Beruflich Dokumente
Kultur Dokumente
Date:
Will the work involve any of the activities below? (Circle any that apply)
Prepared by: If ‘YES’ a Permit must be obtained
Company: ENOTEK ENGINEERING SDN BHD Hot work in Hazardous areas Confined space entry Excavation >/=1.2 m
Work on Flammable Gas
Retail Station Address: Inerting or Gas Freeing Live Electrical Work
Systems
Other (specify):
Asbestos Work Explosive Blasting
JHA Reference No.: ENO/JHA/SHELL/001 JHA Review No.: Rev 003 (4 August 2017) Review by: Project Manager
Wan Anwar Faiz
Making Predetermined JHA shall be verified and reviewed on site every day before performing the work
Approve by: HSSE Executive(HOD)
Description of work: Cutting And Excavation Work At Non-hazardous area
Nazrul Afiq Ramlan
WORK PREPARATION
1.1.1 Ensure the green zone is establish at safe area
Page 1 of 4
RETAIL PERMIT TO WORK SYSTEM –JOB HAZARD ANALYSIS
4.1.1 Make sure the workers are wearing the visible vest
Isolated the working area including barricade and
4 4.1 Traffic flow may cause an accident A trained flagman to be available is there a traffic at
proper signage 4.1.2
site
5.1.1 Make sure workers do housekeeping regularly
5 Identify The temporary debris keeping area 5.1 Debris thrown away may cause trip
5.1.2 Barricade and proper signage display
EXECUTION OF WORKS
Make sure the workers are wearing the high visible
6.1.1
vest
A trained flagman to be available is there a traffic at
6 Mapping and Marking the working area 6.1 Traffic flow may cause an accident 6.1.2
site
Page 2 of 4
RETAIL PERMIT TO WORK SYSTEM –JOB HAZARD ANALYSIS
Heat/spark from the machinery exhaust can cause Spark arrestor will be equipped at the machinery
8.4 8.4.1
fire or explosion exhaust
Operator backhoe failed to hacking at designated Provide dedicated banksman to control backhoe
8.5 8.5.1
area and can cause damage to station properties. operation.
9 Remove all debris from work area 9.1 Debris thrown away may cause people to trip 9.1.1 Make sure workers do housekeeping regularly
Opening from the excavation will cause damages to Trench will be temporary backfill using sand to avoid
10 Temporary cover to the trench 10.1 10.1.1
the vehicle damages to the public vehicle
Lack of communication regarding closure of
11 Close work authorization 11.1 commissioning activity could expose public or station 11.1.1 Close work clearance form
workers to hazards
Page 3 of 4
RETAIL PERMIT TO WORK SYSTEM –JOB HAZARD ANALYSIS
Personal Protective Equipment (PPE) appropriate to the task at hand shall be worn/used at all times.
Tick box any PPE that applies to this job
List required equipment / tools (e.g hand tools, mechanical tools, plant etc.):
The work crew acknowledges that they understand and will comply with the precautions listed above
Page 4 of 4