PRODUKSI, TANGGAL : 1 Apr-19
Total Hari Kerja 30 Hari Remaining 29 Hari
DAILY ACTUAL ACTUAL MTD
KEGIATAN
DAY NIGHT TOTAL 0 1
OB Removel (BCM) 5,042.05 1,212.67 6,254.72 6,254.72
Coal Truck Count (MT) 2,227.87 - 2,227.87 - 2,227.87
Coal Weight Bridge (MT) 2,288.46 - 2,288.46 - 2,288.46
SR Truck Count 2.26 - 2.81 - 2.81
SR Weight Bridge 2.20 - 2.73 - 2.73
75 - 0 1,942.91 IN
11 - 0 284.96 OUT
0 - 0 -
- - 1,999.97
- - 288.49
GM Tgl 31/03/19, 2
- rit (rit ke 39, 40) - -
2,227.87 -
86 0 0
2,288.46 -
-2 1,200.48 KUD SR 46
88 86 799.49 KUD YM 31
288.49 BTP 11
RIT WEIGHT BRIDGE RIT TRUCK COUNT
- BMB
Input H-1
DATA STOCKPILE
TOTAL BATU MASUK & LANGSIR TOTAL COAL DI STOCKPILE
REMAINING TARGET
EOM DAILY SHIFTLY
272,457.20 9,395.08 4,697.54
97,256.90 3,353.69 1,676.84
97,196.31 3,351.60 1,675.80
2.80 2.80 2.80
2.80 2.80 2.80
DAY SHIFT NIGHT SHIFT
TOTAL
Time Start Stop Time
0.00 0:00 0:00 0.00
0.00 0:00 0:00 0.00 0.00
0.00 0:00 0:00 0.00
hat 1 : (12:00-13:00), Istirahat 2 : (00:00-01:00) 1
Input H-1
6,626.74 BTP
- 0
1,208.31 KUD
7,835.05 TOTAL - 0
OB Removal SIANG
Fleet Allocation
JAM 7 8
23 25
4 9 5 9
4 7 3 4 9 5
10 11 12
13
5 8 4
4 9 3 4 7
2 1 2
14 18
8 4 9 4
3 5 8 5 5 9
3 4 5
20 19
9 5 6 3
5 5 9 4 3 9 3
1 1 7
5 RITASE HAULER
ADT MAN DT HD HD HD ADT ADT ADT MAN
(Disposal) (Disposal) (Disposal) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal)
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
16 0 0 0 0 0 0 0
66 0 0 0 0 0 34
4 7 33 0 0 0 0 0 38
4 8 0 0 0 0 0 5
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
107 0 0 0 0 0 77
AULER VOLUME RITASE (BCM)
MAN MAN DT DT DT HD HD HD ADT ADT ADT
(inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud)
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 156 0 0 0 0 0 0 0 0
0 0 0 0 0 1404.48 0 0 0 0 0
0 0 74 0 0 702.24 0 0 0 0 0
0 0 0 0 0 170.24 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 230 0 0 2276.96 0 0 0 0 0
OLUME RITASE (BCM)
TOTAL VOLUME
MAN MAN MAN DT DT DT (BCM)
(Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) PIT
0 0 0 0 0 0 - YM08
0 0 0 0 0 0 - YM07
0 0 0 0 0 0 - YM06
0 0 0 1198.08 0 0 1,198.08 YM05 HW Bawah
440.98 0 0 0 0 0 1,845.46 E33 HW Atas
492.86 0 0 568.32 0 0 1,763.42 E32 HW Bawah
64.85 0 0 0 0 0 235.09 E31 HW Atas
0 0 0 0 0 0 - E20
0 0 0 0 0 0 - E18
0 0 0 0 0 0 - E08
0 0 0 0 0 0 - E05
0 0 0 0 0 0 - R 05
0 0 0 0 0 0 - R 06
0 0 0 0 0 0 - E12
998.69 0 0 1766.4 0 0 5,042.05
HAULER &
SEAM DISPOSAL KODE UNIT TYPE UNIT DUMPINGAN TYPE HAULER
85%
85%
85%
85%
21.28
15.09
7.68
12.97
OB Removal SIANG
Fleet Allocation
JAM 7 8
1 1
2 3
8
10 11 12
4 1
5 4 9
2 12
2 1 2
0 0 0 0 0 0 - YM08
0 0 0 0 0 0 - YM07
0 0 0 0 0 0 - YM06
77.82 0 0 0 0 0 418.30 YM05 HW Bawah
0 0 0 0 0 0 - E33
142.67 0 0 161.28 0 0 538.03 E32 HW Bawah
25.94 0 0 230.4 0 0 256.34 E31 HW Bawah
0 0 0 0 0 0 - E20
0 0 0 0 0 0 - E18
0 0 0 0 0 0 - E08
0 0 0 0 0 0 - E05
0 0 0 0 0 0 - R 05
0 0 0 0 0 0 - R 06
0 0 0 0 0 0 - E12
246.43 0 0 391.68 0 0 1,212.67
HAULER &
SEAM DISPOSAL KODE UNIT TYPE UNIT DUMPINGAN TYPE HAULER
85%
85%
85%
85%
21.28
15.09
7.68
12.97
AC
ACTIVITY PLAN PRODUCTION
KODE UNIT PRODUCTIVITY
PLAN
Prod'ty Produksi EWH Hauler Daily DS NS
D05 Dozing - - - -
D06 Ripping - - - -
D07 Ripping 550 3,858.35 7.01 -
D-15 Ripping 600 5,870.32 9.78 -
D85 - 02 Dozing - - - -
MG - 02 Road - - - -
D-01 HW Dozing - - - -
M : MUD
OB : Overburden
CO : Coal
GN : General
CC : Coal Cleaning
ACTUAL OB PRODUCTION
ACH %
PRODUCTION HAULER ARF
EWH
(BCM) DS NS DS NS Daily Prod EWH
OB
OB/
MUD
OB/CL
OB+
OB+/
REMARK
Shift 1 : Start OB [07:43] di HW B, Start lambat prepare front, Scrape front 3x [12 mnt], Exca cleaning [8 mnt] & Lang
Shift 2 : Start OB [19:04] di HW B, Rain & Slippery [20:15-22:05 & 22:05-23:00], Langsir Co 5 rit, Rain & Slippery Con
Shift 1 : Start OB [08:06] di HW A, Start lambat prepare front [07-08], Scrape front 4x [15 mnt], Exca Low power & H
[16:48].
Shift 1 : Start OB [08:10] di HW B, Start lambat prepare front [07-08], Scrape front 3x [9 mnt], Loading material Sirtu
17], Stop [17:45]. Shift 2 : Start OB [19:00] di HW B, Scrape front [4 mnt], Rain & Slippery [20:15-22:05 & 22:05-23:
[01:00-06:00], Stop [23:46].
Shift 1 : Start OB [16:48] di HW A, Handle hauler E33, Pindah front [3 mnt], Exca travel [6 mnt], Stop [17:45]. Shift 2
shift langsir Co 8 rit, Scrape front 2x [9 mnt], Rain & Slippery [20:15-22:05 & 22:05-23:00], Rain & Slippery Continue
SUPPORT RUNNING:
SHIFT 1 : - OB Prod: { Plan : 3 Fleet, Actual : 3 Fleet }
- Dozer Ripping : { Plan : 2 unit, Actual : 1 Unit} >>> 1 Unit Breakdown (D06/D07)
- Dozer Spreading : { Plan : 2 unit, Actual : 2 Unit} >>>
- Motor Grader : { Plan : 1 unit, Actual : 1 Unit} >>>
SHIFT 2 : - OB Prod : { Plan : 3 Fleet, Actual : 3 Fleet }
- Dozer Ripping : { Plan : 2 unit, Actual : 1 Unit} >>> 1 Unit Breakdown (D06/D07)
- Dozer Spreading : { Plan : 2 unit, Actual : 2 Unit} >>>
- Motor Grader : { Plan : 1 unit, Actual : 1 Unit} >>>
Rest Time : Shift 1 [12:00-13:00] & Shift 2 [00:00-01:00], [HW A = HighWall Atas], [HW B = HighWall Bawa
START LOADING UNIT
DAY SHIFT NIGHT SHIFT
UNIT
7:00-12:00 13:00-18:00 19:00-24:00 01:00-06:00
Start Stop Total Start Stop Total Start Stop Total Start Stop Total
YM05 7:43 10:37 2.90 13:09 17:45 4.60 19:04 20:20 1.27 0.00
E32 8:10 11:46 3.60 13:08 17:45 4.62 19:00 20:17 1.28 0.00
2,081
SPV PROD II : ABDUL ROCHIM SPV PROD I : INDRA BA
DAY SHIFT NIGHT SHIFT
No Unit Operator WH HM REMARK No Unit
10 1 Dozer 01 HW Kholik 9.30 9.50 20 1 Dozer 01 HW
10 2 Dozer 02 HW - 20 2 Dozer 02 HW
10 3 Dozer 85 02 Abdi 8.18 8.30 20 3 Dozer 85 02
10 4 Dozer 375 07 Unit Bd 20 4 Dozer 375 07
10 5 Dozer D10 08 - 20 5 Dozer D10 08
10 6 Dozer 155 05 Unit Bd 20 6 Dozer 155 05
10 7 Dozer 375 06 Unit Bd 20 7 Dozer 375 06
10 8 MG-02 Sholikin 10.00 10.00 20 8 MG-02
10 17 Dozer 375 15 Djasman 10.00 8.00 20 17 Dozer 375 15
10 18 MG 01 Khel - 20 18 MG 01 Khel
10 19 20 19