Sie sind auf Seite 1von 6

REPUBLIC OF THE PHILIPPINES

TABLE OF CONTENTS

PERSPECTIVE
VICINITY MAP
SITE DEVELOPMENT PLAN OFFICE OF THE BUILDING OFFICIAL

GROUND FLOOR PLAN


SECOND FLOOR PLAN
DECK ROOF PLAN
FRONT ELEVATION
LEFT SIDE ELEVATION
REAR ELEVATION
RIGHT SIDE ELEVATION
SECTION A
SECTION B
SCHEDULE OF DOORS AND WINDOWS

LAND USE AND ZONING


STRUCTURAL SPECIFICATION
MASONRY WALL DETAILS
TYPICAL LINTEL BEAM DETAILS
TWO WAY SLAB REINFORCEMENT DETAILS
TYPICAL BEAM DETAILS

FOUNDATION PLAN
SECOND & DECK ROOF FLOOR FRAMING PLAN
ROOF FRAMING PLAN
A VICINITY MAP COLUMN DETAILS
SCHEDULE OF FOOTING
NOT TO SCALE
1-2 SCHEDULE OF SLAB
SCHEDULE OF BEAM
FOOTING DETAILS
TYPICAL WALL FOOTING DETAILS LAND USE AND ZONING

GENERAL NOTES
LEGEND
VICINITY MAP
PANEL BOARD DETAILS
RISER DIAGRAM
SCHEDULE OF LOAD
GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
DECK ROOF LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT
DECK ROOF POWER LAYOUT
LINE AND GRADE

LOT - 9
GENERAL NOTES
LEGENDS
GROUND FLOOR WATER LAYOUT
GROUND FLOOR SANITARY LAYOUT
DECK ROOF SANITARY LAYOUT
SEPTIC TANK DETAILS
CATCH BASIN DETAILS

PE SPECTIVE A
ARCHITECTURAL
B
B
LOT - 2 C LOT - 10
1
B

SANITARY

LOT - 8

LOT - 5 ELECTRICAL

A SITE DEVELOPMENT PLAN


NOT TO SCALE
1-2

ARCHITECT / ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY MECHANICAL SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
A-1
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.
A B C A B C A B C A B C
B B B B

1 1 1 1

B
A A A A

2 2 2 2

A GROUND FLOOR PLAN A SECOND FLOOR PLAN A DECK ROOF PLAN A ROOF PLAN
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
1-11 2-11 3-11 4-11

A FRONT ELEVATION A LEFT SIDE ELEVATION A SECTION ''A-A'' A SECTION ''B-B''


SCALE: 1:100MTS. SCALE: 1:100MTS.
5-11 6-11 9-11 SCALE: 1:100MTS.
10-11 SCALE: 1:100MTS.

SOLID DOOR PANEL DOOR SOLID DOOR PVC DOOR SLIDING WINDOWS AWNING WINDOWS AWNING WINDOWS
1 SET 3 SETS 2 SETS 1 SET 5 SETS 1 SET 1 SET

A SCHEDULE OF DOORS AND WINDOWS


A REAR ELEVATION A RIGHT SIDE ELEVATION 11-11 SCALE: 1:50MTS.
SCALE: 1:100MTS.
7-11 8-11 SCALE: 1:100MTS.

ARCHITECT / ENGINEER PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
A-2
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.
INTERSECTION WALL CORNER WALL

MASONRY PARTITION

A MASONRY WALL DETAILS


NOT TO SCALE
1-4

SCALE

ELEVATION SECTION "A"

A TYPICAL LINTEL BEAM DETAILS A TWO WAY SLAB REINFORCEMENT DETAILS


NOT TO SCALE NOT TO SCALE
2-4 3-4

SECTION EXTERIOR SUPPORT INTERIOR SUPPORT CANTILEVER END


ELEVATION

A TYPICAL BEAM DETAILS


NOT TO SCALE
4-4

CIVIL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
S-1
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.
A B C A B C A B C

GROUND - DECK
B B

F-2 F-1 F-3


C-1 C-1 C-1
1 1 1

B
A S-1 A

S-2

FOOTING - GROUND
2 F-2 F-1 F-3 2 2
C-1 C-1 C-1

S FOUNDATION PLAN A TYPICAL SEC. & DECK FRAMING PLAN A ROOF FRAMING PLAN
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
1-6 2-6 3-6
A COLUMN DETAILS
SCALE: 1:10MTS.
5-6

SCHEDULE OF BEAM:
WIDTH DEPTH LEFT SUPPORT MIDSPAN RIGHT SUPPORT
MARK (mm) (mm) (mm)
STIRRUPS SPACING
TOP BOT. TOP BOT. TOP BOT.

PLAN B-1 200 450 16 5 2 2 5 5 2 10


PLAN
B-2 150 350 16 3 2 2 3 3 2 10 1 @ 50mm, 4 @
100mm, REST
B-3 150 350 16 2 2 2 2 2 2 10 @200mm O.C. FROM
SUPPORT TO
RB - 1 150 250 16 2 2 2 2 2 2 10 MIDSPAN

TRB - 1 150 360 16 2 2 2 2 2 2 10

WF - 1 WF - 2
SECTION SECTION
A TYPICAL WALL FOOTING DETAILS
CORNER FOOTING SIDE FOOTING 6-6 SCALE: 1:100MTS.

SCHEDULE OF SLAB:
S FOOTING DETAILS
SCALE: 1:100MTS.
4-6 THK
BARS ALONG SHORT SPAN BARS ALONG LONG SPAN
MARK (mm) LEFT SUPPORT MIDSPAN RIGHT SUPPORT BAR LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
(mm)
TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT.

SCHEDULE OF FOOTING: S-1

S-2
100

100
10

10
170

250
340

500
340

500
170

250
170

250
340

500
10

10
200

250
400

500
400

500
200

250
200

250
400

500
TWO WAY

TWO WAY

S-3 100 10 200 400 400 200 200 400 10 300 300 300 300 300 300 ONE WAY
WIDTH LENGTH THK DEPTH OF BARS ALONG BARS ALONG
MARK REMARKS S-4 100 10 250 500 500 250 250 500 10 250 250 250 250 250 250 ONE WAY
(mm) (mm) (mm) EXCAVATION WIDTH LENGTH

F1 1200 1200 300 1200 6-16mm 6-16mm SIDE FOOTING S-5 100 10 190 380 380 190 190 380 10 220 440 440 220 220 440 TWO WAY

F2 1050 1050 300 1200 5-16mm 5-16mm CORNER FOOTING CS - 1 110 10 120 240 120 240 120 240 10 250 250 250 250 250 250 CANTILEVER

F3 1000 1100 300 1200 5-16mm 7-16mm CORNER FOOTING

CIVIL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
S-2
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.
GENERAL NOTES: A B C
A B C
A B C

1.0 ALL ELECTRICAL INSTALLATION HEREIN AND OTHER RELATED WORKS TO BE DONE ON THIS BUILDING
SHALL CONFORM IN ACCORDANCE WITH THE PROVISIONS AND CODE STANDARD OF THE FOLLOWING:

1.1 LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE (PEC/NEC).

1 1

B
1.2 REPUBLIC ACT 7920 OTHERWISE KNOWN AS THE THE NEW ELECTRICAL ENGINEERING LAW.
1

B
1.3 NATIONAL BUILDING CODE

1.4 FIRE CODE OF THE PHILIPPINES

1.5 EXISTING LOCAL UTILITY COMPANY

1.6 EXISTING CITY/MUNICIPALITY ORDINANCES AND THE

1.7 REQUIREMENTS OF THE BUREAU OF LABOR STANDARDS

2.0 ELECTRICAL INSTALLATION HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY

REGISTERED ELECTRICAL ENGINEER. THE ELECTRICAL ENGINEER SHALL BE RESPONSIBLE IN THE


2 2
INTERPRETATION OF THE DESIGN INTENT, PLANS AND SPECIFICATIONS, AND THE REQUIRED
STANDARD OF THE ELECTRICAL CODE.
E VICINITY MAP 2
NOT TO SCALE
1-9
3.0 SERVICE ENTRANCE TO THE BUILDING SHALL BE SINGLE PHASE WIRE, 60 HZ, 320 V, THOUGH
TRANSFORMER BANK.

4.0 MATERIALS AND EQUIPMENT TO BE USED (BALLAST, FLUORESCENT TUBE, WIRING DEVICES,CIRCUIT
BREAKERS, CONDUIT AND PIPES, ENCLOSURES, WIRES AND CABLES, ETC.) SHALL HAVE IMPORTED USE: 2-5.5mm
1-3.5mm
COMMODITY CLEARANCE (ICC) LABEL FOR FOREIGN MADE PRODUCTS AND P.S. MARK FOR LOCAL IN
60AMP, 20AF, 2P,
NATURE OF THE BUREAU OF PRODUCTS STANDARDS. (BPS). GROUND FLOOR PLAN SECOND FLOOR PLAN DECK ROOF PLAN
18KAIC 15mm
5.0 PROVIDE GROUNDING AND NEUTRAL WIRES TO ALL OUTLETS AND LIGHTING CIRCUITS. ALL
NON-CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AND BONDED.
M E LIGHTING LAYOUT E LIGHTING LAYOUT E LIGHTING LAYOUT
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
60 AT MAIN
1-4 6-9 8-9
6.0 ALL PANEL BOARDS, MAIN DISTRIBUTION PANELS, ETC.,SHALL HAVE GROUNDING BUS FOR BRANCH
30 AT; 2P, 230 V MCB
CIRCUITS AND SUB-FEEDER GROUNDING SYSTEM, MAIN GROUNDING SYSTEM SHALL BE BONDED TO
THE NEAREST METAL WATER PIPE SERVICE. 30 AT 15 AT A B C A B C A B C
MAIN 1 2 LIGHTING
7.0 MOUNTING HEIGHTS FOR ALL WIRING DEVICES AND PANEL BOARDS SHALL BE AS FOLLOWS: 15 AT 20 AT
LIGHTING 3 4 LIGHTING
7.1 LIGHTING SWITCHES ------------ 1.4 M ABOVE FINISH FLOOR
20 AT 30 AT
7.2 CONVENIENCE OUTLET ------------ 0.3 M ABOVE FINISH FLOOR
7.3 TELEPHONE OUTLET ------------ 0.3 M ABOVE FINISH FLOOR CONVENIENCE OUTLET 5 6 CONVENIENCE OUTLET
7.4 PANEL BOARDS AND CABINETS ------------ 1.8 M ON TOP ABOVE FIN. FLR. 30 AT 30 AT
7.5 MONITOR CONTROL AND ECB ------------ 1.8 M ABOVE FINISH FLOOR REFRIGERATOR OUTLET 7 8 AHU
7.6 MANUAL TRANSFER SWITCH ------------ 1.8 M ABOVE FINISH FLOOR 30 AT 30 AT
1 1 1

B
7.7 EMERGENCY LIGHT FIXTURE ------------ 0.3 M BELOW CEILING LINE AHU 9 10 SPARE

8.0 WIRING METHOD SHALL BE AS FOLLOWS:

8.1 SERVICE ENTRANCE RISER ------------ INTERMEDIATE METALLIC CONDUIT


8.2 LIGHTING AND POWER SYSTEM ------------ ELECTRICAL METALLIC TUBING
8.3 TELEPHONE SYSTEM ------------ ELECTRICAL METALLIC TUBING
8.4 ALL VIBRATING EQUIPMENT ------------ LIQUID TIGHT FLEXIBLE CONDUIT
GROUNDING
8.5 JUNCTION BOX TO LIGHTING --------- FLEXIBLE METAL CONDUIT 10 MM O

9.0 LIGHTING FIXTURES WITH FLUORESCENT TUBE SHALL HAVE THERMAL PROTECTOR HIGH-POWER
FACTOR BALLAST (PRE-HEAT).

10.0 MECHANICAL EQUIPMENT WITH HIGH VIBRATION MOVEMENTS SHALL HAVE FLEXIBLE CONDUIT
CONNECTION FROM MOTOR TERMINAL BOX TO OVER CURRENT DEVICE ENCLOSURE (ECB).
E PANEL BOARD 2 2 2
11.0 PRIOR TO ITS MOUNTING AND TERMINATION OF LIGHTING FIXTURES, WIRING DEVICES, EQUIPMENT, NOT TO SCALE
ETC.. CONTRACTOR SHALL ENGAGE WITH THE CONSULTANT OR OWNER REPRESENTATIVE THE 2-9
FOLLOWING FIELD ACCEPTANCE TEST AND MATERIAL INSPECTION.

11.1 BRANCH CIRCUITS AND SUB-FEEDER INSULATION RESISTANCE TEST MEASUREMENT


11.2 POLARITY TEST ON WIRING DEVICES
11.3 GROUND RESISTANCE TEST MEASUREMENT
11.4 MATERIALS QUALITY INSPECTION AS REQUIRED IN THE ABOVE SPECIFICATION
GROUND FLOOR PLAN SECOND FLOOR PLAN DECK ROOF PLAN
11.5

12.0
GROUND WELL RESISTANCE TEST MEASUREMENT FOR LIGHTING SYSTEM

NO CHANGE AND MODIFICATION SHALL BE MADE WITHOUT THE CONSULTANT/DESIGNER'S WRITTEN


USE: 2-8.0mm E POWER LAYOUT E POWER LAYOUT E POWER LAYOUT
1-5.5mm SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
CONSENT.
60AMP, 30AF, 2P, 18KAIC
5-9 7-9 9-9
13.0 ALL WORKS SHALL BE EXECUTED IN A WORKMANSHIP MANNER AND SHALL PRESENT A NEAT AND 20mm
ORDERLY ACCEPTANCE. ALL WIRING SHALL BE CONCEALED AS MUCH AS POSSIBLE.

SCHEDULE OF LOADS
LEGEND CIRCUIT
NUMBER
DESCRIPTION LIGHTING
OUTLET
CIRCUIT
OUTLET
VOLTS WATTS AMPERE SIZE OF WIRES & CONDUITS AMPERE
PROTECTION

1 MAIN
60 AT MAIN
PANEL 2 LIGHTING 9 230 900 3.91 15V
BOARD
3 LIGHTING 8 230 800 3.48 15V

4 LIGHTING 3 230 300 1.30 20V

5 CONVENIENCE OUTLET 4 230 720 3.13 20V

6 CONVENIENCE OUTLET 4 230 720 3.13 20V

7 REFRIGERATOR OUTLET 1 230 1000 4.35 30V

8 ACU 1 230 1200 5.22 30V

9 ACU 1 230 1200 5.22 30V

10 SPARE 1 230 2000 8.70 30V

TOTAL 230 8840 38.44

E RISER DIAGRAM LOAD COMPUTATION:


IT = 38.44 AMPERES
USE: 2-8.0mm
1-5.5mm
NOT TO SCALE
3-9 =
=
38.44 x 80%
38.44 x 0.80
60AMP, 20AF, 2P, 18KAIC 20

= 30.75 AMPERES
USE = 60AMPERES

PROFESSIONAL ELECTRICAL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
S-2
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.
GENERAL NOTES:
A B C
A B C A B C
1. ALL PLUMBING / SANITARY WORKS INCLUDED SHALL BE EXECUTED ACCORDING TO THE
PROVISION OF THE PLUMBING CODE, THE NATIONAL BUILDING CODE AND THE RULES
AND REGULATIONS OF EXISTING CITY / MUNICIPAL ORDINANCE.

2. COORDINATE THE DRAWINGS WITH OTHER RELATED DRAWINGS AND SPECIFICATIONS


REQUIRED THE ENGINEER / ARCHITECT SHALL BE NOTIFIED IMMEDIATELY OF ANY 1
1 1

B
DISCREPANCY FOUND THEREIN.

3. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS ANY RELOCATIONS REQUIRED


FOR PROPER EXECUTION OTHER TRADES SHALL BE WITH PRIOR APPROVAL OF THE
ARCHITECT OR ENGINEER.

4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL LOCATION, DEPTH,


AND INVERT ELEVATION OF ALL EXISTING STRUCTURES AND PIPES AS VERIFIED BY THE 2
CONTRACTOR. 2 2

M
5. ALL SLOPE FOR HORIZONTAL BRANCHES SHALL MAINTAIN 2% MINIMUM UNLESS SERVICE
CONNECTION POINT.

6. SIZE OF WATER SUPPLY PIPES TO STRUCTURES SHALL BE IN ACCORDANCE WITH THE


MANUFACTURER'S INSTRUCTION.

7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AS SITE AND COORDINATE DECK ROOF PLAN

THE WORKS WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE. E SANITARY LAYOUT
SCALE: 1:100MTS.
3-5
8. ALL WATER PIPES AND WATER TANK SHALL BE THOROUGHLY FLUSHED AND GROUND FLOOR PLAN GROUND FLOOR PLAN

DISINFECTED WITH LIQUID CHLORINE OR HYDROCHLORIDE SOLUTION. P SANITARY LAYOUT P WATER LAYOUT
SCALE: 1:100MTS. SCALE: 1:100MTS.
1-5 2-5
9. ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO AT LEAST 150psi PF THE
DESIGN WORKING PRESSURE OF THE SYSTEM.

10. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED TO
ATLEAST 30M HEAD TO ENSURE THE SYSTEM ARE WATER TIGHT. ALL COLD WATER LINES
0.20M O.C MANHOLE

11 BRANCH WATER LINES SHALL BE PVC WASTE PIPES SHALL BE PVC INLET C.O.

PIPE SHALL BE PVC PIPE STORM DRAIN SHALL BE DOWNSPOUT SHALL BE

12. ALL WORKS TO BE DONE SHALL BE UNDER THE DIRECT PROVISION OF A DULLY C.O. OUTLET
LICENSED SANITARY, SANITARY ENGINEER OR AT LEAST A MASTER PLUMBER.
100MM.THK.LINTEL BEAM
INLET

LEGEND STEEL LIFT BAR


PLAN
MANHOLE COVER
FINISHED GRADE LINE
CO CO CO CO

COLD WATER PIPE LINE F. FAUSET OUTLET PIPE


PIPE
WATER LEVEL 100MM CHB REINFORCEMENT

DRAINAGE PIPE LINE W.C. WATER CLOSET 150MM THK. CHB


REINFORCEMENT W/
WATER LEVEL WATER LEVEL
& VERTICAL BARS
OUTLET PIPE

SEWER PIPE LINE HORIZONTAL 150MM THK. CHB


LAV. LAVATORY & VERTICAL BARS
DIGESTIVE CHAMBER
(GROUTED AT CELLS) 2%
SLOPE
(min)
2%
SLOPE
(min)

VSTR LINE OUTLET INLET


K.S. KITCHEN SINK COMPACTED GRAVEL CEMENT PLASTERED
BASE COARSE FINISH

C.V. CHECK VALVE GRAVEL


CB C.B. CATCH BASIN 100MM THK.CHB
300MM O.C.
REINFORCEMENT
G.V. GATE VALVE C.O. CLEAN OUT CEMENT PLASTERED
HORIZONTAL
FINISH
& VERTICAL BARS

M M. SERVICE WATER F.D. FLOOR DRAIN SECTION SECTION


METER
VSTR VENT STACK THRU ROOF

E SEPTIC TANK DETAILS P CATCH BASIN DETAILS


NOT TO SCALE NOT TO SCALE
4-5 5-5

PROFESSIONAL SANITARY ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.

(AS-BUILT) CAD ENCODER

TWO (2) STOREY RESIDENTIAL


PRC NO.:
ISSUED ON
PTR NO.:
DATE NO.: LOCATION: FE VILLE REALTY HOLDINGS INC. MARQUEZ COMPOUND
AS SHOWN
MR. ROMMEL V. SEVERINO
CHECKED BY
P-1
DATE
PLACE: BRGY. GULOD MALAYA, SAN MATEO RIZAL.

Das könnte Ihnen auch gefallen