Beruflich Dokumente
Kultur Dokumente
TABLE OF CONTENTS
PERSPECTIVE
VICINITY MAP
SITE DEVELOPMENT PLAN OFFICE OF THE BUILDING OFFICIAL
FOUNDATION PLAN
SECOND & DECK ROOF FLOOR FRAMING PLAN
ROOF FRAMING PLAN
A VICINITY MAP COLUMN DETAILS
SCHEDULE OF FOOTING
NOT TO SCALE
1-2 SCHEDULE OF SLAB
SCHEDULE OF BEAM
FOOTING DETAILS
TYPICAL WALL FOOTING DETAILS LAND USE AND ZONING
GENERAL NOTES
LEGEND
VICINITY MAP
PANEL BOARD DETAILS
RISER DIAGRAM
SCHEDULE OF LOAD
GROUND FLOOR LIGHTING LAYOUT
SECOND FLOOR LIGHTING LAYOUT
DECK ROOF LIGHTING LAYOUT
GROUND FLOOR POWER LAYOUT
SECOND FLOOR POWER LAYOUT
DECK ROOF POWER LAYOUT
LINE AND GRADE
LOT - 9
GENERAL NOTES
LEGENDS
GROUND FLOOR WATER LAYOUT
GROUND FLOOR SANITARY LAYOUT
DECK ROOF SANITARY LAYOUT
SEPTIC TANK DETAILS
CATCH BASIN DETAILS
PE SPECTIVE A
ARCHITECTURAL
B
B
LOT - 2 C LOT - 10
1
B
SANITARY
LOT - 8
LOT - 5 ELECTRICAL
ARCHITECT / ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY MECHANICAL SHEET NO.
1 1 1 1
B
A A A A
2 2 2 2
A GROUND FLOOR PLAN A SECOND FLOOR PLAN A DECK ROOF PLAN A ROOF PLAN
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
1-11 2-11 3-11 4-11
SOLID DOOR PANEL DOOR SOLID DOOR PVC DOOR SLIDING WINDOWS AWNING WINDOWS AWNING WINDOWS
1 SET 3 SETS 2 SETS 1 SET 5 SETS 1 SET 1 SET
ARCHITECT / ENGINEER PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.
MASONRY PARTITION
SCALE
CIVIL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.
GROUND - DECK
B B
B
A S-1 A
S-2
FOOTING - GROUND
2 F-2 F-1 F-3 2 2
C-1 C-1 C-1
S FOUNDATION PLAN A TYPICAL SEC. & DECK FRAMING PLAN A ROOF FRAMING PLAN
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
1-6 2-6 3-6
A COLUMN DETAILS
SCALE: 1:10MTS.
5-6
SCHEDULE OF BEAM:
WIDTH DEPTH LEFT SUPPORT MIDSPAN RIGHT SUPPORT
MARK (mm) (mm) (mm)
STIRRUPS SPACING
TOP BOT. TOP BOT. TOP BOT.
WF - 1 WF - 2
SECTION SECTION
A TYPICAL WALL FOOTING DETAILS
CORNER FOOTING SIDE FOOTING 6-6 SCALE: 1:100MTS.
SCHEDULE OF SLAB:
S FOOTING DETAILS
SCALE: 1:100MTS.
4-6 THK
BARS ALONG SHORT SPAN BARS ALONG LONG SPAN
MARK (mm) LEFT SUPPORT MIDSPAN RIGHT SUPPORT BAR LEFT SUPPORT MIDSPAN RIGHT SUPPORT REMARKS
(mm)
TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT. TOP BOT.
S-2
100
100
10
10
170
250
340
500
340
500
170
250
170
250
340
500
10
10
200
250
400
500
400
500
200
250
200
250
400
500
TWO WAY
TWO WAY
S-3 100 10 200 400 400 200 200 400 10 300 300 300 300 300 300 ONE WAY
WIDTH LENGTH THK DEPTH OF BARS ALONG BARS ALONG
MARK REMARKS S-4 100 10 250 500 500 250 250 500 10 250 250 250 250 250 250 ONE WAY
(mm) (mm) (mm) EXCAVATION WIDTH LENGTH
F1 1200 1200 300 1200 6-16mm 6-16mm SIDE FOOTING S-5 100 10 190 380 380 190 190 380 10 220 440 440 220 220 440 TWO WAY
F2 1050 1050 300 1200 5-16mm 5-16mm CORNER FOOTING CS - 1 110 10 120 240 120 240 120 240 10 250 250 250 250 250 250 CANTILEVER
CIVIL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.
1.0 ALL ELECTRICAL INSTALLATION HEREIN AND OTHER RELATED WORKS TO BE DONE ON THIS BUILDING
SHALL CONFORM IN ACCORDANCE WITH THE PROVISIONS AND CODE STANDARD OF THE FOLLOWING:
1 1
B
1.2 REPUBLIC ACT 7920 OTHERWISE KNOWN AS THE THE NEW ELECTRICAL ENGINEERING LAW.
1
B
1.3 NATIONAL BUILDING CODE
2.0 ELECTRICAL INSTALLATION HEREIN SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A DULY
4.0 MATERIALS AND EQUIPMENT TO BE USED (BALLAST, FLUORESCENT TUBE, WIRING DEVICES,CIRCUIT
BREAKERS, CONDUIT AND PIPES, ENCLOSURES, WIRES AND CABLES, ETC.) SHALL HAVE IMPORTED USE: 2-5.5mm
1-3.5mm
COMMODITY CLEARANCE (ICC) LABEL FOR FOREIGN MADE PRODUCTS AND P.S. MARK FOR LOCAL IN
60AMP, 20AF, 2P,
NATURE OF THE BUREAU OF PRODUCTS STANDARDS. (BPS). GROUND FLOOR PLAN SECOND FLOOR PLAN DECK ROOF PLAN
18KAIC 15mm
5.0 PROVIDE GROUNDING AND NEUTRAL WIRES TO ALL OUTLETS AND LIGHTING CIRCUITS. ALL
NON-CURRENT CARRYING METAL PARTS SHALL BE GROUNDED AND BONDED.
M E LIGHTING LAYOUT E LIGHTING LAYOUT E LIGHTING LAYOUT
SCALE: 1:100MTS. SCALE: 1:100MTS. SCALE: 1:100MTS.
60 AT MAIN
1-4 6-9 8-9
6.0 ALL PANEL BOARDS, MAIN DISTRIBUTION PANELS, ETC.,SHALL HAVE GROUNDING BUS FOR BRANCH
30 AT; 2P, 230 V MCB
CIRCUITS AND SUB-FEEDER GROUNDING SYSTEM, MAIN GROUNDING SYSTEM SHALL BE BONDED TO
THE NEAREST METAL WATER PIPE SERVICE. 30 AT 15 AT A B C A B C A B C
MAIN 1 2 LIGHTING
7.0 MOUNTING HEIGHTS FOR ALL WIRING DEVICES AND PANEL BOARDS SHALL BE AS FOLLOWS: 15 AT 20 AT
LIGHTING 3 4 LIGHTING
7.1 LIGHTING SWITCHES ------------ 1.4 M ABOVE FINISH FLOOR
20 AT 30 AT
7.2 CONVENIENCE OUTLET ------------ 0.3 M ABOVE FINISH FLOOR
7.3 TELEPHONE OUTLET ------------ 0.3 M ABOVE FINISH FLOOR CONVENIENCE OUTLET 5 6 CONVENIENCE OUTLET
7.4 PANEL BOARDS AND CABINETS ------------ 1.8 M ON TOP ABOVE FIN. FLR. 30 AT 30 AT
7.5 MONITOR CONTROL AND ECB ------------ 1.8 M ABOVE FINISH FLOOR REFRIGERATOR OUTLET 7 8 AHU
7.6 MANUAL TRANSFER SWITCH ------------ 1.8 M ABOVE FINISH FLOOR 30 AT 30 AT
1 1 1
B
7.7 EMERGENCY LIGHT FIXTURE ------------ 0.3 M BELOW CEILING LINE AHU 9 10 SPARE
9.0 LIGHTING FIXTURES WITH FLUORESCENT TUBE SHALL HAVE THERMAL PROTECTOR HIGH-POWER
FACTOR BALLAST (PRE-HEAT).
10.0 MECHANICAL EQUIPMENT WITH HIGH VIBRATION MOVEMENTS SHALL HAVE FLEXIBLE CONDUIT
CONNECTION FROM MOTOR TERMINAL BOX TO OVER CURRENT DEVICE ENCLOSURE (ECB).
E PANEL BOARD 2 2 2
11.0 PRIOR TO ITS MOUNTING AND TERMINATION OF LIGHTING FIXTURES, WIRING DEVICES, EQUIPMENT, NOT TO SCALE
ETC.. CONTRACTOR SHALL ENGAGE WITH THE CONSULTANT OR OWNER REPRESENTATIVE THE 2-9
FOLLOWING FIELD ACCEPTANCE TEST AND MATERIAL INSPECTION.
12.0
GROUND WELL RESISTANCE TEST MEASUREMENT FOR LIGHTING SYSTEM
SCHEDULE OF LOADS
LEGEND CIRCUIT
NUMBER
DESCRIPTION LIGHTING
OUTLET
CIRCUIT
OUTLET
VOLTS WATTS AMPERE SIZE OF WIRES & CONDUITS AMPERE
PROTECTION
1 MAIN
60 AT MAIN
PANEL 2 LIGHTING 9 230 900 3.91 15V
BOARD
3 LIGHTING 8 230 800 3.48 15V
= 30.75 AMPERES
USE = 60AMPERES
PROFESSIONAL ELECTRICAL ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.
B
DISCREPANCY FOUND THEREIN.
M
5. ALL SLOPE FOR HORIZONTAL BRANCHES SHALL MAINTAIN 2% MINIMUM UNLESS SERVICE
CONNECTION POINT.
7. THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AS SITE AND COORDINATE DECK ROOF PLAN
THE WORKS WITH THE SEWER LINE EFFLUENT DISPOSAL POINT AND WATER LINE. E SANITARY LAYOUT
SCALE: 1:100MTS.
3-5
8. ALL WATER PIPES AND WATER TANK SHALL BE THOROUGHLY FLUSHED AND GROUND FLOOR PLAN GROUND FLOOR PLAN
DISINFECTED WITH LIQUID CHLORINE OR HYDROCHLORIDE SOLUTION. P SANITARY LAYOUT P WATER LAYOUT
SCALE: 1:100MTS. SCALE: 1:100MTS.
1-5 2-5
9. ALL WATER PIPES SHALL BE HYDROSTATICALLY TESTED TO AT LEAST 150psi PF THE
DESIGN WORKING PRESSURE OF THE SYSTEM.
10. ALL SANITARY AND STORM DRAINAGE PIPES SHALL BE HYDROSTATICALLY TESTED TO
ATLEAST 30M HEAD TO ENSURE THE SYSTEM ARE WATER TIGHT. ALL COLD WATER LINES
0.20M O.C MANHOLE
11 BRANCH WATER LINES SHALL BE PVC WASTE PIPES SHALL BE PVC INLET C.O.
12. ALL WORKS TO BE DONE SHALL BE UNDER THE DIRECT PROVISION OF A DULLY C.O. OUTLET
LICENSED SANITARY, SANITARY ENGINEER OR AT LEAST A MASTER PLUMBER.
100MM.THK.LINTEL BEAM
INLET
PROFESSIONAL SANITARY ENGINEER: PROJECT TITLE: SHEET CONTENTS: OWNER: REVISIONS: DESIGN BY SHEET NO.