Case Study

(Individual Assignment)

Topic: Project Management


Time: 1 Week
1. Describe the project network to build a house from the data below. Calculate the time and
critical path.

Activity D Predecessor Time (Days)


e
A Clear the location s - 1
B c location
Bring the tool to the - 2
ri
C Conducting excavations
p A 1
ti
D Pour the foundation C 2
o
E n from outside
Plumbing installation B, C 6
F Create a home frame D 1
0
G Installation of electric wire F 3
H Install the floor G 1
I Installing the roof F 1
J Installation of plumbing from inside E, H 5
K Installing the roof I 2
L Installation of the outer wall layers F, J 1
M Installing windows and outside doors F 2
N Build a wall L, M 4
O Isolate the walls and ceiling G, J 2
P Close the walls and ceiling O 2
Q Isolate the roof I, P 1
R Finish the interior P 7
S Finish the exterior I, N 7
T Build a garden S 3
Jawaban:

1. Jalur Kritis (Tanda Panah Warna Merah)

E F G H
6 10 3 1
B
2
I
0 2D 1 J 5

A 1

1 1
0
C Q

L
2 R
O 7
1 T
P 3
7
S
M N
7
2 4

Waktu Kritis = B-E-F-G-H-J-L-M-P-R-S-T


= (2+6+10+3+1+5+1+2+7+7+7+3)
= 54 Hari
2. Calculate the time and critical path from the data below

Activity Predecessor Time (Days)


A - 3
B A 14
C A 1
D C 3
E C 1
F C 2
G D, E, F 1
H G 1
I H 3
J H 2
K I, J 2
L K 2
M L 4
N L 1
O B, M, N 3
Jawaban:

2. Jalur Kritis (Tanda Panah Warna Merah)

N
H
1
1

3 3 I O 3
A C 1 G 1
M 4

14
B
D 3 2 J
F 2 L 2
K

E 2
1

Waktu Kritis = A-B-E-F-G-H-I-J-K-L-M-N-O


= (3+14+1+2+1+1+3+2+2+2+4+1+3)
= 39 Hari
3. Calculate the time and critical path from the data below

Activity Predecessor Time (Days)


A - 21
B A 14
C A 14
D B, C 3
E D 70
F D 70
G D 14
H G 1
I H 1
J D 1
K J 1
L D 7
M L 7
N D 7
O N 14
P O 1
Q E, F, P 1
R Q, I, K 1
S M, R 2
Jawaban:

3. Jalur Kritis (Tanda Panah Warna Merah)

Waktu Kritis = A-B-C-D-E-F-P-Q-I-M-R-S


= (21+14+14+3+70+70+1+1+1+7+1+2)
= 205 Hari
21
A

B
14

K
J
C 14 1 1

D G
3 14

E 7 H
N 70 L 1
7
7
M

F 70 I
O 14 1 R 1

1 1 2
P Q S
3. Calculate the time and critical path from the data below

Activity Predecessor Time (Days)


A - 21
B A 14
C A 14
D B, C 3
E D 70
F D 70
G D 14
H G 1
I H 1
Activity Predecessor Time (Days)
J D 1
K J 1
L D 7
M L 7
N D 7
O N 14
P O 1
Q E, F, P 1
R Q, I, K 1
S M, R 2