la utilización del método de Similitud de
Cuencas y a partir del registro de caudales de la estación hidrométrica río Verde
correspondiente al periodo 1964 - 2009, se generaron los caudales medios mensuales
del río Paratía en el punto de interés (zona de cierre de la presa Paratía), estimándose
que el caudal medio multianual es 5.79 m3/s, que es igual a un volumen total anual
promedio de 180.26 hm3, para mayor detalle ver Anexo 1.4.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.12 y su representación en el Gráfico 1.12.

Cuadro 1.12: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Paratía, periodo 1964- 2009.
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m3/s) 14.83 19.20 15.31 7.15 1.84 0.86 0.65 0.59 0.64 0.89 2.20 5.33 5.79
Volumen (hm3) 39.71 46.44 41.02 18.53 4.94 2.24 1.75 1.58 1.67 2.39 5.71 14.28 180.26

20.00

18.00

16.00
Caudal medio mensual (m3/s)

14.00

12.00

Qx
10.00

8.00

6.00 Qx

4.00

2.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

Meses

Figura 1.12: Caudales medios mensuales embalse Paratía (m3/s), periodo 1964 – 2009,
Qx = 5.79 m3/s (Vx = 180.26 hm3)

d) Recursos hídricos totales regulables


Los recursos hídricos totales medios regulables en el Embalse Paratía, para un
rendimiento hídrico estimado o asumido de R = 14.36 l/s/km2, lo constituyen los
recursos propios de la cuenca del río Paratía hasta el punto de interés (zona de cierre
del embalse Paratía), provenientes de un área total de cuenca colectora de A = 403.13
Km2, siendo entonces el caudal medio multianual para el periodo 1964 – 2009 y su
correspondiente equivalente en volumen, igual a:

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 30
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Q Total Paratía = 5.79 m3/s; V Total Paratía = 180.26 hm3/año

Como toda estimación, los resultados obtenidos, estarían sujetos a validación


(confirmar o ajustar), cuando se disponga de información hidrométrica, suficiente y
confiable.

e) Disponibilidad de los recursos hídricos totales regulables en el embalse Paratía


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales regulables, en el embalse Paratía:

Cuadro 1.13: Disponibilidad de los recursos hídricos totales regulables en el embalse


Paratía, periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
14.83 19.20 15.31 7.15 1.84 0.86 0.65 0.59 0.64 0.89 2.20 5.33 5.79 Media
20.16 28.24 20.21 9.17 2.03 0.96 0.71 0.66 0.68 1.07 2.48 7.46 7.82 25%
CAUDAL (m3/s) 13.67 17.53 14.46 5.24 1.50 0.81 0.64 0.55 0.54 0.83 1.46 4.29 5.13 50%
7.67 9.28 10.06 3.69 1.10 0.67 0.55 0.49 0.46 0.55 0.81 1.99 3.11 75%
5.72 5.52 3.83 2.19 0.88 0.58 0.46 0.40 0.38 0.43 0.58 1.28 1.85 90%
39.71 46.44 41.02 18.53 4.94 2.24 1.75 1.58 1.67 2.39 5.71 14.28 180.25 Media
54.00 68.33 54.13 23.78 5.45 2.49 1.90 1.76 1.77 2.87 6.42 19.99 242.87 25%
VOLUMEN (hm3) 36.61 42.40 38.72 13.58 4.01 2.10 1.71 1.48 1.41 2.21 3.80 11.49 159.52 50%
20.55 22.45 26.93 9.56 2.94 1.73 1.47 1.30 1.20 1.48 2.09 5.33 97.03 75%
15.31 13.35 10.25 5.67 2.36 1.51 1.23 1.08 0.98 1.15 1.51 3.44 57.83 90%

f) Diseño hidrológico del embalse Paratía mediante simulación del balance hídrico
Para la simulación de la Alternativa 3, se ha considerado un volumen muerto de 57
hm3 (ver detalle en Anexo 1.4) y para el cálculo de volumen útil se ha variado en el
análisis desde 200 a 350 hm3, a fin de obtener los criterios de garantía y seguridad de
la satisfacción de la demanda esperados (ver detalle en Anexo 1.3).

En el Cuadro 1.14 y Figura 1.13 se presenta un resumen de la simulación del embalse


Paratía, donde observamos que con una garantía de 91.30%, la capacidad del embalse
debe ser de 50 hm3, al 96.92% de garantía el volumen es de 300 hm3, razón por la
cual se ha seleccionado una presa con un volumen útil de 200 hm3. (96.74% de
garantía mensual)

Cuadro 1.14: Simulación del embalse Paratía


Volumen
Volumen Total Volumen Útil
Muerto del Nº de Meses Garantía Índice de Balance
del Embalse del Embalse
Embalse Deficitarios Mensual (%) Déficit (ID) Hídrico
(MMC) (MMC)
(MMC)
40 90 50 48 91.30 3.41 Defici ta rio
40 115 75 37 93.30 2.60 Sa ti s fa ctorio
40 140 100 29 94.75 2.05 Sa ti s fa ctorio
40 165 125 23 95.83 1.65 Sa ti s fa ctorio
40 190 150 21 96.20 1.30 Sa ti s fa ctorio
40 215 175 19 96.56 1.12 Sa ti s fa ctorio
40 240 200 18 96.74 1.00 Sa ti s fa ctorio
40 265 225 18 96.74 0.96 Sa ti s fa ctorio
40 290 250 18 96.74 0.94 Sa ti s fa ctorio
40 315 275 18 96.74 0.94 Sa ti s fa ctorio
40 340 300 17 96.92 0.92 Sa ti s fa ctorio
Fuente: Elaboración propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 31
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

98.00

97.00

96.00

95.00

% Garantía
94.00

93.00

92.00

91.00
25 50 75 100 125 150 175 200 225 250 275 300 325
Volumen Útil (MMC)

Figura 1.13: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa Paratía.

2.3.3. CAPTACIÓN RIO JARPAÑA


a) Ubicación
Esta estructura estará ubicada en la margen derecha del curso del río Jarpaña, aguas
abajo de la confluencia de los ríos Quillisani y Jolpamayo a una altitud de 4,341
msnm y coordenadas UTM estimadas de 308,886 Este y 8’282,715 Norte, Ver Foto
1.6 y Plano BJ-PG.

Para la determinación del lugar de emplazamiento de la estructura de captación


(bocatoma Jarpaña), se ha establecido como principal criterio que esta estructura
debe de captar la mayor cantidad posible del total de la producción hídrica del río
Jarpaña y su cuenca.

De acuerdo al estudio geológico preliminar efectuado en la zona de emplazamiento


de la bocatoma Jarpaña, se ha determinado que los suelos en los que se cimentarán
las estructuras de la captación están constituidos por depósitos aluviales del río
Jarpaña, que se caracterizan por ser una mezcla heterométrica de arenas, gravas,
guijarros y cantos rodados, que carecen de cohesión y que solo están unidos por
presión y contacto, por lo que la cimentación del barraje y obras de captación deberán
de alcanzar profundidades de 5,00 m por debajo del lecho actual del río, para mayor
detalle revisar el Estudio Geológico Preliminar de los Planteamientos Alternativos
de Afianzamiento del Sistema Integral Lagunillas que se presenta en el Anexo 1.1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 32
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Zona de
emplazamiento
Bocatoma Jarpaña

Foto 1.6: Zona de emplazamiento de la bocatoma Verde – Alternativa 2.

b) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para la bocatoma Jarpaña según el Plano PH-03, tiene
una extensión de 273.34 Km2, el mismo que está conformado por las subcuencas de
los ríos Quillisani y Jolpamayo. Mediante la utilización del método de Similitud de
Cuencas y a partir del registro de caudales de la estación hidrométrica río Verde
correspondiente al periodo 1964 - 2009, se generaron los caudales medios mensuales
del río Jarpaña en el punto de interés (zona de emplazamiento de la bocatoma
Jarpaña), estimándose que el caudal medio multianual es 4.00 m3/s, que es igual a un
volumen total anual promedio de 124.52 hm3, para mayor detalle ver el Anexo 1.2.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.15 y su representación en el Gráfico 1.14.

Cuadro 1.15: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
Bocatoma Jarpaña, periodo 1964- 2009.
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m3/s) 10.24 13.26 10.58 4.94 1.27 0.60 0.45 0.41 0.45 0.62 1.52 3.68 4.00
Volumen (hm3) 27.43 32.08 28.33 12.80 3.41 1.55 1.21 1.09 1.15 1.65 3.94 9.87 124.51

Río Verde

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 33
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Qx

Figura 1.14: Caudales medios mensuales bocatoma Jarpaña (m3/s), periodo 1964 – 2009,
Qx = 4.00 m3/s (Vx = 124.52 hm3)

c) Disponibilidad de los recursos hídricos totales en la bocatoma Jarpaña


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales disponibles en la bocatoma Jarpaña:

Cuadro 1.16: Disponibilidad de los recursos hídricos totales en la bocatoma Jarpaña,


periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
10.24 13.26 10.58 4.94 1.27 0.60 0.45 0.41 0.45 0.62 1.52 3.68 4.00 Media
13.93 19.51 13.96 6.34 1.41 0.66 0.49 0.45 0.47 0.74 1.71 5.15 5.40 25%
CAUDAL (m3/s) 9.44 12.11 9.99 3.62 1.04 0.56 0.44 0.38 0.38 0.57 1.01 2.96 3.54 50%
5.30 6.41 6.95 2.55 0.76 0.46 0.38 0.34 0.32 0.38 0.56 1.37 2.15 75%
3.95 3.81 2.64 1.51 0.61 0.40 0.32 0.28 0.26 0.30 0.40 0.89 1.28 90%
27.43 32.08 28.33 12.80 3.41 1.55 1.21 1.09 1.15 1.65 3.94 9.87 124.52 Media
37.30 47.20 37.39 16.43 3.76 1.72 1.31 1.22 1.22 1.98 4.43 13.81 167.77 25%
VOLUMEN (hm3) 25.29 29.29 26.75 9.38 2.77 1.45 1.18 1.02 0.97 1.53 2.62 7.94 110.19 50%
14.19 15.51 18.61 6.60 2.03 1.19 1.02 0.90 0.83 1.02 1.45 3.68 67.03 75%
10.58 9.22 7.08 3.92 1.63 1.04 0.85 0.74 0.68 0.79 1.05 2.38 39.95 90%

d) Capacidad de conducción del canal de derivación Jarpaña


Para la determinación de la capacidad de conducción del canal de derivación Jarpaña,
en primer lugar, se determinó las curvas de duración para los meses de mayor
producción hídrica como enero, febrero y marzo, que en forma conjunta representan
el 70.55% del volumen total anual que discurre por el río Jarpaña, en segundo lugar
se construyeron las curvas de utilización, y es a partir de estas que se definió la
capacidad de conducción del canal de derivación Jarpaña.

 Curvas de duración para el canal de derivación Jarpaña


Los caudales medios mensuales generados mediante el método de Similitud de
Cuencas, para los meses enero, febrero y marzo, fueron ordenados
descendentemente, calculándose sus probabilidades o niveles de persistencia
mediante el Método de Weibull, las mismas que se muestran en el Cuadro 1.5.33 del
Anexo 1.5, destacándose los valores de caudales al 50, 75 y 90% de persistencia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 34
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 Curvas de utilización para el canal de derivación Jarpaña


Para obtener las Curvas de Utilización del canal de derivación Jarpaña, se solucionó
la integral de cada una de las curvas de duración respectivas para los meses de mayor
producción hídrica como enero, febrero y marzo.

En los Cuadros 1.5.34 a 1.5.43 (enero), 1.5.44 a 1.5.53 (febrero) y 1.5.54 a 1.5.63
(marzo) del Anexo 1.5, se presenta el cálculo mes a mes de los valores respectivos
para la obtención de las Curvas de Utilización para diferentes capacidades de
conducción que van desde 6.00 a 24.00 m3/s, el resumen se muestra en el Cuadro
1.17 y los diagramas en las Figuras 1.15 a 1.17.

Cuadro 1.17: Resumen de cálculos para la obtención de curvas de utilización


CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
MES EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
10.17 6.00 5.42 4.75 1,253.07 100.00 668.33 53.34 584.74 46.66
10.17 8.00 6.73 3.44 1,253.07 100.00 829.09 66.16 423.98 33.84
10.17 10.00 7.80 2.37 1,253.07 100.00 960.52 76.65 292.55 23.35
10.17 12.00 8.57 1.60 1,253.07 100.00 1,056.32 84.30 196.75 15.70
10.17 14.00 9.19 0.98 1,253.07 100.00 1,131.89 90.33 121.18 9.67
ENERO
10.17 16.00 9.62 0.55 1,253.07 100.00 1,185.60 94.62 67.47 5.38
10.17 18.00 9.90 0.27 1,253.07 100.00 1,219.60 97.33 33.47 2.67
10.17 20.00 10.04 0.13 1,253.07 100.00 1,236.58 98.68 16.49 1.32
10.17 22.00 10.12 0.05 1,253.07 100.00 1,247.29 99.54 5.77 0.46
10.17 24.00 10.17 0.00 1,253.07 100.00 1,253.07 100.00 0.00 0.00
13.17 6.00 5.51 7.66 1,465.31 100.00 613.10 41.84 852.21 58.16
13.17 8.00 6.97 6.20 1,465.31 100.00 775.68 52.94 689.62 47.06
13.17 10.00 8.28 4.89 1,465.31 100.00 921.33 62.88 543.97 37.12
13.17 12.00 9.34 3.82 1,465.31 100.00 1,039.77 70.96 425.54 29.04
13.17 14.00 10.28 2.89 1,465.31 100.00 1,143.56 78.04 321.74 21.96
FEBRERO
13.17 16.00 11.01 2.16 1,465.31 100.00 1,225.26 83.62 240.05 16.38
13.17 18.00 11.59 1.58 1,465.31 100.00 1,289.93 88.03 175.38 11.97
13.17 20.00 12.09 1.07 1,465.31 100.00 1,345.74 91.84 119.56 8.16
13.17 22.00 12.51 0.66 1,465.31 100.00 1,392.33 95.02 72.98 4.98
13.17 24.00 12.74 0.43 1,465.31 100.00 1,417.86 96.76 47.44 3.24
10.50 6.00 5.46 5.05 1,294.26 100.00 672.50 51.96 621.76 48.04
10.50 8.00 6.96 3.55 1,294.26 100.00 856.94 66.21 437.32 33.79
10.50 10.00 8.17 2.34 1,294.26 100.00 1,006.49 77.77 287.78 22.23
10.50 12.00 9.01 1.50 1,294.26 100.00 1,109.78 85.75 184.48 14.25
10.50 14.00 9.64 0.87 1,294.26 100.00 1,187.43 91.75 106.83 8.25
MARZO
10.50 16.00 9.95 0.56 1,294.26 100.00 1,225.63 94.70 68.64 5.30
10.50 18.00 10.20 0.31 1,294.26 100.00 1,256.30 97.07 37.96 2.93
10.50 20.00 10.34 0.16 1,294.26 100.00 1,274.13 98.44 20.14 1.56
10.50 22.00 10.45 0.05 1,294.26 100.00 1,287.96 99.51 6.31 0.49
10.50 24.00 10.50 0.00 1,294.26 100.00 1,294.26 100.00 0.00 0.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 35
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Figura 1.15: Curva de utilización: Enero

Figura 1.16: Curva de utilización: Febrero

Figura 1.17: Curva de utilización: Marzo


De las Figuras 1.15 a 1.17 (Curvas de Utilización), puede decirse que con una
capacidad de conducción del canal de derivación Jarpaña de 12.00 m3/s, se podría

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 36
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

captar al 84.30%, 70.96% y 85.75% los recursos hídricos de la cuenca para los meses
de: enero, febrero y marzo.

Asumiendo un 20% adicional de caudal para bordo libre, el canal de derivación


Jarpaña en su tramo final sería de 14.4 m3/s.

2.3.4. DESCRIPCIÓN DE LAS OBRAS CIVILES


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles
que permitirán regular y derivar los aportes hídricos de los ríos Paratía y Jarpaña,
principalmente durante el periodo de avenidas.

Esta alternativa considera una serie de obras principales, las mismas que se
describen a continuación:

a) Presa Paratía
Se prevé la construcción de una presa con material homogéneo y pantalla de
concreto F’c = 210 kg/cm2 y acero de refuerzo con distribución horizontal y vertical
de ½” diámetro y espaciamientos de 0.30 m en el paramento mojado de la presa, así
mismo se deberá de efectuar un tratamiento en la cimentación consistente en
inyecciones de cemento o pantallas de bentonita, hasta una profundidad de 50.00
m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son
suficientes para satisfacer las exigencias técnicas internacionales. El Talud aguas
arriba se recomienda se prolongue hasta una profundidad de 15.00 m
aproximadamente, por debajo del terreno natural hasta encontrar un material mucho
más compacto para el inicio de las excavaciones de la pantalla impermeable. Luego
del relleno del material que se encontrara sobre el concreto armado, se deberá de
colocar una cobertura de arcilla a manera de colchón de 1.00 m de espesor como
mínimo que se extenderá hacia aguas arriba de la presa, cuya función será la de
evitar que la presión del agua esté en contacto directo con la pantalla plástica de la
cimentación y reducir las pérdidas de agua por filtración. Ver Plano PGAI-01 en el
Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Paratía serían:


Nivel de la Corona : 4256.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4254.78 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,252.48 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,229.15 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,214.15 msnm.
Borde Libre : 1.22 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 1,490.00 m.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 37
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Altura máxima de presa (sobre el cauce) : 52.00 m.


Ancho máximo en la base de la presa : 220.00 m.
Espesor de los filtros : 1.00 m.
Espesor de Pantalla de concreto f’c = 245kg/cm2 : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 240 hm3.
Volumen útil : 200 hm3.
Volumen muerto (sedimentos) : 40 hm3.

b) Túnel de desvío
El túnel de desvío, está proyectado en el estribo derecho, con una longitud total
aproximada de 675.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que
tendrá una sección hidráulica tipo baúl, compuesta por una sección rectangular de
5.00 m de base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio,
revestida de concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00
cm, para las sección circular y rectangular, respectivamente. La pendiente del túnel
será de 0.011 m/m, siendo la cota de inicio del túnel 4,224.15 y la final 4,216.73
msnm.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora
de energía cuyo fondo alcanza la cota 4,187.84 msnm conformada de concreto
armado con resistencia de 245 kg/cm2, longitud igual a 61.88 m, ancho de 10.00 m
y 8.38 m de altura, además se ha previsto considerar a continuación de esta
estructura, enrocado de protección pesado, en una longitud de 25.00 m, 27.00 m de
ancho y 2.00 m de espesor.

c) Vertedero de demasías, canal de fuga y poza disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de
25.00 m de longitud, el mismo que estará emplazado en el estribo derecho, externo
al cuerpo de la presa. La longitud total del vertedero de demasías será de 750.00 m,
longitud que considera al vertedero propiamente dicho y el canal de fuga (rápida)
de sección rectangular, a la poza disipadora de energía (Km 0+060 al Km 0+750).
Ver Plano PP-PP en el Anexo 1.8. Plano Vertedero.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 38
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El vertedero de demasías permitirá evacuar un caudal máximo de 210 m3/s con un


tirante de 2.30 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se
presente el caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,252.48 msnm; tiene tres (03) vanos
de 8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual
se emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de
f’c=245 kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 655.00 m (km 0+120 a km 0+775), y será
de sección rectangular, con 15.00 m de ancho y altura de 2.50 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m (km 0+775 a


km 0+875), un ancho variable entre 15.00 y 25.00 m y altura máxima de 8.00 m
con taludes de 2:1 (H: V). Inmediatamente después de esta estructura, se ha
considerado la colocación de enrocado de protección en una longitud de 25.00 m y
2.00 m de espesor.

d) Barraje fijo
Él barraje será perpendicular al cauce del río Jarpaña y tendrá una longitud de 23.50
m, el perfil será tipo Creager y la cota de la cresta será 4,329.35 msnm, el azud
proyectado será de concreto ciclópeo de 175 kg/cm2 + 30% PM, con un talud de
1:1.5, la curva de enlace tiene un radio de 2.75 m que une el azud con el colchón de
disipación que será construido de concreto simple de 175 kg/cm2 + 30% PM y 1.00
m de espesor, siendo la longitud de este último 10.50 m. Ver Plano BJ-DC.

e) Canal de limpia
El canal de limpia tendrá un ancho promedio de 5.75 m, pendiente de 1.1%, y
espesor de 0.30 m, esta estructura se construirá de concreto armado de f’c = 175
kg/cm2, sobre este canal se ubicaran las compuertas de limpia o regulación, que
estarán apoyadas sobre pilares y el muro guía, las compuertas tendrán un ancho de
2.50 m y altura de 1.60 m, sobre los muros guía descansará el puente de maniobra,
y sobre este el mecanismo de izaje de las compuertas, que serán del tipo Tándem
con capacidad de izaje CP-12. El equipo de izaje será accionado manualmente o
por un grupo electrógeno que proporcionará energía para el accionamiento del
sistema de motoreductores con velocidad mínima de 1,750 RPM. Ver Plano PGAI-
01 en el Anexo 1.8. Plano Bocatoma.

f) Estructura de captación u obra de toma


Es el orificio que permitirá el acceso del agua del río Jarpaña al canal de derivación,
esta estructura permitirá derivar un caudal de 12.00 m3/s.
El sistema de captación estará compuesto por dos (02) ventanas de captación, cuyas
dimensiones serán: 4.00 m de base y 0.80 m de altura, y se localizarán en una cota

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 39
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

de 4,328.40 msnm (cota de fondo de la ventana de captación), inmediatamente


después de las ventanas de captación, se ubicará una transición de 5.45 m de
longitud y la estructura de regulación que estará implementada con una compuerta
de regulación de 3.00 x 1.40 m, cuyo sistema de izaje será accionado manualmente
o por un grupo electrógeno. Ver Plano BJ-DA en el Anexo 1.8. Plano Bocatoma.

g) Enrocado de protección
El enrocado de protección se localizará inmediatamente después del canal de limpia
y barraje móvil, este tendrá una longitud de 15.00 m y 1.00 m de espesor, asimismo
se le dotara de dos (02) uñas en los extremos con profundidades de 2.50 m cada
una, los mismos que llegaran hasta el nivel de cimentación proyectado.

El ancho de este enrocado de protección será igual a la suma del ancho del barraje
móvil y canal de limpia gruesa, estimándose que el diámetro nominal de la roca a
emplearse para esta estructura sería de 0.75 m.

h) Muros guía
Los muros guía son estructuras que permitirán controlar las aguas antes y después
de la estructura de capación, serán construidas de concreto armado de f’c= 175
Kg/cm2, y cuyas dimensiones serán: 6.00 m de una altura, 0.75 m de ancho de
corona y 2.75 m de base con una cota de cimentación igual a 4,325.45 msnm.

i) Canal de derivación
En el Cuadro 1.18 y Figura 1.18, se presenta las principales características
hidráulicas del canal de derivación Jarpaña, el mismo que derivará hasta 12.00 m3/s
de las aguas del río Jarpaña hasta el embalse Lagunillas, este canal estará revestido
con concreto de 175 kg/cm2 y tendrá un espesor de 0.20 m.

Cuadro 1.18: Características hidráulicas del canal de derivación Verde


Progresi va Q S n b y A P R v H Z
Ca nal
De A m3/s (m/m) - (m) (m) (m2) (m) (m) (m/s ) (m) -
Deriva ci ón 0+000 21+700 12.00 0.001 0.02 2 1.659 6.0735 6.694 0.907 1.9758 2.2 1

Figura 1.18: Sección típica del canal de derivación Jarpaña

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 40
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El canal de derivación Jarpaña tendrá una longitud total de 24.00 km, de los cuales
21.70 km corresponden a un canal de sección trapezoidal y los 2.30 km restantes a
un túnel tipo bóveda, tal como se detalla en el Cuadro 1.19.

Cuadro 1.19: Detalle del canal de derivación Jarpaña


Progresiva Caudal Longitud
Tipo Sección
De A (m3/seg) (m)
Canal 0+000 21+700 12 21,700 Trapezoidal
Túnel 21+700 24+000 12 2,300 Túnel tipo bóveda

2.3.5. COSTOS Y PRESUPUESTOS


El costo total estimado de esta alternativa de afianzamiento asciende a S/.
336’447,370.28, monto que incluye los gastos generales (12%), Gastos de
Supervisión (5%), Utilidad (10%) e IGV (19%), tal como se presenta en el Cuadro
1.20.

Cuadro 1.20: Costo total de la alternativa 3


Descripción Costo (S/.)
Costo Directo 222,621,167.40
Gastos Generales (12%) 26,714,540.08
Gastos de Supervisión (5%) 11,131,058.37
Utilidad (10%) 22,262,116.74
Presupuesto Parcial 282,728,882.59
IGV (19%) 53,718,487.69
Presupuesto Total 336,447,370.28

El detalle de los metrados y presupuesto de esta alternativa de afianzamiento se


presenta en el Anexo 1.7.

2.4. ALTERNATIVA 4
2.4.1. DESCRIPCIÓN GENERAL DE LA ALTERNATIVA DE AFIANZAMIENTO
Esta alternativa de afianzamiento hídrico del Sistema Integral Lagunillas considera
el enfoque de la regulación de las aguas de los ríos Paratía y Jarpaña en su propia
cuenca, mediante la construcción de dos presas denominadas Paratía y Jarpaña, con
volúmenes útiles de almacenamiento de 200 y 133 hm3, respectivamente.

2.4.2. PRESA PARATÍA


La descripción de la zona de cierre, zona de inundación, generación de caudales
medios mensuales en el área de estudio, los recursos hídricos totales regulables, la
disponibilidad de los recursos hídricos totales regulables en el embalse, el diseño

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 41
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

hidrológico del embalse mediante simulación del balance hídrico, así como la
descripción de las obras civiles del embalse Paratía fueron desarrolladas en los ítems
3.3.2 y 3.3.4 correspondientes a la alternativa de afianzamiento 3, por lo que, para
conocer el detalle del mismo, se deberá de recurrir a los ítems antes mencionados.

2.4.3. PRESA JARPAÑA


a) Zona de cierre
El eje de la presa Jarpaña fue ubicado en el curso del río Jarpaña, aproximadamente
en la cota de 4,328 msnm y coordenadas UTM estimadas de 309,695 Este y
8’281,055 Norte, ver Foto 1.7.

Estribo Derecho Estribo Izquierdo

Área entre estribos

Foto 1.7: Zona de cierre del embalse Jarpaña

La morfología local corresponde a un pequeño cañón, en sección transversal presenta


la forma de una "U" abierta, ambos estribos tienen pendientes sub-verticales y
elevados. El ancho a nivel de cauce es de 21.00 m aproximadamente, ampliándose la
abertura a medida que aumente la altura de la presa, la pendiente del cauce en el
tramo correspondiente a la zona de cierre es fuerte mayor de 7 %. Ver Plano PJ-PG.
Las consideraciones para la elección del cierre de la presa Jarpaña fueron: 1) La
sección transversal debe de ser lo más estrecha posible, 2) Debe permitir almacenar
el mayor volumen posible. En la zona de cierre elegido, como resultado de la
evaluación geotécnica, se ha definido que el estribo izquierdo de 0.00 m a más
presenta un substrato rocoso conformado por ignimbritas rosado pálido blanquecino
con formas escarpadas, en la zona entre estribos de 0.00 m a más, se deduce la
presencia de un substrato rocoso, conformado por ignimbritas rosado pálido
blanquecino está conformado por relleno aluvial (gravas y arena) del río Paratía, y
de 30.00 m a más, se deduce la presencia de un substrato rocoso, conformado por
ignimbritas rosado pálido blanquecino, blanda con clastos de pumita color crema y
fragmentos de andesita lítica, con muy poca cobertura de material aluvial. El perfil
estratigráfico del estribo derecho está conformado por substrato rocoso, conformado
por ignimbritas rosado pálido blanquecino, blanda, con clastos de pumita color crema

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 42
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

y fragmentos de andesita lítica, con fragmentos y bloques en superficie, para mayor


detalle revisar el Estudio Geológico Preliminar de los Planteamientos Alternativos
de Afianzamiento del Sistema Integral Lagunillas que se presenta en el Anexo 1.1.

b) Zona de inundación
La zona de inundación comprende zonas adyacentes al curso del río Jarpaña, las
aguas embalsadas cubrirán en mayor medida terrazas conformadas por material
morrénico y coluvial y en menor proporción áreas de bofedales, así mismo se llegará
a inundar vías de acceso del tipo afirmadas a los centros poblados de Jarpaña y
Quillisani, en una longitud aproximada de 8.30 km, ver Figura 1.19, Foto 1.8 y Plano
PJ-PG.

Terrazas Bajas, y
Medias

Bofedales

Río Quillisani

Centro Poblado
Jarpaña

Río Jolpamayo Río Jarpaña

Presa Jarpaña

Figura 1.19: Zona de inundación del embalse Jarpaña (Fuente: Imagen Google Earth)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 43
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Foto 1.8: Zona de inundación del embalse Jarpaña

La zona de inundación está limitada por ambas márgenes por cerros rocosos muy
elevados, formando un valle amplio, con sección transversal en forma de "U" abierta
y perfil asimétrico, si tomamos como referencia el curso principal del río Jarpaña en
ambas márgenes la geomorfología de las laderas corresponde a Laderas Suaves (L-
s) las que se caracterizan por presentar pendientes inferiores a 30% y ausencia de
inestabilidad y deslizamientos, ver Foto 08 y Plano PJ-PG.

El curso principal de drenaje es el río Jarpaña, el que conduce agua permanentemente,


durante la fase de reconocimiento de campo, se observó que el río Jarpaña transporta
muy poco material de arrastre y en suspensión, lo que se evidencia en la existencia
de poco material fino y bastante material grueso depositado en el lecho del cauce y
en la transparencia del agua del río Jarpaña.

El material de basamento de esta estructura está constituido por formaciones del


Grupo Palca y Tacaza, ver Plano GG-01.

Para mayor detalle revisar el Estudio Geológico Preliminar de los Planteamientos


Alternativos de Afianzamiento del Sistema Integral Lagunillas que se presenta en el
Anexo 1.1.

Al no disponerse de un levantamiento topográfico detallado de la zona de inundación


(vaso) del embalse Jarpaña, se ha construido la curva altura – área y volumen en base
a la topografía disponible del vaso obtenida por restitución, los datos se presentan en
el Cuadro 1.21 y se visualiza en el Figura 1.20, de donde se deduce que el área del
espejo de agua embalsada para una altura de presa de 72.00m es de 4.52 km2 y

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 44
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

permite almacenar un volumen de 159 hm3. Se debe indicar que las cotas deben ser
asumidas como relativas. Ver Plano PJ-PG

Cuadro 1.21: Embalse Jarpaña: Relación altura – área – volumen


ALTURA AREA VOLUMEN
COTA
Nº De snivel Acum ulada Acumulada Acumulado
(m.s.n.m.) (m) (m) (km 2) (hm3)
1 4,328.00 0.00 0.00 0.00 0.00
2 4,330.00 2.00 2.00 0.01 0.01
3 4,332.00 2.00 4.00 0.04 0.05
4 4,334.00 2.00 6.00 0.10 0.19
5 4,336.00 2.00 8.00 0.16 0.45
6 4,338.00 2.00 10.00 0.22 0.83
7 4,340.00 2.00 12.00 0.28 1.32
8 4,342.00 2.00 14.00 0.48 2.09
9 4,344.00 2.00 16.00 0.69 3.26
10 4,346.00 2.00 18.00 0.90 4.84
11 4,348.00 2.00 20.00 1.10 6.83
12 4,350.00 2.00 22.00 1.24 9.17
13 4,352.00 2.00 24.00 1.37 11.78
14 4,354.00 2.00 26.00 1.57 14.72
15 4,356.00 2.00 28.00 1.78 18.07
16 4,358.00 2.00 30.00 1.94 21.79
17 4,360.00 2.00 32.00 2.10 25.83
18 4,362.00 2.00 34.00 2.23 30.16
19 4,364.00 2.00 36.00 2.35 34.74
20 4,366.00 2.00 38.00 2.46 39.56
21 4,368.00 2.00 40.00 2.58 44.61
22 4,370.00 2.00 42.00 2.73 49.92
23 4,372.00 2.00 44.00 2.89 55.54
24 4,374.00 2.00 46.00 3.02 61.45
25 4,376.00 2.00 48.00 3.14 67.62
26 4,378.00 2.00 50.00 3.27 74.03
27 4,380.00 2.00 52.00 3.39 80.69
28 4,382.00 2.00 54.00 3.50 87.58
29 4,384.00 2.00 56.00 3.62 94.70
30 4,386.00 2.00 58.00 3.73 102.05
31 4,388.00 2.00 60.00 3.84 109.62
32 4,390.00 2.00 62.00 3.95 117.42
33 4,392.00 2.00 64.00 4.07 125.44
34 4,394.00 2.00 66.00 4.18 133.69
35 4,396.00 2.00 68.00 4.29 142.16
36 4,398.00 2.00 70.00 4.41 150.86
37 4,400.00 2.00 72.00 4.52 159.79

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 45
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Área (km2)
5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 0.00
4,410.00

4,400.00

4,390.00

4,380.00
Cota (msnm)

4,370.00

4,360.00

4,350.00

4,340.00

4,330.00 VOLUMEN
AREA
4,320.00
0.00 20.00 40.00 60.00 80.00 100.00 120.00 140.00 160.00
Volumen (hm3)

Figura 1.20: Embalse Jarpaña: Relación altura – área – volumen

c) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para el Embalse Jarpaña según el Plano PH-03, tiene una
extensión de 288.40 Km2, mediante la utilización del método de Similitud de
Cuencas y a partir del registro de caudales de la estación hidrométrica río Verde
correspondiente al periodo 1964 - 2009, se generaron los caudales medios mensuales
del río Jarpaña en el punto de interés (zona de cierre de la presa Jarpaña), estimándose
que el caudal medio multianual es 4.20 m3/s, que es igual a un volumen total anual
promedio de 130.66 hm3, para mayor detalle ver Anexo 1.4.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.22 y su representación en la Figura 1.21.

Cuadro 1.22: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Jarpaña, periodo 1964- 2009.
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m3/s) 10.75 13.91 11.10 5.18 1.34 0.63 0.47 0.43 0.47 0.65 1.60 3.87 4.20
Volumen (hm3) 28.79 33.66 29.73 13.44 3.58 1.62 1.27 1.14 1.21 1.74 4.14 10.35 130.67

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 46
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

16.00

14.00

12.00

Caudal medio mensual (m3/s)


10.00

8.00

6.00

4.00
Qx
2.00

0.00
ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC

Meses

Figura 1.21: Caudales medios mensuales embalse Jarpaña (m3/s), periodo 1964 – 2009,
Qx = 4.20 m3/s (Vx = 130.67 hm3)

d) Recursos hídricos totales regulables


Los recursos hídricos totales medios regulables en el Embalse Jarpaña, para un
rendimiento hídrico estimado o asumido de R = 14.56 l/s/km2, lo constituyen los
recursos propios de la cuenca del río Jarpaña hasta el punto de interés (zona de cierre
del embalse Jarpaña), provenientes de un área total de cuenca colectora de A = 288.40
km2, siendo entonces el caudal medio multianual para el periodo 1964 – 2009 y su
correspondiente equivalente en volumen, igual a:

Q Total Jarpaña = 4.20 m3/s; V Total Jarpaña = 130.67 hm3 /año

Como toda estimación, los resultados obtenidos, estarían sujetos a validación


(confirmar o ajustar), cuando se disponga de información hidrométrica, suficiente y
confiable.

e) Disponibilidad de los recursos hídricos totales regulables en el embalse Jarpaña


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales regulables, en el embalse Jarpaña.

Cuadro 1.23: Disponibilidad de los recursos hídricos totales regulables en el embalse


Jarpaña, periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
10.75 13.91 11.10 5.18 1.34 0.63 0.47 0.43 0.47 0.65 1.60 3.87 4.20 Media
14.61 20.47 14.65 6.65 1.48 0.70 0.51 0.48 0.50 0.78 1.79 5.41 5.67 25%
CAUDAL (m3/s) 9.91 12.71 10.48 3.80 1.09 0.59 0.46 0.40 0.39 0.60 1.06 3.11 3.72 50%
5.56 6.73 7.29 2.67 0.80 0.48 0.40 0.35 0.34 0.40 0.59 1.44 2.25 75%
4.14 4.00 2.77 1.59 0.64 0.42 0.33 0.29 0.27 0.31 0.42 0.93 1.34 90%
28.79 33.66 29.73 13.44 3.58 1.62 1.27 1.14 1.21 1.74 4.14 10.35 130.66 Media
39.14 49.53 39.23 17.24 3.95 1.80 1.38 1.28 1.28 2.08 4.65 14.49 176.05 25%
VOLUMEN (hm3) 26.53 30.74 28.07 9.84 2.91 1.52 1.24 1.07 1.02 1.60 2.75 8.33 115.63 50%
14.89 16.27 19.52 6.93 2.13 1.25 1.07 0.94 0.87 1.08 1.52 3.86 70.33 75%
11.10 9.68 7.43 4.11 1.71 1.09 0.89 0.78 0.71 0.83 1.10 2.49 41.92 90%

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 47
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

f) Diseño hidrológico del embalse Jarpaña mediante simulación del balance


hídrico
Para la simulación de la Alternativa 4, se ha considerado un volumen muerto de 26
hm3 (ver detalle en Anexo 1.4) y para el cálculo de volumen útil se ha variado en el
análisis desde 0 a 250 hm3, a fin de obtener los criterios de garantía y seguridad de la
satisfacción de la demanda esperados (ver detalle en Anexo 1.3).

En el Cuadro 1.24 y Figura 1.22 se presenta un resumen de la simulación del embalse


Paratía, donde observamos que con una garantía de 96.20%, la capacidad del embalse
debe ser de 25 hm3, al 100% de garantía el volumen es de 200 hm3, razón por la cual
se ha seleccionado una presa con un volumen útil de 133 hm3. (100% de garantía
mensual)

Cuadro 1.24: Simulación del embalse Jarpaña


Volumen
Volumen Total Volumen Útil
Muerto del Nº de Meses Garantía Índice de Balance
del Embalse del Embalse
Embalse Deficitarios Mensual (%) Déficit (ID) Hídrico
(MMC) (MMC)
(MMC)
26 51 25 21 96.20 1.26 Sa ti s fa ctori o
26 76 50 11 98.01 0.40 Sa ti s fa ctori o
26 101 75 3 99.46 0.08 Sa ti s fa ctori o
26 126 100 0 100.00 0.00 Sa ti s fa ctori o
26 151 125 0 100.00 0.00 Sa ti s fa ctori o
26 159 133 0 100.00 0.00 Sa ti s fa ctori o
26 176 150 0 100.00 0.00 Sa ti s fa ctori o
26 201 175 0 100.00 0.00 Sa ti s fa ctori o
26 226 200 0 100.00 0.00 Sa ti s fa ctori o
Fuente: Elaboración propia.

100.50

100.00

99.50

99.00

98.50
% Garantía

98.00

97.50

97.00

96.50

96.00
0 25 50 75 100 125 150 175 200 225
Volumen Útil (MMC)

Figura 1.22: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa
Jarpaña.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 48
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.4.4. Descripción de las Obras Civiles


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles
que permitirán regular los aportes hídricos del río Quillisani y su cuenca
principalmente durante el periodo de avenidas, para almacenar un volumen total de
159 hm3, de los cuales 133 hm3 corresponden al volumen útil y 26 hm3 al volumen
muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen
a continuación:

a) Presa Jarpaña
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en
el paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en
la cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta
una profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son
suficientes para satisfacer las exigencias técnicas internacionales. El Talud aguas
arriba se recomienda se prolongue hasta una profundidad de 15.00 m
aproximadamente, por debajo del terreno natural hasta encontrar un material mucho
más compacto para el inicio de las excavaciones de la pantalla impermeable. Luego
del relleno del material que se encontrara sobre el concreto armado, se deberá de
colocar una cobertura de arcilla a manera de colchón de 1.00 m de espesor como
mínimo que se extenderá hacia aguas arriba de la presa, cuya función será la de evitar
que la presión del agua esté en contacto directo con la pantalla plástica de la
cimentación y reducir las pérdidas de agua por filtración. Ver Plano PJ-ST en el
Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Jarpaña serían:


Nivel de la Corona : 4,403.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4,401.82 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,399.82 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,355.36 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,340.36 msnm.
Borde Libre : 1.18 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 500.00 m.
Altura máxima de presa (sobre el cauce) : 75.00 m.
Ancho máximo en la base de la presa : 310.00 m.
Espesor de los filtros : 1.00 m.
2
Espesor de Pantalla de concreto f’c = 245kg/cm : 0.30 m.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 49
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cortina de Inyecciones : 50.00 m @ 3.00 m.


Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 159 hm3.
Volumen útil : 133 hm3.
Volumen muerto (sedimentos) : 26 hm3.

b) Túnel de Desvío
El túnel de desvío, está proyectado en el estribo izquierdo, con una longitud total
aproximada de 675.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m
de base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía conformada de concreto armado con resistencia de 245 kg/cm2, longitud
igual a 61.88 m, ancho de 10.00 m y 8.38 m de altura, además se ha previsto
considerar a continuación de esta estructura, enrocado de protección pesado, en una
longitud de 25.00 m, 27.00 m de ancho y 2.00 m de espesor.
c) Vertedero de Demasías, Canal de Fuga y Poza Disipadora.
El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de
25.00 m de longitud, el mismo que estará emplazado en el estribo derecho, externo
al cuerpo de la presa. La longitud total del vertedero de demasías será de 353.00 m,
longitud que considera al vertedero propiamente dicho y el canal de fuga (rápida) de
sección rectangular, a la poza disipadora de energía. Ver Plano PJ-PP en el Anexo
1.8. Plano Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 198 m3/s con un


tirante de 2.00 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se
presente el caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,399.828 msnm; tiene tres (03) vanos
de 8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual
se emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 50
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El canal de fuga tendrá longitud total de 250.00 m, y será de sección rectangular, con
15.00 m de ancho y altura de 5.00 m.
La estructura de disipación de energía tendrá una longitud de 63.80 m, un ancho
variable entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes de 2:1 (H: V).
Inmediatamente después de esta estructura, se ha considerado la colocación de
enrocado de protección en una longitud de 25.00 m y 2.00 m de espesor.

2.4.5. COSTOS Y PRESUPUESTOS


El costo total estimado de esta alternativa de afianzamiento asciende a S/.
330’654,440.77, monto que incluye los gastos generales (12%), Gastos de
Supervisión (5%), Utilidad (10%) e IGV (19%), tal como se presenta en el Cuadro
1.25.

Cuadro 1.25: Costo total de la alternativa 4


Descripción Costo (S/.)
Costo Directo 218,788,090.24
Gastos Generales (12%) 26,254,570.83
Gastos de Supervisión (5%) 10,939,404.51
Utilidad (10%) 21,878,809.02
Presupuesto Parcial 277,860,874.60
IGV (19%) 52,793,566.17
Presupuesto Total 330,654,440.77

El detalle de los metrados y presupuesto de esta alternativa de afianzamiento se


presenta en el Anexo 1.7.

2.5. ALTERNATIVA 5
2.5.1. DESCRIPCIÓN GENERAL DE LA ALTERNATIVA DE AFIANZAMIENTO
Esta alternativa de afianzamiento hídrico del Sistema Integral Lagunillas considera
el enfoque de la regulación de las aguas de los ríos Paratía y Quillisani en su propia
cuenca, mediante la construcción de dos presas denominadas Paratía y Millo, con
volúmenes útiles de almacenamiento de 200 y 65 hm3, respectivamente.

2.5.2. PRESA PARATÍA


La descripción de la zona de cierre, zona de inundación, generación de caudales
medios mensuales en el área de estudio, los recursos hídricos totales regulables, la
disponibilidad de los recursos hídricos totales regulables en el embalse, el diseño
hidrológico del embalse mediante simulación del balance hídrico, así como la
descripción de las obras civiles del embalse Paratía fueron desarrolladas en los ítems
3.3.2 y 3.3.4 correspondientes a la alternativa de afianzamiento 3, por lo que, para
conocer el detalle del mismo, se deberá de recurrir a los ítems antes mencionados.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 51
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.5.3. PRESA MILLO


a) Zona de cierre
El eje de la presa Millo fue ubicado en el curso del río Quillisani, aproximadamente
en la cota de 4,418 msnm y coordenadas UTM estimadas de 309,709 Este y
8’289,051 Norte, ver Foto 1.9.

Estribo Izquierdo
Área entre estribos Estribo Derecho

Foto 1.9: Zona de cierre del embalse Millo

La morfología local corresponde a un pequeño cañón, en sección transversal presenta


la forma de una "U" abierta, ambos estribos tienen pendientes sub-verticales y
elevados. El ancho a nivel de cauce es de 18.00 m aproximadamente, ampliándose la
abertura a medida que aumente la altura de la presa, la pendiente del cauce en el
tramo correspondiente a la zona de cierre es llana menor de 2.5 %. Ver Plano PM-
PG.

Las consideraciones para la elección del cierre de la presa Millo fueron: 1) La sección
transversal debe de ser lo más estrecha posible, 2) Debe permitir almacenar el mayor
volumen posible. En la zona de cierre elegido, como resultado de la evaluación
geotécnica, se ha definido que el estribo izquierdo de 0.00 a ± 5.00 m está
conformado por material coluvial (arena limosa, con clastos y abundantes bloques
subangulosos de roca), de 5.00 m a más se presentan substratos rocosos conformados
por derrames vulcano-clásticos y andesíticos bien estratificadas, lavas de andesitas
basálticas y tufos de bloques, la zona entre estribos de 0.00 a ± 2.00 m está
conformado por un relleno aluvial del río Quillisani, que por su desarrollo
geomorfológico angosto debe tener una potencia de ± 2,00 m (en esta zona se ubica
el cauce del río Quillisani), de 2.00 m a más, se presentan substratos rocosos
conformado por sedimentos vulcano-clásticos; y por derrames andesíticos bien
estratificadas, lavas de andesitas basálticas y tufos de bloques. El perfil estratigráfico

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 52
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

del estribo derecho de 0.00 a ±5.00 m está conformado por material morrénico y
coluvial y de acuerdo a la configuración geomorfológica, en profundiad se encontrará
el substrato rocoso, de 5.00 m a más está conformado substrato rocoso, conformado
sedimentos vulcano-clásticos; y por derrames andesíticos bien estratificadas, lavas
de andesitas basálticas y tufos de bloques, para mayor detalle revisar el Estudio
Geológico Preliminar de los Planteamientos Alternativos de Afianzamiento del
Sistema Integral Lagunillas que se presenta en el Anexo 1.1.

b) Zona de inundación
La zona de inundación comprende zonas adyacentes al curso del río Quillisani, las
aguas embalsadas cubrirán en mayor medida terrazas conformadas por material
morrénico y coluvial y en menor proporción áreas de bofedales, así mismo se llegará
a inundar vías de acceso del tipo afirmadas al centro poblado de Quillisani, en una
longitud aproximada de 7.20 km, ver Figura 1.23, Foto 1.10 y Planos PM-PG.

Terrazas Bajas,
y Medias

Centro Poblado Río Quillisani

Bofedales

Presa Millo

Figura 1.23: Zona de inundación del embalse Millo (Fuente: Imagen Google Earth)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 53
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Foto 1.10: Zona de inundación del embalse Millo

La zona de inundación está limitada por ambas márgenes por cerros rocosos muy
elevados, formando un valle amplio, con sección transversal en forma de "U" abierta
y perfil asimétrico, si tomamos como referencia el curso principal del río Quillisani
en ambas márgenes la geomorfología de las laderas corresponde a Laderas Suaves
(L-s) las que se caracterizan por presentar pendientes inferiores a 30% y ausencia de
inestabilidad y deslizamientos, ver Foto 10 y Plano PM-PP.

El curso principal de drenaje es el río Quillisani, el que conduce agua


permanentemente, durante la fase de reconocimiento de campo, se observó que el río
Quillisani transporta muy poco material de arrastre y en suspensión, lo que se
evidencia en la existencia de poco material fino y bastante material grueso depositado
en el lecho del cauce y en la transparencia del agua del río Quillisani.
El material de basamento de esta estructura está constituido por formaciones del
Grupo Palca y Tacaza, ver Plano GG-01.

Para mayor detalle revisar el Estudio Geológico Preliminar de los Planteamientos


Alternativos de Afianzamiento del Sistema Integral Lagunillas que se presenta en el
Anexo 1.1.

Al no disponerse de un levantamiento topográfico detallado de la zona de inundación


(vaso) del embalse Millo, se ha construido la curva altura – área y volumen en base
a la topografía disponible del vaso obtenida por restitución, los datos se presentan en
el Cuadro 1.26 y se visualiza en el Figura 1.24, de donde se deduce que el área del
espejo de agua embalsada para una altura de presa de 62.00m es de 2.58 km2 y
permite almacenar un volumen de 78 hm3. Se debe indicar que las cotas deben ser
asumidas como relativas. Ver Plano PM-PG (Plano embalse Millo)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 54
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.26: Embalse Millo: Relación altura – área – volumen


ALTURA AREA VOLUMEN
COTA
Nº Desnivel Acumulada Acumulada Acumulado
(m.s.n.m.) (m) (m) (km2) (hm3)
1 4,418.00 0.00 0.00 0.00 0.00
2 4,420.00 2.00 2.00 0.03 0.03
3 4,422.00 2.00 4.00 0.09 0.14
4 4,424.00 2.00 6.00 0.19 0.42
5 4,426.00 2.00 8.00 0.31 0.92
6 4,428.00 2.00 10.00 0.41 1.65
7 4,430.00 2.00 12.00 0.49 2.54
8 4,432.00 2.00 14.00 0.58 3.61
9 4,434.00 2.00 16.00 0.70 4.89
10 4,436.00 2.00 18.00 0.80 6.38
11 4,438.00 2.00 20.00 0.89 8.07
12 4,440.00 2.00 22.00 0.96 9.92
13 4,442.00 2.00 24.00 1.04 11.92
14 4,444.00 2.00 26.00 1.10 14.06
15 4,446.00 2.00 28.00 1.17 16.33
16 4,448.00 2.00 30.00 1.23 18.73
17 4,450.00 2.00 32.00 1.29 21.25
18 4,452.00 2.00 34.00 1.36 23.90
19 4,454.00 2.00 36.00 1.42 26.67
20 4,456.00 2.00 38.00 1.48 29.58
21 4,458.00 2.00 40.00 1.55 32.61
22 4,460.00 2.00 42.00 1.64 35.80
23 4,462.00 2.00 44.00 1.74 39.18
24 4,464.00 2.00 46.00 1.83 42.76
25 4,466.00 2.00 48.00 1.92 46.52
26 4,468.00 2.00 50.00 2.02 50.46
27 4,470.00 2.00 52.00 2.11 54.59
28 4,472.00 2.00 54.00 2.21 58.91
29 4,474.00 2.00 56.00 2.31 63.43
30 4,476.00 2.00 58.00 2.40 68.14
31 4,478.00 2.00 60.00 2.49 73.02
32 4,480.00 2.00 62.00 2.58 78.09

Área (km2)
2.60 2.40 2.20 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00
4,490.00

4,480.00

4,470.00

4,460.00
Cota (msnm)

4,450.00

4,440.00

4,430.00

4,420.00
VOLUMEN
AREA
4,410.00
0.00 10.00 20.00 30.00 40.00 50.00 60.00 70.00 80.00
Volumen (hm3)

Figura 1.24: Embalse Millo: Relación altura – área – volumen

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 55
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Generación de caudales medios mensuales en el área de estudio


El área de recepción hídrica para el Embalse Millo según el Plano PH-05, tiene una
extensión de 151.04 km2, mediante la utilización del método de Similitud de Cuencas
y a partir del registro de caudales de la estación hidrométrica río Verde
correspondiente al periodo 1964 - 2009, se generaron los caudales medios mensuales
del río Quillisani en el punto de interés (zona de cierre de la presa Millo), estimándose
que el caudal medio multianual es 2.33 m3/s, que es igual a un volumen total anual
promedio de 72.39 hm3, para mayor detalle ver Anexo 1.4.

El resumen a nivel mensual de la serie de caudales medios mensuales y su


equivalente en volumen para el punto de interés para el periodo 1964 – 2009, se
presenta en el Cuadro 1.27 y su representación en la Figura 1.25.

Cuadro 1.27: Caudales medios (m3/s) y volúmenes totales medios mensuales (hm3)
embalse Millo, periodo 1964- 2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SEP OCT NOV DIC MEDIA TOTAL
Caudal (m3/s) 5.95 7.71 6.15 2.87 0.74 0.35 0.26 0.24 0.26 0.36 0.88 2.14 2.33
Volumen (hm3) 15.95 18.65 16.47 7.44 1.98 0.90 0.70 0.63 0.67 0.96 2.29 5.74 72.38

16.00

14.00

12.00
Caudal medio mensual (m3/s)

10.00

8.00

6.00

4.00

Qx
2.00

0.00
ENE FEB M AR ABR MAY JUN JUL AGO SEP OCT NOV DIC

Meses

Figura 1.25: Caudales medios mensuales embalse Millo (m3/s), periodo 1964 – 2009, Qx
= 2.33 m3/s (Vx = 72.38 hm3)

d) Recursos hídricos totales regulables


Los recursos hídricos totales medios regulables en el Embalse Millo, para un
rendimiento hídrico estimado o asumido de R = 15.43 l/s/km2, lo constituyen los
recursos propios de la cuenca del río Jarpaña hasta el punto de interés (zona de cierre
del embalse Millo), provenientes de un área total de cuenca colectora de A = 151.04
km2, siendo entonces el caudal medio multianual para el periodo 1964 – 2009 y su
correspondiente equivalente en volumen, igual a:

Q Total Millo = 2.33 m3/s; V Total Millo = 72.38 hm3/año

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 56
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Como toda estimación, los resultados obtenidos, estarían sujetos a validación


(confirmar o ajustar), cuando se disponga de información hidrométrica, suficiente y
confiable.

e) Disponibilidad de los recursos hídricos totales regulables en el embalse Millo


Se estableció la siguiente persistencia en el tiempo para los caudales medios
mensuales totales regulables, en el embalse Millo:

Cuadro 1.28: Disponibilidad de los recursos hídricos totales regulables en el embalse


Millo, periodo: 1964-2009
PARÁMETRO UNIDAD ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC MEDIO TOTAL DISPONIBILIDAD
5.95 7.71 6.15 2.87 0.74 0.35 0.26 0.24 0.26 0.36 0.88 2.14 2.33 Media
8.10 11.34 8.12 3.68 0.82 0.39 0.28 0.26 0.27 0.43 0.99 3.00 3.14 25%
CAUDAL (m3/s) 5.49 7.04 5.81 2.10 0.60 0.32 0.26 0.22 0.22 0.33 0.59 1.72 2.06 50%
3.08 3.73 4.04 1.48 0.44 0.27 0.22 0.20 0.19 0.22 0.32 0.80 1.25 75%
2.30 2.22 1.54 0.88 0.35 0.23 0.19 0.16 0.15 0.17 0.23 0.52 0.74 90%
15.95 18.65 16.47 7.44 1.98 0.90 0.70 0.63 0.67 0.96 2.29 5.74 72.39 Media
21.69 27.44 21.74 9.55 2.19 1.00 0.76 0.71 0.71 1.15 2.58 8.03 97.54 25%
VOLUMEN (hm3) 14.70 17.03 15.55 5.45 1.61 0.84 0.69 0.60 0.57 0.89 1.52 4.62 64.07 50%
8.25 9.02 10.82 3.84 1.18 0.69 0.59 0.52 0.48 0.60 0.84 2.14 38.97 75%
6.15 5.36 4.12 2.28 0.95 0.60 0.50 0.43 0.39 0.46 0.61 1.38 23.23 90%

f) Diseño hidrológico del embalse Millo mediante simulación del balance hídrico
Para la simulación de la Alternativa 5, se ha considerado un volumen muerto de 13
hm3 (ver detalle en Anexo 1.4) y para el cálculo de volumen útil se ha variado en el
análisis desde 0 a 100 hm3, a fin de obtener los criterios de garantía y seguridad de la
satisfacción de la demanda esperados (ver detalle en Anexo 1.3).

En el Cuadro 1.29 y Figura 1.26 se presenta un resumen de la simulación del embalse


Paratía, donde observamos que con una garantía de 93.84%, la capacidad del embalse
debe ser de 25 hm3, al 97.46% de garantía el volumen es de 150 hm3, razón por la
cual se ha seleccionado una presa con un volumen útil de 65 hm3. (96.38% de garantía
mensual)

Cuadro 1.29: Simulación del embalse Millo


Volumen
Volumen Total Volumen Útil
Muerto del Nº de Meses Garantía Índice de Balance
del Embalse del Embalse
Embalse Deficitarios Mensual (%) Déficit (ID) Hídrico
(MMC) (MMC)
(MMC)
13 38 25 34 93.84 2.50 Sa tis fa ctorio
13 63 50 23 95.83 1.62 Sa tis fa ctorio
13 78 65 20 96.38 1.24 Sa tis fa ctorio
13 88 75 17 96.92 1.07 Sa tis fa ctorio
13 113 100 16 97.10 0.90 Sa tis fa ctorio
13 138 125 15 97.28 0.83 Sa tis fa ctorio
13 163 150 14 97.46 0.74 Sa tis fa ctorio
Fuente: Elaboración propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 57
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

98.00

97.50

97.00

96.50

% Garantía 96.00

95.50

95.00

94.50

94.00

93.50
0 25 50 75 100 125 150 175
Volumen Útil (MMC)

Figura 1.26: Porcentaje de garantía mensual (%) y volumen útil (hm3) de la presa Millo.

2.5.4. DESCRIPCIÓN DE LAS OBRAS CIVILES


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles
que permitirán regular los aportes hídricos del río Quillisani y su cuenca
principalmente durante el periodo de avenidas, para almacenar un volumen total de
78 hm3, de los cuales 65 hm3 corresponden al volumen útil y 13 hm3 al volumen
muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen
a continuación:

a) Presa Millo
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en
el paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en
la cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta
una profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son
suficientes para satisfacer las exigencias técnicas internacionales. El Talud aguas
arriba se recomienda se prolongue hasta una profundidad de 15.00 m
aproximadamente, por debajo del terreno natural hasta encontrar un material mucho
más compacto para el inicio de las excavaciones de la pantalla impermeable. Luego
del relleno del material que se encontrara sobre el concreto armado, se deberá de
colocar una cobertura de arcilla a manera de colchón de 1.00 m de espesor como
mínimo que se extenderá hacia aguas arriba de la presa, cuya función será la de evitar
que la presión del agua esté en contacto directo con la pantalla plástica de la

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 58
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

cimentación y reducir las pérdidas de agua por filtración. Ver Plano PM-PP. Plano
sección típica presa.

Los principales parámetros de la presa Jarpaña serían:


Nivel de la Corona : 4,483.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4,481.76 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,479.96 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,437.92 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,422.92 msnm.
Borde Libre : 1.18 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 540.50 m.
Altura máxima de presa (sobre el cauce) : 65.00 m.
Ancho máximo en la base de la presa : 270.00 m.
Espesor de los filtros : 1.00 m.
2
Espesor de Pantalla de concreto f’c = 245kg/cm : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 78 hm3.
Volumen útil : 65 hm3.
Volumen muerto (sedimentos) : 13 hm3.

b) Túnel de desvío
El túnel de desvío, está proyectado en el estribo izquierdo, con una longitud total
aproximada de 425.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m
de base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m. y las cotas de inicio y fin del túnel serán 4,423.07 y 4,418.40 msnm.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía conformada de concreto armado con resistencia de 245 kg/cm2, longitud
igual a 61.88 m, ancho de 10.00 m y 8.38 m de altura, además se ha previsto
considerar a continuación de esta estructura, enrocado de protección pesado, en una
longitud de 25.00 m, 27.00 m de ancho y 2.00 m de espesor.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 59
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) Vertedero de demasías, canal de fuga y poza disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de
25.00 m de longitud, el mismo que estará emplazado en el estribo derecho, externo
al cuerpo de la presa. La longitud total del vertedero de demasías será de 450.00 m,
longitud que considera al vertedero propiamente dicho y el canal de fuga (rápida) de
sección rectangular, a la poza disipadora de energía. Ver Plano PM-PP. Plano
Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 198 m3/s con un


tirante de 1.80 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se
presente el caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,479.96 msnm; tiene tres (03) vanos
de 8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual
se emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 250.00 m, y será de sección rectangular, con
15.00 m de ancho y altura de 2.50 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m, un ancho


variable entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes de 2:1 (H: V).
Inmediatamente después de esta estructura, se ha considerado la colocación de
enrocado de protección en una longitud de 25.00 m y 2.00 m de espesor.

2.5.5. COSTOS Y PRESUPUESTOS


El costo total estimado de esta alternativa de afianzamiento asciende a S/.
336’334,516.55, monto que incluye los gastos generales (12%), Gastos de
Supervisión (5%), Utilidad (10%) e IGV (19%), tal como se presenta en el Cuadro
1.30.

Cuadro 1.30: Costo total de la alternativa 5


Descripción Costo (S/.)
Costo Directo 222,546,494.11
Gastos Generales (12%) 26,705,579.29
Gastos de Supervisión (5%) 11,127,324.71
Utilidad (10%) 22,254,649.41
Presupuesto Parcial 282,634,047.52
IGV (19%) 53,700,469.03
Presupuesto Total 336,334,516.55

El detalle de los metrados y presupuesto de esta alternativa de afianzamiento se


presenta en el Anexo 1.7.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 60
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

III. SELECCIÓN DEL ESQUEMA ÓPTIMO DE AFIANZAMIENTO


Para la selección del esquema óptimo de afianzamiento del Sistema Integral
Lagunillas se empleó el Método Cualitativo por Puntos, el que consiste en asignar
valores cuantitativos a una serie de factores que se consideran relevantes en cada una
de las alternativas de afianzamiento, conduciendo a una comparación cuantitativa y
a una ponderación de factores para la toma de decisiones.

El procedimiento seguido para jerarquizar los factores cualitativos, es el siguiente:


1. Se estableció una lista de factores relevantes.
2. Se asignó una escala común a cada factor de 01 a 05 puntos, siendo cinco (05)
para la mejor alternativa y un (01) punto para la menos eficiente.
3. Se calificó a cada alternativa de afianzamiento de acuerdo con la escala designada
y se multiplica la calificación por el peso.
4. Se efectuó la sumatoria de la puntuación de cada alternativa de afianzamiento y
se seleccionó el de mayor puntuación como el esquema óptimo de afianzamiento.

Los factores más relevantes considerados para la selección del esquema óptimo de
afianzamiento del Sistema Integral Lagunillas, se describen a continuación:

a) Volúmenes totales regulables y/o derivables


Está referido a los volúmenes de agua totales regulables y/o derivables con cada
una de las alternativas de afianzamiento planteadas, asignándole el mayor puntaje
cinco (05) puntos para la alterativa que posibilite regular y/o derivar el mayor
volumen de agua posible y al resto de alternativas un puntaje proporcional al
puntaje máximo asignado.

b) Niveles de Garantía en la Atención de las Demandas


Este factor está referido a los niveles de garantía en la atención de la demanda
hídrica de los distintos usos y usuarios del Sistema Integral Lagunillas, tanto en
volumen como en tiempo, asignándole el máximo puntaje cinco (05) puntos a la
alternativa que presente los más altos niveles de garantía en la atención de las
demandas hídricas.

c) Costo de Implementación
Está referido al costo de inversión estimado que demande la implementación de
cada una de las alternativas de afianzamiento, se ha calificado a la alternativa que
demande menor costo de inversión con un puntaje de 05 puntos, y al resto de
alternativas un puntaje proporcional al puntaje máximo asignado.

d) Costo Unitario del Agua


Este factor está referido al costo unitario del agua por volumen embalsado y/o
derivado de cada una de las alternativas de afianzamiento, en este caso se le
asignara el mayor valor cinco (05) puntos a la alternativa de menor costo unitario

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 61
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

por volumen de agua embalsada y/o derivada, calculando el resto en forma


proporcional al puntaje máximo otorgado, considerando los costos de cada
alternativa.

En este estudio únicamente se han tomado en cuenta estos cuatro factores, debiéndose
considerar en las siguientes etapas del estudio (perfil, pre-factibilidad y factibilidad),
muchos otros factores más, como los sociales, ambientales y sobretodo técnicos.

En el Cuadro 1.31, se presenta un resumen de las principales características de cada


una de las alternativas de afianzamiento del Sistema Integral Lagunillas, las mismas
que serán útiles para la jerarquización de los factores cualitativos considerados en
esta oportunidad.

Cuadro 1.31: Características de las alternativas de afianzamiento


Criterios de Calificación
Alternativa de Volúmenes Totales Regulables y/o Niveles de Garantía en la Costo de Costo Unitario
Afianzamiento Derivables Atención de las Demandas Implementación del Agua
(hm3) (%) (S/.) (S/. x m3)
1 VU = 283.00 hm3 (Presa Verde) 99.10 190,445,006.23 0.67
2 VD = 163.53 hm3 (Derivación Verde) 97.30 156,989,574.21 0.96
VU = 200.00 hm3 (Presa Paratía)
3 VD = 62.93 hm3 (Derivación Jarpaña) 96.90 336,447,370.28 1.28
VT = 262.93 hm3
VU = 200.00 hm3 (Presa Paratía)
4 VU = 133.00 hm3 (Presa Jarpaña) 100.00 330,654,440.77 0.99
VT = 333.00 hm3
VU = 200.00 hm3 (Presa Paratía)
5 VU = 65.00 hm3 (Presa Jarpaña) 96.70 336,334,516.55 1.27
VT = 265.00 hm3
Donde: VU = Volumen útil, VD = Volumen derivado y VT = Volumen total

A continuación en el Cuadro 1.32 se presenta la calificación general establecida para


cada una de las alternativas de afianzamiento identificadas determinando el puntaje
total resultante de la suma de los puntajes parciales de cada uno de los factores
considerados.

Cuadro 1.32: Priorización de alternativas de afianzamiento


Criterios de Calificación
Alternativa de Volúmenes totales Niveles de Garantía Costo Puntaje
Costo de
Afianzamiento regulables y/o en la Atención de Unitario del Total
Implementación
derivables las Demandas Agua
1 4 4 4 5 17
2 1 3 5 4 13
3 2 2 1 2 7
4 5 5 3 3 16
5 3 1 2 2 8

De acuerdo con las ponderaciones efectuadas en el Cuadro 1.32, la alternativa de


afianzamiento 1 (construcción de la presa Verde) es la que obtuvo la mejor
calificación (17 de un total de 20 puntos ), por lo tanto es la alternativa seleccionada
en este estudio, sin embargo, esta podría cambiar en las siguientes etapas del estudio

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 62
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

(perfil, pre-factibilidad y factibilidad), debido a que en los mismos se considerarán


muchos otros factores de jerarquización de alternativas (técnicos, sociales,
ambientales, otros), que permitirán garantizar una adecuada selección de la
alternativa óptima de afianzamiento del Sistema Integral Lagunillas.

IV. CONCLUSIONES Y RECOMENDACIONES


4.1. CONCLUSIONES
4.1.1. Sobre los aspectos de geología y geotecnia
a) Las características geológicas-geomorfológicas de los vasos Verde, Paratía,
Jarpaña y Millo nos indican que no deben presentarse mayores problemas con
referencia a la estabilidad de taludes.
b) Los embalses Verde, Paratía, Jarpaña y Millo presentan regulares a buenas
condiciones de sellado en el fondo del embalse. Los flancos morrénicos y rocosos
son poco permeables a impermeables. En conjunto los vasos son estancos.
c) En la zona de cierre de la presa Verde, el estribo derecho está conformado por un
tipo de roca del grupo Palca, que presenta características de resistencia un tanto
deficientes, sin embargo, el estribo izquierdo está constituido por roca Ignimbrita
con mejores condiciones de resistencia en comparación al estribo derecho.
d) De acuerdo a los estudios geofísicos efectuados en la zona de cierre de la presa
Verde se ha estimado que la potencia del material gravoso depositado en el río
Verde tiene una potencia variada de 30 a 50 m.
e) Mediante las evaluaciones realizadas el terreno de fundación de la presa Jarpaña,
será la ignimbrita rosado pálido blanquecino. En el eje de la presa Paratía, el área
entre estribos está conformado por material Fluvio-aluvial; y el estribo derecho por
material morrenico.y coluvial (arena limosa, con clastos y bloques subangulosos de
roca).
f) El sector donde se ubica la bocatoma Jarpaña, se caracteriza por presentar terrazas
de baja altura y desnivel (suelos inconsolidados), por lo que se producen
inundaciones y erosiones laterales.
g) El tramo investigado del río Jarpaña, se caracteriza por presentar una baja
pendiente con un desarrollo del tipo meándrico; lo que indica un estado avanzado
de madurez en su evolución geomorfológica. Con relación a los procesos
geodinámicos activos tenemos que la Dinámica Fluvial del río Jarpaña es el
principal y que en los períodos de grandes precipitaciones ocasionan cambios
sustanciales en la capacidad de remoción y descarga fluvial, originando procesos
geodinámicos: Erosión de Riberas, derrumbes, migraciones de cauce y deposición
fluvial.

4.1.2. Sobre los aspectos de hidrología


a) Los recursos hídricos totales medios regulables estimados para el embalse Verde,
provenientes de un área total de cuenca colectora igual a 759.57 km2, expresado
como caudal medio multianual (periodo 1964 -2009) es igual a 10.88 m3/s
equivalente a un volumen total promedio de 338.53 hm3.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 63
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

b) Los recursos hídricos totales medios regulables estimados para el embalse Paratía,
provenientes de un área total de cuenca colectora igual a 403.13 km2, expresado
como caudal medio multianual (periodo 1964 -2009) es igual a 5.79 m3/s
equivalente a un volumen total promedio de 180.26 hm3.
c) Los recursos hídricos totales medios regulables estimados para el embalse Jarpaña,
provenientes de un área total de cuenca colectora igual a 288.40 km2, expresado
como caudal medio multianual (periodo 1964 -2009) es igual a 4.20 m3/s
equivalente a un volumen total promedio de 130.67 hm3.
d) Los recursos hídricos totales medios regulables estimados para el embalse Millo,
provenientes de un área total de cuenca colectora igual a 151.04 km2, expresado
como caudal medio multianual (periodo 1964 -2009) es igual a 2.33 m3/s
equivalente a un volumen total promedio de 72.38 hm3.
e) De la simulación hidrológica efectuada para el diseño hidrológico de los embalses
Verde, Paratía, Jarpaña y Millo, se determino que los volúmenes útiles necesarios
para alcanzar niveles de garantía aceptables en la atención de la demandas hídricas
son: 283, 200, 133 y 65 hm3, respectivamente.
f) Considerando para los embalses Verde, Paratía, Jarpaña y Millo, una vida útil de
100 años, se asumió volúmenes muertos del orden de 57, 40, 26 y 13 hm3,
respectivamente, valores que representan el 20% del volumen útil de cada uno de
los embalses propuestos.
g) Mediante el uso de las Curvas de Utilización, se determinó que con una capacidad
de conducción de 30.00 m3/s del canal de derivación Verde, se podría captar al
81.58%, 67.95% y 82.93% los recursos hídricos de la cuenca para los meses de:
enero, febrero y marzo.
h) Mediante el uso de las Curvas de Utilización, se determinó que con una capacidad
de conducción de 12.00 m3/s del canal de derivación Jarpaña, se podría captar al
84.30%, 70.96% y 85.75% los recursos hídricos de la cuenca para los meses de:
enero, febrero y marzo.

4.1.3. Sobre los aspectos de diseño, costos y presupuestos


a) El tipo de presa elegido para las alternativas 1, 3, 4 y 5, desde el punto de vista de
los materiales utilizados corresponde a una presa de enrocado (el cuerpo principal
de la presa conformado con materiales con grano grueso y los elementos
antifiltrantes de materiales aglutinados) y desde el punto de vista del esquema
constructivo de la presa corresponde al tipo homogénea (cuerpo de la presa
conformado con un solo material en contacto con el filtro), debiéndose de efectuar
un tratamiento en la cimentación consistente en inyecciones de cemento o pantallas
de bentonita, hasta una profundidad de 50.00 m.y la colocación de una cobertura de
arcilla a manera de colchón de 1.00 m de espesor como mínimo que se extenderá
hacia aguas arriba de la presa.
b) Las presas Verde, Paratía, Jarpaña y Millo tendrán alturas máximas de 59.00, 52.00,
75.00 y 65.00 m, respectivamente.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 64
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

c) La capacidad de captación y conducción de las bocatomas y canales de derivación


Verde y Jarpaña, serán de 30.00 y 12.00 m3/s, respectivamente.
d) El costo total estimado para las alternativas de afianzamiento 1, 2, 3 ,4 y 5 ascienden
a S/. 190’445,006.23, S/. 156’989,574.21, S/. 336’447,370.28, 330’654,440.77 y
S/. 336’334,516.55, respectivamente.

4.1.4. De la viabilidad hidrológica de las alternativas de afianzamiento


a) Las alternativas de afianzamiento del Sistema Integral Lagunillas, son
hidrológicamente viables, ya que permitirán reducir los niveles de déficit
presentados en los balances hídricos en la situación futura, sin embargo, dichas
alternativas deberán ser evaluadas con mucho mayor detalle en sus aspectos
técnico, económico, social y ambiental en las siguientes etapas del estudio (perfil,
pre-factibilidad y factibilidad).

4.1.5. Sobre la selección de la alternativa óptima


a) De acuerdo al proceso de selección de la alternativa óptima de afianzamiento
hídrico del Sistema Integral Lagunillas, la alternativa de afianzamiento 1
(construcción de la presa Verde) es la que obtuvo la mejor calificación (17 de un
total de 20 puntos ), por lo tanto es la alternativa seleccionada en este estudio, sin
embargo, esta podría cambiar en las siguientes etapas del estudio (perfil, pre-
factibilidad y factibilidad), debido a que en los mismos se considerarán muchos
otros factores de jerarquización de alternativas (técnicos, sociales, ambientales,
otros), que permitirán garantizar una adecuada selección de la alternativa óptima de
afianzamiento del Sistema Integral Lagunillas.

4.2. RECOMENDACIONES
a) Teniendo en cuenta los resultados del presente estudio, las evaluaciones geológicas
y geotécnicas requieren efectuarse con un nivel de detalle que permita definir la
viabilidad geológica – geotécnica de las alternativas de afianzamiento.
b) Es necesario y urgente la instalación de una estación hidrométrica con carácter
permanente en el río Ichocollo, único afluente del embalse Lagunillas, con la
finalidad de validar los valores obtenidos en este estudio.
c) Así mismo es necesaria la instalación de miras limnimétricas en los cauces de los
embalses proyectados, para determinar los caudales históricos y calibrar los valores
obtenidos.
d) Las alternativas de afianzamiento planteadas en este estudio, son hidrológicamente
viables, por lo que se recomienda se inicie los estudios de afianzamiento del Sistema
Integral Lagunillas a nivel de perfil de proyecto, debiéndose profundizar
principalmente los estudios básicos de Hidrología, Geología, Geotecnia, Geofísica y
el diseño de las obras civiles.
e) En los posteriores estudios de afianzamiento hídrico del Sistema Integral Lagunillas,
no debe de descartarse la posibilidad de trasvasar las aguas de la subcuenca alta del

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 65
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

río Paltiture, las mismas que confluyen a la cuenca del río Tambo, mediante la
construcción de un canal colector desde esta hacia el embalse Lagunillas.

V. REFERENCIAS BIBLIOGRÁFICAS
 Aliaga, V. 1976. Modelos estocásticos de descargas mensuales con aplicación al
Proyecto Majes. Tesis Ing. Agrícola. Universidad Nacional Agraria La Molina.
Lima, Perú.
 Aliaga, S. 1983. Tratamiento de datos hidrometeorológicos, Lima, Perú.
 Aliaga, S. 1985. Hidrología estadística. Lima, Perú.
 Allen, R; Pereira, L; Raes, D; Smith, M. 2005. Evapotranspiración del cultivo – Guías
para la determinación de los requerimientos de agua de los cultivos. Estudio FAO
Riego y Drenaje Nº 56, Roma, Italia.
 Ancco, C. 2001. Aplicación de modelos markovianos para determinar la capacidad
de embalse de las microcuencas Macarimayo, Parina y Buenavista. Tesis Ing.
Agrícola. Universidad Nacional del Altiplano. Puno, Perú.
 Aparicio, F. 1997. Fundamentos de hidrología de superficie. Editorial Limusa.
México.
 Chereque, W. 1989. Hidrología para estudiantes de ingeniería civil. Pontificia
Universidad Católica del Perú. Lima, Perú.
 Chow, V; Maidment, D; Mays, L. 1994. Hidrología Aplicada. Editorial McGraw-
Hill. Santafé de Bogotá, Colombia.
 Comisión de las Comunidades Europeas. 1993. Plan director binacional de
protección, prevención de inundaciones y aprovechamiento de recursos del lago
Titicaca, río Desaguadero, lago Poopó y lago Salar de Coipasa (Sistema TDPS).
 De Pierola J; Aliaga V. 1993. Análisis de consistencia de series hidrometeorológicas.
Lima, Perú.
 INRENA. 2003. Estudio integral de los recursos hídricos de la cuenca del río Chillón;
componente hidrología superficial, Intendencia de Recursos Hídricos. ATDR Chillón
– Rímac – Lurín. Lima, Perú.
 INRENA. 2003. Estudio integral de los recursos hídricos de la cuenca del río Ramis:
Estudio de Hidrología, Intendencia de Recursos Hídricos. ATDR Ramis. Ayaviri,
Perú.
 INRENA. 2003. Evaluación técnica: Proyecto embalse y canal Ccanccairo. Oficina
de Gestión Ambiental Transectorial, Evaluación e Información de Recursos
naturales. Lima, Perú.
 INRENA. 2007. Evaluación de los recursos hídricos en las cuencas de los ríos
Cabanillas y Lampa, Intendencia de Recursos Hídricos. ATDR Juliaca, Perú.
 INRENA. 2007. Estudio de priorización y selección de alternativas de embalse en la
cuenca del río Azufre, Combamayo – Cajamarca, Volumen I y II. Intendencia de
Recursos Hídricos. Oficina de Proyectos de Afianzamiento Hídrico. Lima, Perú.
 INRENA. 2008. Actualización del balance hídrico de la cuenca del río Ramis,
Intendencia de Recursos Hídricos. ATDR Ramis. Ayaviri, Perú.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 66
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 INRENA. 2008. Evaluación de los recursos hídricos en la cuenca del río Ilave,
Intendencia de Recursos Hídricos. ATDR Ilave, Puno, Perú.
 Lutz, S. 1980. Generación de caudales mensuales en la sierra peruana. Programa
Nacional de Pequeñas y Medianas Irrigaciones- Plan Meris II. Perú.
 Mejía, A. 1991. Métodos estadísticos en hidrología. UNALM. Lima, Perú.
 Mejía, A. 2001. Hidrología Aplicada. UNA La Molina, CIP-FIA, Lima, Perú.
 Monsalve, G. 1999. Hidrología en la ingeniería. Segunda Edición. Editorial Escuela
Colombiana de Ingeniería. Alfaomega. Colombia.
 Organización Meteorológica Mundial – OMM. 1994. Guía de prácticas hidrológicas
Nº 168. Quinta edición.
 Obando, W. 1996. Informe final: Actualización y complementación de los aspectos
climatológicos, hidrológicos y sedimentológicos de los embalses Ccaracocha y
Choclococha. Proyecto Especial Tambo Ccaracocha. Ica, Perú.
 Obando, W. 2004. Informe de evaluación de la eficiencia de uso del agua almacenada
en el embalse Pasto Grande. Proyecto Especial Pasto Grande. Moquegua, Perú.
 Obando, W. 2007. Informe final del estudio hidrológico embalse Pelagatos. Proyecto
Especial CHAVIMOCHIC. Trujillo, Perú.
 Obando, W. 2010. Informe final: Asesoría técnica para la conclusión del estudio
hidrológico del Sistema Integral Lagunillas. Proyecto Especial Binacional Lago
Titicaca. Puno, Perú.
 PELT. 2007. Inventario y usos actuales de agua de las irrigaciones en el departamento
de Puno, Dirección de Estudios, Puno, Perú.
 PELT. 2008. Estudio batimétrico del embalse Lagunillas. Dirección de Estudios.
Puno, Perú.
 Villón, M. 1983. Diseño de capacidad de embalses por el método experimental -
teoría del rango. Tesis para optar el Grado de Magister Scientiae, UNA - La Molina,
Lima, Perú.
 Villón, M. 2002. Hidrología estadística. Escuela de Ingeniería Agrícola, Instituto
Tecnológico de Costa Rica. Segunda Edición. Editorial Villón. Lima, Perú.
 Villón, M. 2002. Hidrología. Escuela de Ingeniería Agrícola. Instituto Tecnológico
de Costa Rica. Segunda Edición. Editorial Villón. Lima, Perú.
 Yevjevich, V. 1972. Stochastic process in hydrology. Water Resources Publications.
Fort Collins. Colorado. USA.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 67
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

VI. ANEXOS

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 68
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.1

Estudio geológico preliminar de los planteamientos alternativos de afianzamiento del


Sistema Integral Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 69
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ESTUDIO GEOLÓGICO PRELIMINAR DE LOS PLANTEAMIENTOS


ALTERNATIVOS DE AFIANZAMIENTO DEL SISTEMA INTEGRAL
LAGUNILLAS

CONTENIDO

1.0. INTRODUCCIÓN...................................................................................................... 72
1.1. Generalidades ...................................................................................................... 72
1.2. Objeto del Estudio ................................................................................................ 72
1.3. Utilidad de los Resultados .................................................................................... 72
1.4. Ubicación del Área de Estudio, Extensión y Acceso ............................................... 73
1.5. Metodología de Trabajo ....................................................................................... 73
1.6. Ámbito de Estudio ................................................................................................ 73
2.0. GEOLOGÍA, GEOMORFOLOGÍA Y GEOTECNIA DEL AMBITO DE ESTUDIO ............... 74
2.1. Geología Regional................................................................................................. 74
2.2. Geomorfología Regional ....................................................................................... 74
2.3. Formaciones Geológicas Regionales ..................................................................... 74
2.3.1. Grupo Cabanillas (SD-cb) .................................................................................... 74
2.3.2. Grupo Lagunillas (JK-lg) ...................................................................................... 75
2.3.3. Formación Calizas Ayabacas (K-ay) ..................................................................... 75
2.3.4. Grupo Puno (T-Pu) ............................................................................................. 75
2.3.5. Grupo Tacaza (T-Ta) ........................................................................................... 75
2.3.6. Grupo Palca (T-Pa) ............................................................................................. 76
2.3.7. Grupo Sillapaca (T-si) ......................................................................................... 76
2.3.8. Cuaternario ........................................................................................................ 76
2.4. Geomorfología Local ............................................................................................ 77
2.4.1. Agentes y factores de modelamiento geomorfológico ....................................... 77
2.5. Unidades Geomorfológicas................................................................................... 79
2.5.1. Sistema Antrópico .............................................................................................. 79
2.5.2. Sistema Fluvial ................................................................................................... 80
2.5.3. Sistema Volcánico .............................................................................................. 81
2.6. MARCO GEOLÓGICO............................................................................................. 82
2.7. ESTRATIGRAFÍA LOCAL ......................................................................................... 82
2.7.1. Cenozoico .......................................................................................................... 82
2.7.2. Depósitos Inconsolidados del Cuaternario ......................................................... 83
2.8. GEOLOGÍA ESTRUCTURAL ..................................................................................... 84
2.9. GEOTECNIA .......................................................................................................... 84
2.9.1. Cimentación ....................................................................................................... 84
2.9.2. Geotecnia – Cimentación (Presa Verde) ............................................................. 85
2.9.3. Geotecnia – Cimentación (Presa Paratía) ........................................................... 86
2.9.4. Geotécnica – Cimentación (Presa Jarpaña) ......................................................... 87
2.9.5. Geotécnica – Cimentación (Presa Millo) ............................................................. 88
2.9.6. Análisis de la cimentación (Roca) ....................................................................... 89
2.9.7. Análisis de la cimentación (Gravas y arenas) ...................................................... 91
2.9.8. Geotecnia – Áreas de Embalse. .......................................................................... 92

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 70
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.9.9. Geotecnia – Cimentación (Bocatoma Jarpaña) ................................................... 93


2.9.10. Geología Eje Canal y Túnel de derivación (Canal de Derivación Jarpaña) ............ 94
2.10. HIDROGEOLOGÍA.................................................................................................. 96
2.10.1. Hidrogeografía de la vertiente del Pacifico ......................................................... 96
2.10.2. Condiciones Hidrogeológicas.............................................................................. 96
2.10.3. Puquiales Subsuperficiales en laderas ................................................................ 96
2.11. MATERIALES DE CONSTRUCCIÓN.......................................................................... 97
2.11.1. Materiales para relleno de la Presa .................................................................... 97
2.11.2. Materiales para agregados de Concreto ............................................................. 97
2.11.3. Material para obras especiales en la Presa ......................................................... 97
2.11.4. Previsiones Constructivas ................................................................................... 97
2.12. CANTERAS ............................................................................................................ 97
2.12.1. Material Granular............................................................................................... 97
2.12.2. Diseño de Filtros ................................................................................................ 98
2.12.3. Material Semi permeable – Área de embalse (Msp-1) ........................................ 99
2.12.4. Cantera de Roca ............................................................................................... 100
3.0. CONCLUSIONES .................................................................................................. 100
4.0. RECOMENDACIONES.......................................................................................... 101
5.0. ANEXOS ............................................................................................................. 102
1.1.1. Resultados de análisis de mecánica de suelos
1.1.2. Informe final de exploración geofísica método de resistividad (SEV)
Eje de presa Verde.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 71
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.0. INTRODUCCIÓN
1.1. Generalidades
La Evaluación Geológica – Geotecnia Preliminar de los Planteamientos Alternativos
de Afianzamiento del Sistema Integral Lagunillas que contempla el proyecto,
consiste esencialmente en la caracterización geológica y el análisis de los materiales
que las constituirán y los correspondientes a su cimentación.

El primer problema básico corresponde a las cimentaciones de las estructuras, sin


embargo, en los diferentes casos, las condiciones de cimentación de las estructuras
proyectadas están constituidas por depósitos rocosos y morrénicos – aluviales. El
segundo tema que surge es la elección de los posibles materiales que requieran las
diferentes estructuras de contención (Materiales granulares, materiales impermeables
y enrocado). Uno de los factores importantes aceptados en la práctica es que para que
la solución sea viable, los materiales deben encontrase a poca distancia y ser de buena
calidad.

Las Investigaciones Geotécnicas han sido desarrollados en forma preliminar,


permitiendo establecer las condiciones actuales de la estratigrafía del suelo a lo largo
de los ejes de presas, zona de embalsamiento y estructuras conexas, determinar los
parámetros geotécnicos de la cimentación y las características físico mecánicos de
los materiales de préstamos y canteras; parámetros y características que deben ser
tomados en cuenta en los diseños de las obras civiles, y que se sustentan con los
resultados de las investigaciones de Mecánica de Suelos: Excavaciones exploratorias,
ensayos In Situ y ensayos de laboratorio.

El presente Informe se centrará en el análisis de las propiedades relevantes de los


materiales de las cimentaciones y de los préstamos, tratando de determinar los
parámetros o el rango de variabilidad de los mismos, que sean determinantes, tanto
en el diseño, como en la construcción y funcionamiento de las estructuras.

1.2. Objeto del Estudio


 Investigar y analizar los aspectos Geológicos – Geotécnicos de cada una de los
planteamientos alternativos de afianzamiento del Sistema Integral Lagunillas.
 Conocer y caracterizar las condiciones Geotécnicas del terreno de fundación y
de los materiales para el diseño de las infraestructuras.

1.3. Utilidad de los Resultados


 Garantizar la seguridad y durabilidad de los represamientos.
 Los resultados del presente estudio serán utilizados para los pre-diseños de las
principales infraestructuras planteadas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 72
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.4. Ubicación del Área de Estudio, Extensión y Acceso


El área de estudio corresponde a la cuenca alta del río Cabanillas, abarcando un área
aproximada de 614.39 Km2, geográficamente se enmarca entre las coordenadas
UTM, que se muestran en el Cuadro 1.1.1.

Cuadro 1.1.1: Delimitación del área de estudio


COORDENADAS UTM ÁREA TOTAL
VÉRTICE
ESTE NORTE (Km2)
1 295171 8287786
2 321065 8287786
614.39
3 321065 8264059
4 295171 8264059

El acceso al área de estudio es posible a través de diferentes carreteras, tal como se


muestra en el Cuadro 1.1.2.

Cuadro 1.1.2: Cuadro de distancias a zona de estudio


Distancia Tiempo
Tramo Tipo de Vía Vía Principal
(Km) (Minutos)
Puno – Santa Lucía 102 75 Asfaltada Puno – Arequipa
Santa Lucía – Desvio Paratía 14 10 Asfaltada Puno– Arequipa
Desvio Paratía – Zona de Estudio 15 20 Afirmada Red Rural

1.5. Metodología de Trabajo


La metodología de trabajo para el desarrollo del Estudio Geológico Preliminar de los
Planteamientos Alternativos de Afianzamiento del Sistema Integral Lagunillas, se
resume a continuación:

a) Trabajo de campo
Para cumplir con esta fase, se han efectuado las siguientes actividades:
 Recopilación, análisis y síntesis de la información existente.
 Reconocimiento de campo.
 Prospección, geológica y geomorfológica.

b) Trabajo de Gabinete
 Ensayos de mecánica de suelos
 Descripción de muestras de rocas.
 Redacción del informe.
1.6. Ámbito de Estudio
El área de estudio políticamente se localiza en los distritos de Santa Lucía, y Paratía,
provincia de Lampa, región Puno.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 73
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.0. GEOLOGÍA, GEOMORFOLOGÍA Y GEOTECNIA DEL AMBITO DE


ESTUDIO
2.1. Geología Regional
Como corresponde para todo tipo de obras civiles y particularmente, para obras
longitudinales como es el caso de la Presa y canales, es importante el estudio del
contexto geológico regional, ya que, como es de deducir, la evaluación del medio
natural determina los tipos de rocas y suelos a ser atravesados, así como los problemas
de geodinámica externa que la afectarán; calificando finalmente, la factibilidad
técnico – económica de las estructuras hidráulicas planteadas.

2.2. Geomorfología Regional


Regionalmente en el área de estudio se encuentran dos unidades geomorfológicas
dominantes: Zona de Cordillera, desarrollado sobre los 4000 m.s.n.m.; y que
flanquean la meseta, se elevan hasta 5,300 m.s.n.m.

La evolución geomorfológica de la región está ligada al levantamiento andino, que


determinó el afloramiento de rocas mesozoicas. La tectónica y la acción climática,
esencialmente glaciar, han contribuido a configurar la expresión topográfica actual.

La región está caracterizada por la superposición del vulcanismo Paleógeno Neógeno


sobre la penillanura de Puna, cuyos afloramientos están constituidos por rocas de
origen volcánico, andesitas, traquitas, ignimbritas y todas daciticas la cual representa
un horizonte fallado y plegado por la orogénesis y descansa sobre el horizonte
mesozoico, cuyos afloramientos muestran rocas calcáreas, areniscas y
conglomerados.
La cuenca de Paratía se identifica morfológicamente en el nivel Puna. El nivel Puna
llamado también superficie Puna en la región alta del Altiplano Andino, en que
planicies casi a nivel se extienden entre los valles principales con altitudes fluctuantes
entre los 3900 a los 4600 m.s.n.m. y representan los restos de la altiplanicie pliocénica
nivelada por la erosión.

2.3. Formaciones Geológicas Regionales


La descripción de cada una de las formaciones geológicas regionales es resultado de
la interpretación del Plano GG-01, elaborado a partir del mapa geológico hoja 32 –
U, correspondiente a Lagunillas.

2.3.1. Grupo Cabanillas (SD-cb)


Constituidos por una serie potente, compuesta de alternancias de lutitas grises,
negras y gris olivo oscuras con menor cantidad de areniscas con cuarcitas argiláceas
y limolitas. Pertenece al Siluro-Devónico.

Los afloramientos de la formación Cabanillas, se ubican al Oeste de la zona de riego


de Cabana, al Este, Oeste y Sur de Cabanillas y en la zona de Cupe, a ambas

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 74
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

márgenes del río Cabanillas, pasando por la parte posterior del pueblo de Cabana.
2.3.2. Grupo Lagunillas (JK-lg)
Constituidos en la base se tienen calizas cubiertas por lutitas piritosas, con calizas
delgadas intercaladas cerca al tope. Finalmente areniscas cuarzosas con desechos
de plantas en el techo e intercalaciones de limotitas rojas. La edad del grupo, es
Jurásico - Cretácico.

Dentro del área del Proyecto se ubica alrededor de la laguna Lagunillas y en el


borde de la laguna Saracocha.

2.3.3. Formación Calizas Ayabacas (K-ay)


El nombre viene de la localidad de Ayabacas en el cuadrángulo de Juliaca, en la
Carretera Juliaca - Taraco y constituye una intersecuencia de calizas y capas rojas
de fangolitas.

Se le asigna edad cretácica; bordea la laguna Lagunillas y en ambas márgenes a


inicio del rio Cabanillas.

2.3.4. Grupo Puno (T-Pu)


El grupo consiste de areniscas feldespáticas como arcosas con conglomerados
comunes, limolitas subordinadas, calizas y horizontes de tufos. Las areniscas son
de color rosado a marrón rojizo, bien clasificadas, masivas a bien estratificadas y
de tamaño de grano variable, los granos de cuarzo son típicamente monocristalinos,
angular a subredondeados.

Las estructuras sedimentarias incluyen depresiones y estratificación cruzada con


rizaduras, ripple-marks, lineaciones de corrientes, conductos, marcas de arrastre
irregulares y estructuras de pliegues. Son comunes en fangolitas rojas y
conglomerados limolíticos a lo largo de la base de las areniscas gruesas,
sobreyaciendo a las capas de limolitas y fangolitas.

Los conglomerados del Grupo contienen una variedad de clastos compactos como
los que sencuentran en borde izquierdo de laguna saracocha, los cuales incluyen
calizas grises, cuarcitas y areniscas rojas, limolitas, venas de cuarzo, dioritas,
microdioritas, cherts, jaspes y una selección de volcánicos basálticas.

2.3.5. Grupo Tacaza (T-Ta)


En el sector de Lagunillas está el área típica y consisten de aproximadamente 400
m de andesitas bien estratificadas, lavas de andesitas basálticas y tufos en bloques,
con una alta proporción de sedimentos fluviales; en la parte basal hay un cambio
total hacia arriba de las lavas de augita porfirítica a lavas de plagioclasa porfirítica
con fenocristales de hasta 5 mm.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 75
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cerros moderados circunscritos a la ciudad de Paratía y la parte lateral y cabecera


del Embalse Verde.

Presenta una litología dominante en el área hacia el norte, de lavas andesitas


porfiticas desde color grises a marrones su matriz volcánica y sus componentes
principales de mineral plagioclasas de color blanquecinos, los afloramientos son
compactos, competentes la roca.

Descansa casi siempre en discordancia cobre rocas del Mesozoico o del grupo Puno,
a su vez superpuesto por varios volcánicos del Cenozoico que se extienden desde
las ignimbritas del grupo Palca y lavas del grupo Sillapaca.

2.3.6. Grupo Palca (T-Pa)


La constituyen ignimbritas del tipo soldadas que se alinean desde Ocuviri, su
control morfológico principal, es el grado de intemperismo, el mismo que es notable
por las junturas cuyo enfriamiento producto de un diseño ortogonal, presenta lados
escarpados en los valles.

En la zona infrayace a la secuencia de la Cordillera de Sillapaca. La base expuesta


al Norte de Palca, donde este grupo descansa en discordancia angular sobre el grupo
Tacaza. El contacto superior tiende a ser transicional con el grupo Sillapaca
suprayacente. Se observa un contacto interdigitado con las lavas de Sillapaca, en la
laguna Chilapata así como también en el cerro Hanquerani.

2.3.7. Grupo Sillapaca (T-si)


La sección geológica típica está en el cerro Sillapaca Chico con un grosor de 650m,
cuya cumbre es una dacita exógena que forma un domo de 250 m de alto, el domo
se encuentra cercano a la verticalidad, con flujos laminados de dacita porfirítica.
La parte superior de la secuencia que está debajo del domo, es de 100 m de lavas
dacíticas a andesíticas de color rojo a púrpura, con fenocristales de plagioclasas; la
parte inferior es zonas de flujos lávicos dacíticos y traquiandesíticos de grano medio
con fenocristales de plagioclasas.

Estas secuencias tienen una composición bastante consistente, la variación


petrográfica es un incremento hacia arriba de la proporción de biotita.

En la zona de estudio, esta Formación se presenta como afloramiento localizado


hacia la margen derecha en inicio del rio Verde.
2.3.8. Cuaternario
Tenemos varios depósitos del reciente al más antiguo.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 76
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

a) Depositos aluviales y coluviales (Q-al)


Se emplaza mayormente en los ríos Jarpaña, Paratia, Verde y Cabanillas,
comprenden arcillas y limos de poco espesor (menor a 1 m) y debajo arenas y gravas
no consolidadas, depositadas por las corrientes de ríos, flujo de agua y corrientes
laminares, se incluyen a los depósitos coluviales que se depositan en la base.

b) Depósitos de Morrenas (Q-m)


Las morrenas son Pleistocénicas y compuesto de till sin estratificación, se presentan
como morrenas laterales que se distribuyen ampliamente, formando crestas rectas
o arqueadas, consistiendo mayormente de limos y arcillas mezclados con arenas y
gravas, con canto y bolonería. Las morrenas se presenta como: laterales, de fondo
como buenos ejemplos se presentan en los alrededores del río Jarpaña.

c) Depósitos de grava de rio (Q-gr)


Por encima del nivel del rio Verde presenta aproximadamente 23 m de grava de
guijarros y arena con rodados depositados en cuatros terrazas de las cuales la más
alta esta a 23 metros.

La geoforma deltaica que presenta es del ingreso de la margen izquierda desde la


quebrada Taca, Los componentes de materiales rocosos redondeados de guijarros
son rocas andesitas grises y riolitas.

2.4. Geomorfología Local


Los caracteres geomorfológicos locales de la zona se deben a procesos exógenos de
degradación y agradación o acumulación, cuya secuencia de conformación estaría
dada a partir de la presencia del volcánico Tacaza, Palca y Sillapaca. A partir de este
se produce una intensa erosión lineal, dando lugar a valles en forma de “V” cuyos
fondos alcanzaron las cotas de 4100 a 4300 m.s.n.m. Finalmente debido a procesos
tectónicos y a fenómenos climáticos, se constituyeron los depósitos Morrénicos y
Fluvio – aluviales del cuaternario reciente. Ver Plano GG-01.

2.4.1. Agentes y factores de modelamiento geomorfológico


Los agentes y factores del modelamiento geomorfológico de la zona de estudio más
importantes que han modelado el área en las diversas épocas geológicas son:

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 77
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.4.1.1. Tectónicos
La tectónica de la zona con fallamientos y movimientos epirogenéticos;
desarrollados antes de la efusión volcánica y la última glaciación, ha modelado la
superficie del área.
Actualmente existe una calma tectónica por lo que las estructuras son
controladores pasivos en los procesos morfodinámicos actuales.

2.4.1.2. Volcánicos
La configuración morfológica del área se debe también a la efusión volcánica
Neogena, que ha formado conos y planicies lávicas; antes de la última glaciación.
Actualmente existe una calma volcánica, al igual que la tectónica.

2.4.1.3. Hidroclimaticos
Durante la última glaciación y la actual deglaciación se produjeron períodos
climáticos de altas precipitaciones que son los principales agentes del desgaste y
consiguiente modelado. Actualmente estos agentes son los más relevantes en los
procesos morfodinámicos, debido a que la precipitación total promedio multianual
en la zona de estudio es 790 mm; esta desarrolla los actuales procesos erosivos
más importantes en la zona.

En la definición de las unidades, el clima es sólo indirecto, pues constituye un


factor muy importante, porque condiciona la influencia de los factores del
modelado y, por lo tanto las formas del relieve.

El clima de la zona está influenciado principalmente por la orografía y la altitud,


donde las precipitaciones son estaciónales, presentándose durante los meses de
verano (enero – Marzo), período en el cual ocurre alrededor del 60 al 70% de la
precipitación total anual.

Las temperaturas presentan una fuerte variación entre el día y la noche, siendo
más notorio durante los meses de invierno, cuando el cielo está despejado de
nubosidad; con frecuencia, durante las noches la temperatura desciende por debajo
de 0 °C.

Por lo tanto, el modelado de la zona actualmente está íntimamente ligado al factor


climático, y los procesos geodinámicos se dan con mayor énfasis en periodos de
avenidas, y los procesos de crioclastía en periodos invernales.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 78
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.4.1.4. Eólicos
Estos son de importancia en la zona debido a la escaza cobertura vegetal,
afloramientos líticos y la orientación topográfica que protege del desarrollo de las
corrientes y trombas que ocurren en las planicies.

Sin embargo, los vientos generados por las diferencias de presión, durante el día
y la noche, son persistentes e influyen en la erosión laminar de laderas
descubiertas.

2.4.1.5. Antropomórficos
Actualmente no existe desarrollo de infraestructura importante, tan solo carreteras
vecinales y viviendas bastante aisladas.

2.5. Unidades Geomorfológicas


En la zona de estudio, durante los trabajos de campo se ha podido identificar tres
sistemas (Antrópico, Fluvial, y Volcánico), los mismos que contienen 9 unidades
geomorfológicas, las que se presentan en el Cuadro 1.1.3.

Cuadro 1.1.3: Unidades geomorfológicas identificadas


SISTEMA UNIDAD
Antrópico Viviendas, vías de acceso
Ríos
Depósitos aluviales
Fluvial
Terrazas
Bofedales
Colinas altas
Sedimentario Colinas bajas
- Volcánico Escarpas
Ladera de Montaña

2.5.1. Sistema Antrópico


Está constituido por las construcciones y/o modificaciones efectuadas en la
superficie tales como:
 Vías de acceso local.
 Viviendas comunales.

Posteriormente se realizarán también:


 Excavación de plataformas de cimentación de la Presa.
 Áreas de excavaciones para explotación de canteras.
 Zonas de botaderos de escombros.
 Caminos de acceso.
 Explanaciones para áreas administrativas y vivienda del operador.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 79
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Vías de acceso
Edificaciones rurales

Foto 1.1.1: Unidades geomórficas del sistema antrópico.

2.5.2. Sistema Fluvial


Este sistema contiene unidades que tienen relación directa con el escurrimiento
superficial de las aguas, dichas unidades son:
 Cauce Fluvial.- Corresponde a la zona de escorrentía superficial del río Paratía
y río Verde; en los periodos de incremento del caudal predominan los procesos
de inundación que pueden comprometer las partes bajas del valle.
 Depósitos aluviales: Corresponde a la unidad que se emplaza dentro de ambas
márgenes de los ríos, está compuesta de material fluvio-aluvial (Gravas, arenas,
y material fino) con cantos redondeados a subredendeados de diferente
naturaleza lítica.
 Terrazas Aluviales.- Se localizan en ambas márgenes del cauce del río Paratía.
Se caracteriza por presentar un relieve plano con poca inclinación y pendientes
subhorizontales (inferior a 1º). Esta sub-unidad geomorfológica se halla limitada
hacia sus márgenes laterales por la llanura aluvial.
 Bofedales.- Compuesto por material hidromórfico fango-arcilloso con material
orgánica vegetal en proceso de tuberización en medio acuoso.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 80
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Terrazas aluviales

Bofedales

Cauce fluvial

Depósitos aluviales

Foto 1.1.2: Unidades geomórficas del sistema fluvial río Paratía.

2.5.3. Sistema Volcánico


Está constituido por geoformas originadas por edificación tectónica y volcánica; así
como, originadas por denudación muy relacionada con la composición litológica.
Se pueden distinguen las siguientes unidades:
 Colinas altas: Se encuentran principalmente en las zonas circundantes del área,
por el desgaste lento sobre las rocas, volcánicas de naturaleza Piroclástica
principalmente, el modelado es abrupto.
 Colinas bajas: Se han formado en las partes más bajas, con laderas suaves que
gradualmente pasan a las geoformas de aplanamiento.
 Escarpas: Se ubican en las partes altas del vaso Paratía. Están compuestas de
rocas volcánicas Palca.
 Laderas de Montaña: Se emplazan en los flancos de las montañas, presentan
pendientes variadas y cubiertas por material coluvial de relativa estabilidad. Es
en ésta zona donde se aprecia con mayor énfasis la erosión laminar.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 81
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Escarpas
Colinas altas

Laderas de montaña Colinas bajas

Foto 1.1.3: Unidades geomórficas del sistema volcánico.

2.6. MARCO GEOLÓGICO


En la Cordillera Occidental el Paleógeno y Neógeno (Terciario), fue marcado por
tres fases de vulcanismo calco-alcalino siendo Tacaza (oligoceno superior – Mioceno
inferior), Sillapaca (Mioceno Medio) y Barroso (Mioceno – Superior y Plioceno), las
dos últimas fases volcánicas hicieron erupciones ignimbríticas. En el Mioceno medio
una cuenca lacustre de poca profundidad se formo en la Cordillera Occidental, en
ella fue depositado el grupo Maure. La intercalación de lavas así como las relaciones
estratigráficas indican que esta cuenca existió hasta el Plioceno. El vulcanismo
continúa hasta el reciente

En la zona de estudio, se han podido reconocer rocas cuyo rango de edad van desde
el Paleogeno – Neógeno (Volcánico Tacaza, Palca y Volcánico Sillapaca) hasta el
reciente.

2.7. ESTRATIGRAFÍA LOCAL


En el presente ítem se describen, los principales afloramientos rocosos circundantes,
en un área de influencia del área de estudio. La descripción se efectúa en base a la
información obtenida a parir de mapas regionales a escala 1:100,000 del
INGEMMET. Ver Plano GG-01.

2.7.1. Cenozoico
2.7.1.1. Grupo Tacaza (NM – vt)
En la zona, la mayor parte de los afloramientos del Grupo Tacaza están
constituidos por sedimentos vulcano-clásticos; y por derrames andesíticos bien
estratificadas, lavas de andesitas basálticas y tufos de bloques, con sedimentos

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 82
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

fluviales en una alta proporción en la parte basal. Existe un cambio total hacia
arriba de las lavas de augita porfirítica a lavas de plagioclasa porfirítica con
fenocristales de hasta 0,5 cm.

En el sector NE y NW de la zona de estudio estas rocas se encuentran intensamente


alteradas y presentan geoformas de colinas redondeadas. Se le asigna una edad
Neógeno Mioceno inferior.

2.7.1.2. Grupo Palca (PN- Pa)


Son secuencias piroclásticas y sedimentarias que reposan discordante sobre el
volcánico Tacaza, que forman superficies de plataforma disectada a una cota de
aproximadamente 4,600 m. En los alrededores de Palca y hacia el norte, los planos
de junturas facilitan la erosión formándose zanjas profundas y dan un aspecto de
fracturamiento en los afloramientos, produciéndose en los costados de los valles,
bordes prominentes.

2.7.1.3. Grupo Sillapaca (NP – si)


La secuencia está conformada predominantemente por lavas que forman riscos,
principalmente de composición dacítica a traquiandesítica. Se muestran
principalmente como cordilleras cubiertas de nieve con picos por encima de los 5
000 m.s.n.m, siendo característicamente peñascos como resultado de la presión de
congelamiento del agua en las grietas de las rocas.

En el área de, esta secuencia descansa en discordancia angular sobre el volcánico


Tacaza.

2.7.2. Depósitos Inconsolidados del Cuaternario


2.7.2.1. Depósitos Glaciares
Los materiales que conforman las morrenas, se presentan sin estratificación o muy
pobremente estratificados y muy pobremente clasificados, los cuales consisten
principalmente de bloques dispersos de rocas volcánicas, englobados por gravas,
arenas, limos y arcillas.

2.7.2.2. Depósitos Coluviales (Q – co)


Se considera a las acumulaciones sueltas que ocurren rellenando, tapizando las
laderas o flancos de los picos montañosos y colinas, producto de la crioclastia y
derrubiación de los paquetes volcánicos expuestos, favorecidos por la acción del
intemperismo.

Son depósitos, diferenciados básicamente por su especial configuración,


conformando taludes de escombros nivales de relativo poco transporte y cuya
formación virtualmente continúa hasta el presente.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 83
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Estos tienen gran distribución en los alrededores del vaso constituyendo detritus
de talud que cubren en gran parte las vertientes en sus laderas medias y bajas. Los
materiales depositados por acción combinada de la gravedad y las lluvias son de
naturaleza arcillo-arenosa, englobando bloques, piedras y gravas de composición
volcánica.

2.7.2.3. Depósitos Fluvio -Aluviales


La acción fluvial se limita al cauce del los ríos Verde, Paratía y Jarpaña. El cauce
fluvial es ampliamente desarrollado, con anchos de 10.00 a 50.00 m en el sector
de confluencia de ríos, el material de relleno lo conforman boleos, gravas
subangulosas a subredondeadas de composición silícea, en su mayor parte, con
arena gruesa y algo de limo.

2.8. GEOLOGÍA ESTRUCTURAL


Estructuralmente, las líneas dinámicas del levantamiento Andino han quedado
marcadas en la región, pues la mayoría de las formaciones plegadas y levantadas han
tomado un rumbo SE - NW que es más o menos paralelo a la alineación de la
cordillera.

La región por tener afloramientos Mesozoicos que han sido afectados en diferentes
épocas por el tectonismo es obviamente sede de fallas regionales, las cuales son
difíciles de localizar, debido a la deposición de rocas volcánicas que han recubierto
y soldado muchas fallas antiguas y estos a su vez, deformados por eventos tectónicos
posteriores del ciclo orogénico andino, pero en menor intensidad.

El rasgo estructural más importante lo constituye el alineamiento volcánico del


Tacaza – Sillapaca. Este, cuya configuración al parecer está controlada por sistemas
de fallas de dirección Noroeste-Sureste (NW – SE).

Las otras estructuras reconocidas corresponden mayormente a alineamientos de falla


de rumbo dominante Noreste – Suroeste (NE-SW), conjuntamente con otros sistemas
NW-SE, que cortan las estructuras rocosas con grado variable de inclinación. Es
probable que algunas de estas estructuras guarden relación con los procesos de
alteración – mineralización del área.

2.9. GEOTECNIA
2.9.1. Cimentación
Corresponden a investigaciones complementarias de Mecánica de Suelos
orientadas a determinar las principales características geotécnicas en los sectores en
donde se implantarán las estructuras de la Presa Verde, Paratía, Jarpaña y Millo, así
como de las bocatomas Verde y Jarpaña.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 84
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

a) Investigaciones Geotécnicas ejecutadas


Las investigaciones geotécnicas para cimentación se fundamentan con
exploraciones del subsuelo mediante el método de resistividad (SEV), excavaciones
exploratorias (Calicatas), ensayos de mecánica de suelos (suelos, rocas y
agragados), orientadas a determinar los Parámetros Geotécnicos de los diferentes
materiales de cimentación. Teniendo en cuenta las características geológicas, se
procedió a ejecutar:

a.1) Exploración Geofísica – Método de Resistividad (SEV)


El levantamiento geofísico consistió en la realización de dos (02) puntos de
resistividad en total, con alas AB de 500 m, localizados en la zona de cierre del
embalse Verde, exploración que permitirá determinar por inducción de intensidad
de corriente a diversas instancias de la superficie del suelo; la potencia de los
estratos, identificación de zonas con probable presencia de agua, secuencia
estratigráfica de capas y el probable basamento rocoso.

a.2) Excavaciones Exploratorias


Se ejecutaron un total de dos (02) excavaciones exploratorias (calicatas) y se
alcanzaron profundidades entre 1.00 a 1,50 m; en algunos casos y cuando las
condiciones del terreno lo permitían se complementaron con lecturas de los perfiles
naturales; acción que ha permitido verificar la estratigrafía del área.

a.3) Ensayos de Mecánica de Suelos


Los ensayos de suelos de cimentación se orientaron para definir sus principales
propiedades físico, mecánicas e hidráulicas. Se ejecutaron los siguientes ensayos
siguiendo las normas del U.S. Bureau of Reclamatión (USBR) y del American
Society for Testing Materiales (ASTM):

 Granulometría SUCS (ASTM-D-1422)


 Humedad natural (ASTM-D-216)
 Límite líquido (ASTM-D-4318)
 Límite plástico (ASTM-D-4318)

Los resultados de los ensayos estándar de mecánica de suelos se acompañan en los


Anexos correspondientes, y los parámetros utilizados en la interpretación
geotécnica.

2.9.2. Geotecnia – Cimentación (Presa Verde)


En la zona de cierre elegido, el estribo derecho está conformado por un tipo de roca
del grupo Palca, que presenta características de resistencia un tanto deficientes, sin
embargo, el estribo izquierdo está constituido por roca Ignimbrita con mejores
condiciones de resistencia en comparación al estribo derecho.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 85
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

De acuerdo a los estudios geofísicos efectuados en la zona de cierre (Ver Informe


Final de Exploración Geofísica Presa Verde en Anexo 1.1.2), se ha estimado que la
potencia del material gravoso depositado en el río Verde tiene una potencia variada
de 30 a 50 m.

La presa se cimentará en rocas Ignimbritas de propiedades geotécnicas regulares, a


ella sobreyacen suelos de grava de río.

A nivel del cauce, en el fondo del valle, no será necesario eliminar el material
gravoso del río el cual tiene un espesor de 50 metros aproximadamente. Se
recomienda la impermeabilización hasta el sustrato rocoso de Ignimbritas y en las
laderas será necesaria el desbroce de material de depósito Deluvial hasta alcanzar
el estrato rocoso de Ignimbritas, aproximadamente a 1 o 2 m.

2.9.3. Geotecnia – Cimentación (Presa Paratía)


a) Estribo Izquierdo
La evaluación geotécnica ha definido el siguiente perfil estratigráfico típico:
 De 0.00 a ± 2.00 m: Está conformado por material coluvial (arena limosa, con
clastos y bloques subangulosos de roca).
 De 2.00 a más: Se observa el substrato rocoso conformado por ignimbritas
rosado pálido blanquecino, similar al que se encuentra en el área entre estribos
del eje 1.

b) Zona Entre Estribos


La evaluación geotécnica ha definido el siguiente perfil estratigráfico típico:
 De 0.00 a ± 30.00 m: Conformado por un relleno aluvial del río Paratía, que por
su desarrollo geomorfológico debe tener de ± 30,00 m. de gravas y arena, hasta
llegar al substrato rocoso. En esta zona se ubica también el cauce del río Paratía.
 De 30.00 m. a más: Se deduce la presencia de un substrato rocoso, conformado
por ignimbritas rosado pálido blanquecino, blanda, con clastos de pumita color
crema y fragmentos de andesita lítica.

c) Estribo Derecho
La evaluación geotécnica ha definido el siguiente perfil estratigráfico típico:
 De 0.00 a más: Está conformado por material morrénico y coluvial (arena
limosa, con clastos y bloques subangulosos de roca). De acuerdo a la
configuración geomorfológica, en profundidad se encontrará el mismo material.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 86
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Estribo izquierdo

Área entre estribos

Estribo derecho

Foto 1.1.4: Zona de cierre del embalse Paratía.

2.9.4. Geotécnica – Cimentación (Presa Jarpaña)


a) Estribo Izquierdo
La evaluación geotécnica ha definido el siguiente perfil estratigráfico típico:
 De 0.00 m a más: Se observa el substrato rocoso conformado por ignimbritas
rosado pálido blanquecino, similar al que se encuentra en el área entre estribos
del eje 1 de la presa Paratía, con formas escarpadas.

b) Zona Entre Estribos


 De 0.00 m a más: Se deduce la presencia de un substrato rocoso, conformado
por ignimbritas rosado pálido blanquecino, blanda, con clastos de pumita color
crema y fragmentos de andesita lítica, con muy poca cobertura de material
aluvial.
c) Estribo Derecho
 De 0.00 m a más: Está conformado por substrato rocoso, conformado por
ignimbritas rosado pálido blanquecino, blanda, con clastos de pumita color
crema y fragmentos de andesita lítica, con fragmentos y bloques en superficie.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 87
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Estribo izquierdo

Área entre estribos

Estribo derecho

Foto 1.1.5: Zona de cierre del embalse Jarpaña.

2.9.5. Geotécnica – Cimentación (Presa Millo)


a) Estribo Izquierdo
La evaluación geotécnica ha definido el siguiente perfil estratigráfico típico:
 De 0.00 a ± 5.00 m: Está conformado por material y coluvial (arena limosa, con
clastos y abundantes bloques subangulosos de roca).
 De 5.00 m a más: Se observa el substrato rocoso conformado por derrames
vulcano-clásticos; y andesíticos bien estratificadas, lavas de andesitas basálticas
y tufos de bloques

b) Zona Entre Estribos


 De 0.00 a ± 2.00 m: Conformado por un relleno aluvial del río Jarpaña, que por
su desarrollo geomorfológico angosto debe tener de ± 2,00 m. de gravas y arena,
hasta llegar al substrato rocoso. En esta zona se ubica también el cauce del río
Jarpaña.
 De 2.00 m. a más: Se deduce la presencia de un substrato rocoso, conformado
por sedimentos vulcano-clásticos; y por derrames andesíticos bien estratificadas,
lavas de andesitas basálticas y tufos de bloques.

c) Estribo Derecho
 De 0.00 a ± 5.00 m: Está conformado por material morrénico y coluvial (arena
limosa, con clastos y bloques subangulosos de roca). De acuerdo a la
configuración geomorfológica, en profundidad se encontrará el substrato rocoso.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 88
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 De 5.00 m a más: Está conformado por substrato rocoso, conformado


sedimentos vulcano-clásticos; y por derrames andesíticos bien estratificadas,
lavas de andesitas basálticas y tufos de bloques.

Estribo izquierdo

Estribo derecho

Foto 1.1.6: Zona de cierre del embalse Millo.

2.9.6. Análisis de la cimentación (Roca)


De acuerdo a las descripciones del perfil estratigráfico descritos anteriormente, el
terreno de fundación de la presa Paratía Eje 1, y Estribo izquierdo del eje 2 y presa
Jarpaña, serán la ignimbrita rosado pálido blanquecino, por lo que su Determinación
de la Capacidad de carga se estimará por el método de cimentaciones superficiales
en roca.

a) Cimentaciones Superficiales en Roca.

La expresión que proporciona la carga de hundimiento, Ph, es:

Ph   N    
En donde:

m m
 ci  i ci exp RMR  100
8 8 28

8s 8 RMR  100
   exp
m 2 mi2 25,2

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 89
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Siendo m, s y mi los parámetros del criterio de Hoek y Brown y ci el valor de la


resistencia a la compresión simple de la matriz rocosa. El coeficiente de carga N
es una generalización de los parámetros Nc y Nq de Prandtl; es función de la
inclinación del terreno, de la inclinación de las cargas y de la sobrecarga externa
normalizada actuando alrededor de la cimentación.

Sin entrar en consideraciones respecto al análisis de asientos, que podrían


determinar en algún caso singular el diseño de las cimentaciones en roca, es
necesario establecer la carga admisible, dividiendo la carga de hundimiento, Ph, por
un coeficiente de seguridad global. F, que puede expresarse como producto de dos
factores:
El factor Fp considera las variaciones estadísticas de los parámetros de la roca y su
magnitud está también vinculada a la probabilidad de rotura del cimiento. El factor
F  F p Fm
Fm cubre la posibilidad de que la rotura por fragilidad, de una parte o de la totalidad
del cimiento, no se ajuste al modelo de Hoek y Brown.

De acuerdo a las características observadas en el campo, estas, son las siguientes:


 Roca : Ignimbrita con RQD < 25%.
 Clase de roca : III (*)
 RMR : 42 (*)
 m : 1,89 (*)
 s : 0,00159 (*)
 mi : 15 (**)
 ci : 1,09 Mpa (***)
 N : 5
 Fp : 1
 Fm : 5
 F : 5
(*)
Valor estimado
(**)
Valores tomados de Hoek y Brown (1997)
(***)
Valor estimado

Calculando la carga de hundimiento, Ph, con las formulas establecidas, se tiene:


Ph = 1,29 MPa

Calculando la carga admisible = Ph /F

Ph /5 = 0,26 MPa = 2,64 Kg/cm2

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 90
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

b) Profundidad de Cimentación
Sobre la base del análisis anterior se recomienda cimentar las estructuras a una
profundidad media de 3,00 m., en las zonas destinada para las diferentes estructuras,
con el objeto de cimentar las estructuras en el material rocoso.

2.9.7. Análisis de la cimentación (Gravas y arenas)


En el Cuadro 1.1.4, se presenta la determinación de la capacidad de carga del suelo
(gravas y arenas).

Cuadro 1.1.4: Capacidad de carga del suelo


Tipo de Suelo Gravas arenosas bien
gradadas y mal
GW-GP gradadas
(f) 35,00°
2 0,00
c (Kg/cm )
3 1,20
g (Tn/m )
Dr (m) 5,00

En el Cuadro 1.1.5, se presenta las presiones admisibles del suelo (gravas y arenas).

Cuadro 1.1.5: Presiones admisibles del suelo


2 2 2
Teoría qu (Tn/m ) F.S. qa (Tn/m ) qa (Kg/cm )
Terzagui 45,00 3,00 15,00 > 1,50

a) Parámetros Geotécnicos
Al nivel de la cimentación los materiales presentan las siguientes características:
Geología : Depósitos Fluviales – aluviales.
Clasificación SUCS : GW-GP (Gravas arenosas).
Porcentaje de gravas : > 50%
Porcentaje de arenas : 45%
Porcentaje de finos : 5%.
Límite Líquido : NP
Límite Plástico : NP
Índice de Plasticidad : NP
Angulo de Fricción : 35,0°
Cohesión : 0,00 Kg/cm2
Capacidad Portante : > a 1,50 Kg/cm2
Permeabilidad : 1.0x10-3 a 5.0x10-3 cm/s.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 91
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

b) Profundidad de Cimentación
El terreno en general se presenta homogéneo en el área entre estribos, constituido
por material granular y areno - limoso de regular compacidad, estable.

Sobre la base del análisis anterior se recomienda cimentar las estructuras a una
profundidad media de 5,00 m.

2.9.8. Geotecnia – Áreas de Embalse.


a) Estanqueidad del Área de Inundación
Una de las condiciones básicas que debe reunir un embalse es su estanqueidad. Sin
embargo, dependiendo del uso del mismo, las pérdidas de agua pueden ser más o
menos tolerables. Así, un embalse de regulación de avenidas no requiere la misma
estanqueidad que para abastecimiento o regadío. Por otro lado, las condiciones de
impermeabilidad también deben ser analizadas en función de las necesidades del
aprovechamiento, ya que, en ocasiones, puede ser económicamente rentable
proceder a tratamientos de impermeabilización en zonas concretas.

La construcción de una presa supone un cambio importante en la hidrología e


hidrogeología de la cuenca afectada por el embalse, con la inundación de una parte
del valle, la elevación de los niveles freáticos y su oscilación periódica. Estas
modificaciones afectan a la hidrodinámica de los acuíferos, pudiendo producirse un
flujo de agua desde el embalse hacia el exterior del vaso, o bien una recarga del
embalse desde los acuíferos que bordean al vaso. El análisis de estos factores
corresponde a un estudio hidrogeológico, en la evaluación de los coeficientes de
permeabilidad del área de embalse.

El área de inundación de los embalses Verde, Paratía, Jarpaña y Millo por sus
características y la presencia de bofedales y substratos rocosos del volcánico Palca,
tendrá una estanqueidad relativamente buena.

b) Estanqueidad de Laderas de los Embalses


El llenado de un embalse supone los siguientes efectos:
 Imposición de una carga en las laderas y fondo del valle equivalente a la altura
de agua en cada punto del vaso.
 Elevación del nivel freático en las laderas del embalse.
 Cambios en las condiciones hidrogeológicas de los materiales afectados.
 Oscilación de los niveles freáticos en las laderas del embalse según las
condiciones de explotación del aprovechamiento.

Como consecuencia de estos efectos se produce cambios tensionales, cuyas


consecuencias pueden dar lugar a inestabilidades en las laderas del embalse.
Ante el riesgo de que se puedan producir estas situaciones de inestabilidad fue
necesario investigar la existencia de deslizamientos o zonas inestables, las cuales

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 92
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

luego de la evaluación no se observaron deslizamientos, por lo tanto no presentan


riesgo de esta índole.

De acuerdo a la clasificación SUCS, la permeabilidad de los materiales se estima


en: k = 1.0x10-3 a 5.0x10-3 cm/s.

2.9.9. Geotecnia – Cimentación (Bocatoma Jarpaña)


La zona se ubica en el lugar denominado Jarpaña, es una zona de baja pendiente.
Los suelos en los que se cimentarán las estructuras de la captación están
constituidos por los depósitos aluviales del río Jarpaña, que se caracterizan por ser
una mezcla heterométrica de arenas, gravas, guijarros y cantos rodados, que carecen
de cohesión y que solo están unidos por presión y contacto.

Las cimentación del barraje y obras de captación están sobre dicho suelo aluvial
hasta profundidades de ± 5,00 m por debajo del lecho actual del río.

Las características geotécnicas en ésta zona son:


 Cohesión : 0,00 Kg/cm2
 Angulo de Fricción Interna : 35°
 Peso Unitario Sumergido : 1.2 gr./cc
 Coeficiente de Permeabilidad : Entre 1 y 10-1 cm/s.
 Número de Golpes en el SPT,
considerando al suelo gravoso
como arena según Terzaghi : Entre 15 y 25 golpes/pie.

La Presión Admisible de los suelos granulares se determina para las dos


consideraciones de asentamiento tolerable y resistencia al corte del suelo, estando
generalmente controlada por el primer criterio. Cuando se trata de suelos granulares
gruesos, en los que no es posible medir su resistencia a la penetración mediante
pruebas penetrométricas del tipo SPT (Standard Penetration Test), Terzaghi
recomienda asumir un valor de "N" (número de golpes/pie en el SPT) y calcular la
Presión Admisible, asumiendo al suelo granular grueso como si fuera una arena a
la misma Densidad Relativa. Así, para un valor N=20, correspondiente a una
Densidad Relativa medianamente densa y con la profundidades de cimentación
indicadas y un ancho de cimentación superior a 3,00 m, se obtiene una Presión
Admisible de 1,50 kg/cm2, controlada por el criterio de asentamiento diferencial.
Es importante mencionar que la presión de contacto es muy inferior a éste valor.

Los procesos geodinámicos en ésta zona se limitan a la erosión y acumulación


fluviales, estando el proceso erosivo circunscrito a las terrazas aluviales, no
habiéndose observado mayores procesos de desestabilización de pendientes en los
flancos rocosos del valle, incluyendo el fenómeno de Licuefacción de Arenas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 93
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Eje de bocatoma Jarpaña

Foto 1.1.7: Muestra el eje de la bocatoma Jarpaña.

2.9.10. Geología Eje Canal y Túnel de derivación (Canal de Derivación Jarpaña)


De la verificación preliminar en campo, el eje del canal de derivación atravesará
mayormente laderas conformadas por materiales coluviales (arcillas-arenosas,
englobando bloques, piedras y gravas de composición volcánica). Ocasionalmente
también cortará afloramientos rocosos del volcánico Palca (secuencias piroclásticas
y sedimentarias). Por las características topográficas será necesaria también la
construcción de plataformas (Terraplenes), en las zonas donde existan escarpas. En
el tercio final las rocas a atravesar son del volcánico Tacaza (sedimentos vulcano-
clásticos; y por derrames andesíticos bien estratificadas, lavas de andesitas
basálticas y tufos de bloques), bastante fracturados, en estos últimos también se
desarrollará el eje del Túnel; que por las características de la roca, necesitará
sostenimiento en el proceso constructivo.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 94
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Foto 1.1.8: Vista de la roca del volcánico Tacaza, por donde atravesará el eje del
Túnel, nótese la presencia de diaclasas y fallas.

Foto 1.1.9: Vista de la zona de desembocadura del Túnel hacia la Laguna


Lagunillas, se observa el material coluvial de ladera.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 95
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.10. HIDROGEOLOGÍA
2.10.1. Hidrogeografía de la vertiente del Pacifico
Dentro de la zona existen las siguientes lagunas: Sayt’o Ccocha (Caqueri),
Quinsaccocha (tres lagunas de San Antón), Churo (San Antón), Millo Ccochapata,
Q’omerccocha, Suito Cocha. Ananta que pertenece a Paratía y Santa Lucía.

La red hidrográfica de los ríos Paratia y Jarpaña que confluyen en el río Verde son
de configuración de avenamiento dendrítico entrelazados por la cuenca del río
Verde – Cabanillas, que constituyen el eje principal del Sistema fluvial de la región
y presenta una orientación principal al Noreste – Suroeste y más adelante Oeste a
Este.

2.10.2. Condiciones Hidrogeológicas


Las condiciones hidrogeológicas del área de estudio presentan diversas
particularidades tanto en la posición altimétrica como planimetríca. Entre los
principales factores que actúan en la diversificación de dichas condiciones se tiene:
 Intensidad de las precipitaciones pluviales.
 Características litológicas primarias de las formaciones rocosas de la base local
en rocas volcánicas Ignimbritas consolidadas a in consolidadas. En la superficie
sobreyacen suelos gravosos con presencia de arenas, limos y arcillas.
 Estado de conservación del macizo rocoso dada su competencia por el aumento
de sílice y ceniza volcánica en la matriz Ignimbritica. El grado de alteración en
la Ignimbrita Tacaza es notoria en cambio la Igmibrita del grupo Palca es fresca
y de mayor competencia.
 Control de los patrones estructurales: escarpas hacia el techo de los
afloramientos, contactos de roca Ignimbrita blanca fresca y Ignimbrita alterada
se da a profundidad del lecho rocoso de eje de la presa con cobertura de suelos
gravosos a granulares.

2.10.3. Puquiales Subsuperficiales en laderas


Un puquial es un flujo natural de agua, y en la zona de la Presa Verde proyectada
esta surge en ambos estribos en su parte más baja. La surgencia podría darse en el
contacto del suelo Deluvial con la roca Ignimbrita.

La variación espacial se da porque el caudal del río aumenta aguas arriba, a medida
que se van recogiendo las aguas de la cuenca de drenaje y los aportes de las cuencas
colindantes, debido a esto, el río suele ser pequeño en las montañas, cerca de su
nacimiento, y mucho mayor en las tierras bajas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 96
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

2.11. MATERIALES DE CONSTRUCCIÓN


2.11.1. Materiales para relleno de la Presa
Los materiales para el relleno de la presas de cuerpo homogéneo, se han evaluado,
buscando que estos sean cercanos y cumplan ciertas cualidades físicas necesaria
para su elección. Los materiales que cumplen con estos requisitos se encuentran en
los alrededores de las coordenadas: 8’283,219 Norte y 317,097 Este (área de
inundación del embalse Paratía), los cuales se extienden en una planicie amplia de
600 m x 500 m. x 3.00 m de potencia aproximadamente.

2.11.2. Materiales para agregados de Concreto


La grava se encuentra a lo largo del recorrido de los ríos Verde, Paratia, Jarpaña y
Quillisani en volúmenes bastante considerables.

2.11.3. Material para obras especiales en la Presa


La roca rip-rap podrá ser obtenida de la explotación de las terrazas altas en ambas
márgenes dentro de los embalses Verde, Paratía, Jarpaña y Millo, las mismas que
tiene condiciones geotécnicas adecuadas para este fin, son rocas lo suficientemente
duras de andesitas de color gris y marrones, redondeadas que tienen en promedio
0.30 metros.

2.11.4. Previsiones Constructivas


De lo que se ha podido observar es que a diferencia de una cantera definida de poco
volumen, las zonas escogidas para el relleno de las presas son muy variables, es
decir las cualidades físicas pueden llegar a cambiar de un lugar a otro, por lo tanto
se deberá controlar celosamente las pruebas de laboratorio, a fin de asegurar que las
cualidades físicas sean muy similares a las solicitadas en el diseño. En el caso que
las características físicas sean adversas, se deberá de planificar y diseñar mezclas
de suelo de un sector con otro, para lo cual se deberá de prever dentro del
procedimiento constructivo una cancha de apilamiento y mezcla de estos
materiales.

2.12. CANTERAS
2.12.1. Material Granular
Corresponden a depósitos fluviales – aluviales, que se localizan a lo largo del río
Paratía. A continuación se indicarán sus principales características relacionadas a
su utilización:

 Geología : Depósitos fluvio-aluviales, mezcla de arenas, y


gravas; en las gravas predominan las formas sub-
redondeadas a sub-angulosas; se han derivado
litológicamente de rocas ígneas volcánicas.

 Clasificación SUCS : GW-GP (Predominan las arenas gravosas de buena y

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 97
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

mala gradación), regular distribución granulométrica

 Porcentaje de gravas : 54,03 a 57,5%

 Porcentaje de arenas : 41,2 a 43,17%

 Porcentaje de finos : 1,4 a 2,8%

 Utilización : Como agregado para concreto y material permeable,


filtros o cama del enrocado. Compactar al 70% de la
densidad relativa.

 Distancias : A menos de 2,0 km. de las obras. (Construir una


trocha de ± 2,0 Km.)

2.12.2. Diseño de Filtros


Los dos principales requisitos de un filtro satisfactorio son que debe ser más
permeable que el material por proteger, a fin de servirle de dren y que debe ser lo
suficientemente fino como para evitar que el material por proteger pase a través de
sus vacíos. Filtros convenientemente diseñados, dan excelente protección contra la
tubificación y contaminación de los materiales.

No hay un criterio definido para la adopción de normas únicas que conduzcan al


diseño de un filtro; diferentes investigadores y constructores proponen reglas de
diseño que, si bien básicamente son similares, difieren en los detalles. A
continuación se da un juego de recomendaciones de diseño, que goza de amplia
popularidad entre los constructores.

D15 Filtro
1.- 5  40
D15 Material Protegido

2.- D15 Filtro


5
D85 Material Pr otegido
3.- D50 Filtro
 25
D50 Material Protegido
4.- D50 Filtro
2
Abertura tubo de Drenaje

Cuando el material por proteger tiene un alto contenido de grava, las reglas
anteriores deben aplicarse a la porción del material menor que la malla de 1" (2,54
cm).

El material que constituye el filtro debe tener menos de un 5% en peso de partículas


menores que la malla Nº 200 y su curva granulométrica debe ser toscamente
parecida a la del material por proteger, siempre y cuando éste no sea muy uniforme.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 98
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

La especificación Nº 1 garantiza que la permeabilidad del filtro sea de un orden 100


veces mayor que la del suelo por proteger; la especificación Nº 2 garantiza la
imposibilidad de los arrastres de finos.

Las reglas anteriores son, conservadoras y son válidas para todo tipo de suelo; sin
embargo, apartarse de ellas en los casos en que sean de aplicación difícil, por
ejemplo por escasez de materiales, es problema delicado que solo puede resolverse
con criterio y experiencia, respaldados por investigaciones de laboratorio.

Las curvas granulométricas del material para filtros deben estar dentro del rango
mostrado en la Figura 1.1.1.

Figura 1.1.1: Curva granulométrica de material para filtro

2.12.3. Material Semi permeable – Área de embalse (Msp-1)


Los materiales semi permeables se localizan en los depósitos morrénicos;
constituidos por arena limosa con arena y poco porcentaje de grava, con plasticidad
ligera. El área prospectada se localiza en el sector del área de embalse Paratía, aguas
arriba del eje; reúne las siguientes características:
 Geología : Material morrénico - aluvial, mezcla de arena
limo y de grava.
 Clasificación SUCS : SM (Arena limosa).
 Porcentaje de gravas : 30,60%
 Porcentaje de arenas : 48,04%
 Porcentaje de finos : 21,4%
 Límite Líquido : 19,1
 Límite Plástico : 17,43
 Índice de Plasticidad : 1,67 (Ligera plasticidad)
 Densidad Proctor : 2,09 gr/cm3.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 99
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 Humedad Proctor : 9,40%


 Utilización : Conformación del cuerpo de Presa como
material homogéneo y/o realizar mezclas con
otras canteras.
 Distancias : A ± 3,0 km. de la Obra.
 Volumen : ± 20 000 m3

2.12.4. Cantera de Roca


Las canteras de roca, están constituidas por afloramientos de rocas volcánicas de
composición andesitica y dacitica.

a) Cantera de roca 1 (CR-1)


Se localiza aguas arriba del eje de presa Paratía y corresponden a rocas volcánicas,
que reúnen las siguientes características:

 Litología : Andesitas y dacitas.


 Alteración : Roca con ligera a moderada meteorización
(W2 a W3), potencia promedio entre 0.50 a
1.50m.
 P.e. (s.s.s.) : 2,34 a 2,35 (Moderado)
 Porcentaje de Absorción : 1,22 a 1,25 (Bajo)
 Pérdida por Intemperismo : < a 30%
 Abrasión Los Angeles : < a 30%
 Clasificación geomecánica : Roca tipo III
 Calidad geomecánica : Mediana
 Distancias : A 2,0 km. de la obra
 Volumen : Superior a 10,000 m3

3.0.CONCLUSIONES

 Las características geológicas-geomorfológicas del vaso nos señalan que no


deben presentarse mayores problemas con referencia a la estabilidad de taludes.
 Los embalses Verde, Paratía, Jarpaña y Millo presentan regulares a buenas
condiciones de sellado en el fondo del embalse. Los flancos morrénicos y rocosos
son poco permeables a impermeables. En conjunto los reservorios son estancos.
 Mediante las evaluaciones realizadas el terreno de fundación de la presa Jarpaña,
será la ignimbrita rosado pálido blanquecino. En el eje de la presa Paratía, el área
entre estribos está conformado por material Fluvio-aluvial; y el estribo derecho
por material morrenico.y coluvial (arena limosa, con clastos y bloques
subangulosos de roca).
 El sector donde se ubica la bocatoma Jarpaña, se caracteriza por presentar
terrazas de baja altura y desnivel (suelos inconsolidados), por lo que se producen
inundaciones y erosiones laterales.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 100
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 En el tramo investigado el río Jarpaña, se caracteriza por presentar una baja


pendiente con un desarrollo del tipo meándrico; lo que indica un estado avanzado
de madurez en su evolución geomorfológica. Con relación a los procesos
geodinámicos activos tenemos que la Dinámica Fluvial del río Jarpaña es el
principal y que en los períodos de grandes precipitaciones ocasionan cambios
sustanciales en la capacidad de remoción y descarga fluvial, originando procesos
geodinámicos: Erosión de Riberas, derrumbes, migraciones de cauce y
deposición fluvial.

4.0.RECOMENDACIONES

 Se debe complementar con un estudio detallado de mecánica de suelos para


realizar la caracterización de la cimentación del área de los ejes de presas
contemplados.
 De manera preliminar se recomienda que para el emplazamiento de las
estructuras, se realice sobre el material morrénico.
 Una campaña de prospección geofísica será necesario para determinar el espesor
del material morrénico, fluvio–aluvial tanto el vaso como el eje de las presas
contempladas.
 El material granular para la fabricación de concreto y filtros, podrá utilizarse del
cauce del río Paratía, previos ensayos para diseño de mezcla respectivos.
 El material para los filtros deberá cumplir las especificaciones 1 y 2 indicados en
el ítem 2.10.2. y sus curvas granulométricas deben estar dentro del rango
especificado en la Figura 1.1.1.
 El agua a ser utilizada en la construcción será del río, previos análisis de calidad.
 La Roca para el enrocamiento y/o mampostería se obtendrá de la cantera ubicada
aguas arriba del eje que se ubica a 2,0 Km. de la obra.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 101
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

5.0.ANEXOS

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 102
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.1.1

Resultados de análisis de mecánica de suelos

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 103
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANALISIS GRANULOMETRICO POR TAMIZADO


(Método ASTM D-1422)

PROYECTO : Evaluación Geológica– Geotécnica Prelim inar de los UBICACION : Río Paratía Material Granular
Planteam ientos Alternativos de Afianzamiento del Sistem a Integral
Lagunillas
SOLICITANTE : PELT PROFUNDIDAD : 0,00 - 1,50 m .
N° MUESTRA : C-1 (M-1) Tec. Responsable : R. Pom acosi L.
FECHA : Diciem bre de 2010 Ingº. Responsable: S. Barriales G.

T A M IC E S A B E R T UR A P ESO %R E T E N ID O %R E T EN ID O % Q UE ES P EC IF . TAMAÑO MAXIMO:


A STM mm R ET E N ID O P A R C IA L A C UM ULA D O P ASA
3" 76.200
2 1/2" 63.500 DESCRIPCION DE LA MUESTRA
2" 50.600 0.00 0.00 0.00 100.00 P.I.= 2998.00
1 1/2" 38.100 300.00 10.01 10.01 89.99 %W= 2.86
1" 25.400 223.70 7.46 17.47 82.53 %Grava= 57.46
3/4" 19.050 179.50 5.99 23.46 76.54 %Arena= 41.19
1/2" 12.700 395.10 13.18 36.63 63.37 % Finos= 1.35
3/8" 9.525 154.40 5.15 41.78 58.22 LIMITES DE CONSISTENCIA:
1/4" 6.350 L.L.= NP
No4 4.760 470.00 15.68 57.46 42.54 L.P.= NP
No8 2.380 I.P.= NP
No10 2.000 138.00 27.38 69.11 30.89 504 CLASIFICACION:
No16 1.190 SUCS: GP
No20 0.840 123.00 24.40 79.49 20.51 AASHTO:
No30 0.590 I.G. =
No40 0.420 138.00 27.38 91.14 8.86
No 50 0.300 CARACT. GRANULOM ETRICAS:
No60 0.250 D10 0.461 Cu= 23
No80 0.180 D30= 1.900 Cc= 0.7
No100 0.149 71.00 14.09 97.13 2.87 D60= 10.63
No200 0.074 18.00 3.57 98.65 1.35
BASE 16.000 3.17 100.00 0.00 OBSERVACIONES:
TOTAL 504.00 100.00
% PERDIDA

CURVA GRANULOMETRICA
MALLAS U.S. STANDARD
3"21/2" 2" 11/2" 1" 3/4" 1/2" 3/8" 1/4" N4 8 10 16 20 30 40 50 60 80 100 200
100

90
% QUE PASA EN PESO

80 CURVA GRANULOMETRICA
70

60

50

40

30

20

10

0
76.200
63.500
50.600

38.100

25.400

19.050

12.700

9.525

6.350

4.760

2.380
2.000

1.190

0.840

0.590

0.420

0.300
0.250

0.180
0.149

0.074
1.00

0.10

0.01
100.00

10.00

TAMAÑO DEL GRANO EN mm


(escala logaritmica)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 104
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANALISIS GRANULOMETRICO POR TAMIZADO


(Método ASTM D-1422)

PROYECTO : Evaluación Geológica– Geotécnica Preliminar de los UBICACION : Río Paratía Material Granular
Planteamientos Alternativos de Afianzamiento del Sistem a Integral
Lagunillas
SOLICITANTE : PELT PROFUNDIDAD : 0,00 - 1,50 m .
N° MUESTRA : C-2 (M-1) Tec. Responsable : R. Pom acosi L.
FECHA : Diciem bre de 2010 Ingº. Re sponsable: S. Barriales G.

T A M IC E S A B E R T UR A P ESO %R E T E N ID O %R E T E N ID O % Q UE E S P E C IF . TAMAÑO MAXIMO:


A ST M mm R E T E N ID O P A R C IA L A C UM ULA D O P A SA
3" 76.200
2 1/2" 63.500 0.00 0.00 0.00 100.00 DESCRIPCION DE LA MUESTRA
2" 50.600 246.00 6.82 6.82 93.18 P.I.= 3606.00
1 1/2" 38.100 223.40 6.20 13.02 86.98 %W= 2.86
1" 25.400 151.00 4.19 17.20 82.80 %Grava= 54.03
3/4" 19.050 218.30 6.05 23.26 76.74 %Arena= 43.17
1/2" 12.700 332.60 9.22 32.48 67.52 % Finos= 2.80
3/8" 9.525 118.20 3.28 35.76 64.24 LIMITES DE CONSISTENCIA:
1/4" 6.350 L.L.= NP
No4 4.760 658.70 18.27 54.03 45.97 L.P.= NP
No8 2.380 I.P.= NP
No10 2.000 273.50 33.03 69.21 30.79 828 CLASIFICACION:
No16 1.190 SUCS: GW
No20 0.840 155.20 18.74 77.83 22.17 AASHTO:
No30 0.590 I.G. =
No40 0.420 152.20 18.38 86.28 13.72
No 50 0.300 CARACT. GRANULOMETRICAS:
No60 0.250 D10 0.294 Cu= 29
No80 0.180 D30= 1.894 Cc= 1.5
No100 0.149 143.90 17.38 94.27 5.73 D60= 8.42
No200 0.074 52.80 6.38 97.20 2.80
BASE 50.400 6.09 100.00 0.00 OBSERVACIONES:
TOTAL 828.00 100.00
% PERDIDA

CURVA GRANULOMETRICA
MALLAS U.S. STANDARD
3"21/2" 2" 11/2" 1" 3/4" 1/2" 3/8" 1/4" N4 8 10 16 20 30 40 50 60 80 100 200
100

90
% QUE PASA EN PESO

80 CURVA GRANULOMETRICA
70

60

50

40

30

20

10

0
76.200
63.500
50.600

38.100

25.400

19.050

12.700

9.525

6.350

4.760

2.380
2.000

1.190

0.840

0.590

0.420

0.300
0.250

0.180
0.149

0.074
1.00

0.10

0.01
100.00

10.00

TAMAÑO DEL GRANO EN mm


(escala logaritmica)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 105
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANALISIS GRANULOMETRICO POR TAMIZADO


(Método ASTM D-1422)

PROYECTO : Evaluación Geológica– Geotécnica Preliminar de los UBICACION : Vaso Paratía Material Granular
Planteamientos Alternativos de Afianzamiento del Sistem a Integral
Lagunillas
SOLICITANTE : PELT PROFUNDIDAD : 0,00 - 1,50 m .
N° MUESTRA : C-1 (M-1) Tec. Responsable : R. Pom acosi L.
FECHA : Diciem bre de 2010 Ingº. Re sponsable: S. Barriales G.

T A M IC E S A B E R T UR A P ESO %R E T E N ID O %R E T E N ID O % Q UE E S P E C IF . TAMAÑO MAXIMO:


A ST M mm R E T E N ID O P A R C IA L A C UM ULA D O P A SA
3" 76.200
2 1/2" 63.500 DESCRIPCION DE LA MUESTRA
2" 50.600 P.I.= 2940.00
1 1/2" 38.100 0.00 0.00 0.00 100.00 %W= 2.86
1" 25.400 168.00 5.71 5.71 94.29 %Grava= 30.60
3/4" 19.050 190.00 6.46 12.18 87.82 %Arena= 48.04
1/2" 12.700 193.00 6.56 18.74 81.26 % Finos= 21.37
3/8" 9.525 53.80 1.83 20.57 79.43 LIMITES DE CONSISTENCIA:
1/4" 6.350 L.L.= 19.1
No4 4.760 294.70 10.02 30.60 69.40 L.P.= 17.43
No8 2.380 I.P.= 1.67
No10 2.000 84.30 15.38 41.27 58.73 548 CLASIFICACION:
No16 1.190 SUCS: SM
No20 0.840 84.00 15.33 51.91 48.09 AASHTO:
No30 0.590 I.G. =
No40 0.420 77.50 14.14 61.73 38.27
No 50 0.300 CARACT. GRANULOMETRICAS:
No60 0.250 D10 ---- Cu= ----
No80 0.180 D30= 0.193 Cc= ----
No100 0.149 78.00 14.23 71.60 28.40 D60= 2.33
No200 0.074 55.50 10.13 78.63 21.37
BASE 168.700 30.78 100.00 0.00 OBSERVACIONES:
TOTAL 548.00 100.00
% PERDIDA

CURVA GRANULOMETRICA
MALLAS U.S. STANDARD
3"21/2" 2" 11/2" 1" 3/4" 1/2" 3/8" 1/4" N4 8 10 16 20 30 40 50 60 80 100 200
100

90
% QUE PASA EN PESO

80 CURVA GRANULOMETRICA
70

60

50

40

30

20

10

0
76.200
63.500
50.600

38.100

25.400

19.050

12.700

9.525

6.350

4.760

2.380
2.000

1.190

0.840

0.590

0.420

0.300
0.250

0.180
0.149

0.074
1.00

0.10

0.01
100.00

10.00

TAMAÑO DEL GRANO EN mm


(escala logaritmica)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 106
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

LIMITES DE CONSISTENCIA
(Método ASTM D-4318)

PROYECTO : Evaluación Ge ológica– Geotécnica UBICACION : Vaso Paratía Material Granular


Pre lim inar de los Planteam ientos Alternativos de
Afianzam iento del Sistem a Integral Lagunillas
SOLICITANTE : PELT PROFUNDIDAD : 0,00 - 1,50 m .
N° MUESTRA : C-1 (M-1) Tec. Responsable : R. Pom acosi L.
FECHA : Diciem bre de 2010 Ingº. Responsable : S. Barriale s G.

LIMITE LIQUIDO
N° de tara 05 07 08
Peso tara + suelo húmedo 29.08 31.17 28.58
Peso tara + suelo seco 26.09 27.95 25.84
Peso tara 11.23 11.21 11.17
Peso del agua 2.99 3.22 2.74
Peso suelo sec o 14.86 16.74 14.67
Humedad (%) 20.12 19.24 18.68
Nro. de golpes 14 24 30

LIMITE PLASTICO
N° de tara 09 10
Peso tara + suelo húmedo 9.26 9.32
Peso tara + suelo seco 8.51 8.57
Peso tara 4.27 4.20
Peso del agua 0.75 0.75
Peso suelo sec o 4.24 4.37
Humedad (%) 17.69 17.16
Humedad promedio 17.43

GRAFICO DE LIMITE LIQUIDO

22.00
PORCENTAJE DE HUMEDAD

21.00

20.00

19.00

18.00

17.00
10 15 20 25 30 35 40 45 50 60 70 80 90 100

NUMERO DE GOLPES

LIMITE LIQUIDO LIMITE PLASTICO INDICE DE PLASTICIDAD

LL (%) : 19.10 LP (%) : 17.43 IP (%) : 1.67

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 107
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

PROCTOR MODIFICADO
(Método ASTM D -1557)

PROYECTO : Evaluación Geológica– Geotécnica UBICACION: Vaso Paratía Material Granular


Prelim inar de los Planteam ientos Alternativos de
Afianzam iento del Sistem a Integral Lagunillas
SOLICITANTE : PELT PROFUNDIDAD : 0,00 - 1,50 m .
N° MUESTRA : C-1 (M-1) Tec. Res ponsable : R. Pomacos i L.
FECHA : Diciem bre de 2010 Ingº. Res ponsable: S. Barriales G.

Ensayo N° 1° 2° 3° 4°
Peso muestra húmeda + molde 10095 10275 10140 10140
Peso del molde 5420 5420 5420 5420
Peso muestra húmeda 4675 4855 4720 4720
Volumen del molde (c c) 2120 2120 2120 2120
Densidad húmeda (gr/c c) 2.205 2.290 2.226 2.226
N° de Tara
Peso Tara + muestra húmeda 620.0 455.0 512.0 512.0
Peso Tara + muestra seca 575.0 415.0 458.0 458.0
Peso del agua 45.0 40.0 54.0 54.0
Peso Tara 0.0 0.0 0.0 0.0
Peso muestra seca 575.0 415.0 458.0 458.0
Contenido de humedad (%) 7.8 9.6 11.8 11.8
Humedad promedio (%) 7.8 9.6 11.8 11.8
Densidad sec a (gr/cc ) 2.045 2.089 1.992 1.992

GRAFICO DE PROCTOR MODIFICADO

2.100

2.090

2.080

2.070
DENSIDAD SECA gr/cc

2.060

2.050

2.040

2.030

2.020

2.010

2.000

1.990

1.980
7.0 7.5 8.0 8.5 9.0 9.5 10.0 10.5 11.0 11.5 12.0
CONTENIDO DE HUMEDAD %

DENS IDAD MAX . S ECA 2.09 gr/cc

HUMEDAD O P TIMA 9.40 %

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 108
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.1.2

Informe final de exploración geofísica método de resistividad (SEV)


Eje de presa Verde

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 109
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

INFORME FINAL
EXPLORACIÓN GEOFÍSICA METODO DE
RESISTIVIDAD (SEV)
"PROYECTO ESPECIAL BINACIONAL LAGO
TITCACA" P E L T
ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL
LAGUNILLAS

Solicitado por:
JUAN ROBERT CUELLAR BARRERA S.A.C.
Calle Jorge Polar 302
Urb. Victoria - Arequipa
Teléfono: +51-54- 282-051

Preparado por: GEOINSTRUMENTS S.A.C.


Calle Mártir Olaya 201 Of. 330, Edi ficio Dia gonal - Miraflores, Lima 18 -
Perú; Teléfono: +51-1-241-7592

Diciembre, 2009

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 110
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

CONTENIDO
1.0 INTRODUCCIÓN ............................................................................................... 111
1.1 Antecedentes................................................................................................... 111
1.2 Objetivo del Estudio ......................................................................................... 111
1.3 Ubicación de la Zona de Estudio....................................................................... 112
1.4 Personal Responsable ...................................................................................... 112
2.0 DESCRIPCIÓN Y PRINCIPIO .............................................................................. 112
2.1 Principio de la Resistividad ............................................................................... 112
3.0 INSTRUMENTOS Y PROCEDIMIENTOS DEL LEVANTAMIENTO ......................... 113
3.1 Resistividad (SEV) ............................................................................................. 113
3.2 Presentación de los Datos ................................................................................ 114
4.0 PROCEDIMIENTOS DE TRABAJO DE CAMPO .................................................... 114
5.0 PROCESAMIENTO E INTERPRETACIÓN ............................................................ 114
5.1 Método de Resistividad 5.1.1 Análisis de Equivalencia ..................................... 114
5.1.2 Procesamiento de Datos ............................................................................... 114
5.1.3 Interpretación ............................................................................................... 115
6.0 DISCUSIÓN DE RESULTADOS ........................................................................... 115
7.0 CONCLUSIONES ............................................................................................... 116
8.0 RECOMENDACIONES ....................................................................................... 116
ANEXOS ................................................................................................................ 118

1.0 INTRODUCCIÓN

1.1 Antecedentes
La Empresa Robert Cuellar Barrera S.A.C., ha contratado a la Empresa
Geoinstruments S.A.C., para la realización de la Evaluación Geofísica
mediante el método de Resistividad (SEV) en la Zona Planta General del
Embalse; ubicados en el Departamento de Puno, Provincia de Lampa
Distrito de Santa Lucia.

El levantamiento geofísico consistió en la realización de 2 puntos de


resistividad en total, con alas AB de 500mts; mediante el cual se podrá
determinar por inducción de intensidad de corriente a diversas instancias
de la superficie del suelo; la potencia de los estratos, identificación de
zonas con probable presencia de agua, secuencia estratigráfica de capas y
el probable basamento rocoso.

1.2 Objetivo del Estudio


El objetivo del presente estudio es determinar en función de las
resistividades aparentes por inducción de corriente los espesores de las
diversas capas presentes hasta una profundidad de investigación de 100 m
y definir la presencia del basamento rocoso. Asimismo determinar la

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 111
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

potencia de los estratos con presencia de H2O y las características de las


rocas de cimentación. También se identificara la probable presencia,
secuencia, dirección y profundidad de los diversos estratos definidos.

1.3 Ubicación de la Zona de Estudio


El área de influencia donde se realizó el levantamiento de Resistividad se
presentan en el Anexo 01 (Ver Planos PU-01), lugar localizado en la
Provincia de San Roman, Departamento de Puno, Distrito de Cabana.
Asimismo; la zona de trabajo presenta altitudes de 4205 hasta 4209
m.s.n.m.

1.4 Personal Responsable


La supervisión fue realizada por el Ing. Christian Pilón, la interpretación
y control de calidad a cargo del Ing. Freddy Ccallo; y los trabajos de campo
bajo la responsabilidad del Ing. Manuel Espejo y el Ing. Antonio
Huaynapata. Asimismo, durante el levantamiento asistió personal de
Robert Cuellar Barrera S.A.C. para la supervisión y apoyo del
levantamiento.

Tabla Nro. 1.2: Personal Participante del Levantamiento


Profesional Cargo Función

Ing. Christian Pilon Geofísico Sénior Supervisión

Ing. Freddy Ccallo Ingeniero Geofísico Responsable del Levantamiento

Ing. Manuel Espejo Bach. Geofísico Responsable de Campo

Ing. Antonio Huaynapata Bach. Geofísico Responsable de Campo

Ing. Juan Cuellar Jefe de Proyecto Supervisor de Trabajo

2.0 DESCRIPCIÓN Y PRINCIPIO

2.1 Principio de la Resistividad


Es una técnica geofísica de la exploración que se caracteriza por estudiar
las variaciones de parámetros físicos de las rocas y suelos (resistividad y
conductividad eléctrica), puesto que los materiales muestran por lo
general ciertos rangos de valores de resistividad aparente (Pa) que
dependen de las variables geotécnicas del material qué atraviesa la

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 112
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

corriente eléctrica, teniendo en cuenta el contenido de agua o de sales


disueltas presentes en las fracturas de las rocas o en la porosidad del suelo.
El método se sustenta desde un sentido práctico (medio Heterogéneo), en
la resistividad de las rocas o materiales y consiste en medir la dificultad
del flujo de corrientes peculiares a cada uno de ellos, con dependencia
fundamental de las características físicas y químicas. En este caso la
relación de la resistividad aparente es la siguiente.

En el Esquema 2.1 se presenta un cuadripolo clásico AMNB, cuyos cuatro


polos están alineados simétricamente, donde AB y MN tienen el punto
central "O" y se le denomina estación SEV (Sondeo Eléctrico Vertical),
campo de corriente y de potencial en el subsuelo homogéneo y sobre él
se realizan todos los análisis geo-eléctricos.

Esquema Nro. 2.1 Configuración del método Schlumberger.

Donde:
Pa = Resistividad Aparente (ohmio-metro)
DV = Diferencia de potencial (Voltio)
i = Intensidad de corriente (Amperios)
K = Coeficiente geométrico
AB = Electrodos de corriente

3.0 INSTRUMENTOS Y PROCEDIMIENTOS DEL LEVANTAMIENTO


3.1 Resistividad (SEV)
El equipo que se utilizo en los Sondeos Eléctricos Verticales fue un
resistivímetro de marca GEOTRADE modelo GTR-03 que permite la medida del
potencial espontaneo y resistividad del subsuelo con fines de realizar
investigaciones de hasta mediana profundidad.

Parámetros de levantamiento de campo:

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 113
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Mediciones Configuración Dominio de Tiempo


Extensión de cables AB Schlumberger 500 metros 2
Electrodo de corriente (AB) electrodos metálicos 2
Electrodos de potencial (MN) electrodos metálicos
Equipo de medición Resistivímetro modelo GTR-03

3.2 Presentación de los Datos

Los datos de SEV se presentan en curvas logarítmicas y perfiles de


interpretación (Ver Anexo 9.2), la ubicación de cada punto de evaluación
se presentan en el Anexo 9.1.

4.0 PROCEDIMIENTOS DE TRABAJO DE CAMPO


Para el buen levantamiento de cada perfil se realizó los siguientes
procedimientos:

Se inició ubicando los puntos de cada uno de los SEVs (Ver Planos de
Ubicación) seguidamente se procedió a armar e instalar los electrodos en el
suelo a diversas distancias según la configuración Schlumberger. Después, se
induce intensidad de corriente y se toma los datos de resistividad aparente
para cada distancia, hasta una distancia de AB/2 250m.

En el presente trabajo se realizó un total de 2 puntos de resistividad;


correspondiendo a Planta General del Embalse Ver Anexo 9.1.

5.0 PROCESAMIENTO E INTERPRETACIÓN


Obtenido todos los registros de campo se procede a direccionarlas de Norte a
Sur y de Este a Oeste dependiendo la ubicación de cada perfil trazado en campo.
Seguidamente se proceden a generar las curvas logarítmicas siguientes los
siguientes criterios:

5.1 Método de Resistividad 5.1.1 Análisis de Equivalencia


De acuerdo a las resistividades obtenidas en el levantamiento de campo, se
realiza una serie de modelos equivalentes, con la finalidad de obtener el
"mejor" modelo de ajuste. Este modelo de ajuste es seleccionado en
conjunción permanente con la información geológica, perforaciones,
calicatas y/o SPT.

5.1.2 Procesamiento de Datos

Para definir el modelo de los sondeos de (SEV) tipo Schlumberger se utiliza


el programa WINSEV, desarrollado por WGEOSOFT Ltd. El programa
WINSEV es un programa de modelamiento directo e inverso para la
interpretación de modelos de tierra estratificada. El modelamiento directo

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 114
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

permite el cálculo de una curva sintética de sondeo de resistividad para


modelar hasta 10 capas. Las curvas de resistividad son calculadas usando
filtros lineales descrita por Davis et al (1980).

Asimismo el modelamiento inverso permite la estimación del modelo de


tierra estratificada directamente a partir de la curva de datos, usando un
método similar al empleado por Koefoed (1976).

5.1.3 Interpretación
Finalmente, para la interpretación estratigráfica se correlaciona los datos de
campo y las curvas logarítmicas obtenidas por el software, en un esquema de
modelo que "mejor" se ajuste apoyado continuamente con la geología según
mínimos cuadrados usando una regresión ridge (Inman, 1975). Obtenida el
modelo y con fines de mejorar el ajuste de los parámetros del modelo inicial
se correlaciona esta información con la geología superficial levantada,
asimismo para cuantificar la estratigrafía definida se correlaciona con perfiles
de perforaciones, calicatas y SPT en caso se tuviera dichos métodos.

6.0 DISCUSIÓN DE RESULTADOS


Los rumbos de cada perfil de SEV se eligieron lo más adecuado para que se
evitaran los obstáculos y los cambios abruptos de topografía, obteniendo así
una data precisa.

Los sondeos eléctricos de tipo Schlumberger representan de manera


generalizada las capas Geo-Eléctricas de acuerdo a las normas de ASTM G57.
También permite conocer la probable secuencia estratigráfica de las
formaciones.

Asimismo, la configuración Schlumberger permite conocer y definir la


anisotropía causada por algún material existente en el subsuelo, presentado
las siguientes interpretaciones:
Perfil SEV-01
Capas Resistividades Espesores (m) Descripción
(Nro.) (ohm.m.)
1 210-290 3.3 - 6.9 Zona Semi-Conductiva con probable
presencia de Areniscas y Lutitas
Noduladas.

2 15 - 0.55 8.3 - 21 Zona Altamente Conductiva,


Saturada, con Probable Presencia de
Areniscas.
4 2000-3000 > 100 Zona Altamente Resistiva, Probable
Basamento Rocoso.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 115
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Perfil SEV-02
Capas Resistividades Espesores Descripción
(Nro.) (ohm.m.) (m)
Zona Semi-Conductiva con
1 280 0.6 probable presencia de Areniscas y
Lutitas Noduladas.

Zona Altamente Conductiva,


2 1.2 - 6 0.8 - 45 Saturada, con Probable Presencia de
Areniscas.
Zona Semi-Conductiva,
3 105 7 Húmeda con Probable
Presencia de Cuarcitas y Dolomitas

4 700 - 800 > 100 Zona Altamente Resistiva,


Probable Basamento Rocoso.
En general, los cuadros de interpretación descritos líneas arriba representan
el mejor ajuste estratigráfico de cada sondeo eléctrico vertical realizado.

7.0 CONCLUSIONES
• El levantamiento geofísico de campo, se completó dentro de la
programación establecida y los regímenes estándares de seguridad de la
zona de estudio.

• En cada perfil de SEV se insertó la sección topográfica y los filtros


adecuados con la finalidad de obtener lo más real la secuencia de las capas
interpretadas e identificación de las anomalías correspondientes al objetivo
del trabajo.

• De acuerdo al análisis cualitativo de los perfiles, contrastando las


resistividades del suelo y el plano geológico regional de la zona se
clasificaron e identificaron los estratos en cada perfil y/o sección de SEV.
Asimismo, se identificaron a distintas distancias específicas según el
recorrido de cada perfil la presencia de suelos compactos.

• En general, se presenta en la zona con una capa con probable saturación de


H20 con un rango de potencias entre 6.9 a 45m

• Finalmente, se concluye que la interpretación del método geofísico ha


alcanzado los objetivos trazados y que brindara información cualitativa
importante para la pampa estudiada.
8.0 RECOMENDACIONES

> El método Geofísico de Resistividad son ensayos indirectos por medio de


emisión y recepción de intensidad de corriente y que tiene un grado de
aproximación aceptable, sin embargo requiere definir el grado de

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 116
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

aproximación de los estratos encontrados a través de perforaciones y


determinar su grado de precisión.

> También, se recomienda realizar perforaciones hasta 36m de profundidad


como mínimo para caracterizar la estratigrafía de las Zona.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 117
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXOS

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 118
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.1.2.1 Plano de Ubicación (PU-01)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 119
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.1.2.2. Curvas y Perfiles de Interpretación SEV

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 120
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.1.2.3 Galería de Fotos

Foto Nro. 01 Instalación Típica del Equipo de Resistividad

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 121
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Foto Nro. 02: Levantamiento del Perfile de SEV - 01

Foto Nro. 03: Levantamiento del Perfile de SEV – 02

Foto Nro. 04- Personal que participo en el Levantamiento de Campo

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 122
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.2

Generación de caudales medios mensuales para las alternativas de afianzamiento del Sistema
Integral Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 123
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

GENERACIÓN DE CAUDALES MEDIOS MENSUALES PARA LAS


ALTERNATIVAS DE AFIANZAMIENTO DEL SISTEMA INTEGRAL
LAGUNILLAS

1.1. Generalidades
No disponiéndose de registros hidrométricos en el área de estudios, se procedió a la
generación de caudales medios multianuales mediante la utilización del método de
Similitud de Cuencas y a partir del registro de caudales de la estación hidrométrica río
Verde correspondiente al periodo 1964 - 2009, se generaron los caudales medios
mensuales en los distintos puntos de interés de cada una de las alternativas de
afianzamiento del Sistema Integral Lagunillas.

1.2. Generación de Caudales por Similitud de Cuencas


En general, zonas o cuencas hidrológicamente homogéneas se pueden definir como
aquellas que tienen características fisiográficas o geomorfológicas, climatológicas,
geológicas e hidrológicas y biomasa, similares o semejantes y por lo tanto se puede
transferir información de una cuenca a otra.

A partir de este concepto, es posible transferir entonces, mediante la distribución


proporcional, la escorrentía de una cuenca a otra, en base a la relación de áreas de cuencas
y a la relación de las precipitaciones totales anuales promedio, según la siguiente
expresión:
 A  P 
QS   S  S QC
 AC  PC  ………. (1.2.1)
Dónde:
QS
= Caudal de la cuenca sin información hidrométrica (m3/s).
QC
= Caudal de la cuenca con información hidrométrica (m3/s).
AS
= Área de la cuenca sin información hidrométrica (km2).
AC
= Área de la cuenca con información hidrométrica (km2).
PS
= Precipitación de la cuenca sin información hidrométrica (mm).
PC
= Precipitación de la cuenca con información hidrométrica (mm).

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 124
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Siendo las subcuencas Paratía y Jarpaña, conformantes de la cuenca del río Verde, con
mayor razón es posible la transferencia de información hidrométrica mediante los
conceptos expuestos.

En el Cuadro 1.2.1, se presenta la información utilizada para la generación de caudales


medios mensuales en los distintos puntos de interés de cada una de las alternativas de
afianzamiento hídrico del Sistema Integral Lagunillas.

Cuadro 1.2.1: Información utilizada para generación de caudales


Área de la Precipitación
Cuenca Punto de Interés Cuenca Colectora Total Anual
(km2) (mm)
Con Información Hidrométrica Estación Hidrométrica Río Verde 745.55 787.13
Embalse Verde 759.57 790.35
Bocatoma Verde 759.57 790.35
Embalse Paratía 403.13 792.95
Sin Información Hidrométrica
Embalse Jarpaña 288.40 803.46
Bocatoma Jarpaña 273.34 807.83
Embalse Millo 151.04 850.03

Los caudales medios mensuales históricos del río Verde en la Estación Hidrométrica río
Verde, correspondiente al periodo 1964 – 2009, se presentan en el Cuadro 1.2.2.

En los Cuadros 1.2.3 a 1.2.8, se presenta la serie de caudales medios mensuales generados
para los distintos puntos de interés de cada una de las alternativas de afianzamiento del
Sistema Integral Lagunillas, correspondiente al periodo 1964 – 2009.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 125
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.2
Descargas medias mensuales completadas del río Verde (m3/s)
Punto de interés: Estación Hidrométrica Río Verde, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 11.06 36.63 21.70 7.42 2.96 1.45 1.00 0.98 1.08 1.03 1.58 3.68 7.55
1965 10.04 25.10 25.21 8.18 2.96 1.42 1.06 0.83 1.03 1.39 1.47 15.48 7.85
1966 12.24 27.64 18.89 2.84 1.97 1.23 0.96 0.77 0.76 1.94 4.65 9.28 6.93
1967 5.21 12.54 48.14 5.20 2.23 1.42 1.24 0.96 1.28 2.20 1.56 5.00 7.25
1968 17.60 43.20 22.50 5.79 2.74 1.64 1.25 1.07 1.17 2.13 8.07 8.36 9.63
1969 19.56 20.53 5.83 9.58 2.97 1.84 1.68 1.55 0.79 1.12 2.10 5.78 6.11
1970 20.72 42.02 26.75 9.55 3.24 1.59 1.15 1.01 1.04 1.34 0.98 11.22 10.05
1971 23.39 71.12 29.40 4.81 2.04 1.28 1.01 0.90 0.85 0.80 1.04 11.87 12.38
1972 44.34 15.64 21.10 13.79 2.63 1.52 1.23 1.07 1.25 1.59 3.38 7.06 9.55
1973 36.68 54.26 34.97 18.24 5.90 2.46 1.97 1.70 1.94 1.92 2.12 13.70 14.65
1974 45.02 68.46 25.09 9.65 2.17 1.57 1.20 1.69 1.73 1.92 1.64 12.29 14.37
1975 26.60 59.33 33.84 9.30 6.33 1.98 1.30 1.19 1.49 1.54 1.89 14.69 13.29
1976 45.97 36.63 39.61 11.05 2.82 1.75 1.25 1.11 5.99 2.36 1.37 3.02 12.74
1977 12.53 41.03 56.64 8.04 1.92 1.17 1.01 0.81 0.90 1.08 4.53 3.37 11.09
1978 44.23 27.82 9.28 8.63 2.76 1.17 0.92 0.75 0.85 0.94 5.68 23.54 10.55
1979 36.81 34.17 24.65 8.13 2.44 1.39 1.14 0.91 0.87 1.46 3.73 10.43 10.51
1980 12.29 10.13 24.02 9.83 1.92 1.20 1.10 1.00 1.10 4.41 4.34 3.46 6.23
1981 26.12 35.71 37.69 16.09 2.87 1.46 1.16 1.34 1.43 1.71 1.90 3.40 10.91
1982 35.42 10.13 24.79 15.90 3.40 1.50 1.20 1.10 1.00 1.60 19.73 7.40 10.26
1983 3.82 5.30 5.10 4.51 1.88 1.33 1.20 1.08 1.28 1.85 1.22 2.35 2.58
1984 35.18 78.30 40.86 16.38 3.53 1.70 1.30 1.10 0.90 1.30 3.60 5.90 15.84
1985 26.33 47.80 30.40 28.11 12.38 4.52 1.76 1.32 2.08 2.13 13.46 41.52 17.65
1986 43.10 44.78 28.60 35.12 13.48 2.40 1.86 1.76 2.42 2.51 2.97 8.60 15.63
1987 64.12 12.64 6.36 2.89 1.37 1.20 1.18 0.98 0.87 0.98 3.02 2.36 8.16
1988 24.06 18.72 28.49 21.76 4.42 1.74 1.24 1.01 0.85 0.92 0.72 1.82 8.81
1989 29.13 14.77 37.46 45.20 4.16 2.06 1.50 1.45 0.78 0.94 4.74 4.74 12.24
1990 17.24 11.00 7.31 3.53 1.23 2.25 1.10 0.88 0.72 3.79 15.82 9.30 6.18
1991 28.87 22.75 29.15 12.10 2.59 2.04 1.20 1.11 1.05 1.19 1.77 3.50 8.94
1992 14.38 4.08 4.96 1.41 0.64 0.63 0.61 1.19 0.64 1.55 3.64 8.97 3.56
1993 51.22 4.75 11.45 8.29 1.89 0.91 0.80 0.61 0.85 2.04 16.16 14.98 9.50
1994 14.50 23.93 26.33 18.48 3.61 1.26 0.78 0.68 0.64 0.55 4.41 9.92 8.76
1995 13.20 17.50 24.74 6.93 1.72 1.00 0.76 0.72 0.72 0.60 1.16 6.76 6.32
1996 15.07 29.32 17.18 14.50 2.33 1.14 0.97 1.09 0.90 0.76 2.64 31.10 9.75
1997 59.40 39.45 15.52 9.59 3.09 1.48 1.24 1.92 1.59 1.82 4.90 5.12 12.09
1998 23.85 30.18 14.80 6.29 1.38 1.07 0.87 0.65 0.54 0.62 2.27 2.23 7.06
1999 7.12 35.91 46.74 26.76 5.06 1.77 1.77 0.90 0.87 4.62 2.15 3.56 11.44
2000 28.89 57.64 34.44 5.20 2.38 1.37 0.91 0.86 0.61 2.42 0.80 4.83 11.70
2001 46.83 60.05 37.76 20.52 4.12 1.54 1.02 0.97 0.99 1.37 1.28 2.31 14.90
2002 21.28 91.52 63.86 18.88 5.56 1.49 1.35 1.06 1.01 1.71 3.30 17.50 19.04
2003 23.81 57.39 36.98 14.61 3.06 2.12 1.75 1.39 1.40 1.12 1.13 14.08 13.24
2004 33.12 51.04 13.29 7.75 2.03 1.18 1.16 1.25 1.17 0.86 1.49 6.42 10.06
2005 10.69 63.61 20.08 10.06 2.45 1.05 0.87 0.84 0.96 0.89 2.74 13.71 10.66
2006 30.25 59.36 60.21 47.27 5.19 1.85 1.38 1.27 1.10 1.49 3.78 9.88 18.58
2007 37.61 15.25 49.93 18.82 5.37 1.76 1.35 0.95 0.89 1.78 4.58 6.46 12.06
2008 51.39 25.73 36.50 4.22 1.84 1.47 1.14 0.96 0.91 1.16 1.09 19.25 12.14
2009 11.81 26.15 34.68 12.69 2.68 1.53 1.13 1.02 1.13 2.06 9.36 20.15 10.36
MEDIA 27.22 35.24 28.11 13.13 3.39 1.58 1.20 1.08 1.18 1.64 4.04 9.79 10.63
DESV STD 15.01 21.31 14.42 10.08 2.43 0.59 0.30 0.30 0.82 0.88 4.28 7.88 3.61
MAXIMA 64.12 91.52 63.86 47.27 13.48 4.52 1.97 1.92 5.99 4.62 19.73 41.52 19.04
MINIMA 3.82 4.08 4.96 1.41 0.64 0.63 0.61 0.61 0.54 0.55 0.72 1.82 2.58
Fuente: SENAMHI

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 126
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.3
Descargas medias mensuales generadas del río Verde (m3/s)
Punto de interés: Zona de cierre del embalse Verde, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 11.31 37.47 22.20 7.59 3.03 1.48 1.02 1.00 1.10 1.05 1.62 3.76 7.72
1965 10.27 25.68 25.79 8.37 3.03 1.45 1.08 0.85 1.05 1.42 1.50 15.84 8.03
1966 12.52 28.28 19.32 2.91 2.02 1.26 0.98 0.79 0.78 1.98 4.76 9.49 7.09
1967 5.33 12.83 49.25 5.32 2.28 1.45 1.27 0.98 1.31 2.25 1.60 5.11 7.41
1968 18.00 44.19 23.02 5.92 2.80 1.68 1.28 1.09 1.20 2.18 8.26 8.55 9.85
1969 20.01 21.00 5.96 9.80 3.04 1.88 1.72 1.59 0.81 1.15 2.15 5.91 6.25
1970 21.19 42.98 27.37 9.77 3.31 1.62 1.17 1.04 1.06 1.37 1.00 11.47 10.28
1971 23.93 72.76 30.07 4.92 2.08 1.31 1.04 0.92 0.87 0.82 1.06 12.14 12.66
1972 45.36 16.00 21.58 14.11 2.69 1.55 1.26 1.09 1.28 1.62 3.45 7.22 9.77
1973 37.52 55.51 35.77 18.65 6.04 2.52 2.01 1.74 1.99 1.96 2.17 14.01 14.99
1974 46.05 70.04 25.67 9.87 2.22 1.60 1.23 1.72 1.77 1.97 1.67 12.57 14.70
1975 27.21 60.69 34.62 9.52 6.48 2.03 1.33 1.22 1.52 1.58 1.93 15.02 13.60
1976 47.03 37.48 40.52 11.30 2.89 1.79 1.28 1.14 6.12 2.41 1.40 3.09 13.04
1977 12.82 41.97 57.94 8.22 1.97 1.20 1.03 0.82 0.92 1.10 4.64 3.45 11.34
1978 45.25 28.46 9.50 8.82 2.83 1.19 0.94 0.76 0.86 0.97 5.81 24.08 10.79
1979 37.66 34.96 25.21 8.31 2.50 1.42 1.16 0.93 0.88 1.49 3.82 10.67 10.75
1980 12.57 10.37 24.57 10.05 1.97 1.22 1.12 1.02 1.13 4.51 4.44 3.54 6.38
1981 26.72 36.53 38.56 16.46 2.94 1.50 1.19 1.37 1.47 1.75 1.94 3.48 11.16
1982 36.23 10.36 25.35 16.27 3.48 1.53 1.23 1.13 1.02 1.64 20.18 7.56 10.50
1983 3.91 5.42 5.22 4.61 1.92 1.36 1.22 1.10 1.31 1.89 1.25 2.40 2.63
1984 35.99 80.09 41.80 16.76 3.61 1.74 1.33 1.13 0.92 1.33 3.68 6.04 16.20
1985 26.93 48.89 31.10 28.76 12.66 4.62 1.80 1.35 2.13 2.18 13.76 42.47 18.06
1986 44.09 45.81 29.26 35.93 13.79 2.45 1.90 1.80 2.48 2.57 3.03 8.80 15.99
1987 65.60 12.93 6.50 2.96 1.40 1.23 1.21 1.01 0.89 1.00 3.09 2.42 8.35
1988 24.61 19.15 29.15 22.26 4.52 1.78 1.26 1.04 0.87 0.94 0.73 1.86 9.01
1989 29.80 15.11 38.32 46.23 4.26 2.11 1.54 1.48 0.79 0.96 4.85 4.85 12.53
1990 17.64 11.25 7.48 3.61 1.26 2.31 1.13 0.90 0.74 3.87 16.18 9.51 6.32
1991 29.53 23.27 29.82 12.38 2.65 2.08 1.22 1.13 1.08 1.22 1.81 3.58 9.15
1992 14.71 4.18 5.07 1.44 0.66 0.64 0.63 1.22 0.66 1.59 3.72 9.18 3.64
1993 52.40 4.86 11.71 8.48 1.93 0.93 0.82 0.63 0.87 2.09 16.53 15.33 9.71
1994 14.84 24.47 26.94 18.91 3.69 1.29 0.79 0.70 0.65 0.56 4.51 10.15 8.96
1995 13.50 17.90 25.31 7.09 1.76 1.03 0.78 0.73 0.73 0.61 1.19 6.91 6.46
1996 15.42 29.99 17.57 14.84 2.38 1.16 0.99 1.11 0.92 0.77 2.70 31.82 9.97
1997 60.77 40.36 15.88 9.81 3.16 1.51 1.27 1.96 1.63 1.86 5.02 5.24 12.37
1998 24.40 30.88 15.14 6.43 1.41 1.10 0.88 0.67 0.56 0.63 2.32 2.28 7.22
1999 7.29 36.73 47.81 27.38 5.17 1.81 1.81 0.92 0.89 4.73 2.20 3.64 11.70
2000 29.55 58.97 35.23 5.32 2.44 1.40 0.93 0.88 0.63 2.48 0.82 4.94 11.96
2001 47.91 61.43 38.62 20.99 4.22 1.58 1.04 0.99 1.02 1.40 1.31 2.37 15.24
2002 21.77 93.63 65.32 19.31 5.69 1.53 1.38 1.09 1.03 1.75 3.38 17.90 19.48
2003 24.35 58.71 37.83 14.95 3.13 2.17 1.79 1.42 1.43 1.15 1.15 14.40 13.54
2004 33.88 52.22 13.60 7.93 2.07 1.20 1.19 1.28 1.20 0.88 1.52 6.57 10.30
2005 10.94 65.07 20.54 10.29 2.51 1.08 0.89 0.85 0.98 0.91 2.80 14.02 10.91
2006 30.95 60.73 61.59 48.36 5.31 1.89 1.41 1.30 1.12 1.52 3.87 10.10 19.01
2007 38.47 15.60 51.08 19.25 5.49 1.80 1.38 0.97 0.91 1.82 4.68 6.61 12.34
2008 52.57 26.33 37.34 4.32 1.88 1.51 1.17 0.98 0.93 1.19 1.11 19.69 12.42
2009 12.08 26.75 35.48 12.98 2.74 1.56 1.15 1.04 1.15 2.10 9.57 20.61 10.60
MEDIA 27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88
DESV STD 15.35 21.79 14.75 10.31 2.48 0.60 0.30 0.30 0.84 0.90 4.38 8.07 3.69
MAXIMA 65.60 93.63 65.32 48.36 13.79 4.62 2.01 1.96 6.12 4.73 20.18 42.47 19.48
MINIMA 3.91 4.18 5.07 1.44 0.66 0.64 0.63 0.63 0.56 0.56 0.73 1.86 2.63
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 127
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.4
Descargas medias mensuales generadas del río Verde (m3/s)
Punto de interés: Zona de captación de la bocatoma Verde, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 11.31 37.47 22.20 7.59 3.03 1.48 1.02 1.00 1.10 1.05 1.62 3.76 7.72
1965 10.27 25.68 25.79 8.37 3.03 1.45 1.08 0.85 1.05 1.42 1.50 15.84 8.03
1966 12.52 28.28 19.32 2.91 2.02 1.26 0.98 0.79 0.78 1.98 4.76 9.49 7.09
1967 5.33 12.83 49.25 5.32 2.28 1.45 1.27 0.98 1.31 2.25 1.60 5.11 7.41
1968 18.00 44.19 23.02 5.92 2.80 1.68 1.28 1.09 1.20 2.18 8.26 8.55 9.85
1969 20.01 21.00 5.96 9.80 3.04 1.88 1.72 1.59 0.81 1.15 2.15 5.91 6.25
1970 21.19 42.98 27.37 9.77 3.31 1.62 1.17 1.04 1.06 1.37 1.00 11.47 10.28
1971 23.93 72.76 30.07 4.92 2.08 1.31 1.04 0.92 0.87 0.82 1.06 12.14 12.66
1972 45.36 16.00 21.58 14.11 2.69 1.55 1.26 1.09 1.28 1.62 3.45 7.22 9.77
1973 37.52 55.51 35.77 18.65 6.04 2.52 2.01 1.74 1.99 1.96 2.17 14.01 14.99
1974 46.05 70.04 25.67 9.87 2.22 1.60 1.23 1.72 1.77 1.97 1.67 12.57 14.70
1975 27.21 60.69 34.62 9.52 6.48 2.03 1.33 1.22 1.52 1.58 1.93 15.02 13.60
1976 47.03 37.48 40.52 11.30 2.89 1.79 1.28 1.14 6.12 2.41 1.40 3.09 13.04
1977 12.82 41.97 57.94 8.22 1.97 1.20 1.03 0.82 0.92 1.10 4.64 3.45 11.34
1978 45.25 28.46 9.50 8.82 2.83 1.19 0.94 0.76 0.86 0.97 5.81 24.08 10.79
1979 37.66 34.96 25.21 8.31 2.50 1.42 1.16 0.93 0.88 1.49 3.82 10.67 10.75
1980 12.57 10.37 24.57 10.05 1.97 1.22 1.12 1.02 1.13 4.51 4.44 3.54 6.38
1981 26.72 36.53 38.56 16.46 2.94 1.50 1.19 1.37 1.47 1.75 1.94 3.48 11.16
1982 36.23 10.36 25.35 16.27 3.48 1.53 1.23 1.13 1.02 1.64 20.18 7.56 10.50
1983 3.91 5.42 5.22 4.61 1.92 1.36 1.22 1.10 1.31 1.89 1.25 2.40 2.63
1984 35.99 80.09 41.80 16.76 3.61 1.74 1.33 1.13 0.92 1.33 3.68 6.04 16.20
1985 26.93 48.89 31.10 28.76 12.66 4.62 1.80 1.35 2.13 2.18 13.76 42.47 18.06
1986 44.09 45.81 29.26 35.93 13.79 2.45 1.90 1.80 2.48 2.57 3.03 8.80 15.99
1987 65.60 12.93 6.50 2.96 1.40 1.23 1.21 1.01 0.89 1.00 3.09 2.42 8.35
1988 24.61 19.15 29.15 22.26 4.52 1.78 1.26 1.04 0.87 0.94 0.73 1.86 9.01
1989 29.80 15.11 38.32 46.23 4.26 2.11 1.54 1.48 0.79 0.96 4.85 4.85 12.53
1990 17.64 11.25 7.48 3.61 1.26 2.31 1.13 0.90 0.74 3.87 16.18 9.51 6.32
1991 29.53 23.27 29.82 12.38 2.65 2.08 1.22 1.13 1.08 1.22 1.81 3.58 9.15
1992 14.71 4.18 5.07 1.44 0.66 0.64 0.63 1.22 0.66 1.59 3.72 9.18 3.64
1993 52.40 4.86 11.71 8.48 1.93 0.93 0.82 0.63 0.87 2.09 16.53 15.33 9.71
1994 14.84 24.47 26.94 18.91 3.69 1.29 0.79 0.70 0.65 0.56 4.51 10.15 8.96
1995 13.50 17.90 25.31 7.09 1.76 1.03 0.78 0.73 0.73 0.61 1.19 6.91 6.46
1996 15.42 29.99 17.57 14.84 2.38 1.16 0.99 1.11 0.92 0.77 2.70 31.82 9.97
1997 60.77 40.36 15.88 9.81 3.16 1.51 1.27 1.96 1.63 1.86 5.02 5.24 12.37
1998 24.40 30.88 15.14 6.43 1.41 1.10 0.88 0.67 0.56 0.63 2.32 2.28 7.22
1999 7.29 36.73 47.81 27.38 5.17 1.81 1.81 0.92 0.89 4.73 2.20 3.64 11.70
2000 29.55 58.97 35.23 5.32 2.44 1.40 0.93 0.88 0.63 2.48 0.82 4.94 11.96
2001 47.91 61.43 38.62 20.99 4.22 1.58 1.04 0.99 1.02 1.40 1.31 2.37 15.24
2002 21.77 93.63 65.32 19.31 5.69 1.53 1.38 1.09 1.03 1.75 3.38 17.90 19.48
2003 24.35 58.71 37.83 14.95 3.13 2.17 1.79 1.42 1.43 1.15 1.15 14.40 13.54
2004 33.88 52.22 13.60 7.93 2.07 1.20 1.19 1.28 1.20 0.88 1.52 6.57 10.30
2005 10.94 65.07 20.54 10.29 2.51 1.08 0.89 0.85 0.98 0.91 2.80 14.02 10.91
2006 30.95 60.73 61.59 48.36 5.31 1.89 1.41 1.30 1.12 1.52 3.87 10.10 19.01
2007 38.47 15.60 51.08 19.25 5.49 1.80 1.38 0.97 0.91 1.82 4.68 6.61 12.34
2008 52.57 26.33 37.34 4.32 1.88 1.51 1.17 0.98 0.93 1.19 1.11 19.69 12.42
2009 12.08 26.75 35.48 12.98 2.74 1.56 1.15 1.04 1.15 2.10 9.57 20.61 10.60
MEDIA 27.84 36.05 28.76 13.43 3.46 1.62 1.22 1.11 1.21 1.68 4.13 10.01 10.88
DESV STD 15.35 21.79 14.75 10.31 2.48 0.60 0.30 0.30 0.84 0.90 4.38 8.07 3.69
MAXIMA 65.60 93.63 65.32 48.36 13.79 4.62 2.01 1.96 6.12 4.73 20.18 42.47 19.48
MINIMA 3.91 4.18 5.07 1.44 0.66 0.64 0.63 0.63 0.56 0.56 0.73 1.86 2.63
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 128
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.5
Descargas medias mensuales generadas del río Paratía (m3/s)
Punto de interés: Zona de cierre embalse Paratía, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 6.02 19.95 11.82 4.04 1.61 0.79 0.54 0.53 0.59 0.56 0.86 2.00 4.11
1965 5.47 13.67 13.73 4.46 1.61 0.77 0.58 0.45 0.56 0.76 0.80 8.43 4.27
1966 6.67 15.06 10.29 1.55 1.07 0.67 0.52 0.42 0.41 1.06 2.53 5.05 3.78
1967 2.84 6.83 26.22 2.83 1.21 0.77 0.68 0.52 0.70 1.20 0.85 2.72 3.95
1968 9.59 23.53 12.26 3.15 1.49 0.89 0.68 0.58 0.64 1.16 4.40 4.55 5.24
1969 10.65 11.18 3.18 5.22 1.62 1.00 0.92 0.84 0.43 0.61 1.14 3.15 3.33
1970 11.28 22.89 14.57 5.20 1.76 0.86 0.63 0.55 0.56 0.73 0.53 6.11 5.47
1971 12.74 38.74 16.01 2.62 1.11 0.70 0.55 0.49 0.46 0.44 0.56 6.47 6.74
1972 24.15 8.52 11.49 7.51 1.43 0.83 0.67 0.58 0.68 0.86 1.84 3.85 5.20
1973 19.98 29.56 19.05 9.93 3.22 1.34 1.07 0.92 1.06 1.04 1.16 7.46 7.98
1974 24.52 37.29 13.67 5.26 1.18 0.85 0.65 0.92 0.94 1.05 0.89 6.69 7.83
1975 14.49 32.32 18.43 5.07 3.45 1.08 0.71 0.65 0.81 0.84 1.03 8.00 7.24
1976 25.04 19.96 21.58 6.02 1.54 0.95 0.68 0.61 3.26 1.28 0.75 1.64 6.94
1977 6.83 22.35 30.85 4.38 1.05 0.64 0.55 0.44 0.49 0.59 2.47 1.84 6.04
1978 24.09 15.15 5.06 4.70 1.50 0.63 0.50 0.41 0.46 0.51 3.09 12.82 5.74
1979 20.05 18.61 13.43 4.43 1.33 0.76 0.62 0.49 0.47 0.79 2.03 5.68 5.73
1980 6.69 5.52 13.09 5.35 1.05 0.65 0.60 0.54 0.60 2.40 2.37 1.88 3.39
1981 14.23 19.45 20.53 8.76 1.56 0.80 0.63 0.73 0.78 0.93 1.03 1.85 5.94
1982 19.29 5.52 13.50 8.66 1.85 0.82 0.65 0.60 0.54 0.87 10.75 4.03 5.59
1983 2.08 2.89 2.78 2.46 1.02 0.72 0.65 0.59 0.70 1.01 0.67 1.28 1.40
1984 19.17 42.65 22.26 8.92 1.92 0.93 0.71 0.60 0.49 0.71 1.96 3.21 8.63
1985 14.34 26.04 16.56 15.31 6.74 2.46 0.96 0.72 1.13 1.16 7.33 22.61 9.61
1986 23.48 24.39 15.58 19.13 7.34 1.31 1.01 0.96 1.32 1.37 1.62 4.69 8.52
1987 34.93 6.89 3.46 1.58 0.74 0.66 0.64 0.54 0.47 0.53 1.64 1.29 4.45
1988 13.10 10.20 15.52 11.85 2.41 0.95 0.67 0.55 0.46 0.50 0.39 0.99 4.80
1989 15.87 8.05 20.40 24.62 2.27 1.12 0.82 0.79 0.42 0.51 2.58 2.58 6.67
1990 9.39 5.99 3.98 1.92 0.67 1.23 0.60 0.48 0.39 2.06 8.62 5.07 3.37
1991 15.73 12.39 15.88 6.59 1.41 1.11 0.65 0.60 0.57 0.65 0.96 1.90 4.87
1992 7.83 2.22 2.70 0.77 0.35 0.34 0.33 0.65 0.35 0.84 1.98 4.89 1.94
1993 27.90 2.59 6.23 4.52 1.03 0.49 0.44 0.33 0.46 1.11 8.80 8.16 5.17
1994 7.90 13.03 14.34 10.07 1.96 0.69 0.42 0.37 0.35 0.30 2.40 5.41 4.77
1995 7.19 9.53 13.47 3.77 0.94 0.55 0.42 0.39 0.39 0.33 0.63 3.68 3.44
1996 8.21 15.97 9.36 7.90 1.27 0.62 0.53 0.59 0.49 0.41 1.44 16.94 5.31
1997 32.36 21.49 8.46 5.22 1.68 0.81 0.68 1.05 0.87 0.99 2.67 2.79 6.59
1998 12.99 16.44 8.06 3.42 0.75 0.58 0.47 0.36 0.30 0.34 1.24 1.22 3.85
1999 3.88 19.56 25.46 14.58 2.75 0.97 0.97 0.49 0.47 2.52 1.17 1.94 6.23
2000 15.74 31.40 18.76 2.83 1.30 0.75 0.50 0.47 0.33 1.32 0.44 2.63 6.37
2001 25.51 32.71 20.57 11.17 2.25 0.84 0.56 0.53 0.54 0.74 0.70 1.26 8.11
2002 11.59 49.85 34.78 10.28 3.03 0.81 0.74 0.58 0.55 0.93 1.80 9.53 10.37
2003 12.97 31.26 20.14 7.96 1.67 1.15 0.95 0.76 0.76 0.61 0.61 7.67 7.21
2004 18.04 27.80 7.24 4.22 1.10 0.64 0.63 0.68 0.64 0.47 0.81 3.50 5.48
2005 5.82 34.65 10.94 5.48 1.34 0.57 0.47 0.45 0.52 0.48 1.49 7.47 5.81
2006 16.48 32.34 32.79 25.75 2.83 1.01 0.75 0.69 0.60 0.81 2.06 5.38 10.12
2007 20.49 8.31 27.20 10.25 2.93 0.96 0.73 0.52 0.48 0.97 2.49 3.52 6.57
2008 27.99 14.02 19.88 2.30 1.00 0.80 0.62 0.52 0.49 0.63 0.59 10.48 6.61
2009 6.43 14.25 18.89 6.91 1.46 0.83 0.61 0.55 0.61 1.12 5.10 10.97 5.65
MEDIA 14.83 19.20 15.31 7.15 1.84 0.86 0.65 0.59 0.64 0.89 2.20 5.33 5.79
DESV STD 8.17 11.61 7.85 5.49 1.32 0.32 0.16 0.16 0.45 0.48 2.33 4.29 1.96
MAXIMA 34.93 49.85 34.78 25.75 7.34 2.46 1.07 1.05 3.26 2.52 10.75 22.61 10.37
MINIMA 2.08 2.22 2.70 0.77 0.35 0.34 0.33 0.33 0.30 0.30 0.39 0.99 1.40
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 129
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.6
Descargas medias mensuales generadas del río Jarpaña (m3/s)
Punto de interés: Zona de cierre embalse Jarpaña, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 4.37 14.46 8.57 2.93 1.17 0.57 0.39 0.39 0.43 0.41 0.62 1.45 2.98
1965 3.96 9.91 9.95 3.23 1.17 0.56 0.42 0.33 0.41 0.55 0.58 6.11 3.10
1966 4.83 10.91 7.46 1.12 0.78 0.49 0.38 0.30 0.30 0.77 1.84 3.66 2.74
1967 2.06 4.95 19.01 2.05 0.88 0.56 0.49 0.38 0.51 0.87 0.62 1.97 2.86
1968 6.95 17.06 8.88 2.29 1.08 0.65 0.49 0.42 0.46 0.84 3.19 3.30 3.80
1969 7.72 8.11 2.30 3.78 1.17 0.73 0.66 0.61 0.31 0.44 0.83 2.28 2.41
1970 8.18 16.59 10.56 3.77 1.28 0.63 0.45 0.40 0.41 0.53 0.39 4.43 3.97
1971 9.24 28.08 11.61 1.90 0.80 0.50 0.40 0.35 0.34 0.32 0.41 4.69 4.89
1972 17.51 6.17 8.33 5.44 1.04 0.60 0.48 0.42 0.49 0.63 1.33 2.79 3.77
1973 14.48 21.43 13.81 7.20 2.33 0.97 0.78 0.67 0.77 0.76 0.84 5.41 5.79
1974 17.77 27.03 9.91 3.81 0.86 0.62 0.47 0.67 0.68 0.76 0.65 4.85 5.67
1975 10.50 23.42 13.36 3.67 2.50 0.78 0.51 0.47 0.59 0.61 0.74 5.80 5.25
1976 18.15 14.46 15.64 4.36 1.11 0.69 0.49 0.44 2.36 0.93 0.54 1.19 5.03
1977 4.95 16.20 22.36 3.17 0.76 0.46 0.40 0.32 0.35 0.43 1.79 1.33 4.38
1978 17.46 10.99 3.67 3.41 1.09 0.46 0.36 0.29 0.33 0.37 2.24 9.29 4.16
1979 14.54 13.49 9.73 3.21 0.96 0.55 0.45 0.36 0.34 0.58 1.47 4.12 4.15
1980 4.85 4.00 9.49 3.88 0.76 0.47 0.43 0.39 0.43 1.74 1.71 1.36 2.46
1981 10.31 14.10 14.88 6.35 1.13 0.58 0.46 0.53 0.57 0.68 0.75 1.34 4.31
1982 13.99 4.00 9.79 6.28 1.34 0.59 0.47 0.43 0.39 0.63 7.79 2.92 4.05
1983 1.51 2.09 2.01 1.78 0.74 0.52 0.47 0.43 0.51 0.73 0.48 0.93 1.02
1984 13.89 30.91 16.14 6.47 1.39 0.67 0.51 0.43 0.36 0.51 1.42 2.33 6.25
1985 10.39 18.87 12.00 11.10 4.89 1.78 0.70 0.52 0.82 0.84 5.31 16.39 6.97
1986 17.02 17.68 11.29 13.87 5.32 0.95 0.73 0.69 0.96 0.99 1.17 3.40 6.17
1987 25.32 4.99 2.51 1.14 0.54 0.48 0.47 0.39 0.34 0.39 1.19 0.93 3.22
1988 9.50 7.39 11.25 8.59 1.74 0.69 0.49 0.40 0.34 0.36 0.28 0.72 3.48
1989 11.50 5.83 14.79 17.85 1.64 0.81 0.59 0.57 0.31 0.37 1.87 1.87 4.83
1990 6.81 4.34 2.89 1.39 0.49 0.89 0.44 0.35 0.28 1.49 6.25 3.67 2.44
1991 11.40 8.98 11.51 4.78 1.02 0.80 0.47 0.44 0.42 0.47 0.70 1.38 3.53
1992 5.68 1.61 1.96 0.56 0.25 0.25 0.24 0.47 0.25 0.61 1.44 3.54 1.41
1993 20.23 1.87 4.52 3.27 0.75 0.36 0.32 0.24 0.34 0.81 6.38 5.92 3.75
1994 5.73 9.45 10.40 7.30 1.42 0.50 0.31 0.27 0.25 0.22 1.74 3.92 3.46
1995 5.21 6.91 9.77 2.74 0.68 0.40 0.30 0.28 0.28 0.24 0.46 2.67 2.49
1996 5.95 11.58 6.78 5.73 0.92 0.45 0.38 0.43 0.36 0.30 1.04 12.28 3.85
1997 23.46 15.58 6.13 3.79 1.22 0.58 0.49 0.76 0.63 0.72 1.94 2.02 4.78
1998 9.42 11.92 5.84 2.48 0.54 0.42 0.34 0.26 0.21 0.24 0.90 0.88 2.79
1999 2.81 14.18 18.45 10.57 2.00 0.70 0.70 0.35 0.34 1.82 0.85 1.41 4.52
2000 11.41 22.76 13.60 2.05 0.94 0.54 0.36 0.34 0.24 0.96 0.32 1.91 4.62
2001 18.49 23.71 14.91 8.10 1.63 0.61 0.40 0.38 0.39 0.54 0.51 0.91 5.88
2002 8.40 36.14 25.21 7.46 2.20 0.59 0.53 0.42 0.40 0.68 1.30 6.91 7.52
2003 9.40 22.66 14.60 5.77 1.21 0.84 0.69 0.55 0.55 0.44 0.45 5.56 5.23
2004 13.08 20.15 5.25 3.06 0.80 0.46 0.46 0.50 0.46 0.34 0.59 2.54 3.97
2005 4.22 25.12 7.93 3.97 0.97 0.42 0.34 0.33 0.38 0.35 1.08 5.41 4.21
2006 11.94 23.44 23.77 18.67 2.05 0.73 0.54 0.50 0.43 0.59 1.49 3.90 7.34
2007 14.85 6.02 19.71 7.43 2.12 0.69 0.53 0.37 0.35 0.70 1.81 2.55 4.76
2008 20.29 10.16 14.41 1.67 0.73 0.58 0.45 0.38 0.36 0.46 0.43 7.60 4.79
2009 4.66 10.33 13.69 5.01 1.06 0.60 0.45 0.40 0.44 0.81 3.70 7.96 4.09
MEDIA 10.75 13.91 11.10 5.18 1.34 0.63 0.47 0.43 0.47 0.65 1.60 3.87 4.20
DESV STD 5.93 8.41 5.69 3.98 0.96 0.23 0.12 0.12 0.32 0.35 1.69 3.11 1.42
MAXIMA 25.32 36.14 25.21 18.67 5.32 1.78 0.78 0.76 2.36 1.82 7.79 16.39 7.52
MINIMA 1.51 1.61 1.96 0.56 0.25 0.25 0.24 0.24 0.21 0.22 0.28 0.72 1.02
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 130
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.7
Descargas medias mensuales generadas del río Jarpaña (m3/s)
Punto de interés: Zona de captación de la bocatoma Jarpaña, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 4.16 13.78 8.17 2.79 1.11 0.55 0.38 0.37 0.41 0.39 0.59 1.38 2.84
1965 3.78 9.44 9.49 3.08 1.11 0.53 0.40 0.31 0.39 0.52 0.55 5.82 2.95
1966 4.61 10.40 7.11 1.07 0.74 0.46 0.36 0.29 0.29 0.73 1.75 3.49 2.61
1967 1.96 4.72 18.11 1.96 0.84 0.53 0.47 0.36 0.48 0.83 0.59 1.88 2.73
1968 6.62 16.26 8.47 2.18 1.03 0.62 0.47 0.40 0.44 0.80 3.04 3.15 3.62
1969 7.36 7.72 2.19 3.60 1.12 0.69 0.63 0.58 0.30 0.42 0.79 2.17 2.30
1970 7.79 15.81 10.07 3.59 1.22 0.60 0.43 0.38 0.39 0.50 0.37 4.22 3.78
1971 8.80 26.76 11.06 1.81 0.77 0.48 0.38 0.34 0.32 0.30 0.39 4.47 4.66
1972 16.68 5.88 7.94 5.19 0.99 0.57 0.46 0.40 0.47 0.60 1.27 2.66 3.59
1973 13.80 20.42 13.16 6.86 2.22 0.93 0.74 0.64 0.73 0.72 0.80 5.15 5.51
1974 16.94 25.76 9.44 3.63 0.82 0.59 0.45 0.63 0.65 0.72 0.62 4.62 5.41
1975 10.01 22.32 12.73 3.50 2.38 0.75 0.49 0.45 0.56 0.58 0.71 5.53 5.00
1976 17.30 13.78 14.91 4.16 1.06 0.66 0.47 0.42 2.25 0.89 0.51 1.13 4.80
1977 4.71 15.44 21.31 3.02 0.72 0.44 0.38 0.30 0.34 0.41 1.71 1.27 4.17
1978 16.64 10.47 3.49 3.25 1.04 0.44 0.35 0.28 0.32 0.36 2.14 8.86 3.97
1979 13.85 12.86 9.27 3.06 0.92 0.52 0.43 0.34 0.33 0.55 1.40 3.93 3.95
1980 4.62 3.81 9.04 3.70 0.72 0.45 0.41 0.37 0.41 1.66 1.63 1.30 2.35
1981 9.83 13.44 14.18 6.05 1.08 0.55 0.44 0.50 0.54 0.64 0.71 1.28 4.10
1982 13.33 3.81 9.33 5.98 1.28 0.56 0.45 0.41 0.38 0.60 7.42 2.78 3.86
1983 1.44 1.99 1.92 1.70 0.71 0.50 0.45 0.41 0.48 0.69 0.46 0.88 0.97
1984 13.24 29.46 15.38 6.16 1.33 0.64 0.49 0.41 0.34 0.49 1.35 2.22 5.96
1985 9.91 17.98 11.44 10.58 4.66 1.70 0.66 0.50 0.78 0.80 5.06 15.62 6.64
1986 16.22 16.85 10.76 13.22 5.07 0.90 0.70 0.66 0.91 0.94 1.12 3.24 5.88
1987 24.13 4.76 2.39 1.09 0.51 0.45 0.44 0.37 0.33 0.37 1.14 0.89 3.07
1988 9.05 7.04 10.72 8.19 1.66 0.65 0.46 0.38 0.32 0.35 0.27 0.69 3.32
1989 10.96 5.56 14.09 17.01 1.57 0.77 0.57 0.55 0.29 0.35 1.78 1.79 4.61
1990 6.49 4.14 2.75 1.33 0.46 0.85 0.42 0.33 0.27 1.42 5.95 3.50 2.33
1991 10.86 8.56 10.97 4.55 0.97 0.77 0.45 0.42 0.40 0.45 0.67 1.32 3.36
1992 5.41 1.54 1.87 0.53 0.24 0.24 0.23 0.45 0.24 0.58 1.37 3.38 1.34
1993 19.27 1.79 4.31 3.12 0.71 0.34 0.30 0.23 0.32 0.77 6.08 5.64 3.57
1994 5.46 9.00 9.91 6.95 1.36 0.48 0.29 0.26 0.24 0.21 1.66 3.73 3.30
1995 4.96 6.59 9.31 2.61 0.65 0.38 0.29 0.27 0.27 0.23 0.44 2.54 2.38
1996 5.67 11.03 6.46 5.46 0.88 0.43 0.37 0.41 0.34 0.28 0.99 11.70 3.67
1997 22.35 14.84 5.84 3.61 1.16 0.56 0.47 0.72 0.60 0.68 1.84 1.93 4.55
1998 8.97 11.36 5.57 2.37 0.52 0.40 0.33 0.25 0.20 0.23 0.85 0.84 2.66
1999 2.68 13.51 17.59 10.07 1.90 0.67 0.67 0.34 0.33 1.74 0.81 1.34 4.30
2000 10.87 21.69 12.96 1.96 0.90 0.52 0.34 0.32 0.23 0.91 0.30 1.82 4.40
2001 17.62 22.60 14.21 7.72 1.55 0.58 0.38 0.37 0.37 0.51 0.48 0.87 5.61
2002 8.01 34.44 24.03 7.10 2.09 0.56 0.51 0.40 0.38 0.64 1.24 6.58 7.17
2003 8.96 21.59 13.91 5.50 1.15 0.80 0.66 0.52 0.53 0.42 0.42 5.30 4.98
2004 12.46 19.21 5.00 2.92 0.76 0.44 0.44 0.47 0.44 0.32 0.56 2.42 3.79
2005 4.02 23.94 7.55 3.78 0.92 0.40 0.33 0.31 0.36 0.33 1.03 5.16 4.01
2006 11.38 22.34 22.65 17.79 1.95 0.70 0.52 0.48 0.41 0.56 1.42 3.72 6.99
2007 14.15 5.74 18.79 7.08 2.02 0.66 0.51 0.36 0.33 0.67 1.72 2.43 4.54
2008 19.34 9.68 13.74 1.59 0.69 0.55 0.43 0.36 0.34 0.44 0.41 7.24 4.57
2009 4.44 9.84 13.05 4.78 1.01 0.57 0.42 0.38 0.42 0.77 3.52 7.58 3.90
MEDIA 10.24 13.26 10.58 4.94 1.27 0.60 0.45 0.41 0.45 0.62 1.52 3.68 4.00
DESV STD 5.65 8.02 5.42 3.79 0.91 0.22 0.11 0.11 0.31 0.33 1.61 2.97 1.36
MAXIMA 24.13 34.44 24.03 17.79 5.07 1.70 0.74 0.72 2.25 1.74 7.42 15.62 7.17
MINIMA 1.44 1.54 1.87 0.53 0.24 0.24 0.23 0.23 0.20 0.21 0.27 0.69 0.97
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 131
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.2.8
Descargas medias mensuales generadas del río Jarpaña (m3/s)
Punto de interés: Zona de cierre embalse Millo, Periodo 1964 – 2009
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC TOTAL
1964 2.42 8.01 4.75 1.62 0.65 0.32 0.22 0.21 0.24 0.23 0.35 0.81 1.65
1965 2.20 5.49 5.52 1.79 0.65 0.31 0.23 0.18 0.23 0.30 0.32 3.39 1.72
1966 2.68 6.05 4.13 0.62 0.43 0.27 0.21 0.17 0.17 0.42 1.02 2.03 1.52
1967 1.14 2.74 10.53 1.14 0.49 0.31 0.27 0.21 0.28 0.48 0.34 1.09 1.59
1968 3.85 9.45 4.92 1.27 0.60 0.36 0.27 0.23 0.26 0.47 1.77 1.83 2.11
1969 4.28 4.49 1.28 2.10 0.65 0.40 0.37 0.34 0.17 0.25 0.46 1.26 1.34
1970 4.53 9.19 5.85 2.09 0.71 0.35 0.25 0.22 0.23 0.29 0.21 2.45 2.20
1971 5.12 15.56 6.43 1.05 0.45 0.28 0.22 0.20 0.19 0.18 0.23 2.60 2.71
1972 9.70 3.42 4.62 3.02 0.57 0.33 0.27 0.23 0.27 0.35 0.74 1.54 2.09
1973 8.02 11.87 7.65 3.99 1.29 0.54 0.43 0.37 0.42 0.42 0.46 3.00 3.21
1974 9.85 14.98 5.49 2.11 0.48 0.34 0.26 0.37 0.38 0.42 0.36 2.69 3.14
1975 5.82 12.98 7.40 2.04 1.39 0.43 0.29 0.26 0.33 0.34 0.41 3.21 2.91
1976 10.06 8.01 8.67 2.42 0.62 0.38 0.27 0.24 1.31 0.52 0.30 0.66 2.79
1977 2.74 8.98 12.39 1.76 0.42 0.26 0.22 0.18 0.20 0.24 0.99 0.74 2.43
1978 9.68 6.09 2.03 1.89 0.60 0.25 0.20 0.16 0.18 0.21 1.24 5.15 2.31
1979 8.05 7.48 5.39 1.78 0.53 0.30 0.25 0.20 0.19 0.32 0.82 2.28 2.30
1980 2.69 2.22 5.26 2.15 0.42 0.26 0.24 0.22 0.24 0.96 0.95 0.76 1.36
1981 5.71 7.81 8.25 3.52 0.63 0.32 0.25 0.29 0.31 0.37 0.42 0.74 2.39
1982 7.75 2.22 5.42 3.48 0.74 0.33 0.26 0.24 0.22 0.35 4.32 1.62 2.25
1983 0.84 1.16 1.12 0.99 0.41 0.29 0.26 0.24 0.28 0.40 0.27 0.51 0.56
1984 7.70 17.13 8.94 3.58 0.77 0.37 0.28 0.24 0.20 0.28 0.79 1.29 3.46
1985 5.76 10.46 6.65 6.15 2.71 0.99 0.39 0.29 0.46 0.47 2.94 9.08 3.86
1986 9.43 9.80 6.26 7.68 2.95 0.52 0.41 0.38 0.53 0.55 0.65 1.88 3.42
1987 14.03 2.77 1.39 0.63 0.30 0.26 0.26 0.22 0.19 0.21 0.66 0.52 1.79
1988 5.26 4.09 6.23 4.76 0.97 0.38 0.27 0.22 0.19 0.20 0.16 0.40 1.93
1989 6.37 3.23 8.19 9.89 0.91 0.45 0.33 0.32 0.17 0.21 1.04 1.04 2.68
1990 3.77 2.41 1.60 0.77 0.27 0.49 0.24 0.19 0.16 0.83 3.46 2.03 1.35
1991 6.32 4.98 6.38 2.65 0.57 0.45 0.26 0.24 0.23 0.26 0.39 0.77 1.96
1992 3.15 0.89 1.08 0.31 0.14 0.14 0.13 0.26 0.14 0.34 0.80 1.96 0.78
1993 11.21 1.04 2.50 1.81 0.41 0.20 0.18 0.13 0.19 0.45 3.53 3.28 2.08
1994 3.17 5.23 5.76 4.04 0.79 0.28 0.17 0.15 0.14 0.12 0.96 2.17 1.92
1995 2.89 3.83 5.41 1.52 0.38 0.22 0.17 0.16 0.16 0.13 0.25 1.48 1.38
1996 3.30 6.41 3.76 3.17 0.51 0.25 0.21 0.24 0.20 0.17 0.58 6.80 2.13
1997 13.00 8.63 3.40 2.10 0.68 0.32 0.27 0.42 0.35 0.40 1.07 1.12 2.65
1998 5.22 6.60 3.24 1.38 0.30 0.23 0.19 0.14 0.12 0.14 0.50 0.49 1.54
1999 1.56 7.86 10.22 5.85 1.11 0.39 0.39 0.20 0.19 1.01 0.47 0.78 2.50
2000 6.32 12.61 7.53 1.14 0.52 0.30 0.20 0.19 0.13 0.53 0.17 1.06 2.56
2001 10.25 13.14 8.26 4.49 0.90 0.34 0.22 0.21 0.22 0.30 0.28 0.51 3.26
2002 4.65 20.02 13.97 4.13 1.22 0.33 0.30 0.23 0.22 0.37 0.72 3.83 4.17
2003 5.21 12.55 8.09 3.20 0.67 0.46 0.38 0.30 0.31 0.25 0.25 3.08 2.90
2004 7.25 11.17 2.91 1.70 0.44 0.26 0.25 0.27 0.26 0.19 0.33 1.40 2.20
2005 2.34 13.92 4.39 2.20 0.54 0.23 0.19 0.18 0.21 0.19 0.60 3.00 2.33
2006 6.62 12.99 13.17 10.34 1.14 0.40 0.30 0.28 0.24 0.33 0.83 2.16 4.07
2007 8.23 3.34 10.92 4.12 1.18 0.38 0.30 0.21 0.19 0.39 1.00 1.41 2.64
2008 11.24 5.63 7.99 0.92 0.40 0.32 0.25 0.21 0.20 0.25 0.24 4.21 2.66
2009 2.58 5.72 7.59 2.78 0.59 0.33 0.25 0.22 0.25 0.45 2.05 4.41 2.27
MEDIA 5.95 7.71 6.15 2.87 0.74 0.35 0.26 0.24 0.26 0.36 0.88 2.14 2.33
DESV STD 3.28 4.66 3.15 2.20 0.53 0.13 0.06 0.06 0.18 0.19 0.94 1.72 0.79
MAXIMA 14.03 20.02 13.97 10.34 2.95 0.99 0.43 0.42 1.31 1.01 4.32 9.08 4.17
MINIMA 0.84 0.89 1.08 0.31 0.14 0.14 0.13 0.13 0.12 0.12 0.16 0.40 0.56
Fuente: Elaboración Propia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 132
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.3

Diseño hidrológico de los embalses considerados en las alternativas de afianzamiento del


Sistema Integral Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 133
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

DISEÑO HIDROLÓGICO DE LOS EMBALSES CONSIDERADOS EN


LAS ALTERNATIVAS DE AFIANZAMIENTO DEL SISTEMA
INTEGRAL LAGUNILLAS
CONTENIDO

1.0. DISEÑO HIDROLÓGICO DE LOS EMBALSES VERDE, PARATÍA, JARPAÑA Y MILLO


MEDIANTE SIMULACIÓN DEL BALANCE HÍDRICO .................................................................. 134
1.1.Prioridad de la atención de las demandas hídricas ....................................................... 134
1.2.Criterios de garantía en tiempo y volumen ................................................................... 135
1.2.1. Criterios de garantía en tiempo y volumen para la demanda poblacional y caudal
ecológico.................................................................................................................................................... 135
1.2.2.Criterios de garantía en tiempo y volumen para la demanda agrícola ............................. 135
1.3.Balance hídrico mediante simulación de la operación de los embalses......................... 136

1.0. DISEÑO HIDROLÓGICO DE LOS EMBALSES VERDE, PARATÍA, JARPAÑA


Y MILLO MEDIANTE SIMULACIÓN DEL BALANCE HÍDRICO
Considerado variables como la oferta hídrica no regulada, la oferta hídrica regulada en el
embalse Lagunillas y la oferta hídrica media potencialmente regulable en cada uno de los
embalses considerados en las alternativas de afianzamiento, así como la demanda hídrica
actual y futura para los distintos usos y usuarios del Sistema Integral Lagunillas y
mediante simulación del balance hídrico del Sistema Integral Lagunillas (SIL), se ha
efectuado el diseño hidrológico de los embalses Verde, Paratía, Jarpaña y Millo, buscando
definir un adecuado volumen útil (VU) de almacenamiento de los embalses, según
criterios de garantía de tiempo y volumen para la satisfacción de las demandas.

1.1. Prioridad de la atención de las demandas hídricas


Para la simulación del sistema, se ha establecido un orden de prioridades en la atención
de las demandas hídricas del Sistema Integral Lagunillas, tal como se presenta en el
Cuadro 1.3.1.

Cuadro 1.3.1: Orden de prioridades para la atención de la demanda hídrica en el SIL.


Orden de
Uso
Prioridad
Poblacional 1°
Ecológico 2°
Agrícola 3°
Industrial 4°
Minero 5°

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 134
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

1.2. Criterios de garantía en tiempo y volumen


Para evaluar los niveles de satisfacción en la atención de las demandas hídricas de los
distintos usos y usuarios en el Sistema Integral Lagunillas, se han establecido criterios de
evaluación en tiempo y volumen, los mismos que se describen a continuación:

1.2.1. Criterios de garantía en tiempo y volumen para la demanda poblacional y caudal


ecológico
Para las demandas de uso poblacional y ecológico, se ha asumido premisas de
satisfacción al 100%, o “déficit cero”, en tiempo y volumen.

1.2.2. Criterios de garantía en tiempo y volumen para la demanda agrícola


Para el caso de la demanda de uso agrícola se ha considerado premisas de evaluación de
la satisfacción de la demanda, en tiempo y en volumen tanto a nivel anual como
mensual, las mismas que se describen a continuación:

a) Déficit en tiempo a nivel anual y mensual


La premisa básica de satisfacción en tiempo a nivel anual es, “al 75%”, o hasta 25% con
déficits; es decir, se espera que en 4 años, se presenten 3 de satisfacción y 1 deficitario.
En el periodo de análisis, opcionalmente, se debería esperar hasta 3 años consecutivos
deficitarios para la sequía más severa del registro.

A nivel mensual se contabiliza – para cada año – los meses deficitarios,


independientemente de su magnitud en volumen. Se acepta para los usuarios agrícolas,
un máximo de 3 meses deficitarios por año, es decir, un período de tiempo sin déficits
del orden del 75 % en el año (9 meses).

b) Déficit en volumen a nivel anual y mensual


Por razones agronómicas, se acepta un déficit anual máximo del 10% del volumen total
anual demandado; usualmente, déficits iguales o mayores, producirían, menores
rendimientos de cosecha del orden del 20% o más.

A nivel mensual, también por razones agronómicas, se acepta como máximo un déficit
de 30% del volumen de la demanda mensual respectiva; tener valores mayores,
equivaldría a la pérdida de la cosecha.

c) Índice de Déficit
Adicionalmente a las premisas de evaluación de la satisfacción de la demanda en tiempo
y volumen, se ha contemplado efectuar la evaluación de la satisfacción de la demanda a
través del Índice de Déficit (ID), el mismo que fue planteado por el U.S. Army Corps

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 135
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

of Engineers, y se define como la relación entre el déficit y la demanda total, a nivel


anual para el período simulado, para su determinación se emplea la siguiente expresión:

∑( )
= 100 ∗
Donde:
ID = Índice de Déficit;
Da = Es el déficit anual expresado como fracción de la demanda anual;
n = Número de años del período en análisis.

Si todos los años se tuviera un déficit del 10%, ID sería igual a 1.

Un valor adecuado máximo esperado entonces, sería un Índice de Déficit, ID = 1, para


el período de simulación.

En el Cuadro 1.3.2, se observa mejor los valores que puede asumir el Índice de Déficit
de los valores de déficit anual a lo largo de todo el periodo y la duración que tienen:

Cuadro 1.3.2: Valores de Índice de Déficit (ID)


TIEMPO DÉFICIT ANUAL (%)
(%) 10 20 30 40 50
100 1.00 4.00 9.00 16.00 25.00
75 0.75 3.00 6.75 12.00 18.75
50 0.50 2.00 4.50 8.00 12.50
25 0.25 1.00 2.25 4.00 6.25
4 0.04 0.16 0.36 0.64 1.00
Fuente: AUTODEMA (2003) mencionado por Obando (2007).

Del Cuadro 1.3.2 puede decirse, por ejemplo, “si durante todos los años se tiene un
déficit anual del 10%, se tiene un ID = 1; igualmente; este valor equivale a tener un
déficit del 20% con una duración del 25%, o un déficit del 50% con una duración del
4%”. “Para una situación de déficit cero el 100% del tiempo, una situación ideal, este
valor es cero”.

1.3. Balance hídrico mediante simulación de la operación de los embalses


Se efectuó el balance hídrico mediante simulación de la operación de los embalses Verde,
Paratía, Jarpaña y Millo, consiguiéndose dos objetivos: (1) Determinación del volumen
útil; y (2) Nivel de satisfacción de la demanda para determinados criterios de garantía y
seguridad, para diferentes áreas de Sistema Integral Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 136
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

En los Cuadros 1.3.3 a 1.3.25 se presenta el resumen del balance hídrico mediante
simulación detallado a nivel mensual para los embalses Verde, Paratía, Jarpaña y Millo,
con distintos volúmenes útiles y un área bajo riego total de 30,844 ha:

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 137
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.3: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 100 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 212.096 100.000 20.079 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.175 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 212.096 88.980 20.079 36.041 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 51.822 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 88.980 45.145 36.041 20.066 47.304 100.0 71.866 98.8 393.497 77.0 8.293 66.6 54.930 67.230 0.000 2.0 83.3 117.696 23.0 57.422 100.0 0.05 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 45.145 42.683 20.066 20.083 47.304 100.0 70.556 97.0 325.447 63.7 7.235 58.1 96.826 82.859 0.000 4.0 66.7 185.747 36.3 67.838 100.0 0.13 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 42.683 45.142 20.083 20.066 47.304 100.0 72.720 100.0 456.715 89.3 9.317 74.8 102.335 130.215 0.000 1.0 91.7 54.478 10.7 23.997 41.8 0.01 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 45.142 41.924 20.066 20.065 47.304 100.0 69.666 95.8 349.304 68.3 8.293 66.6 19.770 23.073 0.000 3.0 75.0 161.890 31.7 57.422 100.0 0.10 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 41.924 45.143 20.065 20.061 47.304 100.0 72.720 100.0 459.982 90.0 10.375 83.3 113.389 155.269 0.000 1.0 91.7 51.211 10.0 49.103 72.4 0.01 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 45.143 50.960 20.061 20.069 47.304 100.0 72.720 100.0 480.281 94.0 11.433 91.8 198.223 241.805 0.000 1.0 91.7 30.912 6.0 30.912 45.6 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 50.960 45.142 20.069 20.066 47.304 100.0 72.720 100.0 450.127 88.1 10.375 83.3 97.684 162.747 0.000 2.0 83.3 61.066 11.9 32.634 48.1 0.01 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 45.142 162.089 20.066 33.050 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 299.832 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 162.089 235.784 33.050 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 296.476 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 235.784 298.661 20.064 32.573 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 233.627 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 298.661 269.464 32.573 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 267.353 30.302 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 269.464 188.041 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 189.314 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 188.041 176.637 20.066 70.260 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 126.910 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 176.637 128.228 70.260 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 224.562 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 128.228 45.142 20.066 20.066 47.304 100.0 72.720 100.0 425.606 83.3 10.375 83.3 31.698 16.498 0.000 2.0 83.3 85.588 16.7 55.363 80.2 0.03 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 45.142 45.142 20.066 20.064 47.304 100.0 72.720 100.0 452.688 88.6 10.375 83.3 141.971 220.580 0.000 1.0 91.7 58.506 11.4 57.045 82.7 0.01 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 45.142 95.487 20.064 23.984 47.304 100.0 72.720 100.0 500.951 98.0 11.399 91.5 75.720 139.348 0.000 0.0 100.0 10.242 2.0 10.242 17.8 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 95.487 21.174 23.984 20.068 47.304 100.0 58.470 80.4 171.767 33.6 4.095 32.9 0.000 0.000 0.000 8.0 33.3 339.426 66.4 67.838 100.0 0.44 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 21.174 110.313 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 361.138 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 110.313 423.381 20.066 100.147 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 322.220 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 423.381 351.287 100.147 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 427.700 220.327 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 351.287 146.977 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 127.231 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 146.977 43.832 20.066 27.366 47.304 100.0 72.720 100.0 469.677 91.9 11.399 91.5 79.980 169.634 0.000 1.0 91.7 41.517 8.1 41.517 60.2 0.01 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 43.832 46.112 27.366 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 267.861 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 46.112 55.492 20.066 20.071 47.304 100.0 64.842 89.2 396.134 77.5 8.259 66.3 0.000 0.000 0.000 4.0 66.7 115.060 22.5 36.122 100.0 0.05 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 55.492 45.142 20.071 20.064 47.304 100.0 72.720 100.0 408.964 80.0 10.375 83.3 95.009 150.727 0.000 2.0 83.3 102.230 20.0 56.498 81.9 0.04 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 45.142 35.718 20.064 20.066 47.304 100.0 50.372 69.3 207.147 40.5 4.095 32.9 0.000 0.000 0.000 8.0 33.3 304.046 59.5 57.422 100.0 0.35 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 35.718 107.458 20.066 34.737 47.304 100.0 72.720 100.0 456.628 89.3 11.399 91.5 84.387 79.882 0.000 1.0 91.7 54.565 10.7 54.565 95.0 0.01 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.458 45.142 34.737 20.066 47.304 100.0 72.720 100.0 487.539 95.4 10.375 83.3 66.799 139.407 0.000 0.0 100.0 23.654 4.6 16.551 24.4 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 45.142 40.677 20.066 20.072 47.304 100.0 65.233 89.7 329.153 64.4 8.293 66.6 46.047 47.436 0.000 4.0 66.7 182.040 35.6 67.838 100.0 0.13 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 40.677 111.480 20.072 100.148 47.304 100.0 72.720 100.0 410.623 80.3 10.375 83.3 62.795 99.309 0.000 2.0 83.3 100.571 19.7 53.063 82.7 0.04 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 111.480 109.475 100.148 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 304.854 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 109.475 37.267 20.066 34.849 47.304 100.0 72.483 99.7 361.009 70.6 9.317 74.8 61.023 101.739 0.000 2.0 83.3 150.184 29.4 69.018 100.0 0.09 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 37.267 45.126 34.849 20.072 47.304 100.0 72.720 100.0 481.144 94.1 11.399 91.5 172.116 209.079 0.000 1.0 91.7 30.049 5.9 30.049 43.5 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 45.126 45.146 20.072 20.068 47.304 100.0 72.720 100.0 443.816 86.8 10.375 83.3 193.826 237.414 0.000 1.0 91.7 67.377 13.2 47.448 68.7 0.02 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 45.146 77.798 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 356.484 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 77.798 317.116 20.066 35.831 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 431.406 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 317.116 324.190 35.831 19.319 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 273.665 42.094 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 324.190 213.170 19.319 20.078 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 173.983 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 213.170 174.942 20.078 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 137.422 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 174.942 316.396 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 441.811 64.282 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 316.396 292.946 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 249.202 30.345 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 292.946 274.551 20.066 47.379 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 225.756 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 274.551 290.707 47.379 50.916 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 133.229 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 144.768 138.368 29.084 28.017 47.304 100.0 71.453 98.3 460.584 90.1 11.004 88.3 135.708 185.919 12.050 1.1 90.8 50.610 9.9 22.607 35.8 3.36 26 20

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : DEFICITARIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 138
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.4: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 125 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 236.161 125.000 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.290 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 236.161 139.182 20.075 32.710 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 26.822 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 139.182 45.142 32.710 20.066 47.304 100.0 72.720 100.0 457.490 89.5 9.317 74.8 54.930 38.897 0.000 1.0 91.7 53.703 10.5 41.059 60.5 0.01 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 45.142 45.145 20.066 20.087 47.304 100.0 70.711 97.2 343.848 67.3 8.259 66.3 96.826 57.859 0.000 4.0 66.7 167.346 32.7 67.838 100.0 0.11 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 45.142 20.087 20.066 47.304 100.0 72.720 100.0 479.715 93.8 10.375 83.3 102.335 105.284 0.000 0.0 100.0 31.478 6.2 18.723 27.1 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 45.142 45.147 20.066 20.079 47.304 100.0 72.114 99.2 363.124 71.0 9.317 74.8 19.770 0.000 0.000 3.0 75.0 148.070 29.0 67.838 100.0 0.08 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.147 50.486 20.079 20.074 47.304 100.0 72.720 100.0 478.412 93.6 11.433 91.8 113.389 130.425 0.000 1.0 91.7 32.782 6.4 32.782 48.3 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 50.486 57.252 20.074 20.076 47.304 100.0 72.720 100.0 500.964 98.0 11.433 91.8 198.223 216.879 0.000 0.0 100.0 10.229 2.0 10.229 15.1 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 57.252 45.142 20.076 20.066 47.304 100.0 72.720 100.0 477.199 93.3 10.375 83.3 97.684 138.028 0.000 1.0 91.7 33.995 6.7 28.555 41.4 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 45.142 195.431 20.066 23.498 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 275.083 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 195.431 291.187 23.498 20.941 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 262.166 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 291.187 370.962 20.941 22.505 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 209.572 16.188 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 370.962 293.538 22.505 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 232.526 103.207 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 293.538 235.368 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 164.383 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 235.368 246.024 20.066 70.265 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 102.105 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 246.024 218.998 70.265 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 199.754 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 218.998 51.342 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 51.342 45.133 20.066 20.080 47.304 100.0 72.720 100.0 478.644 93.6 11.399 91.5 141.971 195.720 0.000 1.0 91.7 32.550 6.4 32.550 47.2 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 45.133 110.584 20.080 20.100 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 114.596 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 110.584 21.128 20.100 20.068 47.304 100.0 58.470 80.4 182.065 35.6 4.095 32.9 0.000 0.000 0.000 8.0 33.3 329.128 64.4 67.838 100.0 0.41 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 21.128 134.120 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 336.367 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 134.120 470.100 20.066 125.171 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 272.683 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 470.100 375.415 125.171 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 428.013 267.244 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 375.415 194.402 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 102.311 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 194.402 61.741 20.066 32.128 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 144.774 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 61.741 87.161 32.128 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 247.842 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 87.161 59.493 20.066 20.071 47.304 100.0 68.530 94.2 424.374 83.0 9.317 74.8 0.000 0.000 0.000 3.0 75.0 86.819 17.0 36.122 100.0 0.03 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 59.493 45.144 20.071 20.076 47.304 100.0 72.720 100.0 433.999 84.9 10.375 83.3 95.009 125.865 0.000 2.0 83.3 77.195 15.1 47.730 69.2 0.02 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 45.144 35.719 20.076 20.066 47.304 100.0 50.372 69.3 207.158 40.5 4.095 32.9 0.000 0.000 0.000 8.0 33.3 304.035 59.5 57.422 100.0 0.35 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 35.719 108.058 20.066 27.226 47.304 100.0 72.720 100.0 484.930 94.9 11.399 91.5 84.387 55.080 0.000 1.0 91.7 26.264 5.1 26.264 45.7 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 108.058 45.139 27.226 20.066 47.304 100.0 72.720 100.0 508.589 99.5 11.399 91.5 66.799 106.905 0.000 0.0 100.0 2.605 0.5 2.605 3.8 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 45.139 40.601 20.066 20.082 47.304 100.0 65.233 89.7 351.180 68.7 8.293 66.6 46.047 22.436 0.000 3.0 75.0 160.014 31.3 67.838 100.0 0.10 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 40.601 111.329 20.082 105.279 47.304 100.0 72.720 100.0 432.486 84.6 10.375 83.3 62.795 69.324 0.000 2.0 83.3 78.707 15.4 58.093 85.6 0.02 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 111.329 133.184 105.279 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 285.259 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 133.184 43.971 20.066 39.093 47.304 100.0 72.647 99.9 392.325 76.7 10.375 83.3 61.023 76.800 0.000 2.0 83.3 118.869 23.3 69.018 100.0 0.05 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 43.971 45.148 39.093 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 184.265 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 45.148 45.145 20.072 20.068 47.304 100.0 72.720 100.0 464.561 90.9 11.399 91.5 193.826 212.473 0.000 1.0 91.7 46.633 9.1 46.633 67.6 0.01 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 45.145 101.679 20.068 20.074 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 331.759 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 101.679 364.368 20.074 35.821 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 406.555 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 364.368 340.114 35.821 27.514 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 248.798 89.755 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 340.114 252.588 27.514 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 157.363 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 252.588 236.828 20.069 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 112.562 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 236.828 340.437 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 416.966 125.296 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 340.437 316.986 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 224.466 53.070 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 316.986 298.734 20.066 56.483 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 200.951 13.188 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 298.734 337.937 56.483 50.930 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 117.562 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 166.548 161.175 30.128 28.518 47.304 100.0 71.612 98.5 473.358 92.6 11.344 91.1 135.708 163.299 18.150 0.9 92.6 37.835 7.4 16.938 26.3 2.66 31 15

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : DEFICITARIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 139
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.5: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 150 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 260.274 150.000 20.079 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.390 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 260.274 177.976 20.079 41.102 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 1.822 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 177.976 45.133 41.102 20.066 47.304 100.0 72.720 100.0 510.949 100.0 11.399 91.5 54.930 22.394 0.000 0.0 100.0 0.244 0.0 0.244 0.4 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 45.133 45.145 20.066 20.079 47.304 100.0 70.711 97.2 365.675 71.5 8.259 66.3 96.826 32.859 0.000 4.0 66.7 145.518 28.5 67.838 100.0 0.08 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 45.136 20.079 20.066 47.304 100.0 72.720 100.0 500.320 97.9 11.399 91.5 102.335 80.337 0.000 0.0 100.0 10.873 2.1 10.873 15.8 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 45.136 45.147 20.066 20.079 47.304 100.0 72.114 99.2 363.118 71.0 9.317 74.8 19.770 0.000 0.000 3.0 75.0 148.076 29.0 67.838 100.0 0.08 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.147 44.876 20.079 20.068 47.304 100.0 72.720 100.0 505.257 98.8 11.433 91.8 113.389 105.553 0.000 0.0 100.0 5.937 1.2 5.937 8.8 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 44.876 63.343 20.068 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 191.931 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 63.343 45.126 20.071 20.066 47.304 100.0 72.720 100.0 503.186 98.4 11.399 91.5 97.684 113.228 0.000 0.0 100.0 8.008 1.6 8.008 11.6 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 45.126 222.809 20.066 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 250.205 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 222.809 342.598 20.065 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 233.936 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 342.598 384.973 20.069 32.718 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 183.750 66.504 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 384.973 317.588 32.718 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 218.014 117.328 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 317.588 271.627 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 139.406 11.669 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 271.627 305.031 20.066 70.253 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 77.239 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 305.031 300.151 70.253 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 174.910 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 300.151 129.226 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 129.226 106.858 20.066 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 170.845 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 106.858 193.408 20.069 20.094 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 89.659 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 193.408 29.284 20.094 20.068 47.304 100.0 63.274 87.0 242.623 47.5 6.177 49.6 0.000 0.000 0.000 6.0 50.0 268.570 52.5 67.838 100.0 0.28 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 29.284 165.903 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 311.489 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 165.903 525.060 20.066 133.830 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 239.119 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 525.060 399.550 133.830 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 411.890 317.209 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 399.550 221.559 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 77.387 15.597 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 221.559 116.585 20.066 27.348 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 119.839 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 116.585 163.875 27.348 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 218.125 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 163.875 66.611 20.066 20.071 47.304 100.0 72.720 100.0 479.433 93.8 11.399 91.5 0.000 0.000 0.000 1.0 91.7 31.760 6.2 31.760 55.3 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 66.611 45.139 20.071 20.067 47.304 100.0 72.720 100.0 460.967 90.2 11.399 91.5 95.009 100.990 0.000 1.0 91.7 50.226 9.8 50.226 72.8 0.01 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 45.139 35.715 20.067 20.066 47.304 100.0 50.372 69.3 207.150 40.5 4.095 32.9 0.000 0.000 0.000 8.0 33.3 304.043 59.5 57.422 100.0 0.35 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 35.715 107.199 20.066 32.242 47.304 100.0 72.720 100.0 502.891 98.4 11.399 91.5 84.387 30.260 0.000 0.0 100.0 8.303 1.6 8.303 14.5 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.199 64.243 32.242 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 87.028 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 64.243 45.149 20.066 20.069 47.304 100.0 69.683 95.8 377.929 73.9 9.317 74.8 46.047 0.000 0.000 3.0 75.0 133.264 26.1 67.838 100.0 0.07 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 111.237 20.069 105.263 47.304 100.0 72.720 100.0 458.472 89.7 10.375 83.3 62.795 44.347 0.000 1.0 91.7 52.722 10.3 48.752 71.9 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 111.237 156.971 105.263 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 260.475 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 156.971 43.768 20.066 32.152 47.304 100.0 72.647 99.9 441.285 86.3 10.375 83.3 61.023 51.858 0.000 1.0 91.7 69.908 13.7 69.018 100.0 0.02 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 43.768 62.225 32.152 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 159.187 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 62.225 45.115 20.072 20.068 47.304 100.0 72.720 100.0 501.139 98.0 11.399 91.5 193.826 187.529 0.000 0.0 100.0 10.054 2.0 10.054 14.6 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 45.115 125.565 20.068 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 306.996 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 125.565 406.065 20.072 35.836 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 381.680 5.819 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 406.065 368.750 35.836 22.914 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 223.938 127.920 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 368.750 277.151 22.914 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 127.777 26.880 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 277.151 284.579 20.075 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 87.704 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 284.579 364.510 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 392.090 173.504 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 364.510 341.058 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 199.588 77.346 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 341.058 326.476 20.066 52.790 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 176.128 37.462 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 326.476 388.759 52.790 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 88.874 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 191.976 187.707 30.844 28.690 47.304 100.0 71.904 98.9 484.074 94.7 11.637 93.4 135.708 141.843 24.874 0.6 94.9 27.120 5.3 12.434 18.8 1.97 37 9

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 140
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.6: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 175 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 284.385 175.000 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.476 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 284.385 201.184 20.072 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 201.184 88.870 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 88.870 45.144 20.066 20.070 47.304 100.0 72.720 100.0 422.514 82.7 10.375 83.3 96.826 7.859 0.000 2.0 83.3 88.680 17.3 46.221 68.1 0.03 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.144 55.827 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 55.369 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 55.827 45.147 20.066 20.079 47.304 100.0 72.114 99.2 372.490 72.9 9.317 74.8 19.770 0.000 0.000 3.0 75.0 138.703 27.1 67.838 100.0 0.07 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.147 61.197 20.079 20.080 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 80.667 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 61.197 102.971 20.080 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 166.997 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 102.971 96.985 20.081 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 88.342 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 96.985 293.537 20.066 23.454 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 225.312 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 293.537 378.564 23.454 22.267 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 212.455 55.277 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 378.564 415.642 22.267 26.186 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 161.020 102.770 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 415.642 341.732 26.186 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 186.577 144.233 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 341.732 295.714 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 114.406 34.522 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 295.714 352.340 20.066 70.268 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 52.285 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 352.340 358.332 70.268 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 150.059 12.324 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 358.332 185.268 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 185.268 184.953 20.066 20.084 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 145.958 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 184.953 292.447 20.084 20.107 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 64.705 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 292.447 34.416 20.107 20.068 47.304 100.0 69.831 96.0 317.620 62.1 8.293 66.6 0.000 0.000 0.000 4.0 66.7 193.574 37.9 67.838 100.0 0.14 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 34.416 194.893 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 286.598 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 194.893 577.433 20.066 133.838 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 214.205 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 577.433 423.740 133.838 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 387.070 369.582 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 423.740 245.720 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 52.459 39.175 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 245.720 172.573 20.066 18.797 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 94.871 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 172.573 242.034 18.797 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 184.501 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 242.034 105.403 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 105.403 49.831 20.071 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 76.040 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 49.831 39.774 20.081 20.066 47.304 100.0 50.736 69.8 207.163 40.5 4.095 32.9 0.000 0.000 0.000 8.0 33.3 304.031 59.5 57.422 100.0 0.35 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 39.774 126.468 20.066 30.484 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 5.329 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 126.468 106.468 30.484 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 60.280 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 106.468 45.144 20.066 20.069 47.304 100.0 69.683 95.8 413.873 81.0 10.375 83.3 46.047 0.000 0.000 2.0 83.3 97.321 19.0 67.838 100.0 0.04 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.144 116.848 20.069 105.282 47.304 100.0 72.720 100.0 473.945 92.7 11.433 91.8 62.795 19.370 0.000 1.0 91.7 37.248 7.3 37.248 54.9 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 186.405 105.282 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 235.697 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 186.405 45.114 20.066 20.005 47.304 100.0 72.720 100.0 497.482 97.3 11.399 91.5 61.023 26.881 0.000 0.0 100.0 13.712 2.7 13.712 19.9 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 45.114 81.512 20.005 20.072 47.304 100.0 72.720 100.0 506.860 99.2 11.399 91.5 172.116 134.176 0.000 0.0 100.0 4.333 0.8 4.333 9.2 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 81.512 75.375 20.072 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 162.581 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 75.375 178.897 20.068 20.085 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 282.100 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 178.897 430.163 20.085 35.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 356.807 58.234 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 430.163 395.677 35.840 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 199.053 152.129 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 395.677 301.261 20.062 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 99.951 50.133 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 301.261 331.961 20.072 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 62.824 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 331.961 388.611 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 367.200 221.308 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 388.611 365.160 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 174.654 101.644 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 365.160 344.667 20.066 58.725 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 151.223 61.758 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 344.667 430.505 58.725 50.927 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 69.918 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 223.281 219.919 30.986 28.289 47.304 100.0 72.100 99.1 492.115 96.3 11.957 96.0 135.708 121.093 34.131 0.4 96.4 19.078 3.7 7.879 12.0 1.40 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 141
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.7: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 200 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 308.541 200.000 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.548 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 308.541 224.465 20.063 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 224.465 111.188 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 111.188 45.144 20.066 20.076 47.304 100.0 72.720 100.0 448.762 87.8 10.375 83.3 96.826 0.000 0.000 2.0 83.3 62.432 12.2 37.685 54.6 0.01 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.144 79.800 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 30.375 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 79.800 45.147 20.066 20.079 47.304 100.0 72.114 99.2 393.521 77.0 9.317 74.8 19.770 0.000 0.000 3.0 75.0 117.673 23.0 67.838 100.0 0.05 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.147 85.053 20.079 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 55.712 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 85.053 149.761 20.068 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 142.036 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 149.761 165.901 20.069 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 63.372 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 165.901 387.875 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 200.407 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 387.875 404.850 20.071 20.074 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 184.137 146.367 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 404.850 427.623 20.074 38.490 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 133.857 125.370 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 427.623 365.874 38.490 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 174.058 156.267 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 365.874 319.858 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 89.406 58.878 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 319.858 399.845 20.066 70.274 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 27.327 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 399.845 382.470 70.274 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 125.103 58.648 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 382.470 208.570 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 208.570 231.517 20.066 20.073 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 121.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 231.517 361.348 20.073 20.094 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 39.724 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 361.348 39.892 20.094 20.068 47.304 100.0 69.831 96.0 372.113 72.8 9.317 74.8 0.000 0.000 0.000 2.0 83.3 139.080 27.2 67.838 100.0 0.07 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 39.892 224.199 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 261.693 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 224.199 584.114 20.066 133.838 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 189.282 46.167 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.114 447.997 133.838 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 362.218 376.263 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 447.997 269.839 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 27.531 59.235 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 269.839 214.016 20.066 24.683 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 69.901 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 214.016 306.344 24.683 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 165.488 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 306.344 166.828 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 166.828 132.791 20.071 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 51.068 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 132.791 40.218 20.070 20.066 47.304 100.0 59.143 81.3 272.839 53.4 5.153 41.4 0.000 0.000 0.000 6.0 50.0 238.354 46.6 57.422 100.0 0.22 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 40.218 131.991 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 131.991 135.714 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 35.277 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 135.714 45.145 20.066 20.069 47.304 100.0 72.720 100.0 436.339 85.4 10.375 83.3 46.047 0.000 0.000 2.0 83.3 74.854 14.6 44.161 65.1 0.02 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 210.390 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 210.843 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 210.390 66.047 20.066 29.678 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 1.881 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 66.047 129.257 29.678 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 109.245 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 129.257 145.323 20.072 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 137.630 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 145.323 270.798 20.068 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 257.191 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 270.798 454.341 20.069 35.833 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 331.892 151.057 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 454.341 419.817 35.833 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 174.143 176.415 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 419.817 325.410 20.068 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 75.004 74.385 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 325.410 379.509 20.063 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 37.854 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 379.509 412.783 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 342.297 265.408 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 412.783 389.330 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 149.681 126.005 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 389.330 377.669 20.066 49.803 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 126.262 86.116 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 377.669 486.691 49.803 50.938 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 35.912 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 254.926 252.786 31.817 28.577 47.304 100.0 72.349 99.5 497.008 97.2 12.049 96.7 135.708 102.029 45.077 0.3 97.3 14.186 2.8 6.415 9.8 0.83 41 5

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 142
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.8: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 225 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 332.733 225.000 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.605 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 332.733 247.824 20.070 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 247.824 133.608 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 133.608 45.144 20.066 20.076 47.304 100.0 72.720 100.0 468.340 91.6 10.375 83.3 96.826 0.000 0.000 1.0 91.7 42.854 8.4 37.759 54.7 0.01 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.144 103.691 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 5.375 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 103.691 45.145 20.066 20.079 47.304 100.0 72.114 99.2 413.410 80.9 10.375 83.3 19.770 0.000 0.000 2.0 83.3 97.784 19.1 67.838 100.0 0.04 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.145 109.213 20.079 20.085 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 30.735 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 109.213 197.064 20.085 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 117.099 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 197.064 235.631 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 38.392 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 235.631 480.024 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 175.487 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 480.024 429.039 20.071 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 159.214 233.869 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 429.039 467.862 20.064 22.456 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 108.892 149.671 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 467.862 390.083 22.456 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 132.985 196.674 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 390.083 344.025 20.069 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 64.406 83.295 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 344.025 447.496 20.066 70.267 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 2.344 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 447.496 406.690 70.267 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 100.131 102.642 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 406.690 231.980 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 231.980 278.379 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 96.023 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 278.379 429.991 20.064 21.037 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 14.720 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 429.991 41.155 21.037 20.068 47.304 100.0 72.720 100.0 427.616 83.7 10.375 83.3 0.000 0.000 0.000 2.0 83.3 83.577 16.3 61.375 88.9 0.03 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 41.155 249.607 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 236.774 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 249.607 584.097 20.066 137.082 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 164.314 92.140 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 472.332 137.082 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 340.591 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 472.332 294.013 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 2.561 83.570 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 294.013 263.599 20.066 22.714 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 44.914 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 263.599 378.786 22.714 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 138.522 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 378.786 236.269 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 236.269 223.991 20.071 20.086 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 26.093 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 223.991 45.150 20.086 20.066 47.304 100.0 66.430 91.3 340.491 66.6 7.235 58.1 0.000 0.000 0.000 5.0 58.3 170.702 33.4 57.422 100.0 0.11 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.150 136.693 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.693 164.343 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 10.277 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 164.343 45.145 20.066 20.069 47.304 100.0 72.720 100.0 461.334 90.2 10.375 83.3 46.047 0.000 0.000 1.0 91.7 49.860 9.8 30.788 44.6 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 234.520 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 185.989 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 234.520 89.256 20.066 31.501 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 89.256 177.514 31.501 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 84.282 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 177.514 216.039 20.072 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 112.674 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 216.039 339.805 20.068 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 232.267 24.949 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 339.805 478.554 20.062 35.844 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 306.973 216.922 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 478.554 444.016 35.844 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 149.238 200.731 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 444.016 349.591 20.065 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 50.044 98.691 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 349.591 423.718 20.067 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 12.881 3.627 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 423.718 437.005 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 317.381 309.824 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 437.005 413.554 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 124.706 150.410 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 413.554 406.344 20.066 45.242 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 101.298 106.527 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 406.344 518.081 45.242 50.920 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 6.306 21.501 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 287.015 285.558 32.001 28.217 47.304 100.0 72.570 99.8 501.086 98.0 12.140 97.5 135.708 83.663 56.918 0.2 98.0 10.107 2.0 5.986 9.1 0.42 41 5

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 143
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.9: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 250 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 356.976 250.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.647 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 356.976 271.252 20.066 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 271.252 156.122 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 156.122 45.133 20.066 20.076 47.304 100.0 72.720 100.0 486.946 95.3 11.399 91.5 96.826 0.000 0.000 1.0 91.7 24.247 4.7 24.247 35.1 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.133 108.842 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 108.842 45.143 20.066 20.079 47.304 100.0 72.720 100.0 417.279 81.6 10.375 83.3 19.770 0.000 0.000 2.0 83.3 93.915 18.4 66.588 98.2 0.03 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 133.263 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 5.755 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 133.263 244.417 20.065 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 92.123 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 244.417 305.587 20.071 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 13.409 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 305.587 498.325 20.066 28.368 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 150.555 66.738 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 498.325 453.288 28.368 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 142.636 252.170 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 453.288 492.272 20.069 22.392 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 83.924 174.027 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 492.272 414.379 22.392 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 107.965 216.085 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 414.379 368.285 20.075 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 39.412 107.791 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 368.285 473.357 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 473.357 430.945 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 75.158 128.612 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 430.945 255.454 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 255.454 325.394 20.066 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 71.043 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 325.394 490.760 20.069 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 490.760 45.121 20.092 20.068 47.304 100.0 72.720 100.0 475.027 92.9 11.399 91.5 0.000 0.000 0.000 1.0 91.7 36.166 7.1 36.166 52.4 0.01 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 45.121 277.635 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 211.842 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 277.635 584.097 20.066 161.605 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 139.319 120.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 496.756 161.605 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 340.248 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 496.756 296.492 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 107.994 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 296.492 290.338 20.066 22.648 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 19.914 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 290.338 418.226 22.648 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 113.473 11.305 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 418.226 274.186 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 274.186 284.863 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 1.104 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 284.863 45.147 20.067 20.066 47.304 100.0 70.820 97.4 388.854 76.1 8.293 66.6 0.000 0.000 0.000 2.0 83.3 122.340 23.9 57.422 100.0 0.06 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.147 136.691 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.691 174.303 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.303 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.037 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.156 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 258.740 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 161.106 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 258.740 112.581 20.066 31.501 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 112.581 224.276 31.501 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 59.296 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 224.276 285.539 20.076 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 87.708 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 285.539 364.066 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 207.330 93.547 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 364.066 502.861 20.066 35.844 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 282.050 241.308 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 502.861 468.297 35.844 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 124.294 225.138 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 468.297 373.823 20.065 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 25.065 123.076 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 373.823 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 26.516 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 461.313 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 292.450 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 461.313 437.860 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 99.728 170.897 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 437.860 426.084 20.066 49.719 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 76.299 130.939 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 426.084 528.563 49.719 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 39.857 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 310.692 309.462 33.332 29.004 47.304 100.0 72.679 99.9 503.846 98.6 12.207 98.0 135.708 69.084 67.433 0.2 98.7 7.347 1.4 5.117 7.8 0.23 41 5

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 144
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.10: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 275 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 381.295 275.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.675 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 381.295 294.788 20.066 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 294.788 178.767 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 178.767 45.117 20.066 20.076 47.304 100.0 72.720 100.0 506.691 99.1 11.399 91.5 96.826 0.000 0.000 0.0 100.0 4.503 0.9 4.503 6.5 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.117 108.827 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 108.827 45.143 20.066 20.079 47.304 100.0 72.720 100.0 417.265 81.6 10.375 83.3 19.770 0.000 0.000 2.0 83.3 93.928 18.4 66.602 98.2 0.03 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 138.840 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 138.840 273.984 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 67.141 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 273.984 347.255 20.064 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 347.255 531.024 20.066 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 125.575 108.763 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 531.024 477.631 20.065 20.073 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 109.323 284.869 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 477.631 519.021 20.073 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 58.927 198.473 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 519.021 438.753 20.064 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 80.628 242.833 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 438.753 392.576 20.063 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 14.399 132.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 392.576 477.953 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 18.132 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 477.953 455.265 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 50.165 133.226 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 455.265 277.429 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 1.655 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 277.429 371.100 20.066 20.072 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 46.060 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 371.100 535.226 20.072 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 535.226 46.754 20.092 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 46.754 303.530 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 186.896 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 303.530 584.097 20.066 186.206 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 114.325 146.496 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 521.260 186.206 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 339.948 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 521.260 296.492 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 132.498 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 296.492 309.227 20.066 23.146 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 309.227 442.609 23.146 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 88.977 30.372 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 442.609 297.667 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 297.667 308.712 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 308.712 45.143 20.067 20.066 47.304 100.0 72.720 100.0 406.787 79.6 9.317 74.8 0.000 0.000 0.000 2.0 83.3 104.407 20.4 49.975 87.0 0.04 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.143 136.686 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.686 174.299 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.299 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.034 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.160 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 283.055 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 136.180 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 283.055 136.028 20.066 31.501 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 136.028 271.297 31.501 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 34.296 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 271.297 355.504 20.065 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 62.697 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 355.504 388.427 20.068 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 182.380 160.197 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 388.427 527.279 20.070 35.822 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 257.113 265.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 527.279 488.468 35.822 24.286 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 99.284 246.800 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 488.468 398.128 24.286 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 4.326 143.329 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 398.128 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 51.024 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 485.711 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 267.462 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 485.711 462.255 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 74.748 195.394 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 462.255 454.796 20.066 45.230 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 51.299 150.429 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 454.796 524.146 45.230 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 68.794 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 330.233 328.908 34.183 29.312 47.304 100.0 72.720 100.0 505.451 98.9 12.253 98.4 135.708 56.670 77.761 0.1 99.1 5.742 1.1 3.740 5.8 0.18 43 3

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 145
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.11: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 283 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 389.091 283.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.681 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 389.091 302.340 20.066 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 302.340 186.039 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 186.039 45.975 20.066 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 96.826 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.975 109.647 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 109.647 45.143 20.066 20.079 47.304 100.0 72.720 100.0 417.980 81.8 10.375 83.3 19.770 0.000 0.000 2.0 83.3 93.213 18.2 65.884 97.1 0.03 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 138.840 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 138.840 281.744 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 59.141 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 281.744 354.781 20.064 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 354.781 538.862 20.066 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 117.578 116.351 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 538.862 485.318 20.065 20.214 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 101.336 292.707 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 485.318 526.856 20.214 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 51.070 206.192 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 526.856 446.574 20.064 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 72.631 250.669 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 446.574 400.372 20.063 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 6.399 140.239 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 400.372 477.953 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 25.988 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 477.953 463.062 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 42.165 133.226 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 463.062 277.420 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 9.522 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 277.420 378.911 20.066 20.080 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 38.066 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 378.911 542.128 20.080 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 0.740 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 542.128 53.367 20.092 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 53.367 317.752 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 178.910 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 317.752 584.097 20.066 194.095 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 106.327 160.848 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 529.118 194.095 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 339.861 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 529.118 296.492 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 140.356 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 296.492 309.227 20.066 23.146 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 309.227 450.431 23.146 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 80.977 30.372 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 450.431 305.206 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 305.206 316.032 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 316.032 45.143 20.067 20.066 47.304 100.0 72.720 100.0 413.196 80.8 9.317 74.8 0.000 0.000 0.000 2.0 83.3 97.998 19.2 43.533 75.8 0.04 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.143 136.686 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.686 174.299 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.299 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.034 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.160 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 290.865 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 128.187 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 290.865 143.565 20.066 31.501 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 143.565 286.407 31.501 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 26.296 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 286.407 378.001 20.065 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 54.697 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 378.001 396.252 20.068 20.078 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 174.393 182.802 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 396.252 535.117 20.078 35.810 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 249.138 273.652 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 535.117 488.468 35.810 32.133 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 91.275 252.366 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 488.468 405.924 32.133 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 4.245 143.329 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 405.924 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 58.883 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 493.537 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 259.465 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 493.537 470.081 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 66.753 199.419 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 470.081 462.591 20.066 45.209 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 43.299 158.255 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 462.591 524.125 45.209 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 76.649 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 335.718 334.392 34.702 29.657 47.304 100.0 72.720 100.0 505.704 98.9 12.276 98.5 135.708 53.193 80.829 0.1 99.1 5.490 1.1 3.487 5.4 0.17 43 3

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 146
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.12: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 300 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 405.700 300.000 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.689 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 405.700 318.448 20.076 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 318.448 201.560 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 201.560 60.860 20.066 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 96.826 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 60.860 123.895 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 123.895 45.143 20.066 20.079 47.304 100.0 72.720 100.0 430.391 84.2 10.375 83.3 19.770 0.000 0.000 2.0 83.3 80.802 15.8 53.426 78.8 0.02 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 138.840 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 138.840 298.258 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 42.141 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 298.258 370.810 20.064 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 370.810 555.548 20.066 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 100.583 130.901 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 555.548 502.060 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 84.359 309.393 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 502.060 543.535 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 33.918 223.001 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 543.535 463.222 20.064 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 55.638 267.348 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 463.222 406.614 20.063 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 0.000 153.655 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 406.614 477.953 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 32.277 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 477.953 479.666 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 25.165 133.226 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 479.666 277.408 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 24.695 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 277.408 395.509 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 21.067 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 395.509 542.113 20.064 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 17.471 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 542.113 53.352 20.092 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 53.352 334.364 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 161.936 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 334.364 584.097 20.066 210.886 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 89.331 177.607 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 545.859 210.886 20.082 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 339.690 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 545.859 296.508 20.082 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 157.097 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 296.508 309.242 20.066 23.146 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 309.242 467.082 23.146 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 63.977 30.387 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 467.082 321.265 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 321.265 331.632 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 331.632 45.143 20.067 20.066 47.304 100.0 72.720 100.0 426.861 83.5 9.317 74.8 0.000 0.000 0.000 2.0 83.3 84.333 16.5 39.647 58.4 0.03 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.143 136.686 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.686 174.299 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.299 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.034 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.160 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 307.488 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 111.198 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 307.488 159.619 20.066 31.501 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 159.619 318.591 31.501 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 9.296 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 318.591 397.685 20.065 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 37.697 27.686 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 397.685 412.874 20.068 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 157.413 202.577 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 412.874 551.802 20.062 35.786 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 232.151 290.353 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 551.802 517.121 35.786 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 74.257 269.050 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 517.121 398.186 20.062 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 0.000 166.965 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 398.186 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 51.082 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 510.198 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 242.470 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 510.198 486.741 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 49.764 214.852 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 486.741 479.181 20.066 45.164 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 26.298 174.915 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 479.181 524.081 45.164 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 93.362 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 346.293 344.966 35.169 29.755 47.304 100.0 72.720 100.0 506.271 99.0 12.276 98.5 135.708 45.936 87.249 0.1 99.1 4.923 1.0 3.132 4.6 0.13 43 3

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 147
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.13: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 325 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 430.167 325.000 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.688 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 430.167 340.813 20.063 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 1.414 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 340.813 223.133 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 223.133 81.568 20.066 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 96.826 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 81.568 143.737 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 143.737 45.143 20.066 20.079 47.304 100.0 72.720 100.0 447.688 87.6 10.375 83.3 19.770 0.000 0.000 2.0 83.3 63.506 12.4 36.063 53.2 0.02 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 138.840 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 138.840 322.653 20.065 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 17.141 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 322.653 394.524 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 394.524 574.459 20.066 25.796 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 75.588 152.487 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 574.459 526.581 25.796 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 65.148 328.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 526.581 568.132 20.063 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 8.918 242.483 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 568.132 487.781 20.064 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 30.644 291.944 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 487.781 406.621 20.070 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 0.000 177.777 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 406.621 477.953 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 32.284 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 477.953 504.158 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 0.165 133.226 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 504.158 277.408 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 49.365 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 277.408 416.165 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 416.165 542.113 20.064 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 36.723 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 542.113 53.352 20.092 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 53.352 358.885 20.068 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 136.949 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 358.885 584.097 20.066 235.644 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 64.331 200.780 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 235.644 24.623 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 339.474 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 300.933 24.623 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 300.933 313.540 20.066 23.146 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 313.540 491.636 23.146 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 38.977 34.726 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 491.636 344.972 20.066 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 344.972 354.685 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 354.685 45.143 20.067 20.066 47.304 100.0 72.720 100.0 447.070 87.5 9.317 74.8 0.000 0.000 0.000 1.0 91.7 64.124 12.5 39.647 58.4 0.02 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.143 136.686 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.686 174.299 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.299 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.034 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.160 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 332.006 105.254 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 86.203 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 332.006 183.323 20.066 31.502 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 183.323 350.676 31.502 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 350.676 422.109 20.065 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 12.697 60.048 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 422.109 437.413 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 132.407 227.110 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 437.413 576.407 20.062 35.752 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 207.159 315.004 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 576.407 541.666 35.752 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 49.228 293.656 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 541.666 398.186 20.062 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 0.000 191.509 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 398.186 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 51.082 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 534.770 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 217.476 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 534.770 511.314 20.066 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 24.765 239.424 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 511.314 493.086 20.070 55.703 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 1.303 199.488 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 493.086 534.453 55.703 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 107.368 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 360.663 359.561 36.702 30.745 47.304 100.0 72.720 100.0 507.086 99.2 12.276 98.5 135.708 36.158 95.849 0.1 99.3 4.108 0.8 2.754 4.0 0.09 43 3

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 148
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.14: Resumen balance hídrico por simulación embalse Verde; área: 30,844 ha; V.U.: 350 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Verde en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año Minero Regu - Ver- Lagu- con sin Anual Mensual Lagunillas
ro lados de nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Evrv Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 454.721 350.000 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.263 154.672 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 454.721 340.797 20.063 42.866 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.734 0.000 24.613 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 340.797 223.117 42.866 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 54.930 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 223.117 81.553 20.066 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 96.826 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 81.553 143.722 20.076 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.335 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 143.722 45.143 20.066 20.079 47.304 100.0 72.720 100.0 447.675 87.6 10.375 83.3 19.770 0.000 0.000 2.0 83.3 63.519 12.4 36.076 53.2 0.02 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 138.840 20.079 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.389 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 138.840 339.406 20.065 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 198.223 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 339.406 410.804 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 97.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 410.804 574.459 20.066 50.577 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 208.238 50.591 168.843 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 574.459 551.191 50.577 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.246 65.093 328.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 551.191 570.324 20.068 26.698 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.161 0.000 267.094 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 570.324 512.447 26.698 20.096 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 202.626 12.341 294.137 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 512.447 406.647 20.096 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 188.681 0.000 202.544 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 406.647 477.953 20.066 70.264 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 103.060 0.000 32.310 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 477.953 504.320 70.264 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 131.923 0.000 133.226 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 504.320 277.408 20.066 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 31.698 0.000 49.529 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 277.408 416.165 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 141.971 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 416.165 542.113 20.064 20.092 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.720 0.000 36.723 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 542.113 53.352 20.092 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 53.352 383.508 20.068 20.077 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 278.027 111.946 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 383.508 584.097 20.077 260.482 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 214.494 39.343 225.607 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 260.482 49.456 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 229.233 339.302 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 325.103 49.456 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 119.655 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 325.103 337.035 20.066 23.146 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 79.980 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 337.035 516.296 23.146 20.090 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 168.936 13.977 58.434 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 516.296 349.431 20.090 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 18.326 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 349.431 359.024 20.071 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.009 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 359.024 45.143 20.067 20.066 47.304 100.0 72.720 100.0 450.875 88.2 9.317 74.8 0.000 0.000 0.000 1.0 91.7 60.318 11.8 39.647 58.4 0.01 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.143 136.686 20.066 30.467 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 84.387 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 136.686 174.299 30.467 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 66.799 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 174.299 45.145 20.066 20.069 47.304 100.0 72.720 100.0 470.034 91.9 10.375 83.3 46.047 0.000 0.000 1.0 91.7 41.160 8.1 30.821 44.7 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.848 20.069 105.254 47.304 100.0 72.720 100.0 491.036 96.1 11.433 91.8 62.795 0.000 0.000 0.0 100.0 20.158 3.9 20.158 29.7 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.848 356.653 105.254 20.093 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 180.865 61.194 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 356.653 207.182 20.093 31.528 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 61.023 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 207.182 373.845 31.528 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 172.116 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 373.845 434.549 20.065 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.826 0.000 83.408 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 434.549 462.038 20.061 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 262.910 107.405 239.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 462.038 578.743 20.065 58.151 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 336.419 182.159 339.739 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 578.743 567.431 58.151 18.938 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.384 46.835 295.992 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 567.431 397.081 18.938 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.433 0.000 217.274 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 397.081 436.200 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.310 0.000 49.968 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 436.200 559.454 20.066 20.093 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 346.487 192.479 322.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 559.454 535.786 20.093 20.096 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 157.834 0.000 264.108 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 535.786 493.086 20.096 57.008 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 182.410 0.000 223.960 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 493.086 535.738 57.008 50.942 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 93.696 0.000 107.368 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 369.355 368.281 39.503 33.002 47.304 100.0 72.720 100.0 507.168 99.2 12.276 98.5 135.708 29.942 102.260 0.1 99.3 4.025 0.8 2.754 4.0 0.08 43 3

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 149
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.15: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 50 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 163.793 50.000 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 72.790 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 163.793 76.789 20.070 33.302 47.304 100.0 72.720 100.0 476.522 93.2 11.433 91.8 77.505 40.336 0.000 1.0 91.7 34.671 6.8 34.671 51.1 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 76.789 45.144 33.302 20.064 47.304 100.0 72.720 100.0 382.316 74.8 8.293 66.6 65.712 45.586 0.000 3.0 75.0 128.877 25.2 50.821 86.1 0.06 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 45.144 44.278 20.064 20.066 47.304 100.0 72.452 99.6 311.806 61.0 7.235 58.1 126.184 57.213 0.000 5.0 58.3 199.387 39.0 67.838 100.0 0.15 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 44.278 45.142 20.066 20.064 47.304 100.0 72.720 100.0 468.581 91.7 9.317 74.8 126.724 83.234 0.000 1.0 91.7 42.613 8.3 22.880 33.7 0.01 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 45.142 42.901 20.064 20.064 47.304 100.0 70.957 97.6 332.429 65.0 8.293 66.6 28.548 25.942 0.000 4.0 66.7 178.765 35.0 59.544 100.0 0.12 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 42.901 52.933 20.064 20.070 47.304 100.0 72.720 100.0 468.865 91.7 11.433 91.8 142.684 95.290 0.000 1.0 91.7 42.329 8.3 42.329 62.4 0.01 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 52.933 56.690 20.070 20.069 47.304 100.0 72.720 100.0 502.420 98.3 11.433 91.8 259.136 141.415 0.000 0.0 100.0 8.773 1.7 8.773 12.9 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 56.690 45.142 20.069 20.064 47.304 100.0 72.720 100.0 464.418 90.8 10.375 83.3 132.644 106.441 0.000 1.0 91.7 46.775 9.2 28.602 41.4 0.01 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 45.142 207.238 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 172.670 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 207.238 260.349 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 163.490 46.229 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 260.349 301.160 20.064 19.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 137.026 62.896 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 301.160 221.326 19.624 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 151.390 117.022 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 221.326 156.951 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 106.342 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 156.951 156.261 20.064 50.083 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 82.354 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 156.261 134.454 50.083 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 135.451 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 134.454 45.142 20.064 20.064 47.304 100.0 72.720 100.0 421.659 82.5 10.375 83.3 37.604 15.553 0.000 2.0 83.3 89.535 17.5 55.387 80.2 0.03 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 45.142 45.125 20.064 20.064 47.304 100.0 72.720 100.0 476.422 93.2 11.399 91.5 186.624 133.760 0.000 1.0 91.7 34.771 6.8 34.771 50.4 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 45.125 95.775 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 89.951 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 95.775 22.245 20.081 20.065 47.304 100.0 65.364 89.9 159.327 31.2 4.095 32.9 0.000 0.000 0.000 8.0 33.3 351.867 68.8 67.838 100.0 0.47 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 22.245 143.875 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 208.138 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 143.875 481.960 20.064 50.083 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 204.766 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 481.960 303.000 50.083 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 233.743 355.105 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 303.000 89.145 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 80.568 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 89.145 39.217 20.064 20.068 47.304 100.0 72.720 100.0 442.338 86.5 10.375 83.3 121.336 102.943 0.000 1.0 91.7 68.855 13.5 60.411 87.5 0.02 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 39.217 58.267 20.068 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 151.308 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 58.267 56.516 20.064 20.067 47.304 100.0 66.665 91.7 396.924 77.6 8.259 66.3 0.000 3.962 0.000 3.0 75.0 114.270 22.4 41.070 100.0 0.05 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 56.516 45.142 20.067 20.064 47.304 100.0 72.720 100.0 428.143 83.8 10.375 83.3 114.326 99.110 0.000 2.0 83.3 83.051 16.2 55.167 79.9 0.03 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 45.142 35.941 20.064 20.064 47.304 100.0 56.391 77.5 198.741 38.9 4.095 32.9 0.000 0.000 0.000 8.0 33.3 312.452 61.1 57.422 100.0 0.37 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 35.941 102.548 20.064 27.524 47.304 100.0 72.720 100.0 461.506 90.3 11.399 91.5 115.278 47.781 0.000 1.0 91.7 49.687 9.7 49.687 86.5 0.01 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 102.548 45.142 27.524 20.064 47.304 100.0 72.720 100.0 488.755 95.6 10.375 83.3 99.204 82.682 0.000 0.0 100.0 22.438 4.4 15.197 22.4 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 45.142 41.556 20.064 20.068 47.304 100.0 67.224 92.4 324.917 63.6 8.293 66.6 56.015 31.916 0.000 4.0 66.7 186.277 36.4 67.838 100.0 0.13 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 41.556 112.397 20.068 50.083 47.304 100.0 72.720 100.0 413.389 80.9 10.375 83.3 116.144 81.258 0.000 2.0 83.3 97.805 19.1 55.409 81.7 0.04 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 112.397 128.578 50.083 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 162.058 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 128.578 37.978 20.064 20.064 47.304 100.0 72.720 100.0 398.916 78.0 9.317 74.8 77.225 66.821 0.000 2.0 83.3 112.278 22.0 63.654 92.2 0.05 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 37.978 45.120 20.064 20.064 47.304 100.0 72.720 100.0 472.913 92.5 10.341 83.0 238.193 123.986 0.000 1.0 91.7 38.280 7.5 26.844 38.9 0.01 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 45.120 45.140 20.064 20.065 47.304 100.0 72.720 100.0 469.648 91.9 11.399 91.5 245.601 139.019 0.000 1.0 91.7 41.545 8.1 41.545 60.2 0.01 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 45.140 110.510 20.065 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 202.393 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 110.510 309.971 20.071 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 242.363 63.656 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 309.971 272.743 35.610 22.627 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 171.403 111.711 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 272.743 179.663 22.627 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 108.211 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 179.663 137.395 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 86.151 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 137.395 268.216 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 247.829 109.072 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 268.216 244.777 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 145.268 50.757 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 244.777 228.664 20.064 50.089 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 136.784 19.493 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 228.664 256.927 50.089 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 98.571 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 138.422 131.288 24.161 24.148 47.304 100.0 71.910 98.9 461.513 90.3 11.027 88.5 182.635 111.201 25.190 1.1 90.6 49.680 9.7 21.906 34.1 3.44 26 20

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : DEFICITARIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 150
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.16: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 75 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 187.982 75.000 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 72.998 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 187.982 94.703 20.075 23.463 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 15.342 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 94.703 45.142 23.463 20.064 47.304 100.0 72.720 100.0 418.845 81.9 9.317 74.8 65.712 10.699 0.000 2.0 83.3 92.349 18.1 47.393 69.9 0.03 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 45.142 45.145 20.064 20.066 47.304 100.0 72.452 99.6 331.892 64.9 8.259 66.3 126.184 32.213 0.000 4.0 66.7 179.301 35.1 67.838 100.0 0.12 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 45.142 20.066 20.064 47.304 100.0 72.720 100.0 489.941 95.8 10.375 83.3 126.724 58.282 0.000 0.0 100.0 21.253 4.2 18.857 27.3 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 45.142 45.146 20.064 20.064 47.304 100.0 70.957 97.6 351.323 68.7 9.317 74.8 28.548 0.942 0.000 3.0 75.0 159.871 31.3 59.544 100.0 0.10 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 50.613 20.064 20.069 47.304 100.0 72.720 100.0 494.649 96.8 11.433 91.8 142.684 70.340 0.000 0.0 100.0 16.544 3.2 16.544 24.4 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 50.613 67.540 20.069 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 116.480 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 67.540 45.133 20.069 20.064 47.304 100.0 72.720 100.0 494.490 96.7 11.399 91.5 132.644 81.661 0.000 0.0 100.0 16.703 3.3 16.703 24.2 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 45.133 231.185 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 147.884 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 231.185 284.421 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 138.710 70.400 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 284.421 325.296 20.064 19.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 112.112 87.189 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 325.296 245.385 19.624 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 126.609 141.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 245.385 199.291 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 81.387 5.286 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 199.291 221.084 20.064 54.325 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 53.256 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 221.084 221.058 54.325 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 114.854 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 221.058 45.099 20.064 20.064 47.304 100.0 72.720 100.0 509.611 99.7 11.399 91.5 37.604 0.000 0.000 0.0 100.0 1.582 0.3 1.582 2.3 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 45.099 45.108 20.064 20.064 47.304 100.0 72.720 100.0 498.018 97.4 11.399 91.5 186.624 108.910 0.000 0.0 100.0 13.175 2.6 13.175 19.1 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 45.108 119.435 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 65.157 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 119.435 22.146 20.081 20.065 47.304 100.0 65.364 89.9 181.055 35.4 4.095 32.9 0.000 0.000 0.000 8.0 33.3 330.138 64.6 67.838 100.0 0.42 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 22.146 167.727 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 183.342 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 167.727 529.331 20.064 75.099 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 154.888 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 529.331 327.153 75.099 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 234.004 402.476 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 327.153 136.619 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 55.623 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 136.619 45.102 20.064 20.068 47.304 100.0 72.720 100.0 499.124 97.6 11.399 91.5 121.336 78.080 0.000 0.0 100.0 12.070 2.4 12.070 17.5 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 45.102 87.775 20.068 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 126.476 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 87.775 60.287 20.064 20.067 47.304 100.0 69.333 95.3 419.552 82.1 9.317 74.8 0.000 0.000 0.000 3.0 75.0 91.642 17.9 41.070 100.0 0.03 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 60.287 45.142 20.067 20.064 47.304 100.0 72.720 100.0 453.133 88.6 10.375 83.3 114.326 74.276 0.000 1.0 91.7 58.061 11.4 55.262 80.1 0.01 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 45.142 35.941 20.064 20.064 47.304 100.0 56.391 77.5 198.741 38.9 4.095 32.9 0.000 0.000 0.000 8.0 33.3 312.452 61.1 57.422 100.0 0.37 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 35.941 108.050 20.064 27.512 47.304 100.0 72.720 100.0 478.382 93.6 11.399 91.5 115.278 22.934 0.000 1.0 91.7 32.812 6.4 32.812 57.1 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 108.050 47.248 27.512 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 57.762 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 47.248 41.423 20.064 20.068 47.304 100.0 67.224 92.4 348.866 68.2 8.293 66.6 56.015 6.916 0.000 3.0 75.0 162.327 31.8 67.838 100.0 0.10 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 41.423 112.244 20.068 65.383 47.304 100.0 72.720 100.0 435.278 85.1 10.375 83.3 116.144 41.072 0.000 1.0 91.7 75.915 14.9 60.962 89.9 0.02 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 112.244 152.344 65.383 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 152.599 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 152.344 44.033 20.064 20.064 47.304 100.0 72.720 100.0 434.436 85.0 10.375 83.3 77.225 41.890 0.000 1.0 91.7 76.758 15.0 63.643 92.2 0.02 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 44.033 45.102 20.064 20.064 47.304 100.0 72.720 100.0 500.107 97.8 10.341 83.0 238.193 99.077 0.000 0.0 100.0 11.086 2.2 5.932 12.6 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 45.102 45.122 20.064 20.065 47.304 100.0 72.720 100.0 491.305 96.1 11.399 91.5 245.601 114.119 0.000 0.0 100.0 19.888 3.9 19.888 28.8 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 45.122 134.379 20.065 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 177.613 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 134.379 333.930 20.069 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 217.480 87.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 333.930 296.790 35.610 22.627 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 146.604 135.878 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 296.790 204.795 22.627 20.073 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 83.347 21.637 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 204.795 185.465 20.073 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 61.266 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 185.465 292.275 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 223.003 156.155 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 292.275 268.837 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 120.488 75.036 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 268.837 252.723 20.064 54.024 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 107.965 43.769 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 252.723 304.048 54.024 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 77.647 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 155.892 149.781 25.544 24.988 47.304 100.0 71.968 99.0 474.586 92.8 11.319 90.9 182.635 88.398 31.517 0.8 93.7 36.607 7.2 15.791 24.9 2.71 35 11

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 151
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.17: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 100 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 211.930 100.000 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 73.205 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 211.930 124.867 20.068 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 124.867 45.142 30.624 20.064 47.304 100.0 72.720 100.0 459.844 90.0 10.375 83.3 65.712 0.000 0.000 1.0 91.7 51.349 10.0 39.397 58.1 0.01 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 45.142 45.145 20.064 20.066 47.304 100.0 72.452 99.6 353.687 69.2 8.259 66.3 126.184 7.213 0.000 4.0 66.7 157.506 30.8 67.838 100.0 0.09 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 45.127 20.066 20.064 47.304 100.0 72.720 100.0 510.582 99.9 11.399 91.5 126.724 33.331 0.000 0.0 100.0 0.611 0.1 0.611 0.9 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 45.127 45.146 20.064 20.064 47.304 100.0 70.957 97.6 352.124 68.9 9.317 74.8 28.548 0.000 0.000 3.0 75.0 159.069 31.1 59.544 100.0 0.10 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 57.595 20.064 20.073 47.304 100.0 72.720 100.0 510.216 99.8 11.433 91.8 142.684 45.388 0.000 0.0 100.0 0.978 0.2 0.978 1.4 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 57.595 98.344 20.073 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 91.533 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 98.344 78.999 20.063 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 56.811 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 78.999 288.020 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 122.999 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 288.020 308.448 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 113.870 123.899 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 308.448 349.443 20.064 19.627 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 87.161 111.429 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 349.443 269.499 19.627 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 101.776 161.775 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 269.499 223.239 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 56.387 28.154 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 223.239 267.828 20.064 54.341 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 28.344 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 267.828 285.750 54.341 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 90.023 4.683 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 285.750 104.263 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 104.263 110.356 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 84.026 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 110.356 205.858 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 40.210 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 205.858 27.661 20.081 20.065 47.304 100.0 67.965 93.5 249.384 48.8 6.177 49.6 0.000 0.000 0.000 6.0 50.0 261.810 51.2 67.838 100.0 0.26 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 27.661 197.175 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 158.458 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 197.175 557.900 20.064 80.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 124.493 25.155 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 557.900 351.341 80.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 214.691 431.045 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 351.341 166.779 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 30.678 16.248 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 166.779 84.990 20.064 18.880 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 53.131 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 84.990 150.265 18.880 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 100.333 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 150.265 64.664 20.064 20.067 47.304 100.0 72.720 100.0 466.434 91.2 10.375 83.3 0.000 0.000 0.000 1.0 91.7 44.760 8.8 41.070 71.5 0.01 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 64.664 45.125 20.067 20.064 47.304 100.0 72.720 100.0 477.707 93.4 11.399 91.5 114.326 49.367 0.000 1.0 91.7 33.486 6.6 33.486 48.5 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 45.125 35.924 20.064 20.064 47.304 100.0 56.391 77.5 198.741 38.9 4.095 32.9 0.000 0.000 0.000 8.0 33.3 312.452 61.1 57.422 100.0 0.37 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 35.924 107.881 20.064 27.530 47.304 100.0 72.720 100.0 498.483 97.5 11.399 91.5 115.278 0.000 0.000 0.0 100.0 12.711 2.5 12.711 22.1 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.881 71.060 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 32.814 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 71.060 45.149 20.064 20.072 47.304 100.0 70.982 97.6 367.676 71.9 9.317 74.8 56.015 0.000 0.000 3.0 75.0 143.517 28.1 67.838 100.0 0.08 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.379 47.304 100.0 72.720 100.0 454.910 89.0 11.433 91.8 116.144 16.103 0.000 1.0 91.7 56.284 11.0 56.284 83.0 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 180.853 65.379 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 127.814 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 180.853 45.116 20.064 20.064 47.304 100.0 72.720 100.0 478.991 93.7 11.399 91.5 77.225 16.929 0.000 1.0 91.7 32.202 6.3 32.202 46.7 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 45.116 62.155 20.064 20.064 47.304 100.0 72.720 100.0 506.246 99.0 11.399 91.5 238.193 74.110 0.000 0.0 100.0 4.948 1.0 4.948 10.5 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 62.155 62.357 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 89.167 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 62.357 175.266 20.065 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 152.784 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 175.266 358.024 20.076 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 192.603 129.114 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 358.024 320.893 35.610 22.611 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 121.719 156.345 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 320.893 228.777 22.611 20.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 58.380 45.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 228.777 232.540 20.068 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 36.382 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 232.540 316.356 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 198.119 203.695 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 316.356 292.927 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 95.588 99.328 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 292.927 267.490 20.064 63.481 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 83.097 68.068 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 267.490 342.362 63.481 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 62.261 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 180.777 175.499 26.543 25.443 47.304 100.0 72.180 99.3 483.548 94.6 11.661 93.6 182.635 67.854 39.732 0.6 94.7 27.645 5.4 11.786 18.3 2.06 36 10

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 152
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.18: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 125 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 236.062 125.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 73.413 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 236.062 148.051 20.066 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 148.051 45.142 30.624 20.064 47.304 100.0 72.720 100.0 480.063 93.9 10.375 83.3 65.712 0.000 0.000 0.0 100.0 31.130 6.1 19.101 28.2 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 45.142 45.145 20.064 20.066 47.304 100.0 72.452 99.6 359.956 70.4 8.259 66.3 126.184 0.000 0.000 4.0 66.7 151.238 29.6 67.838 100.0 0.09 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 67.219 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 8.331 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 67.219 45.146 20.064 20.064 47.304 100.0 72.720 100.0 369.733 72.3 9.317 74.8 28.548 0.000 0.000 3.0 75.0 141.461 27.7 59.544 87.8 0.08 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 79.095 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 20.400 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 79.095 142.661 20.067 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 66.575 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 142.661 145.484 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 31.867 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 145.484 376.772 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 98.115 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 376.772 332.563 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 88.985 213.090 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 332.563 373.745 20.064 19.617 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 62.209 135.750 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 373.745 293.616 19.617 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 76.882 186.192 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 293.616 247.505 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 31.387 52.504 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 247.505 315.346 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 3.386 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 315.346 309.884 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 65.106 51.078 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 309.884 127.473 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 127.473 156.704 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 59.077 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 156.704 274.275 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 15.233 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 274.275 37.396 20.081 20.065 47.304 100.0 70.056 96.3 297.158 58.1 8.293 66.6 0.000 0.000 0.000 4.0 66.7 214.036 41.9 67.838 100.0 0.18 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 37.396 230.523 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 133.574 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 230.523 582.153 20.064 80.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 99.569 58.840 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 582.153 375.565 80.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 189.881 455.297 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 375.565 190.912 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 5.708 36.622 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 190.912 130.883 20.064 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 28.160 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 130.883 218.575 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 76.565 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 218.575 78.874 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 78.874 44.523 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 24.401 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 44.523 35.355 20.064 20.064 47.304 100.0 56.391 77.5 198.741 38.9 4.095 32.9 0.000 0.000 0.000 8.0 33.3 312.452 61.1 57.422 100.0 0.37 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 35.355 107.884 20.064 27.530 47.304 100.0 72.720 100.0 497.981 97.4 11.399 91.5 115.278 0.000 0.000 0.0 100.0 13.213 2.6 13.213 23.0 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.884 94.750 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 7.823 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 94.750 45.149 20.064 20.072 47.304 100.0 70.982 97.6 388.483 76.0 9.317 74.8 56.015 0.000 0.000 3.0 75.0 122.711 24.0 67.838 100.0 0.06 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 204.858 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 103.020 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 204.858 47.757 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 47.757 86.143 20.064 20.064 47.304 100.0 72.720 100.0 508.647 99.5 11.399 91.5 238.193 49.144 0.000 0.0 100.0 2.547 0.5 2.547 5.4 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 86.143 109.450 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 64.216 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 109.450 243.480 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 127.900 1.486 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 243.480 382.185 20.066 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 167.709 198.007 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 382.185 345.061 35.610 22.568 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 96.835 180.624 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 345.061 253.049 22.568 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 33.385 66.454 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 253.049 280.023 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 11.429 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 280.023 340.535 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 173.235 251.619 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 340.535 317.089 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 70.622 123.711 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 317.089 303.400 20.064 51.480 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 58.146 92.432 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 303.400 401.213 51.480 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 25.177 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 207.598 203.600 26.849 25.206 47.304 100.0 72.263 99.4 488.786 95.6 11.843 95.1 182.635 48.858 50.576 0.5 95.8 22.407 4.4 8.637 13.2 1.70 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 153
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.19: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 150 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 260.276 150.000 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 73.621 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 260.276 171.349 20.069 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 171.349 45.142 30.624 20.064 47.304 100.0 72.720 100.0 499.378 97.7 11.399 91.5 65.712 0.000 0.000 0.0 100.0 11.816 2.3 11.816 17.1 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 45.142 45.145 20.064 20.066 47.304 100.0 72.452 99.6 359.955 70.4 8.259 66.3 126.184 0.000 0.000 4.0 66.7 151.238 29.6 67.838 100.0 0.09 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 75.069 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.069 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.621 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.573 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 185.763 20.075 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 41.629 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 185.763 211.194 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 6.882 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 211.194 409.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 73.216 55.683 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 409.790 356.716 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 64.101 246.257 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 356.716 397.889 20.064 19.627 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 37.233 156.242 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 397.889 317.818 19.627 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 51.959 210.446 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 317.818 271.483 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 6.387 76.931 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 271.483 341.816 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 341.816 334.102 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 40.154 77.770 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 334.102 150.792 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 150.792 203.429 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 34.111 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 203.429 334.080 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 334.080 39.979 20.081 20.065 47.304 100.0 71.193 97.9 345.315 67.6 9.317 74.8 0.000 0.000 0.000 3.0 75.0 165.879 32.4 67.838 100.0 0.11 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 39.979 257.123 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 108.689 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 257.123 584.123 20.064 80.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 74.573 108.017 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.123 399.830 80.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 165.044 457.268 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 399.830 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 56.121 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 160.273 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 3.160 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 160.273 271.195 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 51.580 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 271.195 129.052 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 129.052 116.426 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 116.426 41.006 20.064 20.064 47.304 100.0 63.724 87.6 250.477 49.0 5.153 41.4 0.000 0.000 0.000 7.0 41.7 260.716 51.0 57.422 100.0 0.26 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 41.006 107.856 20.064 27.530 47.304 100.0 72.720 100.0 502.969 98.4 11.399 91.5 115.278 0.000 0.000 0.0 100.0 8.224 1.6 8.224 14.3 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.856 102.209 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.209 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.038 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.155 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 228.932 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 78.240 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 228.932 70.913 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 70.913 128.595 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 24.158 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 128.595 174.475 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 39.242 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 174.475 267.626 20.065 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 103.016 65.658 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 267.626 406.332 20.066 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 142.824 222.380 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 406.332 371.805 35.610 19.964 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 71.938 204.885 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 371.805 277.073 19.964 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 5.786 93.327 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 277.073 314.348 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 314.348 364.660 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 148.326 286.244 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 364.660 341.234 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 45.655 148.034 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 341.234 330.143 20.064 48.832 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 33.154 116.771 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 330.143 443.452 48.832 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 5.764 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 232.277 229.197 27.279 25.092 47.304 100.0 72.448 99.6 491.834 96.2 11.934 95.8 182.635 33.145 61.100 0.5 96.2 19.360 3.8 8.315 12.6 1.26 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 154
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.20: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 175 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 284.465 175.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 73.828 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 284.465 194.647 20.066 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 194.647 53.273 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 53.273 45.145 20.064 20.066 47.304 100.0 72.452 99.6 367.374 71.9 8.259 66.3 126.184 0.000 0.000 3.0 75.0 143.820 28.1 67.838 100.0 0.08 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 75.069 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.069 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.621 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.573 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 209.922 20.075 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 16.629 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 209.922 241.110 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 241.110 434.027 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 48.249 85.884 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 434.027 380.905 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 39.217 270.598 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 380.905 422.131 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 12.233 180.549 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 422.131 342.007 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 26.995 234.794 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 342.007 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 101.338 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 358.267 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 15.161 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 358.267 174.090 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 174.090 250.106 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 9.126 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 250.106 379.250 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 379.250 42.273 20.081 20.065 47.304 100.0 71.193 97.9 381.716 74.7 10.375 83.3 0.000 0.000 0.000 2.0 83.3 129.477 25.3 67.838 100.0 0.06 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.273 283.575 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 83.805 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 283.575 584.114 20.064 80.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 49.571 157.522 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.114 424.134 80.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 140.130 457.259 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 424.134 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 80.425 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 163.321 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.321 298.457 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 26.580 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 298.457 155.103 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 155.103 141.547 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 141.547 40.909 20.064 20.064 47.304 100.0 63.724 87.6 273.338 53.5 5.153 41.4 0.000 0.000 0.000 6.0 50.0 237.855 46.5 57.422 100.0 0.22 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 40.909 107.857 20.064 27.530 47.304 100.0 72.720 100.0 502.884 98.4 11.399 91.5 115.278 0.000 0.000 0.0 100.0 8.310 1.6 8.310 14.5 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.857 102.210 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.210 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.039 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.155 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 253.088 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 53.364 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 253.088 94.178 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 94.178 174.445 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 174.445 243.112 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 14.242 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 243.112 291.905 20.065 20.073 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 78.108 134.945 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 291.905 430.547 20.073 35.611 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 117.937 243.170 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 430.547 382.922 35.611 33.171 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 46.972 229.210 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 382.922 295.689 33.171 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 104.497 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 295.689 332.422 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 332.422 388.870 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 123.360 300.647 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 388.870 365.500 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 20.680 172.433 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 365.500 349.741 20.064 53.448 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 8.154 137.258 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 447.960 53.448 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 250.077 247.095 28.210 25.480 47.304 100.0 72.448 99.6 493.538 96.5 11.980 96.2 182.635 21.833 70.059 0.4 96.7 17.655 3.5 8.060 12.3 1.06 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 155
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.21: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 200 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 308.864 200.000 20.077 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 74.036 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 308.864 218.190 20.077 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 218.190 75.817 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 75.817 45.145 20.064 20.066 47.304 100.0 72.452 99.6 386.597 75.6 9.317 74.8 126.184 0.000 0.000 2.0 83.3 124.597 24.4 67.838 100.0 0.06 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.145 75.069 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.069 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.621 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.573 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 225.832 20.075 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 225.832 256.510 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 256.510 458.312 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 23.279 101.426 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 458.312 405.134 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 14.255 289.968 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 405.134 434.006 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 0.000 204.891 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 434.006 366.281 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 2.020 246.720 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 366.281 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 125.823 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 373.011 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 0.000 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 373.011 188.320 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 188.320 272.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 272.790 401.241 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 401.241 42.764 20.081 20.065 47.304 100.0 72.720 100.0 398.863 78.0 10.375 83.3 0.000 0.000 0.000 2.0 83.3 112.331 22.0 61.639 89.3 0.05 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.764 308.171 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 58.838 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 308.171 584.105 20.064 80.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 24.556 206.695 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.105 448.460 80.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 115.216 457.250 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 448.460 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 104.750 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 163.321 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.321 322.561 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 1.580 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 322.561 178.168 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 178.168 163.817 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 163.817 45.154 20.064 20.064 47.304 100.0 67.436 92.7 284.574 55.7 6.177 49.6 0.000 0.000 0.000 6.0 50.0 226.620 44.3 57.422 100.0 0.20 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 45.154 107.836 20.064 27.530 47.304 100.0 72.720 100.0 506.632 99.1 11.399 91.5 115.278 0.000 0.000 0.0 100.0 4.562 0.9 4.562 7.9 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.836 102.190 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.190 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.021 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.172 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 277.227 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 28.479 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 277.227 117.456 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 117.456 196.944 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 196.944 278.701 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 278.701 316.039 20.065 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 53.141 167.919 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 316.039 454.792 20.065 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 92.962 267.434 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 454.792 420.126 35.610 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 22.005 253.561 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 420.126 282.812 20.065 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 141.870 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 282.812 319.921 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 319.921 413.130 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 98.393 291.865 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 413.130 385.508 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 0.000 196.876 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 385.508 349.741 20.064 61.431 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 0.000 157.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 455.701 61.431 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 262.971 260.158 28.642 25.368 47.304 100.0 72.562 99.8 494.654 96.8 12.025 96.5 182.635 13.234 77.100 0.4 96.9 16.539 3.2 7.843 11.9 0.94 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 156
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.22: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 225 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 333.023 225.000 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 74.244 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 333.023 241.510 20.065 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 241.510 98.175 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 98.175 45.142 20.064 20.066 47.304 100.0 72.720 100.0 404.852 79.2 10.375 83.3 126.184 0.000 0.000 2.0 83.3 106.341 20.8 64.067 94.4 0.04 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.142 75.066 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.066 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.619 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.575 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 225.832 20.075 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 225.832 256.510 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 256.510 480.949 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 0.000 101.426 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 480.949 418.978 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 0.000 312.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 418.978 434.006 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 0.000 218.799 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 434.006 368.245 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 0.000 246.720 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 368.245 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 127.804 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 373.011 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 0.000 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 373.011 188.320 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 188.320 272.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 272.790 401.241 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 401.241 42.764 20.081 20.065 47.304 100.0 72.720 100.0 398.863 78.0 10.375 83.3 0.000 0.000 0.000 2.0 83.3 112.331 22.0 61.639 89.3 0.05 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.764 332.477 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 33.871 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 332.477 584.097 20.064 83.869 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 0.000 251.911 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.097 472.810 83.869 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 93.547 457.242 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 472.810 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 129.100 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 163.321 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.321 324.100 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 324.100 179.642 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 179.642 165.241 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 165.241 45.154 20.064 20.064 47.304 100.0 67.436 92.7 285.854 55.9 6.177 49.6 0.000 0.000 0.000 6.0 50.0 225.340 44.1 57.422 100.0 0.19 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 45.154 107.836 20.064 27.530 47.304 100.0 72.720 100.0 506.632 99.1 11.399 91.5 115.278 0.000 0.000 0.0 100.0 4.562 0.9 4.562 7.9 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.836 102.190 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.190 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.021 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.172 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 301.468 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 3.528 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 301.468 140.862 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 140.862 219.594 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 219.594 290.360 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 0.000 9.243 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 290.360 340.395 20.065 20.076 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 28.173 178.777 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 340.395 479.082 20.076 35.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 68.008 291.918 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 479.082 441.501 35.610 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 0.000 277.952 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 441.501 282.811 20.064 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 163.339 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 282.811 319.920 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 319.920 437.406 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 73.427 291.863 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 437.406 385.508 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 0.000 217.300 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 385.508 349.741 20.064 61.431 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 0.000 157.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 455.701 61.431 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 270.311 267.497 29.257 25.440 47.304 100.0 72.567 99.8 495.079 96.8 12.048 96.7 182.635 8.148 81.860 0.4 96.9 16.115 3.2 7.761 11.8 0.90 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 157
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.23: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 250 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 357.365 250.000 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 74.452 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 357.365 265.048 20.064 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 265.048 120.769 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 120.769 45.143 20.064 20.066 47.304 100.0 72.720 100.0 424.562 83.1 10.375 83.3 126.184 0.000 0.000 2.0 83.3 86.631 16.9 44.281 65.3 0.03 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.143 75.067 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.067 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.619 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.575 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 225.832 20.075 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 225.832 256.510 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 256.510 480.949 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 0.000 101.426 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 480.949 418.978 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 0.000 312.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 418.978 434.006 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 0.000 218.799 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 434.006 368.245 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 0.000 246.720 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 368.245 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 127.804 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 373.011 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 0.000 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 373.011 188.320 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 188.320 272.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 272.790 401.241 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 401.241 42.764 20.081 20.065 47.304 100.0 72.720 100.0 398.863 78.0 10.375 83.3 0.000 0.000 0.000 2.0 83.3 112.331 22.0 61.639 89.3 0.05 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.764 356.703 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 8.885 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 356.703 584.097 20.064 83.869 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 0.000 276.339 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.097 497.199 83.869 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 68.551 457.242 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 497.199 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 153.489 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 163.321 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.321 324.100 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 324.100 179.642 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 179.642 165.241 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 165.241 45.154 20.064 20.064 47.304 100.0 67.436 92.7 285.854 55.9 6.177 49.6 0.000 0.000 0.000 6.0 50.0 225.340 44.1 57.422 100.0 0.19 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 45.154 107.836 20.064 27.530 47.304 100.0 72.720 100.0 506.632 99.1 11.399 91.5 115.278 0.000 0.000 0.0 100.0 4.562 0.9 4.562 7.9 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.836 102.190 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.190 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.021 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.172 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 304.895 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 304.895 144.174 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 144.174 222.802 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 222.802 290.360 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 0.000 12.482 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 290.360 364.613 20.065 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 3.173 178.777 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 364.613 503.378 20.065 35.611 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 43.029 316.258 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 503.378 441.501 35.611 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 0.000 301.854 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 441.501 282.811 20.064 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 163.339 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 282.811 319.920 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 319.920 461.714 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 48.435 291.863 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 461.714 385.508 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 0.000 240.842 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 385.508 349.741 20.064 61.431 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 0.000 157.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 455.701 61.431 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 274.699 271.885 29.801 25.439 47.304 100.0 72.567 99.8 495.507 96.9 12.048 96.7 182.635 5.359 84.552 0.4 96.9 15.686 3.1 7.331 11.1 0.87 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 158
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.24: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 275 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 381.721 275.000 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 74.659 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 381.721 288.630 20.064 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 288.630 143.433 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 143.433 45.143 20.064 20.066 47.304 100.0 72.720 100.0 444.354 86.9 10.375 83.3 126.184 0.000 0.000 2.0 83.3 66.839 13.1 42.425 61.5 0.02 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.143 75.067 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.067 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.619 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.575 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 225.832 20.075 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 225.832 256.510 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 256.510 480.949 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 0.000 101.426 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 480.949 418.978 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 0.000 312.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 418.978 434.006 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 0.000 218.799 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 434.006 368.245 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 0.000 246.720 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 368.245 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 127.804 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 373.011 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 0.000 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 373.011 188.320 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 188.320 272.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 272.790 401.241 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 401.241 42.764 20.081 20.065 47.304 100.0 72.720 100.0 398.863 78.0 10.375 83.3 0.000 0.000 0.000 2.0 83.3 112.331 22.0 61.639 89.3 0.05 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.764 365.336 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 365.336 584.097 20.064 83.869 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 0.000 281.199 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.097 521.590 83.869 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 43.536 457.242 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 521.590 196.420 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 177.881 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.420 163.321 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.321 324.100 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 324.100 179.642 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 179.642 165.241 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 165.241 45.154 20.064 20.064 47.304 100.0 67.436 92.7 285.854 55.9 6.177 49.6 0.000 0.000 0.000 6.0 50.0 225.340 44.1 57.422 100.0 0.19 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 45.154 107.836 20.064 27.530 47.304 100.0 72.720 100.0 506.632 99.1 11.399 91.5 115.278 0.000 0.000 0.0 100.0 4.562 0.9 4.562 7.9 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.836 102.190 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.190 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.021 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.172 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 304.895 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 304.895 144.174 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 144.174 222.802 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 222.802 290.360 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 0.000 12.482 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 290.360 367.698 20.065 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 0.000 178.777 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 367.698 527.728 20.065 35.599 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 18.050 319.359 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 527.728 441.490 35.599 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 0.000 321.623 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 441.490 282.811 20.064 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 163.327 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 282.811 319.920 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 319.920 486.063 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 23.435 291.863 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 486.063 385.508 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 0.000 261.067 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 385.508 349.741 20.064 61.431 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 0.000 157.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 455.701 61.431 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 278.077 275.264 30.344 25.439 47.304 100.0 72.567 99.8 495.937 97.0 12.048 96.7 182.635 3.471 86.125 0.4 96.9 15.256 3.0 7.291 11.1 0.84 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 159
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.25: Resumen balance hídrico por simulación embalse Paratía; área: 30,844 ha; V.U.: 300 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Agrí - Eco- Industri- Total Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional cola lógica al, Mine- de Año de Año de Año de Año Minero Regu - Para- Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp Da De Dim D Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 511.193 72.720 12.457 643.674 585.130 406.117 300.000 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 101.614 74.867 222.789 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 511.193 72.720 12.457 643.674 406.117 293.446 20.069 30.624 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.505 0.000 18.044 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 511.193 72.720 12.457 643.674 293.446 148.066 30.624 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 65.712 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 511.193 72.720 12.457 643.674 148.066 45.143 20.064 20.066 47.304 100.0 72.720 100.0 448.402 87.7 10.375 83.3 126.184 0.000 0.000 1.0 91.7 62.791 12.3 42.440 61.5 0.02 X
5 1968 913.251 47.304 511.193 72.720 12.457 643.674 45.143 75.067 20.066 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 126.724 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 511.193 72.720 12.457 643.674 75.067 45.146 20.064 20.064 47.304 100.0 72.720 100.0 376.619 73.7 9.317 74.8 28.548 0.000 0.000 3.0 75.0 134.575 26.3 59.544 87.8 0.07 X
7 1970 956.863 47.304 511.193 72.720 12.457 643.674 45.146 98.875 20.064 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 142.684 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 511.193 72.720 12.457 643.674 98.875 225.832 20.075 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 259.136 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 511.193 72.720 12.457 643.674 225.832 256.510 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 132.644 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 511.193 72.720 12.457 643.674 256.510 480.949 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 283.710 0.000 101.426 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 511.193 72.720 12.457 643.674 480.949 418.978 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 312.550 0.000 312.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 511.193 72.720 12.457 643.674 418.978 434.006 20.064 19.629 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 242.438 0.000 218.799 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 511.193 72.720 12.457 643.674 434.006 368.245 19.629 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 255.458 0.000 246.720 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 511.193 72.720 12.457 643.674 368.245 277.710 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 241.645 0.000 127.804 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 511.193 72.720 12.457 643.674 277.710 347.848 20.064 54.342 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 146.538 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 511.193 72.720 12.457 643.674 347.848 373.011 54.342 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.952 0.000 83.850 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 511.193 72.720 12.457 643.674 373.011 188.320 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 37.604 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 511.193 72.720 12.457 643.674 188.320 272.790 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 186.624 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 511.193 72.720 12.457 643.674 272.790 401.241 20.064 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.666 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 511.193 72.720 12.457 643.674 401.241 42.764 20.081 20.065 47.304 100.0 72.720 100.0 398.863 78.0 10.375 83.3 0.000 0.000 0.000 2.0 83.3 112.331 22.0 61.639 89.3 0.05 X
21 1984 1,498.004 47.304 511.193 72.720 12.457 643.674 42.764 365.336 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 376.974 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 511.193 72.720 12.457 643.674 365.336 584.097 20.064 83.869 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 333.270 0.000 281.199 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 511.193 72.720 12.457 643.674 584.097 546.006 83.869 20.074 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 322.893 18.522 457.242 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 511.193 72.720 12.457 643.674 546.006 196.429 20.074 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 167.462 0.000 202.297 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 511.193 72.720 12.457 643.674 196.429 163.330 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 121.336 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 511.193 72.720 12.457 643.674 163.330 324.108 20.065 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 244.060 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 511.193 72.720 12.457 643.674 324.108 179.650 20.064 20.067 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 511.193 72.720 12.457 643.674 179.650 165.249 20.067 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.326 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 511.193 72.720 12.457 643.674 165.249 45.154 20.064 20.064 47.304 100.0 67.436 92.7 285.861 55.9 6.177 49.6 0.000 0.000 0.000 6.0 50.0 225.333 44.1 57.422 100.0 0.19 X
30 1993 928.430 47.304 511.193 72.720 12.457 643.674 45.154 107.836 20.064 27.530 47.304 100.0 72.720 100.0 506.632 99.1 11.399 91.5 115.278 0.000 0.000 0.0 100.0 4.562 0.9 4.562 7.9 0.00 X
31 1994 840.443 47.304 511.193 72.720 12.457 643.674 107.836 102.190 27.530 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 99.204 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 511.193 72.720 12.457 643.674 102.190 45.149 20.064 20.072 47.304 100.0 70.982 97.6 395.021 77.3 9.317 74.8 56.015 0.000 0.000 3.0 75.0 116.172 22.7 67.838 100.0 0.05 X
33 1996 935.803 47.304 511.193 72.720 12.457 643.674 45.149 116.942 20.072 65.366 47.304 100.0 72.720 100.0 469.237 91.8 11.433 91.8 116.144 0.000 0.000 1.0 91.7 41.957 8.2 41.957 61.8 0.01 X
34 1997 1,160.113 47.304 511.193 72.720 12.457 643.674 116.942 304.895 65.366 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 239.195 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 511.193 72.720 12.457 643.674 304.895 144.174 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 77.225 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 511.193 72.720 12.457 643.674 144.174 222.802 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 238.193 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 511.193 72.720 12.457 643.674 222.802 290.360 20.064 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 245.601 0.000 12.482 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 511.193 72.720 12.457 643.674 290.360 367.698 20.065 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 361.870 0.000 178.777 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 511.193 72.720 12.457 643.674 367.698 545.343 20.065 35.583 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 476.585 0.000 319.359 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 511.193 72.720 12.457 643.674 545.343 441.475 35.583 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.742 0.000 339.237 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 511.193 72.720 12.457 643.674 441.475 282.811 20.064 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 171.981 0.000 163.312 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 511.193 72.720 12.457 643.674 282.811 319.920 20.070 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.359 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 511.193 72.720 12.457 643.674 319.920 508.912 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 482.838 0.000 291.863 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 511.193 72.720 12.457 643.674 508.912 385.508 20.064 20.064 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 225.284 0.000 283.915 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 511.193 72.720 12.457 643.674 385.508 349.741 20.064 61.431 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 231.601 0.000 157.358 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 511.193 72.720 12.457 643.674 349.741 455.701 61.431 49.390 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 112.815 0.000 25.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 511.193 72.720 12.457 643.674 280.224 277.410 30.887 25.439 47.304 100.0 72.567 99.8 496.026 97.0 12.048 96.7 182.635 2.030 87.927 0.3 97.1 15.168 3.0 7.291 11.1 0.84 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 160
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.26: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 25 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 315.923 200.000 20.076 25.000 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 87.012 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 315.923 188.861 20.076 19.659 20.027 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 78.333 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 188.861 45.142 19.659 20.064 25.000 20.026 47.304 100.0 72.720 100.0 486.482 95.2 10.375 83.3 63.748 0.000 62.535 0.000 0.0 100.0 24.711 4.8 18.828 27.8 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 45.142 45.145 20.064 20.066 20.026 20.026 47.304 100.0 71.015 97.7 355.021 69.4 8.259 66.3 108.783 0.000 65.641 0.000 3.0 75.0 156.172 30.6 67.838 100.0 0.09 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 44.560 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 89.049 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 44.560 42.156 20.064 20.070 20.026 20.027 47.304 100.0 69.693 95.8 336.045 65.7 8.293 66.6 26.842 0.000 56.381 0.000 4.0 66.7 175.149 34.3 67.838 100.0 0.12 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.156 63.033 20.070 20.073 20.027 25.000 47.304 100.0 72.720 100.0 481.835 94.3 11.433 91.8 130.565 0.000 105.589 0.000 1.0 91.7 29.359 5.7 29.359 43.3 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 63.033 129.089 20.073 20.064 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 132.969 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 129.089 118.039 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 100.831 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 118.039 347.136 20.064 20.066 20.026 24.990 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 155.433 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 347.136 414.452 20.066 20.066 24.990 19.506 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 155.989 105.433 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 414.452 425.766 20.066 20.066 19.506 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 142.662 135.017 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 425.766 382.319 20.066 20.065 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 149.722 154.401 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 382.319 293.381 20.065 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 122.190 75.465 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 293.381 322.605 20.064 51.955 20.026 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 110.814 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 322.605 368.505 51.955 20.064 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 113.939 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 368.505 168.910 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 59.272 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 168.910 183.345 20.064 20.076 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 124.761 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 183.345 254.886 20.076 20.081 20.027 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 114.379 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 254.886 37.394 20.081 20.072 20.027 20.027 47.304 100.0 67.391 92.7 309.059 60.5 8.293 66.6 0.000 0.000 4.548 0.000 4.0 66.7 202.135 39.5 67.838 100.0 0.16 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 37.394 238.824 20.072 20.064 20.027 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 174.651 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 238.824 584.103 20.064 80.583 20.026 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 190.902 75.836 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.103 477.776 80.583 20.064 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 177.066 376.252 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 477.776 222.342 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 85.997 89.014 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 222.342 125.220 20.064 22.148 20.026 24.116 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 98.252 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 125.220 234.304 22.148 20.064 24.116 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 140.711 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 234.304 100.243 20.064 20.064 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 42.416 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 100.243 45.133 20.064 20.074 20.027 20.027 47.304 100.0 72.720 100.0 491.662 96.2 11.399 91.5 110.808 0.000 101.168 0.000 0.0 100.0 19.532 3.8 19.532 28.3 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 45.133 35.991 20.074 20.064 20.027 20.026 47.304 100.0 51.421 70.7 215.355 42.1 4.095 32.9 0.000 0.000 22.146 0.000 8.0 33.3 295.838 57.9 57.422 100.0 0.33 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 35.991 107.875 20.064 20.064 20.026 25.000 47.304 100.0 72.720 100.0 461.595 90.3 11.399 91.5 94.937 0.000 97.905 0.000 1.0 91.7 49.599 9.7 49.599 86.4 0.01 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.875 64.049 20.064 20.064 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 92.224 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 64.049 40.879 20.064 20.074 20.026 20.027 47.304 100.0 65.580 90.2 338.783 66.3 8.293 66.6 54.200 0.000 65.181 0.000 3.0 75.0 172.410 33.7 67.838 100.0 0.11 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 40.879 111.474 20.074 65.383 20.027 25.000 47.304 100.0 72.720 100.0 441.465 86.4 10.375 83.3 77.828 0.000 103.280 0.000 1.0 91.7 69.729 13.6 52.753 77.8 0.02 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 111.474 219.561 65.383 20.064 25.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 134.500 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 219.561 45.111 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 490.580 96.0 11.399 91.5 74.275 0.000 72.565 0.000 0.0 100.0 20.614 4.0 20.614 29.9 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 45.111 95.898 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 116.619 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 95.898 123.668 20.066 20.065 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 127.008 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 123.668 260.152 20.065 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 170.516 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 260.152 460.400 20.064 23.949 20.026 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 217.441 140.309 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 460.400 421.829 23.949 20.065 25.000 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 145.159 182.501 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 421.829 284.015 20.065 20.066 25.000 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 114.573 76.406 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 284.015 294.805 20.066 20.064 20.027 20.785 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 98.832 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 294.805 425.366 20.064 20.064 20.785 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 208.799 183.823 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 425.366 400.412 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 130.975 138.684 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 400.412 345.552 20.064 45.740 20.026 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 145.372 93.611 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 345.552 410.453 45.740 36.221 25.000 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 112.759 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 229.147 225.350 27.651 24.091 21.417 21.417 47.304 100.0 71.883 98.8 484.775 94.8 11.730 94.2 153.585 12.881 113.458 43.341 0.5 95.5 26.418 5.2 11.293 17.2 1.85 38 8

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 161
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.27: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 50 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 343.816 200.000 20.076 50.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 83.405 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 343.816 244.080 20.076 19.659 20.025 37.498 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 36.669 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 244.080 92.572 19.659 20.064 37.498 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 49.729 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 92.572 45.144 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 415.171 81.2 10.375 83.3 108.783 0.000 40.734 0.000 2.0 83.3 96.023 18.8 59.699 88.0 0.04 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.144 68.539 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 64.122 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 68.539 45.146 20.064 20.070 20.026 20.026 47.304 100.0 72.523 99.7 374.393 73.2 9.317 74.8 26.842 0.000 29.507 0.000 3.0 75.0 136.801 26.8 67.838 100.0 0.07 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.146 65.955 20.070 20.073 20.026 20.089 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 76.169 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 65.955 156.152 20.073 20.064 20.089 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 103.092 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 156.152 170.328 20.064 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 73.545 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 170.328 422.616 20.064 20.066 20.026 24.961 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 130.211 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 422.616 438.546 20.066 20.066 24.961 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 130.794 181.266 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 438.546 453.690 20.066 20.066 20.026 28.776 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 111.121 159.220 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 453.690 407.037 20.066 20.065 28.776 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 128.276 182.444 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 407.037 320.220 20.065 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 94.654 100.389 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 320.220 372.815 20.064 51.955 20.026 44.867 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 65.913 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 372.815 412.186 51.955 20.064 44.867 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 106.455 31.404 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 412.186 239.020 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 30.399 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 239.020 280.447 20.064 20.076 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 94.895 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 280.447 385.594 20.076 20.081 20.026 30.706 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 65.674 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 385.594 41.524 20.081 20.072 30.706 20.028 47.304 100.0 72.720 100.0 426.028 83.3 10.375 83.3 0.000 0.000 0.000 0.000 2.0 83.3 85.166 16.7 48.535 71.5 0.03 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 41.524 267.400 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 149.486 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 267.400 584.097 20.064 80.583 20.026 50.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 159.915 110.045 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 502.575 80.583 20.064 50.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 176.844 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 502.575 246.486 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 60.975 113.813 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 246.486 177.725 20.064 22.148 20.026 19.298 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 73.287 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 177.725 310.649 22.148 20.064 19.298 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 109.800 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 310.649 204.077 20.064 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 10.398 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 204.077 151.148 20.064 20.074 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 71.220 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 151.148 45.154 20.074 20.064 20.026 20.026 47.304 100.0 64.236 88.3 308.192 60.3 6.177 49.6 0.000 0.000 0.000 0.000 6.0 50.0 203.001 39.7 57.422 100.0 0.16 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.154 107.682 20.064 20.064 20.026 41.808 47.304 100.0 72.720 100.0 496.138 97.1 11.399 91.5 94.937 0.000 51.250 0.000 0.0 100.0 15.055 2.9 15.055 26.2 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.682 89.438 20.064 20.064 41.808 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 82.319 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 89.438 45.149 20.064 20.074 20.026 20.026 47.304 100.0 69.910 96.1 377.757 73.9 9.317 74.8 54.200 0.000 35.833 0.000 2.0 83.3 133.437 26.1 67.838 100.0 0.07 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.918 20.074 65.383 20.026 50.000 47.304 100.0 72.720 100.0 461.168 90.2 11.433 91.8 77.828 0.000 53.351 0.000 1.0 91.7 50.025 9.8 50.025 73.7 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.918 249.386 65.383 20.064 50.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 134.334 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 249.386 73.851 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 47.693 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 73.851 148.653 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 90.688 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 148.653 198.937 20.066 20.065 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 101.893 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 198.937 350.624 20.065 20.064 20.025 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 145.349 7.677 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 350.624 486.762 20.064 23.949 20.025 38.474 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 177.237 227.797 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 486.762 452.982 23.949 20.065 38.474 21.219 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 130.733 208.974 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 452.982 312.759 20.065 20.066 21.219 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 81.200 107.696 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 312.759 346.915 20.066 20.064 20.026 20.789 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 73.891 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 346.915 451.491 20.064 20.064 20.789 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 182.132 236.390 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 451.491 425.052 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 105.808 165.001 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 425.052 379.311 20.064 45.740 20.026 39.615 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 96.171 118.075 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 379.311 471.557 45.740 36.221 39.615 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 81.969 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 267.734 265.265 27.651 24.091 24.759 24.569 47.304 100.0 72.470 99.7 495.552 96.9 12.048 96.7 153.585 12.881 86.938 54.204 0.3 97.1 15.641 3.1 7.965 12.2 0.81 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 162
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.28: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 75 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 368.479 200.000 20.076 75.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 83.239 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 368.479 285.654 20.076 19.659 20.025 44.068 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 11.646 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 285.654 156.590 19.659 20.064 44.068 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 31.492 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 156.590 45.130 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 491.943 96.2 11.399 91.5 108.783 0.000 15.712 0.000 0.0 100.0 19.251 3.8 19.251 27.9 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.130 92.712 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 39.053 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 92.712 45.147 20.064 20.070 20.026 20.027 47.304 100.0 72.523 99.7 416.517 81.5 10.375 83.3 26.842 0.000 4.831 0.000 2.0 83.3 94.676 18.5 67.838 100.0 0.03 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.147 91.218 20.070 20.073 20.027 19.112 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 51.053 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 91.218 204.896 20.073 20.064 19.112 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 76.997 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 204.896 241.692 20.064 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 48.605 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 241.692 515.391 20.064 20.066 20.026 22.783 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 105.156 3.805 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 515.391 463.204 20.066 20.066 22.783 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 103.632 269.236 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 463.204 478.378 20.066 20.066 20.026 28.747 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 85.954 183.985 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 478.378 431.800 20.066 20.065 28.747 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 103.026 202.190 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 431.800 344.705 20.065 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 69.708 125.350 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 344.705 421.079 20.064 51.955 20.026 44.858 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 41.019 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 421.079 436.853 51.955 20.064 44.858 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 81.280 76.109 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 436.853 287.078 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 5.541 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 287.078 351.739 20.064 20.076 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 69.728 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 351.739 480.520 20.076 20.081 20.026 29.384 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 40.912 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 480.520 45.118 20.081 20.072 29.384 20.028 47.304 100.0 72.720 100.0 503.275 98.5 11.399 91.5 0.000 0.000 0.000 0.000 0.0 100.0 7.918 1.5 7.918 11.5 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 45.118 295.495 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 124.484 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 295.495 584.097 20.064 80.583 20.026 75.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 134.549 138.387 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 527.376 80.583 20.064 75.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 176.623 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 527.376 270.834 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 35.953 138.614 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 270.834 217.450 20.064 22.148 20.026 27.703 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 48.345 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 217.450 373.924 22.148 20.064 27.703 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 93.355 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 373.924 274.870 20.064 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 274.870 243.951 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 46.448 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 243.951 45.147 20.074 20.064 20.025 20.026 47.304 100.0 71.131 97.8 381.593 74.6 8.293 66.6 0.000 0.000 0.000 0.000 3.0 75.0 129.600 25.4 57.422 100.0 0.06 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.147 106.784 20.064 20.064 20.026 49.347 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 26.413 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 106.784 112.885 20.064 20.064 49.347 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 64.952 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 112.885 45.146 20.064 20.074 20.026 20.025 47.304 100.0 69.910 96.1 420.521 82.3 9.317 74.8 54.200 0.000 10.959 0.000 1.0 91.7 90.672 17.7 67.838 100.0 0.03 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.146 116.847 20.074 65.383 20.025 52.863 47.304 100.0 72.720 100.0 483.353 94.6 11.433 91.8 77.828 0.000 25.613 0.000 1.0 91.7 27.840 5.4 27.840 41.0 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.847 273.922 65.383 20.064 52.863 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 112.030 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 273.922 121.726 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 22.856 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 121.726 219.342 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 65.660 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 219.342 291.919 20.066 20.065 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 76.934 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 291.919 375.280 20.065 20.064 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 120.363 99.984 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 375.280 511.480 20.064 23.949 20.025 38.474 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 152.015 252.577 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 511.480 477.671 23.949 20.065 38.474 21.190 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 105.761 233.791 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 477.671 337.234 20.065 20.066 21.190 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 56.220 132.489 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 337.234 395.329 20.066 20.064 20.025 20.570 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 48.821 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 395.329 476.209 20.064 20.064 20.570 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 156.851 281.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 476.209 449.714 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 81.009 185.855 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 449.714 404.858 20.064 45.740 20.026 38.544 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 71.240 142.842 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 404.858 501.613 45.740 36.221 38.544 41.278 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 55.961 20.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 302.652 300.837 27.651 24.091 26.270 25.537 47.304 100.0 72.620 99.9 503.151 98.4 12.184 97.8 153.585 12.881 64.826 65.863 0.2 98.7 8.043 1.6 5.394 8.3 0.29 42 4

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 163
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.29: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 100 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 393.077 200.000 20.076 100.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 83.073 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 393.077 328.898 20.076 19.659 20.025 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 328.898 220.915 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 220.915 99.697 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 99.697 169.220 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 14.167 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 169.220 45.143 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 487.273 95.3 10.375 83.3 26.842 0.000 0.000 0.000 0.0 100.0 23.920 4.7 19.367 28.1 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 45.143 112.413 20.070 20.073 20.027 22.302 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 26.127 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 112.413 249.861 20.073 20.064 22.302 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 55.078 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 249.861 309.630 20.064 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 23.704 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 309.630 540.199 20.064 20.066 20.026 22.767 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 79.935 70.816 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 540.199 485.667 20.066 20.066 22.767 22.256 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 78.451 294.044 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 485.667 493.920 20.066 20.066 22.256 37.925 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 63.023 206.543 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 493.920 456.598 20.066 20.065 37.925 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 87.204 217.732 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 456.598 369.232 20.065 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 44.592 150.340 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 369.232 469.247 20.064 51.955 20.026 44.867 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 16.176 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 469.247 461.462 51.955 20.064 44.867 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 56.349 124.484 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 461.462 308.667 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 7.908 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.667 397.416 20.064 20.076 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 44.757 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 397.416 527.282 20.076 20.081 20.026 32.899 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 16.008 19.394 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 527.282 83.435 20.081 20.072 32.899 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 83.435 357.334 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 99.318 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 357.334 584.097 20.064 80.583 20.026 100.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 109.390 199.217 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 552.204 80.583 20.064 100.000 20.029 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 176.402 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 552.204 295.040 20.064 20.064 20.029 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 11.136 163.442 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 295.040 274.403 20.064 22.148 20.026 18.728 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 23.437 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 274.403 454.164 22.148 20.064 18.728 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 59.119 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 454.164 352.194 20.064 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 352.194 343.523 20.064 20.074 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 21.333 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 343.523 45.142 20.074 20.064 20.026 20.026 47.304 100.0 72.720 100.0 465.262 91.0 10.375 83.3 0.000 0.000 0.000 0.000 1.0 91.7 45.932 9.0 37.801 55.7 0.01 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 139.291 20.064 20.064 20.026 40.652 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 1.830 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 139.291 168.455 20.064 20.064 40.652 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 31.320 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 168.455 45.145 20.064 20.074 20.026 20.025 47.304 100.0 72.720 100.0 474.636 92.8 10.375 83.3 54.200 0.000 0.000 0.000 1.0 91.7 36.558 7.2 21.607 31.9 0.01 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.145 116.727 20.074 65.383 20.025 52.229 47.304 100.0 72.720 100.0 506.107 99.0 11.433 91.8 77.828 0.000 0.750 0.000 0.0 100.0 5.087 1.0 5.087 7.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.727 298.460 65.383 20.064 52.229 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 86.230 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 298.460 167.551 20.064 20.064 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 167.551 288.307 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 40.493 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 288.307 383.589 20.066 20.065 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 51.817 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 383.589 399.993 20.065 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 95.196 188.416 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 399.993 536.265 20.064 23.949 20.028 38.464 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 126.796 277.410 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 536.265 488.708 23.949 20.065 38.464 34.900 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 80.584 253.513 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 488.708 361.783 20.065 20.066 34.900 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 44.847 143.571 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 361.783 428.331 20.066 20.064 20.026 20.542 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 23.934 15.940 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 428.331 500.983 20.064 20.064 20.542 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 131.602 314.458 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 500.983 474.425 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 55.843 205.637 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 474.425 426.572 20.064 45.740 20.026 41.369 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 46.364 162.599 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 426.572 526.153 45.740 36.221 41.369 41.275 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 33.876 40.348 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 338.909 337.626 27.651 24.091 27.537 26.260 47.304 100.0 72.720 100.0 508.770 99.5 12.299 98.7 153.585 12.881 44.353 78.239 0.0 99.6 2.424 0.5 1.823 2.7 0.03 44 2

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 164
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.30: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 125 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 417.737 200.000 20.076 125.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 82.906 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 417.737 352.829 20.076 19.659 20.025 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 352.829 244.006 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 244.006 121.900 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 121.900 204.534 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 204.534 50.373 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 26.842 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 50.373 144.163 20.070 20.073 20.027 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 1.264 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 144.163 305.100 20.073 20.064 20.025 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 27.904 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 305.100 386.646 20.064 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 386.646 565.016 20.064 20.066 20.026 22.752 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 54.949 144.572 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 565.016 512.622 20.066 20.066 22.752 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 53.269 318.861 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 512.622 528.704 20.066 20.066 20.025 27.855 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 35.840 233.605 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 528.704 481.398 20.066 20.065 27.855 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 52.143 252.516 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 481.398 393.825 20.065 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 19.476 171.367 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 393.825 489.043 20.064 51.955 20.026 44.860 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 0.000 19.390 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 489.043 486.127 51.955 20.064 44.860 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 31.443 144.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 486.127 308.654 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 31.204 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.654 422.064 20.064 20.076 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 19.840 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 422.064 546.070 20.076 20.081 20.026 29.802 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 0.000 42.668 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 546.070 98.502 20.081 20.072 29.802 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 98.502 396.708 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 74.151 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 396.708 584.097 20.064 80.583 20.026 125.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 84.024 238.913 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 125.000 31.051 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 176.180 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 317.199 20.064 20.064 31.051 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 317.199 318.926 20.064 22.148 20.026 18.701 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 318.926 483.578 22.148 20.064 18.701 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 34.094 40.161 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 483.578 380.621 20.064 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 380.621 377.150 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 0.000 15.695 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 377.150 45.142 20.074 20.064 20.025 20.026 47.304 100.0 72.720 100.0 494.535 96.7 10.375 83.3 0.000 0.000 0.000 0.000 0.0 100.0 16.658 3.3 8.415 12.4 0.00 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 141.055 20.064 20.064 20.026 40.650 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 141.055 194.654 20.064 20.064 40.650 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 6.442 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 194.654 45.144 20.064 20.074 20.025 20.025 47.304 100.0 72.720 100.0 496.511 97.1 11.399 91.5 54.200 0.000 0.000 0.000 0.0 100.0 14.682 2.9 14.682 21.3 0.00 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.144 116.724 20.074 65.383 20.025 52.228 47.304 100.0 72.720 100.0 506.775 99.1 11.433 91.8 77.828 0.000 0.000 0.000 0.0 100.0 4.419 0.9 4.419 6.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.724 323.181 65.383 20.064 52.228 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 61.336 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 323.181 191.437 20.064 20.064 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 191.437 336.173 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 15.542 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 336.173 409.470 20.066 20.065 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 26.924 45.422 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 409.470 425.069 20.065 20.064 20.026 19.666 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 70.030 214.415 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 425.069 561.081 20.064 23.949 19.666 38.448 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 101.213 302.604 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 561.081 528.223 23.949 20.065 38.448 20.086 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 55.651 278.329 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 528.223 386.347 20.065 20.066 20.086 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 5.375 178.067 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 386.347 452.941 20.066 20.064 20.025 19.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 0.000 39.146 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 452.941 525.783 20.064 20.064 19.610 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 105.672 339.176 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 525.783 499.169 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 30.676 230.437 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 499.169 454.199 20.064 45.740 20.026 38.321 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 21.248 187.343 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 454.199 550.757 45.740 36.221 38.321 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 5.937 68.193 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 363.143 362.395 27.651 24.091 28.061 26.241 47.304 100.0 72.720 100.0 510.416 99.8 12.366 99.3 153.585 12.881 27.251 92.542 0.0 100.0 0.777 0.2 0.598 0.9 0.00 46 0

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 165
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.31: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 133 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 425.659 200.000 20.076 133.000 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 82.853 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 425.659 360.525 20.076 19.659 20.027 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 360.525 251.439 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 251.439 129.052 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 129.052 211.408 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 211.408 56.955 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 26.842 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 56.955 151.714 20.070 20.073 20.027 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 151.714 320.268 20.073 20.064 20.025 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 19.867 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 320.268 401.384 20.064 20.064 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 401.384 572.958 20.064 20.066 20.026 22.747 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 46.878 159.379 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 572.958 520.540 20.066 20.066 22.747 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 45.211 326.803 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 520.540 536.627 20.066 20.066 20.025 27.850 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 27.786 238.412 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 536.627 489.454 20.066 20.065 27.850 19.905 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 44.067 260.440 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 489.454 401.699 20.065 20.064 19.905 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 11.568 179.456 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 401.699 489.043 20.064 51.955 20.026 44.860 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 0.000 27.324 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 489.043 494.037 51.955 20.064 44.860 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 23.390 144.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 494.037 308.654 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 39.172 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.654 429.997 20.064 20.076 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 11.790 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 429.997 546.072 20.076 20.081 20.028 29.802 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 0.000 50.661 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 546.072 98.504 20.081 20.072 29.802 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 98.504 404.624 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 66.354 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 404.624 584.097 20.064 80.583 20.026 133.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 76.173 246.892 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 133.000 39.009 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 176.109 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 325.012 20.064 20.064 39.009 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 325.012 326.522 20.064 22.148 20.026 18.701 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 326.522 491.514 22.148 20.064 18.701 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 26.027 47.827 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 491.514 388.298 20.064 20.064 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 388.298 377.141 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 0.000 23.445 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 377.141 45.142 20.074 20.064 20.025 20.026 47.304 100.0 72.720 100.0 494.528 96.7 10.375 83.3 0.000 0.000 0.000 0.000 0.0 100.0 16.666 3.3 8.423 12.4 0.00 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 141.055 20.064 20.064 20.026 40.650 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 141.055 200.957 20.064 20.064 40.650 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 200.957 45.140 20.064 20.074 20.025 20.025 47.304 100.0 72.720 100.0 502.004 98.2 11.399 91.5 54.200 0.000 0.000 0.000 0.0 100.0 9.189 1.8 9.189 13.3 0.00 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.140 116.724 20.074 65.383 20.025 52.228 47.304 100.0 72.720 100.0 506.771 99.1 11.433 91.8 77.828 0.000 0.000 0.000 0.0 100.0 4.423 0.9 4.423 6.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.724 331.092 65.383 20.064 52.228 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 53.282 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 331.092 199.089 20.064 20.064 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 199.089 351.506 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 7.494 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 351.506 417.386 20.066 20.065 20.026 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 18.887 60.885 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 417.386 432.991 20.065 20.064 20.028 19.661 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 62.242 222.366 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 432.991 569.022 20.064 23.949 19.661 38.443 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 93.375 310.563 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 569.022 536.147 23.949 20.065 38.443 20.081 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 47.593 286.270 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 536.147 391.621 20.065 20.066 20.081 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 0.000 185.990 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 391.621 452.941 20.066 20.064 20.025 19.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 0.000 44.463 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 452.941 533.720 20.064 20.064 19.610 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 97.601 339.176 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 533.720 507.088 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 22.872 238.373 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 507.088 462.082 20.064 45.740 20.026 38.311 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 13.211 195.262 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 462.082 556.582 45.740 36.221 38.311 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 0.000 76.135 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 369.089 368.468 27.651 24.091 28.578 26.584 47.304 100.0 72.720 100.0 510.535 99.9 12.366 99.3 153.585 12.881 23.362 96.177 0.0 100.0 0.658 0.1 0.479 0.7 0.00 46 0

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 166
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.32: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 150 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 442.472 200.000 20.076 150.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 82.740 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 442.472 361.253 20.076 19.659 20.025 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 15.675 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 361.253 252.142 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 252.142 129.729 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 129.729 212.058 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 212.058 57.578 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 26.842 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 57.578 152.312 20.070 20.073 20.027 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 152.312 337.610 20.073 20.064 20.025 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 3.090 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 337.610 418.252 20.064 20.064 20.027 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 418.252 574.459 20.064 20.066 20.026 38.152 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 30.029 176.324 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 574.459 537.367 20.066 20.066 38.152 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 43.539 328.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 537.367 553.465 20.066 20.066 20.025 27.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 10.965 253.269 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 553.465 506.229 20.066 20.065 27.840 20.029 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 26.906 277.277 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 506.229 413.171 20.065 20.064 20.029 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 0.000 196.301 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 413.171 489.043 20.064 51.955 20.026 44.860 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 0.000 35.738 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 489.043 510.863 51.955 20.064 44.860 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 6.581 144.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 510.863 308.654 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 56.118 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.654 441.594 20.064 20.076 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 441.594 546.070 20.076 20.081 20.025 29.802 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 0.000 62.345 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 546.070 98.502 20.081 20.072 29.802 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 98.502 421.442 20.072 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 49.241 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 421.442 584.097 20.064 80.583 20.026 150.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 58.932 259.937 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 150.000 55.919 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 175.959 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 341.626 20.064 20.064 55.919 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 341.626 342.687 20.064 22.148 20.026 18.701 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 342.687 508.394 22.148 20.064 18.701 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 8.884 64.136 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 508.394 392.860 20.064 20.064 20.028 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 10.662 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 392.860 377.139 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 0.000 26.485 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 377.139 45.142 20.074 20.064 20.025 20.026 47.304 100.0 72.720 100.0 494.526 96.7 10.375 83.3 0.000 0.000 0.000 0.000 0.0 100.0 16.668 3.3 8.424 12.4 0.00 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 141.055 20.064 20.064 20.026 40.650 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 141.055 200.957 20.064 20.064 40.650 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 200.957 45.140 20.064 20.074 20.025 20.025 47.304 100.0 72.720 100.0 502.004 98.2 11.399 91.5 54.200 0.000 0.000 0.000 0.0 100.0 9.189 1.8 9.189 13.3 0.00 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.140 116.724 20.074 65.383 20.025 52.228 47.304 100.0 72.720 100.0 506.771 99.1 11.433 91.8 77.828 0.000 0.000 0.000 0.0 100.0 4.423 0.9 4.423 6.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.724 347.931 65.383 20.064 52.228 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 36.169 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 347.931 215.386 20.064 20.064 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 215.386 374.709 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 374.709 434.151 20.066 20.065 20.026 20.024 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 2.104 84.280 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 434.151 449.827 20.065 20.064 20.024 19.651 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 45.126 239.204 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 449.827 578.743 20.064 23.949 19.651 45.607 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 76.214 327.474 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 578.743 552.984 23.949 20.065 45.607 20.071 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 37.675 295.992 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 552.984 391.611 20.065 20.066 20.071 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 0.000 202.828 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 391.611 452.941 20.066 20.064 20.025 19.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 0.000 44.453 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 452.941 550.602 20.064 20.064 19.610 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 80.451 339.176 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 550.602 523.934 20.064 20.064 20.028 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 5.773 255.256 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 523.934 475.332 20.064 45.740 20.028 38.296 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 0.000 212.108 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 475.332 556.567 45.740 36.221 38.296 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 0.000 89.485 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 377.378 376.757 27.651 24.091 30.178 27.814 47.304 100.0 72.720 100.0 510.535 99.9 12.366 99.3 153.585 12.881 16.965 102.558 0.0 100.0 0.658 0.1 0.479 0.7 0.00 46 0

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 167
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.33: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 175 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 467.214 200.000 20.076 175.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 82.574 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 467.214 361.253 20.076 19.659 20.025 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 39.557 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 361.253 252.142 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 252.142 129.729 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 129.729 212.058 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 212.058 57.578 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 26.842 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 57.578 152.312 20.070 20.073 20.027 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 152.312 340.664 20.073 20.064 20.025 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 340.664 421.225 20.064 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 421.225 574.459 20.064 20.066 20.026 63.020 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 4.833 179.310 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 574.459 562.831 20.066 20.066 63.020 19.318 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 43.300 328.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 562.831 563.584 20.066 20.066 19.318 27.833 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 0.000 278.733 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 563.584 531.078 20.066 20.065 27.833 20.035 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 2.044 287.396 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 531.078 413.177 20.065 20.064 20.035 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 0.000 221.250 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 413.177 489.043 20.064 51.955 20.026 44.860 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 0.000 35.738 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 489.043 517.351 51.955 20.064 44.860 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 0.000 144.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 517.351 308.654 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 62.652 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.654 441.594 20.064 20.076 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 441.594 546.070 20.076 20.081 20.025 29.802 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 0.000 62.345 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 546.070 98.502 20.081 20.072 29.802 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 98.502 446.227 20.072 20.064 20.028 20.031 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 24.075 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 446.227 584.097 20.064 80.583 20.031 175.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 33.632 284.833 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 175.000 80.787 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 175.737 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 366.130 20.064 20.064 80.787 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 366.130 361.875 20.064 22.148 20.025 18.701 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 0.000 4.832 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 361.875 517.179 22.148 20.064 18.701 20.030 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 0.000 83.492 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 517.179 392.862 20.064 20.064 20.030 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 18.326 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 392.862 377.139 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 0.000 26.487 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 377.139 45.142 20.074 20.064 20.025 20.026 47.304 100.0 72.720 100.0 494.526 96.7 10.375 83.3 0.000 0.000 0.000 0.000 0.0 100.0 16.668 3.3 8.424 12.4 0.00 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 141.055 20.064 20.064 20.026 40.650 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 141.055 200.957 20.064 20.064 40.650 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 200.957 45.140 20.064 20.074 20.025 20.025 47.304 100.0 72.720 100.0 502.004 98.2 11.399 91.5 54.200 0.000 0.000 0.000 0.0 100.0 9.189 1.8 9.189 13.3 0.00 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.140 116.724 20.074 65.383 20.025 52.228 47.304 100.0 72.720 100.0 506.771 99.1 11.433 91.8 77.828 0.000 0.000 0.000 0.0 100.0 4.423 0.9 4.423 6.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.724 372.719 65.383 20.064 52.228 20.034 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 11.702 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 372.719 239.406 20.064 20.064 20.034 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 239.406 398.041 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 398.041 436.228 20.066 20.065 20.026 20.024 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 0.000 103.912 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 436.228 474.212 20.065 20.064 20.024 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 20.296 241.290 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 474.212 578.743 20.064 23.949 20.027 70.475 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 51.370 351.965 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 578.743 567.431 23.949 20.065 70.475 30.399 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 37.487 295.992 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 567.431 401.793 20.065 20.066 30.399 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 0.000 217.274 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 401.793 452.941 20.066 20.064 20.025 19.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 0.000 54.719 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 452.941 561.783 20.064 20.064 19.610 33.708 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 55.551 339.176 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 561.783 543.202 20.064 20.064 33.708 20.033 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 0.000 266.437 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 543.202 475.337 20.064 45.740 20.033 38.296 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 0.000 231.376 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 475.337 556.567 45.740 36.221 38.296 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 0.000 89.490 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 384.523 383.902 27.651 24.091 33.402 30.495 47.304 100.0 72.720 100.0 510.535 99.9 12.366 99.3 153.585 12.881 11.796 108.037 0.0 100.0 0.658 0.1 0.479 0.7 0.00 46 0

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 168
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.34: Resumen balance hídrico por simulación embalse Jarpaña; área: 30,844 ha; V.U.: 200 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Jarpaña en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Jarpa- Lagu- con sin Anual Mensual Lagunillas
ro lados tía ña nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Ejrj Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 491.958 200.000 20.076 200.000 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.279 80.183 82.407 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 491.958 361.253 20.076 19.659 20.025 36.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 75.362 0.000 0.000 64.484 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 361.253 252.142 19.659 20.064 36.000 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 63.748 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 252.142 129.729 20.064 20.066 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 108.783 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 129.729 212.058 20.066 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 114.705 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 212.058 57.578 20.064 20.070 20.026 20.027 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 26.842 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 57.578 152.312 20.070 20.073 20.027 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.565 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 152.312 340.664 20.073 20.064 20.025 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 221.755 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 340.664 421.225 20.064 20.064 20.028 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 113.683 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 421.225 574.459 20.064 20.066 20.026 67.821 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 236.048 23.279 0.000 179.310 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 574.459 562.831 20.066 20.066 67.821 44.131 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 264.776 13.563 23.313 328.304 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 562.831 570.324 20.066 20.066 44.131 45.694 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 213.089 0.000 0.000 278.733 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 570.324 550.886 20.066 20.065 45.694 19.972 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 226.488 0.000 0.000 294.137 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 550.886 413.115 20.065 20.064 19.972 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 207.521 0.000 0.000 241.133 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 413.115 489.043 20.064 51.955 20.026 44.860 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.007 0.000 0.000 35.738 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 489.043 517.351 51.955 20.064 44.860 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 150.487 0.000 0.000 144.361 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 517.351 308.654 20.064 20.064 20.026 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 36.529 0.000 0.000 62.652 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 308.654 441.594 20.064 20.076 20.026 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 161.288 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 441.594 546.070 20.076 20.081 20.025 29.802 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 87.826 0.000 0.000 62.345 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 546.070 98.502 20.081 20.072 29.802 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 98.502 466.967 20.072 20.064 20.028 23.385 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 307.539 57.719 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 466.967 584.097 20.064 80.583 23.385 200.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 248.399 19.251 11.950 305.662 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 200.000 105.655 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 258.617 113.405 175.516 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 390.648 20.064 20.064 105.655 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 134.845 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 390.648 361.875 20.064 22.148 20.025 18.701 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 98.181 0.000 0.000 29.557 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 361.875 517.179 22.148 20.064 18.701 20.030 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.802 3.686 0.000 83.492 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 517.179 392.862 20.064 20.064 20.030 20.028 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 0.000 0.000 0.000 18.326 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 392.862 377.139 20.064 20.074 20.028 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 110.808 0.000 0.000 26.487 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 377.139 45.142 20.074 20.064 20.025 20.026 47.304 100.0 72.720 100.0 494.526 96.7 10.375 83.3 0.000 0.000 0.000 0.000 0.0 100.0 16.668 3.3 8.424 12.4 0.00 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.142 141.055 20.064 20.064 20.026 40.650 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 94.937 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 141.055 200.957 20.064 20.064 40.650 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 80.035 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 200.957 45.140 20.064 20.074 20.025 20.025 47.304 100.0 72.720 100.0 502.004 98.2 11.399 91.5 54.200 0.000 0.000 0.000 0.0 100.0 9.189 1.8 9.189 13.3 0.00 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.140 116.724 20.074 65.383 20.025 52.228 47.304 100.0 72.720 100.0 506.771 99.1 11.433 91.8 77.828 0.000 0.000 0.000 0.0 100.0 4.423 0.9 4.423 6.5 0.00 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.724 384.274 65.383 20.064 52.228 20.037 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 203.097 28.108 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 384.274 250.614 20.064 20.064 20.037 20.025 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 74.275 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 250.614 408.939 20.064 20.066 20.025 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.242 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 408.939 436.228 20.066 20.065 20.026 20.024 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 217.029 0.000 0.000 114.861 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 436.228 494.231 20.065 20.064 20.024 20.032 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.817 53.141 0.000 241.290 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 494.231 578.743 20.064 23.949 20.032 95.343 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 373.834 92.962 26.520 372.067 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 578.743 567.431 23.949 20.065 95.343 55.212 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 209.029 8.836 37.299 295.992 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 567.431 426.276 20.065 20.066 55.212 20.026 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 151.036 0.000 0.000 217.274 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 426.276 452.942 20.066 20.064 20.026 19.610 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 160.901 0.000 0.000 75.545 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 452.942 561.783 20.064 20.064 19.610 58.576 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 384.656 98.393 30.341 339.177 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 561.783 554.283 20.064 20.064 58.576 33.619 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 181.868 0.000 0.000 266.437 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 554.283 488.750 20.064 45.740 33.619 38.280 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 204.757 0.000 0.000 242.457 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 488.750 556.552 45.740 36.221 38.280 41.277 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 105.419 0.000 0.000 103.001 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 388.852 388.231 27.651 24.091 38.049 34.598 47.304 100.0 72.720 100.0 510.535 99.9 12.366 99.3 153.585 12.881 8.421 111.811 0.0 100.0 0.658 0.1 0.479 0.7 0.00 46 0

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 169
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.35: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 25 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 304.101 200.000 20.072 25.000 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 48.017 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 304.101 169.309 20.072 20.865 20.066 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 36.469 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 169.309 45.142 20.865 20.064 25.000 20.062 47.304 100.0 72.720 100.0 453.147 88.6 10.375 83.3 82.363 0.000 34.480 0.000 1.0 91.7 58.046 11.4 46.145 68.0 0.01 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 45.142 42.772 20.064 20.066 20.062 20.063 47.304 100.0 71.656 98.5 329.817 64.5 8.259 66.3 134.023 0.000 34.196 0.000 4.0 66.7 181.377 35.5 67.838 100.0 0.13 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 42.772 45.142 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 484.886 94.9 10.375 83.3 145.977 0.000 48.841 0.000 0.0 100.0 26.307 5.1 18.817 27.3 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 45.142 40.137 20.064 20.064 20.062 20.062 47.304 100.0 66.836 91.9 324.928 63.6 7.235 58.1 43.015 0.000 31.498 0.000 4.0 66.7 186.265 36.4 57.422 100.0 0.13 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 40.137 56.066 20.064 20.069 20.062 20.066 47.304 100.0 72.720 100.0 481.470 94.2 11.433 91.8 166.820 0.000 55.915 0.000 1.0 91.7 29.723 5.8 29.723 43.8 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 56.066 112.603 20.069 20.062 20.066 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 69.838 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 112.603 84.850 20.062 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 54.364 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 84.850 306.628 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 83.784 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 306.628 401.580 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 81.371 68.480 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 401.580 422.694 20.066 20.066 20.063 24.577 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 73.121 122.085 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 422.694 360.223 20.066 20.065 24.577 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 82.378 151.316 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 360.223 279.491 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 65.338 53.178 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 279.491 293.091 20.064 54.342 20.062 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 56.955 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 293.091 323.213 54.342 20.064 25.000 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 62.947 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 323.213 105.596 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 30.505 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 105.596 116.550 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 65.755 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 116.550 185.660 20.064 20.081 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 60.998 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 185.660 29.291 20.081 20.065 20.066 20.063 47.304 100.0 64.799 89.1 233.974 45.8 6.177 49.6 0.000 0.000 0.000 0.000 6.0 50.0 277.219 54.2 67.838 100.0 0.29 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 29.291 214.737 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 94.462 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 214.737 584.118 20.064 80.583 20.062 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 101.216 36.869 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.118 448.584 80.583 20.064 25.000 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 97.952 376.267 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 448.584 201.023 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 45.463 59.822 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 201.023 103.039 20.064 22.622 20.062 22.280 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 52.173 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 103.039 198.831 22.622 20.064 22.280 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 74.752 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 198.831 66.293 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 488.966 95.7 11.399 91.5 6.857 0.000 17.961 0.000 1.0 91.7 22.227 4.3 22.227 38.7 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 66.293 45.143 20.064 20.071 20.066 20.066 47.304 100.0 72.720 100.0 454.508 88.9 10.375 83.3 144.156 0.000 53.682 0.000 1.0 91.7 56.686 11.1 41.569 60.2 0.01 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 45.143 34.206 20.071 20.064 20.066 20.062 47.304 100.0 53.638 73.8 201.776 39.5 3.072 24.7 0.000 0.000 4.514 0.000 8.0 33.3 309.417 60.5 57.422 100.0 0.37 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 34.206 108.099 20.064 20.064 20.062 25.000 47.304 100.0 72.720 100.0 459.960 90.0 11.399 91.5 121.537 0.000 42.616 0.000 1.0 91.7 51.233 10.0 51.233 89.2 0.01 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 108.099 49.096 20.064 20.064 25.000 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 49.773 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 49.096 37.186 20.064 20.072 20.062 20.066 47.304 100.0 62.543 86.0 325.149 63.6 8.293 66.6 71.409 0.000 33.740 0.000 4.0 66.7 186.045 36.4 67.838 100.0 0.13 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 37.186 111.856 20.072 65.384 20.066 25.000 47.304 100.0 72.720 100.0 427.333 83.6 10.375 83.3 109.560 0.000 53.254 0.000 2.0 83.3 83.860 16.4 60.877 89.7 0.03 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 111.856 201.478 65.384 20.064 25.000 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 74.397 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 201.478 45.131 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 460.044 90.0 11.399 91.5 102.248 0.000 38.021 0.000 1.0 91.7 51.150 10.0 51.150 74.1 0.01 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 45.131 80.132 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 506.942 99.2 11.399 91.5 237.838 0.000 62.291 0.000 0.0 100.0 4.252 0.8 4.252 9.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 80.132 86.445 20.064 20.065 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 68.755 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 86.445 214.451 20.065 20.064 20.063 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 92.171 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 214.451 454.196 20.064 25.454 20.063 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 114.510 94.158 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 454.196 420.194 25.454 20.065 25.000 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 78.788 176.270 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 420.194 280.081 20.065 20.067 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 56.666 74.764 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 280.081 271.556 20.067 20.064 20.066 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 49.520 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 271.556 411.150 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 112.903 160.359 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 411.150 384.935 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 70.262 124.360 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 384.935 347.420 20.064 45.428 20.062 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 78.180 81.687 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 347.420 402.141 45.428 38.975 25.000 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 58.966 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 211.058 207.080 27.765 24.264 21.068 21.068 47.304 100.0 71.761 98.7 478.067 93.5 11.526 92.5 192.075 12.887 59.864 37.969 0.7 93.8 33.126 6.5 14.008 21.7 2.46 34 12

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 170
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.36: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 50 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 330.414 200.000 20.072 50.000 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 46.043 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 330.414 221.954 20.072 20.865 20.061 28.691 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 4.813 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 221.954 53.249 20.865 20.064 28.691 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 13.332 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 53.249 45.145 20.064 20.066 20.062 20.063 47.304 100.0 71.656 98.5 356.875 69.8 8.259 66.3 134.023 0.000 9.330 0.000 3.0 75.0 154.319 30.2 67.838 100.0 0.09 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 45.129 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 509.161 99.6 11.399 91.5 145.977 0.000 22.206 0.000 0.0 100.0 2.032 0.4 2.032 2.9 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 45.129 42.479 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 343.378 67.2 8.293 66.6 43.015 0.000 3.414 0.000 4.0 66.7 167.816 32.8 57.422 100.0 0.11 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.479 50.760 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 28.821 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 50.760 132.739 20.069 20.062 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 43.703 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 132.739 130.210 20.062 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 27.466 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 130.210 375.274 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 58.764 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 375.274 426.212 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 56.398 133.707 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 426.212 449.210 20.066 20.066 20.063 22.703 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 48.133 146.831 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 449.210 384.961 20.066 20.065 22.703 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 55.497 177.946 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 384.961 305.111 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 39.252 78.129 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 305.111 342.052 20.064 54.342 20.062 33.841 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 23.297 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 342.052 394.552 54.342 20.064 33.841 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 45.499 1.937 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 394.552 200.283 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 3.803 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 200.283 233.996 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 39.143 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 233.996 335.681 20.064 20.081 20.062 20.070 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 23.301 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 335.681 39.976 20.081 20.065 20.070 20.063 47.304 100.0 70.570 97.0 348.489 68.2 9.317 74.8 0.000 0.000 0.000 0.000 3.0 75.0 162.705 31.8 67.838 100.0 0.10 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 39.976 249.674 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 69.481 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 249.674 584.097 20.064 80.583 20.062 47.997 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 56.887 92.207 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 473.364 80.583 20.064 47.997 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 95.772 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 473.364 225.158 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 20.450 84.602 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 225.158 154.755 20.064 22.622 20.062 18.203 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 27.417 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 154.755 273.467 22.622 20.064 18.203 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 45.875 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 273.467 129.507 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 129.507 67.778 20.064 20.071 20.066 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 26.369 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 67.778 35.627 20.071 20.064 20.062 20.062 47.304 100.0 57.573 79.2 220.488 43.1 4.095 32.9 0.000 0.000 0.000 0.000 8.0 33.3 290.705 56.9 57.422 100.0 0.32 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 35.627 107.947 20.064 20.064 20.062 25.647 47.304 100.0 72.720 100.0 485.023 94.9 11.399 91.5 121.537 0.000 15.062 0.000 1.0 91.7 26.170 5.1 26.170 45.6 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.947 72.980 20.064 20.064 25.647 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 25.717 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 72.980 45.148 20.064 20.072 20.061 20.061 47.304 100.0 66.313 91.2 358.050 70.0 9.317 74.8 71.409 0.000 6.755 0.000 3.0 75.0 153.143 30.0 67.838 100.0 0.09 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.148 116.933 20.072 65.384 20.061 37.889 47.304 100.0 72.720 100.0 451.317 88.3 11.433 91.8 109.560 0.000 14.852 0.000 1.0 91.7 59.876 11.7 59.876 88.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.933 230.954 65.384 20.064 37.889 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 62.149 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 230.954 45.092 20.064 20.064 20.062 19.832 47.304 100.0 72.720 100.0 507.748 99.3 11.399 91.5 102.248 0.000 13.155 0.000 0.0 100.0 3.445 0.7 3.445 5.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 45.092 104.886 20.064 20.064 19.832 20.062 47.304 100.0 72.720 100.0 506.697 99.1 11.399 91.5 237.838 0.000 36.925 0.000 0.0 100.0 4.497 0.9 4.497 9.6 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 104.886 135.065 20.064 20.065 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 43.162 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 135.065 286.274 20.065 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 67.197 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 286.274 478.867 20.064 25.454 20.062 30.297 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 84.291 166.677 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 478.867 444.868 25.454 20.065 30.297 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 59.121 201.046 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 444.868 305.626 20.065 20.067 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 30.497 99.547 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 305.626 320.557 20.067 20.064 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 24.464 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 320.557 436.628 20.064 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 87.102 209.806 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 436.628 409.624 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 45.283 150.029 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 409.624 380.316 20.064 45.428 20.062 29.698 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 39.841 102.580 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 380.316 459.465 45.428 38.975 29.698 31.851 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 30.916 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 244.341 241.610 27.765 24.264 22.760 22.366 47.304 100.0 72.130 99.2 488.917 95.6 11.842 95.1 192.075 12.887 35.238 47.570 0.5 95.8 22.276 4.4 9.008 14.2 1.59 39 7

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 171
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.37: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 65 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 345.218 200.000 20.072 65.000 20.065 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 45.977 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 345.218 240.900 20.072 20.865 20.065 28.686 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 240.900 84.468 20.865 20.064 28.686 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 84.468 45.145 20.064 20.066 20.062 20.063 47.304 100.0 71.656 98.5 392.038 76.7 9.317 74.8 134.023 0.000 0.000 0.000 2.0 83.3 119.155 23.3 67.838 100.0 0.05 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 56.212 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.977 0.000 7.378 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 56.212 42.407 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 356.271 69.7 8.293 66.6 43.015 0.000 0.000 0.000 3.0 75.0 154.922 30.3 57.422 100.0 0.09 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.407 65.269 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 13.977 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 65.269 161.299 20.069 20.062 20.061 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 28.657 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 161.299 172.303 20.062 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 12.637 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 172.303 431.001 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 43.679 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 431.001 441.036 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 41.332 189.687 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 441.036 464.048 20.066 20.066 20.063 22.692 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 33.068 161.721 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 464.048 399.813 20.066 20.065 22.692 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 40.401 192.845 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 399.813 319.813 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 24.207 93.106 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 319.813 370.902 20.064 54.342 20.062 33.841 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 8.495 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 370.902 409.331 54.342 20.064 33.841 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 30.623 29.475 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 409.331 218.228 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 218.228 266.153 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 24.282 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 266.153 381.415 20.064 20.081 20.062 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 8.421 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 381.415 44.502 20.081 20.065 20.069 20.063 47.304 100.0 71.624 98.5 382.266 74.8 10.375 83.3 0.000 0.000 0.000 0.000 2.0 83.3 128.927 25.2 67.838 100.0 0.06 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 44.502 268.855 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 54.415 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 268.855 584.097 20.064 80.583 20.062 62.969 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 42.014 111.509 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 488.279 80.583 20.064 62.969 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 95.658 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 488.279 239.706 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 5.859 99.517 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 239.706 183.517 20.064 22.622 20.062 18.190 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 12.535 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 183.517 316.166 22.622 20.064 18.190 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 30.797 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 316.166 170.326 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 170.326 121.640 20.064 20.071 20.066 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 11.324 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 121.640 40.651 20.071 20.064 20.061 20.062 47.304 100.0 61.628 84.7 259.572 50.8 5.153 41.4 0.000 0.000 0.000 0.000 7.0 41.7 251.622 49.2 57.422 100.0 0.24 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 40.651 107.849 20.064 20.064 20.062 25.633 47.304 100.0 72.720 100.0 502.760 98.4 11.399 91.5 121.537 0.000 0.612 0.000 0.0 100.0 8.434 1.6 8.434 14.7 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.849 87.542 20.064 20.064 25.633 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 10.844 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 87.542 45.149 20.064 20.072 20.062 20.061 47.304 100.0 70.388 96.8 372.813 72.9 9.317 74.8 71.409 0.000 0.000 0.000 3.0 75.0 138.381 27.1 67.838 100.0 0.07 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.887 20.072 65.384 20.061 38.274 47.304 100.0 72.720 100.0 464.212 90.8 11.433 91.8 109.560 0.000 0.000 0.000 1.0 91.7 46.981 9.2 46.981 69.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.887 245.702 65.384 20.064 38.274 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 47.469 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 245.702 67.340 20.064 20.064 20.062 19.820 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.248 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 67.340 135.122 20.064 20.064 19.820 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 237.838 0.000 21.859 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 135.122 178.863 20.064 20.065 20.062 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 28.117 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 178.863 343.737 20.065 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 52.130 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 343.737 493.698 20.064 25.454 20.062 30.297 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 69.225 220.874 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 493.698 459.696 25.454 20.065 30.297 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 44.056 215.938 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 459.696 320.296 20.065 20.067 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 15.471 114.439 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 320.296 349.428 20.067 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 9.626 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 349.428 451.478 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 72.017 238.924 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 451.478 424.453 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 30.425 164.988 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 424.453 395.726 20.064 45.428 20.062 28.983 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 25.194 117.474 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 395.726 478.770 45.428 38.975 28.983 31.852 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 15.354 10.780 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 264.800 262.488 27.765 24.264 23.404 22.683 47.304 100.0 72.330 99.5 492.750 96.4 11.980 96.2 192.075 12.887 23.003 54.445 0.4 96.7 18.444 3.6 8.125 12.7 1.16 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 172
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.38: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 75 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 355.064 200.000 20.072 75.000 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 45.938 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 355.064 250.408 20.072 20.865 20.061 28.686 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 250.408 93.579 20.865 20.064 28.686 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 93.579 45.145 20.064 20.066 20.062 20.063 47.304 100.0 71.656 98.5 398.981 78.0 10.375 83.3 134.023 0.000 0.000 0.000 2.0 83.3 112.213 22.0 67.838 100.0 0.05 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.145 63.407 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.977 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 63.407 42.357 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 361.662 70.7 9.317 74.8 43.015 0.000 0.000 0.000 3.0 75.0 149.531 29.3 57.422 100.0 0.09 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.357 74.968 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 4.129 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 74.968 180.402 20.069 20.062 20.061 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 18.852 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 180.402 200.481 20.062 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 2.786 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 200.481 468.358 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 33.856 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 468.358 450.924 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 31.292 227.201 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 450.924 473.943 20.066 20.066 20.063 22.685 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 23.247 171.652 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 473.943 409.721 20.066 20.065 22.685 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 30.579 197.756 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 409.721 329.631 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 14.180 103.095 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 329.631 388.902 20.064 54.342 20.062 33.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 388.902 419.201 54.342 20.064 33.840 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 20.828 47.620 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 419.201 227.771 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 227.771 285.258 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 14.242 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 285.258 408.146 20.064 20.081 20.062 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 408.146 42.052 20.081 20.065 20.069 20.063 47.304 100.0 72.720 100.0 406.659 79.6 10.375 83.3 0.000 0.000 0.000 0.000 2.0 83.3 104.535 20.4 61.089 88.5 0.04 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 42.052 276.351 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 44.375 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 276.351 584.097 20.064 80.583 20.062 72.952 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 31.962 119.063 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 498.226 80.583 20.064 72.952 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 95.590 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 498.226 245.570 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 0.000 109.464 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 245.570 194.583 20.064 22.622 20.062 22.665 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 2.511 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 194.583 336.787 22.622 20.064 22.665 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 25.428 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 336.787 190.072 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 190.072 150.440 20.064 20.071 20.066 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 1.471 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 150.440 45.153 20.071 20.064 20.061 20.062 47.304 100.0 61.628 84.7 280.269 54.8 6.177 49.6 0.000 0.000 0.000 0.000 6.0 50.0 230.924 45.2 57.422 100.0 0.20 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.153 107.824 20.064 20.064 20.062 25.633 47.304 100.0 72.720 100.0 507.276 99.2 11.399 91.5 121.537 0.000 0.000 0.000 0.0 100.0 3.918 0.8 3.918 6.8 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.824 97.145 20.064 20.064 25.633 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 0.832 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 97.145 45.149 20.064 20.072 20.061 20.061 47.304 100.0 70.388 96.8 381.241 74.6 9.317 74.8 71.409 0.000 0.000 0.000 3.0 75.0 129.953 25.4 67.838 100.0 0.06 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.887 20.072 65.384 20.061 38.274 47.304 100.0 72.720 100.0 464.212 90.8 11.433 91.8 109.560 0.000 0.000 0.000 1.0 91.7 46.981 9.2 46.981 69.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.887 255.569 65.384 20.064 38.274 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 37.641 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 255.569 76.830 20.064 20.064 20.062 19.820 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.248 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 76.830 154.107 20.064 20.064 19.820 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 237.838 0.000 11.985 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 154.107 206.996 20.064 20.065 20.062 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 18.310 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 206.996 365.781 20.065 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 42.091 15.817 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 365.781 503.590 20.064 25.454 20.062 30.297 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 59.185 243.031 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 503.590 469.586 25.454 20.065 30.297 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 34.225 225.870 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 469.586 330.102 20.065 20.067 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 5.868 124.370 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 330.102 368.543 20.067 20.064 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 368.543 461.381 20.064 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 62.189 258.198 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 461.381 434.344 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 20.385 170.966 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 434.344 405.553 20.064 45.428 20.062 28.973 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 15.167 127.407 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 405.553 488.582 45.428 38.975 28.973 31.852 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 5.493 20.702 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 276.424 274.325 27.765 24.264 23.935 22.997 47.304 100.0 72.354 99.5 494.279 96.7 12.048 96.7 192.075 12.887 16.405 58.813 0.4 96.9 16.914 3.3 7.881 12.3 0.98 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 173
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.39: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 100 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 379.781 200.000 20.072 100.000 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 45.849 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 379.781 274.304 20.072 20.865 20.061 28.686 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 274.304 116.501 20.865 20.064 28.686 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 116.501 45.143 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 417.884 81.7 10.375 83.3 134.023 0.000 0.000 0.000 2.0 83.3 93.310 18.3 50.935 75.1 0.03 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.143 63.405 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.977 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 63.405 42.356 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 361.662 70.7 9.317 74.8 43.015 0.000 0.000 0.000 3.0 75.0 149.531 29.3 57.422 100.0 0.09 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.356 78.987 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 78.987 202.857 20.069 20.062 20.061 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 202.857 224.861 20.062 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 224.861 516.991 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 8.945 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 516.991 475.658 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 6.664 270.836 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 475.658 494.769 20.066 20.066 20.063 25.002 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 0.000 196.493 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 494.769 434.692 20.066 20.065 25.002 19.948 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 7.996 218.581 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 434.692 343.596 20.065 20.064 19.948 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 0.000 128.266 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 343.596 402.450 20.064 54.342 20.062 33.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 402.450 439.925 54.342 20.064 33.840 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 0.000 61.273 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 439.925 247.825 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 247.825 318.930 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 318.930 440.791 20.064 20.081 20.062 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 440.791 41.933 20.081 20.065 20.069 20.063 47.304 100.0 72.720 100.0 435.197 85.1 10.375 83.3 0.000 0.000 0.000 0.000 1.0 91.7 75.996 14.9 61.089 88.5 0.02 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 41.933 300.953 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 19.526 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 300.953 584.097 20.064 80.583 20.062 97.914 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 7.042 143.895 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 523.100 80.583 20.064 97.914 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 95.437 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 523.100 245.570 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 0.000 134.339 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 245.570 194.583 20.064 22.622 20.062 25.162 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 194.583 361.560 22.622 20.064 25.162 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 2.856 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 361.560 213.822 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 213.822 174.789 20.064 20.071 20.066 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 174.789 45.154 20.071 20.064 20.061 20.062 47.304 100.0 65.663 90.3 298.164 58.3 6.177 49.6 0.000 0.000 0.000 0.000 6.0 50.0 213.030 41.7 57.422 100.0 0.17 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.154 107.824 20.064 20.064 20.062 25.633 47.304 100.0 72.720 100.0 507.276 99.2 11.399 91.5 121.537 0.000 0.000 0.000 0.0 100.0 3.917 0.8 3.917 6.8 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.824 97.956 20.064 20.064 25.633 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 97.956 45.149 20.064 20.072 20.061 20.061 47.304 100.0 70.388 96.8 381.953 74.7 9.317 74.8 71.409 0.000 0.000 0.000 3.0 75.0 129.241 25.3 67.838 100.0 0.06 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.887 20.072 65.384 20.061 38.274 47.304 100.0 72.720 100.0 464.212 90.8 11.433 91.8 109.560 0.000 0.000 0.000 1.0 91.7 46.981 9.2 46.981 69.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.887 280.263 65.384 20.064 38.274 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 12.832 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 280.263 100.604 20.064 20.064 20.062 19.820 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.248 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 100.604 188.792 20.064 20.064 19.820 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 237.838 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 188.792 258.684 20.064 20.065 20.062 20.048 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 258.684 390.551 20.065 20.064 20.048 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 17.233 66.450 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 390.551 528.396 20.064 25.454 20.066 30.293 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 34.332 267.924 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 528.396 494.361 25.454 20.065 30.293 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 9.367 246.800 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 494.361 335.852 20.065 20.067 20.060 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 0.000 149.246 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 335.852 374.134 20.067 20.064 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 374.134 486.212 20.064 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 37.074 263.538 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 486.212 454.655 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 0.000 195.898 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 454.655 420.623 20.064 45.428 20.062 28.960 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 0.000 147.803 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 420.623 493.950 45.428 38.975 28.960 31.852 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 0.000 34.352 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 293.379 291.397 27.765 24.264 25.123 23.641 47.304 100.0 72.465 99.6 495.715 97.0 12.048 96.7 192.075 12.887 6.634 66.715 0.3 97.1 15.478 3.0 7.513 11.7 0.84 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 174
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.40: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 125 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 404.518 200.000 20.072 125.000 20.057 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 45.770 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 404.518 298.249 20.072 20.865 20.057 28.686 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 298.249 139.498 20.865 20.064 28.686 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 139.498 45.143 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 437.946 85.7 10.375 83.3 134.023 0.000 0.000 0.000 2.0 83.3 73.248 14.3 42.451 61.5 0.02 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.143 63.405 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.977 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 63.405 42.356 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 361.662 70.7 9.317 74.8 43.015 0.000 0.000 0.000 3.0 75.0 149.531 29.3 57.422 100.0 0.09 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.356 78.987 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 78.987 202.857 20.069 20.062 20.061 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 202.857 224.861 20.062 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 224.861 525.868 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 525.868 482.260 20.064 20.066 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 0.000 279.713 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 482.260 494.769 20.066 20.066 20.062 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 0.000 203.122 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 494.769 442.636 20.066 20.065 25.000 19.946 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 0.000 218.581 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 442.636 343.594 20.065 20.064 19.946 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 0.000 136.271 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 343.594 402.448 20.064 54.342 20.062 33.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 402.448 439.925 54.342 20.064 33.840 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 0.000 61.271 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 439.925 247.825 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 247.825 318.930 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 318.930 440.791 20.064 20.081 20.062 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 440.791 41.933 20.081 20.065 20.069 20.063 47.304 100.0 72.720 100.0 435.197 85.1 10.375 83.3 0.000 0.000 0.000 0.000 1.0 91.7 75.996 14.9 61.089 88.5 0.02 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 41.933 320.508 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 320.508 584.097 20.064 80.583 20.062 104.932 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 0.000 163.627 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 548.020 80.583 20.064 104.932 20.075 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 77.353 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 548.020 245.581 20.064 20.064 20.075 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 0.000 159.259 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 245.581 194.594 20.064 22.622 20.062 25.162 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 194.594 364.405 22.622 20.064 25.162 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 364.405 216.552 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 216.552 177.425 20.064 20.071 20.066 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 177.425 45.154 20.071 20.064 20.061 20.062 47.304 100.0 65.663 90.3 300.533 58.8 6.177 49.6 0.000 0.000 0.000 0.000 6.0 50.0 210.660 41.2 57.422 100.0 0.17 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.154 107.824 20.064 20.064 20.062 25.633 47.304 100.0 72.720 100.0 507.276 99.2 11.399 91.5 121.537 0.000 0.000 0.000 0.0 100.0 3.917 0.8 3.917 6.8 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.824 97.956 20.064 20.064 25.633 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 97.956 45.149 20.064 20.072 20.061 20.061 47.304 100.0 70.388 96.8 381.953 74.7 9.317 74.8 71.409 0.000 0.000 0.000 3.0 75.0 129.241 25.3 67.838 100.0 0.06 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.887 20.072 65.384 20.061 38.274 47.304 100.0 72.720 100.0 464.212 90.8 11.433 91.8 109.560 0.000 0.000 0.000 1.0 91.7 46.981 9.2 46.981 69.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.887 293.193 65.384 20.064 38.274 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 293.193 113.064 20.064 20.064 20.062 19.820 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.248 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 113.064 200.809 20.064 20.064 19.820 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 237.838 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 200.809 270.334 20.064 20.065 20.062 20.048 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 270.334 408.644 20.065 20.064 20.048 19.240 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 0.000 78.207 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 408.644 553.255 20.064 25.454 19.240 30.286 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 8.649 286.103 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 553.255 503.642 25.454 20.065 30.286 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 0.000 270.503 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 503.642 335.852 20.065 20.067 20.060 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 0.000 155.922 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 335.852 374.134 20.067 20.064 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 374.134 511.088 20.064 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 12.186 263.538 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 511.088 454.655 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 0.000 215.742 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 454.655 420.623 20.064 45.428 20.062 28.960 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 0.000 147.803 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 420.623 493.950 45.428 38.975 28.960 31.852 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 0.000 34.352 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 299.335 297.353 27.765 24.264 25.801 23.776 47.304 100.0 72.465 99.6 496.203 97.1 12.048 96.7 192.075 12.887 3.130 69.939 0.3 97.1 14.991 2.9 7.329 11.4 0.81 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 175
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.3.41: Resumen balance hídrico por simulación embalse Millo; área: 30,844 ha; V.U.: 150 hm3; periodo 1964 – 2009.
Oferta Demanda Volumen Volumen Volumen Demanda Sectorial Atendida Excedentes Déficit Agrícola Déficit Agrícola Indice Satisfacción de
Hídrica Hídrica en Lagunillas en Paratía en Millo en el Sistema Integral Lagunillas Hídricos en Tiempo en Volumen de la Demanda en el
Año Total Pobla - Eco- Agrí - Industri- Total Inicio Final Inicio Final Inicio Final Poblacional Ecológica Agrícola Industrial, No Regulados Meses Periodo Total Máximo Déficit Sistema Integral
SIL cional lógica cola al, Mine- de Año de Año de Año de Año de Año de Año Minero Regu - Para- Millo Lagu- con sin Anual Mensual Lagunillas
ro lados tía nillas Déficit Déficit
OHSil Dp De Da Dim D Vui Vudf Vui Vudf Vui Vudf Dpa Dea Daa Dima Enr Eprp Emrq Elrc * ** *** ID
(hm3) (hm3) (hm3) (hm3) (hm3) (hm3) (% Dp) (hm3) (% De) (hm3) (% Da) (hm3) (% Dim) (hm3) (N°) (%) (hm3) (%Da) (hm3) (%Da) Si No

1 1964 714.215 47.304 72.720 511.193 12.457 643.674 585.130 429.354 200.000 20.072 150.000 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 118.532 78.674 45.699 166.947 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
2 1965 752.932 47.304 72.720 511.193 12.457 643.674 429.354 321.757 20.072 20.865 20.061 28.686 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 95.685 0.000 0.000 0.593 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
3 1966 660.938 47.304 72.720 511.193 12.457 643.674 321.757 162.104 20.865 20.064 28.686 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 82.363 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
4 1967 704.391 47.304 72.720 511.193 12.457 643.674 162.104 45.143 20.064 20.066 20.062 20.063 47.304 100.0 72.720 100.0 457.687 89.5 10.375 83.3 134.023 0.000 0.000 0.000 1.0 91.7 53.506 10.5 42.526 61.6 0.01 X
5 1968 913.251 47.304 72.720 511.193 12.457 643.674 45.143 63.405 20.066 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 145.977 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
6 1969 584.222 47.304 72.720 511.193 12.457 643.674 63.405 42.356 20.064 20.064 20.062 20.062 47.304 100.0 70.366 96.8 361.662 70.7 9.317 74.8 43.015 0.000 0.000 0.000 3.0 75.0 149.531 29.3 57.422 100.0 0.09 X
7 1970 956.863 47.304 72.720 511.193 12.457 643.674 42.356 78.987 20.064 20.069 20.062 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.820 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
8 1971 1,165.168 47.304 72.720 511.193 12.457 643.674 78.987 202.857 20.069 20.062 20.061 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 271.428 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
9 1972 926.589 47.304 72.720 511.193 12.457 643.674 202.857 224.861 20.062 20.064 20.060 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 147.454 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
10 1973 1,399.561 47.304 72.720 511.193 12.457 643.674 224.861 525.868 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 294.752 23.279 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
11 1974 1,362.604 47.304 72.720 511.193 12.457 643.674 525.868 482.260 20.064 20.066 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.779 13.562 0.000 279.713 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
12 1975 1,263.268 47.304 72.720 511.193 12.457 643.674 482.260 494.769 20.066 20.066 20.062 25.000 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 261.486 0.000 0.000 203.122 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
13 1976 1,225.871 47.304 72.720 511.193 12.457 643.674 494.769 442.636 20.066 20.065 25.000 19.946 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 276.857 0.000 0.000 218.581 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
14 1977 1,059.765 47.304 72.720 511.193 12.457 643.674 442.636 343.594 20.065 20.064 19.946 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 247.289 0.000 0.000 136.271 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
15 1978 1,016.615 47.304 72.720 511.193 12.457 643.674 343.594 402.448 20.064 54.342 20.062 33.840 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 149.266 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
16 1979 1,008.507 47.304 72.720 511.193 12.457 643.674 402.448 439.925 54.342 20.064 33.840 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 189.674 0.000 0.000 61.271 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
17 1980 603.958 47.304 72.720 511.193 12.457 643.674 439.925 247.825 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 47.021 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
18 1981 1,044.877 47.304 72.720 511.193 12.457 643.674 247.825 318.930 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 206.498 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
19 1982 996.879 47.304 72.720 511.193 12.457 643.674 318.930 440.791 20.064 20.081 20.062 20.069 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 117.487 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
20 1983 248.299 47.304 72.720 511.193 12.457 643.674 440.791 41.933 20.081 20.065 20.069 20.063 47.304 100.0 72.720 100.0 435.197 85.1 10.375 83.3 0.000 0.000 0.000 0.000 1.0 91.7 75.996 14.9 61.089 88.5 0.02 X
21 1984 1,498.004 47.304 72.720 511.193 12.457 643.674 41.933 320.508 20.065 20.064 20.063 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 375.197 58.838 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
22 1985 1,694.739 47.304 72.720 511.193 12.457 643.674 320.508 584.097 20.064 80.583 20.062 104.932 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 319.967 18.365 0.000 163.627 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
23 1986 1,499.026 47.304 72.720 511.193 12.457 643.674 584.097 566.041 80.583 20.064 104.932 27.018 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 320.641 113.033 52.569 376.247 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
24 1987 795.323 47.304 72.720 511.193 12.457 643.674 566.041 252.388 20.064 20.064 27.018 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 166.909 0.000 0.000 177.279 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
25 1988 849.906 47.304 72.720 511.193 12.457 643.674 252.388 201.182 20.064 22.622 20.062 25.162 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 136.600 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
26 1989 1,185.192 47.304 72.720 511.193 12.457 643.674 201.182 370.806 22.622 20.064 25.162 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 246.290 4.165 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
27 1990 596.652 47.304 72.720 511.193 12.457 643.674 370.806 222.694 20.064 20.064 20.062 20.066 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 6.857 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
28 1991 861.791 47.304 72.720 511.193 12.457 643.674 222.694 183.356 20.064 20.071 20.066 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 144.156 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
29 1992 347.039 47.304 72.720 511.193 12.457 643.674 183.356 45.154 20.071 20.064 20.061 20.062 47.304 100.0 65.663 90.3 305.867 59.8 6.177 49.6 0.000 0.000 0.000 0.000 5.0 58.3 205.327 40.2 57.422 100.0 0.16 X
30 1993 928.430 47.304 72.720 511.193 12.457 643.674 45.154 107.824 20.064 20.064 20.062 25.633 47.304 100.0 72.720 100.0 507.276 99.2 11.399 91.5 121.537 0.000 0.000 0.000 0.0 100.0 3.917 0.8 3.917 6.8 0.00 X
31 1994 840.443 47.304 72.720 511.193 12.457 643.674 107.824 97.956 20.064 20.064 25.633 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 107.974 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
32 1995 608.216 47.304 72.720 511.193 12.457 643.674 97.956 45.149 20.064 20.072 20.061 20.061 47.304 100.0 70.388 96.8 381.953 74.7 9.317 74.8 71.409 0.000 0.000 0.000 3.0 75.0 129.241 25.3 67.838 100.0 0.06 X
33 1996 935.803 47.304 72.720 511.193 12.457 643.674 45.149 116.887 20.072 65.384 20.061 38.274 47.304 100.0 72.720 100.0 464.212 90.8 11.433 91.8 109.560 0.000 0.000 0.000 1.0 91.7 46.981 9.2 46.981 69.3 0.01 X
34 1997 1,160.113 47.304 72.720 511.193 12.457 643.674 116.887 293.193 65.384 20.064 38.274 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 250.024 28.108 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
35 1998 671.683 47.304 72.720 511.193 12.457 643.674 293.193 113.064 20.064 20.064 20.062 19.820 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 102.248 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
36 1999 1,093.985 47.304 72.720 511.193 12.457 643.674 113.064 200.809 20.064 20.064 19.820 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 237.838 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
37 2000 1,108.680 47.304 72.720 511.193 12.457 643.674 200.809 270.334 20.064 20.065 20.062 20.048 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 266.006 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
38 2001 1,419.034 47.304 72.720 511.193 12.457 643.674 270.334 408.644 20.065 20.064 20.048 19.240 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 362.169 53.141 0.000 78.207 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
39 2002 1,803.956 47.304 72.720 511.193 12.457 643.674 408.644 561.838 20.064 25.454 19.240 30.284 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 452.811 92.962 0.000 286.103 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
40 2003 1,258.274 47.304 72.720 511.193 12.457 643.674 561.838 503.640 25.454 20.065 30.284 20.060 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 256.829 10.294 0.000 279.086 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
41 2004 951.609 47.304 72.720 511.193 12.457 643.674 503.640 335.852 20.065 20.067 20.060 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 190.303 0.000 0.000 155.922 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
42 2005 999.778 47.304 72.720 511.193 12.457 643.674 335.852 374.134 20.067 20.064 20.061 20.061 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 193.809 0.000 0.000 0.000 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
43 2006 1,776.463 47.304 72.720 511.193 12.457 643.674 374.134 523.179 20.064 20.064 20.061 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 465.225 98.393 0.000 263.538 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
44 2007 1,173.937 47.304 72.720 511.193 12.457 643.674 523.179 454.655 20.064 20.064 20.062 20.062 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 232.600 0.000 0.000 227.833 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
45 2008 1,178.015 47.304 72.720 511.193 12.457 643.674 454.655 420.623 20.064 45.428 20.062 28.960 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 251.928 0.000 0.000 147.803 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X
46 2009 997.665 47.304 72.720 511.193 12.457 643.674 420.623 493.950 45.428 38.975 28.960 31.852 47.304 100.0 72.720 100.0 511.193 100.0 12.457 100.0 130.164 0.000 0.000 34.352 0.0 100.0 0.000 0.0 0.000 0.0 0.00 X

Media 1,018.316 47.304 72.720 511.193 12.457 643.674 302.412 300.430 27.765 24.264 26.495 23.927 47.304 100.0 72.465 99.6 496.748 97.2 12.048 96.7 192.075 12.887 2.136 70.793 0.3 97.5 14.446 2.8 7.330 11.4 0.77 40 6

RESULTADOS DEL BALANCE HÍDRICO EN EL SISTEMA INTEGRAL LAGUNILLAS, PARA EL PERIODO 1964 - 2009 : SATISFACTORIO

Adicionalmente a la Oferta Hídrica Superficial, se dispondría de aguas subterráneas y de retornos de riego para cubrir el déficit promedio anual.
PREMISAS DE SATISFACCIÓN DEL BALANCE AGRÍCOLA
* : Máximo : 3 meses deficitarios por año, independiente del volumen, 12 años deficitarios en el período evaluado (al 75%), y 3 años consecutivos deficitarios.
** : Déficit en Volumen Máximo Anual : 10%.
*** : Déficit en Volumen Máximo Mensual : 30%.
Indice de Déficit Esperado Máximo : ID = 1.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 176
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.4

Determinación del volumen muerto de los embalses considerados en las alternativas de


afianzamiento del Sistema Integral Lagunillas

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 177
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

DETERMINACIÓN DEL VOLUMEN MUERTO DE LOS EMBALSES


CONSIDERADOS EN LAS ALTERNATIVAS DE AFIANZAMIENTO DEL SISTEMA
INTEGRAL LAGUNILLAS

1.0. ESTIMACIÓN DEL TRANSPORTE DE SEDIMENTOS


Considerando que no se dispone de información de campo del transporte de sedimentos
de fondo y en suspensión en los ríos Verde, Paratía, Jarpaña y Millo la tasa de sedimentos
anuales, ha sido estimada por métodos indirectos basados en el principio de analogía de
cuencas, los que dan como resultados valores referenciales y orden de magnitud, los
métodos empleados son:
 Criterio del área de la cuenca
 Método de la ecuación universal de la pérdida del suelo

1.1. Criterio del Área de la Cuenca


La relación establecida por el U.S. Bureau of Reclamation y ajustada en base a los
registros de la cuenca del río Mantaro, permite aproximar la siguiente relación:

.
Qs = 780.7 ∗ A

Donde:
Qs = Transporte de sedimentos (en m3/km2/año)
A = Área de la cuenca (km2)

A partir de esta relación se obtuvieron los resultados para los embalses Verde, Paratía,
Jarpaña y Millo, ver Cuadro 1.4.1.

Cuadro 1.4.1: Transporte de sedimentos en los embalses Verde, Paratía, Jarpaña y Millo
Transporte de Sedimentos
N° Embalse Area (km2)
m3/km2/año hm3/año Ton/año
1 Verde 759.57 139.17 0.11 274,839.82
2 Paratia 403.13 164.08 0.07 171,983.96
3 Jarpaña 288.40 179.01 0.05 134,230.13
4 Millo 151.04 211.80 0.03 83,171.91

1.2. Ecuación Universal de Pérdida de Suelo


La pérdida anual de suelo puede ser estimada, según Wishmaier, como:

= ∗ ∗ ∗( )∗( )

Donde:
P = Promedio anual de pérdida de suelo en t/ha/año
R = Factor de lluvia (índice de erosión)
K = Factor suelo

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 178
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

C = Factor de cultivo (cobertura vegetal)


(LS) = Factor combinado de longitud y pendiente
(CE) = Factor de prácticas de control de erosión

La teoría ha sido desarrollada por el SCS de USA, y aplicada en el Perú por la Ex-
ONERN.

Los valores asumidos para cada uno de los factores que integran la Ecuación Universal
de Pérdida de Suelo, son los que se presentan a continuación:
R = 500 t/ha/año
K = 0.20
C = 0.02
LS = 0.5 (L mayor de 300 m y S mayor de 2 %)
CE = 1.0 (sin prácticas)

La tasa anual de erosión estimada para los embalses Verde, Paratía, Jarpaña y Millo es de
1.0 t/ha/año, equivalente a 0.38 m3/ha/año, cantidad que se estima que se reducirá en un
50% al llegar a la sección de control, debido a que los sedimentos se irán depositando a
lo largo del cauce, en el Cuadro 1.4.2 se presentan los resultados de transporte de
sedimentos para los embalses Verde, Paratía, Jarpaña y Millo.

Cuadro 1.4.2: Transporte de sedimentos en los embalses Verde, Paratía, Jarpaña y


Millo.
Pérdida
N° Embalse Área (km2)
(Ton/ha/año) (m3/ha/año) (m3/año) Ton/año)
1 Verde 759.57 1.00 0.38 29,214.41 75,957.46
2 Paratia 403.13 1.00 0.38 15,505.05 40,313.13
3 Jarpaña 288.40 1.00 0.38 11,092.17 28,839.64
4 Millo 151.04 1.00 0.38 5,809.07 15,103.58

Promediando los resultados obtenidos en los Cuadros 1.4.1 y 1.4.2, y considerando una
vida útil de 100 años para los embalses Verde, Paratía, Jarpaña y Millo, se obtuvieron los
resultados que se muestran en el Cuadro 1.4.3.

Cuadro 1.4.3: Volúmenes muertos estimados por métodos indirectos para los embalses
Verde, Paratía, Jarpaña y Millo.
Transporte de Sedimentos
Vida Útil
N° Embalse Volumen
(años) (Ton/año) (m3/año)
Estimado (hm3)
1 Verde 100 175,398.64 106,302.20 10.63
2 Paratia 100 106,148.55 64,332.45 6.43
3 Jarpaña 100 81,534.88 49,415.08 4.94
4 Millo 100 49,137.74 29,780.45 2.98
Los valores presentados en el Cuadro 1.4.3, como toda estimación deben ser considerados
como referenciales, y estarán sujetos a validación (confirmar o ajustar), cuando se

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 179
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

disponga de información de transporte de sedimentos suficiente y confiable, en razón a


ello para el diseño de los embalses Verde, Paratía, Jarpaña y Millo, se ha considerado un
20% del volumen útil de cada uno de los embalses como volumen muerto, valor asumido
teniendo en consideración los volúmenes determinados en algunos embalses existentes,
tal como se muestra en el Cuadro 1.4.4.

Cuadro 1.4.4: Volúmenes de diseño en embalses existentes


Volumenes (hm3) % Volumen
Embalse
Útil Muerto Total Útil
Angostura 1,140.00 151.00 1,291.00 13.25
El Pañe 98.00 35.50 133.50 36.22
Aguada Blanca 42.00 4.00 46.00 9.52
Gallito Ciego 400.40 86.00 486.40 21.48
Condoroma 265.00 20.00 285.00 7.55
PROMEDIO 17.60

En el Cuadro 1.4.5, se presenta los volúmenes de diseño asumidos para los embalses
Verde, Paratía, Jarpaña y Millo.

Cuadro 1.4.5: Volúmenes de diseño asumidos para los embalses Verde, Paratía, Jarpaña
y Millo
Volumen (hm3)
Embalse
Útil Muerto Total
Lagunillas 585.13 232.34 817.47
Verde 283.00 57.00 340.00
Paratia 200.00 40.00 240.00
Jarpaña 133.00 27.00 160.00
Millo 65.00 13.00 78.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 180
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.5

Determinación de los caudales de derivación de las alternativas de afianzamiento del Sistema


Integral Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 181
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.1
Estudio Hidrológico del Sistema Integral Lagunillas
Descargas medias mensuales generadas del río Verde
Cuenca del canal de derivación Verde (Alternativa 2)
Periodo 1964 – 2009
(m3/s)
MEDIA
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
ANUAL
1964 11.06 36.63 21.70 7.42 2.96 1.45 1.00 0.98 1.08 1.03 1.58 3.68 7.55
1965 10.04 25.10 25.21 8.18 2.96 1.42 1.06 0.83 1.03 1.39 1.47 15.48 7.85
1966 12.24 27.64 18.89 2.84 1.97 1.23 0.96 0.77 0.76 1.94 4.65 9.28 6.93
1967 5.21 12.54 48.14 5.20 2.23 1.42 1.24 0.96 1.28 2.20 1.56 5.00 7.25
1968 17.60 43.20 22.50 5.79 2.74 1.64 1.25 1.07 1.17 2.13 8.07 8.36 9.63
1969 19.56 20.53 5.83 9.58 2.97 1.84 1.68 1.55 0.79 1.12 2.10 5.78 6.11
1970 20.72 42.02 26.75 9.55 3.24 1.59 1.15 1.01 1.04 1.34 0.98 11.22 10.05
1971 23.39 71.12 29.40 4.81 2.04 1.28 1.01 0.90 0.85 0.80 1.04 11.87 12.38
1972 44.34 15.64 21.10 13.79 2.63 1.52 1.23 1.07 1.25 1.59 3.38 7.06 9.55
1973 36.68 54.26 34.97 18.24 5.90 2.46 1.97 1.70 1.94 1.92 2.12 13.70 14.65
1974 45.02 68.46 25.09 9.65 2.17 1.57 1.20 1.69 1.73 1.92 1.64 12.29 14.37
1975 26.60 59.33 33.84 9.30 6.33 1.98 1.30 1.19 1.49 1.54 1.89 14.69 13.29
1976 45.97 36.63 39.61 11.05 2.82 1.75 1.25 1.11 5.99 2.36 1.37 3.02 12.74
1977 12.53 41.03 56.64 8.04 1.92 1.17 1.01 0.81 0.90 1.08 4.53 3.37 11.09
1978 44.23 27.82 9.28 8.63 2.76 1.17 0.92 0.75 0.85 0.94 5.68 23.54 10.55
1979 36.81 34.17 24.65 8.13 2.44 1.39 1.14 0.91 0.87 1.46 3.73 10.43 10.51
1980 12.29 10.13 24.02 9.83 1.92 1.20 1.10 1.00 1.10 4.41 4.34 3.46 6.23
1981 26.12 35.71 37.69 16.09 2.87 1.46 1.16 1.34 1.43 1.71 1.90 3.40 10.91
1982 35.42 10.13 24.79 15.90 3.40 1.50 1.20 1.10 1.00 1.60 19.73 7.40 10.26
1983 3.82 5.30 5.10 4.51 1.88 1.33 1.20 1.08 1.28 1.85 1.22 2.35 2.58
1984 35.18 78.30 40.86 16.38 3.53 1.70 1.30 1.10 0.90 1.30 3.60 5.90 15.84
1985 26.33 47.80 30.40 28.11 12.38 4.52 1.76 1.32 2.08 2.13 13.46 41.52 17.65
1986 43.10 44.78 28.60 35.12 13.48 2.40 1.86 1.76 2.42 2.51 2.97 8.60 15.63
1987 64.12 12.64 6.36 2.89 1.37 1.20 1.18 0.98 0.87 0.98 3.02 2.36 8.16
1988 24.06 18.72 28.49 21.76 4.42 1.74 1.24 1.01 0.85 0.92 0.72 1.82 8.81
1989 29.13 14.77 37.46 45.20 4.16 2.06 1.50 1.45 0.78 0.94 4.74 4.74 12.24
1990 17.24 11.00 7.31 3.53 1.23 2.25 1.10 0.88 0.72 3.79 15.82 9.30 6.18
1991 28.87 22.75 29.15 12.10 2.59 2.04 1.20 1.11 1.05 1.19 1.77 3.50 8.94
1992 14.38 4.08 4.96 1.41 0.64 0.63 0.61 1.19 0.64 1.55 3.64 8.97 3.56
1993 51.22 4.75 11.45 8.29 1.89 0.91 0.80 0.61 0.85 2.04 16.16 14.98 9.50
1994 14.50 23.93 26.33 18.48 3.61 1.26 0.78 0.68 0.64 0.55 4.41 9.92 8.76
1995 13.20 17.50 24.74 6.93 1.72 1.00 0.76 0.72 0.72 0.60 1.16 6.76 6.32
1996 15.07 29.32 17.18 14.50 2.33 1.14 0.97 1.09 0.90 0.76 2.64 31.10 9.75
1997 59.40 39.45 15.52 9.59 3.09 1.48 1.24 1.92 1.59 1.82 4.90 5.12 12.09
1998 23.85 30.18 14.80 6.29 1.38 1.07 0.87 0.65 0.54 0.62 2.27 2.23 7.06
1999 7.12 35.91 46.74 26.76 5.06 1.77 1.77 0.90 0.87 4.62 2.15 3.56 11.44
2000 28.89 57.64 34.44 5.20 2.38 1.37 0.91 0.86 0.61 2.42 0.80 4.83 11.70
2001 46.83 60.05 37.76 20.52 4.12 1.54 1.02 0.97 0.99 1.37 1.28 2.31 14.90
2002 21.28 91.52 63.86 18.88 5.56 1.49 1.35 1.06 1.01 1.71 3.30 17.50 19.04
2003 23.81 57.39 36.98 14.61 3.06 2.12 1.75 1.39 1.40 1.12 1.13 14.08 13.24
2004 33.12 51.04 13.29 7.75 2.03 1.18 1.16 1.25 1.17 0.86 1.49 6.42 10.06
2005 10.69 63.61 20.08 10.06 2.45 1.05 0.87 0.84 0.96 0.89 2.74 13.71 10.66
2006 30.25 59.36 60.21 47.27 5.19 1.85 1.38 1.27 1.10 1.49 3.78 9.88 18.58
2007 37.61 15.25 49.93 18.82 5.37 1.76 1.35 0.95 0.89 1.78 4.58 6.46 12.06
2008 51.39 25.73 36.50 4.22 1.84 1.47 1.14 0.96 0.91 1.16 1.09 19.25 12.14
2009 11.81 26.15 34.68 12.69 2.68 1.53 1.13 1.02 1.13 2.06 9.36 20.15 10.36
MEDIA 27.22 35.24 28.11 13.13 3.39 1.58 1.20 1.08 1.18 1.64 4.04 9.79 10.63
DESV STD 15.01 21.31 14.42 10.08 2.43 0.59 0.30 0.30 0.82 0.88 4.28 7.88 3.61
MAXIMA 64.12 91.52 63.86 47.27 13.48 4.52 1.97 1.92 5.99 4.62 19.73 41.52 19.04
MINIMA 3.82 4.08 4.96 1.41 0.64 0.63 0.61 0.61 0.54 0.55 0.72 1.82 2.58

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 182
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.2
Estudio Hidrológico del Sistema Integral Lagunillas
Descargas medias mensuales generadas del río Verde
Cuenca del canal de derivación Verde (Alternativa 2)
Periodo 1964 – 2009
(m3/s)
Cálculo de probabilidad o persistencia
Método de Weibull
m ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC f = m/(n+1)

1 64.12 91.52 63.86 47.27 13.48 4.52 1.97 1.92 5.99 4.62 19.73 41.52 0.021
2 59.40 78.30 60.21 45.20 12.38 2.46 1.86 1.76 2.42 4.41 16.16 31.10 0.043
3 51.39 71.12 56.64 35.12 6.33 2.40 1.77 1.70 2.08 3.79 15.82 23.54 0.064
4 51.22 68.46 49.93 28.11 5.90 2.25 1.76 1.69 1.94 2.51 13.46 20.15 0.085
5 46.83 63.61 48.14 26.76 5.56 2.12 1.75 1.55 1.73 2.42 9.36 19.25 0.106
6 45.97 60.05 46.74 21.76 5.37 2.06 1.68 1.45 1.59 2.36 8.07 17.50 0.128
7 45.02 59.36 40.86 20.52 5.19 2.04 1.50 1.39 1.49 2.20 5.68 15.48 0.149
8 44.34 59.33 39.61 18.88 5.06 1.98 1.38 1.34 1.43 2.13 4.90 14.98 0.170
9 44.23 57.64 37.76 18.82 4.42 1.85 1.35 1.32 1.40 2.13 4.74 14.69 0.191
10 43.10 57.39 37.69 18.48 4.16 1.84 1.35 1.27 1.28 2.06 4.65 14.08 0.213
11 37.61 54.26 37.46 18.24 4.12 1.77 1.30 1.25 1.28 2.04 4.58 13.71 0.234
12 36.81 51.04 36.98 16.38 3.61 1.76 1.30 1.19 1.25 1.94 4.53 13.70 0.255
13 36.68 47.80 36.50 16.09 3.53 1.75 1.25 1.19 1.17 1.92 4.41 12.29 0.277
14 35.42 44.78 34.97 15.90 3.40 1.74 1.25 1.11 1.17 1.92 4.34 11.87 0.298
15 35.18 43.20 34.68 14.61 3.24 1.70 1.24 1.11 1.13 1.85 3.78 11.22 0.319
16 33.12 42.02 34.44 14.50 3.09 1.64 1.24 1.10 1.10 1.82 3.73 10.43 0.340
17 30.25 41.03 33.84 13.79 3.06 1.59 1.24 1.10 1.10 1.78 3.64 9.92 0.362
18 29.13 39.45 30.40 12.69 2.97 1.57 1.23 1.09 1.08 1.71 3.60 9.88 0.383
19 28.89 36.63 29.40 12.10 2.96 1.54 1.20 1.08 1.05 1.71 3.38 9.30 0.404
20 28.87 36.63 29.15 11.05 2.96 1.53 1.20 1.07 1.04 1.60 3.30 9.28 0.426
21 26.60 35.91 28.60 10.06 2.87 1.52 1.20 1.07 1.03 1.59 3.02 8.97 0.447
22 26.33 35.71 28.49 9.83 2.82 1.50 1.20 1.06 1.01 1.55 2.97 8.60 0.468
23 26.12 34.17 26.75 9.65 2.76 1.49 1.18 1.02 1.00 1.54 2.74 8.36 0.489
24 24.06 30.18 26.33 9.59 2.74 1.48 1.16 1.01 0.99 1.49 2.64 7.40 0.511
25 23.85 29.32 25.21 9.58 2.68 1.47 1.16 1.01 0.96 1.46 2.27 7.06 0.532
26 23.81 27.82 25.09 9.55 2.63 1.46 1.15 1.00 0.91 1.39 2.15 6.76 0.553
27 23.39 27.64 24.79 9.30 2.59 1.45 1.14 0.98 0.90 1.37 2.12 6.46 0.574
28 21.28 26.15 24.74 8.63 2.45 1.42 1.14 0.98 0.90 1.34 2.10 6.42 0.596
29 20.72 25.73 24.65 8.29 2.44 1.42 1.13 0.97 0.90 1.30 1.90 5.90 0.617
30 19.56 25.10 24.02 8.18 2.38 1.39 1.10 0.96 0.89 1.19 1.89 5.78 0.638
31 17.60 23.93 22.50 8.13 2.33 1.37 1.10 0.96 0.87 1.16 1.77 5.12 0.660
32 17.24 22.75 21.70 8.04 2.23 1.33 1.06 0.95 0.87 1.12 1.64 5.00 0.681
33 15.07 20.53 21.10 7.75 2.17 1.28 1.02 0.91 0.87 1.12 1.58 4.83 0.702
34 14.50 18.72 20.08 7.42 2.04 1.26 1.01 0.90 0.85 1.08 1.56 4.74 0.723
35 14.38 17.50 18.89 6.93 2.03 1.23 1.01 0.90 0.85 1.03 1.49 3.68 0.745
36 13.20 15.64 17.18 6.29 1.97 1.20 1.00 0.88 0.85 0.98 1.47 3.56 0.766
37 12.53 15.25 15.52 5.79 1.92 1.20 0.97 0.86 0.85 0.94 1.37 3.50 0.787
38 12.29 14.77 14.80 5.20 1.92 1.18 0.96 0.84 0.79 0.94 1.28 3.46 0.809
39 12.24 12.64 13.29 5.20 1.89 1.17 0.92 0.83 0.78 0.92 1.22 3.40 0.830
40 11.81 12.54 11.45 4.81 1.88 1.17 0.91 0.81 0.76 0.89 1.16 3.37 0.851
41 11.06 11.00 9.28 4.51 1.84 1.14 0.87 0.77 0.72 0.86 1.13 3.02 0.872
42 10.69 10.13 7.31 4.22 1.72 1.07 0.87 0.75 0.72 0.80 1.09 2.36 0.894
43 10.04 10.13 6.36 3.53 1.38 1.05 0.80 0.72 0.64 0.76 1.04 2.35 0.915
44 7.12 5.30 5.83 2.89 1.37 1.00 0.78 0.68 0.64 0.62 0.98 2.31 0.936
45 5.21 4.75 5.10 2.84 1.23 0.91 0.76 0.65 0.61 0.60 0.80 2.23 0.957
46 3.82 4.08 4.96 1.41 0.64 0.63 0.61 0.61 0.54 0.55 0.72 1.82 0.979
Media 27.22 35.24 28.11 13.13 3.39 1.58 1.20 1.08 1.18 1.64 4.04 9.79
P(0.25%) 37.01 51.85 37.10 16.84 3.74 1.76 1.30 1.21 1.26 1.97 4.54 13.70
P(0.5%) 25.09 32.18 26.54 9.62 2.75 1.49 1.17 1.02 1.00 1.52 2.69 7.88
P(0.75%) 14.08 17.04 18.46 6.77 2.01 1.22 1.01 0.89 0.85 1.02 1.48 3.65
P(0.9%) 10.50 10.13 7.02 4.01 1.61 1.07 0.85 0.74 0.69 0.79 1.07 2.36

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 183
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.3
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 15 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 15.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 15.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 15.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 15.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 15.00 15.00 2.60 47.14 100.00 40.18 85.23 6.96 14.77
6 1969 19.56 15.00 15.00 4.56 52.39 100.00 40.18 76.69 12.21 23.31
7 1970 20.72 15.00 15.00 5.72 55.49 100.00 40.18 72.41 15.31 27.59
8 1971 23.39 15.00 15.00 8.39 62.66 100.00 40.18 64.12 22.48 35.88
9 1972 44.34 15.00 15.00 29.34 118.77 100.00 40.18 33.83 78.59 66.17
10 1973 36.68 15.00 15.00 21.68 98.24 100.00 40.18 40.90 58.06 59.10
11 1974 45.02 15.00 15.00 30.02 120.57 100.00 40.18 33.32 80.39 66.68
12 1975 26.60 15.00 15.00 11.60 71.24 100.00 40.18 56.39 31.07 43.61
13 1976 45.97 15.00 15.00 30.97 123.12 100.00 40.18 32.63 82.95 67.37
14 1977 12.53 15.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 15.00 15.00 29.23 118.47 100.00 40.18 33.91 78.29 66.09
16 1979 36.81 15.00 15.00 21.81 98.60 100.00 40.18 40.75 58.42 59.25
17 1980 12.29 15.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 15.00 15.00 11.12 69.97 100.00 40.18 57.42 29.79 42.58
19 1982 35.42 15.00 15.00 20.42 94.87 100.00 40.18 42.35 54.69 57.65
20 1983 3.82 15.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 15.00 15.00 20.18 94.24 100.00 40.18 42.63 54.06 57.37
22 1985 26.33 15.00 15.00 11.33 70.51 100.00 40.18 56.98 30.33 43.02
23 1986 43.10 15.00 15.00 28.10 115.43 100.00 40.18 34.80 75.26 65.20
24 1987 64.12 15.00 15.00 49.12 171.74 100.00 40.18 23.39 131.57 76.61
25 1988 24.06 15.00 15.00 9.06 64.44 100.00 40.18 62.35 24.26 37.65
26 1989 29.13 15.00 15.00 14.13 78.01 100.00 40.18 51.50 37.84 48.50
27 1990 17.24 15.00 15.00 2.24 46.18 100.00 40.18 86.99 6.01 13.01
28 1991 28.87 15.00 15.00 13.87 77.33 100.00 40.18 51.96 37.15 48.04
29 1992 14.38 15.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 15.00 15.00 36.22 137.20 100.00 40.18 29.28 97.02 70.72
31 1994 14.50 15.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 15.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 15.00 15.00 0.07 40.36 100.00 40.18 99.54 0.18 0.46
34 1997 59.40 15.00 15.00 44.40 159.11 100.00 40.18 25.25 118.93 74.75
35 1998 23.85 15.00 15.00 8.85 63.87 100.00 40.18 62.90 23.70 37.10
36 1999 7.12 15.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 15.00 15.00 13.89 77.38 100.00 40.18 51.92 37.20 48.08
38 2001 46.83 15.00 15.00 31.83 125.43 100.00 40.18 32.03 85.25 67.97
39 2002 21.28 15.00 15.00 6.28 56.99 100.00 40.18 70.50 16.81 29.50
40 2003 23.81 15.00 15.00 8.81 63.76 100.00 40.18 63.01 23.58 36.99
41 2004 33.12 15.00 15.00 18.12 88.70 100.00 40.18 45.29 48.53 54.71
42 2005 10.69 15.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 15.00 15.00 15.25 81.02 100.00 40.18 49.59 40.85 50.41
44 2007 37.61 15.00 15.00 22.61 100.73 100.00 40.18 39.89 60.55 60.11
45 2008 51.39 15.00 15.00 36.39 137.64 100.00 40.18 29.19 97.46 70.81
46 2009 11.81 15.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 15.00 13.78 13.44 72.90 36.91 35.99
TOTAL 3,353.57 100.00 1,697.81 50.63 1,655.77 49.37

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 184
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.4
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 20.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 20.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 20.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 20.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 20.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 20.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 20.00 20.00 0.72 55.49 100.00 53.57 96.54 1.92 3.46
8 1971 23.39 20.00 20.00 3.39 62.66 100.00 53.57 85.50 9.09 14.50
9 1972 44.34 20.00 20.00 24.34 118.77 100.00 53.57 45.10 65.20 54.90
10 1973 36.68 20.00 20.00 16.68 98.24 100.00 53.57 54.53 44.67 45.47
11 1974 45.02 20.00 20.00 25.02 120.57 100.00 53.57 44.43 67.00 55.57
12 1975 26.60 20.00 20.00 6.60 71.24 100.00 53.57 75.19 17.67 24.81
13 1976 45.97 20.00 20.00 25.97 123.12 100.00 53.57 43.51 69.56 56.49
14 1977 12.53 20.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 20.00 20.00 24.23 118.47 100.00 53.57 45.22 64.90 54.78
16 1979 36.81 20.00 20.00 16.81 98.60 100.00 53.57 54.33 45.03 45.67
17 1980 12.29 20.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 20.00 20.00 6.12 69.97 100.00 53.57 76.56 16.40 23.44
19 1982 35.42 20.00 20.00 15.42 94.87 100.00 53.57 56.47 41.30 43.53
20 1983 3.82 20.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 20.00 20.00 15.18 94.24 100.00 53.57 56.84 40.67 43.16
22 1985 26.33 20.00 20.00 6.33 70.51 100.00 53.57 75.97 16.94 24.03
23 1986 43.10 20.00 20.00 23.10 115.43 100.00 53.57 46.41 61.87 53.59
24 1987 64.12 20.00 20.00 44.12 171.74 100.00 53.57 31.19 118.18 68.81
25 1988 24.06 20.00 20.00 4.06 64.44 100.00 53.57 83.13 10.87 16.87
26 1989 29.13 20.00 20.00 9.13 78.01 100.00 53.57 68.67 24.44 31.33
27 1990 17.24 20.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 20.00 20.00 8.87 77.33 100.00 53.57 69.28 23.76 30.72
29 1992 14.38 20.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 20.00 20.00 31.22 137.20 100.00 53.57 39.04 83.63 60.96
31 1994 14.50 20.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 20.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 20.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 20.00 20.00 39.40 159.11 100.00 53.57 33.67 105.54 66.33
35 1998 23.85 20.00 20.00 3.85 63.87 100.00 53.57 83.86 10.31 16.14
36 1999 7.12 20.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 20.00 20.00 8.89 77.38 100.00 53.57 69.23 23.81 30.77
38 2001 46.83 20.00 20.00 26.83 125.43 100.00 53.57 42.71 71.86 57.29
39 2002 21.28 20.00 20.00 1.28 56.99 100.00 53.57 94.00 3.42 6.00
40 2003 23.81 20.00 20.00 3.81 63.76 100.00 53.57 84.02 10.19 15.98
41 2004 33.12 20.00 20.00 13.12 88.70 100.00 53.57 60.39 35.14 39.61
42 2005 10.69 20.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 20.00 20.00 10.25 81.02 100.00 53.57 66.12 27.45 33.88
44 2007 37.61 20.00 20.00 17.61 100.73 100.00 53.57 53.18 47.16 46.82
45 2008 51.39 20.00 20.00 31.39 137.64 100.00 53.57 38.92 84.07 61.08
46 2009 11.81 20.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 20.00 17.14 10.08 72.90 45.90 27.00
TOTAL 3,353.57 100.00 2,111.55 62.96 1,242.03 37.04

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 185
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.5
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 25 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 25.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 25.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 25.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 25.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 25.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 25.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 25.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 25.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 25.00 25.00 19.34 118.77 100.00 66.96 56.38 51.81 43.62
10 1973 36.68 25.00 25.00 11.68 98.24 100.00 66.96 68.16 31.28 31.84
11 1974 45.02 25.00 25.00 20.02 120.57 100.00 66.96 55.54 53.61 44.46
12 1975 26.60 25.00 25.00 1.60 71.24 100.00 66.96 93.99 4.28 6.01
13 1976 45.97 25.00 25.00 20.97 123.12 100.00 66.96 54.38 56.16 45.62
14 1977 12.53 25.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 25.00 25.00 19.23 118.47 100.00 66.96 56.52 51.51 43.48
16 1979 36.81 25.00 25.00 11.81 98.60 100.00 66.96 67.91 31.64 32.09
17 1980 12.29 25.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 25.00 25.00 1.12 69.97 100.00 66.96 95.70 3.01 4.30
19 1982 35.42 25.00 25.00 10.42 94.87 100.00 66.96 70.58 27.91 29.42
20 1983 3.82 25.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 25.00 25.00 10.18 94.24 100.00 66.96 71.06 27.28 28.94
22 1985 26.33 25.00 25.00 1.33 70.51 100.00 66.96 94.97 3.55 5.03
23 1986 43.10 25.00 25.00 18.10 115.43 100.00 66.96 58.01 48.47 41.99
24 1987 64.12 25.00 25.00 39.12 171.74 100.00 66.96 38.99 104.78 61.01
25 1988 24.06 25.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 25.00 25.00 4.13 78.01 100.00 66.96 85.83 11.05 14.17
27 1990 17.24 25.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 25.00 25.00 3.87 77.33 100.00 66.96 86.60 10.37 13.40
29 1992 14.38 25.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 25.00 25.00 26.22 137.20 100.00 66.96 48.81 70.24 51.19
31 1994 14.50 25.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 25.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 25.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 25.00 25.00 34.40 159.11 100.00 66.96 42.08 92.15 57.92
35 1998 23.85 25.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 25.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 25.00 25.00 3.89 77.38 100.00 66.96 86.54 10.42 13.46
38 2001 46.83 25.00 25.00 21.83 125.43 100.00 66.96 53.38 58.47 46.62
39 2002 21.28 25.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 25.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 25.00 25.00 8.12 88.70 100.00 66.96 75.49 21.74 24.51
42 2005 10.69 25.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 25.00 25.00 5.25 81.02 100.00 66.96 82.64 14.06 17.36
44 2007 37.61 25.00 25.00 12.61 100.73 100.00 66.96 66.48 33.77 33.52
45 2008 51.39 25.00 25.00 26.39 137.64 100.00 66.96 48.65 70.68 51.35
46 2009 11.81 25.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 25.00 20.01 7.21 72.90 53.59 19.31
TOTAL 3,353.57 100.00 2,465.35 73.51 888.22 26.49

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 186
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.6
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 30 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 30.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 30.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 30.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 30.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 30.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 30.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 30.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 30.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 30.00 30.00 14.34 118.77 100.00 80.35 67.66 38.41 32.34
10 1973 36.68 30.00 30.00 6.68 98.24 100.00 80.35 81.79 17.89 18.21
11 1974 45.02 30.00 30.00 15.02 120.57 100.00 80.35 66.64 40.22 33.36
12 1975 26.60 30.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 30.00 30.00 15.97 123.12 100.00 80.35 65.26 42.77 34.74
14 1977 12.53 30.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 30.00 30.00 14.23 118.47 100.00 80.35 67.83 38.11 32.17
16 1979 36.81 30.00 30.00 6.81 98.60 100.00 80.35 81.50 18.25 18.50
17 1980 12.29 30.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 30.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 30.00 30.00 5.42 94.87 100.00 80.35 84.70 14.52 15.30
20 1983 3.82 30.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 30.00 30.00 5.18 94.24 100.00 80.35 85.27 13.88 14.73
22 1985 26.33 30.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 30.00 30.00 13.10 115.43 100.00 80.35 69.61 35.08 30.39
24 1987 64.12 30.00 30.00 34.12 171.74 100.00 80.35 46.79 91.39 53.21
25 1988 24.06 30.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 30.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 30.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 30.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 30.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 30.00 30.00 21.22 137.20 100.00 80.35 58.57 56.85 41.43
31 1994 14.50 30.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 30.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 30.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 30.00 30.00 29.40 159.11 100.00 80.35 50.50 78.76 49.50
35 1998 23.85 30.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 30.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 30.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 30.00 30.00 16.83 125.43 100.00 80.35 64.06 45.08 35.94
39 2002 21.28 30.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 30.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 30.00 30.00 3.12 88.70 100.00 80.35 90.59 8.35 9.41
42 2005 10.69 30.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 30.00 30.00 0.25 81.02 100.00 80.35 99.17 0.67 0.83
44 2007 37.61 30.00 30.00 7.61 100.73 100.00 80.35 79.77 20.37 20.23
45 2008 51.39 30.00 30.00 21.39 137.64 100.00 80.35 58.38 57.29 41.62
46 2009 11.81 30.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 30.00 22.20 5.02 72.90 59.47 13.43
TOTAL 3,353.57 100.00 2,735.69 81.58 617.89 18.42

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 187
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.7
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 35 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 35.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 35.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 35.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 35.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 35.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 35.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 35.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 35.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 35.00 35.00 9.34 118.77 100.00 93.74 78.93 25.02 21.07
10 1973 36.68 35.00 35.00 1.68 98.24 100.00 93.74 95.43 4.49 4.57
11 1974 45.02 35.00 35.00 10.02 120.57 100.00 93.74 77.75 26.82 22.25
12 1975 26.60 35.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 35.00 35.00 10.97 123.12 100.00 93.74 76.14 29.38 23.86
14 1977 12.53 35.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 35.00 35.00 9.23 118.47 100.00 93.74 79.13 24.72 20.87
16 1979 36.81 35.00 35.00 1.81 98.60 100.00 93.74 95.08 4.85 4.92
17 1980 12.29 35.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 35.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 35.00 35.00 0.42 94.87 100.00 93.74 98.81 1.12 1.19
20 1983 3.82 35.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 35.00 35.00 0.18 94.24 100.00 93.74 99.48 0.49 0.52
22 1985 26.33 35.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 35.00 35.00 8.10 115.43 100.00 93.74 81.21 21.69 18.79
24 1987 64.12 35.00 35.00 29.12 171.74 100.00 93.74 54.58 78.00 45.42
25 1988 24.06 35.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 35.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 35.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 35.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 35.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 35.00 35.00 16.22 137.20 100.00 93.74 68.33 43.45 31.67
31 1994 14.50 35.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 35.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 35.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 35.00 35.00 24.40 159.11 100.00 93.74 58.92 65.36 41.08
35 1998 23.85 35.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 35.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 35.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 35.00 35.00 11.83 125.43 100.00 93.74 74.74 31.69 25.26
39 2002 21.28 35.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 35.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 35.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 35.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 35.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 35.00 35.00 2.61 100.73 100.00 93.74 93.07 6.98 6.93
45 2008 51.39 35.00 35.00 16.39 137.64 100.00 93.74 68.11 43.90 31.89
46 2009 11.81 35.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 35.00 23.91 3.31 72.90 64.03 8.87
TOTAL 3,353.57 100.00 2,945.59 87.83 407.98 12.17

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 188
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.8
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 40 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 40.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 40.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 40.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 40.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 40.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 40.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 40.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 40.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 40.00 40.00 4.34 118.77 100.00 107.14 90.21 11.63 9.79
10 1973 36.68 40.00 36.68 0.00 98.24 100.00 98.24 100.00 0.00 0.00
11 1974 45.02 40.00 40.00 5.02 120.57 100.00 107.14 88.86 13.43 11.14
12 1975 26.60 40.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 40.00 40.00 5.97 123.12 100.00 107.14 87.02 15.99 12.98
14 1977 12.53 40.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 40.00 40.00 4.23 118.47 100.00 107.14 90.44 11.33 9.56
16 1979 36.81 40.00 36.81 0.00 98.60 100.00 98.60 100.00 0.00 0.00
17 1980 12.29 40.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 40.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 40.00 35.42 0.00 94.87 100.00 94.87 100.00 0.00 0.00
20 1983 3.82 40.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 40.00 35.18 0.00 94.24 100.00 94.24 100.00 0.00 0.00
22 1985 26.33 40.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 40.00 40.00 3.10 115.43 100.00 107.14 92.81 8.30 7.19
24 1987 64.12 40.00 40.00 24.12 171.74 100.00 107.14 62.38 64.61 37.62
25 1988 24.06 40.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 40.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 40.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 40.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 40.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 40.00 40.00 11.22 137.20 100.00 107.14 78.09 30.06 21.91
31 1994 14.50 40.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 40.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 40.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 40.00 40.00 19.40 159.11 100.00 107.14 67.34 51.97 32.66
35 1998 23.85 40.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 40.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 40.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 40.00 40.00 6.83 125.43 100.00 107.14 85.42 18.29 14.58
39 2002 21.28 40.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 40.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 40.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 40.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 40.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 40.00 37.61 0.00 100.73 100.00 100.73 100.00 0.00 0.00
45 2008 51.39 40.00 40.00 11.39 137.64 100.00 107.14 77.84 30.50 22.16
46 2009 11.81 40.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 40.00 25.14 2.08 72.90 67.34 5.57
TOTAL 3,353.57 100.00 3,097.46 92.36 256.12 7.64

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 189
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.9
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 45 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 45.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 45.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 45.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 45.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 45.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 45.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 45.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 45.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 45.00 44.34 0.00 118.77 100.00 118.77 100.00 0.00 0.00
10 1973 36.68 45.00 36.68 0.00 98.24 100.00 98.24 100.00 0.00 0.00
11 1974 45.02 45.00 45.00 0.02 120.57 100.00 120.53 99.97 0.04 0.03
12 1975 26.60 45.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 45.00 45.00 0.97 123.12 100.00 120.53 97.89 2.60 2.11
14 1977 12.53 45.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 45.00 44.23 0.00 118.47 100.00 118.47 100.00 0.00 0.00
16 1979 36.81 45.00 36.81 0.00 98.60 100.00 98.60 100.00 0.00 0.00
17 1980 12.29 45.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 45.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 45.00 35.42 0.00 94.87 100.00 94.87 100.00 0.00 0.00
20 1983 3.82 45.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 45.00 35.18 0.00 94.24 100.00 94.24 100.00 0.00 0.00
22 1985 26.33 45.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 45.00 43.10 0.00 115.43 100.00 115.43 100.00 0.00 0.00
24 1987 64.12 45.00 45.00 19.12 171.74 100.00 120.53 70.18 51.22 29.82
25 1988 24.06 45.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 45.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 45.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 45.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 45.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 45.00 45.00 6.22 137.20 100.00 120.53 87.85 16.67 12.15
31 1994 14.50 45.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 45.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 45.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 45.00 45.00 14.40 159.11 100.00 120.53 75.75 38.58 24.25
35 1998 23.85 45.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 45.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 45.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 45.00 45.00 1.83 125.43 100.00 120.53 96.09 4.90 3.91
39 2002 21.28 45.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 45.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 45.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 45.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 45.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 45.00 37.61 0.00 100.73 100.00 100.73 100.00 0.00 0.00
45 2008 51.39 45.00 45.00 6.39 137.64 100.00 120.53 87.57 17.11 12.43
46 2009 11.81 45.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 45.00 26.15 1.06 72.90 70.05 2.85
TOTAL 3,353.57 100.00 3,222.46 96.09 131.12 3.91

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 190
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.10
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 50 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 50.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 50.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 50.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 50.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 50.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 50.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 50.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 50.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 50.00 44.34 0.00 118.77 100.00 118.77 100.00 0.00 0.00
10 1973 36.68 50.00 36.68 0.00 98.24 100.00 98.24 100.00 0.00 0.00
11 1974 45.02 50.00 45.02 0.00 120.57 100.00 120.57 100.00 0.00 0.00
12 1975 26.60 50.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 50.00 45.97 0.00 123.12 100.00 123.12 100.00 0.00 0.00
14 1977 12.53 50.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 50.00 44.23 0.00 118.47 100.00 118.47 100.00 0.00 0.00
16 1979 36.81 50.00 36.81 0.00 98.60 100.00 98.60 100.00 0.00 0.00
17 1980 12.29 50.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 50.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 50.00 35.42 0.00 94.87 100.00 94.87 100.00 0.00 0.00
20 1983 3.82 50.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 50.00 35.18 0.00 94.24 100.00 94.24 100.00 0.00 0.00
22 1985 26.33 50.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 50.00 43.10 0.00 115.43 100.00 115.43 100.00 0.00 0.00
24 1987 64.12 50.00 50.00 14.12 171.74 100.00 133.92 77.98 37.82 22.02
25 1988 24.06 50.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 50.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 50.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 50.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 50.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 50.00 50.00 1.22 137.20 100.00 133.92 97.61 3.28 2.39
31 1994 14.50 50.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 50.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 50.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 50.00 50.00 9.40 159.11 100.00 133.92 84.17 25.19 15.83
35 1998 23.85 50.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 50.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 50.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 50.00 46.83 0.00 125.43 100.00 125.43 100.00 0.00 0.00
39 2002 21.28 50.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 50.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 50.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 50.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 50.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 50.00 37.61 0.00 100.73 100.00 100.73 100.00 0.00 0.00
45 2008 51.39 50.00 50.00 1.39 137.64 100.00 133.92 97.30 3.72 2.70
46 2009 11.81 50.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 50.00 26.65 0.57 72.90 71.38 1.52
TOTAL 3,353.57 100.00 3,283.56 97.91 70.01 2.09

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 191
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.11
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 55 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 55.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 55.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 55.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 55.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 55.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 55.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 55.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 55.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 55.00 44.34 0.00 118.77 100.00 118.77 100.00 0.00 0.00
10 1973 36.68 55.00 36.68 0.00 98.24 100.00 98.24 100.00 0.00 0.00
11 1974 45.02 55.00 45.02 0.00 120.57 100.00 120.57 100.00 0.00 0.00
12 1975 26.60 55.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 55.00 45.97 0.00 123.12 100.00 123.12 100.00 0.00 0.00
14 1977 12.53 55.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 55.00 44.23 0.00 118.47 100.00 118.47 100.00 0.00 0.00
16 1979 36.81 55.00 36.81 0.00 98.60 100.00 98.60 100.00 0.00 0.00
17 1980 12.29 55.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 55.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 55.00 35.42 0.00 94.87 100.00 94.87 100.00 0.00 0.00
20 1983 3.82 55.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 55.00 35.18 0.00 94.24 100.00 94.24 100.00 0.00 0.00
22 1985 26.33 55.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 55.00 43.10 0.00 115.43 100.00 115.43 100.00 0.00 0.00
24 1987 64.12 55.00 55.00 9.12 171.74 100.00 147.31 85.77 24.43 14.23
25 1988 24.06 55.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 55.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 55.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 55.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 55.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 55.00 51.22 0.00 137.20 100.00 137.20 100.00 0.00 0.00
31 1994 14.50 55.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 55.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 55.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 55.00 55.00 4.40 159.11 100.00 147.31 92.59 11.80 7.41
35 1998 23.85 55.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 55.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 55.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 55.00 46.83 0.00 125.43 100.00 125.43 100.00 0.00 0.00
39 2002 21.28 55.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 55.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 55.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 55.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 55.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 55.00 37.61 0.00 100.73 100.00 100.73 100.00 0.00 0.00
45 2008 51.39 55.00 51.39 0.00 137.64 100.00 137.64 100.00 0.00 0.00
46 2009 11.81 55.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 55.00 26.93 0.29 72.90 72.12 0.79
TOTAL 3,353.57 100.00 3,317.35 98.92 36.23 1.08

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 192
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.12
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 60 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 11.06 60.00 11.06 0.00 29.62 100.00 29.62 100.00 0.00 0.00
2 1965 10.04 60.00 10.04 0.00 26.89 100.00 26.89 100.00 0.00 0.00
3 1966 12.24 60.00 12.24 0.00 32.78 100.00 32.78 100.00 0.00 0.00
4 1967 5.21 60.00 5.21 0.00 13.95 100.00 13.95 100.00 0.00 0.00
5 1968 17.60 60.00 17.60 0.00 47.14 100.00 47.14 100.00 0.00 0.00
6 1969 19.56 60.00 19.56 0.00 52.39 100.00 52.39 100.00 0.00 0.00
7 1970 20.72 60.00 20.72 0.00 55.49 100.00 55.49 100.00 0.00 0.00
8 1971 23.39 60.00 23.39 0.00 62.66 100.00 62.66 100.00 0.00 0.00
9 1972 44.34 60.00 44.34 0.00 118.77 100.00 118.77 100.00 0.00 0.00
10 1973 36.68 60.00 36.68 0.00 98.24 100.00 98.24 100.00 0.00 0.00
11 1974 45.02 60.00 45.02 0.00 120.57 100.00 120.57 100.00 0.00 0.00
12 1975 26.60 60.00 26.60 0.00 71.24 100.00 71.24 100.00 0.00 0.00
13 1976 45.97 60.00 45.97 0.00 123.12 100.00 123.12 100.00 0.00 0.00
14 1977 12.53 60.00 12.53 0.00 33.56 100.00 33.56 100.00 0.00 0.00
15 1978 44.23 60.00 44.23 0.00 118.47 100.00 118.47 100.00 0.00 0.00
16 1979 36.81 60.00 36.81 0.00 98.60 100.00 98.60 100.00 0.00 0.00
17 1980 12.29 60.00 12.29 0.00 32.91 100.00 32.91 100.00 0.00 0.00
18 1981 26.12 60.00 26.12 0.00 69.97 100.00 69.97 100.00 0.00 0.00
19 1982 35.42 60.00 35.42 0.00 94.87 100.00 94.87 100.00 0.00 0.00
20 1983 3.82 60.00 3.82 0.00 10.23 100.00 10.23 100.00 0.00 0.00
21 1984 35.18 60.00 35.18 0.00 94.24 100.00 94.24 100.00 0.00 0.00
22 1985 26.33 60.00 26.33 0.00 70.51 100.00 70.51 100.00 0.00 0.00
23 1986 43.10 60.00 43.10 0.00 115.43 100.00 115.43 100.00 0.00 0.00
24 1987 64.12 60.00 60.00 4.12 171.74 100.00 160.70 93.57 11.04 6.43
25 1988 24.06 60.00 24.06 0.00 64.44 100.00 64.44 100.00 0.00 0.00
26 1989 29.13 60.00 29.13 0.00 78.01 100.00 78.01 100.00 0.00 0.00
27 1990 17.24 60.00 17.24 0.00 46.18 100.00 46.18 100.00 0.00 0.00
28 1991 28.87 60.00 28.87 0.00 77.33 100.00 77.33 100.00 0.00 0.00
29 1992 14.38 60.00 14.38 0.00 38.52 100.00 38.52 100.00 0.00 0.00
30 1993 51.22 60.00 51.22 0.00 137.20 100.00 137.20 100.00 0.00 0.00
31 1994 14.50 60.00 14.50 0.00 38.85 100.00 38.85 100.00 0.00 0.00
32 1995 13.20 60.00 13.20 0.00 35.34 100.00 35.34 100.00 0.00 0.00
33 1996 15.07 60.00 15.07 0.00 40.36 100.00 40.36 100.00 0.00 0.00
34 1997 59.40 60.00 59.40 0.00 159.11 100.00 159.11 100.00 0.00 0.00
35 1998 23.85 60.00 23.85 0.00 63.87 100.00 63.87 100.00 0.00 0.00
36 1999 7.12 60.00 7.12 0.00 19.08 100.00 19.08 100.00 0.00 0.00
37 2000 28.89 60.00 28.89 0.00 77.38 100.00 77.38 100.00 0.00 0.00
38 2001 46.83 60.00 46.83 0.00 125.43 100.00 125.43 100.00 0.00 0.00
39 2002 21.28 60.00 21.28 0.00 56.99 100.00 56.99 100.00 0.00 0.00
40 2003 23.81 60.00 23.81 0.00 63.76 100.00 63.76 100.00 0.00 0.00
41 2004 33.12 60.00 33.12 0.00 88.70 100.00 88.70 100.00 0.00 0.00
42 2005 10.69 60.00 10.69 0.00 28.63 100.00 28.63 100.00 0.00 0.00
43 2006 30.25 60.00 30.25 0.00 81.02 100.00 81.02 100.00 0.00 0.00
44 2007 37.61 60.00 37.61 0.00 100.73 100.00 100.73 100.00 0.00 0.00
45 2008 51.39 60.00 51.39 0.00 137.64 100.00 137.64 100.00 0.00 0.00
46 2009 11.81 60.00 11.81 0.00 31.62 100.00 31.62 100.00 0.00 0.00
PROMEDIO 27.22 60.00 27.13 0.09 72.90 72.66 0.24
TOTAL 3,353.57 100.00 3,342.53 99.67 11.04 0.33

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 193
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.13
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 15 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 15.00 15.00 21.63 88.62 100.00 36.29 40.95 52.33 59.05
2 1965 25.10 15.00 15.00 10.10 60.72 100.00 36.29 59.76 24.43 40.24
3 1966 27.64 15.00 15.00 12.64 66.87 100.00 36.29 54.27 30.58 45.73
4 1967 12.54 15.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 15.00 15.00 28.20 104.51 100.00 36.29 34.72 68.22 65.28
6 1969 20.53 15.00 15.00 5.53 49.67 100.00 36.29 73.06 13.38 26.94
7 1970 42.02 15.00 15.00 27.02 101.65 100.00 36.29 35.70 65.36 64.30
8 1971 71.12 15.00 15.00 56.12 172.06 100.00 36.29 21.09 135.77 78.91
9 1972 15.64 15.00 15.00 0.64 37.83 100.00 36.29 95.93 1.54 4.07
10 1973 54.26 15.00 15.00 39.26 131.28 100.00 36.29 27.64 94.99 72.36
11 1974 68.46 15.00 15.00 53.46 165.63 100.00 36.29 21.91 129.34 78.09
12 1975 59.33 15.00 15.00 44.33 143.52 100.00 36.29 25.28 107.23 74.72
13 1976 36.63 15.00 15.00 21.63 88.62 100.00 36.29 40.95 52.34 59.05
14 1977 41.03 15.00 15.00 26.03 99.25 100.00 36.29 36.56 62.96 63.44
15 1978 27.82 15.00 15.00 12.82 67.30 100.00 36.29 53.92 31.02 46.08
16 1979 34.17 15.00 15.00 19.17 82.67 100.00 36.29 43.90 46.38 56.10
17 1980 10.13 15.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 15.00 15.00 20.71 86.39 100.00 36.29 42.00 50.10 58.00
19 1982 10.13 15.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 15.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 15.00 15.00 63.30 189.41 100.00 36.29 19.16 153.12 80.84
22 1985 47.80 15.00 15.00 32.80 115.63 100.00 36.29 31.38 79.34 68.62
23 1986 44.78 15.00 15.00 29.78 108.33 100.00 36.29 33.50 72.04 66.50
24 1987 12.64 15.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 15.00 15.00 3.72 45.28 100.00 36.29 80.14 8.99 19.86
26 1989 14.77 15.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 15.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 15.00 15.00 7.75 55.04 100.00 36.29 65.93 18.75 34.07
29 1992 4.08 15.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 15.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 15.00 15.00 8.93 57.88 100.00 36.29 62.70 21.59 37.30
32 1995 17.50 15.00 15.00 2.50 42.34 100.00 36.29 85.70 6.05 14.30
33 1996 29.32 15.00 15.00 14.32 70.93 100.00 36.29 51.16 34.64 48.84
34 1997 39.45 15.00 15.00 24.45 95.44 100.00 36.29 38.02 59.15 61.98
35 1998 30.18 15.00 15.00 15.18 73.02 100.00 36.29 49.70 36.73 50.30
36 1999 35.91 15.00 15.00 20.91 86.87 100.00 36.29 41.77 50.58 58.23
37 2000 57.64 15.00 15.00 42.64 139.45 100.00 36.29 26.02 103.16 73.98
38 2001 60.05 15.00 15.00 45.05 145.28 100.00 36.29 24.98 108.99 75.02
39 2002 91.52 15.00 15.00 76.52 221.41 100.00 36.29 16.39 185.13 83.61
40 2003 57.39 15.00 15.00 42.39 138.83 100.00 36.29 26.14 102.54 73.86
41 2004 51.04 15.00 15.00 36.04 123.49 100.00 36.29 29.39 87.20 70.61
42 2005 63.61 15.00 15.00 48.61 153.89 100.00 36.29 23.58 117.60 76.42
43 2006 59.36 15.00 15.00 44.36 143.61 100.00 36.29 25.27 107.33 74.73
44 2007 15.25 15.00 15.00 0.25 36.90 100.00 36.29 98.34 0.61 1.66
45 2008 25.73 15.00 15.00 10.73 62.26 100.00 36.29 58.29 25.97 41.71
46 2009 26.15 15.00 15.00 11.15 63.27 100.00 36.29 57.36 26.98 42.64
PROMEDIO 35.24 15.00 13.92 21.32 85.25 33.68 51.58
TOTAL 3,921.58 100.00 1,549.12 39.50 2,372.46 60.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 194
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.14
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 20.00 20.00 16.63 88.62 100.00 48.38 54.60 40.23 45.40
2 1965 25.10 20.00 20.00 5.10 60.72 100.00 48.38 79.68 12.34 20.32
3 1966 27.64 20.00 20.00 7.64 66.87 100.00 48.38 72.36 18.48 27.64
4 1967 12.54 20.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 20.00 20.00 23.20 104.51 100.00 48.38 46.30 56.13 53.70
6 1969 20.53 20.00 20.00 0.53 49.67 100.00 48.38 97.42 1.28 2.58
7 1970 42.02 20.00 20.00 22.02 101.65 100.00 48.38 47.60 53.26 52.40
8 1971 71.12 20.00 20.00 51.12 172.06 100.00 48.38 28.12 123.68 71.88
9 1972 15.64 20.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 20.00 20.00 34.26 131.28 100.00 48.38 36.86 82.89 63.14
11 1974 68.46 20.00 20.00 48.46 165.63 100.00 48.38 29.21 117.24 70.79
12 1975 59.33 20.00 20.00 39.33 143.52 100.00 48.38 33.71 95.14 66.29
13 1976 36.63 20.00 20.00 16.63 88.62 100.00 48.38 54.59 40.24 45.41
14 1977 41.03 20.00 20.00 21.03 99.25 100.00 48.38 48.75 50.86 51.25
15 1978 27.82 20.00 20.00 7.82 67.30 100.00 48.38 71.89 18.92 28.11
16 1979 34.17 20.00 20.00 14.17 82.67 100.00 48.38 58.53 34.28 41.47
17 1980 10.13 20.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 20.00 20.00 15.71 86.39 100.00 48.38 56.01 38.01 43.99
19 1982 10.13 20.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 20.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 20.00 20.00 58.30 189.41 100.00 48.38 25.54 141.03 74.46
22 1985 47.80 20.00 20.00 27.80 115.63 100.00 48.38 41.84 67.24 58.16
23 1986 44.78 20.00 20.00 24.78 108.33 100.00 48.38 44.66 59.94 55.34
24 1987 12.64 20.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 20.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 20.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 20.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 20.00 20.00 2.75 55.04 100.00 48.38 87.91 6.66 12.09
29 1992 4.08 20.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 20.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 20.00 20.00 3.93 57.88 100.00 48.38 83.59 9.50 16.41
32 1995 17.50 20.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 20.00 20.00 9.32 70.93 100.00 48.38 68.21 22.55 31.79
34 1997 39.45 20.00 20.00 19.45 95.44 100.00 48.38 50.70 47.06 49.30
35 1998 30.18 20.00 20.00 10.18 73.02 100.00 48.38 66.26 24.63 33.74
36 1999 35.91 20.00 20.00 15.91 86.87 100.00 48.38 55.70 38.48 44.30
37 2000 57.64 20.00 20.00 37.64 139.45 100.00 48.38 34.70 91.06 65.30
38 2001 60.05 20.00 20.00 40.05 145.28 100.00 48.38 33.30 96.89 66.70
39 2002 91.52 20.00 20.00 71.52 221.41 100.00 48.38 21.85 173.03 78.15
40 2003 57.39 20.00 20.00 37.39 138.83 100.00 48.38 34.85 90.45 65.15
41 2004 51.04 20.00 20.00 31.04 123.49 100.00 48.38 39.18 75.10 60.82
42 2005 63.61 20.00 20.00 43.61 153.89 100.00 48.38 31.44 105.51 68.56
43 2006 59.36 20.00 20.00 39.36 143.61 100.00 48.38 33.69 95.23 66.31
44 2007 15.25 20.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 20.00 20.00 5.73 62.26 100.00 48.38 77.72 13.87 22.28
46 2009 26.15 20.00 20.00 6.15 63.27 100.00 48.38 76.48 14.88 23.52
PROMEDIO 35.24 20.00 17.66 17.58 85.25 42.73 42.52
TOTAL 3,921.58 100.00 1,965.49 50.12 1,956.10 49.88

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 195
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.15
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 25 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 25.00 25.00 11.63 88.62 100.00 60.48 68.25 28.14 31.75
2 1965 25.10 25.00 25.00 0.10 60.72 100.00 60.48 99.60 0.24 0.40
3 1966 27.64 25.00 25.00 2.64 66.87 100.00 60.48 90.45 6.39 9.55
4 1967 12.54 25.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 25.00 25.00 18.20 104.51 100.00 60.48 57.87 44.03 42.13
6 1969 20.53 25.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 25.00 25.00 17.02 101.65 100.00 60.48 59.50 41.17 40.50
8 1971 71.12 25.00 25.00 46.12 172.06 100.00 60.48 35.15 111.58 64.85
9 1972 15.64 25.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 25.00 25.00 29.26 131.28 100.00 60.48 46.07 70.80 53.93
11 1974 68.46 25.00 25.00 43.46 165.63 100.00 60.48 36.52 105.15 63.48
12 1975 59.33 25.00 25.00 34.33 143.52 100.00 60.48 42.14 83.04 57.86
13 1976 36.63 25.00 25.00 11.63 88.62 100.00 60.48 68.24 28.14 31.76
14 1977 41.03 25.00 25.00 16.03 99.25 100.00 60.48 60.94 38.77 39.06
15 1978 27.82 25.00 25.00 2.82 67.30 100.00 60.48 89.86 6.82 10.14
16 1979 34.17 25.00 25.00 9.17 82.67 100.00 60.48 73.16 22.19 26.84
17 1980 10.13 25.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 25.00 25.00 10.71 86.39 100.00 60.48 70.01 25.91 29.99
19 1982 10.13 25.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 25.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 25.00 25.00 53.30 189.41 100.00 60.48 31.93 128.93 68.07
22 1985 47.80 25.00 25.00 22.80 115.63 100.00 60.48 52.31 55.15 47.69
23 1986 44.78 25.00 25.00 19.78 108.33 100.00 60.48 55.83 47.85 44.17
24 1987 12.64 25.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 25.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 25.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 25.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 25.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 25.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 25.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 25.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 25.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 25.00 25.00 4.32 70.93 100.00 60.48 85.27 10.45 14.73
34 1997 39.45 25.00 25.00 14.45 95.44 100.00 60.48 63.37 34.96 36.63
35 1998 30.18 25.00 25.00 5.18 73.02 100.00 60.48 82.83 12.54 17.17
36 1999 35.91 25.00 25.00 10.91 86.87 100.00 60.48 69.62 26.39 30.38
37 2000 57.64 25.00 25.00 32.64 139.45 100.00 60.48 43.37 78.97 56.63
38 2001 60.05 25.00 25.00 35.05 145.28 100.00 60.48 41.63 84.80 58.37
39 2002 91.52 25.00 25.00 66.52 221.41 100.00 60.48 27.32 160.93 72.68
40 2003 57.39 25.00 25.00 32.39 138.83 100.00 60.48 43.56 78.35 56.44
41 2004 51.04 25.00 25.00 26.04 123.49 100.00 60.48 48.98 63.01 51.02
42 2005 63.61 25.00 25.00 38.61 153.89 100.00 60.48 39.30 93.41 60.70
43 2006 59.36 25.00 25.00 34.36 143.61 100.00 60.48 42.11 83.13 57.89
44 2007 15.25 25.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 25.00 25.00 0.73 62.26 100.00 60.48 97.15 1.78 2.85
46 2009 26.15 25.00 25.00 1.15 63.27 100.00 60.48 95.59 2.79 4.41
PROMEDIO 35.24 25.00 21.08 14.16 85.25 51.00 34.26
TOTAL 3,921.58 100.00 2,345.80 59.82 1,575.78 40.18

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 196
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.16
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 30 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 30.00 30.00 6.63 88.62 100.00 72.58 81.90 16.04 18.10
2 1965 25.10 30.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 30.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 30.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 30.00 30.00 13.20 104.51 100.00 72.58 69.44 31.93 30.56
6 1969 20.53 30.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 30.00 30.00 12.02 101.65 100.00 72.58 71.40 29.07 28.60
8 1971 71.12 30.00 30.00 41.12 172.06 100.00 72.58 42.18 99.48 57.82
9 1972 15.64 30.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 30.00 30.00 24.26 131.28 100.00 72.58 55.29 58.70 44.71
11 1974 68.46 30.00 30.00 38.46 165.63 100.00 72.58 43.82 93.05 56.18
12 1975 59.33 30.00 30.00 29.33 143.52 100.00 72.58 50.57 70.94 49.43
13 1976 36.63 30.00 30.00 6.63 88.62 100.00 72.58 81.89 16.05 18.11
14 1977 41.03 30.00 30.00 11.03 99.25 100.00 72.58 73.13 26.67 26.87
15 1978 27.82 30.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 30.00 30.00 4.17 82.67 100.00 72.58 87.79 10.09 12.21
17 1980 10.13 30.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 30.00 30.00 5.71 86.39 100.00 72.58 84.01 13.82 15.99
19 1982 10.13 30.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 30.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 30.00 30.00 48.30 189.41 100.00 72.58 38.32 116.84 61.68
22 1985 47.80 30.00 30.00 17.80 115.63 100.00 72.58 62.77 43.05 37.23
23 1986 44.78 30.00 30.00 14.78 108.33 100.00 72.58 67.00 35.75 33.00
24 1987 12.64 30.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 30.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 30.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 30.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 30.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 30.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 30.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 30.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 30.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 30.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 30.00 30.00 9.45 95.44 100.00 72.58 76.04 22.86 23.96
35 1998 30.18 30.00 30.00 0.18 73.02 100.00 72.58 99.39 0.44 0.61
36 1999 35.91 30.00 30.00 5.91 86.87 100.00 72.58 83.55 14.29 16.45
37 2000 57.64 30.00 30.00 27.64 139.45 100.00 72.58 52.05 66.87 47.95
38 2001 60.05 30.00 30.00 30.05 145.28 100.00 72.58 49.96 72.70 50.04
39 2002 91.52 30.00 30.00 61.52 221.41 100.00 72.58 32.78 148.84 67.22
40 2003 57.39 30.00 30.00 27.39 138.83 100.00 72.58 52.28 66.25 47.72
41 2004 51.04 30.00 30.00 21.04 123.49 100.00 72.58 58.77 50.91 41.23
42 2005 63.61 30.00 30.00 33.61 153.89 100.00 72.58 47.16 81.31 52.84
43 2006 59.36 30.00 30.00 29.36 143.61 100.00 72.58 50.54 71.04 49.46
44 2007 15.25 30.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 30.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 30.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 30.00 23.94 11.30 85.25 57.93 27.33
TOTAL 3,921.58 100.00 2,664.57 67.95 1,257.01 32.05

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 197
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.17
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 35 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 35.00 35.00 1.63 88.62 100.00 84.67 95.55 3.94 4.45
2 1965 25.10 35.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 35.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 35.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 35.00 35.00 8.20 104.51 100.00 84.67 81.02 19.84 18.98
6 1969 20.53 35.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 35.00 35.00 7.02 101.65 100.00 84.67 83.30 16.97 16.70
8 1971 71.12 35.00 35.00 36.12 172.06 100.00 84.67 49.21 87.39 50.79
9 1972 15.64 35.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 35.00 35.00 19.26 131.28 100.00 84.67 64.50 46.60 35.50
11 1974 68.46 35.00 35.00 33.46 165.63 100.00 84.67 51.12 80.96 48.88
12 1975 59.33 35.00 35.00 24.33 143.52 100.00 84.67 59.00 58.85 41.00
13 1976 36.63 35.00 35.00 1.63 88.62 100.00 84.67 95.54 3.95 4.46
14 1977 41.03 35.00 35.00 6.03 99.25 100.00 84.67 85.31 14.58 14.69
15 1978 27.82 35.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 35.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 35.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 35.00 35.00 0.71 86.39 100.00 84.67 98.01 1.72 1.99
19 1982 10.13 35.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 35.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 35.00 35.00 43.30 189.41 100.00 84.67 44.70 104.74 55.30
22 1985 47.80 35.00 35.00 12.80 115.63 100.00 84.67 73.23 30.96 26.77
23 1986 44.78 35.00 35.00 9.78 108.33 100.00 84.67 78.16 23.65 21.84
24 1987 12.64 35.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 35.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 35.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 35.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 35.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 35.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 35.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 35.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 35.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 35.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 35.00 35.00 4.45 95.44 100.00 84.67 88.72 10.77 11.28
35 1998 30.18 35.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 35.00 35.00 0.91 86.87 100.00 84.67 97.47 2.19 2.53
37 2000 57.64 35.00 35.00 22.64 139.45 100.00 84.67 60.72 54.78 39.28
38 2001 60.05 35.00 35.00 25.05 145.28 100.00 84.67 58.28 60.61 41.72
39 2002 91.52 35.00 35.00 56.52 221.41 100.00 84.67 38.24 136.74 61.76
40 2003 57.39 35.00 35.00 22.39 138.83 100.00 84.67 60.99 54.16 39.01
41 2004 51.04 35.00 35.00 16.04 123.49 100.00 84.67 68.57 38.81 31.43
42 2005 63.61 35.00 35.00 28.61 153.89 100.00 84.67 55.02 69.22 44.98
43 2006 59.36 35.00 35.00 24.36 143.61 100.00 84.67 58.96 58.94 41.04
44 2007 15.25 35.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 35.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 35.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 35.00 26.43 8.81 85.25 63.94 21.31
TOTAL 3,921.58 100.00 2,941.22 75.00 980.37 25.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 198
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.18
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 40 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 40.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
2 1965 25.10 40.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 40.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 40.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 40.00 40.00 3.20 104.51 100.00 96.77 92.59 7.74 7.41
6 1969 20.53 40.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 40.00 40.00 2.02 101.65 100.00 96.77 95.20 4.88 4.80
8 1971 71.12 40.00 40.00 31.12 172.06 100.00 96.77 56.24 75.29 43.76
9 1972 15.64 40.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 40.00 40.00 14.26 131.28 100.00 96.77 73.71 34.51 26.29
11 1974 68.46 40.00 40.00 28.46 165.63 100.00 96.77 58.42 68.86 41.58
12 1975 59.33 40.00 40.00 19.33 143.52 100.00 96.77 67.43 46.75 32.57
13 1976 36.63 40.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
14 1977 41.03 40.00 40.00 1.03 99.25 100.00 96.77 97.50 2.48 2.50
15 1978 27.82 40.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 40.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 40.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 40.00 35.71 0.00 86.39 100.00 86.39 100.00 0.00 0.00
19 1982 10.13 40.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 40.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 40.00 40.00 38.30 189.41 100.00 96.77 51.09 92.64 48.91
22 1985 47.80 40.00 40.00 7.80 115.63 100.00 96.77 83.69 18.86 16.31
23 1986 44.78 40.00 40.00 4.78 108.33 100.00 96.77 89.33 11.56 10.67
24 1987 12.64 40.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 40.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 40.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 40.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 40.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 40.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 40.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 40.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 40.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 40.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 40.00 39.45 0.00 95.44 100.00 95.44 100.00 0.00 0.00
35 1998 30.18 40.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 40.00 35.91 0.00 86.87 100.00 86.87 100.00 0.00 0.00
37 2000 57.64 40.00 40.00 17.64 139.45 100.00 96.77 69.39 42.68 30.61
38 2001 60.05 40.00 40.00 20.05 145.28 100.00 96.77 66.61 48.51 33.39
39 2002 91.52 40.00 40.00 51.52 221.41 100.00 96.77 43.70 124.65 56.30
40 2003 57.39 40.00 40.00 17.39 138.83 100.00 96.77 69.70 42.06 30.30
41 2004 51.04 40.00 40.00 11.04 123.49 100.00 96.77 78.36 26.72 21.64
42 2005 63.61 40.00 40.00 23.61 153.89 100.00 96.77 62.88 57.12 37.12
43 2006 59.36 40.00 40.00 19.36 143.61 100.00 96.77 67.38 46.85 32.62
44 2007 15.25 40.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 40.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 40.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 40.00 28.48 6.76 85.25 68.90 16.35
TOTAL 3,921.58 100.00 3,169.43 80.82 752.16 19.18

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 199
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.19
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 45 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 45.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
2 1965 25.10 45.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 45.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 45.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 45.00 43.20 0.00 104.51 100.00 104.51 100.00 0.00 0.00
6 1969 20.53 45.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 45.00 42.02 0.00 101.65 100.00 101.65 100.00 0.00 0.00
8 1971 71.12 45.00 45.00 26.12 172.06 100.00 108.86 63.27 63.20 36.73
9 1972 15.64 45.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 45.00 45.00 9.26 131.28 100.00 108.86 82.93 22.41 17.07
11 1974 68.46 45.00 45.00 23.46 165.63 100.00 108.86 65.73 56.76 34.27
12 1975 59.33 45.00 45.00 14.33 143.52 100.00 108.86 75.85 34.66 24.15
13 1976 36.63 45.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
14 1977 41.03 45.00 41.03 0.00 99.25 100.00 99.25 100.00 0.00 0.00
15 1978 27.82 45.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 45.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 45.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 45.00 35.71 0.00 86.39 100.00 86.39 100.00 0.00 0.00
19 1982 10.13 45.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 45.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 45.00 45.00 33.30 189.41 100.00 108.86 57.47 80.55 42.53
22 1985 47.80 45.00 45.00 2.80 115.63 100.00 108.86 94.15 6.76 5.85
23 1986 44.78 45.00 44.78 0.00 108.33 100.00 108.33 100.00 0.00 0.00
24 1987 12.64 45.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 45.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 45.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 45.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 45.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 45.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 45.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 45.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 45.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 45.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 45.00 39.45 0.00 95.44 100.00 95.44 100.00 0.00 0.00
35 1998 30.18 45.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 45.00 35.91 0.00 86.87 100.00 86.87 100.00 0.00 0.00
37 2000 57.64 45.00 45.00 12.64 139.45 100.00 108.86 78.07 30.58 21.93
38 2001 60.05 45.00 45.00 15.05 145.28 100.00 108.86 74.94 36.41 25.06
39 2002 91.52 45.00 45.00 46.52 221.41 100.00 108.86 49.17 112.55 50.83
40 2003 57.39 45.00 45.00 12.39 138.83 100.00 108.86 78.41 29.97 21.59
41 2004 51.04 45.00 45.00 6.04 123.49 100.00 108.86 88.16 14.62 11.84
42 2005 63.61 45.00 45.00 18.61 153.89 100.00 108.86 70.74 45.03 29.26
43 2006 59.36 45.00 45.00 14.36 143.61 100.00 108.86 75.80 34.75 24.20
44 2007 15.25 45.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 45.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 45.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 45.00 30.13 5.11 85.25 72.90 12.35
TOTAL 3,921.58 100.00 3,353.33 85.51 568.25 14.49

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 200
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.20
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 50 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 50.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
2 1965 25.10 50.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 50.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 50.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 50.00 43.20 0.00 104.51 100.00 104.51 100.00 0.00 0.00
6 1969 20.53 50.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 50.00 42.02 0.00 101.65 100.00 101.65 100.00 0.00 0.00
8 1971 71.12 50.00 50.00 21.12 172.06 100.00 120.96 70.30 51.10 29.70
9 1972 15.64 50.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 50.00 50.00 4.26 131.28 100.00 120.96 92.14 10.32 7.86
11 1974 68.46 50.00 50.00 18.46 165.63 100.00 120.96 73.03 44.67 26.97
12 1975 59.33 50.00 50.00 9.33 143.52 100.00 120.96 84.28 22.56 15.72
13 1976 36.63 50.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
14 1977 41.03 50.00 41.03 0.00 99.25 100.00 99.25 100.00 0.00 0.00
15 1978 27.82 50.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 50.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 50.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 50.00 35.71 0.00 86.39 100.00 86.39 100.00 0.00 0.00
19 1982 10.13 50.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 50.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 50.00 50.00 28.30 189.41 100.00 120.96 63.86 68.45 36.14
22 1985 47.80 50.00 47.80 0.00 115.63 100.00 115.63 100.00 0.00 0.00
23 1986 44.78 50.00 44.78 0.00 108.33 100.00 108.33 100.00 0.00 0.00
24 1987 12.64 50.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 50.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 50.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 50.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 50.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 50.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 50.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 50.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 50.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 50.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 50.00 39.45 0.00 95.44 100.00 95.44 100.00 0.00 0.00
35 1998 30.18 50.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 50.00 35.91 0.00 86.87 100.00 86.87 100.00 0.00 0.00
37 2000 57.64 50.00 50.00 7.64 139.45 100.00 120.96 86.74 18.49 13.26
38 2001 60.05 50.00 50.00 10.05 145.28 100.00 120.96 83.26 24.32 16.74
39 2002 91.52 50.00 50.00 41.52 221.41 100.00 120.96 54.63 100.45 45.37
40 2003 57.39 50.00 50.00 7.39 138.83 100.00 120.96 87.13 17.87 12.87
41 2004 51.04 50.00 50.00 1.04 123.49 100.00 120.96 97.95 2.53 2.05
42 2005 63.61 50.00 50.00 13.61 153.89 100.00 120.96 78.60 32.93 21.40
43 2006 59.36 50.00 50.00 9.36 143.61 100.00 120.96 84.23 22.65 15.77
44 2007 15.25 50.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 50.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 50.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 50.00 31.50 3.74 85.25 76.20 9.05
TOTAL 3,921.58 100.00 3,505.25 89.38 416.33 10.62

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 201
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.21
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 55 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 55.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
2 1965 25.10 55.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 55.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 55.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 55.00 43.20 0.00 104.51 100.00 104.51 100.00 0.00 0.00
6 1969 20.53 55.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 55.00 42.02 0.00 101.65 100.00 101.65 100.00 0.00 0.00
8 1971 71.12 55.00 55.00 16.12 172.06 100.00 133.06 77.33 39.00 22.67
9 1972 15.64 55.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 55.00 54.26 0.00 131.28 100.00 131.28 100.00 0.00 0.00
11 1974 68.46 55.00 55.00 13.46 165.63 100.00 133.06 80.33 32.57 19.67
12 1975 59.33 55.00 55.00 4.33 143.52 100.00 133.06 92.71 10.46 7.29
13 1976 36.63 55.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
14 1977 41.03 55.00 41.03 0.00 99.25 100.00 99.25 100.00 0.00 0.00
15 1978 27.82 55.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 55.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 55.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 55.00 35.71 0.00 86.39 100.00 86.39 100.00 0.00 0.00
19 1982 10.13 55.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 55.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 55.00 55.00 23.30 189.41 100.00 133.06 70.25 56.36 29.75
22 1985 47.80 55.00 47.80 0.00 115.63 100.00 115.63 100.00 0.00 0.00
23 1986 44.78 55.00 44.78 0.00 108.33 100.00 108.33 100.00 0.00 0.00
24 1987 12.64 55.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 55.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 55.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 55.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 55.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 55.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 55.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 55.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 55.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 55.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 55.00 39.45 0.00 95.44 100.00 95.44 100.00 0.00 0.00
35 1998 30.18 55.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 55.00 35.91 0.00 86.87 100.00 86.87 100.00 0.00 0.00
37 2000 57.64 55.00 55.00 2.64 139.45 100.00 133.06 95.42 6.39 4.58
38 2001 60.05 55.00 55.00 5.05 145.28 100.00 133.06 91.59 12.22 8.41
39 2002 91.52 55.00 55.00 36.52 221.41 100.00 133.06 60.09 88.36 39.91
40 2003 57.39 55.00 55.00 2.39 138.83 100.00 133.06 95.84 5.77 4.16
41 2004 51.04 55.00 51.04 0.00 123.49 100.00 123.49 100.00 0.00 0.00
42 2005 63.61 55.00 55.00 8.61 153.89 100.00 133.06 86.46 20.83 13.54
43 2006 59.36 55.00 55.00 4.36 143.61 100.00 133.06 92.65 10.56 7.35
44 2007 15.25 55.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 55.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 55.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 55.00 32.70 2.54 85.25 79.11 6.14
TOTAL 3,921.58 100.00 3,639.05 92.80 282.53 7.20

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 202
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.22
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Verde
Capacidad propuesta del canal: Q = 60 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 36.63 60.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
2 1965 25.10 60.00 25.10 0.00 60.72 100.00 60.72 100.00 0.00 0.00
3 1966 27.64 60.00 27.64 0.00 66.87 100.00 66.87 100.00 0.00 0.00
4 1967 12.54 60.00 12.54 0.00 30.34 100.00 30.34 100.00 0.00 0.00
5 1968 43.20 60.00 43.20 0.00 104.51 100.00 104.51 100.00 0.00 0.00
6 1969 20.53 60.00 20.53 0.00 49.67 100.00 49.67 100.00 0.00 0.00
7 1970 42.02 60.00 42.02 0.00 101.65 100.00 101.65 100.00 0.00 0.00
8 1971 71.12 60.00 60.00 11.12 172.06 100.00 145.15 84.36 26.91 15.64
9 1972 15.64 60.00 15.64 0.00 37.83 100.00 37.83 100.00 0.00 0.00
10 1973 54.26 60.00 54.26 0.00 131.28 100.00 131.28 100.00 0.00 0.00
11 1974 68.46 60.00 60.00 8.46 165.63 100.00 145.15 87.64 20.48 12.36
12 1975 59.33 60.00 59.33 0.00 143.52 100.00 143.52 100.00 0.00 0.00
13 1976 36.63 60.00 36.63 0.00 88.62 100.00 88.62 100.00 0.00 0.00
14 1977 41.03 60.00 41.03 0.00 99.25 100.00 99.25 100.00 0.00 0.00
15 1978 27.82 60.00 27.82 0.00 67.30 100.00 67.30 100.00 0.00 0.00
16 1979 34.17 60.00 34.17 0.00 82.67 100.00 82.67 100.00 0.00 0.00
17 1980 10.13 60.00 10.13 0.00 24.52 100.00 24.52 100.00 0.00 0.00
18 1981 35.71 60.00 35.71 0.00 86.39 100.00 86.39 100.00 0.00 0.00
19 1982 10.13 60.00 10.13 0.00 24.50 100.00 24.50 100.00 0.00 0.00
20 1983 5.30 60.00 5.30 0.00 12.82 100.00 12.82 100.00 0.00 0.00
21 1984 78.30 60.00 60.00 18.30 189.41 100.00 145.15 76.63 44.26 23.37
22 1985 47.80 60.00 47.80 0.00 115.63 100.00 115.63 100.00 0.00 0.00
23 1986 44.78 60.00 44.78 0.00 108.33 100.00 108.33 100.00 0.00 0.00
24 1987 12.64 60.00 12.64 0.00 30.59 100.00 30.59 100.00 0.00 0.00
25 1988 18.72 60.00 18.72 0.00 45.28 100.00 45.28 100.00 0.00 0.00
26 1989 14.77 60.00 14.77 0.00 35.73 100.00 35.73 100.00 0.00 0.00
27 1990 11.00 60.00 11.00 0.00 26.61 100.00 26.61 100.00 0.00 0.00
28 1991 22.75 60.00 22.75 0.00 55.04 100.00 55.04 100.00 0.00 0.00
29 1992 4.08 60.00 4.08 0.00 9.88 100.00 9.88 100.00 0.00 0.00
30 1993 4.75 60.00 4.75 0.00 11.49 100.00 11.49 100.00 0.00 0.00
31 1994 23.93 60.00 23.93 0.00 57.88 100.00 57.88 100.00 0.00 0.00
32 1995 17.50 60.00 17.50 0.00 42.34 100.00 42.34 100.00 0.00 0.00
33 1996 29.32 60.00 29.32 0.00 70.93 100.00 70.93 100.00 0.00 0.00
34 1997 39.45 60.00 39.45 0.00 95.44 100.00 95.44 100.00 0.00 0.00
35 1998 30.18 60.00 30.18 0.00 73.02 100.00 73.02 100.00 0.00 0.00
36 1999 35.91 60.00 35.91 0.00 86.87 100.00 86.87 100.00 0.00 0.00
37 2000 57.64 60.00 57.64 0.00 139.45 100.00 139.45 100.00 0.00 0.00
38 2001 60.05 60.00 60.00 0.05 145.28 100.00 145.15 99.91 0.13 0.09
39 2002 91.52 60.00 60.00 31.52 221.41 100.00 145.15 65.56 76.26 34.44
40 2003 57.39 60.00 57.39 0.00 138.83 100.00 138.83 100.00 0.00 0.00
41 2004 51.04 60.00 51.04 0.00 123.49 100.00 123.49 100.00 0.00 0.00
42 2005 63.61 60.00 60.00 3.61 153.89 100.00 145.15 94.32 8.74 5.68
43 2006 59.36 60.00 59.36 0.00 143.61 100.00 143.61 100.00 0.00 0.00
44 2007 15.25 60.00 15.25 0.00 36.90 100.00 36.90 100.00 0.00 0.00
45 2008 25.73 60.00 25.73 0.00 62.26 100.00 62.26 100.00 0.00 0.00
46 2009 26.15 60.00 26.15 0.00 63.27 100.00 63.27 100.00 0.00 0.00
PROMEDIO 35.24 60.00 33.65 1.59 85.25 81.41 3.84
TOTAL 3,921.58 100.00 3,744.81 95.49 176.77 4.51

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 203
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.23
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 15 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 15.00 15.00 6.70 58.12 100.00 40.18 69.12 17.95 30.88
2 1965 25.21 15.00 15.00 10.21 67.52 100.00 40.18 59.50 27.35 40.50
3 1966 18.89 15.00 15.00 3.89 50.59 100.00 40.18 79.41 10.42 20.59
4 1967 48.14 15.00 15.00 33.14 128.94 100.00 40.18 31.16 88.76 68.84
5 1968 22.50 15.00 15.00 7.50 60.26 100.00 40.18 66.67 20.09 33.33
6 1969 5.83 15.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 15.00 15.00 11.75 71.65 100.00 40.18 56.07 31.48 43.93
8 1971 29.40 15.00 15.00 14.40 78.73 100.00 40.18 51.03 38.56 48.97
9 1972 21.10 15.00 15.00 6.10 56.51 100.00 40.18 71.09 16.34 28.91
10 1973 34.97 15.00 15.00 19.97 93.66 100.00 40.18 42.89 53.49 57.11
11 1974 25.09 15.00 15.00 10.09 67.20 100.00 40.18 59.79 27.02 40.21
12 1975 33.84 15.00 15.00 18.84 90.64 100.00 40.18 44.32 50.47 55.68
13 1976 39.61 15.00 15.00 24.61 106.10 100.00 40.18 37.87 65.92 62.13
14 1977 56.64 15.00 15.00 41.64 151.70 100.00 40.18 26.48 111.53 73.52
15 1978 9.28 15.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 15.00 15.00 9.65 66.01 100.00 40.18 60.86 25.84 39.14
17 1980 24.02 15.00 15.00 9.02 64.34 100.00 40.18 62.44 24.16 37.56
18 1981 37.69 15.00 15.00 22.69 100.95 100.00 40.18 39.80 60.78 60.20
19 1982 24.79 15.00 15.00 9.79 66.38 100.00 40.18 60.52 26.21 39.48
20 1983 5.10 15.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 15.00 15.00 25.86 109.45 100.00 40.18 36.71 69.27 63.29
22 1985 30.40 15.00 15.00 15.40 81.42 100.00 40.18 49.35 41.24 50.65
23 1986 28.60 15.00 15.00 13.60 76.60 100.00 40.18 52.45 36.43 47.55
24 1987 6.36 15.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 15.00 15.00 13.49 76.31 100.00 40.18 52.65 36.13 47.35
26 1989 37.46 15.00 15.00 22.46 100.33 100.00 40.18 40.04 60.15 59.96
27 1990 7.31 15.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 15.00 15.00 14.15 78.08 100.00 40.18 51.46 37.90 48.54
29 1992 4.96 15.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 15.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 15.00 15.00 11.33 70.52 100.00 40.18 56.97 30.35 43.03
32 1995 24.74 15.00 15.00 9.74 66.26 100.00 40.18 60.64 26.08 39.36
33 1996 17.18 15.00 15.00 2.18 46.00 100.00 40.18 87.33 5.83 12.67
34 1997 15.52 15.00 15.00 0.52 41.58 100.00 40.18 96.62 1.40 3.38
35 1998 14.80 15.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 15.00 15.00 31.74 125.18 100.00 40.18 32.09 85.00 67.91
37 2000 34.44 15.00 15.00 19.44 92.24 100.00 40.18 43.56 52.06 56.44
38 2001 37.76 15.00 15.00 22.76 101.13 100.00 40.18 39.73 60.95 60.27
39 2002 63.86 15.00 15.00 48.86 171.03 100.00 40.18 23.49 130.85 76.51
40 2003 36.98 15.00 15.00 21.98 99.04 100.00 40.18 40.56 58.87 59.44
41 2004 13.29 15.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 15.00 15.00 5.08 53.77 100.00 40.18 74.71 13.60 25.29
43 2006 60.21 15.00 15.00 45.21 161.25 100.00 40.18 24.91 121.08 75.09
44 2007 49.93 15.00 15.00 34.93 133.73 100.00 40.18 30.04 93.55 69.96
45 2008 36.50 15.00 15.00 21.50 97.77 100.00 40.18 41.09 57.60 58.91
46 2009 34.68 15.00 15.00 19.68 92.88 100.00 40.18 43.25 52.71 56.75
PROMEDIO 28.11 15.00 13.77 14.35 75.30 36.88 38.42
TOTAL 3,463.82 100.00 1,696.42 48.98 1,767.40 51.02

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 204
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.24
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 20.00 20.00 1.70 58.12 100.00 53.57 92.17 4.55 7.83
2 1965 25.21 20.00 20.00 5.21 67.52 100.00 53.57 79.33 13.95 20.67
3 1966 18.89 20.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 20.00 20.00 28.14 128.94 100.00 53.57 41.55 75.37 58.45
5 1968 22.50 20.00 20.00 2.50 60.26 100.00 53.57 88.89 6.70 11.11
6 1969 5.83 20.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 20.00 20.00 6.75 71.65 100.00 53.57 74.76 18.08 25.24
8 1971 29.40 20.00 20.00 9.40 78.73 100.00 53.57 68.04 25.17 31.96
9 1972 21.10 20.00 20.00 1.10 56.51 100.00 53.57 94.79 2.95 5.21
10 1973 34.97 20.00 20.00 14.97 93.66 100.00 53.57 57.19 40.10 42.81
11 1974 25.09 20.00 20.00 5.09 67.20 100.00 53.57 79.72 13.63 20.28
12 1975 33.84 20.00 20.00 13.84 90.64 100.00 53.57 59.10 37.07 40.90
13 1976 39.61 20.00 20.00 19.61 106.10 100.00 53.57 50.49 52.53 49.51
14 1977 56.64 20.00 20.00 36.64 151.70 100.00 53.57 35.31 98.13 64.69
15 1978 9.28 20.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 20.00 20.00 4.65 66.01 100.00 53.57 81.15 12.45 18.85
17 1980 24.02 20.00 20.00 4.02 64.34 100.00 53.57 83.26 10.77 16.74
18 1981 37.69 20.00 20.00 17.69 100.95 100.00 53.57 53.06 47.38 46.94
19 1982 24.79 20.00 20.00 4.79 66.38 100.00 53.57 80.69 12.82 19.31
20 1983 5.10 20.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 20.00 20.00 20.86 109.45 100.00 53.57 48.94 55.88 51.06
22 1985 30.40 20.00 20.00 10.40 81.42 100.00 53.57 65.79 27.85 34.21
23 1986 28.60 20.00 20.00 8.60 76.60 100.00 53.57 69.93 23.03 30.07
24 1987 6.36 20.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 20.00 20.00 8.49 76.31 100.00 53.57 70.20 22.74 29.80
26 1989 37.46 20.00 20.00 17.46 100.33 100.00 53.57 53.39 46.76 46.61
27 1990 7.31 20.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 20.00 20.00 9.15 78.08 100.00 53.57 68.61 24.51 31.39
29 1992 4.96 20.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 20.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 20.00 20.00 6.33 70.52 100.00 53.57 75.96 16.95 24.04
32 1995 24.74 20.00 20.00 4.74 66.26 100.00 53.57 80.85 12.69 19.15
33 1996 17.18 20.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 20.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 20.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 20.00 20.00 26.74 125.18 100.00 53.57 42.79 71.61 57.21
37 2000 34.44 20.00 20.00 14.44 92.24 100.00 53.57 58.08 38.67 41.92
38 2001 37.76 20.00 20.00 17.76 101.13 100.00 53.57 52.97 47.56 47.03
39 2002 63.86 20.00 20.00 43.86 171.03 100.00 53.57 31.32 117.46 68.68
40 2003 36.98 20.00 20.00 16.98 99.04 100.00 53.57 54.08 45.48 45.92
41 2004 13.29 20.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 20.00 20.00 0.08 53.77 100.00 53.57 99.62 0.21 0.38
43 2006 60.21 20.00 20.00 40.21 161.25 100.00 53.57 33.22 107.69 66.78
44 2007 49.93 20.00 20.00 29.93 133.73 100.00 53.57 40.06 80.16 59.94
45 2008 36.50 20.00 20.00 16.50 97.77 100.00 53.57 54.79 44.20 45.21
46 2009 34.68 20.00 20.00 14.68 92.88 100.00 53.57 57.67 39.32 42.33
PROMEDIO 28.11 20.00 17.61 10.51 75.30 47.16 28.14
TOTAL 3,463.82 100.00 2,169.40 62.63 1,294.42 37.37

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 205
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.25
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 25 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 25.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 25.00 25.00 0.21 67.52 100.00 66.96 99.17 0.56 0.83
3 1966 18.89 25.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 25.00 25.00 23.14 128.94 100.00 66.96 51.93 61.98 48.07
5 1968 22.50 25.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 25.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 25.00 25.00 1.75 71.65 100.00 66.96 93.45 4.69 6.55
8 1971 29.40 25.00 25.00 4.40 78.73 100.00 66.96 85.05 11.77 14.95
9 1972 21.10 25.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 25.00 25.00 9.97 93.66 100.00 66.96 71.49 26.70 28.51
11 1974 25.09 25.00 25.00 0.09 67.20 100.00 66.96 99.65 0.24 0.35
12 1975 33.84 25.00 25.00 8.84 90.64 100.00 66.96 73.87 23.68 26.13
13 1976 39.61 25.00 25.00 14.61 106.10 100.00 66.96 63.11 39.14 36.89
14 1977 56.64 25.00 25.00 31.64 151.70 100.00 66.96 44.14 84.74 55.86
15 1978 9.28 25.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 25.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 25.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 25.00 25.00 12.69 100.95 100.00 66.96 66.33 33.99 33.67
19 1982 24.79 25.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 25.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 25.00 25.00 15.86 109.45 100.00 66.96 61.18 42.49 38.82
22 1985 30.40 25.00 25.00 5.40 81.42 100.00 66.96 82.24 14.46 17.76
23 1986 28.60 25.00 25.00 3.60 76.60 100.00 66.96 87.41 9.64 12.59
24 1987 6.36 25.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 25.00 25.00 3.49 76.31 100.00 66.96 87.75 9.35 12.25
26 1989 37.46 25.00 25.00 12.46 100.33 100.00 66.96 66.74 33.37 33.26
27 1990 7.31 25.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 25.00 25.00 4.15 78.08 100.00 66.96 85.76 11.12 14.24
29 1992 4.96 25.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 25.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 25.00 25.00 1.33 70.52 100.00 66.96 94.95 3.56 5.05
32 1995 24.74 25.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 25.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 25.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 25.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 25.00 25.00 21.74 125.18 100.00 66.96 53.49 58.22 46.51
37 2000 34.44 25.00 25.00 9.44 92.24 100.00 66.96 72.59 25.28 27.41
38 2001 37.76 25.00 25.00 12.76 101.13 100.00 66.96 66.21 34.17 33.79
39 2002 63.86 25.00 25.00 38.86 171.03 100.00 66.96 39.15 104.07 60.85
40 2003 36.98 25.00 25.00 11.98 99.04 100.00 66.96 67.61 32.08 32.39
41 2004 13.29 25.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 25.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 25.00 25.00 35.21 161.25 100.00 66.96 41.52 94.29 58.48
44 2007 49.93 25.00 25.00 24.93 133.73 100.00 66.96 50.07 66.77 49.93
45 2008 36.50 25.00 25.00 11.50 97.77 100.00 66.96 68.49 30.81 31.51
46 2009 34.68 25.00 25.00 9.68 92.88 100.00 66.96 72.09 25.92 27.91
PROMEDIO 28.11 25.00 20.95 7.17 75.30 56.10 19.20
TOTAL 3,463.82 100.00 2,580.72 74.50 883.11 25.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 206
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.26
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 30 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 30.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 30.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 30.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 30.00 30.00 18.14 128.94 100.00 80.35 62.32 48.59 37.68
5 1968 22.50 30.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 30.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 30.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 30.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 30.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 30.00 30.00 4.97 93.66 100.00 80.35 85.79 13.31 14.21
11 1974 25.09 30.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 30.00 30.00 3.84 90.64 100.00 80.35 88.65 10.29 11.35
13 1976 39.61 30.00 30.00 9.61 106.10 100.00 80.35 75.73 25.74 24.27
14 1977 56.64 30.00 30.00 26.64 151.70 100.00 80.35 52.97 71.35 47.03
15 1978 9.28 30.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 30.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 30.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 30.00 30.00 7.69 100.95 100.00 80.35 79.59 20.60 20.41
19 1982 24.79 30.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 30.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 30.00 30.00 10.86 109.45 100.00 80.35 73.41 29.10 26.59
22 1985 30.40 30.00 30.00 0.40 81.42 100.00 80.35 98.69 1.07 1.31
23 1986 28.60 30.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 30.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 30.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 30.00 30.00 7.46 100.33 100.00 80.35 80.09 19.98 19.91
27 1990 7.31 30.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 30.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 30.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 30.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 30.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 30.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 30.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 30.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 30.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 30.00 30.00 16.74 125.18 100.00 80.35 64.19 44.83 35.81
37 2000 34.44 30.00 30.00 4.44 92.24 100.00 80.35 87.11 11.89 12.89
38 2001 37.76 30.00 30.00 7.76 101.13 100.00 80.35 79.46 20.77 20.54
39 2002 63.86 30.00 30.00 33.86 171.03 100.00 80.35 46.98 90.68 53.02
40 2003 36.98 30.00 30.00 6.98 99.04 100.00 80.35 81.13 18.69 18.87
41 2004 13.29 30.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 30.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 30.00 30.00 30.21 161.25 100.00 80.35 49.83 80.90 50.17
44 2007 49.93 30.00 30.00 19.93 133.73 100.00 80.35 60.09 53.38 39.91
45 2008 36.50 30.00 30.00 6.50 97.77 100.00 80.35 82.18 17.42 17.82
46 2009 34.68 30.00 30.00 4.68 92.88 100.00 80.35 86.51 12.53 13.49
PROMEDIO 28.11 30.00 23.32 4.80 75.30 62.45 12.85
TOTAL 3,463.82 100.00 2,872.71 82.93 591.11 17.07

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 207
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.27
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 35 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 35.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 35.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 35.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 35.00 35.00 13.14 128.94 100.00 93.74 72.70 35.19 27.30
5 1968 22.50 35.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 35.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 35.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 35.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 35.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 35.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 35.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 35.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 35.00 35.00 4.61 106.10 100.00 93.74 88.36 12.35 11.64
14 1977 56.64 35.00 35.00 21.64 151.70 100.00 93.74 61.79 57.96 38.21
15 1978 9.28 35.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 35.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 35.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 35.00 35.00 2.69 100.95 100.00 93.74 92.86 7.21 7.14
19 1982 24.79 35.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 35.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 35.00 35.00 5.86 109.45 100.00 93.74 85.65 15.71 14.35
22 1985 30.40 35.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 35.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 35.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 35.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 35.00 35.00 2.46 100.33 100.00 93.74 93.44 6.58 6.56
27 1990 7.31 35.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 35.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 35.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 35.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 35.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 35.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 35.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 35.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 35.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 35.00 35.00 11.74 125.18 100.00 93.74 74.89 31.44 25.11
37 2000 34.44 35.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 35.00 35.00 2.76 101.13 100.00 93.74 92.70 7.38 7.30
39 2002 63.86 35.00 35.00 28.86 171.03 100.00 93.74 54.81 77.29 45.19
40 2003 36.98 35.00 35.00 1.98 99.04 100.00 93.74 94.65 5.30 5.35
41 2004 13.29 35.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 35.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 35.00 35.00 25.21 161.25 100.00 93.74 58.13 67.51 41.87
44 2007 49.93 35.00 35.00 14.93 133.73 100.00 93.74 70.10 39.99 29.90
45 2008 36.50 35.00 35.00 1.50 97.77 100.00 93.74 95.88 4.03 4.12
46 2009 34.68 35.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 35.00 25.13 2.99 75.30 67.30 8.00
TOTAL 3,463.82 100.00 3,095.90 89.38 367.93 10.62

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 208
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.28
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 40 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 40.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 40.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 40.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 40.00 40.00 8.14 128.94 100.00 107.14 83.09 21.80 16.91
5 1968 22.50 40.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 40.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 40.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 40.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 40.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 40.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 40.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 40.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 40.00 39.61 0.00 106.10 100.00 106.10 100.00 0.00 0.00
14 1977 56.64 40.00 40.00 16.64 151.70 100.00 107.14 70.62 44.57 29.38
15 1978 9.28 40.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 40.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 40.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 40.00 37.69 0.00 100.95 100.00 100.95 100.00 0.00 0.00
19 1982 24.79 40.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 40.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 40.00 40.00 0.86 109.45 100.00 107.14 97.89 2.31 2.11
22 1985 30.40 40.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 40.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 40.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 40.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 40.00 37.46 0.00 100.33 100.00 100.33 100.00 0.00 0.00
27 1990 7.31 40.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 40.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 40.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 40.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 40.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 40.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 40.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 40.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 40.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 40.00 40.00 6.74 125.18 100.00 107.14 85.59 18.04 14.41
37 2000 34.44 40.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 40.00 37.76 0.00 101.13 100.00 101.13 100.00 0.00 0.00
39 2002 63.86 40.00 40.00 23.86 171.03 100.00 107.14 62.64 63.89 37.36
40 2003 36.98 40.00 36.98 0.00 99.04 100.00 99.04 100.00 0.00 0.00
41 2004 13.29 40.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 40.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 40.00 40.00 20.21 161.25 100.00 107.14 66.44 54.12 33.56
44 2007 49.93 40.00 40.00 9.93 133.73 100.00 107.14 80.11 26.59 19.89
45 2008 36.50 40.00 36.50 0.00 97.77 100.00 97.77 100.00 0.00 0.00
46 2009 34.68 40.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 40.00 26.24 1.88 75.30 70.27 5.03
TOTAL 3,463.82 100.00 3,232.49 93.32 231.33 6.68

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 209
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.29
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 45 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 45.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 45.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 45.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 45.00 45.00 3.14 128.94 100.00 120.53 93.48 8.41 6.52
5 1968 22.50 45.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 45.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 45.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 45.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 45.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 45.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 45.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 45.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 45.00 39.61 0.00 106.10 100.00 106.10 100.00 0.00 0.00
14 1977 56.64 45.00 45.00 11.64 151.70 100.00 120.53 79.45 31.17 20.55
15 1978 9.28 45.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 45.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 45.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 45.00 37.69 0.00 100.95 100.00 100.95 100.00 0.00 0.00
19 1982 24.79 45.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 45.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 45.00 40.86 0.00 109.45 100.00 109.45 100.00 0.00 0.00
22 1985 30.40 45.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 45.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 45.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 45.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 45.00 37.46 0.00 100.33 100.00 100.33 100.00 0.00 0.00
27 1990 7.31 45.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 45.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 45.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 45.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 45.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 45.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 45.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 45.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 45.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 45.00 45.00 1.74 125.18 100.00 120.53 96.28 4.65 3.72
37 2000 34.44 45.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 45.00 37.76 0.00 101.13 100.00 101.13 100.00 0.00 0.00
39 2002 63.86 45.00 45.00 18.86 171.03 100.00 120.53 70.47 50.50 29.53
40 2003 36.98 45.00 36.98 0.00 99.04 100.00 99.04 100.00 0.00 0.00
41 2004 13.29 45.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 45.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 45.00 45.00 15.21 161.25 100.00 120.53 74.74 40.73 25.26
44 2007 49.93 45.00 45.00 4.93 133.73 100.00 120.53 90.13 13.20 9.87
45 2008 36.50 45.00 36.50 0.00 97.77 100.00 97.77 100.00 0.00 0.00
46 2009 34.68 45.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 45.00 26.91 1.21 75.30 72.07 3.23
TOTAL 3,463.82 100.00 3,315.16 95.71 148.66 4.29

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 210
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.30
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 50 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 50.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 50.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 50.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 50.00 48.14 0.00 128.94 100.00 128.94 100.00 0.00 0.00
5 1968 22.50 50.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 50.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 50.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 50.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 50.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 50.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 50.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 50.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 50.00 39.61 0.00 106.10 100.00 106.10 100.00 0.00 0.00
14 1977 56.64 50.00 50.00 6.64 151.70 100.00 133.92 88.28 17.78 11.72
15 1978 9.28 50.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 50.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 50.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 50.00 37.69 0.00 100.95 100.00 100.95 100.00 0.00 0.00
19 1982 24.79 50.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 50.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 50.00 40.86 0.00 109.45 100.00 109.45 100.00 0.00 0.00
22 1985 30.40 50.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 50.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 50.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 50.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 50.00 37.46 0.00 100.33 100.00 100.33 100.00 0.00 0.00
27 1990 7.31 50.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 50.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 50.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 50.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 50.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 50.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 50.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 50.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 50.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 50.00 46.74 0.00 125.18 100.00 125.18 100.00 0.00 0.00
37 2000 34.44 50.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 50.00 37.76 0.00 101.13 100.00 101.13 100.00 0.00 0.00
39 2002 63.86 50.00 50.00 13.86 171.03 100.00 133.92 78.30 37.11 21.70
40 2003 36.98 50.00 36.98 0.00 99.04 100.00 99.04 100.00 0.00 0.00
41 2004 13.29 50.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 50.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 50.00 50.00 10.21 161.25 100.00 133.92 83.05 27.33 16.95
44 2007 49.93 50.00 49.93 0.00 133.73 100.00 133.73 100.00 0.00 0.00
45 2008 36.50 50.00 36.50 0.00 97.77 100.00 97.77 100.00 0.00 0.00
46 2009 34.68 50.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 50.00 27.45 0.67 75.30 73.51 1.79
TOTAL 3,463.82 100.00 3,381.60 97.63 82.22 2.37

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 211
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.31
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 55 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 55.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 55.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 55.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 55.00 48.14 0.00 128.94 100.00 128.94 100.00 0.00 0.00
5 1968 22.50 55.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 55.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 55.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 55.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 55.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 55.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 55.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 55.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 55.00 39.61 0.00 106.10 100.00 106.10 100.00 0.00 0.00
14 1977 56.64 55.00 55.00 1.64 151.70 100.00 147.31 97.11 4.39 2.89
15 1978 9.28 55.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 55.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 55.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 55.00 37.69 0.00 100.95 100.00 100.95 100.00 0.00 0.00
19 1982 24.79 55.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 55.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 55.00 40.86 0.00 109.45 100.00 109.45 100.00 0.00 0.00
22 1985 30.40 55.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 55.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 55.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 55.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 55.00 37.46 0.00 100.33 100.00 100.33 100.00 0.00 0.00
27 1990 7.31 55.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 55.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 55.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 55.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 55.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 55.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 55.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 55.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 55.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 55.00 46.74 0.00 125.18 100.00 125.18 100.00 0.00 0.00
37 2000 34.44 55.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 55.00 37.76 0.00 101.13 100.00 101.13 100.00 0.00 0.00
39 2002 63.86 55.00 55.00 8.86 171.03 100.00 147.31 86.13 23.72 13.87
40 2003 36.98 55.00 36.98 0.00 99.04 100.00 99.04 100.00 0.00 0.00
41 2004 13.29 55.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 55.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 55.00 55.00 5.21 161.25 100.00 147.31 91.35 13.94 8.65
44 2007 49.93 55.00 49.93 0.00 133.73 100.00 133.73 100.00 0.00 0.00
45 2008 36.50 55.00 36.50 0.00 97.77 100.00 97.77 100.00 0.00 0.00
46 2009 34.68 55.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 55.00 27.77 0.34 75.30 74.39 0.91
TOTAL 3,463.82 100.00 3,421.78 98.79 42.05 1.21

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 212
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.32
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Verde
Capacidad propuesta del canal: Q = 60 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 21.70 60.00 21.70 0.00 58.12 100.00 58.12 100.00 0.00 0.00
2 1965 25.21 60.00 25.21 0.00 67.52 100.00 67.52 100.00 0.00 0.00
3 1966 18.89 60.00 18.89 0.00 50.59 100.00 50.59 100.00 0.00 0.00
4 1967 48.14 60.00 48.14 0.00 128.94 100.00 128.94 100.00 0.00 0.00
5 1968 22.50 60.00 22.50 0.00 60.26 100.00 60.26 100.00 0.00 0.00
6 1969 5.83 60.00 5.83 0.00 15.62 100.00 15.62 100.00 0.00 0.00
7 1970 26.75 60.00 26.75 0.00 71.65 100.00 71.65 100.00 0.00 0.00
8 1971 29.40 60.00 29.40 0.00 78.73 100.00 78.73 100.00 0.00 0.00
9 1972 21.10 60.00 21.10 0.00 56.51 100.00 56.51 100.00 0.00 0.00
10 1973 34.97 60.00 34.97 0.00 93.66 100.00 93.66 100.00 0.00 0.00
11 1974 25.09 60.00 25.09 0.00 67.20 100.00 67.20 100.00 0.00 0.00
12 1975 33.84 60.00 33.84 0.00 90.64 100.00 90.64 100.00 0.00 0.00
13 1976 39.61 60.00 39.61 0.00 106.10 100.00 106.10 100.00 0.00 0.00
14 1977 56.64 60.00 56.64 0.00 151.70 100.00 151.70 100.00 0.00 0.00
15 1978 9.28 60.00 9.28 0.00 24.86 100.00 24.86 100.00 0.00 0.00
16 1979 24.65 60.00 24.65 0.00 66.01 100.00 66.01 100.00 0.00 0.00
17 1980 24.02 60.00 24.02 0.00 64.34 100.00 64.34 100.00 0.00 0.00
18 1981 37.69 60.00 37.69 0.00 100.95 100.00 100.95 100.00 0.00 0.00
19 1982 24.79 60.00 24.79 0.00 66.38 100.00 66.38 100.00 0.00 0.00
20 1983 5.10 60.00 5.10 0.00 13.67 100.00 13.67 100.00 0.00 0.00
21 1984 40.86 60.00 40.86 0.00 109.45 100.00 109.45 100.00 0.00 0.00
22 1985 30.40 60.00 30.40 0.00 81.42 100.00 81.42 100.00 0.00 0.00
23 1986 28.60 60.00 28.60 0.00 76.60 100.00 76.60 100.00 0.00 0.00
24 1987 6.36 60.00 6.36 0.00 17.03 100.00 17.03 100.00 0.00 0.00
25 1988 28.49 60.00 28.49 0.00 76.31 100.00 76.31 100.00 0.00 0.00
26 1989 37.46 60.00 37.46 0.00 100.33 100.00 100.33 100.00 0.00 0.00
27 1990 7.31 60.00 7.31 0.00 19.57 100.00 19.57 100.00 0.00 0.00
28 1991 29.15 60.00 29.15 0.00 78.08 100.00 78.08 100.00 0.00 0.00
29 1992 4.96 60.00 4.96 0.00 13.28 100.00 13.28 100.00 0.00 0.00
30 1993 11.45 60.00 11.45 0.00 30.66 100.00 30.66 100.00 0.00 0.00
31 1994 26.33 60.00 26.33 0.00 70.52 100.00 70.52 100.00 0.00 0.00
32 1995 24.74 60.00 24.74 0.00 66.26 100.00 66.26 100.00 0.00 0.00
33 1996 17.18 60.00 17.18 0.00 46.00 100.00 46.00 100.00 0.00 0.00
34 1997 15.52 60.00 15.52 0.00 41.58 100.00 41.58 100.00 0.00 0.00
35 1998 14.80 60.00 14.80 0.00 39.63 100.00 39.63 100.00 0.00 0.00
36 1999 46.74 60.00 46.74 0.00 125.18 100.00 125.18 100.00 0.00 0.00
37 2000 34.44 60.00 34.44 0.00 92.24 100.00 92.24 100.00 0.00 0.00
38 2001 37.76 60.00 37.76 0.00 101.13 100.00 101.13 100.00 0.00 0.00
39 2002 63.86 60.00 60.00 3.86 171.03 100.00 160.70 93.96 10.33 6.04
40 2003 36.98 60.00 36.98 0.00 99.04 100.00 99.04 100.00 0.00 0.00
41 2004 13.29 60.00 13.29 0.00 35.60 100.00 35.60 100.00 0.00 0.00
42 2005 20.08 60.00 20.08 0.00 53.77 100.00 53.77 100.00 0.00 0.00
43 2006 60.21 60.00 60.00 0.20 161.25 100.00 160.70 99.66 0.55 0.34
44 2007 49.93 60.00 49.93 0.00 133.73 100.00 133.73 100.00 0.00 0.00
45 2008 36.50 60.00 36.50 0.00 97.77 100.00 97.77 100.00 0.00 0.00
46 2009 34.68 60.00 34.68 0.00 92.88 100.00 92.88 100.00 0.00 0.00
PROMEDIO 28.11 60.00 28.03 0.09 75.30 75.06 0.24
TOTAL 3,463.82 100.00 3,452.95 99.69 10.87 0.31

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 213
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.33
Estudio Hidrológico del Sistema Integral Lagunillas
Descargas medias mensuales generadas del río Jarpaña
Cuenca del canal de derivación Jarpaña (Alternativa 3)
Periodo 1964 – 2009
(m3/s)
MEDIA
AÑO ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC
ANUAL
1964 4.13 13.69 8.11 2.77 1.11 0.54 0.37 0.37 0.40 0.38 0.59 1.38 2.82
1965 3.75 9.38 9.42 3.06 1.11 0.53 0.40 0.31 0.38 0.52 0.55 5.78 2.93
1966 4.57 10.33 7.06 1.06 0.74 0.46 0.36 0.29 0.28 0.72 1.74 3.47 2.59
1967 1.95 4.69 17.99 1.94 0.83 0.53 0.46 0.36 0.48 0.82 0.58 1.87 2.71
1968 6.58 16.14 8.41 2.16 1.02 0.61 0.47 0.40 0.44 0.80 3.02 3.12 3.60
1969 7.31 7.67 2.18 3.58 1.11 0.69 0.63 0.58 0.30 0.42 0.78 2.16 2.28
1970 7.74 15.70 10.00 3.57 1.21 0.59 0.43 0.38 0.39 0.50 0.37 4.19 3.75
1971 8.74 26.58 10.98 1.80 0.76 0.48 0.38 0.34 0.32 0.30 0.39 4.44 4.62
1972 16.57 5.84 7.88 5.15 0.98 0.57 0.46 0.40 0.47 0.59 1.26 2.64 3.57
1973 13.70 20.28 13.07 6.81 2.21 0.92 0.73 0.63 0.73 0.72 0.79 5.12 5.48
1974 16.82 25.58 9.37 3.61 0.81 0.58 0.45 0.63 0.65 0.72 0.61 4.59 5.37
1975 9.94 22.17 12.65 3.48 2.37 0.74 0.49 0.44 0.56 0.58 0.70 5.49 4.97
1976 17.18 13.69 14.80 4.13 1.05 0.65 0.47 0.42 2.24 0.88 0.51 1.13 4.76
1977 4.68 15.33 21.16 3.00 0.72 0.44 0.38 0.30 0.34 0.40 1.69 1.26 4.14
1978 16.53 10.40 3.47 3.22 1.03 0.44 0.34 0.28 0.32 0.35 2.12 8.80 3.94
1979 13.75 12.77 9.21 3.04 0.91 0.52 0.42 0.34 0.32 0.54 1.39 3.90 3.93
1980 4.59 3.79 8.98 3.67 0.72 0.45 0.41 0.37 0.41 1.65 1.62 1.29 2.33
1981 9.76 13.34 14.08 6.01 1.07 0.55 0.43 0.50 0.54 0.64 0.71 1.27 4.08
1982 13.23 3.78 9.26 5.94 1.27 0.56 0.45 0.41 0.37 0.60 7.37 2.76 3.83
1983 1.43 1.98 1.91 1.68 0.70 0.50 0.45 0.40 0.48 0.69 0.46 0.88 0.96
1984 13.15 29.26 15.27 6.12 1.32 0.64 0.49 0.41 0.34 0.49 1.35 2.20 5.92
1985 9.84 17.86 11.36 10.50 4.63 1.69 0.66 0.49 0.78 0.80 5.03 15.51 6.59
1986 16.10 16.73 10.69 13.12 5.04 0.90 0.69 0.66 0.90 0.94 1.11 3.21 5.84
1987 23.96 4.72 2.38 1.08 0.51 0.45 0.44 0.37 0.33 0.36 1.13 0.88 3.05
1988 8.99 6.99 10.65 8.13 1.65 0.65 0.46 0.38 0.32 0.34 0.27 0.68 3.29
1989 10.88 5.52 14.00 16.89 1.56 0.77 0.56 0.54 0.29 0.35 1.77 1.77 4.57
1990 6.44 4.11 2.73 1.32 0.46 0.84 0.41 0.33 0.27 1.41 5.91 3.48 2.31
1991 10.79 8.50 10.89 4.52 0.97 0.76 0.45 0.41 0.39 0.45 0.66 1.31 3.34
1992 5.37 1.53 1.85 0.53 0.24 0.23 0.23 0.44 0.24 0.58 1.36 3.35 1.33
1993 19.14 1.77 4.28 3.10 0.71 0.34 0.30 0.23 0.32 0.76 6.04 5.60 3.55
1994 5.42 8.94 9.84 6.91 1.35 0.47 0.29 0.25 0.24 0.20 1.65 3.71 3.27
1995 4.93 6.54 9.24 2.59 0.64 0.38 0.29 0.27 0.27 0.22 0.43 2.53 2.36
1996 5.63 10.96 6.42 5.42 0.87 0.42 0.36 0.41 0.34 0.28 0.99 11.62 3.64
1997 22.20 14.74 5.80 3.58 1.15 0.55 0.46 0.72 0.60 0.68 1.83 1.91 4.52
1998 8.91 11.28 5.53 2.35 0.51 0.40 0.32 0.24 0.20 0.23 0.85 0.83 2.64
1999 2.66 13.42 17.46 10.00 1.89 0.66 0.66 0.33 0.32 1.73 0.80 1.33 4.27
2000 10.79 21.54 12.87 1.94 0.89 0.51 0.34 0.32 0.23 0.90 0.30 1.80 4.37
2001 17.50 22.44 14.11 7.67 1.54 0.58 0.38 0.36 0.37 0.51 0.48 0.86 5.57
2002 7.95 34.20 23.86 7.05 2.08 0.56 0.51 0.40 0.38 0.64 1.23 6.54 7.12
2003 8.89 21.44 13.82 5.46 1.14 0.79 0.66 0.52 0.52 0.42 0.42 5.26 4.95
2004 12.37 19.07 4.97 2.90 0.76 0.44 0.43 0.47 0.44 0.32 0.56 2.40 3.76
2005 3.99 23.77 7.50 3.76 0.92 0.39 0.33 0.31 0.36 0.33 1.02 5.12 3.98
2006 11.30 22.18 22.50 17.66 1.94 0.69 0.51 0.47 0.41 0.56 1.41 3.69 6.94
2007 14.05 5.70 18.66 7.03 2.01 0.66 0.50 0.35 0.33 0.67 1.71 2.41 4.51
2008 19.20 9.62 13.64 1.58 0.69 0.55 0.43 0.36 0.34 0.43 0.41 7.19 4.54
2009 4.41 9.77 12.96 4.74 1.00 0.57 0.42 0.38 0.42 0.77 3.50 7.53 3.87
MEDIA 10.17 13.17 10.50 4.91 1.26 0.59 0.45 0.40 0.44 0.61 1.51 3.66 3.97
DESV STD 5.61 7.96 5.39 3.76 0.91 0.22 0.11 0.11 0.31 0.33 1.60 2.95 1.35
MAXIMA 23.96 34.20 23.86 17.66 5.04 1.69 0.73 0.72 2.24 1.73 7.37 15.51 7.12
MINIMA 1.43 1.53 1.85 0.53 0.24 0.23 0.23 0.23 0.20 0.20 0.27 0.68 0.96

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 214
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.34
Estudio Hidrológico del Sistema Integral Lagunillas
Descargas medias mensuales generadas del río Jarpaña
Cuenca del canal de derivación Jarpaña (Alternativa 3)
Periodo 1964 – 2009
(m3/s)
Cálculo de probabilidad o persistencia
Método de Weibull
m ENE FEB MAR ABR MAY JUN JUL AGO SET OCT NOV DIC f = m/(n+1)

1 23.96 34.20 23.86 17.66 5.04 1.69 0.73 0.72 2.24 1.73 7.37 15.51 0.021
2 22.20 29.26 22.50 16.89 4.63 0.92 0.69 0.66 0.90 1.65 6.04 11.62 0.043
3 19.20 26.58 21.16 13.12 2.37 0.90 0.66 0.63 0.78 1.41 5.91 8.80 0.064
4 19.14 25.58 18.66 10.50 2.21 0.84 0.66 0.63 0.73 0.94 5.03 7.53 0.085
5 17.50 23.77 17.99 10.00 2.08 0.79 0.66 0.58 0.65 0.90 3.50 7.19 0.106
6 17.18 22.44 17.46 8.13 2.01 0.77 0.63 0.54 0.60 0.88 3.02 6.54 0.128
7 16.82 22.18 15.27 7.67 1.94 0.76 0.56 0.52 0.56 0.82 2.12 5.78 0.149
8 16.57 22.17 14.80 7.05 1.89 0.74 0.51 0.50 0.54 0.80 1.83 5.60 0.170
9 16.53 21.54 14.11 7.03 1.65 0.69 0.51 0.49 0.52 0.80 1.77 5.49 0.191
10 16.10 21.44 14.08 6.91 1.56 0.69 0.50 0.47 0.48 0.77 1.74 5.26 0.213
11 14.05 20.28 14.00 6.81 1.54 0.66 0.49 0.47 0.48 0.76 1.71 5.12 0.234
12 13.75 19.07 13.82 6.12 1.35 0.66 0.49 0.44 0.47 0.72 1.69 5.12 0.255
13 13.70 17.86 13.64 6.01 1.32 0.65 0.47 0.44 0.44 0.72 1.65 4.59 0.277
14 13.23 16.73 13.07 5.94 1.27 0.65 0.47 0.42 0.44 0.72 1.62 4.44 0.298
15 13.15 16.14 12.96 5.46 1.21 0.64 0.46 0.41 0.42 0.69 1.41 4.19 0.319
16 12.37 15.70 12.87 5.42 1.15 0.61 0.46 0.41 0.41 0.68 1.39 3.90 0.340
17 11.30 15.33 12.65 5.15 1.14 0.59 0.46 0.41 0.41 0.67 1.36 3.71 0.362
18 10.88 14.74 11.36 4.74 1.11 0.58 0.46 0.41 0.40 0.64 1.35 3.69 0.383
19 10.79 13.69 10.98 4.52 1.11 0.58 0.45 0.40 0.39 0.64 1.26 3.48 0.404
20 10.79 13.69 10.89 4.13 1.11 0.57 0.45 0.40 0.39 0.60 1.23 3.47 0.426
21 9.94 13.42 10.69 3.76 1.07 0.57 0.45 0.40 0.38 0.59 1.13 3.35 0.447
22 9.84 13.34 10.65 3.67 1.05 0.56 0.45 0.40 0.38 0.58 1.11 3.21 0.468
23 9.76 12.77 10.00 3.61 1.03 0.56 0.44 0.38 0.37 0.58 1.02 3.12 0.489
24 8.99 11.28 9.84 3.58 1.02 0.55 0.43 0.38 0.37 0.56 0.99 2.76 0.511
25 8.91 10.96 9.42 3.58 1.00 0.55 0.43 0.38 0.36 0.54 0.85 2.64 0.532
26 8.89 10.40 9.37 3.57 0.98 0.55 0.43 0.37 0.34 0.52 0.80 2.53 0.553
27 8.74 10.33 9.26 3.48 0.97 0.54 0.43 0.37 0.34 0.51 0.79 2.41 0.574
28 7.95 9.77 9.24 3.22 0.92 0.53 0.42 0.37 0.34 0.50 0.78 2.40 0.596
29 7.74 9.62 9.21 3.10 0.91 0.53 0.42 0.36 0.34 0.49 0.71 2.20 0.617
30 7.31 9.38 8.98 3.06 0.89 0.52 0.41 0.36 0.33 0.45 0.70 2.16 0.638
31 6.58 8.94 8.41 3.04 0.87 0.51 0.41 0.36 0.33 0.43 0.66 1.91 0.660
32 6.44 8.50 8.11 3.00 0.83 0.50 0.40 0.35 0.32 0.42 0.61 1.87 0.681
33 5.63 7.67 7.88 2.90 0.81 0.48 0.38 0.34 0.32 0.42 0.59 1.80 0.702
34 5.42 6.99 7.50 2.77 0.76 0.47 0.38 0.34 0.32 0.40 0.58 1.77 0.723
35 5.37 6.54 7.06 2.59 0.76 0.46 0.38 0.33 0.32 0.38 0.56 1.38 0.745
36 4.93 5.84 6.42 2.35 0.74 0.45 0.37 0.33 0.32 0.36 0.55 1.33 0.766
37 4.68 5.70 5.80 2.16 0.72 0.45 0.36 0.32 0.32 0.35 0.51 1.31 0.787
38 4.59 5.52 5.53 1.94 0.72 0.44 0.36 0.31 0.30 0.35 0.48 1.29 0.809
39 4.57 4.72 4.97 1.94 0.71 0.44 0.34 0.31 0.29 0.34 0.46 1.27 0.830
40 4.41 4.69 4.28 1.80 0.70 0.44 0.34 0.30 0.28 0.33 0.43 1.26 0.851
41 4.13 4.11 3.47 1.68 0.69 0.42 0.33 0.29 0.27 0.32 0.42 1.13 0.872
42 3.99 3.79 2.73 1.58 0.64 0.40 0.32 0.28 0.27 0.30 0.41 0.88 0.894
43 3.75 3.78 2.38 1.32 0.51 0.39 0.30 0.27 0.24 0.28 0.39 0.88 0.915
44 2.66 1.98 2.18 1.08 0.51 0.38 0.29 0.25 0.24 0.23 0.37 0.86 0.936
45 1.95 1.77 1.91 1.06 0.46 0.34 0.29 0.24 0.23 0.22 0.30 0.83 0.957
46 1.43 1.53 1.85 0.53 0.24 0.23 0.23 0.23 0.20 0.20 0.27 0.68 0.979
Media 10.17 13.17 10.50 4.91 1.26 0.59 0.45 0.40 0.44 0.61 1.51 3.66
P(0.25%) 13.83 19.37 13.86 6.29 1.40 0.66 0.49 0.45 0.47 0.73 1.70 5.12
P(0.5%) 9.37 12.02 9.92 3.59 1.03 0.56 0.44 0.38 0.37 0.57 1.00 2.94
P(0.75%) 5.26 6.37 6.90 2.53 0.75 0.46 0.38 0.33 0.32 0.38 0.55 1.36
P(0.9%) 3.92 3.79 2.62 1.50 0.60 0.40 0.32 0.28 0.26 0.29 0.40 0.88

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 215
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.35
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 6 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 6.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 6.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 6.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 6.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 6.00 6.00 0.58 17.61 100.00 16.07 91.24 1.54 8.76
6 1969 7.31 6.00 6.00 1.31 19.58 100.00 16.07 82.09 3.51 17.91
7 1970 7.74 6.00 6.00 1.74 20.73 100.00 16.07 77.51 4.66 22.49
8 1971 8.74 6.00 6.00 2.74 23.41 100.00 16.07 68.64 7.34 31.36
9 1972 16.57 6.00 6.00 10.57 44.38 100.00 16.07 36.21 28.31 63.79
10 1973 13.70 6.00 6.00 7.70 36.71 100.00 16.07 43.78 20.64 56.22
11 1974 16.82 6.00 6.00 10.82 45.05 100.00 16.07 35.67 28.98 64.33
12 1975 9.94 6.00 6.00 3.94 26.62 100.00 16.07 60.37 10.55 39.63
13 1976 17.18 6.00 6.00 11.18 46.01 100.00 16.07 34.93 29.93 65.07
14 1977 4.68 6.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 6.00 6.00 10.53 44.26 100.00 16.07 36.31 28.19 63.69
16 1979 13.75 6.00 6.00 7.75 36.84 100.00 16.07 43.62 20.77 56.38
17 1980 4.59 6.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 6.00 6.00 3.76 26.14 100.00 16.07 61.47 10.07 38.53
19 1982 13.23 6.00 6.00 7.23 35.45 100.00 16.07 45.34 19.38 54.66
20 1983 1.43 6.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 6.00 6.00 7.15 35.21 100.00 16.07 45.64 19.14 54.36
22 1985 9.84 6.00 6.00 3.84 26.35 100.00 16.07 61.00 10.28 39.00
23 1986 16.10 6.00 6.00 10.10 43.13 100.00 16.07 37.26 27.06 62.74
24 1987 23.96 6.00 6.00 17.96 64.17 100.00 16.07 25.04 48.10 74.96
25 1988 8.99 6.00 6.00 2.99 24.08 100.00 16.07 66.75 8.01 33.25
26 1989 10.88 6.00 6.00 4.88 29.15 100.00 16.07 55.13 13.08 44.87
27 1990 6.44 6.00 6.00 0.44 17.26 100.00 16.07 93.13 1.19 6.87
28 1991 10.79 6.00 6.00 4.79 28.89 100.00 16.07 55.62 12.82 44.38
29 1992 5.37 6.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 6.00 6.00 13.14 51.26 100.00 16.07 31.35 35.19 68.65
31 1994 5.42 6.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 6.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 6.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 6.00 6.00 16.20 59.45 100.00 16.07 27.03 43.38 72.97
35 1998 8.91 6.00 6.00 2.91 23.87 100.00 16.07 67.33 7.80 32.67
36 1999 2.66 6.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 6.00 6.00 4.79 28.91 100.00 16.07 55.58 12.84 44.42
38 2001 17.50 6.00 6.00 11.50 46.87 100.00 16.07 34.29 30.80 65.71
39 2002 7.95 6.00 6.00 1.95 21.29 100.00 16.07 75.47 5.22 24.53
40 2003 8.89 6.00 6.00 2.89 23.82 100.00 16.07 67.46 7.75 32.54
41 2004 12.37 6.00 6.00 6.37 33.14 100.00 16.07 48.49 17.07 51.51
42 2005 3.99 6.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 6.00 6.00 5.30 30.27 100.00 16.07 53.08 14.20 46.92
44 2007 14.05 6.00 6.00 8.05 37.64 100.00 16.07 42.70 21.57 57.30
45 2008 19.20 6.00 6.00 13.20 51.43 100.00 16.07 31.25 35.36 68.75
46 2009 4.41 6.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 6.00 5.42 4.75 27.24 14.53 12.71
TOTAL 1,253.07 100.00 668.33 53.34 584.74 46.66

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 216
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.36
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 8 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 8.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 8.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 8.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 8.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 8.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 8.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 8.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 8.00 8.00 0.74 23.41 100.00 21.43 91.52 1.98 8.48
9 1972 16.57 8.00 8.00 8.57 44.38 100.00 21.43 48.28 22.95 51.72
10 1973 13.70 8.00 8.00 5.70 36.71 100.00 21.43 58.37 15.28 41.63
11 1974 16.82 8.00 8.00 8.82 45.05 100.00 21.43 47.56 23.62 52.44
12 1975 9.94 8.00 8.00 1.94 26.62 100.00 21.43 80.49 5.19 19.51
13 1976 17.18 8.00 8.00 9.18 46.01 100.00 21.43 46.58 24.58 53.42
14 1977 4.68 8.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 8.00 8.00 8.53 44.26 100.00 21.43 48.41 22.84 51.59
16 1979 13.75 8.00 8.00 5.75 36.84 100.00 21.43 58.16 15.41 41.84
17 1980 4.59 8.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 8.00 8.00 1.76 26.14 100.00 21.43 81.96 4.72 18.04
19 1982 13.23 8.00 8.00 5.23 35.45 100.00 21.43 60.45 14.02 39.55
20 1983 1.43 8.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 8.00 8.00 5.15 35.21 100.00 21.43 60.85 13.78 39.15
22 1985 9.84 8.00 8.00 1.84 26.35 100.00 21.43 81.33 4.92 18.67
23 1986 16.10 8.00 8.00 8.10 43.13 100.00 21.43 49.68 21.70 50.32
24 1987 23.96 8.00 8.00 15.96 64.17 100.00 21.43 33.39 42.75 66.61
25 1988 8.99 8.00 8.00 0.99 24.08 100.00 21.43 88.99 2.65 11.01
26 1989 10.88 8.00 8.00 2.88 29.15 100.00 21.43 73.51 7.72 26.49
27 1990 6.44 8.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 8.00 8.00 2.79 28.89 100.00 21.43 74.16 7.47 25.84
29 1992 5.37 8.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 8.00 8.00 11.14 51.26 100.00 21.43 41.80 29.84 58.20
31 1994 5.42 8.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 8.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 8.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 8.00 8.00 14.20 59.45 100.00 21.43 36.04 38.02 63.96
35 1998 8.91 8.00 8.00 0.91 23.87 100.00 21.43 89.78 2.44 10.22
36 1999 2.66 8.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 8.00 8.00 2.79 28.91 100.00 21.43 74.11 7.48 25.89
38 2001 17.50 8.00 8.00 9.50 46.87 100.00 21.43 45.72 25.44 54.28
39 2002 7.95 8.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 8.00 8.00 0.89 23.82 100.00 21.43 89.94 2.40 10.06
41 2004 12.37 8.00 8.00 4.37 33.14 100.00 21.43 64.65 11.72 35.35
42 2005 3.99 8.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 8.00 8.00 3.30 30.27 100.00 21.43 70.78 8.85 29.22
44 2007 14.05 8.00 8.00 6.05 37.64 100.00 21.43 56.93 16.21 43.07
45 2008 19.20 8.00 8.00 11.20 51.43 100.00 21.43 41.66 30.00 58.34
46 2009 4.41 8.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 8.00 6.73 3.44 27.24 18.02 9.22
TOTAL 1,253.07 100.00 829.09 66.16 423.98 33.84

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 217
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.37
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 10 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 10.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 10.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 10.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 10.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 10.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 10.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 10.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 10.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 10.00 10.00 6.57 44.38 100.00 26.78 60.36 17.59 39.64
10 1973 13.70 10.00 10.00 3.70 36.71 100.00 26.78 72.97 9.92 27.03
11 1974 16.82 10.00 10.00 6.82 45.05 100.00 26.78 59.45 18.27 40.55
12 1975 9.94 10.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 10.00 10.00 7.18 46.01 100.00 26.78 58.22 19.22 41.78
14 1977 4.68 10.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 10.00 10.00 6.53 44.26 100.00 26.78 60.51 17.48 39.49
16 1979 13.75 10.00 10.00 3.75 36.84 100.00 26.78 72.70 10.06 27.30
17 1980 4.59 10.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 10.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 10.00 10.00 3.23 35.45 100.00 26.78 75.56 8.66 24.44
20 1983 1.43 10.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 10.00 10.00 3.15 35.21 100.00 26.78 76.07 8.43 23.93
22 1985 9.84 10.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 10.00 10.00 6.10 43.13 100.00 26.78 62.10 16.35 37.90
24 1987 23.96 10.00 10.00 13.96 64.17 100.00 26.78 41.74 37.39 58.26
25 1988 8.99 10.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 10.00 10.00 0.88 29.15 100.00 26.78 91.89 2.36 8.11
27 1990 6.44 10.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 10.00 10.00 0.79 28.89 100.00 26.78 92.70 2.11 7.30
29 1992 5.37 10.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 10.00 10.00 9.14 51.26 100.00 26.78 52.25 24.48 47.75
31 1994 5.42 10.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 10.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 10.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 10.00 10.00 12.20 59.45 100.00 26.78 45.05 32.67 54.95
35 1998 8.91 10.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 10.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 10.00 10.00 0.79 28.91 100.00 26.78 92.64 2.13 7.36
38 2001 17.50 10.00 10.00 7.50 46.87 100.00 26.78 57.15 20.08 42.85
39 2002 7.95 10.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 10.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 10.00 10.00 2.37 33.14 100.00 26.78 80.81 6.36 19.19
42 2005 3.99 10.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 10.00 10.00 1.30 30.27 100.00 26.78 88.47 3.49 11.53
44 2007 14.05 10.00 10.00 4.05 37.64 100.00 26.78 71.16 10.85 28.84
45 2008 19.20 10.00 10.00 9.20 51.43 100.00 26.78 52.08 24.65 47.92
46 2009 4.41 10.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 10.00 7.80 2.37 27.24 20.88 6.36
TOTAL 1,253.07 100.00 960.52 76.65 292.55 23.35

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 218
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.38
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 12 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 12.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 12.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 12.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 12.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 12.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 12.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 12.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 12.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 12.00 12.00 4.57 44.38 100.00 32.14 72.43 12.24 27.57
10 1973 13.70 12.00 12.00 1.70 36.71 100.00 32.14 87.56 4.57 12.44
11 1974 16.82 12.00 12.00 4.82 45.05 100.00 32.14 71.34 12.91 28.66
12 1975 9.94 12.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 12.00 12.00 5.18 46.01 100.00 32.14 69.86 13.86 30.14
14 1977 4.68 12.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 12.00 12.00 4.53 44.26 100.00 32.14 72.61 12.12 27.39
16 1979 13.75 12.00 12.00 1.75 36.84 100.00 32.14 87.24 4.70 12.76
17 1980 4.59 12.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 12.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 12.00 12.00 1.23 35.45 100.00 32.14 90.67 3.31 9.33
20 1983 1.43 12.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 12.00 12.00 1.15 35.21 100.00 32.14 91.28 3.07 8.72
22 1985 9.84 12.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 12.00 12.00 4.10 43.13 100.00 32.14 74.52 10.99 25.48
24 1987 23.96 12.00 12.00 11.96 64.17 100.00 32.14 50.08 32.03 49.92
25 1988 8.99 12.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 12.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 12.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 12.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 12.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 12.00 12.00 7.14 51.26 100.00 32.14 62.70 19.12 37.30
31 1994 5.42 12.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 12.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 12.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 12.00 12.00 10.20 59.45 100.00 32.14 54.06 27.31 45.94
35 1998 8.91 12.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 12.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 12.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 12.00 12.00 5.50 46.87 100.00 32.14 68.58 14.73 31.42
39 2002 7.95 12.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 12.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 12.00 12.00 0.37 33.14 100.00 32.14 96.97 1.00 3.03
42 2005 3.99 12.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 12.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 12.00 12.00 2.05 37.64 100.00 32.14 85.40 5.50 14.60
45 2008 19.20 12.00 12.00 7.20 51.43 100.00 32.14 62.49 19.29 37.51
46 2009 4.41 12.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 12.00 8.57 1.60 27.24 22.96 4.28
TOTAL 1,253.07 100.00 1,056.32 84.30 196.75 15.70

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 219
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.39
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 14 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 14.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 14.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 14.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 14.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 14.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 14.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 14.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 14.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 14.00 14.00 2.57 44.38 100.00 37.50 84.50 6.88 15.50
10 1973 13.70 14.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 14.00 14.00 2.82 45.05 100.00 37.50 83.23 7.55 16.77
12 1975 9.94 14.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 14.00 14.00 3.18 46.01 100.00 37.50 81.51 8.51 18.49
14 1977 4.68 14.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 14.00 14.00 2.53 44.26 100.00 37.50 84.71 6.77 15.29
16 1979 13.75 14.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 14.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 14.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 14.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 14.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 14.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 14.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 14.00 14.00 2.10 43.13 100.00 37.50 86.94 5.63 13.06
24 1987 23.96 14.00 14.00 9.96 64.17 100.00 37.50 58.43 26.67 41.57
25 1988 8.99 14.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 14.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 14.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 14.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 14.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 14.00 14.00 5.14 51.26 100.00 37.50 73.15 13.77 26.85
31 1994 5.42 14.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 14.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 14.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 14.00 14.00 8.20 59.45 100.00 37.50 63.07 21.95 36.93
35 1998 8.91 14.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 14.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 14.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 14.00 14.00 3.50 46.87 100.00 37.50 80.01 9.37 19.99
39 2002 7.95 14.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 14.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 14.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 14.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 14.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 14.00 14.00 0.05 37.64 100.00 37.50 99.63 0.14 0.37
45 2008 19.20 14.00 14.00 5.20 51.43 100.00 37.50 72.91 13.93 27.09
46 2009 4.41 14.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 14.00 9.19 0.98 27.24 24.61 2.63
TOTAL 1,253.07 100.00 1,131.89 90.33 121.18 9.67

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 220
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.40
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 16 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 16.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 16.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 16.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 16.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 16.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 16.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 16.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 16.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 16.00 16.00 0.57 44.38 100.00 42.85 96.57 1.52 3.43
10 1973 13.70 16.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 16.00 16.00 0.82 45.05 100.00 42.85 95.13 2.20 4.87
12 1975 9.94 16.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 16.00 16.00 1.18 46.01 100.00 42.85 93.15 3.15 6.85
14 1977 4.68 16.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 16.00 16.00 0.53 44.26 100.00 42.85 96.81 1.41 3.19
16 1979 13.75 16.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 16.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 16.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 16.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 16.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 16.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 16.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 16.00 16.00 0.10 43.13 100.00 42.85 99.36 0.28 0.64
24 1987 23.96 16.00 16.00 7.96 64.17 100.00 42.85 66.78 21.32 33.22
25 1988 8.99 16.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 16.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 16.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 16.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 16.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 16.00 16.00 3.14 51.26 100.00 42.85 83.59 8.41 16.41
31 1994 5.42 16.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 16.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 16.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 16.00 16.00 6.20 59.45 100.00 42.85 72.08 16.60 27.92
35 1998 8.91 16.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 16.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 16.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 16.00 16.00 1.50 46.87 100.00 42.85 91.44 4.01 8.56
39 2002 7.95 16.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 16.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 16.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 16.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 16.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 16.00 14.05 0.00 37.64 100.00 37.64 100.00 0.00 0.00
45 2008 19.20 16.00 16.00 3.20 51.43 100.00 42.85 83.33 8.58 16.67
46 2009 4.41 16.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 16.00 9.62 0.55 27.24 25.77 1.47
TOTAL 1,253.07 100.00 1,185.60 94.62 67.47 5.38

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 221
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.41
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 18 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 18.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 18.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 18.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 18.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 18.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 18.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 18.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 18.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 18.00 16.57 0.00 44.38 100.00 44.38 100.00 0.00 0.00
10 1973 13.70 18.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 18.00 16.82 0.00 45.05 100.00 45.05 100.00 0.00 0.00
12 1975 9.94 18.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 18.00 17.18 0.00 46.01 100.00 46.01 100.00 0.00 0.00
14 1977 4.68 18.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 18.00 16.53 0.00 44.26 100.00 44.26 100.00 0.00 0.00
16 1979 13.75 18.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 18.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 18.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 18.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 18.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 18.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 18.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 18.00 16.10 0.00 43.13 100.00 43.13 100.00 0.00 0.00
24 1987 23.96 18.00 18.00 5.96 64.17 100.00 48.21 75.13 15.96 24.87
25 1988 8.99 18.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 18.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 18.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 18.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 18.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 18.00 18.00 1.14 51.26 100.00 48.21 94.04 3.05 5.96
31 1994 5.42 18.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 18.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 18.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 18.00 18.00 4.20 59.45 100.00 48.21 81.09 11.24 18.91
35 1998 8.91 18.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 18.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 18.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 18.00 17.50 0.00 46.87 100.00 46.87 100.00 0.00 0.00
39 2002 7.95 18.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 18.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 18.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 18.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 18.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 18.00 14.05 0.00 37.64 100.00 37.64 100.00 0.00 0.00
45 2008 19.20 18.00 18.00 1.20 51.43 100.00 48.21 93.74 3.22 6.26
46 2009 4.41 18.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 18.00 9.90 0.27 27.24 26.51 0.73
TOTAL 1,253.07 100.00 1,219.60 97.33 33.47 2.67

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 222
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.42
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 20.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 20.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 20.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 20.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 20.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 20.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 20.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 20.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 20.00 16.57 0.00 44.38 100.00 44.38 100.00 0.00 0.00
10 1973 13.70 20.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 20.00 16.82 0.00 45.05 100.00 45.05 100.00 0.00 0.00
12 1975 9.94 20.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 20.00 17.18 0.00 46.01 100.00 46.01 100.00 0.00 0.00
14 1977 4.68 20.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 20.00 16.53 0.00 44.26 100.00 44.26 100.00 0.00 0.00
16 1979 13.75 20.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 20.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 20.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 20.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 20.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 20.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 20.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 20.00 16.10 0.00 43.13 100.00 43.13 100.00 0.00 0.00
24 1987 23.96 20.00 20.00 3.96 64.17 100.00 53.57 83.47 10.60 16.53
25 1988 8.99 20.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 20.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 20.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 20.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 20.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 20.00 19.14 0.00 51.26 100.00 51.26 100.00 0.00 0.00
31 1994 5.42 20.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 20.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 20.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 20.00 20.00 2.20 59.45 100.00 53.57 90.10 5.88 9.90
35 1998 8.91 20.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 20.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 20.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 20.00 17.50 0.00 46.87 100.00 46.87 100.00 0.00 0.00
39 2002 7.95 20.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 20.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 20.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 20.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 20.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 20.00 14.05 0.00 37.64 100.00 37.64 100.00 0.00 0.00
45 2008 19.20 20.00 19.20 0.00 51.43 100.00 51.43 100.00 0.00 0.00
46 2009 4.41 20.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 20.00 10.04 0.13 27.24 26.88 0.36
TOTAL 1,253.07 100.00 1,236.58 98.68 16.49 1.32

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 223
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.43
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 22 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 22.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 22.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 22.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 22.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 22.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 22.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 22.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 22.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 22.00 16.57 0.00 44.38 100.00 44.38 100.00 0.00 0.00
10 1973 13.70 22.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 22.00 16.82 0.00 45.05 100.00 45.05 100.00 0.00 0.00
12 1975 9.94 22.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 22.00 17.18 0.00 46.01 100.00 46.01 100.00 0.00 0.00
14 1977 4.68 22.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 22.00 16.53 0.00 44.26 100.00 44.26 100.00 0.00 0.00
16 1979 13.75 22.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 22.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 22.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 22.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 22.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 22.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 22.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 22.00 16.10 0.00 43.13 100.00 43.13 100.00 0.00 0.00
24 1987 23.96 22.00 22.00 1.96 64.17 100.00 58.92 91.82 5.25 8.18
25 1988 8.99 22.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 22.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 22.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 22.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 22.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 22.00 19.14 0.00 51.26 100.00 51.26 100.00 0.00 0.00
31 1994 5.42 22.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 22.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 22.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 22.00 22.00 0.20 59.45 100.00 58.92 99.12 0.53 0.88
35 1998 8.91 22.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 22.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 22.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 22.00 17.50 0.00 46.87 100.00 46.87 100.00 0.00 0.00
39 2002 7.95 22.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 22.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 22.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 22.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 22.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 22.00 14.05 0.00 37.64 100.00 37.64 100.00 0.00 0.00
45 2008 19.20 22.00 19.20 0.00 51.43 100.00 51.43 100.00 0.00 0.00
46 2009 4.41 22.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 22.00 10.12 0.05 27.24 27.12 0.13
TOTAL 1,253.07 100.00 1,247.29 99.54 5.77 0.46

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 224
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.44
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Enero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 24 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 4.13 24.00 4.13 0.00 11.07 100.00 11.07 100.00 0.00 0.00
2 1965 3.75 24.00 3.75 0.00 10.05 100.00 10.05 100.00 0.00 0.00
3 1966 4.57 24.00 4.57 0.00 12.25 100.00 12.25 100.00 0.00 0.00
4 1967 1.95 24.00 1.95 0.00 5.21 100.00 5.21 100.00 0.00 0.00
5 1968 6.58 24.00 6.58 0.00 17.61 100.00 17.61 100.00 0.00 0.00
6 1969 7.31 24.00 7.31 0.00 19.58 100.00 19.58 100.00 0.00 0.00
7 1970 7.74 24.00 7.74 0.00 20.73 100.00 20.73 100.00 0.00 0.00
8 1971 8.74 24.00 8.74 0.00 23.41 100.00 23.41 100.00 0.00 0.00
9 1972 16.57 24.00 16.57 0.00 44.38 100.00 44.38 100.00 0.00 0.00
10 1973 13.70 24.00 13.70 0.00 36.71 100.00 36.71 100.00 0.00 0.00
11 1974 16.82 24.00 16.82 0.00 45.05 100.00 45.05 100.00 0.00 0.00
12 1975 9.94 24.00 9.94 0.00 26.62 100.00 26.62 100.00 0.00 0.00
13 1976 17.18 24.00 17.18 0.00 46.01 100.00 46.01 100.00 0.00 0.00
14 1977 4.68 24.00 4.68 0.00 12.54 100.00 12.54 100.00 0.00 0.00
15 1978 16.53 24.00 16.53 0.00 44.26 100.00 44.26 100.00 0.00 0.00
16 1979 13.75 24.00 13.75 0.00 36.84 100.00 36.84 100.00 0.00 0.00
17 1980 4.59 24.00 4.59 0.00 12.30 100.00 12.30 100.00 0.00 0.00
18 1981 9.76 24.00 9.76 0.00 26.14 100.00 26.14 100.00 0.00 0.00
19 1982 13.23 24.00 13.23 0.00 35.45 100.00 35.45 100.00 0.00 0.00
20 1983 1.43 24.00 1.43 0.00 3.82 100.00 3.82 100.00 0.00 0.00
21 1984 13.15 24.00 13.15 0.00 35.21 100.00 35.21 100.00 0.00 0.00
22 1985 9.84 24.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
23 1986 16.10 24.00 16.10 0.00 43.13 100.00 43.13 100.00 0.00 0.00
24 1987 23.96 24.00 23.96 0.00 64.17 100.00 64.17 100.00 0.00 0.00
25 1988 8.99 24.00 8.99 0.00 24.08 100.00 24.08 100.00 0.00 0.00
26 1989 10.88 24.00 10.88 0.00 29.15 100.00 29.15 100.00 0.00 0.00
27 1990 6.44 24.00 6.44 0.00 17.26 100.00 17.26 100.00 0.00 0.00
28 1991 10.79 24.00 10.79 0.00 28.89 100.00 28.89 100.00 0.00 0.00
29 1992 5.37 24.00 5.37 0.00 14.39 100.00 14.39 100.00 0.00 0.00
30 1993 19.14 24.00 19.14 0.00 51.26 100.00 51.26 100.00 0.00 0.00
31 1994 5.42 24.00 5.42 0.00 14.52 100.00 14.52 100.00 0.00 0.00
32 1995 4.93 24.00 4.93 0.00 13.21 100.00 13.21 100.00 0.00 0.00
33 1996 5.63 24.00 5.63 0.00 15.08 100.00 15.08 100.00 0.00 0.00
34 1997 22.20 24.00 22.20 0.00 59.45 100.00 59.45 100.00 0.00 0.00
35 1998 8.91 24.00 8.91 0.00 23.87 100.00 23.87 100.00 0.00 0.00
36 1999 2.66 24.00 2.66 0.00 7.13 100.00 7.13 100.00 0.00 0.00
37 2000 10.79 24.00 10.79 0.00 28.91 100.00 28.91 100.00 0.00 0.00
38 2001 17.50 24.00 17.50 0.00 46.87 100.00 46.87 100.00 0.00 0.00
39 2002 7.95 24.00 7.95 0.00 21.29 100.00 21.29 100.00 0.00 0.00
40 2003 8.89 24.00 8.89 0.00 23.82 100.00 23.82 100.00 0.00 0.00
41 2004 12.37 24.00 12.37 0.00 33.14 100.00 33.14 100.00 0.00 0.00
42 2005 3.99 24.00 3.99 0.00 10.70 100.00 10.70 100.00 0.00 0.00
43 2006 11.30 24.00 11.30 0.00 30.27 100.00 30.27 100.00 0.00 0.00
44 2007 14.05 24.00 14.05 0.00 37.64 100.00 37.64 100.00 0.00 0.00
45 2008 19.20 24.00 19.20 0.00 51.43 100.00 51.43 100.00 0.00 0.00
46 2009 4.41 24.00 4.41 0.00 11.82 100.00 11.82 100.00 0.00 0.00
PROMEDIO 10.17 24.00 10.17 0.00 27.24 27.24 0.00
TOTAL 1,253.07 100.00 1,253.07 100.00 0.00 0.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 225
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.45
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 6 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 6.00 6.00 7.69 33.11 100.00 14.52 43.84 18.60 56.16
2 1965 9.38 6.00 6.00 3.38 22.69 100.00 14.52 63.98 8.17 36.02
3 1966 10.33 6.00 6.00 4.33 24.98 100.00 14.52 58.10 10.47 41.90
4 1967 4.69 6.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 6.00 6.00 10.14 39.05 100.00 14.52 37.17 24.53 62.83
6 1969 7.67 6.00 6.00 1.67 18.56 100.00 14.52 78.22 4.04 21.78
7 1970 15.70 6.00 6.00 9.70 37.98 100.00 14.52 38.22 23.46 61.78
8 1971 26.58 6.00 6.00 20.58 64.29 100.00 14.52 22.58 49.78 77.42
9 1972 5.84 6.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 6.00 6.00 14.28 49.05 100.00 14.52 29.59 34.54 70.41
11 1974 25.58 6.00 6.00 19.58 61.89 100.00 14.52 23.45 47.37 76.55
12 1975 22.17 6.00 6.00 16.17 53.63 100.00 14.52 27.07 39.11 72.93
13 1976 13.69 6.00 6.00 7.69 33.11 100.00 14.52 43.83 18.60 56.17
14 1977 15.33 6.00 6.00 9.33 37.08 100.00 14.52 39.14 22.57 60.86
15 1978 10.40 6.00 6.00 4.40 25.15 100.00 14.52 57.72 10.63 42.28
16 1979 12.77 6.00 6.00 6.77 30.89 100.00 14.52 46.99 16.37 53.01
17 1980 3.79 6.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 6.00 6.00 7.34 32.28 100.00 14.52 44.97 17.77 55.03
19 1982 3.78 6.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 6.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 6.00 6.00 23.26 70.77 100.00 14.52 20.51 56.26 79.49
22 1985 17.86 6.00 6.00 11.86 43.20 100.00 14.52 33.60 28.69 66.40
23 1986 16.73 6.00 6.00 10.73 40.48 100.00 14.52 35.86 25.96 64.14
24 1987 4.72 6.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 6.00 6.00 0.99 16.92 100.00 14.52 85.79 2.40 14.21
26 1989 5.52 6.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 6.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 6.00 6.00 2.50 20.57 100.00 14.52 70.58 6.05 29.42
29 1992 1.53 6.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 6.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 6.00 6.00 2.94 21.63 100.00 14.52 67.12 7.11 32.88
32 1995 6.54 6.00 6.00 0.54 15.82 100.00 14.52 91.75 1.31 8.25
33 1996 10.96 6.00 6.00 4.96 26.50 100.00 14.52 54.77 11.99 45.23
34 1997 14.74 6.00 6.00 8.74 35.66 100.00 14.52 40.70 21.15 59.30
35 1998 11.28 6.00 6.00 5.28 27.28 100.00 14.52 53.20 12.77 46.80
36 1999 13.42 6.00 6.00 7.42 32.46 100.00 14.52 44.72 17.94 55.28
37 2000 21.54 6.00 6.00 15.54 52.10 100.00 14.52 27.86 37.59 72.14
38 2001 22.44 6.00 6.00 16.44 54.28 100.00 14.52 26.74 39.77 73.26
39 2002 34.20 6.00 6.00 28.20 82.73 100.00 14.52 17.54 68.22 82.46
40 2003 21.44 6.00 6.00 15.44 51.87 100.00 14.52 27.98 37.36 72.02
41 2004 19.07 6.00 6.00 13.07 46.14 100.00 14.52 31.46 31.63 68.54
42 2005 23.77 6.00 6.00 17.77 57.50 100.00 14.52 25.24 42.99 74.76
43 2006 22.18 6.00 6.00 16.18 53.66 100.00 14.52 27.05 39.15 72.95
44 2007 5.70 6.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 6.00 6.00 3.62 23.26 100.00 14.52 62.40 8.75 37.60
46 2009 9.77 6.00 6.00 3.77 23.64 100.00 14.52 61.40 9.12 38.60
PROMEDIO 13.17 6.00 5.51 7.66 31.85 13.33 18.53
TOTAL 1,465.31 100.00 613.10 41.84 852.21 58.16

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 226
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.46
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 8 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 8.00 8.00 5.69 33.11 100.00 19.35 58.45 13.76 41.55
2 1965 9.38 8.00 8.00 1.38 22.69 100.00 19.35 85.30 3.34 14.70
3 1966 10.33 8.00 8.00 2.33 24.98 100.00 19.35 77.46 5.63 22.54
4 1967 4.69 8.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 8.00 8.00 8.14 39.05 100.00 19.35 49.56 19.70 50.44
6 1969 7.67 8.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 8.00 8.00 7.70 37.98 100.00 19.35 50.96 18.63 49.04
8 1971 26.58 8.00 8.00 18.58 64.29 100.00 19.35 30.10 44.94 69.90
9 1972 5.84 8.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 8.00 8.00 12.28 49.05 100.00 19.35 39.46 29.70 60.54
11 1974 25.58 8.00 8.00 17.58 61.89 100.00 19.35 31.27 42.53 68.73
12 1975 22.17 8.00 8.00 14.17 53.63 100.00 19.35 36.09 34.27 63.91
13 1976 13.69 8.00 8.00 5.69 33.11 100.00 19.35 58.44 13.76 41.56
14 1977 15.33 8.00 8.00 7.33 37.08 100.00 19.35 52.19 17.73 47.81
15 1978 10.40 8.00 8.00 2.40 25.15 100.00 19.35 76.96 5.79 23.04
16 1979 12.77 8.00 8.00 4.77 30.89 100.00 19.35 62.65 11.54 37.35
17 1980 3.79 8.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 8.00 8.00 5.34 32.28 100.00 19.35 59.95 12.93 40.05
19 1982 3.78 8.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 8.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 8.00 8.00 21.26 70.77 100.00 19.35 27.35 51.42 72.65
22 1985 17.86 8.00 8.00 9.86 43.20 100.00 19.35 44.80 23.85 55.20
23 1986 16.73 8.00 8.00 8.73 40.48 100.00 19.35 47.81 21.12 52.19
24 1987 4.72 8.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 8.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 8.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 8.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 8.00 8.00 0.50 20.57 100.00 19.35 94.11 1.21 5.89
29 1992 1.53 8.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 8.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 8.00 8.00 0.94 21.63 100.00 19.35 89.49 2.27 10.51
32 1995 6.54 8.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 8.00 8.00 2.96 26.50 100.00 19.35 73.02 7.15 26.98
34 1997 14.74 8.00 8.00 6.74 35.66 100.00 19.35 54.27 16.31 45.73
35 1998 11.28 8.00 8.00 3.28 27.28 100.00 19.35 70.94 7.93 29.06
36 1999 13.42 8.00 8.00 5.42 32.46 100.00 19.35 59.63 13.10 40.37
37 2000 21.54 8.00 8.00 13.54 52.10 100.00 19.35 37.14 32.75 62.86
38 2001 22.44 8.00 8.00 14.44 54.28 100.00 19.35 35.65 34.93 64.35
39 2002 34.20 8.00 8.00 26.20 82.73 100.00 19.35 23.39 63.38 76.61
40 2003 21.44 8.00 8.00 13.44 51.87 100.00 19.35 37.31 32.52 62.69
41 2004 19.07 8.00 8.00 11.07 46.14 100.00 19.35 41.94 26.79 58.06
42 2005 23.77 8.00 8.00 15.77 57.50 100.00 19.35 33.66 38.15 66.34
43 2006 22.18 8.00 8.00 14.18 53.66 100.00 19.35 36.07 34.31 63.93
44 2007 5.70 8.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 8.00 8.00 1.62 23.26 100.00 19.35 83.20 3.91 16.80
46 2009 9.77 8.00 8.00 1.77 23.64 100.00 19.35 81.87 4.29 18.13
PROMEDIO 13.17 8.00 6.97 6.20 31.85 16.86 14.99
TOTAL 1,465.31 100.00 775.68 52.94 689.62 47.06

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 227
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.47
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 10 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 10.00 10.00 3.69 33.11 100.00 24.19 73.06 8.92 26.94
2 1965 9.38 10.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 10.00 10.00 0.33 24.98 100.00 24.19 96.83 0.79 3.17
4 1967 4.69 10.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 10.00 10.00 6.14 39.05 100.00 24.19 61.95 14.86 38.05
6 1969 7.67 10.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 10.00 10.00 5.70 37.98 100.00 24.19 63.70 13.79 36.30
8 1971 26.58 10.00 10.00 16.58 64.29 100.00 24.19 37.63 40.10 62.37
9 1972 5.84 10.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 10.00 10.00 10.28 49.05 100.00 24.19 49.32 24.86 50.68
11 1974 25.58 10.00 10.00 15.58 61.89 100.00 24.19 39.09 37.70 60.91
12 1975 22.17 10.00 10.00 12.17 53.63 100.00 24.19 45.11 29.43 54.89
13 1976 13.69 10.00 10.00 3.69 33.11 100.00 24.19 73.05 8.92 26.95
14 1977 15.33 10.00 10.00 5.33 37.08 100.00 24.19 65.24 12.89 34.76
15 1978 10.40 10.00 10.00 0.40 25.15 100.00 24.19 96.20 0.96 3.80
16 1979 12.77 10.00 10.00 2.77 30.89 100.00 24.19 78.32 6.70 21.68
17 1980 3.79 10.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 10.00 10.00 3.34 32.28 100.00 24.19 74.94 8.09 25.06
19 1982 3.78 10.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 10.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 10.00 10.00 19.26 70.77 100.00 24.19 34.18 46.58 65.82
22 1985 17.86 10.00 10.00 7.86 43.20 100.00 24.19 55.99 19.01 44.01
23 1986 16.73 10.00 10.00 6.73 40.48 100.00 24.19 59.77 16.28 40.23
24 1987 4.72 10.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 10.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 10.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 10.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 10.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 10.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 10.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 10.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 10.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 10.00 10.00 0.96 26.50 100.00 24.19 91.28 2.31 8.72
34 1997 14.74 10.00 10.00 4.74 35.66 100.00 24.19 67.84 11.47 32.16
35 1998 11.28 10.00 10.00 1.28 27.28 100.00 24.19 88.67 3.09 11.33
36 1999 13.42 10.00 10.00 3.42 32.46 100.00 24.19 74.53 8.27 25.47
37 2000 21.54 10.00 10.00 11.54 52.10 100.00 24.19 46.43 27.91 53.57
38 2001 22.44 10.00 10.00 12.44 54.28 100.00 24.19 44.57 30.09 55.43
39 2002 34.20 10.00 10.00 24.20 82.73 100.00 24.19 29.24 58.54 70.76
40 2003 21.44 10.00 10.00 11.44 51.87 100.00 24.19 46.64 27.68 53.36
41 2004 19.07 10.00 10.00 9.07 46.14 100.00 24.19 52.43 21.95 47.57
42 2005 23.77 10.00 10.00 13.77 57.50 100.00 24.19 42.07 33.31 57.93
43 2006 22.18 10.00 10.00 12.18 53.66 100.00 24.19 45.08 29.47 54.92
44 2007 5.70 10.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 10.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 10.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 10.00 8.28 4.89 31.85 20.03 11.83
TOTAL 1,465.31 100.00 921.33 62.88 543.97 37.12

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 228
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.48
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 12 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 12.00 12.00 1.69 33.11 100.00 29.03 87.68 4.08 12.32
2 1965 9.38 12.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 12.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 12.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 12.00 12.00 4.14 39.05 100.00 29.03 74.34 10.02 25.66
6 1969 7.67 12.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 12.00 12.00 3.70 37.98 100.00 29.03 76.44 8.95 23.56
8 1971 26.58 12.00 12.00 14.58 64.29 100.00 29.03 45.15 35.26 54.85
9 1972 5.84 12.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 12.00 12.00 8.28 49.05 100.00 29.03 59.18 20.02 40.82
11 1974 25.58 12.00 12.00 13.58 61.89 100.00 29.03 46.91 32.86 53.09
12 1975 22.17 12.00 12.00 10.17 53.63 100.00 29.03 54.13 24.60 45.87
13 1976 13.69 12.00 12.00 1.69 33.11 100.00 29.03 87.67 4.08 12.33
14 1977 15.33 12.00 12.00 3.33 37.08 100.00 29.03 78.28 8.05 21.72
15 1978 10.40 12.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 12.00 12.00 0.77 30.89 100.00 29.03 93.98 1.86 6.02
17 1980 3.79 12.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 12.00 12.00 1.34 32.28 100.00 29.03 89.93 3.25 10.07
19 1982 3.78 12.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 12.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 12.00 12.00 17.26 70.77 100.00 29.03 41.02 41.74 58.98
22 1985 17.86 12.00 12.00 5.86 43.20 100.00 29.03 67.19 14.17 32.81
23 1986 16.73 12.00 12.00 4.73 40.48 100.00 29.03 71.72 11.45 28.28
24 1987 4.72 12.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 12.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 12.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 12.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 12.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 12.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 12.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 12.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 12.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 12.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 12.00 12.00 2.74 35.66 100.00 29.03 81.41 6.63 18.59
35 1998 11.28 12.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 12.00 12.00 1.42 32.46 100.00 29.03 89.44 3.43 10.56
37 2000 21.54 12.00 12.00 9.54 52.10 100.00 29.03 55.72 23.07 44.28
38 2001 22.44 12.00 12.00 10.44 54.28 100.00 29.03 53.48 25.25 46.52
39 2002 34.20 12.00 12.00 22.20 82.73 100.00 29.03 35.09 53.70 64.91
40 2003 21.44 12.00 12.00 9.44 51.87 100.00 29.03 55.96 22.84 44.04
41 2004 19.07 12.00 12.00 7.07 46.14 100.00 29.03 62.92 17.11 37.08
42 2005 23.77 12.00 12.00 11.77 57.50 100.00 29.03 50.49 28.47 49.51
43 2006 22.18 12.00 12.00 10.18 53.66 100.00 29.03 54.10 24.63 45.90
44 2007 5.70 12.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 12.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 12.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 12.00 9.34 3.82 31.85 22.60 9.25
TOTAL 1,465.31 100.00 1,039.77 70.96 425.54 29.04

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 229
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.49
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 14 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 14.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 14.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 14.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 14.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 14.00 14.00 2.14 39.05 100.00 33.87 86.73 5.18 13.27
6 1969 7.67 14.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 14.00 14.00 1.70 37.98 100.00 33.87 89.18 4.11 10.82
8 1971 26.58 14.00 14.00 12.58 64.29 100.00 33.87 52.68 30.42 47.32
9 1972 5.84 14.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 14.00 14.00 6.28 49.05 100.00 33.87 69.05 15.18 30.95
11 1974 25.58 14.00 14.00 11.58 61.89 100.00 33.87 54.73 28.02 45.27
12 1975 22.17 14.00 14.00 8.17 53.63 100.00 33.87 63.16 19.76 36.84
13 1976 13.69 14.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 14.00 14.00 1.33 37.08 100.00 33.87 91.33 3.22 8.67
15 1978 10.40 14.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 14.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 14.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 14.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 14.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 14.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 14.00 14.00 15.26 70.77 100.00 33.87 47.85 36.90 52.15
22 1985 17.86 14.00 14.00 3.86 43.20 100.00 33.87 78.39 9.34 21.61
23 1986 16.73 14.00 14.00 2.73 40.48 100.00 33.87 83.68 6.61 16.32
24 1987 4.72 14.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 14.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 14.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 14.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 14.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 14.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 14.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 14.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 14.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 14.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 14.00 14.00 0.74 35.66 100.00 33.87 94.97 1.79 5.03
35 1998 11.28 14.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 14.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 14.00 14.00 7.54 52.10 100.00 33.87 65.00 18.24 35.00
38 2001 22.44 14.00 14.00 8.44 54.28 100.00 33.87 62.39 20.41 37.61
39 2002 34.20 14.00 14.00 20.20 82.73 100.00 33.87 40.94 48.86 59.06
40 2003 21.44 14.00 14.00 7.44 51.87 100.00 33.87 65.29 18.01 34.71
41 2004 19.07 14.00 14.00 5.07 46.14 100.00 33.87 73.40 12.27 26.60
42 2005 23.77 14.00 14.00 9.77 57.50 100.00 33.87 58.90 23.63 41.10
43 2006 22.18 14.00 14.00 8.18 53.66 100.00 33.87 63.12 19.79 36.88
44 2007 5.70 14.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 14.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 14.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 14.00 10.28 2.89 31.85 24.86 6.99
TOTAL 1,465.31 100.00 1,143.56 78.04 321.74 21.96

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 230
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.50
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 16 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 16.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 16.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 16.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 16.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 16.00 16.00 0.14 39.05 100.00 38.71 99.12 0.34 0.88
6 1969 7.67 16.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 16.00 15.70 0.00 37.98 100.00 37.98 100.00 0.00 0.00
8 1971 26.58 16.00 16.00 10.58 64.29 100.00 38.71 60.21 25.58 39.79
9 1972 5.84 16.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 16.00 16.00 4.28 49.05 100.00 38.71 78.91 10.34 21.09
11 1974 25.58 16.00 16.00 9.58 61.89 100.00 38.71 62.54 23.18 37.46
12 1975 22.17 16.00 16.00 6.17 53.63 100.00 38.71 72.18 14.92 27.82
13 1976 13.69 16.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 16.00 15.33 0.00 37.08 100.00 37.08 100.00 0.00 0.00
15 1978 10.40 16.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 16.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 16.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 16.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 16.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 16.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 16.00 16.00 13.26 70.77 100.00 38.71 54.69 32.07 45.31
22 1985 17.86 16.00 16.00 1.86 43.20 100.00 38.71 89.59 4.50 10.41
23 1986 16.73 16.00 16.00 0.73 40.48 100.00 38.71 95.63 1.77 4.37
24 1987 4.72 16.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 16.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 16.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 16.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 16.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 16.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 16.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 16.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 16.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 16.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 16.00 14.74 0.00 35.66 100.00 35.66 100.00 0.00 0.00
35 1998 11.28 16.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 16.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 16.00 16.00 5.54 52.10 100.00 38.71 74.29 13.40 25.71
38 2001 22.44 16.00 16.00 6.44 54.28 100.00 38.71 71.31 15.58 28.69
39 2002 34.20 16.00 16.00 18.20 82.73 100.00 38.71 46.79 44.02 53.21
40 2003 21.44 16.00 16.00 5.44 51.87 100.00 38.71 74.62 13.17 25.38
41 2004 19.07 16.00 16.00 3.07 46.14 100.00 38.71 83.89 7.43 16.11
42 2005 23.77 16.00 16.00 7.77 57.50 100.00 38.71 67.32 18.79 32.68
43 2006 22.18 16.00 16.00 6.18 53.66 100.00 38.71 72.13 14.95 27.87
44 2007 5.70 16.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 16.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 16.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 16.00 11.01 2.16 31.85 26.64 5.22
TOTAL 1,465.31 100.00 1,225.26 83.62 240.05 16.38

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 231
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.51
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 18 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 18.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 18.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 18.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 18.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 18.00 16.14 0.00 39.05 100.00 39.05 100.00 0.00 0.00
6 1969 7.67 18.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 18.00 15.70 0.00 37.98 100.00 37.98 100.00 0.00 0.00
8 1971 26.58 18.00 18.00 8.58 64.29 100.00 43.55 67.73 20.75 32.27
9 1972 5.84 18.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 18.00 18.00 2.28 49.05 100.00 43.55 88.78 5.51 11.22
11 1974 25.58 18.00 18.00 7.58 61.89 100.00 43.55 70.36 18.34 29.64
12 1975 22.17 18.00 18.00 4.17 53.63 100.00 43.55 81.20 10.08 18.80
13 1976 13.69 18.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 18.00 15.33 0.00 37.08 100.00 37.08 100.00 0.00 0.00
15 1978 10.40 18.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 18.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 18.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 18.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 18.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 18.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 18.00 18.00 11.26 70.77 100.00 43.55 61.53 27.23 38.47
22 1985 17.86 18.00 17.86 0.00 43.20 100.00 43.20 100.00 0.00 0.00
23 1986 16.73 18.00 16.73 0.00 40.48 100.00 40.48 100.00 0.00 0.00
24 1987 4.72 18.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 18.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 18.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 18.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 18.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 18.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 18.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 18.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 18.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 18.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 18.00 14.74 0.00 35.66 100.00 35.66 100.00 0.00 0.00
35 1998 11.28 18.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 18.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 18.00 18.00 3.54 52.10 100.00 43.55 83.57 8.56 16.43
38 2001 22.44 18.00 18.00 4.44 54.28 100.00 43.55 80.22 10.74 19.78
39 2002 34.20 18.00 18.00 16.20 82.73 100.00 43.55 52.63 39.19 47.37
40 2003 21.44 18.00 18.00 3.44 51.87 100.00 43.55 83.94 8.33 16.06
41 2004 19.07 18.00 18.00 1.07 46.14 100.00 43.55 94.38 2.59 5.62
42 2005 23.77 18.00 18.00 5.77 57.50 100.00 43.55 75.73 13.96 24.27
43 2006 22.18 18.00 18.00 4.18 53.66 100.00 43.55 81.15 10.12 18.85
44 2007 5.70 18.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 18.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 18.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 18.00 11.59 1.58 31.85 28.04 3.81
TOTAL 1,465.31 100.00 1,289.93 88.03 175.38 11.97

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 232
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.52
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 20.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 20.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 20.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 20.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 20.00 16.14 0.00 39.05 100.00 39.05 100.00 0.00 0.00
6 1969 7.67 20.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 20.00 15.70 0.00 37.98 100.00 37.98 100.00 0.00 0.00
8 1971 26.58 20.00 20.00 6.58 64.29 100.00 48.38 75.26 15.91 24.74
9 1972 5.84 20.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 20.00 20.00 0.28 49.05 100.00 48.38 98.64 0.67 1.36
11 1974 25.58 20.00 20.00 5.58 61.89 100.00 48.38 78.18 13.50 21.82
12 1975 22.17 20.00 20.00 2.17 53.63 100.00 48.38 90.22 5.24 9.78
13 1976 13.69 20.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 20.00 15.33 0.00 37.08 100.00 37.08 100.00 0.00 0.00
15 1978 10.40 20.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 20.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 20.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 20.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 20.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 20.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 20.00 20.00 9.26 70.77 100.00 48.38 68.36 22.39 31.64
22 1985 17.86 20.00 17.86 0.00 43.20 100.00 43.20 100.00 0.00 0.00
23 1986 16.73 20.00 16.73 0.00 40.48 100.00 40.48 100.00 0.00 0.00
24 1987 4.72 20.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 20.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 20.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 20.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 20.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 20.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 20.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 20.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 20.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 20.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 20.00 14.74 0.00 35.66 100.00 35.66 100.00 0.00 0.00
35 1998 11.28 20.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 20.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 20.00 20.00 1.54 52.10 100.00 48.38 92.86 3.72 7.14
38 2001 22.44 20.00 20.00 2.44 54.28 100.00 48.38 89.13 5.90 10.87
39 2002 34.20 20.00 20.00 14.20 82.73 100.00 48.38 58.48 34.35 41.52
40 2003 21.44 20.00 20.00 1.44 51.87 100.00 48.38 93.27 3.49 6.73
41 2004 19.07 20.00 19.07 0.00 46.14 100.00 46.14 100.00 0.00 0.00
42 2005 23.77 20.00 20.00 3.77 57.50 100.00 48.38 84.14 9.12 15.86
43 2006 22.18 20.00 20.00 2.18 53.66 100.00 48.38 90.17 5.28 9.83
44 2007 5.70 20.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 20.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 20.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 20.00 12.09 1.07 31.85 29.26 2.60
TOTAL 1,465.31 100.00 1,345.74 91.84 119.56 8.16

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 233
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.53
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 22 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 22.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 22.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 22.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 22.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 22.00 16.14 0.00 39.05 100.00 39.05 100.00 0.00 0.00
6 1969 7.67 22.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 22.00 15.70 0.00 37.98 100.00 37.98 100.00 0.00 0.00
8 1971 26.58 22.00 22.00 4.58 64.29 100.00 53.22 82.78 11.07 17.22
9 1972 5.84 22.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 22.00 20.28 0.00 49.05 100.00 49.05 100.00 0.00 0.00
11 1974 25.58 22.00 22.00 3.58 61.89 100.00 53.22 86.00 8.66 14.00
12 1975 22.17 22.00 22.00 0.17 53.63 100.00 53.22 99.25 0.40 0.75
13 1976 13.69 22.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 22.00 15.33 0.00 37.08 100.00 37.08 100.00 0.00 0.00
15 1978 10.40 22.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 22.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 22.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 22.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 22.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 22.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 22.00 22.00 7.26 70.77 100.00 53.22 75.20 17.55 24.80
22 1985 17.86 22.00 17.86 0.00 43.20 100.00 43.20 100.00 0.00 0.00
23 1986 16.73 22.00 16.73 0.00 40.48 100.00 40.48 100.00 0.00 0.00
24 1987 4.72 22.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 22.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 22.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 22.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 22.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 22.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 22.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 22.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 22.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 22.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 22.00 14.74 0.00 35.66 100.00 35.66 100.00 0.00 0.00
35 1998 11.28 22.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 22.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 22.00 21.54 0.00 52.10 100.00 52.10 100.00 0.00 0.00
38 2001 22.44 22.00 22.00 0.44 54.28 100.00 53.22 98.05 1.06 1.95
39 2002 34.20 22.00 22.00 12.20 82.73 100.00 53.22 64.33 29.51 35.67
40 2003 21.44 22.00 21.44 0.00 51.87 100.00 51.87 100.00 0.00 0.00
41 2004 19.07 22.00 19.07 0.00 46.14 100.00 46.14 100.00 0.00 0.00
42 2005 23.77 22.00 22.00 1.77 57.50 100.00 53.22 92.56 4.28 7.44
43 2006 22.18 22.00 22.00 0.18 53.66 100.00 53.22 99.18 0.44 0.82
44 2007 5.70 22.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 22.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 22.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 22.00 12.51 0.66 31.85 30.27 1.59
TOTAL 1,465.31 100.00 1,392.33 95.02 72.98 4.98

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 234
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.54
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Febrero
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 24 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 13.69 24.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
2 1965 9.38 24.00 9.38 0.00 22.69 100.00 22.69 100.00 0.00 0.00
3 1966 10.33 24.00 10.33 0.00 24.98 100.00 24.98 100.00 0.00 0.00
4 1967 4.69 24.00 4.69 0.00 11.34 100.00 11.34 100.00 0.00 0.00
5 1968 16.14 24.00 16.14 0.00 39.05 100.00 39.05 100.00 0.00 0.00
6 1969 7.67 24.00 7.67 0.00 18.56 100.00 18.56 100.00 0.00 0.00
7 1970 15.70 24.00 15.70 0.00 37.98 100.00 37.98 100.00 0.00 0.00
8 1971 26.58 24.00 24.00 2.58 64.29 100.00 58.06 90.31 6.23 9.69
9 1972 5.84 24.00 5.84 0.00 14.13 100.00 14.13 100.00 0.00 0.00
10 1973 20.28 24.00 20.28 0.00 49.05 100.00 49.05 100.00 0.00 0.00
11 1974 25.58 24.00 24.00 1.58 61.89 100.00 58.06 93.82 3.83 6.18
12 1975 22.17 24.00 22.17 0.00 53.63 100.00 53.63 100.00 0.00 0.00
13 1976 13.69 24.00 13.69 0.00 33.11 100.00 33.11 100.00 0.00 0.00
14 1977 15.33 24.00 15.33 0.00 37.08 100.00 37.08 100.00 0.00 0.00
15 1978 10.40 24.00 10.40 0.00 25.15 100.00 25.15 100.00 0.00 0.00
16 1979 12.77 24.00 12.77 0.00 30.89 100.00 30.89 100.00 0.00 0.00
17 1980 3.79 24.00 3.79 0.00 9.16 100.00 9.16 100.00 0.00 0.00
18 1981 13.34 24.00 13.34 0.00 32.28 100.00 32.28 100.00 0.00 0.00
19 1982 3.78 24.00 3.78 0.00 9.16 100.00 9.16 100.00 0.00 0.00
20 1983 1.98 24.00 1.98 0.00 4.79 100.00 4.79 100.00 0.00 0.00
21 1984 29.26 24.00 24.00 5.26 70.77 100.00 58.06 82.04 12.71 17.96
22 1985 17.86 24.00 17.86 0.00 43.20 100.00 43.20 100.00 0.00 0.00
23 1986 16.73 24.00 16.73 0.00 40.48 100.00 40.48 100.00 0.00 0.00
24 1987 4.72 24.00 4.72 0.00 11.43 100.00 11.43 100.00 0.00 0.00
25 1988 6.99 24.00 6.99 0.00 16.92 100.00 16.92 100.00 0.00 0.00
26 1989 5.52 24.00 5.52 0.00 13.35 100.00 13.35 100.00 0.00 0.00
27 1990 4.11 24.00 4.11 0.00 9.94 100.00 9.94 100.00 0.00 0.00
28 1991 8.50 24.00 8.50 0.00 20.57 100.00 20.57 100.00 0.00 0.00
29 1992 1.53 24.00 1.53 0.00 3.69 100.00 3.69 100.00 0.00 0.00
30 1993 1.77 24.00 1.77 0.00 4.29 100.00 4.29 100.00 0.00 0.00
31 1994 8.94 24.00 8.94 0.00 21.63 100.00 21.63 100.00 0.00 0.00
32 1995 6.54 24.00 6.54 0.00 15.82 100.00 15.82 100.00 0.00 0.00
33 1996 10.96 24.00 10.96 0.00 26.50 100.00 26.50 100.00 0.00 0.00
34 1997 14.74 24.00 14.74 0.00 35.66 100.00 35.66 100.00 0.00 0.00
35 1998 11.28 24.00 11.28 0.00 27.28 100.00 27.28 100.00 0.00 0.00
36 1999 13.42 24.00 13.42 0.00 32.46 100.00 32.46 100.00 0.00 0.00
37 2000 21.54 24.00 21.54 0.00 52.10 100.00 52.10 100.00 0.00 0.00
38 2001 22.44 24.00 22.44 0.00 54.28 100.00 54.28 100.00 0.00 0.00
39 2002 34.20 24.00 24.00 10.20 82.73 100.00 58.06 70.18 24.67 29.82
40 2003 21.44 24.00 21.44 0.00 51.87 100.00 51.87 100.00 0.00 0.00
41 2004 19.07 24.00 19.07 0.00 46.14 100.00 46.14 100.00 0.00 0.00
42 2005 23.77 24.00 23.77 0.00 57.50 100.00 57.50 100.00 0.00 0.00
43 2006 22.18 24.00 22.18 0.00 53.66 100.00 53.66 100.00 0.00 0.00
44 2007 5.70 24.00 5.70 0.00 13.79 100.00 13.79 100.00 0.00 0.00
45 2008 9.62 24.00 9.62 0.00 23.26 100.00 23.26 100.00 0.00 0.00
46 2009 9.77 24.00 9.77 0.00 23.64 100.00 23.64 100.00 0.00 0.00
PROMEDIO 13.17 24.00 12.74 0.43 31.85 30.82 1.03
TOTAL 1,465.31 100.00 1,417.86 96.76 47.44 3.24

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 235
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.55
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 6 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 6.00 6.00 2.11 21.72 100.00 16.07 74.00 5.65 26.00
2 1965 9.42 6.00 6.00 3.42 25.23 100.00 16.07 63.70 9.16 36.30
3 1966 7.06 6.00 6.00 1.06 18.90 100.00 16.07 85.01 2.83 14.99
4 1967 17.99 6.00 6.00 11.99 48.18 100.00 16.07 33.36 32.11 66.64
5 1968 8.41 6.00 6.00 2.41 22.52 100.00 16.07 71.37 6.45 28.63
6 1969 2.18 6.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 6.00 6.00 4.00 26.77 100.00 16.07 60.02 10.70 39.98
8 1971 10.98 6.00 6.00 4.98 29.42 100.00 16.07 54.63 13.35 45.37
9 1972 7.88 6.00 6.00 1.88 21.12 100.00 16.07 76.10 5.05 23.90
10 1973 13.07 6.00 6.00 7.07 35.00 100.00 16.07 45.92 18.93 54.08
11 1974 9.37 6.00 6.00 3.37 25.11 100.00 16.07 64.00 9.04 36.00
12 1975 12.65 6.00 6.00 6.65 33.87 100.00 16.07 47.45 17.80 52.55
13 1976 14.80 6.00 6.00 8.80 39.64 100.00 16.07 40.54 23.57 59.46
14 1977 21.16 6.00 6.00 15.16 56.68 100.00 16.07 28.35 40.61 71.65
15 1978 3.47 6.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 6.00 6.00 3.21 24.67 100.00 16.07 65.15 8.60 34.85
17 1980 8.98 6.00 6.00 2.98 24.04 100.00 16.07 66.85 7.97 33.15
18 1981 14.08 6.00 6.00 8.08 37.72 100.00 16.07 42.60 21.65 57.40
19 1982 9.26 6.00 6.00 3.26 24.80 100.00 16.07 64.79 8.73 35.21
20 1983 1.91 6.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 6.00 6.00 9.27 40.90 100.00 16.07 39.30 24.83 60.70
22 1985 11.36 6.00 6.00 5.36 30.42 100.00 16.07 52.83 14.35 47.17
23 1986 10.69 6.00 6.00 4.69 28.62 100.00 16.07 56.15 12.55 43.85
24 1987 2.38 6.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 6.00 6.00 4.65 28.51 100.00 16.07 56.36 12.44 43.64
26 1989 14.00 6.00 6.00 8.00 37.49 100.00 16.07 42.87 21.42 57.13
27 1990 2.73 6.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 6.00 6.00 4.89 29.17 100.00 16.07 55.09 13.10 44.91
29 1992 1.85 6.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 6.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 6.00 6.00 3.84 26.35 100.00 16.07 60.99 10.28 39.01
32 1995 9.24 6.00 6.00 3.24 24.76 100.00 16.07 64.91 8.69 35.09
33 1996 6.42 6.00 6.00 0.42 17.19 100.00 16.07 93.49 1.12 6.51
34 1997 5.80 6.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 6.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 6.00 6.00 11.46 46.77 100.00 16.07 34.36 30.70 65.64
37 2000 12.87 6.00 6.00 6.87 34.47 100.00 16.07 46.63 18.39 53.37
38 2001 14.11 6.00 6.00 8.11 37.79 100.00 16.07 42.53 21.72 57.47
39 2002 23.86 6.00 6.00 17.86 63.91 100.00 16.07 25.15 47.83 74.85
40 2003 13.82 6.00 6.00 7.82 37.01 100.00 16.07 43.42 20.94 56.58
41 2004 4.97 6.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 6.00 6.00 1.50 20.09 100.00 16.07 79.98 4.02 20.02
43 2006 22.50 6.00 6.00 16.50 60.25 100.00 16.07 26.67 44.18 73.33
44 2007 18.66 6.00 6.00 12.66 49.97 100.00 16.07 32.16 33.90 67.84
45 2008 13.64 6.00 6.00 7.64 36.53 100.00 16.07 43.99 20.46 56.01
46 2009 12.96 6.00 6.00 6.96 34.71 100.00 16.07 46.30 18.64 53.70
PROMEDIO 10.50 6.00 5.46 5.05 28.14 14.62 13.52
TOTAL 1,294.26 100.00 672.50 51.96 621.76 48.04

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 236
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.56
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 8 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 8.00 8.00 0.11 21.72 100.00 21.43 98.67 0.29 1.33
2 1965 9.42 8.00 8.00 1.42 25.23 100.00 21.43 84.93 3.80 15.07
3 1966 7.06 8.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 8.00 8.00 9.99 48.18 100.00 21.43 44.48 26.75 55.52
5 1968 8.41 8.00 8.00 0.41 22.52 100.00 21.43 95.16 1.09 4.84
6 1969 2.18 8.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 8.00 8.00 2.00 26.77 100.00 21.43 80.03 5.35 19.97
8 1971 10.98 8.00 8.00 2.98 29.42 100.00 21.43 72.83 7.99 27.17
9 1972 7.88 8.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 8.00 8.00 5.07 35.00 100.00 21.43 61.22 13.57 38.78
11 1974 9.37 8.00 8.00 1.37 25.11 100.00 21.43 85.34 3.68 14.66
12 1975 12.65 8.00 8.00 4.65 33.87 100.00 21.43 63.27 12.44 36.73
13 1976 14.80 8.00 8.00 6.80 39.64 100.00 21.43 54.05 18.22 45.95
14 1977 21.16 8.00 8.00 13.16 56.68 100.00 21.43 37.80 35.26 62.20
15 1978 3.47 8.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 8.00 8.00 1.21 24.67 100.00 21.43 86.87 3.24 13.13
17 1980 8.98 8.00 8.00 0.98 24.04 100.00 21.43 89.13 2.61 10.87
18 1981 14.08 8.00 8.00 6.08 37.72 100.00 21.43 56.80 16.29 43.20
19 1982 9.26 8.00 8.00 1.26 24.80 100.00 21.43 86.38 3.38 13.62
20 1983 1.91 8.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 8.00 8.00 7.27 40.90 100.00 21.43 52.39 19.47 47.61
22 1985 11.36 8.00 8.00 3.36 30.42 100.00 21.43 70.43 8.99 29.57
23 1986 10.69 8.00 8.00 2.69 28.62 100.00 21.43 74.86 7.20 25.14
24 1987 2.38 8.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 8.00 8.00 2.65 28.51 100.00 21.43 75.15 7.09 24.85
26 1989 14.00 8.00 8.00 6.00 37.49 100.00 21.43 57.16 16.06 42.84
27 1990 2.73 8.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 8.00 8.00 2.89 29.17 100.00 21.43 73.45 7.75 26.55
29 1992 1.85 8.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 8.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 8.00 8.00 1.84 26.35 100.00 21.43 81.32 4.92 18.68
32 1995 9.24 8.00 8.00 1.24 24.76 100.00 21.43 86.55 3.33 13.45
33 1996 6.42 8.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 8.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 8.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 8.00 8.00 9.46 46.77 100.00 21.43 45.81 25.35 54.19
37 2000 12.87 8.00 8.00 4.87 34.47 100.00 21.43 62.17 13.04 37.83
38 2001 14.11 8.00 8.00 6.11 37.79 100.00 21.43 56.71 16.36 43.29
39 2002 23.86 8.00 8.00 15.86 63.91 100.00 21.43 33.53 42.48 66.47
40 2003 13.82 8.00 8.00 5.82 37.01 100.00 21.43 57.90 15.58 42.10
41 2004 4.97 8.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 8.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 8.00 8.00 14.50 60.25 100.00 21.43 35.56 38.83 64.44
44 2007 18.66 8.00 8.00 10.66 49.97 100.00 21.43 42.88 28.54 57.12
45 2008 13.64 8.00 8.00 5.64 36.53 100.00 21.43 58.65 15.11 41.35
46 2009 12.96 8.00 8.00 4.96 34.71 100.00 21.43 61.74 13.28 38.26
PROMEDIO 10.50 8.00 6.96 3.55 28.14 18.63 9.51
TOTAL 1,294.26 100.00 856.94 66.21 437.32 33.79

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 237
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.57
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 10 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 10.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 10.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 10.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 10.00 10.00 7.99 48.18 100.00 26.78 55.59 21.39 44.41
5 1968 8.41 10.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 10.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 10.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 10.00 10.00 0.98 29.42 100.00 26.78 91.04 2.64 8.96
9 1972 7.88 10.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 10.00 10.00 3.07 35.00 100.00 26.78 76.53 8.21 23.47
11 1974 9.37 10.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 10.00 10.00 2.65 33.87 100.00 26.78 79.08 7.08 20.92
13 1976 14.80 10.00 10.00 4.80 39.64 100.00 26.78 67.56 12.86 32.44
14 1977 21.16 10.00 10.00 11.16 56.68 100.00 26.78 47.25 29.90 52.75
15 1978 3.47 10.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 10.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 10.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 10.00 10.00 4.08 37.72 100.00 26.78 71.01 10.94 28.99
19 1982 9.26 10.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 10.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 10.00 10.00 5.27 40.90 100.00 26.78 65.49 14.11 34.51
22 1985 11.36 10.00 10.00 1.36 30.42 100.00 26.78 88.04 3.64 11.96
23 1986 10.69 10.00 10.00 0.69 28.62 100.00 26.78 93.58 1.84 6.42
24 1987 2.38 10.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 10.00 10.00 0.65 28.51 100.00 26.78 93.93 1.73 6.07
26 1989 14.00 10.00 10.00 4.00 37.49 100.00 26.78 71.45 10.70 28.55
27 1990 2.73 10.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 10.00 10.00 0.89 29.17 100.00 26.78 91.81 2.39 8.19
29 1992 1.85 10.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 10.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 10.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 10.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 10.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 10.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 10.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 10.00 10.00 7.46 46.77 100.00 26.78 57.26 19.99 42.74
37 2000 12.87 10.00 10.00 2.87 34.47 100.00 26.78 77.71 7.68 22.29
38 2001 14.11 10.00 10.00 4.11 37.79 100.00 26.78 70.88 11.00 29.12
39 2002 23.86 10.00 10.00 13.86 63.91 100.00 26.78 41.91 37.12 58.09
40 2003 13.82 10.00 10.00 3.82 37.01 100.00 26.78 72.37 10.22 27.63
41 2004 4.97 10.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 10.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 10.00 10.00 12.50 60.25 100.00 26.78 44.45 33.47 55.55
44 2007 18.66 10.00 10.00 8.66 49.97 100.00 26.78 53.60 23.18 46.40
45 2008 13.64 10.00 10.00 3.64 36.53 100.00 26.78 73.32 9.75 26.68
46 2009 12.96 10.00 10.00 2.96 34.71 100.00 26.78 77.17 7.92 22.83
PROMEDIO 10.50 10.00 8.17 2.34 28.14 21.88 6.26
TOTAL 1,294.26 100.00 1,006.49 77.77 287.78 22.23

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 238
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.58
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 12 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 12.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 12.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 12.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 12.00 12.00 5.99 48.18 100.00 32.14 66.71 16.04 33.29
5 1968 8.41 12.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 12.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 12.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 12.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 12.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 12.00 12.00 1.07 35.00 100.00 32.14 91.84 2.86 8.16
11 1974 9.37 12.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 12.00 12.00 0.65 33.87 100.00 32.14 94.90 1.73 5.10
13 1976 14.80 12.00 12.00 2.80 39.64 100.00 32.14 81.08 7.50 18.92
14 1977 21.16 12.00 12.00 9.16 56.68 100.00 32.14 56.70 24.54 43.30
15 1978 3.47 12.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 12.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 12.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 12.00 12.00 2.08 37.72 100.00 32.14 85.21 5.58 14.79
19 1982 9.26 12.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 12.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 12.00 12.00 3.27 40.90 100.00 32.14 78.59 8.76 21.41
22 1985 11.36 12.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 12.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 12.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 12.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 12.00 12.00 2.00 37.49 100.00 32.14 85.74 5.35 14.26
27 1990 2.73 12.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 12.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 12.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 12.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 12.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 12.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 12.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 12.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 12.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 12.00 12.00 5.46 46.77 100.00 32.14 68.72 14.63 31.28
37 2000 12.87 12.00 12.00 0.87 34.47 100.00 32.14 93.26 2.32 6.74
38 2001 14.11 12.00 12.00 2.11 37.79 100.00 32.14 85.06 5.64 14.94
39 2002 23.86 12.00 12.00 11.86 63.91 100.00 32.14 50.29 31.76 49.71
40 2003 13.82 12.00 12.00 1.82 37.01 100.00 32.14 86.85 4.87 13.15
41 2004 4.97 12.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 12.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 12.00 12.00 10.50 60.25 100.00 32.14 53.34 28.11 46.66
44 2007 18.66 12.00 12.00 6.66 49.97 100.00 32.14 64.32 17.83 35.68
45 2008 13.64 12.00 12.00 1.64 36.53 100.00 32.14 87.98 4.39 12.02
46 2009 12.96 12.00 12.00 0.96 34.71 100.00 32.14 92.61 2.57 7.39
PROMEDIO 10.50 12.00 9.01 1.50 28.14 24.13 4.01
TOTAL 1,294.26 100.00 1,109.78 85.75 184.48 14.25

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 239
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.59
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 14 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 14.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 14.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 14.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 14.00 14.00 3.99 48.18 100.00 37.50 77.83 10.68 22.17
5 1968 8.41 14.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 14.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 14.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 14.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 14.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 14.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 14.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 14.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 14.00 14.00 0.80 39.64 100.00 37.50 94.59 2.15 5.41
14 1977 21.16 14.00 14.00 7.16 56.68 100.00 37.50 66.15 19.19 33.85
15 1978 3.47 14.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 14.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 14.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 14.00 14.00 0.08 37.72 100.00 37.50 99.41 0.22 0.59
19 1982 9.26 14.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 14.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 14.00 14.00 1.27 40.90 100.00 37.50 91.69 3.40 8.31
22 1985 11.36 14.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 14.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 14.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 14.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 14.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 14.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 14.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 14.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 14.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 14.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 14.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 14.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 14.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 14.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 14.00 14.00 3.46 46.77 100.00 37.50 80.17 9.28 19.83
37 2000 12.87 14.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 14.00 14.00 0.11 37.79 100.00 37.50 99.24 0.29 0.76
39 2002 23.86 14.00 14.00 9.86 63.91 100.00 37.50 58.68 26.41 41.32
40 2003 13.82 14.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 14.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 14.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 14.00 14.00 8.50 60.25 100.00 37.50 62.23 22.75 37.77
44 2007 18.66 14.00 14.00 4.66 49.97 100.00 37.50 75.04 12.47 24.96
45 2008 13.64 14.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 14.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 14.00 9.64 0.87 28.14 25.81 2.32
TOTAL 1,294.26 100.00 1,187.43 91.75 106.83 8.25

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 240
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.60
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 16 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 16.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 16.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 16.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 16.00 16.00 1.99 48.18 100.00 42.85 88.95 5.32 11.05
5 1968 8.41 16.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 16.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 16.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 16.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 16.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 16.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 16.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 16.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 16.00 14.80 0.00 39.64 100.00 39.64 100.00 0.00 0.00
14 1977 21.16 16.00 16.00 5.16 56.68 100.00 42.85 75.60 13.83 24.40
15 1978 3.47 16.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 16.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 16.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 16.00 14.08 0.00 37.72 100.00 37.72 100.00 0.00 0.00
19 1982 9.26 16.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 16.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 16.00 15.27 0.00 40.90 100.00 40.90 100.00 0.00 0.00
22 1985 11.36 16.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 16.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 16.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 16.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 16.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 16.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 16.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 16.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 16.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 16.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 16.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 16.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 16.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 16.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 16.00 16.00 1.46 46.77 100.00 42.85 91.62 3.92 8.38
37 2000 12.87 16.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 16.00 14.11 0.00 37.79 100.00 37.79 100.00 0.00 0.00
39 2002 23.86 16.00 16.00 7.86 63.91 100.00 42.85 67.06 21.05 32.94
40 2003 13.82 16.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 16.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 16.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 16.00 16.00 6.50 60.25 100.00 42.85 71.12 17.40 28.88
44 2007 18.66 16.00 16.00 2.66 49.97 100.00 42.85 85.76 7.11 14.24
45 2008 13.64 16.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 16.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 16.00 9.95 0.56 28.14 26.64 1.49
TOTAL 1,294.26 100.00 1,225.63 94.70 68.64 5.30

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 241
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.61
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 18 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 18.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 18.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 18.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 18.00 17.99 0.00 48.18 100.00 48.18 100.00 0.00 0.00
5 1968 8.41 18.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 18.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 18.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 18.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 18.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 18.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 18.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 18.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 18.00 14.80 0.00 39.64 100.00 39.64 100.00 0.00 0.00
14 1977 21.16 18.00 18.00 3.16 56.68 100.00 48.21 85.05 8.47 14.95
15 1978 3.47 18.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 18.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 18.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 18.00 14.08 0.00 37.72 100.00 37.72 100.00 0.00 0.00
19 1982 9.26 18.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 18.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 18.00 15.27 0.00 40.90 100.00 40.90 100.00 0.00 0.00
22 1985 11.36 18.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 18.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 18.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 18.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 18.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 18.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 18.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 18.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 18.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 18.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 18.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 18.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 18.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 18.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 18.00 17.46 0.00 46.77 100.00 46.77 100.00 0.00 0.00
37 2000 12.87 18.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 18.00 14.11 0.00 37.79 100.00 37.79 100.00 0.00 0.00
39 2002 23.86 18.00 18.00 5.86 63.91 100.00 48.21 75.44 15.69 24.56
40 2003 13.82 18.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 18.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 18.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 18.00 18.00 4.50 60.25 100.00 48.21 80.02 12.04 19.98
44 2007 18.66 18.00 18.00 0.66 49.97 100.00 48.21 96.48 1.76 3.52
45 2008 13.64 18.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 18.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 18.00 10.20 0.31 28.14 27.31 0.83
TOTAL 1,294.26 100.00 1,256.30 97.07 37.96 2.93

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 242
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.62
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 20 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 20.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 20.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 20.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 20.00 17.99 0.00 48.18 100.00 48.18 100.00 0.00 0.00
5 1968 8.41 20.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 20.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 20.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 20.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 20.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 20.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 20.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 20.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 20.00 14.80 0.00 39.64 100.00 39.64 100.00 0.00 0.00
14 1977 21.16 20.00 20.00 1.16 56.68 100.00 53.57 94.50 3.12 5.50
15 1978 3.47 20.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 20.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 20.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 20.00 14.08 0.00 37.72 100.00 37.72 100.00 0.00 0.00
19 1982 9.26 20.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 20.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 20.00 15.27 0.00 40.90 100.00 40.90 100.00 0.00 0.00
22 1985 11.36 20.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 20.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 20.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 20.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 20.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 20.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 20.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 20.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 20.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 20.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 20.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 20.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 20.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 20.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 20.00 17.46 0.00 46.77 100.00 46.77 100.00 0.00 0.00
37 2000 12.87 20.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 20.00 14.11 0.00 37.79 100.00 37.79 100.00 0.00 0.00
39 2002 23.86 20.00 20.00 3.86 63.91 100.00 53.57 83.82 10.34 16.18
40 2003 13.82 20.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 20.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 20.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 20.00 20.00 2.50 60.25 100.00 53.57 88.91 6.68 11.09
44 2007 18.66 20.00 18.66 0.00 49.97 100.00 49.97 100.00 0.00 0.00
45 2008 13.64 20.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 20.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 20.00 10.34 0.16 28.14 27.70 0.44
TOTAL 1,294.26 100.00 1,274.13 98.44 20.14 1.56

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 243
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.63
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 22 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 22.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 22.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 22.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 22.00 17.99 0.00 48.18 100.00 48.18 100.00 0.00 0.00
5 1968 8.41 22.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 22.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 22.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 22.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 22.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 22.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 22.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 22.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 22.00 14.80 0.00 39.64 100.00 39.64 100.00 0.00 0.00
14 1977 21.16 22.00 21.16 0.00 56.68 100.00 56.68 100.00 0.00 0.00
15 1978 3.47 22.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 22.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 22.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 22.00 14.08 0.00 37.72 100.00 37.72 100.00 0.00 0.00
19 1982 9.26 22.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 22.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 22.00 15.27 0.00 40.90 100.00 40.90 100.00 0.00 0.00
22 1985 11.36 22.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 22.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 22.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 22.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 22.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 22.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 22.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 22.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 22.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 22.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 22.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 22.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 22.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 22.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 22.00 17.46 0.00 46.77 100.00 46.77 100.00 0.00 0.00
37 2000 12.87 22.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 22.00 14.11 0.00 37.79 100.00 37.79 100.00 0.00 0.00
39 2002 23.86 22.00 22.00 1.86 63.91 100.00 58.92 92.21 4.98 7.79
40 2003 13.82 22.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 22.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 22.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 22.00 22.00 0.50 60.25 100.00 58.92 97.80 1.33 2.20
44 2007 18.66 22.00 18.66 0.00 49.97 100.00 49.97 100.00 0.00 0.00
45 2008 13.64 22.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 22.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 22.00 10.45 0.05 28.14 28.00 0.14
TOTAL 1,294.26 100.00 1,287.96 99.51 6.31 0.49

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 244
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.5.64
Estudio Hidrológico del Sistema Integral Lagunillas
Curva de utilización
Mes: Marzo
Canal de derivación Jarpaña
Capacidad propuesta del canal: Q = 24 m3/s
CAUDAL CAPACIDAD CAUDAL CAUDAL NO
VOLUMEN EXISTENTE VOLUMEN CAPTADO VOLUMEN NO CAPTADO
m AÑO EXISTENTE DEL CANAL CAPTADO CAPTADO
(m3/s) (m3/s) (m3/s) (m3/s) (hm3) (%) (hm3) (%) (hm3) (%)
1 1964 8.11 24.00 8.11 0.00 21.72 100.00 21.72 100.00 0.00 0.00
2 1965 9.42 24.00 9.42 0.00 25.23 100.00 25.23 100.00 0.00 0.00
3 1966 7.06 24.00 7.06 0.00 18.90 100.00 18.90 100.00 0.00 0.00
4 1967 17.99 24.00 17.99 0.00 48.18 100.00 48.18 100.00 0.00 0.00
5 1968 8.41 24.00 8.41 0.00 22.52 100.00 22.52 100.00 0.00 0.00
6 1969 2.18 24.00 2.18 0.00 5.83 100.00 5.83 100.00 0.00 0.00
7 1970 10.00 24.00 10.00 0.00 26.77 100.00 26.77 100.00 0.00 0.00
8 1971 10.98 24.00 10.98 0.00 29.42 100.00 29.42 100.00 0.00 0.00
9 1972 7.88 24.00 7.88 0.00 21.12 100.00 21.12 100.00 0.00 0.00
10 1973 13.07 24.00 13.07 0.00 35.00 100.00 35.00 100.00 0.00 0.00
11 1974 9.37 24.00 9.37 0.00 25.11 100.00 25.11 100.00 0.00 0.00
12 1975 12.65 24.00 12.65 0.00 33.87 100.00 33.87 100.00 0.00 0.00
13 1976 14.80 24.00 14.80 0.00 39.64 100.00 39.64 100.00 0.00 0.00
14 1977 21.16 24.00 21.16 0.00 56.68 100.00 56.68 100.00 0.00 0.00
15 1978 3.47 24.00 3.47 0.00 9.29 100.00 9.29 100.00 0.00 0.00
16 1979 9.21 24.00 9.21 0.00 24.67 100.00 24.67 100.00 0.00 0.00
17 1980 8.98 24.00 8.98 0.00 24.04 100.00 24.04 100.00 0.00 0.00
18 1981 14.08 24.00 14.08 0.00 37.72 100.00 37.72 100.00 0.00 0.00
19 1982 9.26 24.00 9.26 0.00 24.80 100.00 24.80 100.00 0.00 0.00
20 1983 1.91 24.00 1.91 0.00 5.11 100.00 5.11 100.00 0.00 0.00
21 1984 15.27 24.00 15.27 0.00 40.90 100.00 40.90 100.00 0.00 0.00
22 1985 11.36 24.00 11.36 0.00 30.42 100.00 30.42 100.00 0.00 0.00
23 1986 10.69 24.00 10.69 0.00 28.62 100.00 28.62 100.00 0.00 0.00
24 1987 2.38 24.00 2.38 0.00 6.36 100.00 6.36 100.00 0.00 0.00
25 1988 10.65 24.00 10.65 0.00 28.51 100.00 28.51 100.00 0.00 0.00
26 1989 14.00 24.00 14.00 0.00 37.49 100.00 37.49 100.00 0.00 0.00
27 1990 2.73 24.00 2.73 0.00 7.31 100.00 7.31 100.00 0.00 0.00
28 1991 10.89 24.00 10.89 0.00 29.17 100.00 29.17 100.00 0.00 0.00
29 1992 1.85 24.00 1.85 0.00 4.96 100.00 4.96 100.00 0.00 0.00
30 1993 4.28 24.00 4.28 0.00 11.46 100.00 11.46 100.00 0.00 0.00
31 1994 9.84 24.00 9.84 0.00 26.35 100.00 26.35 100.00 0.00 0.00
32 1995 9.24 24.00 9.24 0.00 24.76 100.00 24.76 100.00 0.00 0.00
33 1996 6.42 24.00 6.42 0.00 17.19 100.00 17.19 100.00 0.00 0.00
34 1997 5.80 24.00 5.80 0.00 15.54 100.00 15.54 100.00 0.00 0.00
35 1998 5.53 24.00 5.53 0.00 14.81 100.00 14.81 100.00 0.00 0.00
36 1999 17.46 24.00 17.46 0.00 46.77 100.00 46.77 100.00 0.00 0.00
37 2000 12.87 24.00 12.87 0.00 34.47 100.00 34.47 100.00 0.00 0.00
38 2001 14.11 24.00 14.11 0.00 37.79 100.00 37.79 100.00 0.00 0.00
39 2002 23.86 24.00 23.86 0.00 63.91 100.00 63.91 100.00 0.00 0.00
40 2003 13.82 24.00 13.82 0.00 37.01 100.00 37.01 100.00 0.00 0.00
41 2004 4.97 24.00 4.97 0.00 13.30 100.00 13.30 100.00 0.00 0.00
42 2005 7.50 24.00 7.50 0.00 20.09 100.00 20.09 100.00 0.00 0.00
43 2006 22.50 24.00 22.50 0.00 60.25 100.00 60.25 100.00 0.00 0.00
44 2007 18.66 24.00 18.66 0.00 49.97 100.00 49.97 100.00 0.00 0.00
45 2008 13.64 24.00 13.64 0.00 36.53 100.00 36.53 100.00 0.00 0.00
46 2009 12.96 24.00 12.96 0.00 34.71 100.00 34.71 100.00 0.00 0.00
PROMEDIO 10.50 24.00 10.50 0.00 28.14 28.14 0.00
TOTAL 1,294.26 100.00 1,294.26 100.00 0.00 0.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 245
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.6

Diseño de obras hidráulicas mayores para las alternativas de afianzamiento del


Sistema Integral Lagunillas

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 246
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

DISEÑO DE OBRAS HIDRAULICAS MAYORES PARA LAS ALTERNATIVAS DE


AFIANZAMIENTO DEL SISTEMA INTEGRAL LAGUNILLAS

1. GENERALIDADES
En el marco del planteamiento de las alternativas de afianzamiento del Sistema Integral
Lagunillas, el Proyecto Especial Binacional Lago Titicaca (PELT), elaboro el estudio de
las Presas, Bocatomas y canales de derivación para cada una de las alternativas de
afianzamiento consideradas, con un nivel de detalle preliminar (Pre-diseños), y que
permitan efectuar comparaciones entre las distintas alternativas de afianzamiento
planteados.

A partir de los sitios potenciales de regulación y de posibles lugares de captación y


derivación previamente identificados, se desarrollaron las alternativas de afianzamiento
del Sistema Integral Lagunillas, cuya evaluación técnico-económica permitirá definir la
viabilidad de cada una de ellos, siendo para tal efecto necesario disponer de costos
paramétricos (estimados).

2. CRITERIOS CONSIDERADOS PARA EL PLANTEAMIENTO DE OBRAS


HIDRÁULICAS MAYORES
Los criterios adoptados para el planteamiento de las obras de regulación (Presas), se
detallan a continuación:
 Se identificó los sitios definidos en antecedentes técnicos, a fin de verificar su
vigencia y condiciones propicias para una regulación, en aspectos técnicos,
económicos, sociales y ambientales.
 Los posibles sitios elegidos como emplazamiento de la obra de represamiento
propuesto, se efectuó en función de las condiciones topográficas, geológicas y
geotécnicas, hidrológicas e hidráulicas, entre otras.
 Los parámetros topográficos está referido a los volúmenes de material de relleno,
volumen de presa y/o área de embalse “vs” altura de presa, además de tener en cuenta
el caudal regulado.
 Los parámetros geológicos-geotécnicos está referidos a las condiciones geológicas
de zona de cierre y zona de inundación de las represas, tratamiento de la cimentación.
Asimismo, se tuvo muy en cuenta la disponibilidad en cantidad, calidad y costo de
los materiales de construcción y de relleno.
 Los parámetros hidrológicos e hidráulicos a considerados son el volumen de embalse
requerido, caudales regulables, garantía de riego, caudales de máximas para obras de
excedencia y desvío durante la etapa constructiva y de operación, volúmenes de
evaporación y de sedimentación.
 Un factor de relevancia lo constituye el efecto social y de impacto ambiental de los
embalses, esto es de verificar la existencia de asentamientos humanos afectados,

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 247
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

áreas de aprovechamiento actual con fines de cultivo y pastoreo, infraestructura vial


y de otros servicios a reubicar, reservas naturales, etc.
 Las alternativas de almacenamiento propuestas, están conformadas por un conjunto
de obras principales, constituidas por: las obras preliminares y temporales, obras
definitivas consistentes en dique de cierre, aliviadero de excedencias, estructura de
captación de servicio y entrega.
 Las obras de represamiento contemplan utilizar materiales del lugar, como tierra,
enrocado para rellenos de los diques, espaldones, concreto, etc., evaluando diferentes
tipo de Presa.
 Se considerará excavaciones en la zona del cauce para la fundación de la presa, que
incluye la eliminación del material suelto en superficie y tratamientos de
consolidación. Asimismo, en los taludes se considerará eliminación del material o
roca suelta superficial.
 Se prevé que las presas estarán conformadas por material homogéneo, los espaldones
con enrocado y concreto en su cara húmeda, asimismo se consideró que las obras de
toma y aliviadero de excedencias estén externas al cuerpo de presa.
 El tipo de presa considerado contempla la proyección de una cortina de
impermeabilización de la fundación, en función de las condiciones geotécnicas
locales que presenta la sección en la zona de cierre (boquilla), en la cual se ubica el
eje de presa.
 La ubicación de la obra de toma se proyecta considerando el nivel mínimo de
operación de los embalses, altura igual al que teóricamente ocuparía el volumen de
sedimentos acumulados durante la vida útil del reservorio.
 El nivel de agua normal de operación del embalse se fijó como resultado de la
simulación de operación del sistema. El nivel de agua máximo, altura de carga de
agua que actuando sobre la cresta del vertedero, permitirá eliminar el caudal de
excedencias y se determinará luego del Análisis del tránsito de avenidas.
 El borde libre en las presas toma en cuenta la longitud del espejo de agua (Fech) y la
altura teórica de la ola, que se mide a partir del nivel de agua máximo en el embalse
hasta el nivel de la corona. Se determinó utilizando las metodologías dadas por el
USBR y Cuerpo de Ingenieros del Ejército de los Estados Unidos, entre otros.
 La capacidad del aliviadero de excedencias permitirá el tránsito de la avenida
laminada en el reservorio, equivalente a un período de retorno de 10,000 años,
teniendo en cuenta el riesgo de poblaciones ubicadas aguas abajo. El aliviadero, en
el caso de la presa de tierra, estará ubicado en una de las márgenes.

Para el planeamiento de las obras de conducción, se tuvo en cuenta lo siguiente:


 Búsqueda de sistemas hidráulicos simples de captación y conducción; es decir, con
obras sencillas en lo posible que no compliquen la construcción, operación y
mantenimiento.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 248
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

 Selección de pendientes adecuadas para un funcionamiento hidráulico adecuado, a


fin que las velocidades en los canales adquieran valores razonables contra la erosión
y sedimentación.
 Se prevé las conducciones en túnel, como reemplazo de trazos de canal demasiados
largos, cuya relación canal/túnel supere la relación 5:1.
 No se prevé el desarrollo de propuestas o posibilidades de bombeo.

3. ALTERNATIVAS DE AFIANZAMIENTO HÍDRICO CONSIDERADAS


3.1. ALTERNATIVA 01
Esta alternativa tiene como principal y única obra hidráulica a la Presa Verde.

3.1.1. Presa Verde


a) Ubicación
La presa está proyectada sobre el río Verde, aguas debajo de la confluencia de los ríos
Paratía y Jarpaña y a 1.8 km aguas debajo de la estación hidrométrica Río Verde de
propiedad del SENAMHI, en donde las laderas del cauce del río Verde forman un
estrechamiento. Ver Plano PV-PG en el Anexo 1.8. (Plano de planta)

b) Tipo de presa
El tipo de presa elegido desde el punto de vista de los materiales utilizados corresponde
a una presa de enrocado (el cuerpo principal de la presa conformado con materiales con
grano grueso y los elementos antifiltrantes de materiales aglutinados) y desde el punto
de vista del esquema constructivo de la presa corresponde al tipo homogénea (cuerpo
de la presa conformado con un solo material en contacto con el filtro). Ver Plano PV-
ST en el Anexo 1.8. Plano sección típica.

Se ha optado por este tipo de presa, debido a las características topográficas, geológicas
y geotécnicas del sitio de emplazamiento, como son un cierre en U con estribos rocosos
de pendiente del orden de 45° a 50°, una cimentación conformada por material aluvial
y fluvio-aluvial de características relativamente competentes, así como por la
disponibilidad de materiales apropiados, en cantidad y localización adecuados para su
construcción, otras opciones podrían ser evaluadas con mayor detalle en las etapas
siguientes de los estudios, profundizándose las investigaciones en ellas antes de la
decisión final.

c) Ancho de Corona
Para la determinación del ancho de la coronación se empleó el criterio de uso
convencional utilizado por el US Bureau of Reclamation (ecuación 1.6.1) y el
establecido por el Comité Español de Grandes Presas (Ecuación 1.6.2.), cuyas
expresiones en función de la altura de presa se presentan a continuación:
US Bureau o Reclamation

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 249
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

= 1 + 1.1√ℎ ……. (1.6.1)

Donde:
B : Ancho de la corona, en metros.
h : Altura máxima de presa, en metros.

Comité Español de Grandes Presas


= 3 + 1.5√ − 15 ……. (1.6.2)

Donde:
C : Ancho de coronación de presa, en metros.
H : Altura de presa, en metros.

Considerando una altura de presa de 59.00 m, se ha obtenido un ancho de corona de


9.45 y 8.30 m, empleando las ecuaciones 1.6.1 y 1.6.2, respectivamente, para finalmente
adoptar un valor de “B” de 10.00 m, ya que permitirá dar mayor volumen a la presa para
mejorar su seguridad y estabilidad y facilitar su construcción. Ver Plano PV-PP en el
Anexo 1.8. Plano sección típica

d) Borde Libre
El borde libre es la distancia vertical entre la cresta de la presa y la superficie de agua
máxima en el reservorio. Esta superficie máxima está asociada al diseño del tránsito de
avenidas en el embalse. El borde libre debe ser capaz de prevenir y evitar el
derramamiento sobre la presa en condiciones normales o en alguna acción severa de las
olas de rara ocurrencia que son producidos por vientos de alta velocidad en direcciones
críticas.

El borde libre (BL) o distancia vertical entre la coronación y el nivel de aguas máximas
extraordinarias puede ser estimado con la ecuación 1.6.3, que se presenta a
continuación:
a  0.76  0.34 * ( Fe) 0.5  0.26 * ( Fe) 0.25 ……. (1.6.3)
Donde:
a = Altura de ola, en metros.
Fe = Fetch efectivo (longitud del espejo de agua), en kilómetros.

Asumiendo un valor de 6.00 km como Fetch (F) para una dirección de viento Noreste
(NE), y empleando la ecuación 1.6.3, se determinó que la altura de la ola en el embalse
Verde sería de 1.19 m, para finalmente asumir el valor del borde libre (BL) igual a 1.20
m sobre el NAME (nivel de aguas máximas extraordinarias).

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 250
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

e) Diseño del Filtro


Los objetivos del filtro, son los de evitar la erosión de las partículas finas del suelo y
además de conducir la descarga de filtración y disminuir su longitud de recorrido.

Las condiciones de diseño, para que el filtro impida las entradas de partículas son
principalmente de carácter granulométrico y debe de cumplir con las siguientes
relaciones
D15 ( Filtro )
5
D85 ( Suelo)
D15 ( Filtro )
5  40
D15 ( Suelo)
D50 ( Filtro )
 25
D50 ( Suelo)
D85 ( Filtro )
2
Abertura.tubo.de.Drenaje

Donde:
D15, D50, D85, son los tamaños de las partículas correspondientes a una distribución
granulométrica para los porcentajes en peso de 15, 50 y 85 que pasan respectivamente.
Las expresiones dadas anteriormente aseguran, no solo el arrastre de las partículas finas,
si no que, también la permeabilidad del filtro, la cual debe ser mayor a la del suelo. Por
lo que el material que se utilice tendrá que cumplir con estas condiciones.

Además debemos verificar que el Coeficiente de uniformidad cumpla la siguiente


condición:
D
C u  60  20
D10

f) Obras de Toma y Conducto de Descarga


Las obras de toma son las estructuras que permitirán regular las descargas desde el
embalse hacia aguas abajo de la presa mediante un conducto de descarga. Estas
descargas son controladas generalmente por compuertas.

Los cálculos hidráulicos para el dimensionamiento de la obra de descarga, se efectuaron


para las condiciones de carga hidráulica mínima y máxima, así como para diferentes
aberturas de la compuerta.

La descarga bajo la compuerta en estas condiciones fue calculada con la ecuación 1.6.4.
Q  CGo * B * 2 GH ' ……. (1.6.4)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 251
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Donde:
Q = Caudal que atraviesa la compuerta, en m3/s.
C = Coeficiente de descarga, adimensional.
Go = Abertura de la compuerta, en metros.
B = Ancho de la compuerta, en metros.
H’ = Carga de agua efectiva (H’ = H – Go), en metros.

H H’

Go Q

Figura 1.6.1: Esquema para la determinación del caudal de descarga.

El caudal evacuado por el conducto de descarga varía de acuerdo a la demanda del


sistema, estableciéndose para la etapa de pleno desarrollo, un caudal máximo (para un
nivel mínimo operacional) referencial para el diseño de las compuertas, del orden de
20.00 m3/s. Ver simulación del sistema en la componente 06 de este estudio.

La toma de agua se plantea este ubicada externa al cuerpo de presa, en el estribo


izquierdo del eje de presa (ver plano PV-DD). El conducto de descarga tendrá una
sección circular de 2.54 m2, con un diámetro de 1.80 m, la longitud del conducto, así
como otros detalles del mismo se presentan en los planos.

g) Estructura Terminal y Entrega del Conducto de Descarga de Fondo


La estructura terminal, es la estructura hidráulica encargada de disipar la energía de la
descarga proveniente del conducto de descarga. El caudal máximo determinado a la
salida del conducto es del orden de 20.00 m3/s y velocidad máxima de 8.2 m/s.

La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega al final a la poza, de ancho variable entre 5.00 a 10.00 m y altura de
muros de 5.00 y 8.00 m del canal de aproximación y la poza, respectivamente. La
protección contra la acción erosiva en el fondo del cauce, se efectuará a través de la
colocación de enrocado, en un área de 250.00 m2 (25.00 m de largo, 10.00 m de anchi
y 2.00 m de espesor).

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 252
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

h) Vertedero de Demasías
Esta estructura hidráulica está diseñada para descargar el agua en exceso del embalse
hacia un lugar establecido en el río aguas abajo de la presa. A continuación se presenta
el cálculo de todos los componentes de las obras de alivio.

Se ha establecido que la descarga máxima probable para un periodo de retorno de 1,000


años sería de 364,00 m3/s, por lo que para el diseño del vertedero de demasías del
embalse Verde, previo tránsito de avenidas en el embalse, se estimó una descarga
máxima, del orden de 200.00 m3/s.

Para determinar la altura de lámina vertiente, se empleó la ecuación 1.6.5, que se


presenta a continuación:
/
= ...…… (1.6.5)

Donde:
H = Altura de lámina vertiente, en metros.
Q = Caudal de descarga, en m3/s.
C = Coeficiente de descarga, adimensional.
L = Longitud del vertedero de demasías, en metros.

Asumiendo un valor de 2.80 para el coeficiente de descarga (C) y 25.00 m para la


longitud del vertedero de demasías (L), se estimó que la altura de la lámina vertiente
(H) sería de 2.01 m, para finalmente asumir un valor de 2.00 m como altura de lámina
vertiente (H).

i) Estructura de Disipación y Canal de Fuga


La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega a la poza, el ancho es variable entre 5.00 a 10.00 m y altura de muros
de 5.00 y 8.00 m del canal de fuga y la poza, respectivamente. La protección contra la
acción erosiva en el fondo del cauce, se efectuará a través de la colocación de enrocado,
en un área de 250.00 m2 (25.00 m de largo, 10.00 m de ancho y 2.00 m de espesor).

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 253
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Figura 1.6.2: Detalle de cálculo del canal de fuga.

Figura 1.6.3: Sección trasversal de la estructura de disipación.

3.1.2. Descripción de las Obras Civiles


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles que
permitirán regular los aportes hídricos del río Verde y su cuenca principalmente durante
el periodo de avenidas, para almacenar un volumen total de 340 hm3, de los cuales 283
hm3 corresponden al volumen útil y 57 hm3 al volumen muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen a
continuación:

b) Presa Verde
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en el
paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en la
cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta una
profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son suficientes
para satisfacer las exigencias técnicas internacionales. El Talud aguas arriba se

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 254
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

recomienda se prolongue hasta una profundidad de 15.00 m aproximadamente, por


debajo del terreno natural hasta encontrar un material mucho más compacto para el
inicio de las excavaciones de la pantalla impermeable. Luego del relleno del material
que se encontrara sobre el concreto armado, se deberá de colocar una cobertura de arcilla
a manera de colchón de 1.00 m de espesor como mínimo que se extenderá hacia aguas
arriba de la presa, cuya función será la de evitar que la presión del agua esté en contacto
directo con la pantalla plástica de la cimentación y reducir las pérdidas de agua por
filtración. Ver Plano PV-ST en el Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Verde serían:


Nivel de la Corona : 4249.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4247.78 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,245.78 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,216.87 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,176.17 msnm.
Borde Libre : 1.30 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 1,185.00 m.
Altura máxima de presa (sobre el cauce) : 59.00 m.
Ancho máximo en la base de la presa : 243.00 m.
Espesor de los filtros : 1.00 m.
2
Espesor de Pantalla de concreto f’c = 245kg/cm : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 340 hm3.
Volumen útil : 283 hm3.
Volumen muerto (sedimentos) : 57 hm3.

c) Túnel de Desvío
El túnel de desvío, está proyectado en el estribo derecho, con una longitud total
aproximada de 850.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m de
base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m, siendo la cota de inicio del túnel 4,202.02 y la final 4,192.77 msnm.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 255
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía cuyo fondo alcanza la cota 4,187.84 msnm conformada de concreto armado con
resistencia de 245 kg/cm2, longitud igual a 61.88 m, ancho de 10.00 m y 8.38 m de
altura, además se ha previsto considerar a continuación de esta estructura, enrocado de
protección pesado, en una longitud de 25.00 m, 27.00 m de ancho y 2.00 m de espesor,
colocado a una cota de 4,192.22 msnm.

d) Vertedero de Demasías, Canal de Fuga y Poza Disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de 25.00
m de longitud, el mismo que estará emplazado en el estribo derecho, externo al cuerpo
de la presa. La longitud total del vertedero de demasías será de 875.00 m, longitud que
considera al vertedero propiamente dicho y el canal de fuga (rápida) de sección
rectangular, a la poza disipadora de energía (Km 0+060 al Km 0+875). Ver Plano PV-
PD en el Anexo 1.8. Plano Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 200 m3/s con un tirante
de 2.00 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se presente el
caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,245.78 msnm; tiene tres (03) vanos de
8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual se
emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 655.00 m (km 0+120 a km 0+775), y será de
sección rectangular, con 15.00 m de ancho y altura de 5.00 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m (km 0+775 a km


0+875), un ancho variable entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes
de 2:1 (H: V). Inmediatamente después de esta estructura, se ha considerado la
colocación de enrocado de protección en una longitud de 25.00 m y 2.00 m de espesor.

3.2. ALTERNATIVA 02
Esta alternativa tiene como principales obras hidráulicas a la bocatoma Verde y el canal
de derivación Verde.

3.2.1. Bocatoma Verde


a) Datos para el Diseño
La estructura de captación está proyectada sobre el río Verde, aguas abajo de la
confluencia de los ríos Paratía y Jarpaña y a 0.80 km aguas debajo de la estación
hidrométrica Río Verde de propiedad del SENAMHI. Ver Plano PV-PG en el Anexo
1.8. (Plano de planta)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 256
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

La información empleada para el diseño de estructura de captación (bocatoma), es la


que se muestra en el Cuadro 1.6.1.

Cuadro 1.6.1: Datos para el diseño de la bocatoma Verde


Descripción Valor
3
Caudal de Derivación Qd = 30 m /s
Caudal máximo del río (Tr = 50 años) Qr = 240 m3/s
Pendiente de fondo del río S = 0.005 m/m
Coeficiente de rugosidad n = 0.035
Ancho medio de equilibrio B = 15 m
Tipo de suelo Grava – Arena
Material flotante por el río Nulo a despreciable

El río Verde en el tramo donde se emplazará la estructura de captación, presenta un


cauce estable de baja pendiente, constituido principalmente por gravas gruesas, medias
y finas.

b) Memoria de Cálculos Hidráulicos


En el Cuadro 1.6.2 se presenta la memoria de cálculos hidráulicos de la bocatoma Verde.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 257
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 258
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)


3) Dimensionamiento del Barraje
Linea de Energía
Hv= 0.43 Datos de Entrada
Q= 240 m 3 /s
3
He= 3.111 Qd= 180 m /s
Hd= 2.68 L= 19.98065 m
P= 1.45 m
g= 9.81 m 2 /s

3
Ht Qmáx = 8475.520 p /s
1.45 P Qd= 6356.640 p 3 /s
L= 65.553 pie
P= 4.757 pie
2
g= 32.2 pie /s

90
Cota de Fondo
3 COMP 239.9311308
2
Datos de Entrada Q  C * L * Hd

Q= 240 C= 2.737 Valor supuesto


L= 19.98065 Hd = 2.68
P= 1.45
Cálculo de Co
P/Hd = 0.54 Co = 2
v= 2.908 m/s
Hv =h va = 0.431 m. C/Co = 1.3685
F= 0.35 para entrar al gráfico C= 2.737
Verificación de C Si se acepta
C= 2.737 He= 3.111
Hv= 0.431 Hd= 2.68
4) Perfil de la cresta del vertedero del barraje
C= 2.737 Hd= 2.68
Hv= 0.431 He= 3.111
Valores de las coordenadas para la cresta del barraje:
Valores definitivos de vertedero

Ecuación General
X 1 .85
y  0 .5 0 *
H d 0 .85

1,85
y= 0.2163 X Talud 1.5

dy/dx= 0.667
A 0.4
x 1.825 Puntos de Tangencia
aguas abajo del azud
y 0.658

x y Cota x y Cota
0.000 0.000 91.45 1.120 0.267 91.18
0.100 0.003 91.45 1.130 0.271 91.18
0.200 0.011 91.44 1.140 0.276 91.17
0.300 0.023 91.43 1.150 0.280 91.17
0.400 0.040 91.41 1.160 0.285 91.17
0.500 0.060 91.39 1.170 0.289 91.16
0.600 0.084 91.37 1.180 0.294 91.16
0.610 0.087 91.36 1.190 0.298 91.15
0.620 0.089 91.36 1.200 0.303 91.15
0.630 0.092 91.36 1.210 0.308 91.14
0.640 0.095 91.36 1.220 0.312 91.14
0.650 0.097 91.35 1.230 0.317 91.13
0.660 0.100 91.35 1.240 0.322 91.13
0.670 0.103 91.35 1.250 0.327 91.12
0.680 0.106 91.34 1.260 0.332 91.12

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 259
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)


0.690 0.109 91.34 1.270 0.337 91.11
0.700 0.112 91.34 1.280 0.342 91.11
0.720 0.118 91.33 1.290 0.346 91.10
0.740 0.124 91.33 1.300 0.351 91.10
0.760 0.130 91.32 1.310 0.356 91.09
0.780 0.137 91.31 1.320 0.362 91.09
0.800 0.143 91.31 1.330 0.367 91.08
0.820 0.150 91.30 1.340 0.372 91.08
0.840 0.157 91.29 1.350 0.377 91.07
0.860 0.164 91.29 1.360 0.382 91.07
0.880 0.171 91.28 1.370 0.387 91.06
0.900 0.178 91.27 1.380 0.392 91.06
0.910 0.182 91.27 1.390 0.398 91.05
0.920 0.185 91.26 1.400 0.403 91.05
0.930 0.189 91.26 1.410 0.408 91.04
0.940 0.193 91.26 1.420 0.414 91.04
0.950 0.197 91.25 1.430 0.419 91.03
0.960 0.201 91.25 1.440 0.425 91.03
0.970 0.204 91.25 1.450 0.430 91.02
0.980 0.208 91.24 1.460 0.436 91.01
0.990 0.212 91.24 1.470 0.441 91.01
1.000 0.216 91.23 1.480 0.447 91.00
1.010 0.220 91.23 1.490 0.452 91.00
1.020 0.224 91.23 1.500 0.458 90.99
1.030 0.228 91.22 1.510 0.464 90.99
1.040 0.233 91.22 1.520 0.469 90.98
1.050 0.237 91.21 1.530 0.475 90.97
1.060 0.241 91.21 1.540 0.481 90.97
1.070 0.245 91.20 1.550 0.487 90.96
1.080 0.249 91.20 1.560 0.492 90.96
1.090 0.254 91.20 1.570 0.498 90.95
1.100 0.258 91.19 1.571 0.499 90.95
1.110 0.262 91.19

Entrada a la cresta del barraje Datos de Entrada


Hd = 2.68
y
x Pt(0,0)
0,175Hd = L2 Cálculos
L1 = 0.756
L2= 0.469
R1= 1.206
R2= 0.536
0,45 Hd =R1
xt yt cota
R2= 0,2 Hd Pt(x ,y )
t t
1.825 0.658 90.79
Pared del Azud

Notas aclaratorias: Hd es la carga neta sobre la cresta del vertedero

0,282 Hd
L1

Punto de Tangencia
x y cota 0.926 0.188 91.600
0.000 0.000 91.45 cota azud (máximo) 0.958 0.200 91.250 0.012
0.100 0.100 0.003 91.45 0.003 1.000 0.216 91.234 0.017
0.100 0.200 0.011 91.44 0.008 1.200 0.303 91.147 0.087
0.200 0.300 0.023 91.43 0.012 1.300 0.351 91.099 0.048
0.200 0.400 0.040 91.41 0.016 1.400 0.403 91.047 0.052
0.300 0.500 0.060 91.39 0.020 1.500 0.458 90.992 0.055
0.300 0.600 0.084 91.37 0.024 1.517 0.468 90.982 0.010
0.400 0.700 0.112 91.34 0.028
0.400 0.800 0.143 91.31 0.031 Punto de cruce con la curva de enlace Azud - Colchón de Disipación
0.500 0.900 0.178 91.27 0.035
0.500 1.000 0.216 91.23 0.038
0.520 1.020 0.224 91.23 0.008
0.520 1.040 0.233 91.22 0.008
0.540 1.060 0.241 91.21 0.008
0.524 1.064 0.243 91.21 0.002

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 260
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 261
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 262
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 263
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 264
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)


Sección B-B
L V2 = 1.00 Lc = 19.06
L H2 = 20.060 L2 = 7.687

x2 = 0.999
S PBB = 3.489

Sección C-C
L V3 = 1.00 Lc = 19.06
L H3 = 1.000 L3 = 1.333

x3 = 0.173
S PCC = 2.663
Con los valores obtenido verificar los valores propuestos de la siguiente manera:

Espesor de la estructura en sus diferentes secciones críticas 4 


e * Sp * a
Sección A-A
3 b 2400 Peso del concreto
TA = 2.021
comprobación acertaste!
Sección B-B
TB = 1.938
comprobación acertaste!
Sección B-B
TC = 1.479444444
comprobación acertaste!

Diagrama de sub presión  H 


S x   H x  * Lx  * Wa H x = H + H'
 L 
L= 5.947 H'= Variable
H= 2.48 Wa = 1000

En el punto (1)
H' = 2.49 H x = 4.97 L x = 0
S1 = 4968.000
En el punto (2)
H' = 4.89 H x = 7.37 L x = 2.4 Lv 2.400
S2 = 6367.966 Lh 0

En el punto (3)
H' = 4.89 Hx = 7.37 Lx = 2.733 Lv 2.400
S3 = 6229.212 Lh 1.000

En el punto (4)
H' = 5.190 Hx = 7.67 Lx = 2.433 Lv 2.100
S4 = 6654.216 Lh 1.000

En el punto (P)
H' = 5.190 Hx = 7.67 Lx = 3.545 Lv 2.100
SP = 6190.867 Lh 4.336
En el punto (Q)
H' = 5.190 Hx = 7.67 Lx = 5.947
SQ = 5190.000

Diagrama de Sub presiones


4968.000

5190.000
6190.867
6654.216

6229.212
Ed 3700.867
6367.966 Et 1.542027917
Espesor del delantal
Enrrocado de Proteción o Escollera

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 265
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 266
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 267
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 268
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)


b) Tirante en la compuerta de Regulación

v 32
E2 = 5.290 E 2  y3   Hf 3
Qd = 34.5 2 * g Ecuación
B= 12.00
Hj = 0.5
1 .5 *
Qd2
 y32 y33  5.290 y32  0.653
E2 y3 2 * g * L2 * y32 E3
5.290 5.27 5.290 5.290 Valores de y 3 0.0664
0.6272
5.27 es el valor buscado

B y3 v3 hv 3 Hf 3 E2
12.00 5.27 0.546 0.015 0.008 5.293

Cálculo de la compuerta de regulación y2 Qd Cd L A h vc


Datos de Entrada 5.27 34.5 0.62 12.00 1.64 1.18

Altura de la Ventana 1.2

Análisis de las compuertas deslizantes


90.4 Cota fondo de canal de canal
v12
2*g
5.51 AE
v 32
2 * g
y1 2.49 v 22
2 * g y3
90.4
y2

ecuación de energía
en 1 y 2. v12 v2 Valores de y 2
  y1   y 2  2  AE a) 0.1907
2* g 2*g
y23  3.263 y22  0.421 b) 1.0127

Datos de Entrada
Delta 0.40 E1 (Q/L) 2 2*g f1 AE y2 E2
y1 2.49 4.037 8.266 19.620 0.421 0.774 4.011 4.0370
L 12.00
Q1 34.5 Características Hidráulicas de la Ventana de Regulación (2) Correcto
v1 5.51
g= 9.81 y2 L v2 hv 3
hf = 1.547 4.0110 12.00 0.717 0.026
b) Tirante en la compuerta de Regulación y3
v32 v32
E 2  y3   hf hf  k * y33  4.037
y32  0.653
2* g 2* g
Datos de Entrada k = 0,55 pérdida de carga para las entradas Diseño de presas pequeñas
Qd2
1.5 *
E2 = 4.0110 E2 y3 2 * g * L2 E 3 Valores de y 3
Q = 34.5 4.0370 3.868 0.653 4.0370 Correcto
B = 12.00
g= 9.81
Características Hidráulicas
B y3 v3 hv 3 E3
12 3.868 0.743 0.044 3.912

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 269
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 270
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 271
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 272
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.2: Memoria de cálculos hidráulicos bocatoma Verde (continuación)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 273
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

3.2.2. Descripción de las Obras Civiles


Esta alternativa de afianzamiento está conformada por un conjunto de obras civiles que
permitirán derivar los aportes hídricos del río Verde y su cuenca, principalmente durante
el periodo de avenidas, con un caudal máximo de 30.00 m3/s.

Esta alternativa considera una serie de obras principales, las mismas que se describen a
continuación:

g) Barraje Móvil y Compuertas de Limpia


El barraje será perpendicular al cauce y tendrá una longitud de 15.00 m, así mismo estará
implementando con cuatro (04) compuertas, cuya cota de fondo será 4,190.00 msnm,
ya que esta misma estructura cumplirá la función de compuerta de limpia.

El canal de limpia tendrá un ancho promedio de 15.00 m, pendiente de 1.1%, y espesor


de 0.30 m, esta estructura se construirá de concreto armado de f’c = 175 kg/cm2, sobre
este canal se ubicaran las compuertas de limpia o regulación, que estarán apoyadas sobre
pilares y el muro guía, las compuertas tendrán un ancho de 3.25 m y altura de 2.00 m,
sobre los muros guía descansará el puente de maniobra, y sobre este el mecanismo de
izaje de las compuertas, que serán del tipo Tándem con capacidad de izaje CP-12. El
equipo de izaje será accionado manualmente o por un grupo electrógeno que
proporcionará energía para el accionamiento del sistema de motoreductores con
velocidad mínima de 1,750 RPM. Ver Plano BV-PG en el Anexo 1.8. Plano Bocatoma.

h) Estructura de Captación u Obra de Toma


Es el orificio que permitirá el acceso del agua del río Verde al canal de derivación, esta
estructura permitirá derivar un caudal de 30.00 m3/s.

El sistema de captación estará compuesto por cinco (05) ventanas de captación, cuyas
dimensiones serán: 3.00 m de base y 0.85 m de altura, y se localizarán en una cota de
4,190.40 msnm (cota de fondo de la ventana de captación), inmediatamente después de
las ventanas de captación, se ubicará una transición de 5.45 m de longitud y la estructura
de regulación que estará implementada con una compuerta de regulación de 4.00 x 2.00
m, cuyo sistema de izaje será accionado manualmente o por un grupo electrógeno. Ver
Plano PV-PD en el Anexo 1.8. Plano Bocatoma.

i) Enrocado de protección
El enrocado de protección se localizará inmediatamente después del canal de limpia y
barraje móvil, este tendrá una longitud de 15.00 m y 1.00 m de espesor, asimismo se le
dotara de dos (02) uñas en los extremos con profundidades de 2.50 m cada una, los
mismos que llegaran hasta el nivel de cimentación proyectado.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 274
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El ancho de este enrocado de protección será igual a la suma del ancho del barraje móvil
y canal de limpia gruesa, estimándose que el diámetro nominal de la roca a emplearse
para esta estructura sería de 0.75 m.

j) Muros Guía
Los muros guía son estructuras que permitirán controlar las aguas antes y después de la
estructura de capación, serán construidas de concreto armado de f’c= 175 Kg/cm2, y
cuyas dimensiones serán: 6.55 m de una altura, 0.75 m de ancho de corona y 2.75 m de
base con una cota de cimentación igual a 4,187.45 msnm.

k) Canal de Derivación
En el Cuadro 1.6.3 y Figura 1.6.4, se presenta las principales características hidráulicas
del canal de derivación Verde, el mismo que derivará hasta 30.00 m3/s de las aguas del
río Verde hasta el embalse Lagunillas, este canal estará revestido con concreto de 175
kg/cm2 y tendrá un espesor de 0.20 m.

Cuadro 1.6.3: Características hidráulicas del canal de derivación Verde


Progresi va Q S n b y A P R v H Z
Ca nal
De A m3/s (m/m) - (m) (m) (m2) (m) (m) (m/s ) (m) -
Deriva ci ón 0+000 32+200 30.00 0.001 0.02 3 2.287 12.09 9.468 1.277 2.4813 3 1

Figura 1.6.4: Sección típica del canal de derivación Verde

3.3. ALTERNATIVA 03
Esta alternativa tiene como principales obras hidráulicas a la presa Paratía, bocatoma
Jarpaña y canal de derivación Jarpaña.

3.3.1. Presa Paratía


a) Ubicación
La presa está proyectada sobre el río Paratía, aguas arriba de la confluencia de los ríos
Paratía y Jarpaña a 0.8 km aproximadamente, en donde las laderas del cauce del río
Paratía forman un estrechamiento. Ver Plano PP-PG en el Anexo 1.8. (Plano de planta)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 275
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

b) Tipo de presa
El tipo de presa elegido desde el punto de vista de los materiales utilizados corresponde
a una presa de enrocado (el cuerpo principal de la presa conformado con materiales con
grano grueso y los elementos antifiltrantes de materiales aglutinados) y desde el punto
de vista del esquema constructivo de la presa corresponde al tipo homogénea (cuerpo
de la presa conformado con un solo material en contacto con el filtro). Ver Plano PP-
ST en el Anexo 1.8. Plano sección típica.

Se ha optado por este tipo de presa, debido a las características topográficas, geológicas
y geotécnicas del sitio de emplazamiento, como son un cierre en U con estribos rocosos
de pendiente del orden de 45° a 50°, una cimentación conformada por material aluvial
y fluvio-aluvial de características relativamente competentes, así como por la
disponibilidad de materiales apropiados, en cantidad y localización adecuados para su
construcción, otras opciones podrían ser evaluadas con mayor detalle en las etapas
siguientes de los estudios, profundizándose las investigaciones en ellas antes de la
decisión final.

c) Ancho de Corona
Para la determinación del ancho de la coronación se empleó el criterio de uso
convencional utilizado por el US Bureau of Reclamation (ecuación 1.6.1) y el
establecido por el Comité Español de Grandes Presas (Ecuación 1.6.6.), cuyas
expresiones en función de la altura de presa se presentan a continuación:

US Bureau o Reclamation
= 1 + 1.1√ℎ ……. (1.6.6)

Donde:
B : Ancho de la corona, en metros.
h : Altura máxima de presa, en metros.

Comité Español de Grandes Presas


= 3 + 1.5√ − 15 ……. (1.6.7)

Donde:
C : Ancho de coronación de presa, en metros.
H : Altura de presa, en metros.

Considerando una altura de presa de 52.00 m, se ha obtenido un ancho de corona de


8.93 y 8.00 m, empleando las ecuaciones 1.6.6 y 1.6.7, respectivamente, para finalmente
adoptar un valor de “B” de 10.00 m, ya que permitirá dar mayor volumen a la presa para
mejorar su seguridad y estabilidad y facilitar su construcción. Ver Plano PP-ST en el
Anexo 1.8. Plano sección típica

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 276
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

d) Borde Libre
El borde libre es la distancia vertical entre la cresta de la presa y la superficie de agua
máxima en el reservorio. Esta superficie máxima está asociada al diseño del tránsito de
avenidas en el embalse. El borde libre debe ser capaz de prevenir y evitar el
derramamiento sobre la presa en condiciones normales o en alguna acción severa de las
olas de rara ocurrencia que son producidos por vientos de alta velocidad en direcciones
críticas.

El borde libre (BL) o distancia vertical entre la coronación y el nivel de aguas máximas
extraordinarias puede ser estimado con la ecuación 1.6.8, que se presenta a
continuación:
a  0.76  0.34 * ( Fe) 0.5  0.26 * ( Fe) 0.25 ……. (1.6.8)
Donde:
a = Altura de ola, en metros.
Fe = Fetch efectivo (longitud del espejo de agua), en kilómetros.

Asumiendo un valor de 4.00 km como Fetch (F) para una dirección de viento Noreste
(NE), y empleando la ecuación 1.6.8, se determinó que la altura de la ola en el embalse
Paratía sería de 1.07 m, para finalmente asumir el valor del borde libre (BL) igual a 1.22
m sobre el NAME (nivel de aguas máximas extraordinarias).

e) Diseño del Filtro


Los objetivos del filtro, son los de evitar la erosión de las partículas finas del suelo y
además de conducir la descarga de filtración y disminuir su longitud de recorrido.

Las condiciones de diseño, para que el filtro impida las entradas de partículas son
principalmente de carácter granulométrico y debe de cumplir con las siguientes
relaciones
D15 ( Filtro )
5
D85 ( Suelo)
D15 ( Filtro )
5  40
D15 ( Suelo)
D50 ( Filtro )
 25
D50 ( Suelo)
D85 ( Filtro )
2
Abertura.tubo.de.Drenaje

Donde:
D15, D50, D85, son los tamaños de las partículas correspondientes a una distribución
granulométrica para los porcentajes en peso de 15, 50 y 85 que pasan respectivamente.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 277
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Las expresiones dadas anteriormente aseguran, no solo el arrastre de las partículas finas,
si no que, también la permeabilidad del filtro, la cual debe ser mayor a la del suelo. Por
lo que el material que se utilice tendrá que cumplir con estas condiciones.

Además debemos verificar que el Coeficiente de uniformidad cumpla la siguiente


condición:
D
C u  60  20
D10

f) Obras de Toma y Conducto de Descarga


Las obras de toma son las estructuras que permitirán regular las descargas desde el
embalse hacia aguas abajo de la presa mediante un conducto de descarga. Estas
descargas son controladas generalmente por compuertas.

Los cálculos hidráulicos para el dimensionamiento de la obra de descarga, se efectuaron


para las condiciones de carga hidráulica mínima y máxima, así como para diferentes
aberturas de la compuerta.

La descarga bajo la compuerta en estas condiciones fue calculada con la ecuación 1.6.9.
Q  CGo * B * 2 GH ' ……. (1.6.9)
Donde:
Q = Caudal que atraviesa la compuerta, en m3/s.
C = Coeficiente de descarga, adimensional.
Go = Abertura de la compuerta, en metros.
B = Ancho de la compuerta, en metros.
H’ = Carga de agua efectiva (H’ = H – Go), en metros.

H H’

Go Q

Figura 1.6.5: Esquema para la determinación del caudal de descarga.

El caudal evacuado por el conducto de descarga varía de acuerdo a la demanda del


sistema, estableciéndose para la etapa de pleno desarrollo, un caudal máximo (para un

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 278
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

nivel mínimo operacional) referencial para el diseño de las compuertas, del orden de
20.00 m3/s. Ver simulación del sistema en la componente 06 de este estudio.

La toma de agua se plantea este ubicada externa al cuerpo de presa, en el estribo


izquierdo del eje de presa (ver plano PP-PP). El conducto de descarga tendrá una sección
circular de 2.54 m2, con un diámetro de 1.80 m, la longitud del conducto, así como otros
detalles del mismo se presentan en los planos.

g) Estructura Terminal y Entrega del Conducto de Descarga de Fondo


La estructura terminal, es la estructura hidráulica encargada de disipar la energía de la
descarga proveniente del conducto de descarga. El caudal máximo determinado a la
salida del conducto es del orden de 20.00 m3/s y velocidad máxima de 8.2 m/s.

La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega al final a la poza, de ancho variable entre 5.00 a 10.00 m y altura de
muros de 5.00 y 8.00 m del canal de aproximación y la poza, respectivamente. La
protección contra la acción erosiva en el fondo del cauce, se efectuará a través de la
colocación de enrocado, en un área de 250.00 m2 (25.00 m de largo, 10.00 m de anchi
y 2.00 m de espesor).

h) Vertedero de Demasías
Esta estructura hidráulica está diseñada para descargar el agua en exceso del embalse
hacia un lugar establecido en el río aguas abajo de la presa. A continuación se presenta
el cálculo de todos los componentes de las obras de alivio.

Se ha establecido que la descarga máxima probable para un periodo de retorno de 1,000


años sería de 371.90 m3/s, por lo que para el diseño del vertedero de demasías del
embalse Verde, previo tránsito de avenidas en el embalse, se estimó una descarga
máxima, del orden de 210.00 m3/s.

Para determinar la altura de lámina vertiente, se empleó la ecuación 1.6.10, que se


presenta a continuación:
/
= ...…… (1.6.10)

Donde:
H = Altura de lámina vertiente, en metros.
Q = Caudal de descarga, en m3/s.
C = Coeficiente de descarga, adimensional.
L = Longitud del vertedero de demasías, en metros.

Asumiendo un valor de 2.50 para el coeficiente de descarga (C) y 25.00 m para la


longitud del vertedero de demasías (L), se estimó que la altura de la lámina vertiente

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 279
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

(H) sería de 2.24 m, para finalmente asumir un valor de 2.30 m como altura de lámina
vertiente (H).

i) Estructura de Disipación y Canal de Fuga


La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega a la poza, el ancho es variable entre 5.00 a 10.00 m y altura de muros
de 5.00 y 8.00 m del canal de fuga y la poza, respectivamente. La protección contra la
acción erosiva en el fondo del cauce, se efectuará a través de la colocación de enrocado,
en un área de 250.00 m2 (25.00 m de largo, 10.00 m de ancho y 2.00 m de espesor).

3.3.2. Bocatoma Jarpaña


a) Datos para el Diseño
La estructura de captación está proyectada sobre el río Jarpaña, aguas abajo de la
confluencia de los ríos Quillisani y Jolpamayo a 0.50 km aguas debajo de este punto.
Ver Plano BJ-PG en el Anexo 1.8. (Plano de planta)

La información empleada para el diseño de estructura de captación (bocatoma), es la


que se muestra en el Cuadro 1.6.4.

Cuadro 1.6.4: Datos para el diseño de la bocatoma Jarpaña


Descripción Valor
3
Caudal de Derivación Qd = 12 m /s
3
Caudal máximo del río (Tr = 50 años) Qr = 110 m /s
Pendiente de fondo del río S = 0.005 m/m
Coeficiente de rugosidad n = 0.035
Ancho medio de equilibrio B = 15 m
Tipo de suelo Grava – Arena
Material flotante por el río Nulo a despreciable

El río Jarpaña en el tramo donde se emplazará la estructura de captación, presenta un


cauce estable de baja pendiente, constituido principalmente por gravas gruesas, medias
y finas.

c) Memoria de Cálculos Hidráulicos


En el Cuadro 1.6.5 se presenta la memoria de cálculos hidráulicos de la bocatoma
Jarpaña.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 280
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña


BOCATOMA JARPAÑA

MEMORIA DE CALCULOS HIDRAULICOS

1.- Cálculo de las Caraterísticas del Río Aguas Abajo 1 2 1


Q * A* R 3 *S 2
n
Datos de entrada
Q= 110 m3/s Caudal de Máxima Avenida
n = 0.035 Rugosidad de río Q * n / S 1/2 77
S= 0.0025 Pendiente del río
Z= 1.00
b= 30.00 m

T y P A V f(Q)
33.536422 1.768211 35.001 56.17 1.958 110.000 Ok!!!!

yn = 1.77

Río A P R Vn h vn
JARPAÑA 56.17 35.00 1.60 1.958 0.2

2.- Dimensionamiento de la Ventana de Captación


Caudal de Demanda 12000 l/s 13800
Caudal de diseño de la Ventana de captación 13800 l/s 13.8 m 3 /s
3
Caudal de diseño de la Ventana de la Ventana de Captación 13.8 m /s

Altura de la Ventana de Captación Cota Terreno Fondo de Río 4328.00 msnm 28 m.s.n.m.

Cota Azud 29.40

Datos de Entrada

0.2

hv 0.80
ho 1.40

L 0.4

28.00

a) Sí trabaja como orificio ahogado

L 8.00 m Q  Cd * A * 2* g *h F hv
Cd 0.75 h(  0.2)
2
Q 13.80

F hv f F f
0.5190 0.7 0.519 OK!
Q hv
Entonces hv = 0.7  hv *  0.2
Cd * L * 2 * g 2
b) Sí trabaja como vertedero
2
3
Q 13.80  Q 
C 2.5
ho    hv 0.78
C * L
L 8.00
Conclusión
La Altura de la ventana de Captación es 0.80 Altura del Azud o Barraje
y puede captar el Qmin requerido que trabaja como orificio 1.40

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 281
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


3) Dimensionamiento del Barraje
Linea de Energía
Hv= 0.09 Datos de Entrada
Q= 110 m 3 /s
3
He= 1.216 Qd= 82.5 m /s
Hd= 1.13 L= 33.536422 m
P= 1.40 m
2
g= 9.81 m /s

3
Ht Qmáx = 3884.613 p /s
1.40 P Qd= 2913.460 p 3 /s
L= 110.028 pie
P= 4.593 pie
2
g= 32.2 pie /s

28
Cota de Fondo
3 COMP 110.2577659
Q  C * L * Hd 2
Datos de Entrada

Q= 110 C= 2.737 Valor supuesto


L= 33.536422 Hd = 1.13
P= 1.40
Cálculo de Co
P/Hd = 1.24 Co = 2
v= 1.296 m/s
Hv =h va = 0.086 m. C/Co = 1.3685
F= 0.55 para entrar al gráfico C= 2.737
Verificación de C Si se acepta
C= 2.737 He= 1.216
Hv= 0.086 Hd= 1.13
4) Perfil de la cresta del vertedero del barraje
C= 2.737 Hd= 1.13
Hv= 0.086 He= 1.216
Valores de las coordenadas para la cresta del barraje:
Valores definitivos de vertedero

Ecuación General
X 1 .85
y  0 .50 *
H d 0 .85

1,85
y= 0.4507 X Talud 1.5

dy/dx= 0.667
A 0.834
x 0.769 Puntos de Tangencia aguas
abajo del azud
y 0.277

x y Cota x y Cota
0.000 0.000 29.40 1.120 0.556 28.84
0.100 0.006 29.39 1.130 0.565 28.83
0.200 0.023 29.38 1.140 0.574 28.83
0.300 0.049 29.35 1.150 0.584 28.82
0.400 0.083 29.32 1.160 0.593 28.81
0.500 0.125 29.27 1.170 0.603 28.80
0.600 0.175 29.22 1.180 0.612 28.79
0.610 0.181 29.22 1.190 0.622 28.78
0.620 0.186 29.21 1.200 0.631 28.77
0.630 0.192 29.21 1.210 0.641 28.76
0.640 0.197 29.20 1.220 0.651 28.75
0.650 0.203 29.20 1.230 0.661 28.74
0.660 0.209 29.19 1.240 0.671 28.73
0.670 0.215 29.19 1.250 0.681 28.72

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 282
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


0.680 0.221 29.18 1.260 0.691 28.71
0.690 0.227 29.17 1.270 0.701 28.70
0.700 0.233 29.17 1.280 0.712 28.69
0.720 0.245 29.15 1.290 0.722 28.68
0.740 0.258 29.14 1.300 0.732 28.67
0.760 0.271 29.13 1.310 0.743 28.66
0.780 0.285 29.12 1.320 0.753 28.65
0.800 0.298 29.10 1.330 0.764 28.64
0.820 0.312 29.09 1.340 0.775 28.63
0.840 0.326 29.07 1.350 0.785 28.61
0.860 0.341 29.06 1.360 0.796 28.60
0.880 0.356 29.04 1.370 0.807 28.59
0.900 0.371 29.03 1.380 0.818 28.58
0.910 0.379 29.02 1.390 0.829 28.57
0.920 0.386 29.01 1.400 0.840 28.56
0.930 0.394 29.01 1.410 0.851 28.55
0.940 0.402 29.00 1.420 0.862 28.54
0.950 0.410 28.99 1.430 0.873 28.53
0.960 0.418 28.98 1.440 0.885 28.52
0.970 0.426 28.97 1.450 0.896 28.50
0.980 0.434 28.97 1.460 0.908 28.49
0.990 0.442 28.96 1.470 0.919 28.48
1.000 0.451 28.95 1.480 0.931 28.47
1.010 0.459 28.94 1.490 0.943 28.46
1.020 0.468 28.93 1.500 0.954 28.45
1.030 0.476 28.92 1.510 0.966 28.43
1.040 0.485 28.92 1.520 0.978 28.42
1.050 0.493 28.91 1.530 0.990 28.41
1.060 0.502 28.90 1.540 1.002 28.40
1.070 0.511 28.89 1.550 1.014 28.39
1.080 0.520 28.88 1.560 1.026 28.37
1.090 0.529 28.87 1.570 1.038 28.36
1.100 0.538 28.86 1.571 1.039 28.36
1.110 0.547 28.85

Entrada a la cresta del barraje Datos de Entrada


Hd = 1.13
y
x Pt(0,0)
0,175Hd = L2 Cálculos
L1 = 0.319
L2= 0.198
R1= 0.509
R2= 0.226
0,45 Hd =R1
xt yt cota
R2= 0,2 Hd Pt(x ,y )
t t
0.769 0.277 29.12
Pared del Azud

Notas aclaratorias: Hd es la carga neta sobre la cresta del vertedero

0,282 Hd
L1

Punto de Tangencia
x y cota 0.926 0.391 29.151
0.000 0.000 29.40 cota azud (máximo) 0.958 0.416 28.984 0.025
0.100 0.100 0.006 29.39 0.006 1.000 0.451 28.949 0.034
0.100 0.200 0.023 29.38 0.017 1.200 0.631 28.769 0.181
0.200 0.300 0.049 29.35 0.026 1.300 0.732 28.668 0.101
0.200 0.400 0.083 29.32 0.034 1.400 0.840 28.560 0.108
0.300 0.500 0.125 29.27 0.042 1.500 0.954 28.446 0.114
0.300 0.600 0.175 29.22 0.050 1.517 0.974 28.426 0.020
0.400 0.700 0.233 29.17 0.058
0.400 0.800 0.298 29.10 0.065 Punto de cruce con la curva de enlace Azud - Colchón de Disipación
0.500 0.900 0.371 29.03 0.073
0.500 1.000 0.451 28.95 0.080
0.520 1.020 0.468 28.93 0.017
0.520 1.040 0.485 28.92 0.017
0.540 1.060 0.502 28.90 0.017
0.524 1.064 0.506 28.89 0.004

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 283
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Hd = 1.13
Yc = 0.142
R 0= 0.264
R 1= 0.599
Yc R2 = 0.264
R2 R3 = 0.334
L1 = 0.32
R0 R1

V 12 V 22
E1   y1 E2   y2
R3 2*g 2*g
L1
0,282 Hd

Deteminación del Salto hidráulico


Poza de Dispación de Energía
condición:
ìnicial y 2 = yn
30.62 30.62
Línea de Energía
0.09
z1 0.422997452
Hd = 1.13
29.40 30.3 29.97

h v1 0.2 =h vn

1.40 =P
y2
1.77 = yn
Cota Solado 28
y1 S
Cota fondo 28

Datos de entrada :
Q = 110 A= 0.55
Q2
y1  P  He  1.1 *
L = 33.54 A1 0.61 y * B2 * 2* g
2
1
He = 1.216
P = 1.40 He + P y1 A1/ y 1 2 Igualdad
He+P 2.616 2.620 0.3857 4.1 4.486 No! y13  2.620
y12  0.61

y1 v1 hv 1 F1 Variables 0.3805
0.39 8.41 3.6 4.3 1.6409
Caraterísticas Hidráulicas después del salto son:

y2 1
y2 v2 h v2 F2  *
y1 2
1  8 * F   1 1
2

2.185 1.501 0.115 0.324


2.185 1.501 0.115 0.324

Condiciones Hidráulicas de la poza S>y 2 -y n S= 0.42


Asumir el Valor de S = 3.59 m
y2 y2 v2 h v2 F2
5.36 0.610 5.380 1.48 2.2

P 4.99 He + P y1 A1/ y 1 2 Igualdad


He 1.216 6.206 0.356 4.813 5.169 No! y13  6.206 y12  0.61
A= 0.55
A1 0.61 y1 v1 hv 1 F1 Variables 0.356
0.36 9.11 4.23 4.85 1.8784

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 284
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Comprobación de la Elevación del Tanque Amortiguador

Elev  1.15 * d 2  d1 elev= Q/L = 3.280015978

y2 1
 * 1  8 * F   1 1
2 y2
2.3
v2
1.43
h v2
0.1
F2
0.3
y1 2
Cs = Cota del Solado (msnm) 24.410

Segundo método O 1 2

Hd 1.13

P 1.40

yn 1.77 yn 1.77
y2
Co= 28 28
y C1
1

V12 VH2  V2 
E1  C1   y1 E0  C0  P  H d  V1  2 * g C0  C1  P  H d  y1  H  Hf 01 
2* g 2* g
 2 * g 
C0 = 28 C 1 = 27.6
VH2
r= C 0 -C 1 = 0.4 Hf 0 1  0.1*
Datos de Entrada 2* g
r= 0.4 Hd= 1.13 V 0 /2*g= 0.43
P= 1.40 Vo = 2.9

f1 = 2.93 f2 = 0.387 f1 + f2 = 3.32


q 2 /d 1 = 10.76 A= 65.08 B= 19.62

Ecuación a resolver 19.62 y 1 3 - 65.08 y1 2 + 10.76 =0


resolviendo al ecuación y1 =
q 2 /d 1 y 1 igualdad y1 v1 hv 1 F1
10.76 0.43632 10.76 Ok 0.44 7.45 2.83 3.59

Tipo de Salto es

y2 v2 h v2 F2
2.02 1.620 0.13 0.36
2.02 1.620 0.13 0.36

Cota del solado

Primer Método y1 v1 hv 1 F1 y2 v2 h v2 F2
0.36 9.11 4.23 4.85 0.61 5.38 1.48 2.20
0.44 7.45 2.83 3.59 2.02 1.62 0.13 0.36
Condición r+y n =y 2 2.17

Segunda alternativa

y1 v1 hv1 F1 y2 v2 hv2 F2
0.44 7.45 2.83 3.59 2.020 1.620 0.130 0.360

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 285
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


ii) Longitud del Solado

L  (5  6) * ( d 2  d1 ) L  6 * d1 * F1 L = 4*d 2

1 Schoklitsch 2 Safranez 3 U.S. of Reclamation U.S. of Reclamation (Gráfico)


min 7.9 L/y2 = 5.5
max 9.48 9.48 8.08 L= 12.65
L  9.75 * d1 * ( F1  1)1.01
4 Sylvester 5 Valor máximo 12.650
11.220

Por consiguiente Longitud del solado = 9.480 m

iii) Espesor del Solado Esta en función de la sub presión.


iv) Curva de Enlace entre el perfil y el solado Datos :
Hd = 1.13
P ángulo = 0.67 38.19718634

R R= 1.7
T= 0.59
R = 1.5*Hd Tx= 0.460
Ty= 0.38
Ty
a Cota 24.790

Tx T
Perfil externo de la estructura Barraje - Poza de dispación
29.54 Ecuación Recta y x cota
0 0.0000 29.1230
0.15 0.2250 28.9730
0.2 0.3000 28.9230
Pt = 0.3 0.4500 28.8230
xt 0.769 Cota = 29.12 0.32 0.4800 28.8030
yt 0.277 0.33 0.4950 28.7930

4.3330 h = Ty 4.333 ángulo = 0.588002604 33.69 grados


1
1.5 Longitud= 6.4995
24.790
28
6.4995 24.410 3.590

Espesor del colchón 1


0.769 0.495
0.226 1.26 1.050 9.480 14.360 0.8 long. Dentellon
Longitud Total 27.18
2.4 Profundidad de Socavación
Talud de dentellón Espesor 1.000 Talud de dentellón
-2.190 0.00 Talud del dentellón 0 0.500 Espesor
Ojo Longitud Total(1) 25.580 AA
0.00 Cota de cimentac 25.600 0
0.8 0.8 Valores

Cálculo de la Profundidad de Cimentación de la Estructura Barraje - Poza Dispadora


Análisis de la Sub Presión

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 286
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Altura del vertedor w a alt.máx
30.67
1 H= 0.90
L  * LH  LV
3
1.13 29.54
A
N= 0.23

29.77

1.77
28 B 14.36
C 1 28
24.410 3.590
1.000
2.40 A 1.000 5.090
B 23.410 0.500 0.5
-2.190
22.910
25.6 25.580
25.6 14.36
0.800 1.740 9.48 1.000

Control de Filtración - Análisis por sifonamiento


LV 5.8 L 6.4 24.84

LH 1.800 10.48
I) H1 = 1.40 x= -14.36
II) H2 = 30.67 H= 0.90
Comprobación C= 2.4
H= 0.90 L' 2.165

Sí L > L' satisfactorio Ok! estas bién

Determinación de la Sub Presión mas desfavorable:


a) Caso de Aguas Máximas
Ah 0.90

1.77 1.77 1.77 Tirrante normal del río


Spi

xi
0.90

L xi

b) Caso de Aguas Mínimas


Ah = 1.54

1.54 Spi

Li

El caso mas crítico Es el de aguas mínimas, por lo que calcularemos los vavlores de la subpresión para las distintas secciones críticas de la estructura barraje poza de
disipación

Sección A-A Li
L Vi = -1.190 Lc = 9.48 xi  h *
Lc
L Hi = 12.220 L2 = 2.883

xi = 0.274
S PAA = 2.044

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 287
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Sección B-B
L V2 = 1.00 Lc = 9.48
L H2 = 10.480 L2 = 4.493

x2 = 0.427
S PBB = 2.197

Sección C-C
L V3 = 1.00 Lc = 9.48
L H3 = 1.000 L3 = 1.333

x3 = 0.127
S PCC = 1.897
Con los valores obtenido verificar los valores propuestos de la siguiente manera:

Espesor de la estructura en sus diferentes secciones críticas 4 


e * Sp * a
Sección A-A
3 b 2400 Peso del concreto
TA = 1.136
comprobación acertaste!
Sección B-B
TB = 1.221
comprobación acertaste!
Sección B-B
TC = 1.053888889
comprobación acertaste!

Diagrama de sub presión  H 


S x   H x  * L x  * Wa H x = H + H'
 L 
L= 2.165 H'= Variable
H= 0.90 Wa = 1000

En el punto (1)
H' = 1.77 H x = 2.67 L x = 0
S1 = 2672.000
En el punto (2)
H' = 4.17 H x = 5.07 L x = 2.4 Lv 2.400
S2 = 4072.092 Lh 0

En el punto (3)
H' = 4.17 Hx = 5.07 Lx = 2.667 Lv 2.400
S3 = 3960.853 Lh 0.800

En el punto (4)
H' = 6.360 Hx = 7.26 Lx = 0.477 Lv 0.210
S4 = 7063.268 Lh 0.800

En el punto (P)
H' = 6.360 Hx = 7.26 Lx = 0.79 Lv 0.210
SP = 6932.864 Lh 1.740
En el punto (Q)
H' = 6.360 Hx = 7.26 Lx = 2.165
SQ = 6360.000

Diagrama de Sub presiones


2672.000

6360.000
6932.864
7063.268

3960.853
Ed 5162.864
4072.092 Et 2.151193333
Espesor del delantal
Enrrocado de Proteción o Escollera

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 288
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Le  Lt  Lc 1
 1
Lt  0.67 * C *  Db * q  2 1  Db  2 
Lt  0.60 * C * Dr 2 * 1.12 *  q *   1
Datos de Entrada
1
  Dr  
Lt  0.60 * C *  Dr  2

C = 9 Tabla Según bligth


Dr= 0.23 Le longitud de la escollera Dr =
q = 3.280015978 Lt Longitud total de escollera
Db = P 1.40 Lc Longitud del colchón
29.54 Dr = 0.23

29.77

Db = 1.40

28

Reemplazando
Le = 10.39 m
Profundidad necesaria para resistir el efecto erosivo( Prof de Socavación) yn = 1.77
1
Lacey´s Blench  q2  3
f 1.76* D50
R  1 . 34 *  
 f 
D= X*R -y n

XR

D = XR - y n
1.58

q= 3.28 m 3 /s/m
x= 1.88 Promedio ESCOLLERA
D 50 = 20 Curva Granulométrica
f= 7.871
R= 1.487
T= 2.788
D= 1.58 Profundidad de Socavación
1.77
Cálculo de la Profundidad de Socavación 1
 Q  x 1
t 0.28 
Datos de entrada 1.78
 0.68 * L * D50 *  
Q= 110
L= 33.536422 d 51.17829009
D 50 = 20 2.149348871
beta = 0.97 0.991507687 0.754716981
x= 0.325 ts 1.781548585
1.9

Hs = 0.1 hs 0.01

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 289
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)

1.40

4.80 10.39
14.360
1.0
0.4 3.59

0.50 0.00 1.000 0 5.09


0.5 0 25.580
0.50 -2.2 1 0.50 0.50
0

Total = 1.40 0.800 25.58 1.5

Determinación de los Elementos de Barraje Móvil - Canal de Limpia


Se recomienda que sea 1/10 de Longitud de Barraje 3.3536422
Número de Compuertas = 2
Long. = 2.5 altura = 1.40
Primera alternativa
0.80

29.64
nivel azud

1.40

0.80

0.80 2.50 2.50 28.24

2.20 2.20 2.20


Diseño del Canal de Limpia
Velocidad requerida para el canal de limpia v O  1. 5 * C * d C= 3 Tabla
d= 0.051 m
vO = 1.02 m/s.
Ancho del Canal de Limpia
vO =
Qm vC
Qm= 5.00 1.02 B q
q= 0.11 B= 45.45454545 q g
B 1= 3.3536422
Pendiente del Canal de Limpia
L 3.00 m
3
Por Francis Q= 7.661323 m /s
Velocidad recomendada para provocar el arrastre de material sólido = 2 m/s
Pendiente en el canal de Limpia
Datos de Entrada
10
n2 * g 9 2 n= 0.035 g= 9.81
Ic  v *n  b* y  3 q= 3.28 Ic = 0.012
2 1
 b  2* y 
9
q S 2  
Pendiente del Canal de Limpia 1.20E-02
(a) (a)*b 2*y b*y
b= 5.00 0.418 2.09 0.836 5.00 4.16 0.5
S= 0.002
v= 1.25 y= 0.5 mínimo
n= 0.020

Barraje

b= 5.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 290
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


DIMENSIONAMIENTO DE LA OBRA DE TOMA
Dimensiones del Orificio y Conducto
Determinación del gasto máximo que puede pasar por las compuertas
Cálculo Hidráulico de la Toma
Determinación de la capacidad del mecanismo elevador
Diseño de la transición que une la salida de la toma con el canal de riego
a ) Dimensiones del Orificio y Conducto Orificio ahogado
Q  C * A* 2* g *h A
Q Q2
h
C * 2* g *h 2 * C * A2 * g
2

Las dimensiones de la ventana de captación se detallaron en acápites anteriores.


L= 8.00 m
h= 0.80 m
b) Determinación del gasto máximo que puede pasar por las compuertas.(Obras Complementarias)
c) Determinación de la capacidad del mecanismo elevador
Elevación
Cresta vertedora
NAME

Hmáx

Diagrama de
Presiones

Compuerta
E
Plantilla del
Conducto

Plantilla del canal


desarenador
Primera alternativa de solución
31.20 31.460
Muro
30.70

0.086 30.62

1.216
29.40 31.160
30.65

y2 2.762
1.40 28.40 y3

0.4 0.5
5 27.90
28.00 20
a) Cálculo del tirante en la cámara de ingreso

aplicando la ecuación de energía en 1 y 2 tenemos v12 v2


  y1   y2  2  AE
2* g 2* g
delta 0.4
y1 = 2.70 Ecuación
v1 = 1.21 Qd2
 y2
v12 0.08 E1 y2 2 * g * L2 * y 22 2 E2 y23  2.782 y22  0.152
2*g 2.782 2.762 2.782 2.782
hf 0 Valores de y 2 0.5162
L= 8.00 2.76 bien es el valor buscado y2 0.0459
Qd = 13.8
Carácterísticas de la ventana de captación B y2 v2 hf 2 E2
8.00 2.76 0.63 0.02 2.780

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 291
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


b) Tirante en la compuerta de Regulación
v 32
E2 = 2.780 E 2  y3   Hf 3
Qd = 13.8 2 * g Ecuación
B= 8.00
Hj = 0.5
1.5 *
Qd2
 y32 y33  2.780
y32  0.236
E2 y3 2 * g * L2 * y32 E3
2.780 2.745 2.780 2.780 Valores de y 3 0.0664
0.6272
2.75 es el valor buscado

B y3 v3 hv 3 Hf 3 E2
8.00 2.75 0.627 0.02 0.011 2.781

Cálculo de la compuerta de regulación y2 Qd Cd L A h vc


Datos de Entrada 2.745 13.8 0.62 8.00 1.18 1.06

Altura de la Ventana 1.2

Análisis de las compuertas deslizantes


28.4 Cota fondo de canal de canal
v12
2*g
1.96 AE
v 32
2 * g
y1 1.77 v 22
2 * g y3
28.4
y2

ecuación de energía
en 1 y 2. v12 v2 Valores de y 2
  y1   y 2  2  AE a) 0.1907
2* g 2* g 3
y 
2
1.867 y22  0.152 b) 1.0127

Datos de Entrada
Delta 0.40 E1 (Q/L) 2 2*g f1 AE y2 E2
y1 1.77 1.965 2.976 19.620 0.152 0.098 1.924 1.9650
L 8.00
Q1 13.8 Características Hidráulicas de la Ventana de Regulación (2) Correcto
v1 1.96
g= 9.81 y2 L v2 hv 3
hf = 0.195 1.9240 8.00 0.897 0.041
b) Tirante en la compuerta de Regulación y3
v32 v 32
E2  y3   hf hf  k * y33  1.965
y32  0.235
2* g 2* g
Datos de Entrada k = 0,55 pérdida de carga para las entradas Diseño de presas pequeñas
Qd2
1 .5 *
E2 = 1.9240 E2 y3 2 * g * L2 E 3 Valores de y 3
Q = 13.8 1.9650 1.837 0.235 1.9650 Correcto
B = 8.00
g= 9.81
Características Hidráulicas
B y3 v3 hv 3 E3
8 1.837 0.939 0.07 1.907

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 292
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


31.12

1.916 0.5

y =
2
2.76 1.2
0.80 0.001 S 1.5*1000
28.4

0.4

3
28

Aliviadero aguas abajo de la curva


Datos del canal rectangular de entrega Datos del canal rectangular canal de derivación
Q= 13.8 P = 7.42 Q= 12 P = 7.04
B= 3.5 T = 3.5 B= 3.5 T = 3.5
y= 1.96 v = 2.01 yn = 1.77 v = 1.94
A= 6.86 hf = 0.21 A= 6.20 hf = 0.19
Emáx = 2.17 Emín = 1.96

Diseño del Limitador de Gasto (Aliviadero)

h1 h2
y máx 2.17
Q máx 20.1 y1 yn 1.77 y2 1.96
Qn 12 Q2 7.6

Cálculo de los tirantes aguas arriba y debajo de la estructura


h2  y2  yn
y máx 2.17 Sí : h2 = 0.19
yn 1.77 h1 = 0.152
h1  0.8 * h2
y2 1.96 h= 0.171
El caudal a evacuar es : Q= 12.5 3*Q
L
 0.95 2 * *  * 2*g *h
3
2

 0.75
h= 0.171
Longitud del aliviadero es: (L) L= 84.01808 Forchheiner
L= 146.70
considerando un 60% del borde libre h  0.6 * ( y máx  y n ) 12.5
h= 0.114
L= 146.6335 Longitud= 146.6335099

Caraterísticas del colchón amortiguador del aliviadero lateral.

1 2 3

hf= 0.40

y máx 2.17
0.09

0.5

Datos Solución
Caudal de Vertedor 12.5
Carga sobre el vertedor 0.4 v22 hf  k *
v22 E1  y2  1.1*
Qv2
Longitud del vertedor 146.70 E1  y 2   hf 2* g 2 * g * L2
Coeficiente de descarga 0.79
2* g

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 293
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)

E 1 - E 2 + perdidas E1 f y2 E 2 comprobación
2.57 0.0004 2.57 2.57 Ok bien

Ecuación a resolver y2 = 0.021 F 2 = 0.006572232


y23  2.57 y22  0.0004 v2 = 0.033

Tirante conjugado mayor es: 1.285 y3 = -1.27 m


1.651225
y1  y12 2 * y1 * v12  0.000571
y2       0.023887 -1.27 Lc = -24
2  4 g  Longitud del colchón

Profundidad del colchón yc 0.09 P  1.15( y3  y n )


Q2
tirante crítico P= -1.6 yc  3
P= 0.5 B2 * g

Espesor del colchón e= 0.25


Q
hu  (1.5 * )
 * B * 2* g 88.2
Qv= 12.5
B= 146.70 0.25
mu= 0.70 1.000 0.5
hu= 0.041221 -24

1,85
Sí Ht = 2.17 y= 1.089 X
P= 1.77 Talud 1 x y Cota
He = 0.4001 dy/dx= 1 0.000 0.000 89.97
Hd = 0.40 A 2.015 0.050 0.006 89.96
C= 0.337 x 0.439 0.100 0.021 89.95
cota canal 88.20 y 0.237 0.200 0.075 89.89
Cota azud 89.97 0.250 0.113 89.86
0.307 0.166 89.80
Curva de enlace 0.350 0.212 89.76
R= 0.2 0.375 0.240 89.73
ángulo = 1 0.400 0.271 89.70
T= 0.311481545 T 0.501858 0.440 0.323 89.65
Tx 0.190376113
Ty 0.037845645

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 294
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


Calculo de la transición
Canal Rectangular Canal Trapezoidal máxima eficiencia alfa =
Q= 12 Q= 12 F' = 0.85615
b= 3.5 y= 1.6596 2.15748 tan(a/2) = 0.389339874
y= 1.77 b= 2
A= 6.20 A= 6.0735 L= 1.9263375
P= 7.04 P= 6.6941
v= 1.935 R= 0.9073 Base mayor
F= 1.1219 v= 1.9758 5.8
F= 0.5904
F= 0.85615 E= 1.8586 Ht = 1.88
Por boreau a = 12.5 0.218166
L= -5.2 Por consiguiente L = 2.5

1 1.88 2 1.88 Ancho total=


5.76
5.80
2.01 0.22

1.88 1

1.6596 1

2
Diseño del Limitador de Gasto (Aliviadero)

h1 h2
y máx 1.88
Q máx 14.4 y1 yn 1.6596 y2 1.8586
Q máx 13.8 Qn 12 Q2 12 15

Cálculo de los titentes aguas arriba y debajo de la estructura


y máx 1.88 Sí : h2 = 0.2
yn 1.6596 h1 = 0.16
h1  0.8 * h2
y2 1.8586 h= 0.18
El caudal a evacuar es : Q= 2.4 3*Q
L
 0.95 2 * *  * 2* g *h
3
2

 0.5
h= 0.18
Longitud del aliviadero es: (L) L= 22.40529 Forchheiner

considerando un 60% del borde libre h  0.6 * ( ymáx  yn )


h= 0.13224
L= 33.80171 Longitud= 33.80171488 L= 34.00

Caraterísticas del colchón amortiguador del aliviadero lateral. 3* Q


L 3
3 2*  * 2* g *h 2
1 2

hf= 0.37

y máx 1.88
0.08

0.4
Datos Solución
Caudal de Vertedor 2.4
Carga sobre el vertedor 0.37 v22 v22 Qv2
hf  k * E1  y2  1.1*
Longitud del vertedor 34.00 E1  y2   hf 2* g 2 * g * L2
Coeficiente de descarga 0.79
2* g

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 295
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.6.5: Memoria de cálculos hidráulicos bocatoma Jarpaña (continuación)


E 1 - E 2 + perdidas E1 f y2 E 2 comprobación
2.25 0 2.25 2.25 Ok bien
Ecuación a resolver y2 = 3 F2 = 0.006598359
y23  2.25 y22  0.000 v2 = 0.031
Tirante conjugado mayor es: 1.125 y3 = -1.11 m
1.265625
y1  y 2 2 * y1 * v12  0.000441
y2     1   0.020996 -1.11 Lc = -21
2  4 g  Longitud del colchón

Profundidad del colchón yc 0.08 P  1.15( y3  y n )


Q2
tirante crítico P= -1.4 yc  3
P= 0.4 B2 * g

Espesor del colchón e= 0.20


Q
hu  (1.5 * )
 *B * 2* g
Qv= 2.4
B= 34.00 0.20
mu= 0.70 0.4
hu= 0.034149 0.950 -21
0.1
Datos de Entrada
Q= 2.4 m 3 /s
Qd= 2.4 m 3 /s 3
2
 Q2 
Q  C * L * Hd He  y  P   
L= 34.00 m  2 * g *l2 * y2 
P= 1.66 m
He Hd  y  P
g= 9.81 m 2 /s C  3.27  0 .4 0 *
P
3
Qmáx = 84.755 p /s
Qd= 84.755 p 3 /s Ht 0.474 pies
L= 111.549 pie Ht 0.144 m
P= 5.445 pie
2
g= 32.2 pie /s

Q m He Hd (3/2) C L Q
84.755 0.474 0.04 0.326 3.273 111.549 119.00

Resultados pies m P/Hd C/Cd Cd He/Hd


C= 3.273 1.807 1.095 0.875 4.03 1.008046671
Hv= 0.04 0.012
He= 5.011 1.528 C(pie 1/2 /s) C m/s Ccalc.
Hd= 4.971 1.515 3.52625 1.947 1.807

Ecuación General dy/dx= 1


1,85
y= 0.3513 X X 1 .85 A 0.65
y  0 .50 * Puntos de Tangencia aguas
Talud 1 H d 0 . 85 x 1.660
abajo del azud
y 0.897
x y Cota
0.000 0.000 100.00 Cota canal = 68.96
0.200 0.018 100.06
0.400 0.064 100.02 Como h 1 3 f= 0.000279356
0.600 0.137 99.94 h2 -1.11
0.800 0.232 99.85 y n +Hv 3.1746
0.610 0.141 99.94
0.620 0.145 99.93 Ecuación h13  3.1746 h12  0.000279356
0.623 0.147 99.93
0.700 0.182 99.90 h1 = 0.023
0.750 0.206 99.87
0.760 0.211 99.87 h2 = 0.22
0.770 0.217 99.86
0.780 0.222 99.86 L= -21
0.790 0.227 99.85 S= 0.14 0.2
Long 0.8

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 296
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

3.3.3. Descripción de las Obras Civiles


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles que
permitirán regular y derivar los aportes hídricos de los ríos Paratía y Jarpaña,
principalmente durante el periodo de avenidas.

Esta alternativa considera una serie de obras principales, las mismas que se describen a
continuación:

g) Presa Paratía
Se prevé la construcción de una presa con material homogéneo y pantalla de concreto
F’c = 210 kg/cm2 y acero de refuerzo con distribución horizontal y vertical de ½”
diámetro y espaciamientos de 0.30 m en el paramento mojado de la presa, así mismo se
deberá de efectuar un tratamiento en la cimentación consistente en inyecciones de
cemento o pantallas de bentonita, hasta una profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son suficientes
para satisfacer las exigencias técnicas internacionales. El Talud aguas arriba se
recomienda se prolongue hasta una profundidad de 15.00 m aproximadamente, por
debajo del terreno natural hasta encontrar un material mucho más compacto para el
inicio de las excavaciones de la pantalla impermeable. Luego del relleno del material
que se encontrara sobre el concreto armado, se deberá de colocar una cobertura de arcilla
a manera de colchón de 1.00 m de espesor como mínimo que se extenderá hacia aguas
arriba de la presa, cuya función será la de evitar que la presión del agua esté en contacto
directo con la pantalla plástica de la cimentación y reducir las pérdidas de agua por
filtración. Ver Plano PP-PG en el Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Paratía serían:


Nivel de la Corona : 4256.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4254.78 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,252.48 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,229.15 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,214.15 msnm.
Borde Libre : 1.22 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 1,490.00 m.
Altura máxima de presa (sobre el cauce) : 52.00 m.
Ancho máximo en la base de la presa : 220.00 m.
Espesor de los filtros : 1.00 m.
2
Espesor de Pantalla de concreto f’c = 245kg/cm : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 297
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.


Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 240 hm3.
Volumen útil : 200 hm3.
Volumen muerto (sedimentos) : 40 hm3.

h) Túnel de Desvío
El túnel de desvío, está proyectado en el estribo derecho, con una longitud total
aproximada de 675.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m de
base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m, siendo la cota de inicio del túnel 4,224.15 y la final 4,216.73 msnm.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía cuyo fondo alcanza la cota 4,187.84 msnm conformada de concreto armado con
resistencia de 245 kg/cm2, longitud igual a 61.88 m, ancho de 10.00 m y 8.38 m de
altura, además se ha previsto considerar a continuación de esta estructura, enrocado de
protección pesado, en una longitud de 25.00 m, 27.00 m de ancho y 2.00 m de espesor.

i) Vertedero de Demasías, Canal de Fuga y Poza Disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de 25.00
m de longitud, el mismo que estará emplazado en el estribo derecho, externo al cuerpo
de la presa. La longitud total del vertedero de demasías será de 750.00 m, longitud que
considera al vertedero propiamente dicho y el canal de fuga (rápida) de sección
rectangular, a la poza disipadora de energía (Km 0+060 al Km 0+750). Ver Plano PP-
PP en el Anexo 1.8. Plano Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 210 m3/s con un tirante
de 2.30 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se presente el
caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,252.48 msnm; tiene tres (03) vanos de
8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual se
emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 655.00 m (km 0+120 a km 0+775), y será de
sección rectangular, con 15.00 m de ancho y altura de 2.50 m.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 298
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

La estructura de disipación de energía tendrá una longitud de 63.80 m (km 0+775 a km


0+875), un ancho variable entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes
de 2:1 (H: V). Inmediatamente después de esta estructura, se ha considerado la
colocación de enrocado de protección en una longitud de 25.00 m y 2.00 m de espesor.

j) Barraje Fijo
Él barraje será perpendicular al cauce del río Jarpaña y tendrá una longitud de 23.50 m,
el perfil será tipo Creager y la cota de la cresta será 4,329.35 msnm, el azud proyectado
será de concreto ciclópeo de 175 kg/cm2 + 30% PM, con un talud de 1:1.5, la curva de
enlace tiene un radio de 2.75 m que une el azud con el colchón de disipación que será
construido de concreto simple de 175 kg/cm2 + 30% PM y 1.00 m de espesor, siendo la
longitud de este último 10.50 m. Ver Plano BJ-PG en el Anexo 1.8. Plano Bocatoma.

k) Canal de Limpia
El canal de limpia tendrá un ancho promedio de 5.75 m, pendiente de 1.1%, y espesor
de 0.30 m, esta estructura se construirá de concreto armado de f’c = 175 kg/cm2, sobre
este canal se ubicaran las compuertas de limpia o regulación, que estarán apoyadas sobre
pilares y el muro guía, las compuertas tendrán un ancho de 2.50 m y altura de 1.60 m,
sobre los muros guía descansará el puente de maniobra, y sobre este el mecanismo de
izaje de las compuertas, que serán del tipo Tándem con capacidad de izaje CP-12. El
equipo de izaje será accionado manualmente o por un grupo electrógeno que
proporcionará energía para el accionamiento del sistema de motoreductores con
velocidad mínima de 1,750 RPM. Ver Plano BJ-PG en el Anexo 1.8. Plano Bocatoma.

l) Estructura de Captación u Obra de Toma


Es el orificio que permitirá el acceso del agua del río Jarpaña al canal de derivación,
esta estructura permitirá derivar un caudal de 12.00 m3/s.

El sistema de captación estará compuesto por dos (02) ventanas de captación, cuyas
dimensiones serán: 4.00 m de base y 0.80 m de altura, y se localizarán en una cota de
4,328.40 msnm (cota de fondo de la ventana de captación), inmediatamente después de
las ventanas de captación, se ubicará una transición de 5.45 m de longitud y la estructura
de regulación que estará implementada con una compuerta de regulación de 3.00 x 1.40
m, cuyo sistema de izaje será accionado manualmente o por un grupo electrógeno. Ver
Plano BJ-PG en el Anexo 1.8. Plano Bocatoma.

m) Enrocado de protección
El enrocado de protección se localizará inmediatamente después del canal de limpia y
barraje móvil, este tendrá una longitud de 15.00 m y 1.00 m de espesor, asimismo se le
dotara de dos (02) uñas en los extremos con profundidades de 2.50 m cada una, los
mismos que llegaran hasta el nivel de cimentación proyectado.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 299
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El ancho de este enrocado de protección será igual a la suma del ancho del barraje móvil
y canal de limpia gruesa, estimándose que el diámetro nominal de la roca a emplearse
para esta estructura sería de 0.75 m.

n) Muros Guía
Los muros guía son estructuras que permitirán controlar las aguas antes y después de la
estructura de capación, serán construidas de concreto armado de f’c= 175 Kg/cm2, y
cuyas dimensiones serán: 6.00 m de una altura, 0.75 m de ancho de corona y 2.75 m de
base con una cota de cimentación igual a 4,325.45 msnm.

o) Canal de Derivación
En el Cuadro 1.6.6 y Figura 1.6.6, se presenta las principales características hidráulicas
del canal de derivación Jarpaña, el mismo que derivará hasta 12.00 m3/s de las aguas
del río Jarpaña hasta el embalse Lagunillas, este canal estará revestido con concreto de
175 kg/cm2 y tendrá un espesor de 0.20 m.

Cuadro 1.6.6: Características hidráulicas del canal de derivación Verde


Progresi va Q S n b y A P R v H Z
Ca nal
De A m3/s (m/m) - (m) (m) (m2) (m) (m) (m/s ) (m) -
Deriva ci ón 0+000 21+700 12.00 0.001 0.02 2 1.659 6.0735 6.694 0.907 1.9758 2.2 1

Figura 1.6.6: Sección típica del canal de derivación Jarpaña

El canal de derivación Jarpaña tendrá una longitud total de 24.00 km, de los cuales 21.70
km corresponden a un canal de sección trapezoidal y los 2.30 km restantes a un túnel
tipo bóveda, tal como se detalla en el Cuadro 1.6.7.

Cuadro 1.6.7: Detalle del canal de derivación Jarpaña


Progresiva Caudal Longitud
Tipo Sección
De A (m3/seg) (m)
Canal 0+000 21+700 12 21,700 Trapezoidal
Túnel 21+700 24+000 12 2,300 Túnel tipo bóveda

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 300
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

3.4. ALTERNATIVA 4
Esta alternativa tiene como principales obras hidráulicas a las presas Paratía y Jarpaña, a
continuación únicamente se presenta la memoria de cálculos preliminar de la presa
Jarpaña, mas no así el de la presa Paratía, debido a que esta fue presentada en el ítem 3.3.1
correspondiente a la alternativa de afianzamiento 3.

3.4.1. Presa Jarpaña


a) Ubicación
La presa está proyectada sobre el río Jarpaña, a 2.6 km aguas debajo de la confluencia
de los ríos Quillisani y Jolpamayo, en donde las laderas del cauce del río Jarpaña forman
un estrechamiento. Ver Plano PJ-PG en el Anexo 1.8. (Plano de planta)

b) Tipo de presa
El tipo de presa elegido desde el punto de vista de los materiales utilizados corresponde
a una presa de enrocado (el cuerpo principal de la presa conformado con materiales con
grano grueso y los elementos antifiltrantes de materiales aglutinados) y desde el punto
de vista del esquema constructivo de la presa corresponde al tipo homogénea (cuerpo
de la presa conformado con un solo material en contacto con el filtro). Ver Plano PJ-ST
en el Anexo 1.8. Plano sección típica.

Se ha optado por este tipo de presa, debido a las características topográficas, geológicas
y geotécnicas del sitio de emplazamiento, como son un cierre en U con estribos rocosos
de pendiente del orden de 45° a 50°, una cimentación conformada por material aluvial
y fluvio-aluvial de características relativamente competentes, así como por la
disponibilidad de materiales apropiados, en cantidad y localización adecuados para su
construcción, otras opciones podrían ser evaluadas con mayor detalle en las etapas
siguientes de los estudios, profundizándose las investigaciones en ellas antes de la
decisión final.

c) Ancho de Corona
Para la determinación del ancho de la coronación se empleó el criterio de uso
convencional utilizado por el US Bureau of Reclamation (ecuación 1.6.11) y el
establecido por el Comité Español de Grandes Presas (Ecuación 1.6.12), cuyas
expresiones en función de la altura de presa se presentan a continuación:

US Bureau o Reclamation
= 1 + 1.1√ℎ ……. (1.6.11)

Donde:
B : Ancho de la corona, en metros.
h : Altura máxima de presa, en metros.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 301
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Comité Español de Grandes Presas


= 3 + 1.5√ − 15 ……. (1.6.12)

Donde:
C : Ancho de coronación de presa, en metros.
H : Altura de presa, en metros.

Considerando una altura de presa de 75.00 m, se ha obtenido un ancho de corona de


10.51 y 8.87 m, empleando las ecuaciones 1.6.11 y 1.6.12, respectivamente, para
finalmente adoptar un valor de “B” de 10.00 m, ya que permitirá dar mayor volumen a
la presa para mejorar su seguridad y estabilidad y facilitar su construcción. Ver Plano
PJ-ST en el Anexo 1.8. Plano sección típica

d) Borde Libre
El borde libre es la distancia vertical entre la cresta de la presa y la superficie de agua
máxima en el reservorio. Esta superficie máxima está asociada al diseño del tránsito de
avenidas en el embalse. El borde libre debe ser capaz de prevenir y evitar el
derramamiento sobre la presa en condiciones normales o en alguna acción severa de las
olas de rara ocurrencia que son producidos por vientos de alta velocidad en direcciones
críticas.

El borde libre (BL) o distancia vertical entre la coronación y el nivel de aguas máximas
extraordinarias puede ser estimado con la ecuación 1.6.13, que se presenta a
continuación:
a  0.76  0.34 * ( Fe) 0.5  0.26 * ( Fe) 0.25 ……. (1.6.13)
Donde:
a = Altura de ola, en metros.
Fe = Fetch efectivo (longitud del espejo de agua), en kilómetros.

Asumiendo un valor de 5.82 km como Fetch (F) para una dirección de viento Noroeste
(NO), y empleando la ecuación 1.6.13, se determinó que la altura de la ola en el embalse
Verde sería de 1.176 m, para finalmente asumir el valor del borde libre (BL) igual a
1.18 m sobre el NAME (nivel de aguas máximas extraordinarias).
e) Diseño del Filtro
Los objetivos del filtro, son los de evitar la erosión de las partículas finas del suelo y
además de conducir la descarga de filtración y disminuir su longitud de recorrido.

Las condiciones de diseño, para que el filtro impida las entradas de partículas son
principalmente de carácter granulométrico y debe de cumplir con las siguientes
relaciones
D15 ( Filtro )
5
D85 ( Suelo)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 302
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

D15 ( Filtro )
5  40
D15 ( Suelo)
D50 ( Filtro )
 25
D50 ( Suelo)
D85 ( Filtro )
2
Abertura.tubo.de.Drenaje

Donde:
D15, D50, D85, son los tamaños de las partículas correspondientes a una distribución
granulométrica para los porcentajes en peso de 15, 50 y 85 que pasan respectivamente.
Las expresiones dadas anteriormente aseguran, no solo el arrastre de las partículas finas,
si no que, también la permeabilidad del filtro, la cual debe ser mayor a la del suelo. Por
lo que el material que se utilice tendrá que cumplir con estas condiciones.

Además debemos verificar que el Coeficiente de uniformidad cumpla la siguiente


condición:
D
C u  60  20
D10

f) Obras de Toma y Conducto de Descarga


Las obras de toma son las estructuras que permitirán regular las descargas desde el
embalse hacia aguas abajo de la presa mediante un conducto de descarga. Estas
descargas son controladas generalmente por compuertas.

Los cálculos hidráulicos para el dimensionamiento de la obra de descarga, se efectuaron


para las condiciones de carga hidráulica mínima y máxima, así como para diferentes
aberturas de la compuerta.

La descarga bajo la compuerta en estas condiciones fue calculada con la ecuación


1.6.14.
Q  CGo * B * 2 GH ' ……. (1.6.14)

Donde:
Q = Caudal que atraviesa la compuerta, en m3/s.
C = Coeficiente de descarga, adimensional.
Go = Abertura de la compuerta, en metros.
B = Ancho de la compuerta, en metros.
H’ = Carga de agua efectiva (H’ = H – Go), en metros.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 303
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

H H’

Go Q

Figura 1.6.7: Esquema para la determinación del caudal de descarga.

El caudal evacuado por el conducto de descarga varía de acuerdo a la demanda del


sistema, estableciéndose para la etapa de pleno desarrollo, un caudal máximo (para un
nivel mínimo operacional) referencial para el diseño de las compuertas, del orden de
20.00 m3/s. Ver simulación del sistema en la componente 06 de este estudio.

La toma de agua se plantea este ubicada externa al cuerpo de presa, en el estribo


izquierdo del eje de presa (ver plano PJ-PP). El conducto de descarga tendrá una sección
circular de 2.54 m2, con un diámetro de 1.80 m, la longitud del conducto, así como otros
detalles del mismo se presentan en los planos.

g) Estructura Terminal y Entrega del Conducto de Descarga de Fondo


La estructura terminal, es la estructura hidráulica encargada de disipar la energía de la
descarga proveniente del conducto de descarga. El caudal máximo determinado a la
salida del conducto es del orden de 20.00 m3/s y velocidad máxima de 8.2 m/s.

La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega al final a la poza, de ancho variable entre 5.00 a 10.00 m y altura de
muros de 5.00 y 8.00 m del canal de aproximación y la poza, respectivamente. La
protección contra la acción erosiva en el fondo del cauce, se efectuará a través de la
colocación de enrocado, en un área de 250.00 m2 (25.00 m de largo, 10.00 m de anchi
y 2.00 m de espesor).

h) Vertedero de Demasías
Esta estructura hidráulica está diseñada para descargar el agua en exceso del embalse
hacia un lugar establecido en el río aguas abajo de la presa. A continuación se presenta
el cálculo de todos los componentes de las obras de alivio.

Se ha establecido que la descarga máxima probable para un periodo de retorno de 1,000


años sería de 322.60 m3/s, por lo que para el diseño del vertedero de demasías del
embalse Verde, previo tránsito de avenidas en el embalse, se estimó una descarga
máxima, del orden de 198.00 m3/s.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 304
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Para determinar la altura de lámina vertiente, se empleó la ecuación 1.6.15, que se


presenta a continuación:
/
= ...…… (1.6.15)

Donde:
H = Altura de lámina vertiente, en metros.
Q = Caudal de descarga, en m3/s.
C = Coeficiente de descarga, adimensional.
L = Longitud del vertedero de demasías, en metros.

Asumiendo un valor de 2.80 para el coeficiente de descarga (C) y 25.00 m para la


longitud del vertedero de demasías (L), se estimó que la altura de la lámina vertiente
(H) sería de 2.00 m, para finalmente asumir un valor de 2.00 m como altura de lámina
vertiente (H).

i) Estructura de Disipación y Canal de Fuga


La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega a la poza, el ancho es variable entre 5.00 a 10.00 m y altura de muros
de 5.00 y 8.00 m del canal de fuga y la poza, respectivamente. La protección contra la
acción erosiva en el fondo del cauce, se efectuará a través de la colocación de enrocado,
en un área de 250.00 m2 (25.00 m de largo, 10.00 m de ancho y 2.00 m de espesor).

3.4.2. Descripción de las Obras Civiles


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles que
permitirán regular los aportes hídricos del río Jarpaña y su cuenca principalmente
durante el periodo de avenidas, para almacenar un volumen total de 159 hm3, de los
cuales 133 hm3 corresponden al volumen útil y 26 hm3 al volumen muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen a
continuación:

a) Presa Jarpaña
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en el
paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en la
cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta una
profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son suficientes
para satisfacer las exigencias técnicas internacionales. El Talud aguas arriba se

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 305
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

recomienda se prolongue hasta una profundidad de 15.00 m aproximadamente, por


debajo del terreno natural hasta encontrar un material mucho más compacto para el
inicio de las excavaciones de la pantalla impermeable. Luego del relleno del material
que se encontrara sobre el concreto armado, se deberá de colocar una cobertura de arcilla
a manera de colchón de 1.00 m de espesor como mínimo que se extenderá hacia aguas
arriba de la presa, cuya función será la de evitar que la presión del agua esté en contacto
directo con la pantalla plástica de la cimentación y reducir las pérdidas de agua por
filtración. Ver Plano PJ-ST en el Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Jarpaña serían:


Nivel de la Corona : 4,403.00 msnm.
Nivel de Aguas Máximo Extraordinario (NAME) : 4,401.82 msnm.
Nivel de Aguas Máximo Ordinario (NAMO) : 4,399.82 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,355.36 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,340.36 msnm.
Borde Libre : 1.18 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 500.00 m.
Altura máxima de presa (sobre el cauce) : 75.00 m.
Ancho máximo en la base de la presa : 310.00 m.
Espesor de los filtros : 1.00 m.
2
Espesor de Pantalla de concreto f’c = 245kg/cm : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 159 hm3.
Volumen útil : 133 hm3.
Volumen muerto (sedimentos) : 26 hm3.

b) Túnel de Desvío
El túnel de desvío, está proyectado en el estribo izquierdo, con una longitud total
aproximada de 675.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m de
base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 306
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía conformada de concreto armado con resistencia de 245 kg/cm2, longitud igual
a 61.88 m, ancho de 10.00 m y 8.38 m de altura, además se ha previsto considerar a
continuación de esta estructura, enrocado de protección pesado, en una longitud de
25.00 m, 27.00 m de ancho y 2.00 m de espesor.

c) Vertedero de Demasías, Canal de Fuga y Poza Disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de 25.00
m de longitud, el mismo que estará emplazado en el estribo derecho, externo al cuerpo
de la presa. La longitud total del vertedero de demasías será de 353.00 m, longitud que
considera al vertedero propiamente dicho y el canal de fuga (rápida) de sección
rectangular, a la poza disipadora de energía. Ver Plano PJ-PP en el Anexo 1.8. Plano
Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 198 m3/s con un tirante
de 2.00 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se presente el
caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,399.82 msnm; tiene tres (03) vanos de
8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual se
emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 250.00 m, y será de sección rectangular, con
15.00 m de ancho y altura de 5.00 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m, un ancho variable


entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes de 2:1 (H: V).
Inmediatamente después de esta estructura, se ha considerado la colocación de enrocado
de protección en una longitud de 25.00 m y 2.00 m de espesor.

3.5. ALTERNATIVA 5
Esta alternativa tiene como principales obras hidráulicas a las presas Paratía y Millo, a
continuación únicamente se presenta la memoria de cálculos preliminar de la presa Millo,
mas no así el de la presa Paratía, debido a que esta fue presentada en el ítem 3.3.1
correspondiente a la alternativa de afianzamiento 3.

3.5.1. Presa Millo


a) Ubicación
La presa está proyectada sobre el río Quillisani, a 7.2 km aguas arriba de la confluencia
de los ríos Quillisani y Jolpamayo, en donde las laderas del cauce del río Quillisani
forman un estrechamiento. Ver Plano PM-PG en el Anexo 1.8. (Plano de planta)

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 307
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

b) Tipo de presa
El tipo de presa elegido desde el punto de vista de los materiales utilizados corresponde
a una presa de enrocado (el cuerpo principal de la presa conformado con materiales con
grano grueso y los elementos antifiltrantes de materiales aglutinados) y desde el punto
de vista del esquema constructivo de la presa corresponde al tipo homogénea (cuerpo
de la presa conformado con un solo material en contacto con el filtro). Ver Plano PM-
ST en el Anexo 1.8. Plano sección típica.

Se ha optado por este tipo de presa, debido a las características topográficas, geológicas
y geotécnicas del sitio de emplazamiento, como son un cierre en U con estribos rocosos
de pendiente del orden de 45° a 50°, una cimentación conformada por material aluvial
y fluvio-aluvial de características relativamente competentes, así como por la
disponibilidad de materiales apropiados, en cantidad y localización adecuados para su
construcción, otras opciones podrían ser evaluadas con mayor detalle en las etapas
siguientes de los estudios, profundizándose las investigaciones en ellas antes de la
decisión final.

c) Ancho de Corona
Para la determinación del ancho de la coronación se empleó el criterio de uso
convencional utilizado por el US Bureau of Reclamation (ecuación 1.6.16) y el
establecido por el Comité Español de Grandes Presas (Ecuación 1.6.17), cuyas
expresiones en función de la altura de presa se presentan a continuación:

US Bureau o Reclamation
= 1 + 1.1√ℎ ……. (1.6.16)

Donde:
B : Ancho de la corona, en metros.
h : Altura máxima de presa, en metros.

Comité Español de Grandes Presas


= 3 + 1.5√ − 15 ……. (1.6.17)

Donde:
C : Ancho de coronación de presa, en metros.
H : Altura de presa, en metros.

Considerando una altura de presa de 65.00 m, se ha obtenido un ancho de corona de


9.86 y 8.52 m, empleando las ecuaciones 1.6.16 y 1.6.17, respectivamente, para
finalmente adoptar un valor de “B” de 10.00 m, ya que permitirá dar mayor volumen a

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 308
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

la presa para mejorar su seguridad y estabilidad y facilitar su construcción. Ver Plano


PM-ST en el Anexo 1.8. Plano sección típica

d) Borde Libre
El borde libre es la distancia vertical entre la cresta de la presa y la superficie de agua
máxima en el reservorio. Esta superficie máxima está asociada al diseño del tránsito de
avenidas en el embalse. El borde libre debe ser capaz de prevenir y evitar el
derramamiento sobre la presa en condiciones normales o en alguna acción severa de las
olas de rara ocurrencia que son producidos por vientos de alta velocidad en direcciones
críticas.

El borde libre (BL) o distancia vertical entre la coronación y el nivel de aguas máximas
extraordinarias puede ser estimado con la ecuación 1.6.18, que se presenta a
continuación:
a  0.76  0.34 * ( Fe) 0.5  0.26 * ( Fe) 0.25 ……. (1.6.18)
Donde:
a = Altura de ola, en metros.
Fe = Fetch efectivo (longitud del espejo de agua), en kilómetros.

Asumiendo un valor de 6.10 km como Fetch (F) para una dirección de viento Noroeste
(NO), y empleando la ecuación 1.6.18, se determinó que la altura de la ola en el embalse
Verde sería de 1.19 m, para finalmente asumir el valor del borde libre (BL) igual a 1.24
m sobre el NAME (nivel de aguas máximas extraordinarias).

e) Diseño del Filtro


Los objetivos del filtro, son los de evitar la erosión de las partículas finas del suelo y
además de conducir la descarga de filtración y disminuir su longitud de recorrido.

Las condiciones de diseño, para que el filtro impida las entradas de partículas son
principalmente de carácter granulométrico y debe de cumplir con las siguientes
relaciones
D15 ( Filtro )
5
D85 ( Suelo)
D15 ( Filtro )
5  40
D15 ( Suelo)
D50 ( Filtro )
 25
D50 ( Suelo)
D85 ( Filtro )
2
Abertura.tubo.de.Drenaje

Donde:

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 309
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

D15, D50, D85, son los tamaños de las partículas correspondientes a una distribución
granulométrica para los porcentajes en peso de 15, 50 y 85 que pasan respectivamente.
Las expresiones dadas anteriormente aseguran, no solo el arrastre de las partículas finas,
si no que, también la permeabilidad del filtro, la cual debe ser mayor a la del suelo. Por
lo que el material que se utilice tendrá que cumplir con estas condiciones.

Además debemos verificar que el Coeficiente de uniformidad cumpla la siguiente


condición:
D
C u  60  20
D10

f) Obras de Toma y Conducto de Descarga


Las obras de toma son las estructuras que permitirán regular las descargas desde el
embalse hacia aguas abajo de la presa mediante un conducto de descarga. Estas
descargas son controladas generalmente por compuertas.

Los cálculos hidráulicos para el dimensionamiento de la obra de descarga, se efectuaron


para las condiciones de carga hidráulica mínima y máxima, así como para diferentes
aberturas de la compuerta.

La descarga bajo la compuerta en estas condiciones fue calculada con la ecuación


1.6.19.
Q  CGo * B * 2 GH ' ……. (1.6.19)

Donde:
Q = Caudal que atraviesa la compuerta, en m3/s.
C = Coeficiente de descarga, adimensional.
Go = Abertura de la compuerta, en metros.
B = Ancho de la compuerta, en metros.
H’ = Carga de agua efectiva (H’ = H – Go), en metros.

H H’

Go Q

Figura 1.6.8: Esquema para la determinación del caudal de descarga.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 310
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

El caudal evacuado por el conducto de descarga varía de acuerdo a la demanda del


sistema, estableciéndose para la etapa de pleno desarrollo, un caudal máximo (para un
nivel mínimo operacional) referencial para el diseño de las compuertas, del orden de
20.00 m3/s. Ver simulación del sistema en la componente 06 de este estudio.

La toma de agua se plantea este ubicada externa al cuerpo de presa, en el estribo


izquierdo del eje de presa (ver plano PM-PP). El conducto de descarga tendrá una
sección circular de 2.54 m2, con un diámetro de 1.80 m, la longitud del conducto, así
como otros detalles del mismo se presentan en los planos.

g) Estructura Terminal y Entrega del Conducto de Descarga de Fondo


La estructura terminal, es la estructura hidráulica encargada de disipar la energía de la
descarga proveniente del conducto de descarga. El caudal máximo determinado a la
salida del conducto es del orden de 20.00 m3/s y velocidad máxima de 8.2 m/s.

La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega al final a la poza, de ancho variable entre 5.00 a 10.00 m y altura de
muros de 5.00 y 8.00 m del canal de aproximación y la poza, respectivamente. La
protección contra la acción erosiva en el fondo del cauce, se efectuará a través de la
colocación de enrocado, en un área de 250.00 m2 (25.00 m de largo, 10.00 m de ancho
y 2.00 m de espesor).

h) Vertedero de Demasías
Esta estructura hidráulica está diseñada para descargar el agua en exceso del embalse
hacia un lugar establecido en el río aguas abajo de la presa. A continuación se presenta
el cálculo de todos los componentes de las obras de alivio.

Se ha establecido que la descarga máxima probable para un periodo de retorno de 1,000


años sería de 243.49 m3/s, por lo que para el diseño del vertedero de demasías del
embalse Verde, previo tránsito de avenidas en el embalse, se estimó una descarga
máxima, del orden de 146.00 m3/s.

Para determinar la altura de lámina vertiente, se empleó la ecuación 1.6.20, que se


presenta a continuación:
/
= ...…… (1.6.20)

Donde:
H = Altura de lámina vertiente, en metros.
Q = Caudal de descarga, en m3/s.
C = Coeficiente de descarga, adimensional.
L = Longitud del vertedero de demasías, en metros.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 311
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Asumiendo un valor de 2.50 para el coeficiente de descarga (C) y 25.00 m para la


longitud del vertedero de demasías (L), se estimó que la altura de la lámina vertiente
(H) sería de 1.76 m, para finalmente asumir un valor de 1.80 m como altura de lámina
vertiente (H).

j) Estructura de Disipación y Canal de Fuga


La obra disipadora de energía tendrá una longitud de 61.57 m, desde el portal de salida
hasta la entrega a la poza, el ancho es variable entre 5.00 a 10.00 m y altura de muros
de 5.00 y 8.00 m del canal de fuga y la poza, respectivamente. La protección contra la
acción erosiva en el fondo del cauce, se efectuará a través de la colocación de enrocado,
en un área de 250.00 m2 (25.00 m de largo, 10.00 m de ancho y 2.00 m de espesor).

3.5.2. Descripción de las Obras Civiles


Esta alternativa de afianzamiento, está conformada por un conjunto de obras civiles que
permitirán regular los aportes hídricos del río Quillisani y su cuenca principalmente
durante el periodo de avenidas, para almacenar un volumen total de 78 hm3, de los cuales
65 hm3 corresponden al volumen útil y 13 hm3 al volumen muerto.

Esta alternativa considera una serie de obras principales, las mismas que se describen a
continuación:

d) Presa Millo
Se prevé la conformación de una obra de cierre mediante la construcción de una presa
con material homogéneo y pantalla de concreto F’c = 210 kg/cm2 y acero de refuerzo
con distribución horizontal y vertical de ½” diámetro y espaciamientos de 0.30 m en el
paramento mojado de la presa, así mismo se deberá de efectuar un tratamiento en la
cimentación consistente en inyecciones de cemento o pantallas de bentonita, hasta una
profundidad de 50.00 m.

Los taludes aguas arriba y abajo se estima sean de 1.0V: 2.0H, los cuales son suficientes
para satisfacer las exigencias técnicas internacionales. El Talud aguas arriba se
recomienda se prolongue hasta una profundidad de 15.00 m aproximadamente, por
debajo del terreno natural hasta encontrar un material mucho más compacto para el
inicio de las excavaciones de la pantalla impermeable. Luego del relleno del material
que se encontrara sobre el concreto armado, se deberá de colocar una cobertura de arcilla
a manera de colchón de 1.00 m de espesor como mínimo que se extenderá hacia aguas
arriba de la presa, cuya función será la de evitar que la presión del agua esté en contacto
directo con la pantalla plástica de la cimentación y reducir las pérdidas de agua por
filtración. Ver Plano PM-PG en el Anexo 1.8. Plano sección típica presa.

Los principales parámetros de la presa Jarpaña serían:


Nivel de la Corona : 4,483.00 msnm.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 312
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Nivel de Aguas Máximo Extraordinario (NAME) : 4,481.76 msnm.


Nivel de Aguas Máximo Ordinario (NAMO) : 4,479.96 msnm.
Nivel de Aguas Mínimo (NAMIN) : 4,437.92 msnm.
Nivel Mínimo de cimentación Cuerpo Presa : 4,422.92 msnm.
Borde Libre : 1.18 m.
Ancho coronación : 10.00 m.
Longitud de coronación : 540.50 m.
Altura máxima de presa (sobre el cauce) : 65.00 m.
Ancho máximo en la base de la presa : 270.00 m.
Espesor de los filtros : 1.00 m.
Espesor de Pantalla de concreto f’c = 245kg/cm2 : 0.30 m.
Cortina de Inyecciones : 50.00 m @ 3.00 m.
Profundidad máxima del dentellón : 14.22 m.
Ancho máximo de la base del dentellón : 75.00 m.
Talud aguas arriba de la pantalla de concreto : 1 V: 2.0 H.
Talud aguas abajo del enrocado : 1 V: 2.0 H.
Taludes del dentellón : 1 V: 1.0 H.
Volumen total : 78 hm3.
Volumen útil : 65 hm3.
Volumen muerto (sedimentos) : 13 hm3.

e) Túnel de desvío
El túnel de desvío, está proyectado en el estribo izquierdo, con una longitud total
aproximada de 425.00 m, de los cuales los primeros 21.00 m corresponden a un
conducto cubierto y el tramo restante al túnel propiamente dicho, el mismo que tendrá
una sección hidráulica tipo baúl, compuesta por una sección rectangular de 5.00 m de
base, 2.50 m de altura y una bóveda semicircular de 2.50 m de radio, revestida de
concreto armado de f’c= 245 kg/cm2, con espesores de 25.00 y 30.00 cm, para las
sección circular y rectangular, respectivamente. La pendiente del túnel será de 0.011
m/m. y las cotas de inicio y fin del túnel serán 4,423.07 y 4,418.40 msnm.

Inmediatamente aguas abajo del portal de salida, se proyecta una poza disipadora de
energía conformada de concreto armado con resistencia de 245 kg/cm2, longitud igual
a 61.88 m, ancho de 10.00 m y 8.38 m de altura, además se ha previsto considerar a
continuación de esta estructura, enrocado de protección pesado, en una longitud de
25.00 m, 27.00 m de ancho y 2.00 m de espesor.

f) Vertedero de demasías, canal de fuga y poza disipadora.


El diseño del vertedero libre responde a un cuerpo vertedor con una cresta libre de 25.00
m de longitud, el mismo que estará emplazado en el estribo derecho, externo al cuerpo
de la presa. La longitud total del vertedero de demasías será de 450.00 m, longitud que
considera al vertedero propiamente dicho y el canal de fuga (rápida) de sección

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 313
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

rectangular, a la poza disipadora de energía. Ver Plano PM-PP en el Anexo 1.8. Plano
Vertedero.

El vertedero de demasías permitirá evacuar un caudal máximo de 198 m3/s con un tirante
de 1.80 m sobre la cresta del vertedero de 25.00 m de longitud, cuando se presente el
caudal máximo de la avenida milenaria.

La cresta del vertedero se ubica en una cota de 4,479.96 msnm; tiene tres (03) vanos de
8.33 m de ancho cada uno separados por pilas de 0.60 m de ancho, sobre el cual se
emplazará un puente de acceso de 8.00 m de ancho, de concreto armado de f’c=245
kg/cm2, con tipo de carga SH-20.

El canal de fuga tendrá longitud total de 250.00 m, y será de sección rectangular, con
15.00 m de ancho y altura de 2.50 m.

La estructura de disipación de energía tendrá una longitud de 63.80 m, un ancho variable


entre 15.00 y 25.00 m y altura máxima de 8.00 m con taludes de 2:1 (H: V).
Inmediatamente después de esta estructura, se ha considerado la colocación de enrocado
de protección en una longitud de 25.00 m y 2.00 m de espesor.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 314
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.7

Metrados, costos y presupuestos de las alternativas de afianzamiento del Sistema Integral


Lagunillas.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 315
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.1: Metrado general alternativa 1 – presa Verde


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 319,950.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 20,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 22.00
01.01.07 LIMPIEZA Y DESBROCE M2 60,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION GLB 280.29

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 700.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 700.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 11,400.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,750.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 14,066.25
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 8,439.75
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 5,626.50
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 777.55
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 33,759.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 2,600.00
03.10.00 CIMBRAS METALICAS UND 71,987.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 5,225.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 7,492.80
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 532.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 14,472.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 1,873.20
03.16.00 ACERO DE REFUERZO KG 457,515.00
03.17.00 JUNTA WATER STOP 6" M 864.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 2.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 8.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 316
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.1: Metrado general alternativa 1 – presa Verde (continuación)


Item Descripción Unidad Metrado
05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO
05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 VERTEDERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17300.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50
06.08.00 ACERO DE REFUERZO KG 427,792.00
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 30.00
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 1442.00

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,368,810.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,642,572.00
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 3,877.91
07.03.02 PERFORACION DE POZOS M3 3,877.91

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,774,790.88
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,040,414.45

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 136,250.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 77,750.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 194,186.25
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 148,765.98
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 54,500.00

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 114,450.00
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 109,000.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 147,150.00
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 109,000.00

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 3,873.99
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 3,228.33

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 317
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.1: Metrado general alternativa 1 – presa Verde (continuación)


Item Descripción Unidad Metrado
07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M
07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 43,840.70

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 1,340,161.02

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 1,336,001.80

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,235.49
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 1,974.22
07.11.03 JUNTAS ASFALTICAS M 296.40
07.11.04 PINTURA ESMALTE EN SARDINEL M 2,370.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 500.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 1,185.00

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 OBRAS COMPLEMENTARIAS


10.01.00 OBRAS DE TOMA
10.01.01 TRAZO Y REPLANTEO M2 102.74
10.01.02 EXCAVACION EN MATERIAL SUELTO M3 172.53
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 141.21
10.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 26.10

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 318
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.1: Metrado general alternativa 1 – presa Verde (continuación)


Item Descripción Unidad Metrado
10.01.05 ENROCADO DE PROTECCIÓN M3 17.93
10.01.06 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 59.01
10.01.07 CONCRETO F'C= 175 KG/CM2 M3 0.16
10.01.08 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 160.90
10.01.09 ACERO DE REFUERZO Fy = 4200 Kg/cm2 Kg 6.73
10.01.10 COMPUERTA IZAJE 0.50 X0.50 M. (INCLUYE MONTAJE) UND 2.00

10.02.00 CANAL DE DERIVACION


10.02.01 TRAZO Y REPLANTEO CANAL M 200.00
10.02.02 EXCAVACION Y REFINE CAJA CANAL A MANO EN MATERIAL SUELTO M3 32.50
10.02.03 CONCRETO F'C= 175 Kg/cm2 PARA CANALES M3 9.00
10.02.04 JUNTAS ASFALTICAS M 75.60
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 39.00

11.00.00 VARIOS
11.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 540.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 319
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.2: Presupuesto general alternativa 1 – presa Verde


Item Descripción Unidad Metrado Precio Parcial Total

01.00.00 OBRAS PROVISIONALES


01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA RIO VERDE UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 319,950.00 0.65 207,967.50
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 20,000.00 8.49 169,800.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 22.00 2,434.41 53,557.02
01.01.07 LIMPIEZA Y DESBROCE M2 60,000.00 0.55 33,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 1,000.00 140.00 140,000.00 793,919.28

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 700.00 2,500.00 1,750,000.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 700.00 850.00 595,000.00 3,138,919.28

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 11,400.00 0.65 7,410.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 11,400.00 5.12 58,368.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 14,066.25 68.92 969,445.95
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 8,439.75 86.57 730,629.16
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 5,626.50 118.38 666,065.07
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 777.55 60.63 47,142.86
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 33,759.00 17.70 597,534.30
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 2,600.00 309.57 804,882.00
03.10.00 CIMBRAS METALICAS UND 71,987.00 18.61 1,339,678.07
03.11.00 PLANCHAS METALICAS ACANALADAS M2 5,225.00 110.21 575,847.25
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 7,492.80 512.36 3,839,011.01
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 532.00 291.08 154,854.56
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 14,472.27 94.14 1,362,419.50
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 1,873.20 78.52 147,083.66
03.16.00 ACERO DE REFUERZO KG 457,515.00 5.02 2,296,725.30
03.17.00 JUNTA WATER STOP 6" M 864.00 34.73 30,006.72
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 78.00 29.52 2,302.56
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 13,961,589.43

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 320
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.2: Presupuesto general alternativa 1 – presa Verde (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.00.00 ALIVIADERO DE DEMASIAS
06.01.00 TRAZO Y REPLANTEO M2 17,300.00 0.65 11,245.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00 3.80 351,971.20
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00 2.90 49,662.50
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70 436.79 2,817,164.46
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25 486.87 548,337.34
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50 49.46 563,670.89
06.08.00 ACERO DE REFUERZO KG 427,792.00 5.02 2,147,515.84
06.09.00 RELLENO DE ESTRUCTURAS M3 711.00 37.86 26,918.46
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 1,442.00 34.73 50,080.66 7,228,369.48

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,368,810.00 3.77 5,160,413.70
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,642,572.00 3.42 5,617,596.24
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 3,877.91 187.76 728,116.38 728,116.38

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,774,790.88 3.49 27,134,020.17
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,040,414.45 5.12 30,926,921.98 58,060,942.15

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 136,250.00 6.88 937,400.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 200,349.00 20.89 4,185,290.61
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 148,765.98 7.35 1,093,429.95
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 109,000.00 7.34 800,060.00 7,016,180.56

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 114,450.00 28.15 3,221,767.50
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 10,900.00 39.40 429,460.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 147,150.00 8.86 1,303,749.00
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 109,000.00 18.16 1,979,440.00 6,934,416.50

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 3,873.99 6.91 26,769.27
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 302.45 9.63 2,912.59 29,681.86

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 20,819.07 512.36 10,666,858.71 10,666,858.71

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 490,933.40 5.02 2,464,485.67 2,464,485.67

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,159.22 512.36 2,131,017.96 2,131,017.96

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,235.49 402.03 898,734.04
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 1,974.22 49.46 97,644.92
07.11.03 JUNTAS ASFALTICAS M 296.40 11.32 3,355.25
07.11.04 PINTURA ESMALTE EN SARDINELES M 2,370.00 2.00 4,740.00 1,004,474.21

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 500.00 42.95 21,475.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 1,185.00 30.48 36,118.80 99,871,777.74

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 321
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.2: Presupuesto general alternativa 1 – presa Verde (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
08.02.00 OBRAS DE ARTE
08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 540.00 32.92 17,776.80 17,776.80

COSTO DIRECTO 126,014,031.78


GASTOS GENERALES (12%) 15,121,683.81
GASTOS DE SUPERVISION (5%) 6,300,701.59
UTILIDAD (10%) 12,601,403.18
PRESUPUESTO PARCIAL 160,037,820.36
IGV (19%) 30,407,185.87
PRESUPUESTO TOTAL 190,445,006.23

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 322
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.3: Metrado general alternativa 2 – bocatoma Verde


Ítem Descripción Unidad Metrado
01.00.00 CONSTRUCCIÓN BOCATOMA
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CASA DE TOMERO GBL 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 6,000.00
01.01.04 TRANSPORTE DE MAQUINARIA Y EQUIPO GLB 2.00
01.01.05 CAMINOS DE ACCESO M 6,000.00
01.01.06 MANTENIMIENTO DE CAMINOS DE ACCESO KM 11.00

01.02.00 MOVIMIENTO DE TIERRAS


01.02.01 EXPLOTACION DE ROCA EN CANTERA M3 1,810.00
01.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 2,624.50
01.02.03 TRANSPORTE DE ROCA M3 2,624.50
01.02.04 DESVIO DEL RÍO M3 2,250.00
01.02.05 EXCAVACIÓN EN MATERIAL SUELTO M3 18,700.10
01.02.06 RELLENO COMPACTADO PARA ESTRC. C. MAT. PROPIO M3 6,315.05
01.02.07 ENROCADO DE PROTECCIÓN 1,810.00
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE M3 14,862.07

01.03.00 CONCRETOS
01.03.01 CONCRETO F'C= 175 Kg/cm2 M3 2,735.55
01.03.02 CONCRETO F'C= 210 Kg/cm2 M3 13.13

01.04.00 ENCOFRADO Y DESENCOFRADO


01.04.01 ENCOFRADO Y DESENCOFRADO PLANO M2 3,523.88
01.04.02 ENCOFRADO Y DESENCOFRADO CURVO M2 56.35

01.05.00 ACERO DE REFUERZO


01.05.01 ACERO DE REFUERZO KG 49,938.99

01.06.00 VARIOS
01.06.01 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 4.00
01.06.02 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 1.00
01.06.03 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 1.00
01.06.04 BOMBEO DE AGUA HM 2,160.00
01.06.05 TRANSPORTE DE MATERIALES DE CONSTRUCCION TON 58.19
01.06.06 BARANDA DE FIERRO GALVANIZADO Ø= 1 1/2" M 50.00
01.06.07 JUNTA WATER STOP 6" M 332.00
01.06.08 LIMNIMETRO H = 5.00 m UND 1.00
01.06.09 TUBERIA ROMPE PRESIONES UND 50.00
01.06.10 PRUEBA DE CALIDAD DEL CONCRETO UND 137.00

02.00.00 CONSTRUCCION CANAL DE EMPALME


02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO ML 150.00
02.01.02 LIMPIEZA Y DESBROCE A MANO M2 150.00
02.01.03 LIMPIEZA Y DESBROCE A MAQUINA e=0.20 m. M2 900.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 323
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.3: Metrado general alternativa 2 – bocatoma Verde (continuación)


Ítem Descripción Unidad Metrado
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 2,812.50
02.02.02 TERRAPLEN COMPACTADO M3 525.00
02.02.03 EXCAVAC. CAJA CANAL EN MATERIAL SUELTO A MAQ. M3 1,225.20
02.02.04 EXCAV. Y REFINE CANAL A MANO EN MAT.SUELTO M3 816.80
02.02.05 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts IMPERMEABLE M3 262.50
02.02.06 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts MAT. GRANULAR M3 262.50
02.02.07 ELIMINACION DE MATERIAL EXEDENTE M3 5,825.40

02.03.00 CONCRETOS
02.03.01 CONCRETO F'C=175 KG/CM2 P/REVESTIDO DE CANAL M3 244.00

02.04.00 JUNTAS Y SELLOS


02.04.01 JUNTA ASFALTICA e=1" ML 185.53

02.05.00 VARIOS
02.05.01 PRUEBAS DE CONTROL DE COMPACTACION UND 18.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 324
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.4: Presupuesto general alternativa 2 – bocatoma Verde


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 CONSTRUCCION BOCATOMA
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CASA DE TOMERO GLB 1.00 23,372.95 23,372.95
01.01.02 CARTEL DE OBRA 5x3 m UND 1.00 4,886.14 4,886.14
01.01.03 TRAZO Y REPLANTEO M2 6,000.00 1.66 9,960.00
01.01.04 TRANSPORTE DE MAQUINARIA Y EQUIPO GLB 2.00 14,000.00 28,000.00
01.01.05 CAMINOS DE ACCESO M 10,000.00 4.31 43,100.00
01.01.06 MANTENIMIENTO DE CAMINOS DE ACCESO KM 10.00 1,930.77 19,307.70 128,626.79

01.02.00 MOVIMIENTO DE TIERRAS


01.02.01 EXPLOTACION DE ROCA EN CANTERA M3 1,810.00 18.15 32,851.50
01.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 2,624.50 12.09 31,730.21
01.02.03 TRANSPORTE DE ROCA M3 2,624.50 16.45 43,173.03
01.02.04 DESVÍO DE RÍO M3 2,250.00 3.95 8,887.50
01.02.05 EXCAVACION EN MATERIAL SUELTO M3 18,700.10 4.31 80,597.43
01.02.06 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 6,315.05 5.59 35,301.13
01.02.07 ENROCADO DE PROTECCION M3 1,810.00 9.83 17,792.30
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE M3 14,862.07 5.03 74,756.21 325,089.31

01.03.00 CONCRETOS
01.03.01 CONCRETO FC=175 Kg/cm2 M3 2,735.55 370.74 1,014,177.81
01.03.02 CONCRETO F'C= 210 KG/CM2 M3 13.13 396.93 5,211.69 1,019,389.50

01.04.00 ENCOFRADO Y DESENCOFRADO


01.04.01 ENCOFRADO Y DESENCOFRADO PLANO M2 3,523.88 39.45 139,017.07
01.04.02 ENCOFRADO Y DESENCOFRADO CURVO M2 56.35 73.59 4,146.80 143,163.87

01.05.00 ACERO DE REFUERZO


01.05.01 ACERO DE REFUERZO KG 49,938.99 5.62 280,657.12 280,657.12

01.06.00 VARIOS
01.06.01 FABRICACION Y MONTAJE DE COMPUERTA DE LIMPIA CON MECANISMO DE IZAJE DE 3.25X2.00M UND 4.00 90,013.60 360,054.40
01.06.02 FABRICACION Y MONTAJE DE COMPUERTA DE REGULACION CON MECANISMO DE IZAJE DE 2.65X0.60M UND 1.00 100,013.60 100,013.60
01.06.03 FABRICACION Y MONTAJE DE COMPUERTA DESRIPEADORA DE IZAJE UND 1.00 90,013.60 90,013.60
01.06.04 BOMBEO DE AGUA HM 2,160.00 135.54 292,766.40
01.06.05 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 58.19 145.00 8,437.55
01.06.06 BARANDA DE F°G° Ø= 2" M 50.00 74.59 3,729.50
01.06.07 JUNTA WATER STOP 6" M 332.00 32.95 10,939.40
01.06.08 LIMNIMETRO DE H = 5.00 m UND 1.00 1,500.00 1,500.00
01.06.09 TUBERÍA ROMPE PRESIONES UND 50.00 31.31 1,565.50
01.06.10 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 137.00 25.00 3,425.00 2,769,371.54

02.00.00 CONSTRUCCION CANAL DE EMPALME


02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO M 150.00 3.17 475.50
02.01.02 LIMPIEZA Y DESBROCE A MANO M2 150.00 2.74 411.00
02.01.03 LIMPIEZA Y DESBROCE A MAQUINA M2 900.00 0.89 801.00 1,687.50

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 2,812.50 4.10 11,531.25
02.02.02 TERRAPLEN COMPACTADO (CANAL) M3 525.00 13.41 7,040.25
02.02.03 EXCAVACION DE CAJA DE CANAL A MAQUINA M3 1,225.20 6.41 7,853.53
02.02.04 EXCAVACION Y REFINE DE CAJA DE CANAL A MANO M3 816.80 35.96 29,372.13
02.02.05 TRANSPORTE DE MATERIAL DE PRESTAMO (1) granu. M3 262.50 7.11 1,866.38
02.02.06 TRANSPORTE DE MATERIAL DE PRESTAMO (2) arci. M3 262.50 17.90 4,698.75
02.02.07 ELIMINACION DE MATERIAL EXCEDENTE M3 5,825.40 5.03 29,301.76 91,664.05

02.03.00 CONCRETOS
02.03.01 CONCRETO FC=175 Kg/cm2 PARA REVESTIDO DE CANAL M3 244.00 437.85 106,835.40 106,835.40

02.04.00 JUNTAS
02.04.01 JUNTA ASFALTICA e= 1" M 185.53 9.03 1,675.34 1,675.34

02.05.00 VARIOS
02.05.01 PRUEBA DE COMPACTACION UND 18.00 25.00 450.00 202,312.29

COSTO DIRECTO 2,971,683.83


GASTOS GENERALES (12%) 356,602.06
SUPERVISION (5%) 148,584.19
UTILIDAD (10%) 297,168.38
PRESUPUESTO PARCIAL 3,774,038.31
IGV (19%) 717,067.31
PRESUPUESTO TOTAL 4,491,105.77

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 325
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.5: Metrado general alternativa 2 – canal derivación Verde


Ítem Descripción Unidad Metrado
01.00.00 TRABAJOS PRELIMINARES
01.01.00 CAMPAMENTO GLB 1.00
01.02.00 CARTEL DE OBRA 5X3 M. UND 1.00
01.03.00 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB 2.00
01.04.00 TRAZO Y REPLANTEO ML 64,400.00
01.05.00 TRAZO Y REPLANTEO OBRAS DE ARTE M2 2,268.00
01.06.00 LIMPIEZA Y DESBROCE A MANO M2 2,268.00
01.07.00 LIMPIEZA Y DESBROCE A MAQUINA e=0.20 m. M2 289,800.00
01.08.00 APERTURA DE CAMINOS DE ACCESO KM 15.00
01.09.00 MANTENIMIENTO DE CAMINO DE ACCESO ML 15,000.00

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 621,403.65
02.02.00 EXCAVACION DE PLATAFRMA EN ROCA FIJA M3 1,449,941.85
02.03.00 TERRAPLEN COMPACTADO M3 363,409.20
02.04.00 EXCAVACION DE CAJA DE CANAL A MAQ. EN MATERIAL SUELTO M3 282,168.85
02.04.01 EXCAVACION DE CAJA DE CANAL A MAQ. EN ROCA FIJA M3 282,168.85
02.04.02 EXCAVACION DE CAJA DE CANAL A MAQ. EN ROCA SUELTA M3 376,225.13
02.05.00 EXCAV. Y REFINE DE CAJA CANAL A MANO M3 39,503.64
02.06.00 EXCAV. Y REFINE DE CAJA CANAL EN ROCA FIJA M3 16,930.13
02.07.00 EXCAVACION DE CIMENTACION DE OBRAS DE ARTE M3 2,702.83
02.08.00 RELLENO COMPACTADO DE OBRAS DE ARTE M3 1,065.12
02.09.00 ENROCADO DE PROTECCION A MANO M3 997.92
02.10.00 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts IMPERMEABLE M3 100,947.00
02.11.00 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts MAT. GRANULAR M3 235,543.00
02.12.00 ELIMINACION DE MATERIAL EXEDENTE M3 818,530.67

03.00.00 CONCRETOS
03.01.00 CONCRETO F'C=175 KG/CM2 P/REVESTIDO DE CANAL M3 78,473.21
03.02.00 CONCRETO F'C=175 KG/CM2 + 30% PM O.ARTE M3 2,390.47
03.03.00 CONCRETO F'C=210 KG/CM2 O.ARTE M3 528.71

04.00.00 ENCOFRADO Y DESENCOFRADO


04.01.00 ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE M2 10,152.55
04.02.00 CONFECCION Y COLOCADO DE CERCHAS ML 2,100.00

05.00.00 ACERO DE REFUERZO


05.01.00 ACERO DE REFUERZO KG 138,086.10

06.00.00 JUNTAS Y SELLOS


06.01.00 JUNTA WATER STOP 6" ML 0.00
06.02.00 JUNTA ASFALTICA e=1" ML 156,958.61

07.00.00 VARIOS
07.01.00 PRUEBAS DE CALIDAD DEL CONCRETO A LA COMPRESION UND 1,628.00
07.02.00 PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN UND 1,817.00
07.03.00 BARANDA DE FIERRO GALVANIZADO ML 710.00
07.04.00 TRANSPORTE DE MATERIAL DE CONSTRUCCION TN 1,275.07

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 326
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.6: Presupuesto general alternativa 2 – canal derivación Verde


Item Descripción Unidad Metrado Precio Parcial Subtotal
01.00.00 TRABAJOS PRELIMINARES
01.01.00 CAMPAMENTO GLB 1.00 50,000.00 50,000.00
01.02.00 CARTEL DE OBRA 5.0X3.0 M UND 1.00 5,070.51 5,070.51
01.03.00 TRANSPORTE DE MAQUINARIA Y EQUIPO_cp1 GLB 2.00 75,000.00 150,000.00
01.04.00 TRAZO Y REPLANTEO M 64,400.00 3.08 198,352.00
01.05.00 TRAZO Y REPLANTEO OBRAS DE ARTE M2 3,842.29 1.35 5,187.09
01.06.00 LIMPIEZA Y DESBROCE A MANO M2 3,835.85 2.74 10,510.23
01.07.00 LIMPIEZA Y DESBROCE A MAQUINA e=0.20M M2 289,800.00 0.58 168,084.00
01.08.00 APERTURA DE CAMINOS DE ACCESO KM 15.00 3,285.04 49,275.60
01.09.00 MANTENIMIENTO DE CAMINOS DE ACCESO M 15,000.00 3.63 54,450.00 690,929.43

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 621,403.65 4.79 2,976,523.48
02.02.00 EXCAVACION DE PLATAFORMA EN ROCA FIJA M3 490,985.60 24.82 12,186,262.59
02.02.01 EXCAVACION DE PLATAFORMA EN ROCA SUELTA M3 583,045.40 20.76 12,104,022.50
02.03.00 TERRAPLEN COMPACTADO M3 363,409.20 13.93 5,062,290.16
02.04.00 EXCAVACION DE CAJA DE CANAL A MAQUINA M3 282,168.85 10.28 2,900,695.78
02.04.01 EXCAVACION DE CAJA CANAL A MAQUINA EN ROCA FIJA M3 282,168.85 29.38 8,290,120.81
02.04.02 EXCAVACION DE CAJA CANAL A MAQUINA EN ROCA SUELTA M3 376,225.13 25.16 9,465,824.27
02.05.00 EXCAVACION DE CAJA DE CANAL A MANO M3 39,503.64 40.39 1,595,552.02
02.06.00 EXCAVACION Y REFINE DE CAJA DE CANAL EN ROCA FIJA M3 16,930.13 39.46 668,062.93
02.07.00 EXCAVACION PARA CIMENTACION DE OBRAS DE ARTE M3 2,702.83 31.56 85,301.31
02.08.00 RELLENO COMPACTADO DE OBRAS DE ARTE M3 1,297.63 26.74 34,698.63
02.09.00 ENROCADO DE PROTECCION A MANO M3 87.43 98.21 8,586.50
02.10.00 TRANSPORTE DE MATERIAL IMPERMEABLE > 1000 MTS. M3 100,947.00 10.31 1,040,763.57
02.11.00 TRANSPORTE DE MATERIAL GRANULAR > 1000 MTS. M3 235,543.00 14.31 3,370,620.33
02.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 817,715.68 4.54 3,712,429.19 63,501,754.07

03.00.00 CONCRETOS
03.01.00 CONCRETO FC=175 KG/CM2 PARA REVESTIMIENTO DE CANALES M3 78,473.21 421.96 33,112,555.69
03.02.00 CONCRETO F'C= 175 Kg/cm2 + 30% PM M3 453.80 316.07 143,432.57
03.03.00 CONCRETO F'C= 210 Kg/cm2 M3 528.71 434.91 229,941.27
03.04.00 CONCRETO F'C= 140 KG/CM2 + 30% PM M3 1,000.00 291.84 291,840.00 33,777,769.53

04.00.00 ENCOFRADO Y DESENCOFRADO


04.01.00 ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE M2 10,152.00 46.17 468,717.84 468,717.84

05.00.00 ACERO DE REFUERZO


05.01.00 ACERO DE REFUERZO KG 138,086.00 5.14 709,762.04 709,762.04

06.00.00 JUNTAS Y SELLOS


06.01.00 JUNTA WATER STOP 6" M 2,500.00 34.85 87,125.00
06.02.00 JUNTAS ASFALTICAS e=1" M 156,958.61 8.91 1,398,501.22 1,485,626.22

07.00.00 VARIOS
07.01.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 1,577.00 25.00 39,425.00
07.02.00 PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN UND 1,817.00 41.00 74,497.00
07.03.00 BARANDA DE F° G° Ø= 1 1/2" M 710.00 104.78 74,393.80
07.04.00 TRANSPORTE DE MATERIALES DE CONSTRUCCION cp_1 TON 826.16 100.00 82,616.00 270,931.80

COSTO DIRECTO 100,905,490.93


GASTOS GENERALES (12%) 12,108,658.91
SUPERVISION (5%) 5,045,274.55
UTILIDAD (10%) 10,090,549.09
PRESUPUESTO PARCIAL 128,149,973.48
IGV (19%) 24,348.494.96
PRESUPUESTO TOTAL 152,498,468.44

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 327
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.7: Metrado general alternativa 3 – presa Paratía


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 320,350.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 12,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION GLB 280.29

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 0.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,000.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 9,803.75
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 541.93
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 23,529.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 2,100.00
03.10.00 CIMBRAS METALICAS UND 48,600.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 6,054.55
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00
03.16.00 ACERO DE REFUERZO KG 325,076.00
03.17.00 JUNTA WATER STOP 6" M 666.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 2.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 8.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 328
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.7: Metrado general alternativa 3 – presa Paratía (continuación)


Item Descripción Unidad Metrado
05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO
05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17300.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50
06.08.00 ACERO DE REFUERZO KG 427,792.00
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.04
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 1442.00

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03
07.03.02 PERFORACION DE POZOS M3 4,876.03

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 89,375.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 218,850.00
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.60
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 329
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.7: Metrado general alternativa 3 – presa Paratía (continuación)


Item Descripción Unidad Metrado
07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 4,702.44
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 3,918.70

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 48,880.90

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 1,354,068.80

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11
07.11.03 JUNTAS ASFALTICAS M 681.15
07.11.04 PINTURA ESMALTE EN SARDINEL M 2,980.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 500.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 1,490.00

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 OBRAS COMPLEMENTARIAS


10.01.00 OBRAS DE TOMA
10.01.01 TRAZO Y REPLANTEO M2 102.74
10.01.02 EXCAVACION EN MATERIAL SUELTO M3 172.53
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 141.21

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 330
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.7: Metrado general alternativa 3 – presa Paratía (continuación)


Item Descripción Unidad Metrado
10.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 26.10
10.01.05 ENROCADO DE PROTECCIÓN M3 17.93
10.01.06 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 59.01
10.01.07 CONCRETO F'C= 175 KG/CM2 M3 0.16
10.01.08 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 160.90
10.01.09 ACERO DE REFUERZO Fy = 4200 Kg/cm2 Kg 6.73
10.01.10 COMPUERTA IZAJE 0.50 X0.50 M. (INCLUYE MONTAJE) UND 2.00

10.02.00 CANAL DE DERIVACION


10.02.01 TRAZO Y REPLANTEO CANAL M 200.00
10.02.02 EXCAVACION Y REFINE CAJA CANAL A MANO EN MATERIAL SUELTO M3 32.50
10.02.03 CONCRETO F'C= 175 Kg/cm2 PARA CANALES M3 9.00
10.02.04 JUNTAS ASFALTICAS M 75.60
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 39.00

11.00.00 VARIOS
11.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 5,760.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 331
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.8: Presupuesto general alternativa 3 – presa Paratía


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA PRESA MILLO UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 320,350.00 0.65 208,227.50
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 12,000.00 8.49 101,880.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00 2,434.41 36,516.15
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00 0.55 22,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 750.00 140.00 105,000.00 663,218.41

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00 3,500.00 1,400,000.00 2,063,218.41

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00 0.65 5,265.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 3,000.00 5.12 15,360.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 9,803.75 68.92 675,674.45
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25 86.57 509,226.38
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50 118.38 464,227.17
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 541.93 60.63 32,857.22
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 23,529.00 17.70 416,463.30
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 2,100.00 309.57 650,097.00
03.10.00 CIMBRAS METALICAS UND 48,600.00 18.61 904,446.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00 110.21 347,161.50
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 6,054.55 512.36 3,102,109.24
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00 291.08 110,028.24
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27 94.14 979,269.70
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00 78.52 76,949.60
03.16.00 ACERO DE REFUERZO KG 325,076.00 5.02 1,631,881.52
03.17.00 JUNTA WATER STOP 6" M 666.00 34.73 23,130.18
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 2.00 29.52 59.04
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 10,276,389.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17,300.00 0.65 11,245.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00 3.80 351,971.20
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00 2.90 49,662.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 332
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.8: Presupuesto general alternativa 3 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70 436.79 2,817,164.46
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25 486.87 548,337.34
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50 49.46 563,670.89
06.08.00 ACERO DE REFUERZO KG 427,792.00 5.02 2,147,515.84
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60 37.86 26,941.18
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.00 27.39 9,120.87
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 1,442.00 34.73 50,080.66 7,229,296.07

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00 3.77 6,547,132.80
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00 3.42 7,127,170.56
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03 187.76 915,523.39 915,523.39

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93 3.49 27,098,387.45
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11 5.12 30,886,308.40 57,984,695.85

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00 6.88 1,017,380.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 308,225.00 20.89 6,438,820.25
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.00 7.35 1,206,487.80
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00 7.34 434,161.00 9,096,849.05

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00 28.15 3,496,652.25
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00 39.40 4,661,020.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00 8.86 1,414,986.30
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00 18.16 2,148,328.00 11,720,986.55

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 4,702.44 6.91 32,493.86
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 3,918.70 9.63 37,737.08 70,230.94

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 48,880.90 512.36 25,044,617.92 25,044,617.92

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 1,307,643.80 5.02 6,564,371.88 6,564,371.88

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17 512.36 2,510,651.10 2,510,651.10

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89 402.03 1,130,866.17
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11 49.46 120,687.84
07.11.03 JUNTAS ASFALTICAS M 681.15 11.32 7,710.62
07.11.04 PINTURA ESMALTE EN SARDINELES M 2,980.00 2.00 5,960.00 1,265,224.63

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 500.00 42.95 21,475.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 1,490.00 30.48 45,415.20 128,914,344.87

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 333
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.8: Presupuesto general alternativa 3 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 5,760.00 32.92 189,619.20 189,619.20

COSTO DIRECTO 150,468,466.60


GASTOS GENERALES (12%) 18,056,215.99
GASTOS DE SUPERVISION (5%) 7,523,423.33
UTILIDAD (10%) 15,046,846.66
PRESUPUESTO PARCIAL 191,094,952.58
IGV (19%) 36,308,040.99
PRESUPUESTO TOTAL 227,402,993.57

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 334
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.9: Metrado general alternativa 3 – bocatoma Jarpaña


Ítem Descripción Unidad Metrado
01.00.00 CONSTRUCCIÓN BOCATOMA
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CASA DE TOMERO GBL 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 7,200.00
01.01.04 TRANSPORTE DE MAQUINARIA Y EQUIPO GLB 2.00
01.01.05 CAMINOS DE ACCESO M 10,000.00
01.01.06 MANTENIMIENTO DE CAMINOS DE ACCESO KM 10.00

01.02.00 MOVIMIENTO DE TIERRAS


01.02.01 EXPLOTACION DE ROCA EN CANTERA M3 1,042.90
01.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 1,564.35
01.02.03 TRANSPORTE DE ROCA M3 1564.35
01.02.04 DESVIO DEL RÍO M3 6,750.00
01.02.05 EXCAVACIÓN EN MATERIAL SUELTO M3 13,813.75
01.02.06 RELLENO COMPACTADO PARA ESTRC. C. MAT. PROPIO M3 5,907.89
01.02.07 ENROCADO DE PROTECCIÓN 1,564.35
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE M3 9,487.03

01.03.00 CONCRETOS
01.03.01 CONCRETO F'C= 175 Kg/cm2 M3 1,372.96
01.03.02 CONCRETO F'C= 210 Kg/cm2 M3 8.78
01.03.03 CONCRETO F'C= 175 Kg/cm2 + 30% PM M3 752.88

01.04.00 ENCOFRADO Y DESENCOFRADO


01.04.01 ENCOFRADO Y DESENCOFRADO PLANO M2 2,883.77
01.04.02 ENCOFRADO Y DESENCOFRADO CURVO M2 60.97

01.05.00 ACERO DE REFUERZO


01.05.01 ACERO DE REFUERZO KG 40,102.91

01.06.00 VARIOS
01.06.01 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 2
01.06.02 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 1
01.06.03 FABRICACION Y MONTAJE DE COMPUERTA C/M.I UND 1
01.06.04 BOMBEO DE AGUA HM 2880
01.06.05 TRANSPORTE DE MATERIALES DE CONSTRUCCION TON 58.19
01.06.06 BARANDA DE FIERRO GALVANIZADO Ø= 1 1/2" M 22.90
01.06.07 JUNTA WATER STOP 6" M 335.15
01.06.08 LIMNIMETRO H = 4.00 m UND 1
01.06.09 TUBERIA ROMPE PRESIONES UND 175
01.06.10 PRUEBA DE CALIDAD DEL CONCRETO UND 95.00

02.00.00 CONSTRUCCION CANAL DE EMPALME


02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO ML 200.00
02.01.02 LIMPIEZA Y DESBROCE A MANO M2 600.00
02.01.03 LIMPIEZA Y DESBROCE A MAQUINA e=0.20 m. M2 600.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 335
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.9: Metrado general alternativa 3 – bocatoma Jarpaña (continuación)


Ítem Descripción Unidad Metrado
02.02.00 MOVIMIENTO DE TIERRAS
02.02.01 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 680.00
02.02.02 TERRAPLEN COMPACTADO M3 247.61
02.02.03 EXCAVAC. CAJA CANAL EN MATERIAL SUELTO A MAQ. M3 613.50
02.02.04 EXCAV. Y REFINE CANAL A MANO EN MAT.SUELTO M3 409.00
02.02.05 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts IMPERMEABLE M3 247.61
02.02.06 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts MAT. GRANULAR M3 247.61
02.02.07 ELIMINACION DE MATERIAL EXEDENTE M3 2,043.00

02.03.00 CONCRETOS
02.03.01 CONCRETO F'C=175 KG/CM2 P/REVESTIDO DE CANAL M3 132.00

02.04.00 JUNTAS Y SELLOS


02.04.01 JUNTA ASFALTICA e=1" ML 336.20

02.05.00 VARIOS
02.05.01 PRUEBAS DE CONTROL DE COMPACTACION UND 8.00

03.00.00 CONSTRUCCION DE DIQUES DE ENCAUZAMIENTO


03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO M2 3,675.00
03.01.02 LIMPIEZA Y DESBROCE HA 0.37
03.01.03 DESVIO DE RIO M3 4,410.00

03.02.00 MOVIMIENTO DE TIERRAS


03.02.01 EXPLOTACION DE ROCA EN CANTERA M3 6,154.63
03.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 8,001.01
03.02.03 TRANSPORTE DE ROCA M3 8,001.01
03.02.04 EXCAVACION DE UÑA DE CIMENTACION M3 6,216.74
03.02.05 RELLENO COMPACTADO CON MATERIAL DE PRESTAMO M3 8,385.08
03.02.06 RELLENO CON MATERIAL DE FILTRO M3 1,853.25
03.02.07 COLOCACION Y ACOMODO DE ENROCADO PESADO M3 6,154.63

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 336
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.10: Presupuesto general alternativa 3 – bocatoma Jarpaña


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 CONSTRUCCION BOCATOMA
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CASA DE TOMERO GLB 1.00 50,000.00 50,000.00
01.01.02 CARTEL DE OBRA 5x3 m UND 1.00 4,886.14 4,886.14
01.01.03 TRAZO Y REPLANTEO M2 7,200.00 1.66 11,952.00
01.01.04 TRANSPORTE DE MAQUINARIA Y EQUIPO GLB 2.00 14,000.00 28,000.00
01.01.05 CAMINOS DE ACCESO M 10,000.00 4.31 43,100.00
01.01.06 MANTENIMIENTO DE CAMINOS DE ACCESO KM 10.00 1,930.77 19,307.70 157,245.84

01.02.00 MOVIMIENTO DE TIERRAS


01.02.01 EXPLOTACION DE ROCA EN CANTERA M3 1,042.90 18.15 18,928.64
01.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 1,564.35 12.09 18,912.99
01.02.03 TRANSPORTE DE ROCA M3 1,564.35 16.45 25,733.56
01.02.04 DESVÍO DE RÍO M3 6,750.00 3.95 26,662.50
01.02.05 EXCAVACION EN MATERIAL SUELTO M3 13,813.75 4.31 59,537.26
01.02.06 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 5,907.89 5.59 33,025.11
01.02.07 ENROCADO DE PROTECCION M3 1,564.35 9.83 15,377.56
01.02.08 ELIMINACION DE MATERIAL EXCEDENTE M3 9,487.03 5.03 47,719.76 245,897.38

01.03.00 CONCRETOS
01.03.01 CONCRETO FC=175 Kg/cm2 M3 1,372.96 370.74 509,011.19
01.03.02 CONCRETO F'C= 210 KG/CM2 M3 8.78 396.93 3,485.05
01.03.03 CONCRETO F'C= 175 Kg/cm2 + 40% PM M3 752.88 279.04 210,083.64 722,579.88

01.04.00 ENCOFRADO Y DESENCOFRADO


01.04.01 ENCOFRADO Y DESENCOFRADO PLANO M2 2,883.77 39.45 113,764.73
01.04.02 ENCOFRADO Y DESENCOFRADO CURVO M2 60.97 73.59 4,486.78 118,251.51

01.05.00 ACERO DE REFUERZO


01.05.01 ACERO DE REFUERZO KG 40,102.91 5.62 225,378.35 225,378.35

01.06.00 VARIOS
01.06.01 FABRICACION Y MONTAJE DE COMPUERTA DE LIMPIA CON MECANISMO DE IZAJE DE 2.50X1.60M UND 2.00 90,013.60 180,027.20
01.06.02 FABRICACION Y MONTAJE DE COMPUERTA DE REGULACION CON MECANISMO DE IZAJE DE 3.00X1.60M UND 1.00 90,013.60 90,013.60
01.06.03 FABRICACION Y MONTAJE DE COMPUERTA DESRIPEADORA DE IZAJE UND 1.00 90,013.60 90,013.60
01.06.04 BOMBEO DE AGUA HM 2,880.00 135.54 390,355.20
01.06.05 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 58.19 145.00 8,437.55
01.06.06 BARANDA DE F°G° Ø= 2" M 22.90 74.59 1,708.11
01.06.07 JUNTA WATER STOP 6" M 335.15 32.95 11,043.19
01.06.08 LIMNIMETRO DE H = 1.90 m UND 1.00 1,500.00 1,500.00
01.06.09 TUBERÍA ROMPE PRESIONES UND 175.00 31.31 5,479.25
01.06.10 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 95.00 25.00 2,375.00 2,250,305.66

02.00.00 CONSTRUCCION CANAL DE EMPALME


02.01.00 TRABAJOS PRELIMINARES
02.01.01 TRAZO Y REPLANTEO M 200.00 3.17 634.00
02.01.02 LIMPIEZA Y DESBROCE A MANO M2 600.00 2.74 1,644.00
02.01.03 LIMPIEZA Y DESBROCE A MAQUINA M2 600.00 0.89 534.00 2,812.00

02.02.00 MOVIMIENTO DE TIERRAS


02.02.01 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 680.00 4.10 2,788.00
02.02.02 TERRAPLEN COMPACTADO (CANAL) M3 247.61 13.41 3,320.45
02.02.03 EXCAVACION DE CAJA DE CANAL A MAQUINA M3 613.50 6.41 3,932.54
02.02.04 EXCAVACION Y REFINE DE CAJA DE CANAL A MANO M3 409.00 35.96 14,707.64
02.02.05 TRANSPORTE DE MATERIAL DE PRESTAMO (1) granu. M3 247.61 7.11 1,760.51
02.02.06 TRANSPORTE DE MATERIAL DE PRESTAMO (2) arci . M3 247.61 17.90 4,432.22
02.02.07 ELIMINACION DE MATERIAL EXCEDENTE M3 2,043.00 5.03 10,276.29 41,217.65

02.03.00 CONCRETOS
02.03.01 CONCRETO FC=175 Kg/cm2 PARA REVESTIDO DE CANAL M3 132.00 437.85 57,796.20 57,796.20

02.04.00 JUNTAS
02.04.01 JUNTA ASFALTICA e= 1" M 336.20 9.03 3,035.89 3,035.89

02.05.00 VARIOS
02.05.01 PRUEBA DE COMPACTACION UND 8.00 25.00 200.00 105,061.74

03.00.00 CONSTRUCCION DIQUE DE ENCAUZAMIENTO


03.01.00 TRABAJOS PRELIMINARES
03.01.01 TRAZO Y REPLANTEO M2 3,675.00 1.66 6,100.50
03.01.02 LIMPIEZA Y DESBROCE HA 0.37 2,537.00 938.69
03.01.03 DESVÍO DE RÍO M3 4,410.00 3.95 17,419.50 24,458.69

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 337
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.10: Presupuesto general alternativa 3 – bocatoma Jarpaña (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
03.02.00 MOVIMIENTO DE TIERRAS
03.02.01 EXPLOTACION DE ROCA EN CANTERA M3 6,154.63 18.15 111,706.53
03.02.02 DESQUINCHE Y ACOPIO DE ROCA EN CANTERA M3 8,001.01 12.09 96,732.21
03.02.03 TRANSPORTE DE ROCA (Bocatoma d= 4 km) M3 8,001.01 7.01 56,087.08
03.02.04 EXCAVACION DE UÑA DE CIMENTACION M3 6,216.74 4.55 28,286.17
03.02.05 RELLENO COMPACTADO CON MATERIAL DE LECHO M3 8,385.08 3.76 31,527.90
03.02.06 RELLENO CON MATERIAL DE FILTRO M3 1,853.25 5.47 10,137.28
03.02.07 COLOCACIÓN Y ACOMODO DE ENROCADO PESADO M3 6,154.63 9.02 55,514.76 414,450.62

COSTO DIRECTO 2,769,818.02


GASTOS GENERALES (12%) 332,378.16
GASTOS DE SUPERVISION (5.0%) 138,490.90
UTILIDAD (10%) 276,981.80
SUB TOTAL 3,517,668.88
IGV (19%) 668,357.09
PRESUPUESTO TOTAL 4,186,025.97

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 338
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.11: Metrado general alternativa 3 – canal Jarpaña


Ítem Descripción Unidad Metrado
01.00.00 TRABAJOS PRELIMINARES
01.01.00 CAMPAMENTO GLB 1.00
01.02.00 CARTEL DE OBRA 5X3 M. UND 1.00
01.03.00 TRANSPORTE DE EQUIPO Y MAQUINARIA GLB 2.00
01.04.00 TRAZO Y REPLANTEO ML 48,000.00
01.05.00 TRAZO Y REPLANTEO OBRAS DE ARTE M2 1,944.00
01.06.00 LIMPIEZA Y DESBROCE A MANO M2 1,944.00
01.07.00 LIMPIEZA Y DESBROCE A MAQUINA e=0.20 m. M2 216,000.00
01.08.00 APERTURA DE CAMINOS DE ACCESO KM 15.00
01.09.00 MANTENIMIENTO DE CAMINO DE ACCESO ML 15,000.00

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO M3 262,248.84
02.01.01 EXCAVACION DE PLATAFRMA EN ROCA FIJA M3 611,913.96
02.02.00 TERRAPLEN COMPACTADO M3 136,080.00
02.03.00 EXCAVACION DE CAJA DE CANAL A MAQ. EN MATERIAL SUELTO M3 95,620.11
02.03.01 EXCAVACION DE CAJA DE CANAL A MAQ. EN ROCA FIJA M3 95,620.11
02.03.02 EXCAVACION DE CAJA DE CANAL A MAQ. EN ROCA SUELTA M3 127,493.48
02.04.00 EXCAV. Y REFINE DE CAJA CANAL A MANO M3 13,386.82
02.05.00 EXCAV. Y REFINE DE CAJA CANAL EN ROCA FIJA M3 5,737.21
02.06.00 EXCAVACION DE CIMENTACION DE OBRAS DE ARTE M3 1,825.92
02.07.00 RELLENO COMPACTADO DE OBRAS DE ARTE M3 912.96
02.08.00 ENROCADO DE PROTECCION A MANO M3 855.36
02.09.00 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts IMPERMEABLE M3 37,800.00
02.10.00 TRANSPORTE DE MATERIAL DE PRESTAMO > 1000 mts MAT. GRANULAR M3 88,200.00
02.11.00 ELIMINACION DE MATERIAL EXEDENTE M3 327,214.89
02.12.00 PERFILADO FINAL Y PROTECCION DE BERMAS CON MATERIAL GRANULAR M2 86,800.00

03.00.00 CONCRETOS
03.01.00 CONCRETO F'C=175 KG/CM2 P/REVESTIDO DE CANAL M3 23,818.78
03.02.00 CONCRETO F'C=175 KG/CM2 + 30% PM O.ARTE M3 2,048.98
03.03.00 CONCRETO F'C=210 KG/CM2 O.ARTE M3 453.18

04.00.00 ENCOFRADO Y DESENCOFRADO


04.01.00 ENCOFRADO Y DESENCOFRADO OBRAS DE ARTE M2 8,312.55
04.02.00 CONFECCION Y COLOCADO DE CERCHAS ML 2,100.00

05.00.00 ACERO DE REFUERZO


05.01.00 ACERO DE REFUERZO KG 118,359.51

06.00.00 JUNTAS Y SELLOS


06.01.00 JUNTA WATER STOP 6" ML 0.00
06.02.00 JUNTA ASFALTICA e=1" ML 76,228.89

07.00.00 TUNEL DE DE CANAL BOCATOMA JARPAÑA - LAGUNILLAS 2300 ml


07.01.00 TRAZO Y REPLANTEO M2 27,600.00
07.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 1,800.00
07.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 11,457.60

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 339
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.11: Metrado general alternativa 3 – canal Jarpaña (continuación)


Ítem Descripción Unidad Metrado
07.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 19,096.00
07.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 45,830.40
07.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 2,111.16
07.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 94,194.19
07.08.00 BOMBEO DE AGUA TUNEL HM 3,600.00
07.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 7,000.00
07.10.00 CIMBRAS METALICAS Kg 161,970.00
07.11.00 PLANCHAS METALICAS ACANALADAS M2 10,450.00
07.12.00 CONCRETO F'C= 210 KG/CM2 M3 14,553.30
07.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1,288.00
07.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 33,300.00
07.15.00 ACERO DE REFUERZO KG 975,229.34
07.16.00 JUNTA WATER STOP 6" M 1,656.00

08.00.00 VARIOS
08.01.00 PRUEBAS DE CALIDAD DEL CONCRETO A LA COMPRESION UND 526.00
08.02.00 PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN UND 680.00
08.03.00 BARANDA DE FIERRO GALVANIZADO ML 640.00
08.04.00 TRANSPORTE DE MATERIAL DE CONSTRUCCION TN 1,275.07

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 340
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.12: Presupuesto general alternativa 3 – canal derivación Jarpaña


Item Descripción Unidad Metrado Precio Parcial Subtotal
01.00.00 TRABAJOS PRELIMINARES
01.01.00 CAMPAMENTO GLB 1.00 50,000.00 50,000.00
01.02.00 CARTEL DE OBRA 5.0X3.0 M UND 1.00 5,070.51 5,070.51
01.03.00 TRANSPORTE DE MAQUINARIA Y EQUIPO_cp1 GLB 2.00 75,000.00 150,000.00
01.04.00 TRAZO Y REPLANTEO M 48,000.00 3.08 147,840.00
01.05.00 TRAZO Y REPLANTEO OBRAS DE ARTE M2 1,944.00 1.35 2,624.40
01.06.00 LIMPIEZA Y DESBROCE A MANO M2 1,944.00 2.74 5,326.56
01.07.00 LIMPIEZA Y DESBROCE A MAQUINA e=0.20M M2 216,000.00 0.58 125,280.00
01.08.00 APERTURA DE CAMINOS DE ACCESO KM 15.00 3,285.04 49,275.60
01.09.00 MANTENIMIENTO DE CAMINOS DE ACCESO M 15,000.00 3.63 54,450.00 589,867.07

02.00.00 MOVIMIENTO DE TIERRAS


02.01.00 EXCAVACION DE PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 262,248.84 4.79 1,256,171.94
02.02.00 EXCAVACION DE PLATAFORMA EN ROCA FIJA M3 279,732.10 24.82 6,942,950.72
02.02.01 EXCAVACION DE PLATAFORMA EN ROCA SUELTA M3 332,181.86 20.76 6,896,095.41
02.03.00 TERRAPLEN COMPACTADO M3 136,080.00 13.93 1,895,594.40
02.04.00 EXCAVACION DE CAJA DE CANAL A MAQUINA M3 95,620.11 10.28 982,974.73
02.04.01 EXCAVACION DE CAJA CANAL A MAQUINA EN ROCA FIJA M3 95,620.11 29.38 2,809,318.83
02.04.02 EXCAVACION DE CAJA CANAL A MAQUINA EN ROCA SUELTA M3 127,493.48 25.16 3,207,735.96
02.05.00 EXCAVACION DE CAJA DE CANAL A MANO M3 13,386.82 40.39 540,693.66
02.06.00 EXCAVACION Y REFINE DE CAJA DE CANAL EN ROCA FIJA M3 5,737.21 39.46 226,390.31
02.07.00 EXCAVACION PARA CIMENTACION DE OBRAS DE ARTE M3 1,825.92 31.56 57,626.04
02.08.00 RELLENO COMPACTADO DE OBRAS DE ARTE M3 912.92 26.74 24,411.48
02.09.00 ENROCADO DE PROTECCION A MANO M3 855.36 98.21 84,004.91
02.10.00 TRANSPORTE DE MATERIAL IMPERMEABLE > 1000 MTS. M3 37,800.00 10.31 389,718.00
02.11.00 TRANSPORTE DE MATERIAL GRANULAR > 1000 MTS. M3 88,200.00 14.31 1,262,142.00
02.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 327,214.89 4.54 1,485,555.60 28,061,383.99

03.00.00 CONCRETOS
03.01.00 CONCRETO FC=175 KG/CM2 PARA REVESTIMIENTO DE CANALES M3 23,818.78 421.96 10,050,572.41
03.02.00 CONCRETO F'C= 175 Kg/cm2 + 30% PM M3 2,048.98 316.07 647,621.11
03.03.00 CONCRETO F'C= 210 Kg/cm2 M3 528.71 434.91 229,941.27
03.04.00 CONCRETO F'C= 140 KG/CM2 + 30% PM M3 650.00 291.84 189,696.00 11,117,830.79

04.00.00 ENCOFRADO Y DESENCOFRADO


04.01.00 ENCOFRADO Y DESENCOFRADO DE OBRAS DE ARTE M2 8,312.55 46.17 383,790.43 383,790.43

05.00.00 ACERO DE REFUERZO


05.01.00 ACERO DE REFUERZO KG 118,359.51 5.14 608,367.88 608,367.88

06.00.00 JUNTAS Y SELLOS


06.01.00 JUNTA WATER STOP 6" M 1,500.00 34.85 52,275.00
06.02.00 JUNTAS ASFALTICAS e=1" M 76,228.89 8.91 679,199.41 731,474.41

07.00.00 TUNEL DE L = 2300 ML


07.01.00 TRAZO Y REPLANTEO M2 27,600.00 1.20 33,120.00
07.02.00 EXCAVACION DE PLAT. EN MAT. C/EXCAVADORA M3 1,800.00 5.75 10,350.00
07.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 11,457.60 65.68 752,535.17
07.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 19,096.00 85.35 1,629,843.60
07.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 45,830.40 91.69 4,202,189.38
07.06.00 REFINE DE TUNEL EN MATERIAL ROCA M3 2,111.16 97.21 205,225.86
07.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 94,194.19 20.65 1,945,110.02
07.08.00 BOMBEO DE AGUA HM 2,100.00 35.54 74,634.00
07.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 7,000.00 306.78 2,147,460.00
07.10.00 CIMBRAS METALICAS KG 161,970.00 19.59 3,172,992.30
07.11.00 PLANCHA METALICA ACANALADA M2 10,450.00 119.27 1,246,371.50
07.12.00 CONCRETO F'C= 210 Kg/cm2 M3 10,942.30 434.91 4,758,915.69
07.13.00 SOLADO DE CONCRETO F'C= 100 KG/CM2 E = 0.10M M3 1,288.00 291.91 375,980.08
07.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 33,300.00 61.17 2,036,961.00
07.15.00 ACERO DE REFUERZO KG 975,229.34 5.14 5,012,678.81
07.16.00 JUNTA WATER STOP 6" M 1,656.00 34.85 57,711.60 27,662,079.01

08.00.00 VARIOS
08.01.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 526.00 25.00 13,150.00
08.02.00 PRUEBAS DE CONTROL DE COMPACTACION DE TERRAPLEN UND 680.00 41.00 27,880.00
08.03.00 BARANDA DE F° G° Ø= 1 1/2" M 640.00 104.78 67,059.20
08.04.00 TRANSPORTE DE MATERIALES DE CONSTRUCCION cp_1 TON 1,200.00 100.00 120,000.00 228,089.20

COSTO DIRECTO S/. 69,382,882.78


GASTOS GENERALES (12%) S/. 8,325,945.93
GASTOS DE SUPERVISION (5%) S/. 3,469,144.14
UTILIDAD 10% S/. 6,938,288.28
PRESUPUESTO PARCIAL S/. 88,116,261.13
IGV (19%) S/. 16,742,089.61
PRESUPUESTO TOTAL S/. 104,858,350.74

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 341
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.13: Metrado general alternativa 4 – presa Paratía


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 320,350.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 12,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION GLB 280.29

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 0.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,000.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 9,803.75
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 541.93
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 23,529.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 2,100.00
03.10.00 CIMBRAS METALICAS UND 48,600.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 6,054.55
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00
03.16.00 ACERO DE REFUERZO KG 325,076.00
03.17.00 JUNTA WATER STOP 6" M 666.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 2.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 8.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 342
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.13: Metrado general alternativa 4 – presa Paratía (continuación)


Item Descripción Unidad Metrado
05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO
05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17300.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50
06.08.00 ACERO DE REFUERZO KG 427,792.00
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.04
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 1442.00

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03
07.03.02 PERFORACION DE POZOS M3 4,876.03

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 89,375.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 218,850.00
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.60
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 343
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.13: Metrado general alternativa 4 – presa Paratía (continuación)


Item Descripción Unidad Metrado
07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 4,702.44
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 3,918.70

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 48,880.90

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 1,354,068.80

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11
07.11.03 JUNTAS ASFALTICAS M 681.15
07.11.04 PINTURA ESMALTE EN SARDINEL M 2,980.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 500.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 1,490.00

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 OBRAS COMPLEMENTARIAS


10.01.00 OBRAS DE TOMA
10.01.01 TRAZO Y REPLANTEO M2 102.74
10.01.02 EXCAVACION EN MATERIAL SUELTO M3 172.53
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 141.21

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 344
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.13: Metrado general alternativa 4 – presa Paratía (continuación)


Item Descripción Unidad Metrado
10.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 26.10
10.01.05 ENROCADO DE PROTECCIÓN M3 17.93
10.01.06 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 59.01
10.01.07 CONCRETO F'C= 175 KG/CM2 M3 0.16
10.01.08 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 160.90
10.01.09 ACERO DE REFUERZO Fy = 4200 Kg/cm2 Kg 6.73
10.01.10 COMPUERTA IZAJE 0.50 X0.50 M. (INCLUYE MONTAJE) UND 2.00

10.02.00 CANAL DE DERIVACION


10.02.01 TRAZO Y REPLANTEO CANAL M 200.00
10.02.02 EXCAVACION Y REFINE CAJA CANAL A MANO EN MATERIAL SUELTO M3 32.50
10.02.03 CONCRETO F'C= 175 Kg/cm2 PARA CANALES M3 9.00
10.02.04 JUNTAS ASFALTICAS M 75.60
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 39.00

11.00.00 VARIOS
11.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 5,760.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 345
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.14: Presupuesto general alternativa 4 – presa Paratía


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA PRESA MILLO UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 320,350.00 0.65 208,227.50
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 12,000.00 8.49 101,880.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00 2,434.41 36,516.15
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00 0.55 22,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 750.00 140.00 105,000.00 663,218.41

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00 3,500.00 1,400,000.00 2,063,218.41

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00 0.65 5,265.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 3,000.00 5.12 15,360.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 9,803.75 68.92 675,674.45
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25 86.57 509,226.38
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50 118.38 464,227.17
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 541.93 60.63 32,857.22
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 23,529.00 17.70 416,463.30
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 2,100.00 309.57 650,097.00
03.10.00 CIMBRAS METALICAS UND 48,600.00 18.61 904,446.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00 110.21 347,161.50
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 6,054.55 512.36 3,102,109.24
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00 291.08 110,028.24
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27 94.14 979,269.70
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00 78.52 76,949.60
03.16.00 ACERO DE REFUERZO KG 325,076.00 5.02 1,631,881.52
03.17.00 JUNTA WATER STOP 6" M 666.00 34.73 23,130.18
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 2.00 29.52 59.04
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 10,276,389.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17,300.00 0.65 11,245.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00 3.80 351,971.20
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00 2.90 49,662.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 346
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.14: Presupuesto general alternativa 4 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70 436.79 2,817,164.46
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25 486.87 548,337.34
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50 49.46 563,670.89
06.08.00 ACERO DE REFUERZO KG 427,792.00 5.02 2,147,515.84
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60 37.86 26,941.18
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.00 27.39 9,120.87
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 1,442.00 34.73 50,080.66 7,229,296.07

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00 3.77 6,547,132.80
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00 3.42 7,127,170.56
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03 187.76 915,523.39 915,523.39

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93 3.49 27,098,387.45
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11 5.12 30,886,308.40 57,984,695.85

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00 6.88 1,017,380.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 308,225.00 20.89 6,438,820.25
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.00 7.35 1,206,487.80
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00 7.34 434,161.00 9,096,849.05

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00 28.15 3,496,652.25
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00 39.40 4,661,020.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00 8.86 1,414,986.30
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00 18.16 2,148,328.00 11,720,986.55

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 4,702.44 6.91 32,493.86
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 3,918.70 9.63 37,737.08 70,230.94

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 48,880.90 512.36 25,044,617.92 25,044,617.92

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 1,307,643.80 5.02 6,564,371.88 6,564,371.88

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17 512.36 2,510,651.10 2,510,651.10

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89 402.03 1,130,866.17
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11 49.46 120,687.84
07.11.03 JUNTAS ASFALTICAS M 681.15 11.32 7,710.62
07.11.04 PINTURA ESMALTE EN SARDINELES M 2,980.00 2.00 5,960.00 1,265,224.63

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 500.00 42.95 21,475.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 1,490.00 30.48 45,415.20 128,914,344.87

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 347
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.14: Presupuesto general alternativa 4 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 5,760.00 32.92 189,619.20 189,619.20

COSTO DIRECTO 150,468,466.60


GASTOS GENERALES (12%) 18,056,215.99
GASTOS DE SUPERVISION (5%) 7,523,423.33
UTILIDAD (10%) 15,046,846.66
PRESUPUESTO PARCIAL 191,094,952.58
IGV (19%) 36,308,040.99
PRESUPUESTO TOTAL 227,402,993.57

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 348
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.15: Metrado general alternativa 4 – presa Jarpaña


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA PRESA JARPAÑA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 145,000.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 12,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION TN 700.00

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 350.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 0.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 5,400.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,000.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 3,580.50
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 2,387.00
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 5,967.50
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 329.87
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 14,322.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 1,400.00
03.10.00 CIMBRAS METALICAS UND 32,394.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 2,090.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 4,877.80
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 252.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 7,072.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00
03.16.00 ACERO DE REFUERZO KG 216,717.63
03.17.00 JUNTA WATER STOP 6" M 504.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 250.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 349
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.15: Metrado general alternativa 4 – presa Jarpaña (continuación)


Item Descripción Unidad Metrado
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 10900.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 47,240.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 10,675.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 4,169.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 556.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 6,836.50
06.08.00 ACERO DE REFUERZO KG 213,896.00
06.09.00 RELLENO DE ESTRUCTURAS M3 371.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 219.04
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 659.20

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 572,850.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 687,420.00
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 1,636.25
07.03.02 PERFORACION DE POZOS M3 1,636.25

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 3,365,311.41
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 2,614,588.10

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 54,963.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 19,863.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 65,868.75
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 58,864.20
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 21,985.00
07.06.00 ENROCADOS DE PROTECCION
07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 46,168.50
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 43,970.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 59,359.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 350
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.15: Metrado general alternativa 4 – presa Jarpaña (continuación)


Item Descripción Unidad Metrado
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 43,970.00

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 867.90
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 723.25

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 17,728.85

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 4,939.69

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 746,171.92

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 941.79
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 930.36
07.11.03 JUNTAS ASFALTICAS M 229.71
07.11.04 PINTURA ESMALTE EN SARDINEL M 1,000.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 1,200.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 500.00

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 2,160.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 351
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.16: Presupuesto general alternativa 4 – presa Jarpaña


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA PRESA JARPAÑA UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 145,000.00 0.65 94,250.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 12,000.00 8.49 101,880.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00 2,434.41 36,516.15
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00 0.55 22,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 750.00 140.00 105,000.00 549,240.91

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 350.00 3,500.00 1,225,000.00 1,774,240.91

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 5,400.00 0.65 3,510.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 3,000.00 5.12 15,360.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 5,967.50 68.92 411,280.10
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 3,580.50 86.57 309,963.89
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 2,380.50 118.38 281,803.59
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 329.87 60.63 20,000.02
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 14,322.00 17.70 253,499.40
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 1,400.00 309.57 433,398.00
03.10.00 CIMBRAS METALICAS UND 32,394.00 18.61 602,852.34
03.11.00 PLANCHAS METALICAS ACANALADAS M2 2,090.00 110.21 230,338.90
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 4,877.80 512.36 2,499,189.61
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 252.00 291.08 73,352.16
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 7,072.27 94.14 665,783.50
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00 78.52 76,949.60
03.16.00 ACERO DE REFUERZO KG 216,717.63 5.02 1,087,922.50
03.17.00 JUNTA WATER STOP 6" M 504.00 34.73 17,503.92
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 250.00 29.52 7,380.00
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 7,322,270.99

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 352
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.16: Presupuesto general alternativa 4 – presa Jarpaña (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.00.00 ALIVIADERO DE DEMASIAS
06.01.00 TRAZO Y REPLANTEO M2 10,900.00 0.65 7,085.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 47,240.00 3.80 179,512.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 10,675.00 2.90 30,957.50
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 4,169.70 436.79 1,821,283.26
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 556.25 486.87 270,821.44
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 6,836.50 49.46 338,133.29
06.08.00 ACERO DE REFUERZO KG 213,896.00 5.02 1,073,757.92
06.09.00 RELLENO DE ESTRUCTURAS M3 371.60 37.86 14,068.78
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 220.00 27.39 6,025.80
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 659.20 34.73 22,894.02 4,418,125.14

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 572,850.00 3.77 2,159,644.50
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 687,420.00 3.42 2,350,976.40
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 1,636.25 187.76 307,222.30 307,222.30

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 3,365,311.41 3.49 11,744,936.82
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 2,614,588.10 5.12 13,386,691.07 25,131,627.89

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 54,963.00 6.88 378,145.44
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 85,731.85 20.89 1,790,938.35
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 58,864.20 7.35 432,651.87
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 21,985.00 7.34 161,369.90 2,763,105.56

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 46,168.50 28.15 1,299,643.28
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 43,970.00 39.40 1,732,418.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 59,359.50 8.86 525,925.17
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 43,970.00 18.16 798,495.20 4,356,481.65

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 867.90 6.91 5,997.19
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 723.25 9.63 6,964.90 12,962.09

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 17,728.85 512.36 9,083,553.59 9,083,553.59

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 746,171.92 5.02 3,745,783.04 3,745,783.04

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,939.69 512.36 2,530,899.57 2,530,899.57

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 941.79 402.03 378,627.83
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 930.36 49.46 46,015.61
07.11.03 JUNTAS ASFALTICAS M 229.71 11.32 2,600.32
07.11.04 PINTURA ESMALTE EN SARDINELES M 1,000.00 2.00 2,000.00 429,243.76

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 1,200.00 42.95 51,540.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 500.00 30.48 15,240.00 52,938,280.35

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 353
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.16: Presupuesto general alternativa 4 – presa Jarpaña (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
08.02.00 OBRAS DE ARTE
08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 2,160.00 32.92 71,107.20 71,107.20

COSTO DIRECTO 68,319,623.64


GASTOS GENERALES (12%) 8,198,354.84
GASTOS DE SUPERVISION (5%) 3,415,981.18
UTILIDAD (10%) 6,831,962.36
PRESUPUESTO PARCIAL 86,765,922.02
IGV (19%) 16,485,525.18
PRESUPUESTO TOTAL 103,251,447.20

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 354
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.17: Metrado general alternativa 5 – presa Paratía


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 320,350.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 12,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION GLB 280.29

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 0.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,000.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 9,803.75
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 541.93
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 23,529.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 2,100.00
03.10.00 CIMBRAS METALICAS UND 48,600.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 6,054.55
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00
03.16.00 ACERO DE REFUERZO KG 325,076.00
03.17.00 JUNTA WATER STOP 6" M 666.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 2.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 8.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 355
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.17: Metrado general alternativa 5 – presa Paratía (continuación)


Item Descripción Unidad Metrado
05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO
05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17300.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50
06.08.00 ACERO DE REFUERZO KG 427,792.00
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.04
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 1442.00

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03
07.03.02 PERFORACION DE POZOS M3 4,876.03

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 89,375.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 218,850.00
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.60
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 356
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.17: Metrado general alternativa 5 – presa Paratía (continuación)


Item Descripción Unidad Metrado
07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 4,702.44
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 3,918.70

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 48,880.90

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 1,354,068.80

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11
07.11.03 JUNTAS ASFALTICAS M 681.15
07.11.04 PINTURA ESMALTE EN SARDINEL M 2,980.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 500.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 1,490.00

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 OBRAS COMPLEMENTARIAS


10.01.00 OBRAS DE TOMA
10.01.01 TRAZO Y REPLANTEO M2 102.74
10.01.02 EXCAVACION EN MATERIAL SUELTO M3 172.53
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 141.21

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 357
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.17: Metrado general alternativa 5 – presa Paratía (continuación)


Item Descripción Unidad Metrado
10.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 26.10
10.01.05 ENROCADO DE PROTECCIÓN M3 17.93
10.01.06 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 59.01
10.01.07 CONCRETO F'C= 175 KG/CM2 M3 0.16
10.01.08 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 160.90
10.01.09 ACERO DE REFUERZO Fy = 4200 Kg/cm2 Kg 6.73
10.01.10 COMPUERTA IZAJE 0.50 X0.50 M. (INCLUYE MONTAJE) UND 2.00

10.02.00 CANAL DE DERIVACION


10.02.01 TRAZO Y REPLANTEO CANAL M 200.00
10.02.02 EXCAVACION Y REFINE CAJA CANAL A MANO EN MATERIAL SUELTO M3 32.50
10.02.03 CONCRETO F'C= 175 Kg/cm2 PARA CANALES M3 9.00
10.02.04 JUNTAS ASFALTICAS M 75.60
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 39.00

11.00.00 VARIOS
11.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 5,760.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 358
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.18: Presupuesto general alternativa 5 – presa Paratía


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA PRESA MILLO UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 320,350.00 0.65 208,227.50
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 12,000.00 8.49 101,880.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00 2,434.41 36,516.15
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00 0.55 22,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 750.00 140.00 105,000.00 663,218.41

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 400.00 3,500.00 1,400,000.00 2,063,218.41

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 8,100.00 0.65 5,265.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 3,000.00 5.12 15,360.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 9,803.75 68.92 675,674.45
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 5,882.25 86.57 509,226.38
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 3,921.50 118.38 464,227.17
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 541.93 60.63 32,857.22
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 23,529.00 17.70 416,463.30
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 2,100.00 309.57 650,097.00
03.10.00 CIMBRAS METALICAS UND 48,600.00 18.61 904,446.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 3,150.00 110.21 347,161.50
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 6,054.55 512.36 3,102,109.24
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 378.00 291.08 110,028.24
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 10,402.27 94.14 979,269.70
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00 78.52 76,949.60
03.16.00 ACERO DE REFUERZO KG 325,076.00 5.02 1,631,881.52
03.17.00 JUNTA WATER STOP 6" M 666.00 34.73 23,130.18
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 2.00 29.52 59.04
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 10,276,389.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 17,300.00 0.65 11,245.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 92,624.00 3.80 351,971.20
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 17,125.00 2.90 49,662.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 359
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.18: Presupuesto general alternativa 5 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 6,449.70 436.79 2,817,164.46
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 1,126.25 486.87 548,337.34
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 11,396.50 49.46 563,670.89
06.08.00 ACERO DE REFUERZO KG 427,792.00 5.02 2,147,515.84
06.09.00 RELLENO DE ESTRUCTURAS M3 711.60 37.86 26,941.18
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 333.00 27.39 9,120.87
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 1,442.00 34.73 50,080.66 7,229,296.07

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 1,736,640.00 3.77 6,547,132.80
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 2,083,968.00 3.42 7,127,170.56
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 4,876.03 187.76 915,523.39 915,523.39

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 7,764,580.93 3.49 27,098,387.45
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 6,032,482.11 5.12 30,886,308.40 57,984,695.85

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 147,875.00 6.88 1,017,380.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 308,225.00 20.89 6,438,820.25
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 164,148.00 7.35 1,206,487.80
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 59,150.00 7.34 434,161.00 9,096,849.05

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 124,215.00 28.15 3,496,652.25
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 118,300.00 39.40 4,661,020.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 159,705.00 8.86 1,414,986.30
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 118,300.00 18.16 2,148,328.00 11,720,986.55

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 4,702.44 6.91 32,493.86
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 3,918.70 9.63 37,737.08 70,230.94

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 48,880.90 512.36 25,044,617.92 25,044,617.92

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 1,307,643.80 5.02 6,564,371.88 6,564,371.88

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,900.17 512.36 2,510,651.10 2,510,651.10

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 2,812.89 402.03 1,130,866.17
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 2,440.11 49.46 120,687.84
07.11.03 JUNTAS ASFALTICAS M 681.15 11.32 7,710.62
07.11.04 PINTURA ESMALTE EN SARDINELES M 2,980.00 2.00 5,960.00 1,265,224.63

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 500.00 42.95 21,475.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 1,490.00 30.48 45,415.20 128,914,344.87

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 360
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.18: Presupuesto general alternativa 5 – presa Paratía (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 5,760.00 32.92 189,619.20 189,619.20

COSTO DIRECTO 150,468,466.60


GASTOS GENERALES (12%) 18,056,215.99
GASTOS DE SUPERVISION (5%) 7,523,423.33
UTILIDAD (10%) 15,046,846.66
PRESUPUESTO PARCIAL 191,094,952.58
IGV (19%) 36,308,040.99
PRESUPUESTO TOTAL 227,402,993.57

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 361
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.19: Metrado general alternativa 5 – presa Millo


Item Descripción Unidad Metrado
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00
01.01.02 CARTEL DE OBRA SAGUANANI UND 1.00
01.01.03 TRAZO Y REPLANTEO M2 145,935.00
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00
01.01.05 CAMINOS DE ACCESO M 12,000.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00
01.01.08 TRANSPORTE DE MATERIAL DE CONSTRUCCION GLB 280.29

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 250.00
01.02.02 AREA DE EMBALSE EN TERRENO ERIAZO HA 250.00

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 5,400.00
03.02.00 EXCAVACION DE CAJA DUCTO EN MATERIAL COMPACTADO A MAQUINA M3 3,000.00
03.03.00 EXCAVACION DE TUNEL ROCA TIPO I M3 5,967.50
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 3,580.50
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 2,387.00
03.06.00 REFINE DE CAJA DUCTO EN MAT. ROCA M3 329.87
03.07.00 ELIMINACION DE MATERIAL DE TUNEL M3 14,322.00
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00
03.09.00 PERNOS DE ANCLAJE D=1", L = 3.0M UND 1,400.00
03.10.00 CIMBRAS METALICAS UND 32,394.00
03.11.00 PLANCHAS METALICAS ACANALADAS M2 2,090.00
03.12.00 CONCRETO F'C= 245 KG/CM2 M3 4,877.80
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 252.00
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 7,072.27
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00
03.16.00 ACERO DE REFUERZO KG 216,717.63
03.17.00 JUNTA WATER STOP 6" M 504.00
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00m M 20.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M UND 1.00
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00
03.22.00 ESCALERA DE GATO UND 2.00
03.23.00 REJILLA DE SEGURIDAD DE 2.20 x 0.75 m UND 2.00
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00
03.25.00 PRUEBAS DE OPERACION Y MANTENIMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE GLB 2.00

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00
04.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 11.20
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 362
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.19: Metrado general alternativa 5 – presa Millo (continuación)


Item Descripción Unidad Metrado
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36
04.06.00 ACERO DE REFUERZO KG 7,561.42
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 8.00

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8000.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00
05.03.00 PERFILADO DE TALUDES M2 1,500.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70
05.06.01 CONCRETO F'C= 280 Kg/cm2 M3 11.17
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00
05.08.00 ACERO DE REFUERZO KG 69,850.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.25
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60

06.00.00 ALIVIADERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 10900.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 47,240.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 10,675.00
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 4,169.70
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 556.25
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 6,836.50
06.08.00 ACERO DE REFUERZO KG 213,896.00
06.09.00 RELLENO DE ESTRUCTURAS M3 371.60
06.10.00 ENROCADO DE PROTECCION M3 5,775.00
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 219.04
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00
06.14.00 JUNTA WATER STOP 6" M 659.20

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 591,543.00
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 709,851.60
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 1,768.79
07.03.02 PERFORACION DE POZOS M3 1,768.79

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 3,672,057.24
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 2,852,906.01

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 63,696.00
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 5,196.00
07.05.03 TRANSPORTE DE MATERIAL FILTRO D< 15 KM M3 59,199.22
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 68,218.49
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 25,478.50

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 363
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.19: Metrado general alternativa 5 – presa Millo (continuación)


Item Descripción Unidad Metrado
07.06.00 ENROCADOS DE PROTECCION
07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 53,504.85
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 50,957.00
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 68,791.95
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 50,957.00

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km (Ccochapata) M3 1,641.91
07.07.02 RELLENO COMPACTADO MATERIAL SEMI PERMEABLE M3 1,368.26

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 210 Kg/cm2 M3 20,819.07

07.09.00 INYECCIONES DE CORTINA DE CONCRETO H = 50MT


07.09.01 CONCRETO F'C= 245 Kg/cm2 M3 4,159.22

07.10.00 ACERO DE REFUERZO


07.10.01 ACERO DE REFUERZO FY = 4200 KG/CM2 KG 766,805.12

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 1,017.39
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 991.36
07.11.03 JUNTAS ASFALTICAS M 149.91
07.11.04 PINTURA ESMALTE EN SARDINEL M 1,081.00

07.09.00 OTROS EN CUERPO DE PRESA


07.09.01 PRUEBAS DE COMPACTACION PTO 500.00
07.09.02 TUBERIA DE DRENAJE FILTRO Ø 6" C - 7.5 M 540.50

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56
08.01.07 LASTRADO e= 0.20 m. M2 598.38

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12
08.02.044 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57
08.02.05 ACERO DE REFUERZO KG 304.00
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 364
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.19: Metrado general alternativa 5 – presa Millo (continuación)


Item Descripción Unidad Metrado
09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72
09.04.00 ACERO DE REFUERZO KG 9,239.00
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60
09.09.00 TUBOS DE DRENAJE UND 40.00
09.10.00 JUNTAS DE DILATACION GBL 1.00

10.00.00 OBRAS COMPLEMENTARIAS


10.01.00 OBRAS DE TOMA
10.01.01 TRAZO Y REPLANTEO M2 102.74
10.01.02 EXCAVACION EN MATERIAL SUELTO M3 172.53
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE M3 141.21
10.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 26.10
10.01.05 ENROCADO DE PROTECCIÓN M3 17.93
10.01.06 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 59.01
10.01.07 CONCRETO F'C= 175 KG/CM2 M3 0.16
10.01.08 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 160.90
10.01.09 ACERO DE REFUERZO Fy = 4200 Kg/cm2 Kg 6.73
10.01.10 COMPUERTA IZAJE 0.50 X0.50 M. (INCLUYE MONTAJE) UND 2.00

10.02.00 CANAL DE DERIVACION


10.02.01 TRAZO Y REPLANTEO CANAL M 200.00
10.02.02 EXCAVACION Y REFINE CAJA CANAL A MANO EN MATERIAL SUELTO M3 32.50
10.02.03 CONCRETO F'C= 175 Kg/cm2 PARA CANALES M3 9.00
10.02.04 JUNTAS ASFALTICAS M 75.60
10.02.05 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 39.00

11.00.00 VARIOS
11.01.00 BOMBEO PARA CAUDAL ECOLOGICO H 540.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 365
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.20: Presupuesto general alternativa 5 – presa Millo


Item Descripción Unidad Metrado Precio Parcial Total
01.00.00 OBRAS PROVISIONALES
01.01.00 TRABAJOS PRELIMINARES
01.01.01 CAMPAMENTO PROVISIONAL DE OBRA GLB 1.00 37,512.96 37,512.96
01.01.02 CARTEL DE OBRA PRESA MILLO UND 1.00 2,081.80 2,081.80
01.01.03 TRAZO Y REPLANTEO M2 145,935.00 0.65 94,857.75
01.01.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIA GLB 2.00 75,000.00 150,000.00
01.01.05 CAMINOS DE ACCESO M 12,000.00 8.49 101,880.00
01.01.06 MANTENIMIENTO CAMINOS DE ACCESO KM 15.00 2,434.41 36,516.15
01.01.07 LIMPIEZA Y DESBROCE M2 40,000.00 0.55 22,000.00
01.01.09 TRANSPORTE DE MATERIAL DE CONSTRUCCION TON 750.00 140.00 105,000.00 549,848.66

01.02.00 INDEMNIZACIONES
01.02.01 AREA DE EMBALSE EN TERRENO DE PASTOREO HA 250.00 3,500.00 875,000.00 1,424,848.66

02.00.00 CANAL ADUCTOR


02.01.00 TRAZO Y REPLANTEO M 100.00 4.76 476.00
02.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 2,100.00 3.80 7,980.00
02.03.00 REFINE Y COMPACTACION DE RASANTE M2 1,500.00 2.90 4,350.00
02.04.00 ENROCADO CANAL DE ADUCCION M3 1,500.00 77.35 116,025.00
02.05.00 ELIMINACION DE MATERIAL EXCEDENTE M3 1,020.00 3.42 3,488.40 132,319.40

03.00.00 TUNEL DE ALIVIO Y DUCTO DE DESCARGA


03.01.00 TRAZO Y REPLANTEO M2 5,400.00 0.65 3,510.00
03.02.00 EXCAVACION EN MATERIAL SUELTO A MAQUINA M3 3,000.00 5.12 15,360.00
03.03.00 EXCAVACIO DE TUNEL ROCA TIPO I M3 5,967.50 68.92 411,280.10
03.04.00 EXCAVACION DE TUNEL ROCA TIPO II M3 3,580.50 86.57 309,963.89
03.05.00 EXCAVACION DE TUNEL ROCA TIPO III M3 2,380.50 118.38 281,803.59
03.06.00 REFINE CAJA DUCTO EN MAT. ROCA M3 329.87 60.63 20,000.02
03.07.00 ELIMINACION DE MATERIAL EXCEDENTE DE TUNEL M3 14,322.00 17.70 253,499.40
03.08.00 BOMBEO DE AGUA TUNEL HM 2,160.00 44.69 96,530.40
03.09.00 PERNOS DE ANCLAJE D=1" Y L=3.00M UND 1,400.00 309.57 433,398.00
03.10.00 CIMBRAS METALICAS UND 32,394.00 18.61 602,852.34
03.11.00 PLANCHAS METALICAS ACANALADAS M2 2,090.00 110.21 230,338.90
03.12.00 CONCRETO F'C= 245 Kg/cm2 M3 4,877.80 512.36 2,499,189.61
03.13.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 252.00 291.08 73,352.16
03.14.00 ENCOFRADO Y DESENCOFRADO SUBTERRÁNEO M2 7,072.27 94.14 665,783.50
03.15.00 ENCOFRADO Y DESENCOFRADO CURVO M2 980.00 78.52 76,949.60
03.16.00 ACERO DE REFUERZO KG 216,717.63 5.02 1,087,922.50
03.17.00 JUNTA WATER STOP 6" M 504.00 34.73 17,503.92
03.18.00 BLINDAJE DE ACERO E = 5mm Y D = 5.00M M 20.00 271.00 5,420.00
03.19.00 COMPUERTA CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 2.00 89,405.52 178,811.04
03.20.00 REJILLA DE PECES CON MECANISMO DE IZAJE D = 2.50 M. (INCLUYE MONTAJE) UND 1.00 28,977.23 28,977.23
03.21.00 LIMNIMETRO ESTRUCTURA DE TOMA H= 45.00 M (SUMINISTRO E INSTALACION) UND 1.00 4,740.07 4,740.07
03.22.00 ESCALERA DE GATO UND 78.00 29.52 2,302.56
03.23.00 REJILLA DE SEGURIDAD 2.20 X 0.75 M.(EN PUENTE DE MANIOBRAS) UND 2.00 1,123.54 2,247.08
03.24.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 300.00 27.39 8,217.00
03.25.00 PRUEBAS DE OPERACION Y FUNCIONAMIENTO DE COMPUERTAS Y MECANISMO DE IZAJE UND 2.00 3,620.32 7,240.64 7,317,193.55

04.00.00 PUENTE DE MANIOBRAS


04.01.00 TRAZO Y REPLANTEO M2 350.00 0.65 227.50
04.02.00 EXCAVACION MATERIAL SUELTO A MANO M3 11.20 25.26 282.91
04.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 708.34 49.46 35,034.50
04.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 1.12 291.08 326.01
04.05.00 CONCRETO F'C= 210 KG/CM2 M3 94.36 436.79 41,215.50
04.06.00 ACERO DE REFUERZO KG 7,561.42 5.02 37,958.33
04.07.00 BARANDA DE F°G° Ø= 1.5" M 200.00 96.65 19,330.00
04.08.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 25.00 27.39 684.75 135,059.50

05.00.00 ESTRUCTURA TERMINAL Y DE ENTREGA A RIO


05.01.00 TRAZO Y REPLANTEO M2 8,000.00 0.65 5,200.00
05.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 4,088.00 3.80 15,534.40
05.03.00 PERFILADO DE TALUDES M2 1,500.00 3.82 5,730.00
05.04.00 SOLADO DE CONCRETO F'C= 100 Kg/cm2 e=0.10 M. M3 70.00 291.08 20,375.60
05.05.00 CONCRETO F'C= 210 KG/CM2 M3 1,360.70 436.79 594,340.15
05.06.00 CONCRETO F'C= 280 Kg/cm2 M3 11.17 486.87 5,438.34
05.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 840.00 49.46 41,546.40
05.08.00 ACERO DE REFUERZO KG 69,850.00 5.02 350,647.00
05.09.00 EMBOQUILLADO DE PIEDRA M3 225.00 265.40 59,715.00
05.10.00 ENROCADO DE PROTECCION M3 2,000.00 77.35 154,700.00
05.11.00 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 341.00 56.53 19,276.73
05.12.00 ELIMINACION DE MATERIAL EXCEDENTE M3 4,905.60 3.42 16,777.15 1,289,280.77

06.00.00 VERTEDERO DE DEMASIAS


06.01.00 TRAZO Y REPLANTEO M2 10,900.00 0.65 7,085.00
06.02.00 EXCAV.CANAL EN MATERIAL SUELTO A MAQ. M3 47,240.00 3.80 179,512.00
06.03.00 REFINE Y COMPACTACION DE RASANTE M2 10,675.00 2.90 30,957.50
06.04.00 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 750.00 272.20 204,150.00

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 366
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.20: Presupuesto general alternativa 5 – presa Millo (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
06.05.00 CONCRETO F'C= 210 KG/CM2 M3 4,169.70 436.79 1,821,283.26
06.06.00 CONCRETO F'C= 280 Kg/cm2 M3 556.25 486.87 270,821.44
06.07.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 6,836.50 49.46 338,133.29
06.08.00 ACERO DE REFUERZO KG 213,896.00 5.02 1,073,757.92
06.09.00 RELLENO DE ESTRUCTURAS M3 371.60 37.86 14,068.78
06.10.00 ENROCADO DE PROTECCION M3 5,775.00 77.35 446,696.25
06.11.00 ELIMINACION DE MATERIAL EXCEDENTE M3 482.40 3.42 1,649.81
06.12.00 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) UND 220.00 27.39 6,025.80
06.13.00 LIMNIMETRO ALIVIADERO DE DEMASIAS H= 1.50M (SUMINISTRO E INSTALACION) UND 1.00 1,090.07 1,090.07
06.14.00 JUNTA WATER STOP 6" M 659.20 34.73 22,894.02 4,418,125.14

07.00.00 CUERPO DE PRESA


07.01.00 EXCAVACION PLATAFORMA EN MATERIAL SUELTO A MAQ. M3 591,543.00 3.77 2,230,117.11
07.02.00 ELIMINACION DE MATERIAL EXCEDENTE M3 709,851.00 3.42 2,427,690.42
07.03.00 PERFORACION DE PUNTOS DE INYECCION
07.03.01 PUNTOS DE INYECCION M3 1,768.79 187.76 332,108.01 332,108.01

07.04.00 MATERIAL HOMOGENIO CUERPO DE PRESA


07.04.01 TRANSPORTE DE MATERIAL HOMOGENIO < 1.5 Km M3 3,672,057.24 3.49 12,815,479.77
07.04.02 RELLENO Y COMPACTADO MATERIAL HOMOGENIO e=0.20 M. M3 2,852,906.01 5.12 14,606,878.77 27,422,358.54

07.05.00 MATERIAL DE FILTRO


07.05.01 TRANSPORTE DE MATERIAL CAMA DE ENROCADO M3 63,696.00 6.88 438,228.48
07.05.02 TRANSPORTE DE MATERIAL FILTRO D< 7.5 KM M3 64,395.00 20.89 1,345,211.55
07.05.04 RELLENO Y COMPACTADO MATERIAL FILTRO e=0.20 M. M3 68,218.49 7.35 501,405.90
07.05.05 RELLENO Y COMPACTADO MATERIAL CAMA DE ENROCADO e=0.20 M. M3 25,478.50 7.34 187,012.19 2,471,858.12

07.06.00 ENROCADOS DE PROTECCION


07.06.01 EXPLOTACION Y DESQUINCHE DE ROCA M3 53,504.85 28.15 1,506,161.53
07.06.02 SELECCION Y PREPARADO DE PIEDRA P/AGUAS ABAJO e=0.30 M max. M3 50,957.00 39.40 2,007,705.80
07.06.03 TRANSPORTE DE ROCA AGUAS ABAJO M3 68,791.95 8.86 609,496.68
07.06.04 ENROCADO DE PROTECCION AGUAS ABAJO M3 50,957.00 18.16 925,379.12 5,048,743.13

07.07.00 AFIRMADO
07.07.01 TRANSPORTE DE MATERIAL PARA AFIRMADO < 1.5 Km M3 1,641.91 6.91 11,345.60
07.07.02 AFIRMADO (RELLENO Y COMPACTADO) M3 1,368.26 9.63 13,176.34 24,521.94

07.08.00 PANTALLA DE CONCRETO AGUAS ARRIBA PRESA E = 0.30M


07.08.01 CONCRETO F'C= 245 Kg/cm2 M3 20,819.07 512.36 10,666,858.71 10,666,858.71

07.09.00 ACERO DE REFUERZO PANTALLA DE PRESA


07.09.01 ACERO DE REFUERZO KG 766,805.22 5.02 3,849,362.20 3,849,362.20

07.10.00 INYECCIONES CORTINA DE CONCRETO


07.10.01 CONCRETO F'C= 245 Kg/cm2 M3 4,159.22 512.36 2,131,017.96 2,131,017.96

07.11.00 SARDINEL DE SEGURIDAD (Corona de Presa)


07.11.01 CONCRETO F'C= 175 Kg/cm2 M3 1,017.39 402.03 409,021.30
07.11.02 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 991.36 49.46 49,032.67
07.11.03 JUNTAS ASFALTICAS M 150.00 11.32 1,698.00
07.11.04 PINTURA ESMALTE EN SARDINELES M 1,081.00 2.00 2,162.00 461,913.97

07.12.00 OTROS EN CUERPO DE PRESA


07.12.01 PRUEBAS DE COMPACTACION PTO 500.00 42.95 21,475.00
07.12.02 TUBERIA DE DRENAJE DEL FILTRO M 540.00 30.48 16,459.20 57,104,484.31

08.00.00 VARIANTE DE CARRETERA


08.01.00 PLATAFORMA
08.01.01 TRAZO Y REPLANTEO KM 0.47 742.39 348.92
08.01.02 CORTE EN MATERIAL SUELTO M3 4,550.91 5.80 26,395.28
08.01.03 MATERIAL DE PRESTAMO LATERAL M3 848.22 6.05 5,131.73
08.01.04 RELLENO Y CONFORMACION DE TERRAPLEN M3 706.85 7.54 5,329.65
08.01.05 ELIMINACION DE MATERIAL CORTE M3 4,612.88 3.45 15,914.44
08.01.06 PERFILADOY COMPACTADO DE SUB RASANTE M2 2,467.56 1.39 3,429.91
08.01.07 LASTRADO e= 0.20 m. M2 598.38 4.04 2,417.46 58,967.39

08.02.00 OBRAS DE ARTE


08.02.01 EXCAVACION MATERIAL SUELTO A MANO M3 82.73 25.26 2,089.76
08.02.02 RELLENO COMPACTADO PARA ESTRUCTURAS CON MATERIAL PROPIO M3 31.79 56.53 1,797.09
08.02.03 ELIMINACION DE MATERIAL EXCEDENTE A MANO M3 61.12 10.54 644.20
08.02.04 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 61.57 49.46 3,045.25
08.02.05 ACERO DE REFUERZO KG 304.00 5.02 1,526.08
08.02.06 CONCRETO F'C= 210 KG/CM2 M3 3.84 436.79 1,677.27
08.02.07 CONCRETO F'C= 175 Kg/cm2 M3 4.86 402.03 1,953.87
08.02.08 CONCRETO F'C= 175 KG/CM2 + 30% PM M3 0.97 272.20 264.03 71,964.94

09.00.00 PONTON
09.01.00 TRAZO Y REPLANTEO M2 333.60 0.65 216.84
09.02.00 EXCAVACION EN MATERIAL SUELTO M3 100.55 5.12 514.82
09.03.00 ENCOFRADO Y DESENCOFRADO PLANO P/ESTRUCTURAS M2 498.72 49.46 24,666.69

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 367
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Cuadro 1.7.20: Presupuesto general alternativa 5 – presa Millo (continuación)


Item Descripción Unidad Metrado Precio Parcial Total
09.04.00 ACERO DE REFUERZO KG 9,239.00 5.02 46,379.78
09.05.00 CONCRETO F'C= 140 KG/CM2 M3 37.90 309.95 11,747.11
09.06.00 CONCRETO F'C= 175 Kg/cm2 M3 36.86 402.03 14,818.83
09.07.00 CONCRETO F'C= 210 KG/CM2 M3 141.80 436.79 61,936.82
09.08.00 BARANDA DE F°G° Ø= 1.5" M 55.60 96.65 5,373.74
09.09.00 TUBOS DE DRENAJE UND 40.00 5.30 212.00
09.10.00 JUNTAS DE DILATACION GLB 1.00 1,107.81 1,107.81 166,974.44

10.00.00 VARIOS
10.01.00 BOMBEO PARA CAUDAL ECOLOGICO HM 540.00 32.92 17,776.80 17,776.80

COSTO DIRECTO 72,078,027.51


GASTOS GENERALES 12% 8,649,363.30
GASTOS DE SUPERVISION 5% 3,603,901.38
UTILIDAD 10 % 7,207,802.75
PRESUPUESTO PARCIAL 91,539,094.94
IGV (19%) 17,392,428.04
PRESUPUESTO TOTAL 108,931,522.98

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 368
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.8

Topografía con GPS Diferencial.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 369
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Toma de Información Preliminar


Una primera incógnita que se debe de despejar es la diferencia de nivel entre la toma
(bocatoma o presa) hasta la zona de llegada del canal estimado, para lo cual se ha tomado
dos puntos con un GPS diferencial. El primer punto fue ubicado en las cercanías de la
intersección de los ríos Jarpaña y Paratia, y el segundo punto fue ubicado en las
inmediaciones de la caseta de vigilancia de la presa Lagunillas (aprox. 25 m), luego de lo
cual se ha procesado esta información.
La diferencia de altura entre el punto tomado y el nivel del fondo del río o nivel máximo
de la Laguna Lagunillas (cota verdadera de toma) es de 5 m.
A continuación se muestra un grafico que explica lo antes descrito.

Pto. 01

Laguna Lagunillas
5m Río Verde
Nivel Máximo de
Desnivel entre puntos 40 m

Pto. 02

5m

Los ítems a y b siguientes describen los argumentos técnicos que han servido de base para

a. GPS Diferencial

El DGPS (Differential GPS), o GPS diferencial, es un sistema que proporciona a los


receptores de GPS correcciones de los datos recibidos de los satélites GPS, con el fin de
proporcionar una mayor precisión en la posición calculada. Se concibió
fundamentalmente debido la introducción de la disponibilidad selectiva (SA).
El fundamento radica en el hecho de que los errores producidos por el sistema GPS
afectan por igual (o de forma muy similar) a los receptores situados próximos entre sí. Los
errores están fuertemente correlacionados en los receptores próximos.
Un receptor GPS fijo en tierra (referencia) que conoce exactamente su posición
basándose en otras técnicas, recibe la posición dada por el sistema GPS, y puede calcular

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 370
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

los errores producidos por el sistema GPS, comparándola con la suya, conocida de
antemano. Este receptor transmite la corrección de errores a los receptores próximos a
él, y así estos pueden, a su vez, corregir también los errores producidos por el sistema
dentro del área de cobertura de transmisión de señales del equipo GPS de referencia.
En suma, la estructura DGPS quedaría de la siguiente manera:
- Estación monitorizada (referencia), que conoce su posición con una precisión muy
alta. Esta estación está compuesta por:
- Un receptor GPS.
- Un microprocesador, para calcular los errores del sistema GPS y para generar la
estructura del mensaje que se envía a los receptores.
- Transmisor, para establecer un enlace de datos unidireccional hacia los receptores
de los usuarios finales.

b. Coordenadas de Puntos de Referencia.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 371
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

FIGURA 1.1
NOMBRE CODIGO LOCALIDAD ESTABLECIDA POR
AUX 2 DG - ENE/29-1 Lagunillas/Juliaca J&MEN/Jnavarro

UBICACIÓN CARACTERISTICAS DE LA MARCA


Lagunillas - JULIACA-PUNO Hito de Concreto con estaca de Fe 5/8" al Centro

NORTE(Y) WGS 84 ESTE(X) (W) WGS 84


8 278 972,611 316 416,8137

NORTE (Y) PSAD-56 ESTE (X) PSAD-56


8 279 345,7290 316 604,9657

ALTURA ELIPSOIDAL (m) ELEVACION ORTOMETRICA


ZONA UTM ORDEN
4 242,4908 4 193,4717 19 B

DESCRIPCION

El Punto Aux 2 esta ubicado en el lado derecho del Rio Verde

MARCA DE ESTACION

El Punto AUX 2, esta en Hito de concreto rectangular

Referencia: Hojas del IGN Cuadrángulos del IGN, 32-u Lagunillas, escala 1 / 100 000,

DESCRITA POR REVISADO OPERACION FECHA


J&MEN/Jnavarro J&MEN/JJ Ing° Juan de Dios Navarro Juliaca, Febrero 2 010

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 372
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

FIGURA 1.2
NOMBRE CODIGO LOCALIDAD ESTABLECIDA POR
BM 101 DG - ENE/29-002 LAGUNILLAS/JULIACA J&MEN/Jnavarro

UBICACIÓN CARACTERISTICAS DE LA MARCA


Lagunillas - Juliaca - PUNO Punto Marcado en Hito de Concreto

NORTE(Y) WGS 84 ESTE(X) (W) WGS 84


8 261 105,939 317 334,4011

NORTE (Y) PSAD-56 ESTE (X) PSAD-56


8 261 479,062 317 522,5216

ALTURA ELIPSOIDAL (m) ELEVACION ORTOMETRICA


ZONA UTM ORDEN
4 219,5694 4 169 ,9152 19 B

DESCRIPCION

El Punto BM 101 se encuentra al centro de Hito de Concreto de 0,50 mts de diametro con la Inscripcion BM 101

MARCA DE ESTACION

Se ha establecido un punto Central el mismo que ha sido señalizado

Referencia: Hojas del IGN Cuadrángulos del IGN, 32-u Lagunillas, escala 1 / 100 000,

DESCRITA POR REVISADO OPERACION FECHA


J&MEN/Jnavarro J&MEN/JJ Ing° Juan de Dios Navarro Juliaca, Febrero 2 010

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 373
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

FIGURA 1.3
NOMBRE CODIGO LOCALIDAD ESTABLECIDA POR
SARACOCHA DG - ENE/29-003 LAGUNILLAS J&MEN/JNavarro

UBICACIÓN CARACTERISTICAS DE LA MARCA


Lagunillas - Juliaca - Puno Roca Pintada con Triangulo al Centro

NORTE(Y) WGS 84 ESTE(X) (W) WGS 84


8 256 796,927 326 106,8528

NORTE (Y) PSAD-56 ESTE (X) PSAD-56


8 257 170,038 326 294,9647

ALTURA ELIPSOIDAL (m) ELEVACION ORTOMETRICA ZONA UTM ORDEN


4 190,0194 4 140,4100 19 B

DESCRIPCION

El Punto Saracocha se encuentra en

MARCA DE ESTACION

Punto Pintado sobre roca con la Inscripcion Saracocha

Referencia: Hojas del IGN Cuadrángulos del IGN, 32-u Lagunillas, escala 1 / 100 000,

DESCRITA POR REVISADO OPERACION FECHA


J&MEN/Jnavarro J&MEN/JJ Ing° Juan de Dios Navarro Juliaca, Febrero 2 010

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 374
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Resumen de procesamiento

Información del proyecto

Nombre del proyecto: Juliaca 2010

Fecha de creación: 02/02/2010 09:37:27

Huso horario: -5h 00'

Sistema de coordenadas: psad56 utm 19

Programa de aplicación: LEICA Geo Office 6.0

Fecha y hora de inicio: 01/29/2010 11:00:45

Fecha y hora de término: 01/29/2010 18:34:45

Puntos ocupados manualmente: 3

Kernel de procesamiento: PSI-Pro 2.0

Procesado: 02/02/2010 09:40:56

Parámetros de procesamiento

Parámetros Selección

Ángulo de elevación: 10°

Tipo de efemérides: Transmitidas

Tipo de solución: Automático

Tipo GNSS: GPS

Frecuencia: Automático

Fijar ambigüedades hasta: 150 km

Duración mínima para solución flotante (estático): 5' 00"

Intervalo de muestreo: Usar todas

Modelo troposférico: Hopfield

Modelo ionosférico: Automático

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 375
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Emplear modelo estocástico: Sí

Dist. mínima: 8 km

Actividad ionosférica: Automático

Inf. general de línea base

AREQ - aux2 Referencia: AREQ Móvil: aux2

Tipo de receptor / N/S: ASHTECHUZ-12 / ZR220010401 SR510 / 10058

Tipo de antena / N/S: AOAD/M_T JPLA / 294 AT501 Tripod / -

Altura de antena: 0.0610 m 0.9190 m

Coordenadas:

Latitud: 16° 27' 55.85185" S 15° 33' 36.82971" S

Longitud: 71° 29' 34.05004" W 70° 42' 43.02553" W

Alt Elip.: 2488.9340 m 4242.4909 m

Tipo de solución: Flotante

Tipo GNSS: GPS

Frecuencia: Sólo L1

Ambigüedad: No

Intervalo de observación: 01/29/2010 11:00:45 - 01/29/2010 12:32:15

Duración: 1h 31' 30"

Calidad: Desv. Est. Lat: 0.0003 m Desv. Est. Lon: 0.0002 m Desv. Est. Alt.: 0.0018 m

Q Posic.: 0.0003 m Desv. Est. geom.: 0.0002 m

Vector de línea base: DLat: 0° 54' 19.02214" DLon: 0° 46' 51.02451" DAlt: 1753.5569 m

Geométrica: 130537.5783 m

DOPs (mín-máx): GDOP: 2.5 - 7.5

PDOP: 2.2 - 6.7 HDOP: 0.9 - 1.5 VDOP: 2.0 - 6.5

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 376
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

AREQ - bm101 Referencia: AREQ Móvil: bm101

Tipo de receptor / N/S: ASHTECHUZ-12 / ZR220010401 SR510 / 10058

Tipo de antena / N/S: AOAD/M_T JPLA / 294 AT501 Tripod / -

Altura de antena: 0.0610 m 0.9540 m

Coordenadas:

Latitud: 16° 27' 55.85185" S 15° 43' 18.30849" S

Longitud: 71° 29' 34.05004" W 70° 42' 17.04258" W

Alt Elip.: 2488.9340 m 4219.5695 m

Tipo de solución: Flotante

Tipo GNSS: GPS

Frecuencia: Sólo L1

Ambigüedad: No

Intervalo de observación: 01/29/2010 15:11:15 - 01/29/2010 16:43:15

Duración: 1h 32' 00"

Calidad: Desv. Est. Lat: 0.0005


Desv. Est. Lon: 0.0004 m Desv. Est. Alt.: 0.0020 m
m

Q Posic.: 0.0006 m Desv. Est. geom.: 0.0002 m

Vector de DLat: 0° 44' 37.54336" DLon: 0° 47' 17.00746" DAlt: 1730.6355 m


línea base:
Geométrica: 117895.2438 m

DOPs (mín- GDOP: 2.2 - 4.2


máx):
PDOP: 1.9 - 3.5 HDOP: 0.8 - 1.3 VDOP: 1.7 - 3.2

AREQ - saracocha Referencia: AREQ Móvil: saracocha

Tipo de receptor / N/S: ASHTECHUZ-12 / ZR220010401 SR510 / 10058

Tipo de antena / N/S: AOAD/M_T JPLA / 294 AT501 Tripod / -

Altura de antena: 0.0610 m 0.9100 m

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 377
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

Coordenadas:

Latitud: 16° 27' 55.85185" S 15° 45' 40.74041" S

Longitud: 71° 29' 34.05004" W 70° 37' 23.51317" W

Alt Elip.: 2488.9340 m 4190.0194 m

Tipo de solución: Flotante

Tipo GNSS: GPS

Frecuencia: Sólo L1

Ambigüedad: No

Intervalo de observación: 01/29/2010 17:34:45 - 01/29/2010 18:34:45

Duración: 1h 00' 00"

Calidad: Desv. Est. Lat: 0.0005 m Desv. Est. Lon: 0.0028 m Desv. Est. Alt.: 0.0017 m

Q Posic.: 0.0028 m Desv. Est. geom.: 0.0021 m

Vector de línea base: DLat: 0° 42' 15.11144" DLon: 0° 52' 10.53687" DAlt: 1701.0854 m

Geométrica: 121423.6336 m

DOPs (mín-máx): GDOP: 2.6 - 5.4

PDOP: 2.2 - 4.3 HDOP: 1.2 - 1.9 VDOP: 1.9 - 3.9

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 378
Proyecto Especial Binacional Lago Titicaca Dirección de Estudios

ANEXO 1.9

Planos.

ESTUDIO HIDROLOGICO DEL SISTEMA INTEGRAL LAGUNILLAS


Componente 1 379