Sie sind auf Seite 1von 28

DOCUMENT REGISTER TO PETROCIL

Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
DANEM-PETROCIL-
1
TRANS-0001
Minutes of Meeting of Kick Off Meeting 23-Feb-19

DANEM-PETROCIL- CLARIFICATION FROM FPC REGARDING COOLING


2 PEC-002 28-Feb-19
TRANS-0002 WATER REQUIREMENT FOR TANK ROOF COOLING
DANEM-PETROCIL- 93092-PRS-TQ- Clarification from QAPCO for P&ID and DESIGN BASIS
3
TRANS-0003 0001
0 4-Mar-19
Queries
DANEM-PETROCIL-
4
TRANS-0004
PEC-004 Comments on PLOT PLAN 11-Mar-19

QV-1S-VEN-Y15-
DANEM-PETROCIL- 14400917-0006 Comments on Design Basis & Study Report for Pile
5
TRANS-0005 QV-00-VEN-C02- Foundation Optimization
0 12-Mar-19
14400917-0001
DANEM-PETROCIL-
6
TRANS-0006
PEC-005 Technical query from Hempel 12-Mar-19

DANEM-PETROCIL-
7
TRANS-0007
PEC-006 QAPCO PLANT EXISTING LAYOUT (AutoCAD files) 13-Mar-19

DANEM-PETROCIL- QV-1S-VEN-E81-
8 HAZARDOUS AREA CLASSIFICATION 0 14-Mar-19
TRANS-0008 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-E60-
9 CABLE TRENCH SECTION DETAILS 0 14-Mar-19
TRANS-0008 14400917-0001

DANEM-PETROCIL- CRS_QAP-DANM- CRS - STUDY REPORT FOR PILE FOUNDATION


10 0 14-Mar-19
TRANS-0009 0002 OPTIMIZATION

DANEM-PETROCIL- CRS_QAP-DANM- CRS - STUDY REPORT FOR PILE FOUNDATION


11 1 18-Mar-19
TRANS-0010 0002 OPTIMIZATION

Page 1 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
DANEM-PETROCIL- QV-1S-VEN-Y66-
12 COMMENTS ON GENERAL DRAWING NOTES 0 18-Mar-19
TRANS-0011 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-Y50- COMMENTS ON SPECIFICATIONS FOR CIVIL & STRUCTURAL


13 0 19-Mar-19
TRANS-0012 14400917-0001 WORKS

DANEM-PETROCIL- QV-1S-VEN-Y60- COMMENTS FROM QAPCO FOR BLOWER FOUNDATION


14 0 21-Mar-19
TRANS-0013 14400917-0003 DETAILS

DANEM-PETROCIL- QV-1S-VEN-Y15- COMMENTS FROM QAPCO FOR FOUNDATION DESIGN


15 0 21-Mar-19
TRANS-0013 14400917-0002 REPORT FOR BLOWER

DANEM-PETROCIL- QV-1S-VEN-C16- APPROVAL FROM QAPCO FOR DYKE VOLUME


16 0 21-Mar-19
TRANS-0014 14400917-0001 CALCULATION REPORT

DANEM-PETROCIL- QV-1S-VEN-Y50- DANEM COMMENTS ON SPECIFICATIONS FOR CIVIL &


17 0 25-Mar-19
TRANS-0015 14400917-0001 STRUCTURAL WORKS AND PEC RESPONSE ON COMMENTS

DANEM-PETROCIL- QV-1S-VEN-C16- APPROVAL FROM QAPCO FOR DYKE VOLUME


18 1 27-Mar-19
TRANS-0016 14400917-0001 CALCULATION REPORT

DANEM-PETROCIL- QV-1S-VEN-Y02- COMMENTS FROM QAPCO ON STRUCTURAL DESIGN BASIS


19 0 27-Mar-19
TRANS-0017 14400917-0001 FOR TANK FOUNDATION

DANEM-PETROCIL- 93092-INS-TQ- COMMENTS FROM QAPCO ON EDC VENT BLOWER VENDOR


20 0 30-Mar-19
TRANS-0018 0002 SIGNALS-TECHNICAL QUERY

DANEM-PETROCIL- 93092-PIP-TQ- COMMENT FROM QAPCO ON TECHNICAL QUERIES FOR


21 0 1-Apr-19
TRANS-0019 0001 PIPING

DANEM-PETROCIL- 93092-HSE-TQ- COMMENT FROM QAPCO ON TECHNICAL QUERIES FOR


22 0 1-Apr-19
TRANS-0019 0001 HSE

DANEM-PETROCIL- QV-1S-VEN-P56-
23 COMMENT FROM QAPCO ON PLOT PLAN 1 1-Apr-19
TRANS-0020 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-C16- COMMENT FROM QAPCO ON DYKE VOLUME CALCULATION


24 A 3-Apr-19
TRANS-0021 14400917-0001 REPORT

Page 2 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
DANEM-PETROCIL- 93092-PIP-TQ-
25 COMMENT FROM QAPCO ON PIPING TECHNICAL QUERY 0 6-Apr-19
TRANS-0022 0002

DANEM-PETROCIL- QV-00-VEN-M60- COMMENT FROM DANEM ON NAME PLATE DETAILS-SHT 01


26 0 7-Apr-19
TRANS-0023 14400917-0008 OF 01

DANEM-PETROCIL- QV-1S-TPI-C78-
27 PID FOR EDC STORAGE & LOADING FACILITIES STORAGE 0 12-Apr-19
TRANS-0024 03906-0001

DANEM-PETROCIL- QV-1S-TPI-C78-
28 PID FOR EDC STORAGE & LOADING FACILITIES STORAGE 0 12-Apr-19
TRANS-0024 03906-0002

DANEM-PETROCIL- QVC-2V-UD-C78-
29 PID FOR BATTERY LIMIT SALES EDC STORAGE 0 12-Apr-19
TRANS-0024 00026

DANEM-PETROCIL- QVC-2V-UD-C78-
30 PID FOR INTER-CONNECTION CAUSTIC STORAGE 0 12-Apr-19
TRANS-0024 00027

DANEM-PETROCIL- QVC-2V-UD-C78-
31 PID FOR SALES GRADE EDC STORAGE TANK 0 12-Apr-19
TRANS-0024 00019

DANEM-PETROCIL- QVC-1U-VEN-C78-
32 PID FOR INSTRUMENT AIR HEADER 0 12-Apr-19
TRANS-0024 00001

DANEM-PETROCIL- 93092-HSE-TQ- COMMENT FROM QAPCO FOR FPC REVIEW REPORT-


33 0 12-Apr-19
TRANS-0025 0002 TECHNICAL QUERIES
COMMENT FROM QAPCO FOR PRELIMINARY FOUNDATION
DANEM-PETROCIL- QV-00-VEN-Y15-
34 DESIGN REPORT FOR EDC SALES TANK WITH 0 14-Apr-19
TRANS-0026 14400917-0001
ATTACHMENTS
DANEM-PETROCIL- QV-1S-VEN-C16- COMMENT FROM QAPCO ON DYKE VOLUME CALCULATION
35 A 14-Apr-19
TRANS-0027 14400917-0001 REPORT

DANEM-PETROCIL- QV-00-VEN-I54- COMMENT FROM QAPCO ON DATASHEET FOR FLOW


36 0 16-Apr-19
TRANS-0028 14400917-0012 INDICATOR

DANEM-PETROCIL- QV-00-VEN-M58-
37 GA DRAWING FOR NEW SALES EDC TANK 0 16-Apr-19
TRANS-0029 14400917-0001

Page 3 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
ADDITIONAL COMMENT FROM QAPCO FOR PRELIMINARY
DANEM-PETROCIL- QV-00-VEN-Y15-
38 FOUNDATION DESIGN REPORT FOR EDC SALES TANK WITH 0 17-Apr-19
TRANS-0030 14400917-0001
ATTACHMENTS

DANEM-PETROCIL- QV-00-VEN-M16- COMMENT FROM QAPCO ON DESIGN CALCULATION FOR


39 0 18-Apr-19
TRANS-0031 14400917-0001 NEW EDC SALES TANK

DANEM-PETROCIL- PLANT LAYOUT WITH GLOBAL COORDINATES OF DYKE


40 PEC-007 0 21-Apr-19
TRANS-0032 WALL INNER CORNER POINTS

DANEM-PETROCIL- QV-1S-VEN-C16-
41 PVV SIZING CALCULATION 0 22-Apr-19
TRANS-0033 14400917-0002

DANEM-PETROCIL- QV-1S-VEN-E81-
42 HAZARDOUS AREA CLASSIFICATION 0 23-Apr-19
TRANS-0034 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-I50- SPECIFICATION FOR INSTRUMENT CABLES AND JUNCTION


43 0 23-Apr-19
TRANS-0035 14400917-0001 BOXES

DANEM-PETROCIL- 93092-INS-TQ- REQUEST FOR VENDOR DETAILS OF PROCURED


44 0 23-Apr-19
TRANS-0036 0004 INSTRUMENTS

DANEM-PETROCIL- QV-1S-VEN-I54-
45 DATASHEET FOR RESTRICTION ORIFICE 0 22-Apr-19
TRANS-0037 14400917-0010

DANEM-PETROCIL- QV-1S-VEN-I19- COMMENTS FROM QAPCO ON ALARM & TRIP SET POINT
46 0 24-Apr-19
TRANS-0038 14400917-0002 LIST

DANEM-PETROCIL- QV-1S-VEN-C19-
47 COMMENTS FROM QAPCO ON UTILITY CONSUMPTION LIST 0 24-Apr-19
TRANS-0039 14400917-0002

DANEM-PETROCIL- 93092-PIP-TQ-
48 COMMENT FROM QAPCO ON PIPING TECHNICAL QUERY 1 24-Apr-19
TRANS-0040 0002

DANEM-PETROCIL- QV-1S-VEN-P54-
49 COMMENT FROM QAPCO ON DATA SHEET FOR BALL VALVE 0 25-Apr-19
TRANS-0041 14400917-0004

DANEM-PETROCIL- QV-1S-VEN-P54- COMMENT FROM QAPCO ON DATA SHEET FOR BUTTERFLY


50 0 25-Apr-19
TRANS-0041 14400917-0005 VALVE

Page 4 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
DANEM-PETROCIL- QV-1S-VEN-P54- COMMENT FROM QAPCO ON DATA SHEET FOR CHECK
51 0 25-Apr-19
TRANS-0041 14400917-0003 VALVE

DANEM-PETROCIL- QV-1S-VEN-P54-
52 COMMENT FROM QAPCO ON DATA SHEET FOR GATE VALVE 0 25-Apr-19
TRANS-0041 14400917-0002

DANEM-PETROCIL- QV-1S-VEN-P54-
53 COMMENT FROM QAPCO ON DATA SHEET FOR PLUG VALVE 0 25-Apr-19
TRANS-0041 14400917-0006

DANEM-PETROCIL- 93092-INS-TQ- COMMENT FROM QAPCO ON EDC VENT BLOWER VENDOR


54 1 25-Apr-19
TRANS-0042 0002 SIGNALS-TECHNICAL QUERY

DANEM-PETROCIL- QV-00-VEN-C15-
55 COMMENT FROM QAPCO ON CONTROL VALVE SIZING 0 25-Apr-19
TRANS-0043 14400917-0001

DANEM-PETROCIL- 93092-INS-TQ- COMMENT FROM QAPCO ON POWER SUPPLY FOR RADAR


56 0 27-Apr-19
TRANS-0044 0005 TYPE LEVEL TRANSMITTERS

DANEM-PETROCIL- QV-1S-VEN-P58-
57 COMMENT FROM QAPCO ON EQUIPMENT LOCATION PLAN 0 27-Apr-19
TRANS-0045 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-Y15- COMMENT FROM DANEM ON L-SHAPED WALL DESIGN


58 1 30-Apr-19
TRANS-0046 14400917-0005 REPORT

DANEM-PETROCIL- 93092-PRS-CRS-
59 CRS-PVV SIZING CALCULATION 0 30-Apr-19
TRANS-0047 0004

DANEM-PETROCIL- QV-1S-VEN-Y60- APPROVAL FROM QAPCO FOR FOAM PUMP FOUNDATION


60 1 30-Apr-19
TRANS-0048 14400917-0005 DETAILS-SHT 1 OF 1

DANEM-PETROCIL- QV-1S-VEN-Y60- COMMENT FROM DANEM ON L-SHAPED WALL DETAILS-SHT


61 1 1-May-19
TRANS-0049 14400917-0006 01 TO 02

DANEM-PETROCIL- QV-1S-VEN-Y15- COMMENT FROM DANEM ON L-SHAPED WALL DESIGN


62 1 1-May-19
TRANS-0049 14400917-0005 REPORT

DANEM-PETROCIL- QV-1S-VEN-I54- COMMENT FROM QAPCO ON DATASHEET FOR PRESSURE


63 0 1-May-19
TRANS-0050 14400917-0005 VACUUM RELIEF VALVE

Page 5 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date
DANEM-PETROCIL- QV-1S-VEN-I54- COMMENT FROM QAPCO ON DATASHEET FOR CONTROL
64 0 1-May-19
TRANS-0050 14400917-0009 VALVE

DANEM-PETROCIL- QV-1S-VEN-I54- COMMENT FROM QAPCO ON DATASHEET FOR RELIEF


65 0 2-May-19
TRANS-0051 14400917-0003 VALVE

DANEM-PETROCIL- 93092-INS-TQ-
66 F&G SCOPE AND QAPCO INPUTS 0 2-May-19
TRANS-0052 0001

DANEM-PETROCIL- QVC-2V-UD-C72- COMMENT FROM QAPCO ON PROCESS FLOW DIAGRAM


67 0 5-May-19
TRANS-0053 00005 NO. 3901 SALES EDC-STORAGE

DANEM-PETROCIL- QV-00-VEN-C02-
68 COMMENT FROM QAPCO ON DESIGN BASIS 0 5-May-19
TRANS-0054 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-I18- COMMENT FROM QAPCO ON INSTRUMENT JUNCTION BOX


69 0 5-May-19
TRANS-0055 14400917-0002 SCHEDULE

DANEM-PETROCIL- QV-1S-VEN-I71- COMMENT FROM QAPCO ON INSTRUMENT HOOK-UP


70 0 5-May-19
TRANS-0056 14400917-0001 DIAGRAM

DANEM-PETROCIL- QV-1S-VEN-P50- COMMENT FROM QAPCO ON PIPING MATERIAL


71 0 5-May-19
TRANS-0057 14400917-0001 SPECIFICATION

DANEM-PETROCIL- QV-1S-VEN-P56-
72 COMMENTS FROM PLOT PLAN 2 9-May-19
TRANS-0058 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-E60-
73 EARTHING LAYOUT-SHT 01 OF 01 0 9-May-19
TRANS-0059 14400917-0002

DANEM-PETROCIL- QV-1S-VEN-E57-
74 ELECTRICAL EQUIPMENT LAYOUT-SHT 01 OF 01 0 9-May-19
TRANS-0059 14400917-0001

DANEM-PETROCIL- QV-1S-VEN-E56-
75 LIGHTING LAYOUT-SHT 01 OF 01 0 9-May-19
TRANS-0059 14400917-0001

Page 6 of 28
Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
TANK IN QAPCO VINYL PLANT
Subm. Petrocil
Sl. No. Transmittal No. Document No. Description Rev.
Date Reply Date

Page 7 of 28
T REGISTER TO PETROCIL

MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC


IN QAPCO VINYL PLANT
Remarks

Page 8 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 9 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 10 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 11 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 12 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 13 of 28
MENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC
IN QAPCO VINYL PLANT
Remarks

Page 14 of 28
DOCUMENT REGISTER FROM PETROCIL

Contract: 7000010671 – ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF NEW SALES EDC TANK IN QAPCO
VINYL PLANT
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-Y15- STUDY REPORT FOR PILE FOUNDATION T-DANM-QAP-0005 Email from Aly dated
1 93092-PEC-TR-0001 0 26-Feb-19
14400917-0006 OPTIMIZATION dated 27/02/19 28/02/19
BASIC CALCULATION DETAILS FOR PILE
SELECTION (SUPPORTING DOCUMENT FOR T-DANM-QAP-0006 Email from Aly dated
2 0 27-Feb-19
STUDY REPORT FOR PILE FOUNDATION dated 28/02/19 28/02/19
OPTIMIZATION)
93092-PRS-TQ- T-DANM-QAP-0007 T-QAP-DANM-0003 Trans 03 dated
3 93092-PEC-TR-0002 P&ID-TECHNICAL QUERY 0 26-Feb-19
0001 dated 28/02/19 dated 04/03/19 04/03/19

4 93092-PEC-TR-0003 MINUTES OF MEETING-PEC commented 27-Feb-19

93092-PRJ-MOM-
5 93092-PEC-TR-0004 DANEM-PEC-MINUTES OF MEETING 27-Feb-19
0001

93092-PRJ-MOM- DANEM-PEC-MINUTES OF MEETING_SITE


6 93092-PEC-TR-0004 27-Feb-19
0002 VISIT

93092-PRS-TQ- T-DANM-QAP-0007 T-QAP-DANM-0003 Trans 03 dated


7 93092-PEC-TR-0005 DESIGN BASIS-TECHNICAL QUERY 0 27-Feb-19
0002 dated 28/02/19 dated 04/03/19 04/03/19

QV-1S-VEN-P56- T-DANM-QAP-0011 T-QAP-DANM-0005 Trans 04 dated


8 93092-PEC-TR-0006 PLOT PLAN 0 28-Feb-19
14400917-0001 dated 04/03/19 dated 07/03/19 11/03/19

QV-00-VEN-E19- T-DANM-QAP-0008 T-QAP-DANM-0006


9 93092-PEC-TR-0007 ELECTRICAL LOAD LIST 28-Feb-19
14400917-0001 dated 03/03/19 dated 07/03/19

QV-00-VEN-E50- SPECIFICATION FOR ELECTRICAL BULK T-DANM-QAP-0008 T-QAP-DANM-0006


10 93092-PEC-TR-0007 0 28-Feb-19
14400917-0002 MATERIALS dated 03/03/19 dated 07/03/19

QV-00-VEN-E50- T-DANM-QAP-0008 T-QAP-DANM-0006


11 93092-PEC-TR-0007 SPECIFICATION FOR LV CABLE 28-Feb-19
14400917-0001 dated 03/03/19 dated 07/03/19

QV-00-VEN-E54- T-DANM-QAP-0008 T-QAP-DANM-0006


12 93092-PEC-TR-0007 DATASHEET FOR LV CABLE 0 28-Feb-19
14400917-0001 dated 03/03/19 dated 07/03/19

Page 15 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-E16- T-DANM-QAP-0008 T-QAP-DANM-0006


13 93092-PEC-TR-0007 CABLE SIZING CALCULATION 0 28-Feb-19
14400917-0001 dated 03/03/19 dated 07/03/19

T-DANM-QAP-0009 T-QAP-DANM-0053 Trans 52 dated


14 93092-PEC-TR-0008 93092-INS-TQ-0001 F&G SCOPE AND QAPCO INPUTS 0 2-Mar-19
dated 03/03/19 dated 24/03/19 02/05/19

QV-1S-VEN-Y60- T-DANM-QAP-0010 T-QAP-DANM-0004


15 93092-PEC-TR-0009 L-SHAPED WALL DETAILS 0 2-Mar-19
14400917-0006 dated 03/03/19 dated 07/03/19

QV-1S-VEN-Y60- T-DANM-QAP-0010 T-QAP-DANM-0004


16 93092-PEC-TR-0009 FOAM PUMP FOUNDATION DETAILS 0 2-Mar-19
14400917-0005 dated 03/03/19 dated 07/03/19

QV-1S-VEN-Y15- T-DANM-QAP-0010 T-QAP-DANM-0004


17 93092-PEC-TR-0009 L-SHAPED WALL DESIGN REPORT 0 2-Mar-19
14400917-0005 dated 03/03/19 dated 07/03/19

93092-PRJ-SCH-
18 93092-PEC-TR-0010 PROJECT SCHEDULE 2-Mar-19
0001

QV-1S-VEN-P58- T-DANM-QAP-0014 T-QAP-DANM-0044 Trans 45 dated


19 93092-PEC-TR-0011 EQUIPMENT LOCATION PLAN 0 6-Mar-19
14400917-0001 dated 06/03/19 dated 16/04/19 27/04/19

QV-1S-VEN-Y15- STUDY REPORT FOR PILE FOUNDATION T-DANM-QAP-0015 T-QAP-DANM-0008 Trans 05 dated
20 93092-PEC-TR-0012 1 6-Mar-19
14400917-0006 OPTIMIZATION dated 07/03/19 dated 12/03/19 12/03/19

T-QAP-DANM-0008
QV-00-VEN-C02- T-DANM-QAP-0015 Trans 54 dated
21 93092-PEC-TR-0013 DESIGN BASIS 0 6-Mar-19 dated 12/03/19
14400917-0001 dated 07/03/19 05/05/19
T-QAP-DANM-0062

T-DANM-QAP-0022 T-QAP-DANM-0018 Trans 19 dated


22 93092-PEC-TR-0014 93092-PIP-TQ-0001 PIPING -TECHNICAL QUERY 0 14-Mar-19
dated 14/03/19 dated 25/03/19 01/04/19

93092-HSE-TQ- T-DANM-QAP-0025 T-QAP-DANM-0018 Trans 19 dated


23 93092-PEC-TR-0014 HSE -TECHNICAL QUERY 0 14-Mar-19
0001 dated 14/03/19 dated 25/03/19 01/04/19

T-DANM-QAP-0024
24 93092-PEC-TR-0014 93092-INS-TQ-0003 E&I NEED LIST -TECHNICAL QUERY 14-Mar-19
dated 14/03/19

QVC-1S-VEN-C72- T-DANM-QAP-0020
25 93092-PEC-TR-0015 SCD FOR SALES GRADE EDC STORAGE TANK 0 7-Mar-19
00001 dated 11/03/19

QVC-2V-UD-C72- PROCESS FLOW DIAGRAM NO. 3901 SALES T-DANM-QAP-0020 T-QAP-DANM-0063 Trans 53 dated
26 93092-PEC-TR-0015 0 7-Mar-19
00005 EDC-STORAGE dated 11/03/19 dated 29/04/19 05/05/19

QV-1S-VEN-Y50- SPECIFICATIONS FOR CIVIL & STRUCTURAL Comment mailed on


27 93092-PEC-TR-0016 0 8-Mar-19
14400917-0001 WORKS 19/03/19

93092-PRJ-SCH-
28 93092-PEC-TR-0017 PROJECT SCHEDULE 8-Mar-19
0001

Page 16 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

93092-PRJ-EDDR-
29 93092-PEC-TR-0017 PROJECT EDDR 0 8-Mar-19
0001

QV-1S-VEN-E60- T-DANM-QAP-0019
30 93092-PEC-TR-0018 INSTALLATION DETAILS 0 8-Mar-19
14400917-0003 dated 11/03/19

QV-1S-VEN-E81- T-DANM-QAP-0019 T-QAP-DANM-0009 Trans 08 dated


31 93092-PEC-TR-0018 HAZARDOUS AREA CLASSIFICATION 0 8-Mar-19
14400917-0001 dated 11/03/19 dated 14/03/19 14/03/19

QV-1S-VEN-E60- T-DANM-QAP-0019 T-QAP-DANM-0009 Trans 08 dated


32 93092-PEC-TR-0018 CABLE TRENCH SECTION DETAILS 0 8-Mar-19
14400917-0001 dated 11/03/19 dated 14/03/19 14/03/19

QV-1S-VEN-E71- SINGLE LINE DIAGRAM MODIFICATION FOR T-DANM-QAP-0019


33 93092-PEC-TR-0018 0 8-Mar-19
14400917-0003 EMERGENCY LIGHTING DB dated 11/03/19

QV-1S-VEN-E71- SINGLE LINE DIAGRAM MODIFICATION T-DANM-QAP-0019


34 93092-PEC-TR-0018 0 8-Mar-19
14400917-0002 LIGHTING DB dated 11/03/19

QV-1S-VEN-E71- T-DANM-QAP-0019
35 93092-PEC-TR-0018 SINGLE LINE DIAGRAM MODIFICATION MCC 0 8-Mar-19
14400917-0001 dated 11/03/19

QV-1S-VEN-Y60- T-DANM-QAP-0023 T-QAP-DANM-0014 Trans 13 dated


36 93092-PEC-TR-0019 BLOWER FOUNDATION DETAILS 0 8-Mar-19
14400917-0003 dated 11/03/19 dated 21/03/19 21/03/19

QV-1S-VEN-Y15- T-DANM-QAP-0023 T-QAP-DANM-0014 Trans 13 dated


37 93092-PEC-TR-0020 FOUNDATION DESIGN REPORT FOR BLOWER 0 8-Mar-19
14400917-0002 dated 11/03/19 dated 21/03/19 21/03/19

QV-1S-TPI-C78- PID FOR EDC STORAGE & LOADING FACILITIES T-DANM-QAP-0035 T-QAP-DANM-0036
38 93092-PEC-TR-0021 13-Mar-19
03906-0001 STORAGE dated 21/03/19 dated 09/04/19

QV-1S-TPI-C78- PID FOR EDC STORAGE & LOADING FACILITIES T-DANM-QAP-0035


39 93092-PEC-TR-0021 0 13-Mar-19
03906-0002 STORAGE dated 21/03/19

QVC-2V-UD-C78- T-DANM-QAP-0035 T-QAP-DANM-0036 Trans 24 dated


40 93092-PEC-TR-0021 PID FOR BATTERY LIMIT SALES EDC STORAGE 13-Mar-19
00026 dated 21/03/19 dated 09/04/19 12/04/19

QVC-2V-UD-C78- PID FOR INTER-CONNECTION CAUSTIC T-DANM-QAP-0035 T-QAP-DANM-0036 Trans 24 dated


41 93092-PEC-TR-0021 13-Mar-19
00027 STORAGE dated 21/03/19 dated 09/04/19 12/04/19

93092-PRS-CRS- T-DANM-QAP-0090
42 93092-PEC-TR-0022 CRS-TECHNICAL QUERY FROM HEMPEL 13-Mar-19
0001 dated 24/03/19

CRS_QAP-DANM-
43 93092-PEC-TR-0023 CRS - FOAM PUMP & L -SHAPED WALL DETAILS 13-Mar-19
0001

QV-00-VEN-M58- T-DANM-QAP-0027 T-QAP-DANM-0020 Trans 29 dated


44 93092-PEC-TR-0024 GA DRAWING FOR NEW SALES EDC TANK 13-Mar-19
14400917-0001 dated 17/03/19 dated 26/03/19 16/04/19

Page 17 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

T-QAP-DANM-0026
QV-00-VEN-M16- DESIGN CALCULATION FOR NEW EDC SALES T-DANM-QAP-0028 Trans 31 dated
45 93092-PEC-TR-0024 0 13-Mar-19 dated 28/03/19
14400917-0001 TANK dated 17/04/19 18/04/19
T-QAP-DANM-0046

QVC-2V-UD-C78- T-DANM-QAP-0035
46 93092-PEC-TR-0025 PID FOR SALES GRADE EDC STORAGE TANK 0 14-Mar-19
00019 dated 21/03/19

EDC VENT BLOWER VENDOR SIGNALS- Danem Comment Trans 18 dated


47 93092-PEC-TR-0026 93092-INS-TQ-0002 0 14-Mar-19
TECHNICAL QUERY mailed on 30/03/19 30/03/19

CRS_QAP-DANM- CRS - STUDY REPORT FOR PILE FOUNDATION


48 93092-PEC-TR-0027 14-Mar-19
0002 OPTIMIZATION

QV-1S-VEN-P56- T-DANM-QAP-0026 T-QAP-DANM-0019 Trans 20 dated


50 93092-PEC-TR-0028 PLOT PLAN 1 14-Mar-19
14400917-0001 dated 16/03/19 dated 25/03/19 01/04/19

93092-PIP-CRS-
51 93092-PEC-TR-0028 CRS-PLOT PLAN 14-Mar-19
0001

QV-1S-VEN-C16- T-DANM-QAP-0030 T-QAP-DANM-0022 Trans 14 dated


52 93092-PEC-TR-0029 DYKE VOLUME CALCULATION REPORT 0 15-Mar-19
14400917-0001 dated 19/03/19 dated 27/03/19 21/03/19

93092-PRJ-MOM- DANEM-PEC-MINUTES OF MEETING_CIVIL CRS


53 93092-PEC-TR-0030 15-Mar-19
0003 14-03-2019

QV-1S-VEN-Y66-
54 93092-PEC-TR-0031 GENERAL DRAWING NOTES 0 15-Mar-19
14400917-0001

CRS_QAP-DANM- CRS - STUDY REPORT FOR PILE FOUNDATION


55 93092-PEC-TR-0032 1 15-Mar-19
0002 OPTIMIZATION

93092-HSE-TQ- T-DANM-QAP-0048 T-QAP-DANM-0037 Trans 25 dated


56 93092-PEC-TR-0033 FPC REVIEW REPORT-TECHNICAL QUERIES 0 16-Mar-19
0002 dated 31/03/19 dated 09/04/19 12/04/19

QV-00-VEN-C15- T-DANM-QAP-0075 T-QAP-DANM-0060 Trans 43 dated


57 93092-PEC-TR-0034 CONTROL VALVE SIZING 0 20-Mar-19
14400917-0001 dated 18/04/19 dated 24/04/19 25/04/19

CRS_QAP-DANM- CRS - STUDY REPORT FOR PILE FOUNDATION


58 93092-PEC-TR-0035 2 18-Mar-19
0002 OPTIMIZATION - ATTACHMENTS

QV-1S-VEN-Y66-
59 93092-PEC-TR-0036 GENERAL DRAWING NOTES 1 18-Mar-19
14400917-0001

QVC-1U-VEN-C78- T-DANM-QAP-0035 T-QAP-DANM-0036 Trans 24 dated


60 93092-PEC-TR-0037 PID FOR INSTRUMENT AIR HEADER 0 18-Mar-19
00001 dated 21/03/19 dated 09/04/19 12/04/19

QV-1S-VEN-I50- SPECIFICATION FOR INSTRUMENT CABLES AND T-DANM-QAP-0033 T-QAP-DANM-0028 Trans 35 dated
61 93092-PEC-TR-0038 0 19-Mar-19
14400917-0001 JUNCTION BOXES dated 19/03/19 dated 02/04/19 23/04/19

Page 18 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-Y66- T-DANM-QAP-0032
62 93092-PEC-TR-0039 GENERAL DRAWING NOTES 0 19-Mar-19
14400917-0001 dated 19/03/19

QV-00-VEN-I19- T-DANM-QAP-0038 T-QAP-DANM-0030


63 93092-PEC-TR-0040 INSTRUMENTATION INDEX 0 20-Mar-19
14400917-0001 dated 23/03/19 dated 02/04/19

T-DANM-QAP-0047 T-QAP-DANM-0034 Trans 40 dated


64 93092-PEC-TR-0041 93092-PIP-TQ-0002 PIPING TECHNICAL QUERY 0 20-Mar-19
dated 30/03/19 dated 06/04/19 24/04/19

QV-1S-VEN-I19- T-DANM-QAP-0040 T-QAP-DANM-0038 Trans 38 dated


65 93092-PEC-TR-0042 ALARM & TRIP SET POINT LIST 0 21-Mar-19
14400917-0002 dated 23/03/19 dated 09/04/19 24/04/19

QV-1S-VEN-Y02- STRUCTURAL DESIGN BASIS FOR TANK T-DANM-QAP-0036 T-QAP-DANM-0021 Trans 17 dated
66 93092-PEC-TR-0043 0 21-Mar-19
14400917-0001 FOUNDATION dated 21/03/19 dated 27/03/19 27/03/19

QV-1S-VEN-Y50- SPECIFICATIONS FOR CIVIL & STRUCTURAL Comment mailed on Not required QAPCO
67 93092-PEC-TR-0044 0 22-Mar-19 submission
14400917-0001 WORKS AND PEC RESPONSE ON COMMENTS 25/03/19

QV-1S-VEN-E81- T-DANM-QAP-0039 T-QAP-DANM-0027 Trams 34 dated


68 93092-PEC-TR-0045 HAZARDOUS AREA CLASSIFICATION 0 22-Mar-19
14400917-0001 dated 23/03/19 dated 02/04/19 23/04/19

QV-00-VEN-M60- T-DANM-QAP-0106
69 93092-PEC-TR-0046 SHELL PLATE DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0001 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0107
70 93092-PEC-TR-0046 BOTTOM PLATE DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0002 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0108
71 93092-PEC-TR-0046 ROOF PLATE DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0003 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0109
72 93092-PEC-TR-0046 ROOF STRUCTURAL DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0004 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0110
73 93092-PEC-TR-0046 SHELL NOZZLE DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0005 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0111
74 93092-PEC-TR-0046 SHELL MANWAY DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0006 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0112
75 93092-PEC-TR-0046 ROOF NOZZLE DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0007 dated 01/05/19

QV-00-VEN-M60- T-DANM-QAP-0043
76 93092-PEC-TR-0047 NAME PLATE DETAILS-SHT 01 OF 01 0 22-Mar-19 Cancelled
14400917-0008 dated 24/03/19

QV-00-VEN-M60- T-DANM-QAP-0101
77 93092-PEC-TR-0047 SPIRAL STAIRWAY DETAILS-SHT 01 TO 04 0 22-Mar-19
14400917-0009 dated 30/04/19

Page 19 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-00-VEN-M60- T-DANM-QAP-0102
78 93092-PEC-TR-0047 PERIPHERAL HANDRAIL DETAILS-SHT 01 OF 01 0 22-Mar-19
14400917-0010 dated 30/04/19

QV-00-VEN-M60- T-DANM-QAP-0103
79 93092-PEC-TR-0047 INTERNALS-SHT 01 OF 01 0 22-Mar-19
14400917-0012 dated 30/04/19

QV-00-VEN-M60- 1ST SHELL COURSE NOZZLE MARKING-SHT 01 T-DANM-QAP-0104


80 93092-PEC-TR-0047 0 22-Mar-19
14400917-0013 OF 01 dated 30/04/19

QV-1S-VEN-M30- T-DANM-QAP-0105
81 93092-PEC-TR-0047 MECHANICAL BULK MTO 0 22-Mar-19
14400917-0001 dated 30/04/19

QV-00-VEN-I54- T-DANM-QAP-0042 T-QAP-DANM-0039 Trans 28 dated


82 93092-PEC-TR-0048 DATASHEET FOR FLOW INDICATOR 0 22-Mar-19
14400917-0012 dated 24/03/19 dated 10/04/19 16/04/19

QV-1S-VEN-I54- T-DANM-QAP-0041 T-QAP-DANM-0035 Trans 37 dated


83 93092-PEC-TR-0049 DATASHEET FOR RESTRICTION ORIFICE 0 22-Mar-19
14400917-0010 dated 24/03/19 dated 06/04/19 22/04/19

QV-00-VEN-M60- T-DANM-QAP-0100
84 93092-PEC-TR-0050 SUPPORT DETAILS & MISC-SHT 01 OF 01 0 23-Mar-19
14400917-0011 dated 30/04/19

QV-1S-VEN-E60- T-DANM-QAP-0129 Email from Aly dated Trans 59 dated


85 93092-PEC-TR-0051 EARTHING LAYOUT-SHT 01 OF 01 0 25-Mar-19
14400917-0002 dated 08/05/19 09/05/19 09/05/19

QV-1S-VEN-E57- T-DANM-QAP-0129 Email from Aly dated Trans 59 dated


86 93092-PEC-TR-0051 ELECTRICAL EQUIPMENT LAYOUT-SHT 01 OF 01 0 25-Mar-19
14400917-0001 dated 08/05/19 09/05/19 09/05/19

QV-1S-VEN-E56- T-DANM-QAP-0129 Email from Aly dated Trans 59 dated


87 93092-PEC-TR-0051 LIGHTING LAYOUT-SHT 01 OF 01 0 25-Mar-19
14400917-0001 dated 08/05/19 09/05/19 09/05/19

QV-1S-VEN-154- T-DANM-QAP-0126
88 93092-PEC-TR-0052 DATASHEET FOR PUSH BUTTON STATION 0 25-Mar-19
14400917-0011 dated 08/05/19

QV-1S-VEN-I54- T-DANM-QAP-0127
89 93092-PEC-TR-0052 DATASHEET FOR TEMPERATURE GAUGE 0 25-Mar-19
14400917-0004 dated 08/05/19

QV-1S-VEN-I54- T-DANM-QAP-0128
90 93092-PEC-TR-0052 DATASHEET FOR TEMPERATURE TRANSMITTER 0 25-Mar-19
14400917-0007 dated 08/05/19

QV-1S-VEN-C16- T-DANM-QAP-0051 T-QAP-DANM-0033 Trans 21 dated


91 93092-PEC-TR-0053 DYKE VOLUME CALCULATION REPORT 1 25-Mar-19
14400917-0001 dated 02/04/19 dated 03/04/19 03/04/19
CRS_DANEM-PETROCIL-TRANS-
93092-CIV-CRS-
92 93092-PEC-TR-0054 0013_FOUNDATION DESIGN REPORT FOR 0 26-Mar-19
0001
BLOWER
QV-1S-VEN-P50- T-DANM-QAP-0066 T-QAP-DANM-0071 Trans 57 dated
93 93092-PEC-TR-0055 PIPING MATERIAL SPECIFICATION 0 26-Mar-19
14400917-0001 dated 06/04/19 dated 01/05/19 05/05/19

Page 20 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

REQUEST FOR VENDOR DETAILS OF T-DANM-QAP-0046 T-QAP-DANM-0029 Trans 36 dated


94 93092-PEC-TR-0056 93092-INS-TQ-0004 0 26-Mar-19
PROCURED INSTRUMENTS dated 27/03/19 dated 02/04/19 23/04/19

QV-1S-VEN-I54- T-DANM-QAP-0131
95 93092-PEC-TR-0057 DATASHEET FOR PRESSURE GAUGE 0 26-Mar-19
14400917-0002 dated 08/05/19

QV-1S-VEN-I54- T-DANM-QAP-0132
96 93092-PEC-TR-0057 DATASHEET FOR PRESSURE TRANSMITTER 0 26-Mar-19
14400917-0006 dated 08/05/19

QV-1S-VEN-I54- T-DANM-QAP-0130
97 93092-PEC-TR-0058 DATASHEET FOR LEVEL TRANSMITTER 0 26-Mar-19
14400917-0001 dated 08/05/19

QV-1S-VEN-Y50- SPECIFICATIONS FOR CIVIL & STRUCTURAL


98 93092-PEC-TR-0059 0 28-Mar-19
14400917-0001 WORKS AND PEC RESPONSE ON COMMENTS

QV-1S-VEN-P18- T-DANM-QAP-0067
99 93092-PEC-TR-0060 TIE-IN LIST 0 28-Mar-19
14400917-0002 dated 16/04/19

QV-00-VEN-Y15- PRELIMINARY FOUNDATION DESIGN REPORT T-DANM-QAP-0053 T-QAP-DANM-0041 Trans 26 dated


100 93092-PEC-TR-0061 0 28-Mar-19
14400917-0001 FOR EDC SALES TANK WITH ATTACHMENTS dated 04/04/19 T-QAP-DANM-0043 16/04/19

QV-1S-VEN-P54- T-DANM-QAP-0068 T-QAP-DANM-0054 Trans 41 dated


101 93092-PEC-TR-0062 DATA SHEET FOR BALL VALVE 0 28-Mar-19
14400917-0004 dated 16/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-P54- T-DANM-QAP-0069 T-QAP-DANM-0055 Trans 41 dated


102 93092-PEC-TR-0062 DATA SHEET FOR BUTTERFLY VALVE 0 28-Mar-19
14400917-0005 dated 16/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-P54- T-DANM-QAP-0070 T-QAP-DANM-0056 Trans 41 dated


103 93092-PEC-TR-0062 DATA SHEET FOR CHECK VALVE 0 28-Mar-19
14400917-0003 dated 16/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-P54- T-DANM-QAP-0071 T-QAP-DANM-0057 Trans 41 dated


104 93092-PEC-TR-0062 DATA SHEET FOR GATE VALVE 0 28-Mar-19
14400917-0002 dated 16/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-P54- T-DANM-QAP-0072 T-QAP-DANM-0058 Trans 41 dated


105 93092-PEC-TR-0062 DATA SHEET FOR PLUG VALVE 0 28-Mar-19
14400917-0006 dated 16/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-P56- T-DANM-QAP-0073
106 93092-PEC-TR-0062 PIPING KEY PLAN 0 28-Mar-19
14400917-0002 dated 16/04/19

POWER SUPPLY FOR RADAR TYPE LEVEL T-DANM-QAP-0064 T-QAP-DANM-0059 Trans 44 dated
107 93092-PEC-TR-0063 93092-INS-TQ-0005 0 28-Mar-19
TRANSMITTERS dated 16/04/19 dated 24/04/19 27/04/19

93092-PRS-CRS-
108 93092-PEC-TR-0064 CRS-DYKE VOLUME CALCULATION REPORT 0 28-Mar-19
0002

93092-PRJ-EDDR-
109 93092-PEC-TR-0065 PROJECT EDDR 1 29-Mar-19
0001

Page 21 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-I54- T-DANM-QAP-0093
110 93092-PEC-TR-0066 DATASHEET FOR RELIEF VALVE 0 1-Apr-19
14400917-0003 dated 05/04/19

QV-1S-VEN-I54- T-DANM-QAP-0094
111 93092-PEC-TR-0067 DATASHEET FOR ESD VALVE 0 1-Apr-19
14400917-0008 dated 25/04/19

QV-1S-VEN-I19- T-DANM-QAP-0085
112 93092-PEC-TR-0067 IO LIST 0 1-Apr-19
14400917-0003 dated 23/04/19

QV-1S-VEN-C16- T-DANM-QAP-0052 T-QAP-DANM-0042 Trans 27 dated


113 93092-PEC-TR-0068 DYKE VOLUME CALCULATION REPORT A 2-Apr-19
14400917-0001 dated 04/04/19 dated 11/04/19 14/04/19

QV-1S-VEN-C02- T-DANM-QAP-0062
114 93092-PEC-TR-0069 CONTROL AND SAFE GUARDING PHILOSOPHY 0 2-Apr-19
14400917-0002 dated 16/04/19

QV-1S-VEN-C19- T-DANM-QAP-0063
115 93092-PEC-TR-0069 UTILITY CONSUMPTION LIST 0 2-Apr-19
14400917-0002 dated 16/04/19

93092-PRS-CRS-
116 93092-PEC-TR-0070 CRS-DYKE VOLUME CALCULATION REPORT 1 3-Apr-19
0002

QV-1S-VEN-I71- T-DANM-QAP-0083
117 93092-PEC-TR-0071 INSTRUMENT CABLE BLOCK DIAGRAM 0 3-Apr-19
14400917-0004 dated 23/04/19

QV-1S-VEN-I54- DATASHEET FOR PRESSURE VACUUM RELIEF T-DANM-QAP-0084 T-QAP-DANM-0070 Trans 50 dated
118 93092-PEC-TR-0072 0 3-Apr-19
14400917-0005 VALVE dated 23/04/19 dated 01/05/19 01/05/19

QV-1S-VEN-I54- T-DANM-QAP-0084 T-QAP-DANM-0070 Trans 50 dated


119 93092-PEC-TR-0072 DATASHEET FOR CONTROL VALVE 0 3-Apr-19
14400917-0009 dated 23/04/19 dated 01/05/19 01/05/19

93092-PRJ-PGR-
120 93092-PEC-TR-0073 PROJECT MONTHLY PROGRESS REPORT 0 3-Apr-19
0001

QV-1S-VEN-P56- T-DANM-QAP-0055 T-QAP-DANM-0040 Trans 58 dated


121 93092-PEC-TR-0074 PLOT PLAN 2 4-Apr-19
14400917-0001 dated 04/04/19 dated 10/04/19 09/05/19

QV-00-VEN-Y15- PRELIMINARY FOUNDATION DESIGN REPORT T-DANM-QAP-0053 T-QAP-DANM-0041 Trans 30 dated


122 93092-PEC-TR-0075 0 4-Apr-19
14400917-0001 FOR EDC SALES TANK WITH ATTACHMENTS dated 04/04/19 T-QAP-DANM-0043 17/04/19

QV-1S-VEN-Y56- PILE LAYOUT AND DETAILS OF TEST PILE-SHT T-DANM-QAP-0054


123 93092-PEC-TR-0075 0 4-Apr-19
14400917-0002 01 TO 02 dated 04/04/19

93092-PRS-CRS-
124 93092-PEC-TR-0076 CRS-DYKE VOLUME CALCULATION REPORT 2 5-Apr-19
0002

QV-1S-VEN-C16- T-DANM-QAP-0065
125 93092-PEC-TR-0077 PVV SIZING CALCULATION 0 5-Apr-19
14400917-0002 dated 16/04/19

Page 22 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

FIRE FIGHTING - FOAM SYSTEM P&ID FOR EDC T-DANM-QAP-0056


126 93092-PEC-TR-0078 93092-INS-TQ-0006 0 6-Apr-19
STORAGE TANK dated 10/04/19

EDC VENT BLOWER VENDOR SIGNALS- T-DANM-QAP-0076 T-QAP-DANM-0052 Trans 42 dated


127 93092-PEC-TR-0079 93092-INS-TQ-0002 1 8-Apr-19
TECHNICAL QUERY dated 21/04/19 dated 24/04/19 25/04/19

QV-1S-VEN-Y60- T-DANM-QAP-0059
128 93092-PEC-TR-0080 BLOWER FOUNDATION DETAILS-SHT 01 TO 02 1 9-Apr-19
14400917-0003 dated 11/04/19

QV-1S-VEN-Y15- FOUNDATION DESIGN REPORT FOR BLOWER T-DANM-QAP-0059


129 93092-PEC-TR-0080 1 9-Apr-19
14400917-0002 WITH ATTACHMENTS dated 11/04/19

QV-1S-VEN-Y60- T-DANM-QAP-0060
130 93092-PEC-TR-0081 TEMPORARY ACCESS RAMP DETAILS 0 11-Apr-19
14400917-0002 dated 14/04/19

QV-1S-VEN-Y16- DESIGN CALCULATION FOR TEMPORARY T-DANM-QAP-0060


131 93092-PEC-TR-0081 0 11-Apr-19
14400917-0001 ACCESS RAMP dated 14/04/19

QV-00-VEN-M60- T-DANM-QAP-0099
132 93092-PEC-TR-0082 NAME PLATE DETAILS-SHT 01 OF 01 0 11-Apr-19
14400917-0008 dated 30/04/19

QV-1S-VEN-I18- T-DANM-QAP-0087 T-QAP-DANM-0072 Trans 55 dated


133 93092-PEC-TR-0083 INSTRUMENT JUNCTION BOX SCHEDULE 0 11-Apr-19
14400917-0002 dated 24/04/19 dated 05/05/19 05/05/19

QV-1S-VEN-Y60- T-DANM-QAP-0061 T-QAP-DANM-0050 Trans 48 dated


134 93092-PEC-TR-0084 FOAM PUMP FOUNDATION DETAILS-SHT 1 OF 1 1 12-Apr-19
14400917-0005 dated 16/04/19 dated 23/04/19 30/04/19

CRS_DANEM-PETROCIL-TRANS-0010_FOAM
135 93092-PEC-TR-0084 93092-CIV-CRS-002 0 12-Apr-19
PUMP FOUNDATION DETAILS

QV-1S-VEN-Y15- DESIGN CALCULATION OF FOAM PUMP T-DANM-QAP-0061


136 93092-PEC-TR-0084 0 12-Apr-19
14400917-0004 FOUNDATION WITH ATTACHMENTS dated 16/04/19

QV-1S-VEN-I71- INSTRUMENT INTERCONNECTION DIAGRAM- T-DANM-QAP-0088 T-QAP-DANM-0076


137 93092-PEC-TR-0085 0 12-Apr-19
14400917-0003 SHT 01 TO 21 dated 24/04/19 dated 09/05/19

93092-PRJ-EDDR- T-DANM-QAP-0091
138 93092-PEC-TR-0086 PROJECT EDDR 2 17-Apr-19
0001 dated 25/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
139 93092-PEC-TR-0087 PIPING GA TANKFARM AREA SHT 1 OF 16 0 17-Apr-19
14400917-0002-01 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
140 93092-PEC-TR-0087 PIPING GA TANKFARM AREA SHT 2 OF 16 0 17-Apr-19
14400917-0002-02 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
141 93092-PEC-TR-0087 PIPING GA TANKFARM AREA SHT 3 OF 16 0 17-Apr-19
14400917-0002-03 dated 30/04/19

Page 23 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-P58- T-DANM-QAP-0097
142 93092-PEC-TR-0087 PIPING GA TANKFARM AREA SHT 4 OF 16 0 17-Apr-19
14400917-0002-04 dated 30/04/19

QV-1S-VEN-P58- PIPING GA TANKFARM DYKE WALL AREA SHT 6 T-DANM-QAP-0097


143 93092-PEC-TR-0087 0 17-Apr-19
14400917-0002-06 OF 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA TANKFARM DYKE WALL AREA SHT 5 T-DANM-QAP-0097


144 93092-PEC-TR-0087 0 17-Apr-19
14400917-0002-05 OF 16 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
145 93092-PEC-TR-0087 PIPING GA EXISTING TIE-IN AREA SHT 8 OF 16 0 17-Apr-19
14400917-0002-08 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
146 93092-PEC-TR-0087 PIPING GA EXISTING TIE-IN AREA SHT 7 OF 16 0 17-Apr-19
14400917-0002-07 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
147 93092-PEC-TR-0088 PIPING GA BLOWER AREA SHT 9 OF 16 0 17-Apr-19
14400917-0002-09 dated 30/04/19

QV-1S-VEN-P58- T-DANM-QAP-0097
148 93092-PEC-TR-0088 PIPING GA FIRE FIGHTING TIE-IN SHT 10 OF 16 0 17-Apr-19
14400917-0002-10 dated 30/04/19

QV-1S-VEN-P58- PIPING GA FIRE FIGHTING TIE IN FOAM PUMP T-DANM-QAP-0097


149 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-11 SHT 11 OF 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA- SECTION TANKFARM AREA SHT 12 T-DANM-QAP-0097


150 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-12 OF 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA- SECTION VIEW OVERALL SHT 13 OF T-DANM-QAP-0097


151 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-13 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA SECTION VIEW TIE IN AREA SHT 14 T-DANM-QAP-0097


152 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-14 OF 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA SECTION VIEW OVERALL SHT 15 OF T-DANM-QAP-0097


153 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-15 16 dated 30/04/19

QV-1S-VEN-P58- PIPING GA SECTION VIEW OVERALL SHT 16 OF T-DANM-QAP-0097


154 93092-PEC-TR-0088 0 17-Apr-19
14400917-0002-16 16 dated 30/04/19

93092-PRS-CRS- T-DANM-QAP-0089 T-QAP-DANM-0064


155 93092-PEC-TR-0089 CRS-PVV SIZING CALCULATION 0 22-Apr-19
0004 dated 24/04/19 dated 30/04/19

93092-PRS-CRS- T-DANM-QAP-0090
156 93092-PEC-TR-0089 CRS-PIPING & INSTRUMENTATION DIAGRAM 0 22-Apr-19
0003 dated 24/03/19

93092-MEC-CRS- CRS-DESIGN CALCULATION FOR NEW SALES


157 93092-PEC-TR-0090 0 24-Apr-19
0001 EDC TANK

Page 24 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-Y60- T-DANM-QAP-0095 T-QAP-DANM-0067 Trans 49 dated


158 93092-PEC-TR-0091 L-SHAPED WALL DETAILS-SHT 01 TO 02 1 25-Apr-19
14400917-0006 dated 27/04/19 dated 30/04/19 01/05/19

93092-CIV-CRS-
159 93092-PEC-TR-0091 CRS_L-SHAPED WALL DETAILS 0 25-Apr-19
0003

QV-1S-VEN-Y15- T-DANM-QAP-0095 Trans 46 dated


160 93092-PEC-TR-0092 L-SHAPED WALL DESIGN REPORT 1 26-Apr-19 Danem Commented
14400917-0005 on 27/04/19 30/04/19

QV-1S-VEN-I71- T-DANM-QAP-0096 T-QAP-DANM-0073 Trans 56 dated


161 93092-PEC-TR-0093 INSTRUMENT HOOK-UP DIAGRAM 0 29-Apr-19
14400917-0001 dated 30/04/19 dated 05/05/19 05/05/19

QV-1S-VEN-P54- T-DANM-QAP-0121 T-QAP-DANM-0077


162 93092-PEC-TR-0094 DATA SHEET FOR BALL VALVE A 29-Apr-19
14400917-0004 on 05/05/19 dated 09/05/19

QV-1S-VEN-P54- T-DANM-QAP-0121 T-QAP-DANM-0077


163 93092-PEC-TR-0094 DATA SHEET FOR BUTTERFLY VALVE A 29-Apr-19
14400917-0005 on 05/05/19 dated 09/05/19

QV-1S-VEN-P54- T-DANM-QAP-0121 T-QAP-DANM-0077


164 93092-PEC-TR-0094 DATA SHEET FOR CHECK VALVE A 29-Apr-19
14400917-0003 on 05/05/19 dated 09/05/19

QV-1S-VEN-P54- T-DANM-QAP-0121 T-QAP-DANM-0077


165 93092-PEC-TR-0094 DATA SHEET FOR GATE VALVE A 29-Apr-19
14400917-0002 on 05/05/19 dated 09/05/19

QV-1S-VEN-P54- T-DANM-QAP-0121 T-QAP-DANM-0077


166 93092-PEC-TR-0094 DATA SHEET FOR PLUG VALVE A 29-Apr-19
14400917-0006 on 05/05/19 dated 09/05/19

POWER SUPPLY FOR RADAR TYPE LEVEL T-DANM-QAP-0114


167 93092-PEC-TR-0095 93092-INS-TQ-0005 1 30-Apr-19
TRANSMITTERS dated 01/05/19

QV-00-VEN-I54- T-DANM-QAP-0115
168 93092-PEC-TR-0096 DATASHEET FOR FLOW INDICATOR 1 30-Apr-19
14400917-0012 dated 01/05/19

QV-1S-VEN-I54- T-DANM-QAP-0116
169 93092-PEC-TR-0096 DATASHEET FOR RESTRICTION ORIFICE 1 30-Apr-19
14400917-0010 dated 01/05/19

93092-INS-CRS-
170 93092-PEC-TR-0096 CRS-DATASHEET FOR FLOW INDICATOR 0 30-Apr-19
0001

CRS_QAP-DANM-
171 93092-PEC-TR-0096 CRS-DATASHEET FOR RESTRICTION ORIFICE 0 30-Apr-19
0004

REQUEST FOR VENDOR DETAILS OF T-DANM-QAP-0120


172 93092-PEC-TR-0097 93092-INS-TQ-0004 1 2-May-19
PROCURED INSTRUMENTS dated 05/05/19

173 93092-PEC-TR-0098 93092-PIP-TQ-0001 PIPING -TECHNICAL QUERY 1 3-May-19

Page 25 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

QV-1S-VEN-P54- T-DANM-QAP-0124
174 93092-PEC-TR-0099 DATA SHEET FOR FLAME ARRESTOR 0 6-May-19
14400917-0009 dated 08/05/19

QV-1S-VEN-Y60- T-DANM-QAP-0125 T-QAP-DANM-0075


175 93092-PEC-TR-0100 FOAM PUMP FOUNDATION DETAILS A 6-May-19
14400917-0005 dated 08/05/19 dated 09/05/19
PRELIMINARY FOUNDATION DESIGN REPORT
QV-00-VEN-Y15- T-DANM-QAP-0122
176 93092-PEC-TR-0101 FOR EDC SALES TANK WITH ATTACHMENTS AND 1 6-May-19
14400917-0001 dated 05/05/19
CRS
93092-PRJ-PGR- PROJECT MONTHLY PROGRESS REPORT -
177 93092-PEC-TR-0102 0 8-May-19
0002 APRIL 2019 WITH ATTACHMENT

EDC VENT BLOWER VENDOR SIGNALS-


178 93092-PEC-TR-0103 93092-INS-TQ-0002 2 8-May-19
TECHNICAL QUERY WITH ATTACHMENTS

QV-1S-VEN-P56-
179 93092-PEC-TR-0104 PLOT PLAN 3 9-May-19
14400917-0001

QV-1S-VEN-P58-
180 93092-PEC-TR-0104 EQUIPMENT LOCATION PLAN-SHT 01 TO 02 1 9-May-19
14400917-0001

93092-PIP-CRS-
181 93092-PEC-TR-0104 CRS EQUIPMENT LOCATION PLAN 0 9-May-19
0003

QV-1S-VEN-C16-
93092-PEC-TR-0105 DYKE VOLUME CALCULATION REPORT B 9-May-19
14400917-0001

Page 26 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

Page 27 of 28
Document Received QAPCO Danem Trans
Sl. No. Transmittal No. Description Rev QAPCO Comment
Number on submission Status to PEC

Page 28 of 28

Das könnte Ihnen auch gefallen