DETAILS OF TENDERS AWARDED (more than Rs. 1 crore value) upto 19.12.

2018
Whether
No. & name of the
Mode of Date of Type of bidding contract Value of the
Last date of No. of tender parties not Contract No. and Name of Schedule date of
S.No. Tender No Item/Nature of work tender publication of Single/Two bid awarded to contract (In
tender receipt received qualified after date contractor completion
enquiry NIT system lowest crore)
tech. evaluation
tenderer

Design and Construction of Rail


Flyover and approaches on
IFP No: Viaducts, Formation in
HQ/EN/EDFC- Embankments/Cuttings including
1/PQ/RFO/BRKN- blanketing, Supply and Spreading of
DERdated Ballast and related works for single M/s M.G.
Issued PQ on LOA
06.03.2018, track electrified railway line on Contractors
07.03.2018, PQ followed by PQ 03.05.2018, PQ-4, PQ-Nil, No.HQ/EN/EDFC-
& Design Build Lump Sum Basis Pvt. Ltd.,
1 Open PQ Bid on bidding single stage Bid 20.09.2018 Bid-3. Bid-Nil. Yes 1/BID/RFO/BRKN- Rs.172.80 Cr. 600 days
IFB No: connecting New Boraki DFC yard to Panchkula,
27.06.2018. two packet. DER dated
HQ/EN/EDFC- Dadri yard approx. length 4.54 Kms Haryana.
12.11.2018
1/BID/RFO/BRK from Ch. 0.00 m (Rly Km 1410.436)
N-DER dated to Ch. 4540 m (Rly Km 1414.955)
27.06.2018 and related Diversion works in
connection with Eastern Dedicated
Freight Corridor in the state of Uttar
Pradesh in India

M/s
No.- 2
HQ/Admin/ HQ/Admin/ ASHIRBAD
1. M/s Avia Xpert (P)
Tender/Houseke Engagement of housekeeping Tender/Housekeepin HOUSEKEEPI
Ltd.,New Delhi Rs.
2 eping services for DFCCIL’s Corporate E-open tender 19.03.2018 Single 12.04.2018 5 Yes g NG 31.07.2020
2.M/s Das 3,13,97,750.60/-
services /17 office ,New Delhi services /17 SERVICES
Restaurant, Jaipur,
dtd .02.07.2018 PVT. LTD
Rajasthan
,NEW DELHI

No.4
1. M/s Ecos (I)
Mobibility &
Hospitality Pvt. Ltd.
New Delhi HQ/AD/VEHICLE M/s Vivek
HQ/AD/VEHICLE Hiring of Vehicles for DFCCIL Rs.
3 E-open tender 15.6.2018 Single 23.7.2018 5 2. M/s Kuldip Tourist Yes TENDER-2018 travels Pvt. 14.10.2020
TENDER-2018 Corporate Office, new Delhi 7,42,05,896.66/-
Taxi , New Delhi dtd. 08.10.2018 Ltd.New Delhi
3. Avtar Travels ,New
Delhi
4 S.A.Travels, New
Delhi

No.-2
1. M/s Rahul Bose M/s 3097/
Security & Allied Services for the Security Agency, new HQ/AD/Security Rang Nath Rai
HQ/AD/Security Rs.
4 DFCCIL Corporate Office, New E-open tender 17.11.2016 Single 01.12.2016 3 Delhi Yes Services/2, Security 31.12.2018
Services/2 2,22,53,339/-
Delhi 2. M/s Mohit Bawa dtd. 29.12.2016 Agency, New
Security Agency, New Delhi
Delhi
M/s Price
watre house
Coopers
Private Limited
in Joint
Venture with
M/s PWC
Strategy &
EOI Publication in
RFP No.HQ/OP RFP issued to (India) Pvt.
Consultancy Services for New papers - EOI followed by HQ/OP &
& Short listed Ltd., M/s
Development of Marketing and 24/08/2014& Selection of BD/HEAVYHAUL/D
5 BD/HEAVYHAUL consultants in 20.01.2015 4 Nil Yes Hamburg Port Rs. 9,61,01189/- 15.12.2018
Commercial Strategies for DFCCIL 26/08/2014 Consultants on MCSD/RFP/2014,
/DMCSD/RFP/20 response to Consulting
and its Catchment Areas (DMCSD) On website – QCBS System 06/10/2015
14 EOI GmbH,
28/08/2014
Germany and
M/s
UNICONSULT
Universal
Transport
Consulting
GmbH,
Germany

M/s CPCS
Transcom
International
Limited
(Barbados) in
RFP issued to EOI Publication in Joint Venture
RFP No. HQ/OP EOI followed by No. HQ/OP &
Consultancy Services for Short listed New papers - with CPCS 11.11.2018
& BD/HEAVY Selection of BD/HEAVY Rs.6,96,82,371.
6 Institutional Strengthening Module consultants in 17/08/2014 16.04.2015 2 Nil Yes Transcom extension under
HAUL/ISMD/RFP Consultants on HAUL/ISMD/RFP/20 56/-
of DFCCIL (ISMD) response to On website – Limited process
/2014 QCBS System 14 dtd. 22/09/2015
EOI 19/08/2014 (Canada) Suit
G6, Welches
Plaza,
Welches,
St.Michael,
Barbodos

Engagement of Manpower service


M/s
provider for outsourcing of
HQ/HR/Tender/C Newspapers HQ/HR/Tender/CO/6 M.J.Solanki, Rs.
7 Secretarial and Support Manpower 03.12.2015 Single 22.12.2015 9 Nill Yes 28.02.2019
O/6 Open Tender dtd. 29.01.2016 Bhavnagar, 7,43,01,491/-
services in DFCCIL Corporate
Gujrat
Office.

Engagement of Manpower Services


CPM/DFCCIL/N DFCCIL/Noida
Provider for Outsourcing of Support
OIDA Unit/ Hiring Unit/Hiring of M/s Rakshak
Services in DFCCIL under
8 of E-Tendering 17.07.2018 Single Packet 10.08.2018 5 Nill Yes Manpower/Rakshak/ Securitas 2,95,69,452/- 16.09.2020
CPM/Noida Unit for a period of Two
Manpower/2018/ 2018/02 dated Pvt.Ltd
year (extendable by additional one
02 30.10.2018
year)

Consultancy Services for Social &


EOI:- 22.11.2017
Environmental Safeguard
in newspaper &
Monitoring and Review Consultant Contract
RFP issued to 01.12.2017 in No.
(SESMRC) for EDFC-3 project: Single stage 01; M/s EPTISA Awarded to M/s LEA
No: Short listed UNDB website HQ/SEMU/SESMRC/
Sahnewal-Pilkhani section, 175 bidding from Servicios de Highest Associates INR 45 Months from date
9 HQ/SEMU/SESM consultants in RFP:- 05.02.2018 5 EDFC-3/2017
Kms, Khurja-Dadri section, 46 Kms Shortlisted Ingenieria, S.L., Combined South Asia 3,31,98,000/- of Commencement
RC/EDFC-3/2017 response to 02.01.2018 (sent Dated 28.03.2018
and Pilkhani-Khurja section, 221 Consultants Madrid, Spain Score Pvt. Ltd.
EOI to shortlisted
Kms and Balance 3 QPRs of EDFC- Consultant
consultant)
1 project: Khurja-Bhaupur section,
343 Kms.
Contract
RFP issued to EOI: 29.09.2017
Balance General Consultancy Single stage Awarded to No. HQ/EN/Proc./GC-
No: Short listed & 26.10.2017
Services for Khurja-Sahnewal and bidding from Highest III Egis Rail S.A- INR 8 Months from date of
10 HQ/EN/Proc./GC- consultants in RFP: 27.03.2018 2 Nill
Khurja-Dadri Section of Eastern Shortlisted Combined Dated 09.05.2018 Egis India JV 2,72,17,210/- Commencement
III/RFP response to 12.02.2018
Dedicated Freight Corridor. Consultants Score
EOI
Consultant

EOI Publication:
DFCCIL website-
25.01.2017
News Papers-
Consultancy Services for RFP issued to
RFP No.: 02.02.2017 Single Stage Euro 149,859
Independent Safety Assessment of shortlisted HQ/S&T/EC/ISA/MG
HQ/S&T/EC/ISA/ UNDB website: Bidding from Italcertifer (exclusive of 15 months after the
11 Signalling Works of Mughalsarai – consultants in 19.01.2018 3 Nil Yes S-BPUN dated
MGS-BPUN 02.02.2017 shortlisted S.p.A, Italy local indirect Effective Date
New Bhaupur section of Eastern response to 23.03.2018
dated 11.12.2017 RFP Publication: consultants taxes)
DFC Project-2. EOI.
11.12.2017 (sent
to shortlisted
consultants)

Contract Systra MVA


RFP No: Project Management Consultancy RFP issued to
EOI: 20.05.2016 Single stage Awarded to Consulting EURO:
HQ/EN/Procurem Services for Khurja - Pilkhani Short listed HQ/EN/Procurement/
RFP: bidding from Highest (India)Pvt. Ltd 23,92,390/- and 68 Months from date
12 ent/PMC/KRJ- Section (Approx. 222 Route Kms) of consultants in 30.01.2017 4 NIL PMC/KRJ-PKY,
25.10.2016 Shortlisted Combined and Systra INR of Commencement
PKY Dated Eastern Dedicated Freight corridor response to Dated 20.02.2018
Consultants Score S.A. France 49,07,66,000/-
25.10.2016 Project-3 EOI
Consultant ‘JV’

First stage Bid


Design and Construction of civil, (Technical bid):
Structures and Track Works, 08.11.2016
involving Formation in Extended up to
Embankment/ Cuttings, Ballast on SPN issued on 22.11.2016
Formation, Track Works, Bridges, 30.04.2015and and 24th June, 2021
ICB No. 8 for Technical
Structures, Buildings, yards & Prequalificatio first stage Bid Second Stage HQ/EN/EC/D-B/ (i.e 1200 days from
HQ/EN/EC/D-B/ Two stage bidding bid (1st stage) INR
Integration with Indian Railway’s n followed by invitation issued Bid (Financial Khurja - Pilkhani Larsen & Date of
13 Khurja - Pilkhani from Pre-qualified and 6 for NIL YES 28,63,81,13,28
Existing Railway system and two stage on 22.11.2016. Bid from section/CP-303, Toubro Ltd. Commencement of
section, dated bidders Financial bid 0.00
Testing & Commissioning on bidding Second stage bid technically dated 15.03.2018 work on 12.03.2018)
19.08.2016 (2nd stage)
Design-Build Lump-Sum Basis of invitation issued qualified
Khurja - Pilkhani Section (approx. on 22.06.2017. bidders):
222 route Km of Single Line) of 12.06.2017 and it
Eastern Dedicated freight Corrdor was extended up
(Contract Package-303) to 22.06.2017

Independent Safety Assessment


Limited tender LOA No.
Services for Signalling System of M/s Bureau
HQ/S&T/WC- to firms on Single Stage Two HQ/S&T/ISA/WDFC- 3 Years from date of
14 Phase-II (Rewari -Dadri and JNPT- 28/07/2017 05/10/2017 3 Nill Yes veritas Italia 2.7264699
II/ISA RDSO's list of Envelop Bidding II/Bid Evaluation issue of LOA
Vadodara section) of the Western S.p.A
ISA dated: 01/01/2018
Dedicated Freight Corridor
Selection of Architechtural & Design
Consultancy Firm, for Providing
comprehensive Architecural &
Design Consultancy Services for
the Following Work:

Detailed Master Planning of


Awarded
"DFCCIL Inegrated Office Cum
CPM/DFCCIL/N Using
Residential Complex" with Pre-
OIDA CQCCBS LOA No. DFCC/
Certified GRIHA 5 Star Rating (on Stage -I
UNIT/Architectur (Combined Noida Unit/ Arch- Space
the land measuring approx. 16.8491 E-tendering 28/08/2016 Two Bid System 05/10/2016 11 (i) KliMart Pvt. Ltd. 17,136,000 13/12/2019
al Quality Cum Tender/ Contract/370 Combine
Hect. At Noida-Greater Noida (ii) Mecon Limited
15 Consultancy/201 Cost Based dtd 29/11/2016
Expresswat in Village Jhatta, Noida)
6/3 System)
System
&
Complete Design, Drawing &
Development of a Corporate Office
Building with GRIHA 5 Star Green
Building rating (of built up area
19200 sqm) to be constructed in
Phase-I of the Project.

Note:- For Stage-II Tech. Evaluation concept Presentation were given by bidders to nomiated Jury (Approved by Corporate Office) Out of 9, Only 2 bidders qualified Stage-II technical Evaluation, therefore, Financial offers of only these 2 bidders (C.P. Kukreja &
Space Combine) were opened.

2 LOA No.
CPM/DFCCIL/No
M/s Indraprastha DFCC/Noida M/s Amrita
ida Unit/ Hiring of Hiring of Commercial Vehicles for
Services, Lado Sarai Unit/Hiring of travels, Mohan
16 Commercial official use of CPM/DFCCIL/Noida E-tendering 08/02/2017 Two Bid 03/03/2017 3 Yes Rs 1,65,97,584/- 07/04/2019
Commercial Nagar ,
Vehicles/ Unit for a period of two years.
M/s Vivek Travels, Vehicles/2017/01/57 Gaziabad
2017/01
Pitampura 2 dtd 23/03/2017

Engagement of Manpower Services M/s Crux


CPM/DFCCIL/No
Provider for Outsourcing of support LOA No. DFCC/ Management
ida Unit/Hiring of
services in DFCCIL under Noida Unit/Hiring of Services Pvt.
17 Manpower Open tender 20/05/2017 Single Bid system 13/06/2017 4 NIL Yes 1.15 crs 30/06/2018
CPM/Noida Unit for a period of ine Manpower/2017/02 Ltd.,
Services/2017/02
year (extandable by additional 1 dtd 28/06/2017 Begumpet,
dtd 16/05/2017
year) Hyderabad.

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-PNU/ROB/ Ranjit Construction
18 Construction of ROB Open Tender 05.01.2017 Two bid system 18.02.2017 2 Yes PNU/ROB/LC No. Construction 63.83 05.01.2019
LC No. 211 & Company
211 & 216 Dated:- Co.
216
06.05.2017

Independent Safety Assessment


Services for Signalling System Limited tender 4.2961
HQ/S&T/WC- including TPWS of Phase-I (Rewari - to firms on Single Stage Two HQ/S&T/WC-I/ISA-R ITALCERTIFE (excluding local 4 Years from date of
19 26/10/2016 28/11/2016 3 NILL Yes
I/ISA-R Makarpura) of the Western RDSO's list of Envelope Bidding Dated 31-01-2017 R S.p.A. service tax issue of LOA.
Dedicated Freight Corridor and ISA component)
Signalling Generic Products

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-PNU/ROB/ Open Tender,
20 Construction of ROB 08.12.2016 Two bid system 10.01.2017 3 NA Yes PNU/ROB/LC No. Construction 76.87 21.11.2018
LC No. 199 & E-Tender
199 & 201 Dated:- Co.
201
22.03.2017
Expression Of
Interest:
05.11.2015
EOI invited on Expression Of Joint Venture
and
05.10.2015 and Interest: 18 Contract of ITALFERR
ICB No: Quality and Safety Audit Short listing EURO
Request for Single stage Awarded to HQ/EN/Procurement/ S.p.A –
HQ/EN/Procurem Consultancy Services for Sahnewl- followed by Request for 14,04,000.00 45 (Forty Five)
Proposal invited bidding from Request for Highest QSAC/SNL-KRJ & VOGUE
21 ent/QSAC/SNL- Khurja Section with Khurja-Dadri Single Stage Proposal NIL and INR Months from date of
(Technical + Shortlisted Proposal Combined KRJ-DER Dated: Construction &
KRJ-DER, Dated: Link of Eastern Dedicated Freight and Two (Technical + 18,81,50,000.0 Commencement
Financial Consultants (Technical + Score 20.03.2017 Consultancy
18.05.2016 Corridor. Packet System Financial): 0/-
Proposal) on Financial): 3 Consultant Services Pvt.
28.06.2016
18.05.2016 Ltd.
Extended up to
12.07.2016

EOI invited Expression Of


on Interest:
Expression of
Consultancy Services for 28.6.2016 17.08.2016 Contract
Interest: Monash
ICB No: study on the Special and and Awarded
Short listing 10 University’s
HQ/EN/Proc./IR/ Railway Establishment for 02.08.2016 Single stage two Request for to AUD
followed by Request HQ/EN/Proc/IR/ Institute of 4 (Four) Months from
SRESTHA, Strategic Technology & and Request packet bidding from Proposal Highest 635,160/-
22 Single Stage for NIL SRESTHA Railway date of
Dated Holistic Advancement for Proposal Shortlisted (Technical + Combined excluding
and Two Proposal Dated 16.03.2017 Technology, Commencement
16.03.2017 (SRESTHA) in Indian invited Consultants Financial): Score service tax
Packet System (Technical + Australia
Railways (Technical + 27.10.2016 Consultant
Financial ): 4
Financial Extended up to
Proposal) on 21.11.2016
21.09.2016

Expression Of
Interest:02.08.20 Expression Of
EOI invited on
16 Interest: 13
Consultancy Services for study on 12.07.2016 and Contract
ICB No: Short listing and KPMG
the Railway Planning & Investment Request for Single stage Awarded to
HQ/EN/Proc./IR/ followed by Request for HQ/EN/Proc/IR/RPIO Advisory 4 (Four) Months from
Organization (RPIO) and Special Proposal invited bidding from Highest INR
23 SUTRA & RPIO, Single Stage Proposal Nill & SUTRA Dated Services date of
Unit for Transportation Research (Technical + Shortlisted Combined 2,36,28,250
Dated and Two (Technical + Request for 15.02.2017 Private Commencement
and Analysis ( SUTRA ) in Indian Financial Consultants Score
30.08.2016 Packet System Financial): Proposal(Tech Limited, India
Railways Proposal) on Consultant
05.10.2016 nical +
30.08.2016
Extended up to Financial):4
17.11.2016

IFP No:
HQ/EN/EC/PQ/Tr
ack/MGS-
Design, Supply and Construction of
DGO&KWDN-
Track & Track related works
CPBH-SEBN
including Testing & Commissioning LOA No.
dated Issued PQ on M/s Kalindee
for double track electrified railway HQ/EN/EC/Bal.Track
14/01/2016, 14.01.2016, PQ followed by PQ 17.03.2016, PQ-5, PQ-Nil, Rail Nirman
line on Design Build Lump Sum /MGS-DGO&KWDN-
24 & Open PQ Bid on bidding single stage Bid 27.09.2016 Bid-2. Bid-Nil. Yes (Engineers) Rs.196.90 Cr. 730 days
Basis from Mughalsarai to New CPBH-SEBN/Bid
IFB No: 11.07.2016. two packet. Limited, New
Sonnagar and Chirailapathu Doc dated
HQ/EN/EC/Track Delhi.
(excluding New Karwandiya – New 25.01.2017
/MGS-
Durgauti Section) of Eastern
DGO&KWDN-
Dedicated Freight Corridor.
CPBH-SEBN
dated 11.07.2016
Social and Environmental
Safeguards Monitoring and Review
HQ/SEMU/EC/SESM
HQ/SEMU/EC/S Consultancy (SESMRC) for M/s Operation
RC/APL-3/2016 1.10.2020
25 ESMRC/APL- Sahnewal-Pilkhani (175 Kms) and Open Tender 09.03.2016 Two Packet System 01.07.2016 3 All qualified Yes Research 1.67
Dated: (45 months)
3/2016 Khurja- Dadri (46 Kms) Sec. (APL- Group Pvt.Ltd.
16.12.2016
3) of EDFC Project.
Total 221 Kms

Date of Award-12-05-
EOI followed by 29 months from date
Engg service Consultancy (Rewari- Open, in terms 2010
Selection of N.K. of commencement i.e.
26 Hq/EN/WC/E&S Vadodara section, WDFC, Ph-1)ES- of JICA 30/10/2009 21/12/2009 1 Nill Sole tenderer CA No- 127.46
Consultants on Consortium from 13-06-2010; up
1 Guidelines Hq/EN/WC/E&S
QCBS System to 30-10-2012
dated 12-05-2010

21 months from the


Date of Award-31-10-
Engg service Consultancy (JNPT- EOI followed by date of issue of
Open, in terms 2011
Hq/EN/WC/Ph- Vadodara & Rewari-Dadri sections, Selection of N.K. Client’s Notice to
27 of JICA 09/07/2010 18/10/2010 1 Nill Sole tenderer CA No- 99.25
II/ECS WDFC, Ph-2) Consultants on Consortium-2 Proceed i.e.
Guidelines Hq/EN/WC/E&S
ES-2 QCBS System From 30-12-2011
dated 30-11-2011
Up to 30-09-2013

Date of Award-07-06-
2013
Prequalification
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms followed by Single
2011/WC/Ph.I/P Package (Rewari- Iqbalgarh, WDFC- HQ/EN/PWC/Phase-I Sojitz-L&T of commencement i.e.
28 of JICA 18/11/2011 Stage Two 27/09/2012 2 Nill Yes 6,699.50
Q Ph-1) Pkg- Consortium 30-08-2013 up to 25-
Guidelines Envelope Bidding
CTP-1&2 1&2/D&B/1/Sojitz- 08-2018
System
L&T dated 06-08-
2013

Date of Award-26-08-
2014
Prequalification
CA No- 208 weeks from date
Electrical Package (Rewari- Open, in terms followed by Single
2013/WC/Ph.I/P HQ/EN/PWC/PHASE- JFE-Gammon of commencement i.e.
29 Makarpura-WDFC-Ph-1) of JICA 01/07/2013 Stage Two 07/03/2014 2 Nill Yes 328.00
Q-3A(R ) I PKG- Consortium 20-11-2014 up to 15-
EMP-4 Guidelines Envelope Bidding
3A(R)/D&B/2/JFE- 11-2018
System
Gammon Dated 15-
10-2014

Date of Award-18-11-
2014
200 weeks from date
Electrical Package (Rewari- Open, in terms Single Stage Two CA no-
2013/WC/EMP- Sojitz-L&T of commencement i.e.
30 Makarpura-WDFC-Ph-1) of JICA 28/03/2013 Envelope Bidding 26/02/2014 Nill Yes Hq/EL/WC/Phase- 3097.00
4/Ph-1/Bid Consortium 15-05-2015 up to 15-
EMP-4 Guidelines (Post PQ) 1/Pkg-EMP-
03-2019
4/D&B/3/Sojitz-L&T
dated 04-03-2015

Date of Award-22-06-
2015
338 weeks from date
Signalling & Telecom Package Open, in terms Single Stage Two CA no-
2013/WC/STP- S.A.F.E. of commencement i.e.
31 (Rewari-Makarpura-WDFC-Ph-1) of JICA 15/04/2013 Envelope Bidding 21/11/2014 2 Nill Yes Hq/S&T/WC/Phase- 1780.2
5/Ph-1/Bid Consortium 11-01-2016 up to 04-
STP-5 Guidelines (Post PQ) 1/Pkg ST P-
07-2022
5/D&B/4/S.A.F.E.
dated 10-12-2015

442 weeks from date


Train Protection & warning System Open, in terms Single Stage Two
2014/WC/STP- I-N Signal of commencement i.e.
32 (TPWS) Package of JICA 14/08/2014 Envelope Bidding 28/11/2014 2 Nill yes 28/11/2014 608.99
5A/Phase-I&II/Bid Cosnortium 01-06-2016 up to 20-
STP-5A Guidelines (Post PQ)
11-2024
06 years from date of
Date of Award-26-02- commencement i.e.
EOI followed by
Project Management Consultancy Open, in terms 2014 11-04-2014 up to 09-
Hq/EN/WC/Ph.I/ Selection of
33 (Rewari-Makarpura-WDFC-Ph-1) of JICA 08/04/2013 28/06/2013 1 Nill Sole tenderer CA no- NKC 653 04-2020; for Loco
PMC Consultants on
PMC-1 Guidelines Hq/EN/WC/PMC-1 related activities, 96
QCBS System
dated 27-03-2014 months i.e. up to 28-
02-2022

Date of Award-25-02-
2016
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms Single Stage Two Sojitz-L&T-
HQ/EN/WC/Ph.I/ Package ( Iqbalgarh-Vadodara, HQ/EN/PWC/PHASE of commencement i.e.
34 of JICA 01/06/2015 Envelope Bidding 11/09/2015 2 Nill Yes Gayatri 4743.9
CTP-3R WDFC-Ph-1) – I PKG – 3( R)/ 06-06-2016 up to 01-
Guidelines (Post PQ) Consortium
CTP-3R D&B/8/Sojitz-L&T- 06-2020
Gayatri dated 17-
05-2016.

Date of Award-15-07-
2016
Prequalification CA no-
Civil, Building Track Contract
Open, in terms followed by Single HQ/EN/PWC/Phase- Express freight
2014/HQ/EN/PW Package (JNPT-Vaiterana, WDFC- 208 weeks from date
35 of JICA 18/06/2014 Stage Two 15/03/2016 2 Nill Yes II/Pkg CTP- Railway 2949
C/CTP-11 Ph-2) of commencement
Guidelines Envelope Bidding 11/D&B/9/Express Consortium
CTP-11
System Freight Railway
Consortium dated 10-
11-2016

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Hq/En/WC/Ph.II/ Package (Vaiterana-Sachin, WDFC- Hq/EN/PWC/Phase- of commencement i.e.
36 of JICA 12/11/2012 Stage Two 10/11/2014 2 Nill Yes Freight 2170.6
PQ-12 & 13 Ph-2) II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
CTP-12 12/D&B/3/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Hq/En/WC/Ph.II/ Package (Sachin - Hq/EN/PWC/Phase- of commencement i.e.
37 of JICA 12/11/2012 Stage Two 10/11/2014 2 Nill Yes Freight 2157.6
PQ-12 & 13 Makarpura(Vadodara) section, II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
WDFC-Ph-2)CTP-13 13/D&B/4/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single 01
Track Contract Package (JNPT- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
38 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 JFE-Gammon yes 518.1
Vadodara section, WDFC-Ph- II Pkg- Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding Consortium
2)CTP-15A 15A/D&B/5/IIS-L&T 10-2019
System
Consortium dated 06-
08-2015
Date of Award-03-06-
2015
Prequalification CA no-
Spl Bridge Package Civil, Building 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single Hq/EN/PWC/Phase-
Track Contract Package (JNPT- IIS-L&T of commencement i.e.
39 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 Nill Yes II Pkg- 330.7
Vadodara section, WDFC-Ph-2) Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding 15B/D&B/6/IIS-L&T
CTP-15B 10-2019
System Consortium dated 06-
08-2015 dated 06-08-
2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single
Track Contract Package (Rewari- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
40 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 Nill Yes 214.11
Dadri section, WDFC-Ph-2)CTP- II Pkg- Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding
15C 15C/D&B/7/IIS-L&T 10-2019
System
Consortium dated 06-
08-2015

Date of Award-
30 months of issue of
26/12/2008
Single stage two Soma Acceptance letter no-
Hq/EN/WC/BRID Spl. Bridge Package (Vaiterana- CA No-
41 Open 11/07/2008 envelope bidding 04/09/2008 5 Nill Yes Enterprises 605.15 Hq/EN/WC/Bridges/D
GES/D&B/1 Utran, 54 Bridges) Hq/EN/WC/Bridges/
system Ltd &B/1 dated 26-12-
D&B/1/Soma dated
2008
17-03-2009

Date of Award-21-01-
Prequalification 2016
182 weeks from date
Open, in terms followed by Single CA no-
2013/WC/EM/Ph. Electrical Package (JNPT-Vadodara Sojitz-L&T of commencement i.e.
42 of JICA 26/09/2014 Stage Two 09/10/2015 2 Nill Yes 2015/Hq/EL/PH- 1213
II/PQ section, WDFC,Ph-2) EMP-16 Consortium 02-05-2016 up to 28-
Guidelines Envelope Bidding II/EMP-16/8/Sojitz-
10-2019
System L&T dated 31-03-
2016

Date of Award-13-05-
Prequalification
2016CA No- 208 weeks from date
(JNPT-Vadodara section, Open, in terms followed by Single
2014/WC/S&T/P HQ/S&T/WC/Ph- Sojitz-L&T of commencement i.e.
43 WDFC,Ph-2) of JICA 25/09/2014 Stage Two 26/11/2015 2 Nill Yes 631
h.II/PQ 2/Pkg STP-17/ Consortium 29-08-2016 up to 24-
STP-17 Guidelines Envelope Bidding
D&B/9/Sojitz-L&T 08-2020
System
dated 10-08-2016

Date of Award-15-02- Part-A- 4+2 Years


Project Management Consultancy EOI followed by
Open, in terms 2016 Part-B-6+2 Years
Hq/EN/WC/Ph- (JNPT-Vadodara & Rewari-Dadri Selection of OCG
44 of JICA 04/06/2015 06/07/2015 1 Nill Sole tenderer CA no- 555 from Commencement
2/PMC(2R) sections, WDFC, Ph-2) Consultants on Consortium
Guidelines HQ/EN/PWC/PMC- date i.e. on 31-03-
PMC-2R QCBS System
2R dated 21-03-2016 2016
Date of Award-14-10-
2016
LOA No-
Integrated Contract Package of 2016/HQ/EN/PWC/C
Design and Construction of Civil, Prequalification TP-14/Price Bid
Building and Track Works, Open, in terms followed by Single Evaluation dated:
Hq/EN/WC Sojitz-L&T 208 weeks from date
45 Electrical and Mechanical Works of JICA 25/05/2014 Stage Two 07/04/2016 2 Nill Yes 14-10-2016 3798.99
Ph.II/PQ-14 Consortium of commencement-
and Signal and Telecom Works Guidelines Envelope Bidding CA no-
(CTP-14) from Dadri to Rewari System HQ/EN/PWC/Phase-
(WDFC-Ph-2) II/Pkg CTP-
14/D&B/10/Sojitz-
L&T Consortium
dated 09-01-2017

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI- M/s. R.C.Patel
46 Construction of ROB Open Tender 21.07.2016 Two bid system 26.08.2016 4 Yes PNU/ROB/LC.No. Construction 34.92 27.06.2018
PNU/ROB/LC.N Co.(JV)
227 Dated:- Co.
O. 227
28.12.2016

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-
47 Construction of ROB Open Tender 19.07.2016 Two bid system 24.08.2016 3 NA Yes PNU/ROB/LC.No. Construction 58.45 27.08.2018
PNU/ROB/LC.N
208 & 208B Co
O. 208 & 208B
Dated:28.12.2016

Expression Of
Interest:
Project Management Consultancy 15.05.2015
EOI invited on Expression Of
Services for construction of double and
27.03.2015 and Interest: 16 Contract
ICB No: line electrified (2x25 KV) Railway Short listing
Request for Single stage Awarded to EURO:
HQ/EN/Procurem Track complete with Signaling & followed by Request for HQ/EN/Procurement/
Proposal invited bidding from Request for Highest TYPSA-ICT- 1698000 and 60 Months from date
48 ent/PMC/KRJ- Telecommunication System and Single Stage Proposal NIL PMC/ KRJ-DER
(Technical + Shortlisted Proposal Combined BARSYL (JV) INR of Commencement
DER, Dated related infrastructure for Khurjal - and Two (Technical + Dated 20.10.2016
Financial Consultants (Technical + Score 21,39,69,500
30.10.2015 Dadri Section (Approx. 46 Kms) of Packet System Financial):
Proposal) on Financial):3 Consultant
Eastern Dedicated Freight corridor 04.12.2015
30.10.2015
Project Extended up to
18.04.2016

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI- M/s. Rakesh
49 Construction of ROB Open Tender 14.06.2016 Two bid system 18.07.2016 2 Yes PNU/ROB/LC.No.21 Construction 68.84 05.06.2018
PNU/ROB/LC.N Construction Co.
4 & 220/R1 Dated:- Co.
O.214 & 220/R1
05.10.2016

Integrated Contract Package of Date of Award-14-10-


Design and Construction of Civil, Prequalification 2016
Building and Track Works, Open, in terms followed by Single LOA No-
Sojitz-L&T 208 weeks from date
50 CTP-14 Electrical and Mechanical Works of JICA 25/05/2014 Stage Two 07/04/2016 2 Yes 2016/HQ/EN/PWC/C 3798.99
Consortium of commencement
and Signal and Telecom Works Guidelines Envelope Bidding TP-14/Price Bid
(CTP-14) from Dadri to Rewari System Evaluation dated:
(WDFC-Ph-2) 14-10-2016
LOA No.
M/s Lall
ALD(E)/EN/ROB/ ALD(E)/EN/ROB/201
51 ROB Work Open Tender 04/06/2016 Two Bid System 04/07/2016 3 NILL Yes Contruction 13.49 30/11/2017
2016/OT-2/177 6/OT-2/177, dated
Co.
30/08/2016

EOI followed by Date of Award-12-05- 29 months from date


Engg service Consultancy (Rewari- Open, in terms
Selection of 2010 N.K. of commencement i.e.
52 ES-1 Vadodara section, WDFC, Ph-1)ES- of JICA 21/12/2009 1 Sole tenderer 127.46
Consultants on No-Hq/EN/WC/E&S Consortium from 13-06-2010; up
1 Guidelines
QCBS System dated 12-05-2010 to 30-10-2012

21 months from the


Engg service Consultancy (JNPT- EOI followed by Date of Award-31-10- date of issue of
Open, in terms
Vadodara & Rewari-Dadri sections, Selection of 2011 N.K. Client’s Notice to
53 ES-2 of JICA 09/07/2010 18/10/2010 1 Sole tenderer 99.25
WDFC, Ph-2) Consultants on No-Hq/EN/WC/E&S Consortium-2 Proceed i.e.
Guidelines
ES-2 QCBS System dated 30-11-2011 From 30-12-2011
Up to 30-09-2013

Date of Award-07-06-
2013
Prequalification
Civil, Building Track Contract No- 208 weeks from date
Open, in terms followed by Single
Package (Rewari- Iqbalgarh, WDFC- HQ/EN/PWC/Phase-I Sojitz-L&T of commencement i.e.
54 CTP-1 &2 of JICA 18/11/2011 Stage Two 27/09/2012 2 Yes 6699.5
Ph-1) Pkg- Consortium 30-08-2013 up to 25-
Guidelines Envelope Bidding
CTP-1&2 1&2/D&B/1/Sojitz- 08-2018
System
L&T dated 06-08-
2013

Date of Award-26-08-
2014
Prequalification
No- 208 weeks from date
Open, in terms followed by Single
Spl Bridge Package HQ/EN/PWC/PHASE- JFE-Gammon of commencement i.e.
55 CTP-3AR of JICA 01/07/2013 Stage Two 07/03/2014 2 Yes 328
CTP-3AR I PKG- Consortium 20-11-2014 up to 15-
Guidelines Envelope Bidding
3A(R)/D&B/2/JFE- 11-2018
System
Gammon Dated 15-
10-2014

Date of Award-18-11-
2014
200 weeks from date
Electrical Package (Rewari- Open, in terms Single Stage Two CA no-
Sojitz-L&T of commencement i.e.
56 EMP-4 Makarpura-WDFC-Ph-1) of JICA 28/03/2013 Envelope Bidding 26/02/2014 Yes Hq/EL/WC/Phase- 3097
Consortium 15-05-2015 up to 15-
EMP-4 Guidelines (Post PQ) 1/Pkg-EMP-
03-2019
4/D&B/3/Sojitz-L&T
dated 04-03-2015

Date of Award-22-06-
2015
338 weeks from date
Signalling & Telecom Package Open, in terms Single Stage Two CA no-
S.A.F.E. of commencement i.e.
57 STP-5 (Rewari-Makarpura-WDFC-Ph-1) of JICA 15/04/2013 Envelope Bidding 21/11/2014 2 Yes Hq/S&T/WC/Phase- 1780.2
Consortium 11-01-2016 up to 04-
STP-5 Guidelines (Post PQ) 1/Pkg ST P-
07-2022
5/D&B/4/S.A.F.E.
dated 10-12-2015
Date of Award-12-08-
2015
442 weeks from date
Train Protection & warning System Open, in terms Single Stage Two CA no-
I-N Signal of commencement i.e.
58 STP-5A (TPWS) Package of JICA 14/08/2014 Envelope Bidding 28/11/2014 2 Yes Hq/S&T/WC/Ph- 608.99
Cosnortium 01-06-2016 up to 20-
STP-5A Guidelines (Post PQ) 1&2/Pkg-STP-
11-2024
5A/D&B/5/I-N dated
10-12-2015

06 years from date of


Date of Award-26-02- commencement i.e.
EOI followed by
Project Management Consultancy Open, in terms 2014 11-04-2014 up to 09-
Selection of
59 PMC-1 (Rewari-Makarpura-WDFC-Ph-1) of JICA 08/04/2013 28/06/2013 1 Sole tenderer CA no- NKC 653 04-2020; for Loco
Consultants on
PMC-1 Guidelines Hq/EN/WC/PMC-1 related activities, 96
QCBS System
dated 27-03-2014 months i.e. up to 28-
02-2022

Date of Award-25-02-
2016
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms Single Stage Two Sojitz-L&T-
Package ( Iqbalgarh-Vadodara, HQ/EN/PWC/PHASE of commencement i.e.
60 CTP-3R of JICA 01/06/2015 Envelope Bidding 11/09/2015 2 Yes Gayatri 4743.9
WDFC-Ph-1) – I PKG – 3( R)/ 06-06-2016 up to 01-
Guidelines (Post PQ) Consortium
CTP-3R D&B/8/Sojitz-L&T- 06-2020
Gayatri dated 17-
05-2016.

Prequalification
Civil, Building Track Contract
Open, in terms followed by Single Express freight
Package (JNPT-Vaiterana, WDFC- Date of Award-15-07- 208 weeks from date
61 CTP-11 of JICA 18/06/2014 Stage Two 15/03/2016 2 Yes Railway 2949
Ph-2) 2016 of commencement
Guidelines Envelope Bidding Consortium
CTP-11
System

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Package (Vaiterana-Sachin, WDFC- Hq/EN/PWC/Phase- of commencement i.e.
62 CTP-12 of JICA 12/11/2012 Stage Two 10/11/2014 2 Yes Freight 2170.6
Ph-2) II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
CTP-12 12/D&B/3/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Package (Sachin - Hq/EN/PWC/Phase- of commencement i.e.
63 CTP-13 of JICA 12/11/2012 Stage Two 10/11/2014 2 Yes Freight 2157.6
Makarpura(Vadodara) section, II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
WDFC-Ph-2)CTP-13 13/D&B/4/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Open, in terms followed by Single 01
Track Contract Package (JNPT- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
64 CTP-15A of JICA 23/11/2012 Stage Two 03/02/2014 2 JFE-Gammon Yes 518.1
Vadodara section, WDFC-Ph- II Pkg- Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
2)CTP-15A 15A/D&B/5/IIS-L&T 10-2019
System
Consortium dated 06-
08-2015
Date of Award-03-06-
2015
Prequalification CA no-
Spl Bridge Package Civil, Building 208 weeks from date
Open, in terms followed by Single Hq/EN/PWC/Phase-
Track Contract Package (JNPT- IIS-L&T of commencement i.e.
65 CTP-15B of JICA 23/11/2012 Stage Two 03/02/2014 2 Yes II Pkg- 330.7
Vadodara section, WDFC-Ph-2) Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding 15B/D&B/6/IIS-L&T
CTP-15B 10-2019
System Consortium dated 06-
08-2015 dated 06-08-
2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Open, in terms followed by Single
Track Contract Package (Rewari- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
66 CTP-15C of JICA 23/11/2012 Stage Two 03/02/2014 2 Yes 214.11
Dadri section, WDFC-Ph-2)CTP- II Pkg- Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding
15C 15C/D&B/7/IIS-L&T 10-2019
System
Consortium dated 06-
08-2015

Date of Award-
30 months of issue of
26/12/2008
Soma Acceptance letter no-
Spl. Bridge Package (Vaiterana- CA No-
67 open Enterprises 605.15 Hq/EN/WC/Bridges/D
Utran, 54 Bridges) Hq/EN/WC/Bridges/
Ltd &B/1 dated 26-12-
D&B/1/Soma dated
2008
17-03-2009

Date of Award-21-01-
Prequalification 2016
182 weeks from date
Open, in terms followed by Single CA no-
Electrical Package (JNPT-Vadodara Sojitz-L&T of commencement i.e.
68 EMP-16 of JICA 26/09/2014 Stage Two 09/10/2015 2 yes 2015/Hq/EL/PH- 1213
section, WDFC,Ph-2) EMP-16 Consortium 02-05-2016 up to 28-
Guidelines Envelope Bidding II/EMP-16/8/Sojitz-
10-2019
System L&T dated 31-03-
2016

Track Side Works -


Date of Award-13-05- 208 weeks from date
Prequalification
2016CA No- of Commencement
(JNPT-Vadodara section, Open, in terms followed by Single
HQ/S&T/WC/Ph- Sojitz-L&T i.e. 29-08-2016 up to
69 STP-17 WDFC,Ph-2) of JICA 25/09/2014 Stage Two 26/11/2015 2 Yes 631
2/Pkg STP-17/ Consortium 24-08-2020 ; On
STP-17 Guidelines Envelope Bidding
D&B/9/Sojitz-L&T Board Radio Works -
System
dated 10-08-2016 416 weeks i.e. up to
19-08-2024

Date of Award-15-02- Part-A- 4+2 Years


Project Management Consultancy EOI followed by
Open, in terms 2016 Part-B-6+2 Years
(JNPT-Vadodara & Rewari-Dadri Selection of OCG
70 PMC-2R of JICA 04/06/2015 06/07/2015 1 Sole tenderer no- 555 from Commencement
sections, WDFC, Ph-2) Consultants on Consortium
Guidelines HQ/EN/PWC/PMC- date i.e. on 31-03-
PMC-2R QCBS System
2R dated 21-03-2016 2016
First stage Bid
(Technical bid):
Design and Construction of civil,
26.08.2015
Sructures and Track Works for
Extended up to
Railway, involving Formation in
16.09.2015
Embankment/Cuttings, Ballast on SPN issued on
ICB No:
Formation, Track Works, Bridges, 05.03.2014 and
HQ/EN/EC/D- and 9 for Technical
Structures, Buildings, yards, Prequalificatio first stage Bid HQ/EN/EC/D-
B/sahnewal- Two stage bidding bid (1st stage)
Integration with Indian Rialway’s n followed by invitation issued 01 (Jaiprakash B/Sahnewal – INR 1769.40
71 Pilkhani and from Pre-qualified Second Stage and 6 for Yes GIL-TPL JV 25th Mach, 2020
existing Railway system and two stage on 26.06.2015. Associates Ltd) Pilkhani/CP-301, Crores
Dadri-Khurja bidders Bid (Financial Bid Financial bid
Testing & Commissioning on bidding Second stage bid Dated 29.08.2016
sections , dated from technically (2nd stage)
Design-Build Lump-Sum Basis for invitation issued
26.06.2015 qualified
Sahnewal-Pilkhani (approx.. 175 on 25.02.2016.
bidders):
route Km of Single Line) of Eastern
29.03.2016 and it
Dedicated freight Corrdor (Contract
was extended up
Package-301)
to 19.04.2016

First stage Bid


(Technical bid):
Design and Construction of civil,
26.08.2015
Sructures and Track Works for
Extended up to
Railway, involving Formation in
16.09.2015
Embankment/Cuttings, Ballast on SPN issued on
ICB No:
Formation, Track Works, Bridges, 05.03.2014 and
HQ/EN/EC/D- and 10 for
Structures, Buildings, yards, Prequalificatio first stage Bid
B/sahnewal- Two stage bidding Technical bid HQ/EN/EC/D-B/Dadri
Integration with Indian Rialway’s n followed by invitation issued 01 (Jaiprakash INR 511.30
72 Pilkhani and from Pre-qualified Second Stage (1st stage) and Yes - Khurja/CP-302, GIL-TPL JV 19th July, 2019
existing Railway system and two stage on 26.06.2015. associates Ltd) Crores
Dadri-Khurja bidders Bid (Financial Bid 6 for Financial Dated 29.08.2016
Testing & Commissioning on bidding Second stage bid
sections , dated from technically bid (2nd stage)
Design-Build Lump-Sum Basis for invitation issued
26.06.2015 qualified
Dadri-Khurja section (approx.. 46 on 25.02.2016.
bidders):
route Km of double Line) of Eastern
29.03.2016 and it
Dedicated freight Corrdor (Contract
was extended up
Package-302
to 19.04.2016

M/S Vivek
Travels
21-5-2013 on LOA No: NOIDA
NOIDA (Regd), SD 1.85 19/07/2013
Hiring of Vehicles for DFCCIL under website and 28- 5- Unit/DFCC/Vehicle
73 Unit/DFCC/ Open tender Single 25/06/2013 2 Under TC Under TC Block, Main revised to extended to
CPM/ NOIDA 2013 in /13/01/197 Dt. 19-07-
Vehicle/13/0 1 Road, 2.72 31/01/2017
newspapers 2013
Pitampura,
Delhi

Expression Of
Interest:
15.05.2015
Project Management Consultancy EOI invited on Expression Of
and
ICB No: Services for construction of single 27.03.2015and Interest: 17 Contract
Short listing DB
HQ/EN/Procurem line electrified (2x25 KV) Railway Request for Single stage Awarded to EURO:
followed by Request for HQ/EN/Procurement/ Engineering
ent/PMC/SNL- Track complete with Signaling & Proposal invited bidding from Request for Highest 1674538 and 68 Months from date
74 Single Stage Proposal NIL PMC SNL-PKY, and Consulting
PKY, Telecommunication System and (Technical + Shortlisted Proposal Combined INR of Commencement
and Two (Technical + Dated 09.09.2016 GmbH,
Dated related infrastructure for Sahnewal - Financial Consultants (Technical + Score 53,34,40,133/-
Packet System Financial): Germany
30.10.2015 Pilkhani Section of Eastern Proposal) on Financial):3 Consultant
17.12.2015
Dedicated Freight corridor Project-3 30.10.2015
Extended up to
18.04.
Engagement of Manpower Service
Noida/ Hiring of Noida/Hiring of M/s JMD
Provider agency for providing M/s Security Solution 1.07 31/08/2016
Manpower Single packet Manpower Consultants,
75 various categories of outsourced Open tender 02/07/2015 24/07/2015 6 and Manpower Yes revised to extended to
Services/01/ system Services/01/2015 Shakarpur,
staff for Chief Project Manager/ Services, Noida, UP 1.51 30/06/2017
2015 dated 26.08.2015 Delhi-92
DFCCIL, Noida Unit

M/s VKS 23/02/2010


HQ/EN/BB/ Preliminary works and detail engg HQ/EN/BB/Rewari- 1.83 extended to
Infratech &
76 RewariDadri/15 & survey Rewari-Dadri dection & land Open tender 24/02/2009 Single bid system 25/03/2009 7 N/A Yes Dadri/15 & 16 dated revised to 25/07/2015
Management
16 facilitation work 12.05.2009 2.19 (Work Completed,
Pvt Ltd
final payment done)
08 Nos 1) M/s -
Chansma taluka
sarvoday mazoor
kamdar sahakari
mandli ltd.- Mehsana.
2) M/s - Prime one
work force Pvt.Ltd. -
Bhopal. 3) M/s -
Jagdamba services
solutions Pvt. Ltd.-
West Mumbai.
DFCC/ ADI/ 4 )M/s - M.S. No. DFCC/ ADI/
M/s-Komal
Manpower Hiring/ Services Pvt. Ltd. - Manpower Hiring/ 08 Rs. 1.006
77 Hiring of manpower Open tender 26.02.2016 Single 05.04.2016 9 Yes Enterprise. - 19.05.2018
08 Solan (H.P). 5) M/s - (R1)/ 2015 Cr.
Mehsana
(R1)/ 2015 Minesh security Date: 20.05.2018
agency -
Gandhinagar. 6) M/s -
Kiran security
services -
Ahmedabad. 7) M/s -
Bhakti management
services Pvt. Ltd. -
Gandhinagar. 8) M/s
- Orion security
solutions Pvt. Ltd. -
Mumbai.

PROJECT MANAGEMENT
CONSULTANCY for
Design and Construction of
Formation in
Embankments/Cuttings including
blanketing, Viaducts, Rail Flyover,
6,
Bridges (Major, Minor & RUBs),
M/s CEG Ltd, M/s
Supply and Spreading of Ballast
RBP I&E Works, M/s Rodic
IFB No. and other related infrastructural
M/s SOWiL Ltd, Consultants
HQ/EN/EC/ SEB works for double track electrified 07.12.2015, single stage two 900 days + DLP 24
78 Open 08.03.2016 8 M/s SN Bhobe&A P Yes Date: 20.05.2018 Pvt. 8.6
JN/CS/PMC railway line on Design Build Lump 10.12.2015 packet months
Ltd JV DIMMTS Ltd, Ltd., Gurgaon,
dated 07.12.2015 Sum Basis from Howrah end
M/s Feedback Infra P Haryana.
approach of DFC Sone bridge to
Ltd, M/s SM
Chirailapathu station of IR towards
Consultants.
Howrah & to New Sonnagar station
towards Garhwa and at Dehri-on-
Sone yard from Km. 3.16 to Km.
5.38 in connection with Eastern
Dedicated Freight Corridor in the
state of Bihar in India.
M/S BC-VGS
Infra JV (M/S
Shifting and Commissioning of Binod
Three Phase Double Circuit 132 KV construction,
CPM/MTC/ NCR Transmission line in 01 M/s MAN LOA NO Industrial
DFCCIL/ 132KV connection with proposed DFCCIL Structural Pvt. Ltd. CPM/MTC/DFCCI estate Kokar
INR
79 NCR ALIGNMENT at BORAKI, WEIR, Open Tender 10.12.2015 Double Bid System 13.01.2016 2 P.B. No. 189, Near Yes L/132KV NCR Tr. Ranchi- 25.04.2018
7.18 Crore
Tr. Line/OT/ 2015- DANKAUR, and Loco, Line/OT/2015-16 834001 & VGS
16 KHURJA in Khurja- Dadri section in Jaipur (Rajasthan) dated 26.04.2016 Infrastructure
the Jurisdiction of Chief Project Pvt. Ltd 140-B,
Manager/DFCCIL/Meer ut unit. Pocket- F,
GTB Enclave
Delhi-110093)

Engagement of Manpower Service LOA No.


Noida/ Hiring of M/s JMD
Provider agency for providing M/s Security Solution DFCC/Noida Unit/
Manpower Single packet Consultants,
80 various categories of outsourced Open Tender 02/07/2015 24/07/2015 6 and Manpower Yes Tender/Hiring of 1.07 31/08/2016
Services/01/ system Shakarpur,
staff for Chief Project Manager/ Services, Noida, UP Manpower dtd. 22-
2015 Delhi-92
DFCCIL, Noida Unit 08-15

M/S Vivek
Travels
21-5-2013 on LOA No: NOIDA
NOIDA (Regd), SD
Hiring of Vehicles for DFCCIL under website and 28- Unit/DFCC/Vehicle 3 years after issue of
81 Unit/DFCC/ Open Tender Single 25/06/2013 Two Under TC Under TC Block, Main 1.85
CPM/ NOIDA 5-2013 in /13/01 Dt. 19-07- Letter Of Acceptance
Vehicle/13/0 1 Road,
newspapers 2013
Pitampura,
Delhi

Design and Construction of


Formation in
Embankments/Cuttings including
blanketing, Viaducts, Rail
Flyover,Bridges (Major, Minor &
IFP No: RUBs),Supply and Spreading of
HQ/EN/EC/ Ballast and other related
PQ/SEB- BCJ- infrastructural works for double M/s ATEPL-
LOA No.
CPBH track electrified railway line on Issued PQ on PQ followed by MGCPL
PQ 23.07.2015, PQ-3, PQ-Nil, HQ/EN/EC/SEB
82 dated 01/06/2015 Design Build Lump Sum Basis from Open PQ 01.06.2015, Bid bidding single stage Yes Joint 365.22 900 days
Bid 29.12.2015 Bid-2. Bid-Nil. Jn.Works/Bid Doc
& IFB No: Howrah end approach of DFC Sone on 09.10.2015 two packet. Venture,New
dated 26.04.2016
HQ/EN/EC/ SEB bridge to Chirailapathu station of IR Delhi.
JN.Works dated towards Howrah & to New
09.10.2015 Sonnagar station towards Garhwa
and at Dehri-on- Sone yard from
Km. 3.16 to Km. 5.38 in connection
with Eastern Dedicated Freight
Corridor in the state of Bihar in
India.

Social and Environmental


Safeguards Monitoring and Review M/s Haskoning
HQ/SEMU/ 1, M/s SAI HQ/SEMU/SESM
Consultancy (SESMRC)for DHV
83 SESMRC/E EOI 05.05.2013 Two Packet System 29.04.14 4 Consulting Engineers Yes RC/02/13 Dated: 1.97 1.12.2018
Bhaupur Consulting
OI/APL-2/13 Pvt. Ltd. 2.12.2014
– Mughalsarai Sec. Pvt.Ltd.
(APL-2) of EDFC
Design, Construction, Supply,
Installation, Testing and SPN PQ issued
Commissioning of 2x25 AC 50 Hz on 16.07.2012 08.08.2014 (First
JV of Alstom
HQ/SYS/ EC/D- Electrification, Signalling and and first stage bid stage bid)
Pre 3 during first HQ/SYS/EC/D-B/ India Limited
B/ Telecommunication and associated invitation issued Two stage Bidding 27.04.2015
Qualification stage and 3 Bhaupura Khurja/ CP- (AIL) and 1100 days from
84 Bhaupur- Khurja works of Double Track Railways on 31.01.2014 from Pre-qualified (Second stage Nil Yes 1497.11
followed by two during second 104 dated Alstom commencement date
Dated Lines Under construction on A and bidders bid from
stage bidding stage 21.07.2015 Transport
31.01.2014 Design Buid Lump Sum Basis for second stage bid technically
S.A. (ATSA)
Bhaupur- Khurja Section of Eastern invitation issued qualified bidders)
Dedicated Freight Corridor (System on 21.02.2015
Works Contract Package-104)

M/s
Siddhivinayak
LOA No.
Engagement of Manpower service Sushikshit
MUM/HR/ MUM/HR/Manpow
provider for outsourcing of support Berojgar Seva Rs. 1.22
85 Manpower/ OA, Open Tender 31.02.2015 Single Bid System 09.03.2015 10 NA Yes er/OA, EA & 31/05/2017
services at offices in the Jurisdiction Sarkari Crore
EA & ACO/303 ACO/303 dtd :
of CPM/DFCCIL/Mumbai Sanstha
02/05/15
Maryadit
Mumbai

Design and Construction of Civil,


Structures and Track Works for
Double Line Railway involving
Formation in
SPN for PQ
Embankments/Cuttings, Ballast on
issued on
Formation, Track Works, Bridges, 29.05.2014 (First
11.04.2013 and
HQ/EN/EC/ D-B/ Structures, Buildings, Yards, stage bid) , HQ/EN/EC/D-
Pre first stage bid 7 during first
Mughalsarai Integration with IR Existing Railway Two stage bidding 24.11.2014 B/Mughalsarai - New
Qualificaiton invitation issued stage and 5 Rs. 2664.09
86 - New Bhaupur System and Testing & from pre qualified (Second stage Nil Yes Bhaupur /CP - 202 GIL - SIL JV 20.01.2019
followed by two on 12.02.2014 during second Crores
Dated Commissioning on Design-Build bidders. bid from Dated
stage bidding and second stage stage
12.02.2014 Lump Sum Basis for New Karchana technically 27.05.2015
bid invitation
Station (excluding) – New Bhaupur qualified bidders)
issued on
station (excluding) (Approx.
01.10.2014.
236 Route Km out of which 229.5
Km is double line and 6.7 km is
single line) of Eastern Dedicated
Freight Corridor.

Design and Construction of Civil,


Structures and Track Works for
Double Line Railway involving
Formation in SPN for PQ
Embankments/Cuttings, Ballast on issued on
29.05.2014 (First
HQ/EN/EC Formation, Track Works, Bridges, 11.04.2013 and
stage bid) , HQ/EN/EC/D-
/D-B/ Structures, Buildings, Yards, Pre first stage bid 8 during first
Two stage bidding 24.11.2014 B/Mughalsarai - New
Mughalsarai Integration with IR existing Railway Qualificaiton invitation issued stage and 5 Rs.2416.68
87 from pre qualified (Second stage Nil Yes Bhaupur /CP - 201 GIL - SIL JV 20.01.2019
- New Bhaupur System and Testing & followed by two on 12.02.2014 during second Crores
bidders. bid from Dated
Dated Commissioning on Design-Build stage bidding and second stage stage
technically 27.05.2015
12.02.2014 Lump Sum Basis for Mughalsarai – bid invitation
qualified bidders)
New Karchana Station (including) issued on
(Approx. 181 Route Km out of which 01.10.2014.
158.6 Km is double line and 22.43
is single line) of Eastern Dedicated
Freight Corridor
One Sanjeev Bahl M/s Durga Co-
Construction of Station Buildings,
(Contractor), Marble LOA No. operative L&C
CPM/UMB/ S&T- Relay Rooms and Gate Goomties in
House, Punjabi CPM/UMB/S&T- Society Ltd.,
88 Utility/2015/ PB- connection with shifting of S&T Open Tender 24.01.2015 Single 16.02.2015 2 Yes 1.03 08.09.2015
Mohalla, Utlity/2015/PB-01 #16, Jawahar
01 Utilities in the Punjab State under
Ambala Cantt- dated 09.03.2015 Nagar, Ambala
the jurisdiction of CPM/Ambala
133001 City.

HQ/EN/PW Project management Consultancy HQ/EN/PWC/RFP/ M/s


JYP-294.45
89 C/RFP/PMC for Rewari to Vododara Section of Single Bid System PMC/PHASE-I Dated N.K.Constortiu 06 Years
INR- 474.25
/PHASE-I Phase-I of WDFC 21.02.2014 m

Design and construction of


Civil,Building<trackwork s for
double line Railway involving
HQ/EN/PWC/PRE-
HQ/EN/PW embankments/cutting,st
WORKS/PHASE- SOJITZ-L&T
C/PRE- ructure,building,ballast on Single Bid
90 I/PKG1&2/D&B/1/ CONSORTIU 6699.5 208 WEEKS
WORKS/PH ASE- formation,track works,including System
SOJITZ-L&T M
I/PKG1&2/ D&B/1 testing,abnd commissioning on
06.08.2013
designbuild lump-sum price basis
for Rewari- Iqbalgarh Section of
WDFC-PH-I

Contract
awarded to
the firm who Joint Venture
scored of Mott
RFP issued to Quality and Cost
HQ/EN/PR Quality and Safety Audit EOI published on Last date of highest HQ/EN/PROCURE MacDonald GBP 920056/-
shortlisted base
OCUREME Consultancy services for Bhaupur- 11/10/12, RFP submission of combined MENT/QSAC/BAU- Limited ,UK + INR
91 consultants in selection(QCBS) 2 0 42 months
NT/QSAC/ BAU- Khurja issued on date RFP was technical and KRJ dated and Mott 177,670,06
response to with 2 packet
KRJ section of EDFC Project- I 25/04/2013 27/08/2013 financial 06.05.2014 MacDonald 6
published EOI system
score based Private Limited
on QCBS India
selection
process

Construction of Boundary wall,


The Durga Co-
supplying & fixing of boundary posts
None (It was a single LOA No. op L&C
CPM/UMB/ along newly acquired land by 6 Months from the
packet bid & work CPM/UMB/BW/2/ Society Ltd.,
92 BW/2/Const DFCCIL from Kalanaur to Ambala Open Tender 25.10.2013 Single 25.11.2013 3(Three) Yes 1.16 date of Start
was awarded to L1 Const. dated 16 Jawahar
. city in Haryana within the i.e.22.08.2014
tenderer) 22.02.2014 Nagar, Ambala
Jurisdiction of
City
CPM/DFCCIL/Ambala.

M/s Kardam
Constructions Pvt. M/s S.G.
CPM/ Ltd., C-8, Road No.- CPM/ Constructions,
6 Months after issue
93 UMB/BW/3/ Civil Work Open Tender 25.10.2013 Single Bid 25.11.2013 Two 11, Nitya Nand Yes UMB/BW/3/Const. 951,Urban 1.35
of LOA.
Const. Nagar, Gandhi Path, dated: 25.04.2014 Estate Phase,
Vaishali Nagar, Jaipur- Jalandhar.
302021.
Prepartion of GAD for proposed
ROBs in Lieu of LC gates JNPT-
BSR on WDFC and ROBs of
Central Railway comprising of
Engineering Survey, Geo-
technological investigation;
prepartion
& approval of GADs from Mum/EN/LT/
MUM/EN/LT M/s. SOWIL
94 concerned Railway authorities etc. Limited Tender 03.10.2012 Single BID 05.11.2012 2 NA Yes ROB/254 1.42 20.11.2014
/ROB/254 Ltd
including temporary diversions, dt.19/12/2012
temporary LCs, prepartion of
detailed design & drawings of ROBs
(Railway portion including
FOBs/Subways wherever required),
and prepartion of BOQ
,Estimate, Schedule if quantites for
construction of ROBs etc

M/s Vivek
Travels(regd.),
Hiring of Vehicles for DFCCIL at ROB/254 SD Block,
95 NA NA NA NA NA NA NA 1.84 19.07.2016
Corporate office dt.19/12/2012 main Road,
Pitampura
Delhi

PMC for Design and Construction of


Important Bridge across river
Sone(approx. lengh 3.06.km), its
approaches (on both sides) and
other miscellaneous works for
double track electrified railway line
on Design Build Lump Sum Basis
between Sonnagar(Rly.km
M/s
NCB No. 549) and Dehri-on- Sone(Rly. km.
LOA No. Intercontinenta
HQ/EN/EC/ 554) Railway Stations on
HQ/GGM/CO/EC/ l Consultants
NKWD- Mughalsarai-Sonnagar Section of
96 Open 06.09.2013 Two Packet 19.11.2013 5 2 Yes PM-SEB- and 13.9 1216 days
NGAQ/Sone Eastern DFC & Design and
GAQN/73/2013 Technocrats
RFO/PMC Construction of Rail Flyover near
dated 02-01-2014 Pvt. Ltd, New
dated 06.09.2013 Ganjkhwaja, Formation in
Delhi
Embankments/Cuttings including
blanketing, Bridge(Major, Minor &
RUBs), Supply and Spreading of
Ballast and oher related
infrastructural works for double
track electrified railway line on
Design Build Lump Sum
Basis in different stretches
Design and Construction of Rail
Flyover near Ganjkhwaja,
Formation in
Embankments/Cuttings including
blanketing, Bridges (Major, Minor &
IFB No. RUBs), Supply and Spreading of LOA No.
M/s ILF&S
HQ/EN/EC/ DOS- Ballast and other related Issued PQ on PQ followed by HQ/EN/EC/DOS-
PQ 19.03.2013 PQ-10 Engg-
97 MGS/RFO& infrastructural works for double Open PQ 31.10.2013 Bid bidding, Single PQ-2 Bid-Nil Yes MGS/Bid/RFO & Bal. 144.65 900 days
Bid 08.08.2013 Bid-3 GPT(JV)
Bal.Works Date track electrified railway line on 14.06.2013 stage two packet Works dated
hyderabad
14.06.2013 Design Build Lump Sum Basis in 12.11.2013
different stretches between Dehri-
on-Sone
& Mughalsarai of Eastern Dedicated
Freight Corridor in the states of
Bihar and Uttar Pradesh in India

RFP No. RFP issued to


HQ/EN/proc Project Management Consultancy short listed HQ/EN/Procureme
Joint Venture
98 urement/PM Services for Bhaupur-Khurja consultants in 31.10.2013 Bidding 19.03.2013 6 nil yes nt/PMC/BAU-KRJ 80.98 72 months
SAI- TYPSA
C/BAU-KRJ Section of Eastern DFC Project-1 response to dated 31.01.13
dated 11.01.13 EOI

Design and Construction of


important Bridge across river
Sone(approximate length 3.06
Kms),its approaches(on both sides)
IFB No. and other miscellaneous works for LOA No. M/s ATEPL-
HQ/EN/EC/ double track electrified railway line PQ-14, HQ/EN/EC/Bid/So ne MGCPL
99 Open PQ id Single Stage Bid PQ-Nil Bid-1 Yes 249.84 1216 Days
DB/Sone Bridge on Design build Lump Sum Basis Bid-7 Bridge/Pt.II Dated Joint Venture,
Date 23.04.2013 between Sonnagar(Rly. Km. 549) 24.10.2013 New Delhi
and Dehri-on- Sone(Rly. Km. 554)
railway Station on Mughalsarai-
Sonnagar Section of Eastern
Dedicated Freight Corridor

M/s
No.
HQ/SEMU/ Operations
Social & Environmental Safeguard HQ/SEMU/SESM
100 SESMRC/E EOI 14.06.2013 Two Packet 30.01.1900 3 Nil Yes Research 1.08 31.07.2017
Monitoring & Review Consultancy RC/EOI/11-12/2
OI/11-12/2 Group Pvt.
Dated:01.08.2013
Ltd. (ORG)

PMC for Design and construction of


Track, signalling & Telecom works,
4 Parties:1) EGIS
Traction power supply,SCADA,OHE
India Consulting M/s Wilbur
HQ/EN/ EC/NK and
Engineers Pvt. Ltd.. smith
WDNGAQ/ T general Electrical works and its
2) SOWIL HQ/EN/EC/NKWD associates pvt.
racksystem s/ testing & commissioning for double
101 Open Tender 15.06.2012 Two Bid System 27.09.2012 5 Limited.3) LEA Yes /DGO/PMC-Track Ltd. JV with 19.02 07.07.2017
PMC line electrical railway track from
Associates South /Adt-d 08.03.2013 ardanury
dated 22.06.20 New Karwandiya(Rly. Km
Asia Pvt. Ltd. 4) SAI Igeneieria,
12 564) to Durgawati(Km 630) approx.
Consulting engineers S.A.
66 Kms on Mughalsarai-Sonnagar
Pvt. Ltd.
section of Eastern Dedicated freight
Corridor
Preparation of GAD, & detail design
, modification/rebuilding of ROB M/s
DFC / ADI / Engineering Survey; Geotechnical NIL DFC / ADI / GAD Construma
15.12.2012
102 GAD / 4 / 2012- investigation; Preparation of Land Open Tender Single 21.01.2013 10 (Awarded to Lowest Yes /4 / 2012-13 Consultancy 3.51 21.04.2017
(Indian Exp.)
13 Acquisition Plans; estimate, offer) 14.03.2013 Pvt.
Schedule of quantities and Ltd
Comprehensive tender documents.

Dismantling of acquired structures


JP/EN/Dism
from Rewari to Madar along DFCC JP/EN/Dismantling of
antling of Website & M/s Miral
103 alignment in the State of Haryana 04.12.12 Single 07.01.13 6 Nil Yes structures/2012/10 1.05 22.09.13
structures/2 office Infrastructure
and Rajasthan on Western Freight 2/01-R Dated 23.3.13
012/102/01- R
Corridor under CPM/ JAIPUR

LOA No.
HQ/Admin/Tender/
HQ/Admin/T Engagement of manpower service
Housekeeping GA Digital
ender/Hous provider for outsourcing of
104 Open Tender 16.10.12 Single Bid 16.11.12 7 Not Applicable Yes services/12 dated Web word(P) 1.12 31.12.2014
ekeeping housekeeping services in DFCCIL's
20.12.12 Date of Ltd
services/12 Corporate office
start of work-
01.01.13

PQ No.
HQ/EN/EC/
Track/NKW D-
DGO M/s Ferrovia
Issued PQ HQ/EN/EC/NKWD-
dated 18.11.2011 Single stage two PQ 16.01.2012 PQ-22 Transrail
105 Track Works Open PQ 18.11.2011, Bid PQ Nil Bid-9 Yes DGO/Track Bid 147.61 540 days
Bid No. packet after PQ Bid 30.05.2012 Bid-11 Solutions Pvt.
17.04.2012 Dated 20.07.2012
HQ/EN/EC/ Ltd.
Track/NKW D-
DGO
dated 17.04.2012

2 Parties:(1) INECO
S.A. Contract
in JV with Prointec Awarded to
S.A. and LEA the firm who
HQ/EN/Proc
Associate South asia scored
urement/GC RFP issued to Quality and cost HQ/EN/Procureme
Pvt. Ltd. highest
/MGS- BAU(PH- General consultancy Services for short listed base nt/GC/MGS- AECOM Asia
EOI published on (2) SYSTRA combined
106 2), KRJ- LDH(PH- Bhaupur- Mughalsarai and Khurja- consultant in selection(QCBS) 03.05.2012 6 BAU(PH-2), KRJ- Company 18.18 36 months
03.05.2011 S.A. France JV with technical and
3) Ludhiana Section of EDFC response to with 2 packet LDH(PH-3) Dated Limited
CANA RAIL financial
Dated EOI system 09.01.2013
Consultant INC. score based
11.04.2012
CANADA and on QCBS
SYSTRA MVA selection
consulting India Pvt. process
Ltd.
Design and construction of Civil,
Structures and Track works for
double line railway involving SPN for PQ
Formation in issued on
Embankments/Cuttings Ballast on 05.04.2010 and 30.03.2012(First
13
HQ/EN/DB/ Formation, Track Works, Bridges, Prequalificatio first stage Bid Stage Bid),
Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja Structures, Buildings including n followed by invitation issued 20.12.2012(Seco TATA-
107 from Pre-qualified stage and 9 NIL Yes Khurja Lot 101 1329.5 21.04.2017
Lot 101 dt. Testing and Commisioning on two stage on 24.12.2011 nd stage bid from ALDESA(JV)
bidders during second dt. 08.03.2013
24.12.2011 Design-Build Lump- Sum basis for bidding and Second stage Technically
stage
bhaupur- khurja section of Eastern bid invitation qualified bidders)
Dedicated Freight Corridor Lot issued on
101(Bhaupur village to Bhathura 08.11.2012
village rly.
1040-1170)

Design and construction of Civil,


Structures and Track works for
SPN for PQ
double line railway involving
issued on
Formation in
05.04.2010 and 30.03.2012(First
Embankments/Cuttings Ballast on 13
HQ/EN/DB/ Prequalificatio first stage Bid Stage Bid),
Formation, Track Works, Bridges, Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja n followed by invitation issued 20.12.2012(Seco TATA-
108 Structures, Buildings including from Pre-qualified stage and 9 NIL Yes Khurja Lot 102 925.9 21.04.2017
Lot 102 dt. two stage on 24.12.2011 nd stage bid from ALDESA(JV)
Testing and Commisioning on bidders during second dt. 08.03.2013
24.12.2011 bidding and Second stage Technically
Design-Build Lump- Sum basis for stage
bid invitation qualified bidders)
bhaupur- khurja section of Eastern
issued on
Dedicated Freight Corridor Lot
08.11.2012
102(Bhathura village to Birauni
village rly. 1170- 1266)

Design and construction of Civil,


Structures and Track works for
SPN for PQ
double line railway involving
issued on
Formation in
05.04.2010 and 30.03.2012(First
Embankments/Cuttings Ballast on 13
HQ/EN/DB/ Prequalificatio first stage Bid Stage Bid),
Formation, Track Works, Bridges, Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja n followed by invitation issued 20.12.2012(Seco 1(OHL-PUNJ TATA-
109 Structures, Buildings including from Pre-qualified stage and 9 Yes Khurja Lot 103dt. 1012.14 21.04.2017
Lot 103 dt. two stage on 24.12.2011 nd stage bid from LIOYD(JV)) ALDESA(JV)
Testing and Commisioning on bidders during second 08.03.2013
24.12.2011 bidding and Second stage Technically
Design-Build Lump- Sum basis for stage
bid invitation qualified bidders)
bhaupur- khurja section of Eastern
issued on
Dedicated Freight Corridor Lot 103(
08.11.2012
Birauni village to Khurja rly. Km.
1266- 1368)

M/s Nippon
Koei Co. Ltd,
Japan Railway JPY
The Project for Construction of
technical 1,069,968,1
HQ/EN/WC/ E&S Freight Corridor: Dadri-Rewarri
110 05.12.2011 Service, PB 01 ( INR
dated 30.11.2011 & Vadodara-JNPT Section under
Japan Co. Ltd 302,702,30
Phase-2.
and Nippon 1)
Koei India Pvt.
Ltd
DFCCIL/HQ
/AD/Tender/ 2011- DFCCIL/HQ/AD/TEN
Hiring of Vehicles for DFCCIL at M/s Vivek
111 12-III Open Tende 01.09.2011 Single bid system 30.09.2011 3 Nill yes DER-2011-2012(III) 4.62 31.10.2014
Corporate office Travels
Dated Date:15/11/2011
15.11.2011

DFCCIL invites sealed bids from


eligible Bidders for design and
development of package-based
integrated IT Solution, procurement
Original DOC
of hardware and software, testing, 01. Infosys M/s HCL
DFCCIL/IT/ Single stage & two DFCCIL/IT/SI/2011 30.06.2013
112 ensuring security, deployment and Open Tender 04.07.2011 11.11.2011 4 Technologies Yes Technologies 23.98
SI/2011 packet 29.03.2012 Extended up to
commissioning, training to end- Limited Ltd.
30.09.2016
users, post implementation
Warranty and Operation
& Maintenance for a period of three
years, for IT Project at DFCCIL

HQ/EN/EC/ Original DOC =


TS/EN/PETS/Futu re
PETS/Futur e 11.9.2014
113 PETS Survey for Future Corridors SINGLE DFC Date : M/s RITES Ltd 63.552
DFC Extended upto
14.10.2011
Dated 2.9.2011 29.2.2016

Geotechnical Investigation,
CPM/ADI/E Preparation of GAD of bridges,
N/Pre ( Works) preparation of schedule of Hydropneum
114 20.5.2011 1.17
Wamaj - IGQ ( quantities, Joint measurement Systems,Pune
East)/2 survey, preparation of land plans &
land acquisition

Original DOC
01 Vyam
Consultancy Service for Overall IT HQ/IT/PPF/1 Dated 16/05/2012
115 HQ/IT/PPF/ 1 EOI and RFP 30.06.2009 EOI and RFP 20.01.2010 6 Technologies Pvt. No M/S WIPRO 1.08
Strategy and Program Management 17.05.2010 Extended upto
Ltd.
31.12.2016

M/s Nippon
Koei Co. Ltd,
Japan Railway JPY
Engineering Consulting Services
HQ/EN/WC/ technical 1,79,603,00
for construction of WDFC- RE-BRC
116 E&S/Pt IV dated 12.5.2010 Service, PB 0 ( INR
and procurement of Eectric
12.5.2010 Japan Co. Ltd 396,108,00
locomotives.
and Nippon 0)
Koei India Pvt.
Ltd
Contract
Awarded to
the firm who
scored
RFP issued to Quality and cost M/s Scott
Consultancy Service for Design EOI published on Last date of highest
short listed base Wilson Ltd.,
HQ/Engg./P Review Consultancy for 27.03.09.RFP submission of combined HQ/EN/PPF/DRC/ 12 weeks after
117 consultants in selection(QCBS) 6 0 U.K & Scott 1.2
PL/DRC/1 Khurja_Bhaupur section of Eastern issued on RFP was technical and 1 dated 11.02.10 11.02.10
response to with 2 packet Wilson India
DFC 14.07.09 20.10.2009 financial
published EOI system Pvt. Ltd.
score based
on QCBS
selection
process

23 feb 2010, extended


M/s VKS
HQ/EN/BB/ Preliminary works and detail engg HQ/EN/BB/Rewari- to 23.01.2014,
Infratech &
118 Rewari- Dadri/15 survey Rewari-Dadri dection & land Open tender 24.02.2009 Single bid system 25.03.2009 7 N/A Yes Dadri/15 & 16 2.8 further extension upto
Management
& 16 facilitation work dated 12.05.2009 23-4-2014 is under
Pvt Ltd
process

Design and construction of


formation including blanketing,
major Bridges, Minor Bridges,
RUBs,ROBs, Supply and spreading
of ballast and other related
HQ/EN/NK WD- infrastructural works for Dedicated HQ/EN/NKWD- 16.12.2011 EOT
119 NGAQ/D&B/ fright corridor from chainage 14.108 NGAQ/D&B/03/20 09 BSC-C&C 'JV' 660.31 granted upto
03/2009 Km(Near New Karwandiya) to Dt-17.03.2009 20.02.2014
chainage 119.437 Km(Near New
Ganj Khawaja) approx
101.089 Kms, on Mughalsarai-Son
nagar Section of eastern corridor in
the state of Bihar and Uttar Pradesh

M/s Consulting
Engineer
Limited tender fro staking out
None (It was a single Group Ltd., E-
alignment, detail engineering LDH/EN/BB.CEG.
packet bid & work 12, Moji
120 NA construction survey for locations)…. Limited Tender 03.02.09 Single 12.03.2009 3 Yes Agreement dated 1.54 24.07.09
was awarded to L1 Colony,
etc… from Kesri to Sanehwal on 04.06.2009
tenderer) Malaviya
Eastern Dedicated Freight Corridor
Nagar, Jaipur-
302017

M/s Pankaj
Limited tender fro preparation of Patel &
General arrangement drawings for Associates,
proposed Road Over Bridges in lieu 303,
None (It was a single
of level corssing gates (approx.43 LDH/EN/ROB.PPA Chakrawarty
packet bid & work
121 NA Nos.) between Kalanaur to Limited Tender 12.06.09 Single 30.06.2009 16 Yes /Agreement dated Complex, Opp. 1.13 9.12.2009
was awarded to L1
Sanehwal in the State of Haryana & 11.11.2009 Kiran Park
tenderer)
Punjab Circle, Nawa
……. Estimates, Schedule of Vadaj,
quantities etc. Ahmedabad-
380013
Project Management Consultancy
Services for design and
construction of formation including
blanketing, major Bridges, Minor
M/s SMEC (
Bridges, RUBs,ROBs, Supply and
India )
spreading of ballast and other
Pvt.Ltd., in
HQ/EN/EC/ related infrastructural works for HQ/EN/EC/NKWD- 19.04.2012 EOT
Association
122 NKWD- NGAQ/ Dedicated fright corridor from NFAQ/PMC/04/20 09 19.2 granted upto
with M/s Rodic
PMC 1 chainage 14.108 Km(Near New Dt. 10.06.2009 20.02.2014
Consultants
Karwandiya) to chainage 119.437
Pvt Ltd.
Km(Near New Ganj Khawaja)
Gurgaon .
approx
101.089 Kms, on Mughalsarai-Son
nagar Section of eastern corridor in
the state of Bihar and Uttar Pradesh

Detail Engineering Construction


Survey of the proposed alignment of
the section, preparation of land Plan
and Land Acquisition Proposal as 3 nos. As
per Railway (Amendment) Act, under: 1) M/s STUP
2008, identification of utilities & Two bid Consultants Pvt. Ltd M/s Monarch
HQ/EN/EC/ Open tender HQ/EN/Ec/Pre- 25.06.2010
preparation of schedule of system(Technical 2)M/s EMA Unihorn Surveyors &
123 Pre(Works)/ DHN- (Two packet 28.05.2009 22.07.2009 8 Yes (Works)/DHN- SEB, 2 (original) extended
quantities for construction of followed by (India) Pvt. Contractors
SEB/ system) dated 29.09.2009 upto 31.07.2013
Dedicated Freight Corridor from Financial) Ltd 3) Lion Pvt. Ltd
Dhanbad at Km 270.88 to Sonnagar Engineering
at Km 549.04 (Approx.route length Consultants
of 278 Kms) on Eastern Dedicated
Freight Corridor (KM 00.00 starts
from Howrah).

Detail Engineering Construction


Survey of the proposed alignment of
the section, preparation of land Plan
and Land Acquisition Proposal as
M/s Aarvee
per Railway (Amendment) Act, 2 nos.As under:1) M/s
Associates
HQ/EN/EC/ 2008, identification of utilities & Two bid STUP HQ/EN/EC/Pre-
Open Architects 30.04.2010(origi nal)
Pre(Works)/ preparation of schedule of system(Technical Consultants Pvt. Ltd (Works)/DKAE-
124 tender(Two 28.05.2009 22.07.2009 8 Yes Engineers & 1.43 extended upto
DKAE-DH, quantities for construction of followed by 2) M/s EMA DHN, dated
packet system) consultant Pvt. 30.04.2013
dated 28.05.2009 Dedicated Freight Corridor from Financial) Unihorn(India 04.08.2009
Ltd.
Dankuni at Km 14.81 To Dhanbad ) Pvt. Ltd
, Hyderabad
at Km 270.88 (Approx. route length
of 256 Kms) on Eastern Dedicated
Freight Corridor (KM 00.00 starts
from Howrah).

Providing assistance for the


acquisition of land from the stage of
Rodic
Sec. 20A onwards up to transfer of
Consultants
ALD/ EN/ title in favour of DFCCIL/Rlys. for
125 14/04/2009 Private 1.01
Tender LA/ 48 construction of Dedicated Freight
Limited,
Corridor Corporation from Sonnagar
Ranchi.
(Km 549.04) to Karchana
(Km 807.43).
Limited tender for staking out
alignment, detail engineering
construction survey for location(s)
preparation of Land Plan for section
4 & 6 notification under Indian Land
Acquisition Act, 1989, identification
& preparation of Land Acquisition
Consulting
Plan for dumping locations for
LDH/EN/Te Engineer
126 ballast/ blanket material etc, 25/03/2009 1.54
nder.BB Group Ltd.,
Geotechnical investigation,
Jaipur
preoaration of G.A.D. for Minor &
Major bridges along with
preparation of schedule of
quantities, estimate and DPR for
construction of Dedicated Frieght
Corridor from Kesri to Sanehwal on
Eastern Frieght Corridor.

Design and Construction of


important and major bridges
(54Nos) for Western Freight
M/s Soma
HQ/EN/WC/ Corridors between Vaitarna and
127 Open Tender 10.07.2008 Two BID System 04.09.2008 5 NIL YES 26/12/2008 Enterprises, 605.15
Bridge/D&B/ 1 Utran on Vaisai - Bharuch Section
Hyderabad
in the states of Maharastra and
Gujrat, India on Lump Sum
Contract.

Design and Construction of


formation including blanketing, M/s B.Seenah
HQ/EN/EC/ Major Bridges, for DFCC on & Co.
128 17/12/2008 781.06
Bridge/DNB/ 1 Mughalsarai-Sone Nagar Section of (Projects) Ltd.,
Eastern Corridor in States of Bihar Hyderabad
and Uttar Pradesh in India.

Prepaaration of GAD for proposed


ROBs etc in lieu of Level Crossing
M/s.Consulting
HQ/EN/EC/ LC Gates (51 Nos) between
129 27/10/2008 Engg Group 2.03
ROB UP Mughalsarai to Kalanaur in the
Ltd., Jaipur
State of Uttar Pradesh on Eastern
Freight Corridor

M/s (IL&FS)
HQ/OP&BD/ Project Consultancy services for
Ltd.
130 Business development of Business Plan of 23-09-2008 6.54
Consortium,
Plan/RFP/ Pt.4 DFC project in India.
New Delhi
Consortium
consisting of
parsons
Brinckerhoff
India private
Contract Ltd., New
Awarded to Delhi(lead
RFP issued to
the firm who partner),
short listed
scored Halcrow
General Consultancy services for consultants in Quality and cost LOA No.
Last date of highest Consulting
the work of Double line Electrified response to base HQ/EN/GC/1 dt.
RFP issued on submission of combined India Private
131 HQ/EN/GC/ 1 railway track complete with S&T etc. notice in selection(QCBS) 3 0 22.09.2008 133.86 21.09.2014
date 10.04.08 RFP was technical and Ltd., New
for Bhaupur- Mandrak of Kanpur - newspaper for with 2 packet Agreement dated
08.07.2008 financial delhi, Wilbur
Khurja section of EFC. short listing of system 04.03.2009
score based Smith
detail design
on QCBS Associates
consultants
selection Inc.,
process Bangalore,
Lea
Associates
South asia
private Ltd.,
New Delhi

30.03.2010 physically
Interior works Flooring partition, M/s Godrej &
Contract value work completed on
false ceiling complete Elec work for HQ/Adm./Off./1 Boyce Mfg.
132 HQ/Adm/Off ice/1 Open 10.03.2008 - 31.03.2008 6 - yes 7.24 value on 15.11.2009 date of
top and middle floor for DFCCIL 5/04/2008 Co. Ltd., New
completion 8.98 completion exetended
office Complex at Pragati Maidan Delhi
upto 30.03.2010

Interior works Flooring partition, M/s Space


false ceiling complete Elec work for HQ/ADM./OFF./1 Furniture 04.08.2008 extended
133 HQ/Adm/Off ice/2 Open 10.03.2008 - 31.03.2008 7 - yes 3.73
bottom floor for DFCCIL office 07/04/2008 System, New upto 30.09.2008
Complex at Pragati Maidan Delhi

Stacking out alignment Detailed


M/s Monarch
Engineering Const.Survey for
Surveyors
HQ/EN/Pre- DFCCIL from :Prempur at Km 991.2
134 14/03/2008 Contractors 1.9
Works/CNB to Bhavpur (KM 1037.6) and from
Pvt.
Ekdil (KM 1146.69 to Kulwa (Km
Ltd. Pune
1338.40) on EFC.

Stacking out alignment Detail M/s Monarch


Engineering Const. for DFCCIL Surveyors
HQ/EN/Pre-
135 from 12.03.2008 Contractors 2.48
Works/MTC
: Kulwa to Khurja, Khurja to Dadri Pvt.
and Khurja to Talheri Ltd., Pune

Stacking out alignment, Detailed


M/s Rodic
Engineering Construction Survey for
HQ/EN/Pre. Consultants
136 detour alignment at Dehri-On- 11.03.2008 3.21
(Works)/AL D/E Pvt. Ltd.,
Sone,Sasaram,ROB for Const.
Ranchi
from Sonnagar to Karchana on EFC
M/s
Stacking out alignment Detailed
Consultancy
HQ/EN/Pre- Engineering Const. from :Madar to
137 07.03.2008 Engineers 5.31
Works/AII Palanpur Km 290 to Km 648 on
Group Ltd.
WFC
Jaipur

Stacking out alignment, Detailed


Engineering Construction Survey M/s Rodic
HQ/EN/Pre- from Nadiad at Km. Consultants
138 07.03.2008 2.65
Works/ADI 451.6 to Palampur (Km.648.4 ex Pvt.
Rewari) on Western Freight Ltd., Ranchi
Corridor
M/s Monarch
Stacking out alignment, Detailed
Surveyors
HQ/EN/Pre- Engineering Const. Survey from :
139 07.03.2008 Contractors 1.51
Works/ALD( W) Karchana at Km 807.43 to Prempur
Pvt.
at Km 991.2 on EFC.
Ltd., Pune

Stacking out alignment, Detail


engineering construction survey for
detour from Ambala to Doraha on
M/s Scott
left side of GT Road and at any
Wilson India
HQ/EN/Pre- other locations (s) as directed by
140 07.03.2008 Pvt. Ltd 3.36
Works/LDH the Engineer in Charge, preparation
Mathura Road.
of Land Plan for section etc. for
New Delhi.
construction of DFCCIL from Talheri
at Km 156 to Ludhiana on Eastern
Freight Corridor.
Stacking out alignment detail
Engineering Const. for DFCCIL M/s Wilbur
HQ/EN/Pre- from Smith
141 07.03.2008 2.5
Works/JP :Khori ( Rewari ) to Madar Km 10 to Associates,
290 WFC and Rewari Area (35 Bangalore
Kms)
M/s
Stacking out alignment, Engg Con
HQ/EN/Pre- Consultancy
Survey work from Sachin at Km.
142 Works/BRC/ 04.03.2008 Engineers 3.19
251.6 to Nadiad at Km.451.6 on
2008 Group Ltd.
Western Freight Corridor
Jaipur

Design, supply installation testing


and commissioning of heating,
HQ/EL/ Tender- M/s Voltas Ltd,
143 ventilation and air conditioning 22.02.2008 3.37
AC/Pt.II New Delhi
(HVAC) system at DFCCIL office
Complex at Pragati Maidan

M/s STUP
HW/Engg/ Pre- Preliminary works of const. of major 10.07.2008
Consultants
144 works/ Bridges and important bridges from Vaitrana Limited Tender 07.01.2008 Two Bid System 23.01.2008 4 NIL YES 11.02.2008 1.24 extended upto
Pvt.
/Surat to Utran on Western DFC 15.10.11
Ltd.Mumbai

No.
2007/GM/E M/s Vivek
2007/GM/Engg.III/Hir
145 ngg III/Hiring Vehicle Hiring Limited Tender 24.08.2007 Single bid system 03.09.2007 5 Nill yes Travel Pvt. Ltd 1.67 31.10.2010
ing/Vehicle, Date:
Vehicle New Delhi
01/11/2007

Dismantling of structures from


JP/EN/Dism JP/EN/ Dismantling
Rewari to Madar along DFCC 30.04.2014
antling Website & of structures/2012/ M/s. Miral
146 alignment in the State of Haryana 04.12.2012 Single Bid System 07.01.2013 6 NIL Yes 1.05 (Contract is
of structures/2 Office 102/01-R dated Infrastructure
and Rajasthan on Western Freight completed)
012/ 102/01- R 23.03.2013
Corridor under CPM/JAIPUR
M/s Skylark
MTC/EN/DF Detail Engg. Construction Survey MTC/EN/DFCCIL/ designer &
INR:
147 CCIL/Detour from Hafizpur to Daurala and Open Tender 23/02/2014 Single Bid System 28.04.2014 6 NA YES Detour Survvey/2014- enginnering 04/12/2015
1,49,94,4311
Survvey/20 14-15 Khatauli to Rohana Kalan 15 Dated 26.06.2014 Pvt.
Ltd. Noida

Design Supply, Erection, Testing


and Commissioning of 132 KV 3 HQ/EL/132/KVTR L- M/s Associate
HQ/EL/132k
Phase Double Circuit Transmission single stage/Two XING/EC/02/ 02 Power
148 VTRL- XING/EC- Open Tender 14/05/2013 12/07/2013 one one YES Rs.25.45 Cr. 10.04.2015
Line Xing Modification work for packet system /2013 DTD Structures Pvt.
02dt. 14.5.2013
DFCalignment in Allahabad Division 11.10.2013 Ltd.
of North Centra Railway

HQ/EN/WC/ PMC for Design and Construction of HQ/EN/WC/BRID M/S SNC 10.71 25.09.2012
149 BRIDGES/ 54 Major Bridges in WDFC between Open Tender 01.10.2008 Two BID System 06.11.2008 NA YES GES/PMC/1/SPA Lavanin Pvt. revised C>A. extended upto
PMC/1 Vaitarana and UTRAN N dated 12.06.2009 Ltd. 17.85 29.12.14

Design, Construction, Supply,


installation, testing and
Commissioning of 2x25 KV
electrification, signalling &
telecommunication and associated
one (Siemens Yes (out of HQ/SYS/DB/NKW D-
HQ/SYS/DB works for the double track railway Single stage Two M/s Larsen &
150 open Tender 26.10.2012 05.02.2013 Two infrastructure and two, one firm DGO/01/2013 Rs. 315 Cr. 18.08.2015
/NKWD- DGO line under construction on design packet system Toubro Limited
cities) disqualified) dated 08.05.2013
buid lump sum basis from new-
karwandiya (Rly km
564) approx. 66 kms of route on
mughalsarai section of Eastern
deidcated freight corridor