0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
31 Ansichten1 Seite
This document outlines a preventative maintenance technical data schedule for a public address system. It lists 10 activities to check the installation, operation, audio quality, cable terminations, speaker lines, equipment labeling, components, power supply regulation, and ventilation. It requires a specialist electronics contractor and notes the service should be performed annually.
This document outlines a preventative maintenance technical data schedule for a public address system. It lists 10 activities to check the installation, operation, audio quality, cable terminations, speaker lines, equipment labeling, components, power supply regulation, and ventilation. It requires a specialist electronics contractor and notes the service should be performed annually.
This document outlines a preventative maintenance technical data schedule for a public address system. It lists 10 activities to check the installation, operation, audio quality, cable terminations, speaker lines, equipment labeling, components, power supply regulation, and ventilation. It requires a specialist electronics contractor and notes the service should be performed annually.
Last Amendment Date: 04/02/2008 A B C D E 1 Check installation against records, report & record any discrepancies. Y 2 Check operation of the system. Y 3 Check,(under full connected load),the audio quality for any discernible distortion, Y undesirable noise or hum. 4 Check cable terminations and check cable termination records. Y 5 Measure and record resistance of all speaker lines at main equipment. Y 6 Check labelling of speaker selection unit Y 7 Check all equipment for damaged,stressed or heated components. Y 8 Check output voltage regulation of power supplies. Y 9 Check equipment for proper ventilation. Y 10 Record all results in log book. Y
Special Comments and Technical Data
*SPECIALIST ELECTRONICS CONTRACTOR REQUIRED FOR THIS WORK.