Shift 1 Shift 2 Total COAL

OB KUD 5,042.05 1,212.67 6,254.72


OB BMB E31+YM07 [08:30-17:10]
Coal (RIT) KUD 75 1,942.91
Coal (RIT) BTP 11 284.96
Coal (RIT) BMB -
Total Ritase 86 0 2,227.87 -
TOTAL ARMADA (UNIT) 16 YM07 [10:00-11:30]

COAL GETTING RITAS


SHIFT 1
Count By Kode Coal Shift 1 Shift 2 Daily Total Coal in
Stockpile
KUD 1,942.91 - 1,942.91 -
TRUCK COUNT BTP 284.96 - 284.96 -
BMB - - - -
KUD 1,999.97 - 1,999.97 77
WEIGHT BRIDGE BTP 288.49 - 288.49 11
GM
BMB - - - rit
TOTAL TRUCK COUNT 2,227.87 - 2,227.87
88
TOTAL WEIGHT BRIDGE 2,288.46 - 2,288.46
GANTUNGAN / GANTUNGAN MASUK
88
TOTAL RITASE/DAY
RIT WEIGHT BRIDGE

Senin
PRODUKSI, TANGGAL : 1 Apr-19
Total Hari Kerja 30 Hari Remaining 29 Hari
DAILY ACTUAL ACTUAL MTD
KEGIATAN
DAY NIGHT TOTAL 0 1
OB Removel (BCM) 5,042.05 1,212.67 6,254.72 6,254.72
Coal Truck Count (MT) 2,227.87 - 2,227.87 - 2,227.87
Coal Weight Bridge (MT) 2,288.46 - 2,288.46 - 2,288.46
SR Truck Count 2.26 - 2.81 - 2.81
SR Weight Bridge 2.20 - 2.73 - 2.73

MTD TOTAL FUEL 8,437 1.053 FR (Ltr/Mtd) 0


DAILY TOTAL FUEL 8,437 1.053 FR (Ltr/Day)
8,437
SIANG MALAM
HUJAN
Start Stop waktu Start Stop
Hujan 1 0:00 0:00 0.00 20:15 22:05
Slippery 1 0:00 0:00 0.00 22:05 23:00
Hujan 2 0:00 0:00 0.00 1:00 1:30
Slippery 2 0:00 0:00 0.00 1:30 3:10
Hujan 3 0:00 0:00 0.00 3:10 4:20
Slippery 3 0:00 0:00 0.00 4:20 6:00
CH 22.00 mm/day Istirahat 1 : (12:00-13:00), Istirahat 2 : (00:00-01:00

MTD RAIN & SLIPPERY(Jam) 3.50 22.00


0 1 TOTAL
- 3.50 3.50
- 4.25 4.25
MONITORING
ENG Material EDP ACH
6,254.72 OB 6,256,540.00 0.10%
- COAL BMB - 0.00%
2,288.46 COAL KUD 2,288.46 100.00%
Total CO 2,288.46 KUD+BMB 2,288.46 100.00%

RITASE COAL MTD (MT)


SHIFT 1 SHIFT 2
1 0
From PIT Coal in Stockpile From PIT

75 - 0 1,942.91 IN
11 - 0 284.96 OUT
0 - 0 -
- - 1,999.97
- - 288.49
GM Tgl 31/03/19, 2
- rit (rit ke 39, 40) - -
2,227.87 -
86 0 0
2,288.46 -
-2 1,200.48 KUD SR 46
88 86 799.49 KUD YM 31
288.49 BTP 11
RIT WEIGHT BRIDGE RIT TRUCK COUNT
- BMB

ACTUAL MTD TARGET


PLAN MTD ACHIVE
TOTAL MONTHLY DAILY SHIFTLY
6,254.72 9,290.40 67.32% 278,711.92 9,290.40 4,645.20
2,227.87 3,316.16 67.18% 99,484.77 3,316.16 1,658.08
2,288.46 3,316.16 69.01% 99,484.77 3,316.16 1,658.08
2.81 2.80 100% 2.80 2.80 2.80
2.73 2.80 98% 2.80 2.80 2.80

Day Night Stockpile PLAN MTD ACHIVE PLAN FR


3,899 4,538 2,500 284,642.43 3% 0.80
MALAM DAY SHIFT
TOTAL/DAY FOG
waktu Start Stop
1.83 3.50 Fog 1 0:00 0:00
0.92 4.25 Fog 2 0:00 0:00
0.50 Fog 3 0:00 0:00
1.67 Istirahat 1 : (12:00-13:00), Istirahat 2 : (00
1.17
1.67
00-13:00), Istirahat 2 : (00:00-01:00) MTD FOG (jam)
0 1 MTD
4.25 - - - -
INPUT DATA STOCKPILE H-1

Input H-1

DATA STOCKPILE
TOTAL BATU MASUK & LANGSIR TOTAL COAL DI STOCKPILE

KUD (Rit) KUD (Ton) MPME (Ton) MPME (Rit) STOCKPILE 1 0

88 2,288.46 - 0 KUD 14,532.21 20,078.80


262 7,835.05 - 0 MPME - -
0 TOTAL 14,532.21 20,078.80
COAL OUT IN LANGSIR BATU MASUK LANGSIR BATU MASUK
KUD (Ton) - - 1 1 1 1
MPME (Ton) - - KUD (Ton) KUD (Ton) KUD (Rit) KUD (Rit)
0 7,835.05 2,288.46 262 88
RITASE OUT IN MPME (Ton) MPME (Ton) MPME (Rit) MPME (Rit)
KUD (Rit) - - - 0
MPME (Rit) - - 7,835.05 2,288.46 262 88

REMAINING TARGET
EOM DAILY SHIFTLY
272,457.20 9,395.08 4,697.54
97,256.90 3,353.69 1,676.84
97,196.31 3,351.60 1,675.80
2.80 2.80 2.80
2.80 2.80 2.80
DAY SHIFT NIGHT SHIFT
TOTAL
Time Start Stop Time
0.00 0:00 0:00 0.00
0.00 0:00 0:00 0.00 0.00
0.00 0:00 0:00 0.00
hat 1 : (12:00-13:00), Istirahat 2 : (00:00-01:00) 1
Input H-1

MTD BATU MASUK STOCKPILE MTD LANGSIR STOCK

Stockpile MTD KUD LAHAN MTD MPME LANGSIR KUD

11 288.49 BTP 221


- 0
77 1,999.97 KUD 41
88 2,288.46 TOTAL - 0 262

LANGSIR (TON) Ritase


BTP 6626.74 221
KUD 1,208.31 41
MTD LANGSIR STOCKPILE KE TCT

LANGSIR KUD LAHAN LANGSIR MPME

6,626.74 BTP
- 0
1,208.31 KUD
7,835.05 TOTAL - 0
OB Removal SIANG
Fleet Allocation
JAM 7 8

HD ADT MAN DT HD ADT


KODE UNIT (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)
1 YM08
2 YM07
3 YM06
4 YM05 8
5 E33 8
6 E32 2
7 E31
8 E20
9 E18
10 E08
11 E05
12 R 05
13 R 06
14 E12
PRODUCTION/Jam
PRODUCTIVITY /Jam
8 9 10

MAN DT HD ADT MAN DT HD ADT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

23 25
4 9 5 9
4 7 3 4 9 5
10 11 12

MAN DT HD ADT MAN DT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

13
5 8 4
4 9 3 4 7
2 1 2

HD ADT MAN DT HD ADT MAN DT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

14 18
8 4 9 4
3 5 8 5 5 9
3 4 5

HD ADT MAN DT HD ADT MAN DT HD


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

20 19
9 5 6 3
5 5 9 4 3 9 3
1 1 7
5 RITASE HAULER
ADT MAN DT HD HD HD ADT ADT ADT MAN
(Disposal) (Disposal) (Disposal) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal)
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
16 0 0 0 0 0 0 0
66 0 0 0 0 0 34
4 7 33 0 0 0 0 0 38
4 8 0 0 0 0 0 5
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
107 0 0 0 0 0 77
AULER VOLUME RITASE (BCM)
MAN MAN DT DT DT HD HD HD ADT ADT ADT
(inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud)
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 156 0 0 0 0 0 0 0 0
0 0 0 0 0 1404.48 0 0 0 0 0
0 0 74 0 0 702.24 0 0 0 0 0
0 0 0 0 0 170.24 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 230 0 0 2276.96 0 0 0 0 0
OLUME RITASE (BCM)
TOTAL VOLUME
MAN MAN MAN DT DT DT (BCM)
(Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) PIT

0 0 0 0 0 0 - YM08
0 0 0 0 0 0 - YM07
0 0 0 0 0 0 - YM06
0 0 0 1198.08 0 0 1,198.08 YM05 HW Bawah
440.98 0 0 0 0 0 1,845.46 E33 HW Atas
492.86 0 0 568.32 0 0 1,763.42 E32 HW Bawah
64.85 0 0 0 0 0 235.09 E31 HW Atas
0 0 0 0 0 0 - E20
0 0 0 0 0 0 - E18
0 0 0 0 0 0 - E08
0 0 0 0 0 0 - E05
0 0 0 0 0 0 - R 05
0 0 0 0 0 0 - R 06
0 0 0 0 0 0 - E12
998.69 0 0 1766.4 0 0 5,042.05
HAULER &
SEAM DISPOSAL KODE UNIT TYPE UNIT DUMPINGAN TYPE HAULER

E18 Hitachi ZX 870 HD (Disposal) Komatsu HD 465


E31 Doosan 520 ADT (Disposal) Komatsu 740B
E32 Doosan 520 DT (Disposal) Hino FM 320
Plan Jln Hauling E33 Doosan 520 MAN (Disposal) TGA 40.400
Plan Jln Hauling E20 Hitachi ZX 470
Plan Jln Hauling E05 Komatsu PC 300 HD (Mud) Komatsu HD 465
Plan Jln Hauling E08 Komatsu PC 400 ADT (Mud) Komatsu 740B
YM07 Komatsu PC300 DT (Mud) Hino FM 320
YM05 Zx 470 MAN (Mud) TGA 40.400
YM06 Zx 470
YM08 Zx 850
R 05 Cobelco 480 HD (inpit) Komatsu HD 465
R 06 Cobelco 480 ADT (inpit) Komatsu 740B
E12 PC 200 DT (inpit) Hino FM 320
MAN (inpit) TGA 40.400
Capacity
(BCM)
21.28
15.09
7.68
12.97

85%
85%
85%
85%

21.28
15.09
7.68
12.97
OB Removal SIANG
Fleet Allocation
JAM 7 8

HD ADT MAN DT HD ADT


KODE UNIT (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)
1 YM08
2 YM07
3 YM06
4 YM05 7 4 4
5 E33
6 E32 5 5 9 1
7 E31 10
8 E20
9 E18
10 E08
11 E05
12 R 05
13 R 06
14 E12
PRODUCTION/Jam
PRODUCTIVITY /Jam
8 9 10

MAN DT HD ADT MAN DT HD ADT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

1 1

2 3
8
10 11 12

MAN DT HD ADT MAN DT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)

4 1

5 4 9
2 12
2 1 2

HD ADT MAN DT HD ADT MAN DT


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)
3 4 5

HD ADT MAN DT HD ADT MAN DT HD


(Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal) (Disposal)
5 RITASE HAULER
ADT MAN DT HD HD HD ADT ADT ADT MAN
(Disposal) (Disposal) (Disposal) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal)
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
16 0 0 0 0 0 6
0 0 0 0 0 0 0
11 0 0 0 0 0 11
0 0 0 0 0 0 2
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0 0
27 0 0 0 0 0 19
AULER VOLUME RITASE (BCM)
MAN MAN DT DT DT HD HD HD ADT ADT ADT
(inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud)
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 340.48 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 21 0 0 234.08 0 0 0 0 0
0 0 30 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0 0
0 0 51 0 0 574.56 0 0 0 0 0
LUME RITASE (BCM)
TOTAL VOLUME
MAN MAN MAN DT DT DT (BCM)
(Disposal) (inpit) (Mud) (Disposal) (inpit) (Mud) PIT

0 0 0 0 0 0 - YM08
0 0 0 0 0 0 - YM07
0 0 0 0 0 0 - YM06
77.82 0 0 0 0 0 418.30 YM05 HW Bawah
0 0 0 0 0 0 - E33
142.67 0 0 161.28 0 0 538.03 E32 HW Bawah
25.94 0 0 230.4 0 0 256.34 E31 HW Bawah
0 0 0 0 0 0 - E20
0 0 0 0 0 0 - E18
0 0 0 0 0 0 - E08
0 0 0 0 0 0 - E05
0 0 0 0 0 0 - R 05
0 0 0 0 0 0 - R 06
0 0 0 0 0 0 - E12
246.43 0 0 391.68 0 0 1,212.67
HAULER &
SEAM DISPOSAL KODE UNIT TYPE UNIT DUMPINGAN TYPE HAULER

E18 Hitachi ZX 870 HD (Disposal) Komatsu HD 465


E31 Doosan 520 ADT (Disposal) Komatsu 740B
E32 Doosan 520 DT (Disposal) Hino FM 320
Plan Jln Hauling E33 Doosan 520 MAN (Disposal) TGA 40.400
E20 Hitachi ZX 470
Plan Jln Hauling E05 Komatsu PC 300 HD (Mud) Komatsu HD 465
Plan Jln Hauling E08 Komatsu PC 400 ADT (Mud) Komatsu 740B
YM07 Komatsu PC300 DT (Mud) Hino FM 320
YM05 Zx 470 MAN (Mud) TGA 40.400
YM06 Zx 470
YM08 Zx 850
R 05 Cobelco 480 HD (inpit) Komatsu HD 465
R 06 Cobelco 480 ADT (inpit) Komatsu 740B
E12 PC 200 DT (inpit) Hino FM 320
MAN (inpit) TGA 40.400
Capacity
(BCM)
21.28
15.09
7.68
12.97

85%
85%
85%
85%

21.28
15.09
7.68
12.97
AC
ACTIVITY PLAN PRODUCTION
KODE UNIT PRODUCTIVITY
PLAN
Prod'ty Produksi EWH Hauler Daily DS NS

YM05 OB - - - 178 160 264

E33 OB/CO - - - 251 251 0

E32 OB/CO - - - 224 215 262

E31 OB 225 2,511.72 13.42 7DT 203 247 175

D05 Dozing - - - -
D06 Ripping - - - -
D07 Ripping 550 3,858.35 7.01 -
D-15 Ripping 600 5,870.32 9.78 -
D85 - 02 Dozing - - - -
MG - 02 Road - - - -
D-01 HW Dozing - - - -

M : MUD

OB : Overburden
CO : Coal
GN : General
CC : Coal Cleaning
ACTUAL OB PRODUCTION
ACH %
PRODUCTION HAULER ARF
EWH
(BCM) DS NS DS NS Daily Prod EWH

1,616.38 9.08 5DT 2HD+1MAN OB OB 0% 0% 0%

1,845.46 7.37 2HD+1MAN - OB/ - 0% 0% 0%

2,301.45 10.27 1HD+1MAN+2DT 1HD+1MAN+2DT OB OB 0% 0% 0%

491.43 2.42 2HD+1MAN 5DT OB/ OB 91% 20% 18%

0.00 TOTAL FLEET/SHIFT 3.00 3.00


0.00
0.00
TOTAL OB (DAILY) 6254.72
13.00
12.00
TOTAL COAL (DAILY) 2,288.46
15.50 FUEL CON'S (DAILY) 8,437.00
13.00 FUEL RATIO (DAILY) 1.05
[Hijau = Prod'ty Tercapai], [Merah/Kuning = Prod'ty Tidak tercapai]

OB
OB/
MUD
OB/CL
OB+
OB+/
REMARK

Shift 1 : Start OB [07:43] di HW B, Start lambat prepare front, Scrape front 3x [12 mnt], Exca cleaning [8 mnt] & Lang
Shift 2 : Start OB [19:04] di HW B, Rain & Slippery [20:15-22:05 & 22:05-23:00], Langsir Co 5 rit, Rain & Slippery Con

Shift 1 : Start OB [08:06] di HW A, Start lambat prepare front [07-08], Scrape front 4x [15 mnt], Exca Low power & H
[16:48].
Shift 1 : Start OB [08:10] di HW B, Start lambat prepare front [07-08], Scrape front 3x [9 mnt], Loading material Sirtu
17], Stop [17:45]. Shift 2 : Start OB [19:00] di HW B, Scrape front [4 mnt], Rain & Slippery [20:15-22:05 & 22:05-23:
[01:00-06:00], Stop [23:46].

Shift 1 : Start OB [16:48] di HW A, Handle hauler E33, Pindah front [3 mnt], Exca travel [6 mnt], Stop [17:45]. Shift 2
shift langsir Co 8 rit, Scrape front 2x [9 mnt], Rain & Slippery [20:15-22:05 & 22:05-23:00], Rain & Slippery Continue

SUPPORT RUNNING:
SHIFT 1 : - OB Prod: { Plan : 3 Fleet, Actual : 3 Fleet }
- Dozer Ripping : { Plan : 2 unit, Actual : 1 Unit} >>> 1 Unit Breakdown (D06/D07)
- Dozer Spreading : { Plan : 2 unit, Actual : 2 Unit} >>>
- Motor Grader : { Plan : 1 unit, Actual : 1 Unit} >>>
SHIFT 2 : - OB Prod : { Plan : 3 Fleet, Actual : 3 Fleet }
- Dozer Ripping : { Plan : 2 unit, Actual : 1 Unit} >>> 1 Unit Breakdown (D06/D07)
- Dozer Spreading : { Plan : 2 unit, Actual : 2 Unit} >>>
- Motor Grader : { Plan : 1 unit, Actual : 1 Unit} >>>
Rest Time : Shift 1 [12:00-13:00] & Shift 2 [00:00-01:00], [HW A = HighWall Atas], [HW B = HighWall Bawa
START LOADING UNIT
DAY SHIFT NIGHT SHIFT
UNIT
7:00-12:00 13:00-18:00 19:00-24:00 01:00-06:00
Start Stop Total Start Stop Total Start Stop Total Start Stop Total

YM05 7:43 10:37 2.90 13:09 17:45 4.60 19:04 20:20 1.27 0.00

E33 8:06 11:46 3.67 13:06 16:48 3.70 0.00 0.00

E32 8:10 11:46 3.60 13:08 17:45 4.62 19:00 20:17 1.28 0.00

E31 0.00 16:48 17:45 0.95 19:28 20:20 0.87 0.00

YM08 (2) 0.00 0.00 0.00 0.00


YM07 (2) 0.00 0.00 0.00 0.00
YM06 (2) 0.00 0.00 0.00 0.00
YM05 (2) 0.00 0.00 22:58 23:17 0.32 0.00
E33 (2) 0.00 0.00 0.00 0.00
E32 (2) 0.00 0.00 23:00 23:46 0.77 0.00
E31 (2) 0.00 0.00 23:10 23:46 0.60 0.00
E20 (2) 0.00 0.00 0.00 0.00
E18 (2) 0.00 0.00 0.00 0.00
E08 (2) 0.00 0.00 0.00 0.00
E05 (2) 0.00 0.00 0.00 0.00
R 05 (2) 0.00 0.00 0.00 0.00
R 06 (2) 0.00 0.00 0.00 0.00
E12 (2) 0.00 0.00 0.00 0.00
REKAP
DS NS
EWH Prod EWH Prod

7.50 1,198 1.58 418.30

7.37 1,845 0.00 -

8.22 1,763 2.05 538.03

0.95 235 1.47 256.34

2,081
SPV PROD II : ABDUL ROCHIM SPV PROD I : INDRA BA
DAY SHIFT NIGHT SHIFT
No Unit Operator WH HM REMARK No Unit
10 1 Dozer 01 HW Kholik 9.30 9.50 20 1 Dozer 01 HW
10 2 Dozer 02 HW - 20 2 Dozer 02 HW
10 3 Dozer 85 02 Abdi 8.18 8.30 20 3 Dozer 85 02
10 4 Dozer 375 07 Unit Bd 20 4 Dozer 375 07
10 5 Dozer D10 08 - 20 5 Dozer D10 08
10 6 Dozer 155 05 Unit Bd 20 6 Dozer 155 05
10 7 Dozer 375 06 Unit Bd 20 7 Dozer 375 06
10 8 MG-02 Sholikin 10.00 10.00 20 8 MG-02
10 17 Dozer 375 15 Djasman 10.00 8.00 20 17 Dozer 375 15
10 18 MG 01 Khel - 20 18 MG 01 Khel
10 19 20 19
20 20

Note : Stby = standby


Bd = Breakdown
NM = No operator
NJ = No Job
SPV PROD I : INDRA BAYU PERSENTASE RUNNING SUPPORT
NIGHT SHIFT
DS NS DAY Unit
Operator WH HM REMARK
Ucok 3.30 3.50 95% 35% 65% Dozer 01 HW 1
- 0% 0% 0% Dozer 02 HW 2
Sholeh 6.00 3.70 83% 37% 60% Dozer 85 02 3
Unit Bd 0% 0% 0% Dozer 375 07 4
- 0% 0% 0% Dozer D10 08
Unit Bd 0% 0% 0% Dozer 155 05
Unit Bd 0% 0% 0% Dozer 375 06
Sulaiman 6.30 5.50 100% 55% 78% MG-02
Sugito 5.00 5.00 80% 50% 65% Dozer 375 15
- 0% 0% 0% MG 01 Khel
Ripping Spreading Grader
DS NS DS NS DS NS
0% 0% 95% 35% 100% 55%
83% 37%
0% 0%
80% 50%

40% 25% 59% 24% 100% 55%


33% 42% 78%