Content
• Introduction on Energy Efficiency
Section Regulations & Act
• An Overview of the Efficient
Management of Electrical Energy
1 Regulations 2008
• Guidelines for Prospective and REEM

• Continuous Development Program for


Section REEM
• Guidelines on Information to be
Submitted to Energy Commission Under
2 Regulation 6, EMEER 2008 using EMIS
Content

• Introduction on Energy
Efficiency Regulations & Act

Section • An Overview of the Efficient


Management of Electrical
Energy Regulations 2008
1 • Guidelines for Prospective and
REEM
INTRODUCTION
▪ Energy Efficiency and Conservation Unit (EECU) is one of the unit
under Industry Operation Department. Previously it was known as
Demand Side Management until major restructuring starting 01st August
2018.
▪ The Unit was establish to promote and regulate energy efficiency
(electrical) in Malaysia.

ENERGY EFFICIENCY AND CONSERVATION UNIT


eec@st.gov.my
Function Energy Efficiency &
Conservation Unit
• CREATING STANDARDS
• Creating standard for energy efficiency such as
Minimum Energy Performance Standards (MEPS)

03
02
01

• PROMOTION • ENFORCEMENT
• Promoting energy efficiency in Malaysia • Enforcement of EMEER 2008

ENERGY EFFICIENCY AND CONSERVATION UNIT


eec@st.gov.my
New Suruhanjaya tenaga

ENERGY EFFICIENCY AND CONSERVATION UNIT


eec@st.gov.my
INTRODUCTION
ENERGY EFFICIENCY
Energy Efficiency means using electricity
wisely or less energy in order to
accomplish the same tasks whether at
home or at the workplace
ACTS & REGULATIONS
ENERGY COMMISSION ACT 2001
▪ To promote efficiency, economy and safety in the
generation, production, transmission, distribution supply and
use of electricity

▪ To promote the use of renewable energy and the


conservation of non-renewable energy
ACTS & REGULATIONS
ELECTRICITY SUPPLY ACT 1990
▪ To promote the efficient use of electricity
• Part VA – Efficient use of electricity
To determine the standards, • Section 23A – Minister to determine standards, etc.
specifications, practices and • The Minister may, from time to time, prescribe the standards
measures for the efficient specifications, practices and measures to be adopted and any other
use of electricity. matters in respect of the efficient use of electricity.

• Part VA – Efficient use of electricity


• Section 23B – Installation to meet requirements.
• No person shall use or operate any installation unless the
installation meets such requirements as may be prescribed in
Installation and equipment respect of efficient use of electricity.
to meet requirements in
respect of the efficient use • Part VA – Efficient use of electricity
of electricity. • Section 23C – Equipment to meet requirements.
• No person shall manufacture, import, sell or offer for sale or
lease any equipment unless the equipment meets such
requirements as may be prescribed in respect of efficient
use of electricity.
ACTS & REGULATIONS
LEGAL AND REGULATORY FRAMEWORK
EFFICIENT
MANAGEMENT OF
ELECTRICAL ENERGY
REGULATION (EMEER)
2008
EFFICIENT MANAGEMENT OF ELECTRICAL
ENERGY REGULATIONS (EMEER) 2008
▪ Gazette on 15th December 2008
▪ Improving energy management practices among
large consumers through the implementation and
enforcement of the EFFICIENT MANAGEMENT
OF ELECTRICAL ENERGY REGULATIONS
(EMEER) 2008.
▪ Applied to big energy users (equal or exceeding 3
Million kWh over any period not exceeding 6
consecutives months
Efficient Management Of Electrical Energy
Regulations (EMEER) 2008
REGULATIONS
3:
APPLICATIONS

CONSUMER GENERATOR

Any installation which Any installation used,


receives electrical energy worked or operated by a
from a licensee or supply private installation licensee
authority with a total with a total net electrical
electricity consumption equal
energy generation equal to
to or exceeding 3,000,000
or exceeding 3,000,000 kWh
kWh as measured at one
metering point or more over over any period of six
any period of six consecutive consecutive months
months; or
Efficient Management Of Electrical Energy
Regulations (EMEER) 2008
REGULATION 5 : OBLIGATION TO SUBMIT INFORMATION

◼ Licensee, supply authority or private installation licensee shall ensure


that the information or documents provided are true,accurate and
complete.
◼ Any licensee, supply authority or private installation licensee who –
• fails to submit such information; or
• fails to disclose or omits to give any relevant information or
document, or provides information or documents that he or it
knows or has reason to believe is false or misleading
commits an offence under these Regulations
Notification by Energy Commission

To appoint a Registered Electrical Energy


Manager and to submit written confirmation of the
appointment

To submit Electrical Energy Management


Objectives and Policy

To submit Electrical Energy Management


accounts and documents
Efficient Management Of Electrical Energy
Regulations (EMEER) 2008
• 6. (1) The Commission may, at any
•(d) to submit the report in Form A of
the Second Schedule that has been
time by written notice, direct any
duly signed; and private installation licensee or
•(e) to submit any other information consumer whose total net
which the Commission may require. electrical energy generation or
•6.(2) The private installation licensee Every 6 months, a total electrical energy
How to get
or consumer shall upon submitting the review report on
informed that your consumption, as the case may be,
information and report under the measures taken
installation is equals to or exceeds
paragraphs (1)(c), (d) and (e) include a must be submitted
affected by the 3,000,000kWh
declaration by the registered electrical to Energy
energy manager for the installation in regulation?
Commission
Form B of the Second Schedule.

Information to be
submitted must •(a) to appoint or designate a
•(c) to submit information regarding – include the way registered electrical energy
What you should
(i) the statement of policy for efficient forward of the manager to carry out the functions
installation towards do when received
electrical energy management of the and duties under regulation 16 at
efficient energy the notice?
installation; the installation
(ii) the objectives of efficient electrical management in 3
•(b) to submit a written
energy management; and months from the
date notice received confirmation of such appointment
(iii) the accounts and documents or designation under paragraph (a)
pertaining to efficient electrical energy to the Commission containing the
management name and particulars of the
registered electrical energy
manager as well as the date of
REPORT expiry of his registration as an
FORM A FORM B electrical energy manager
FORMAT
Efficient Management Of Electrical Energy
Regulations (EMEER) 2008
REGULATION 7 : OBLIGATION OF PRIVATE INSTALLATION LICENSEE OR CONSUMER
30 Days 30 Days
To submit To submit
information and information and
report report
[ 6(1)(c),(d) &(e) and [ 6(1)(c),(d) &(e) and
6(2) ] 6(2) ]

10 11 12 1 2 3 4 5 6 7 8 9 10 11 12 1

Three Months Six Months Six Months


To appoint REEM and
submit written
confirmation of
appointment
[ 6(1)(a) and (b) ]
2017 2018 2019
Efficient Management Of Electrical Energy
Regulations (Emeer) 2008
REGULATION 9 :REVIEW REGULATION 10 : WITHDRAWAL
The Commission may, review the The Commission may withdraw the
obligations of the entity by considering: - earlier notice by considering:-

The total net electrical energy The total net electrical energy
consumption/generation for the reported consumption or generation for the
period is below 3,000,000 kWh; reported period equals to or exceeds
3,000,000 kWh

Any other reason as the Commission


Has fully complied with the requirements deems fit when it is satisfied that
of the Regulations; and efficient management of electrical
energy at the installation for the
reported period has not been practised
Any other reason which the Commission after the date of issue of the notice
deems fit to show efficient management
of electrical energy at the installation for
the reported period.

and may by written notice notify the entity


that he or it is no longer required to further
submit the information and report
EMEER 2008 ACTIVITY

Enforcement of EMEER 2008


Enforcement to the installation who did
not comply to the EMEER 2008.

Energy Management Audit


Audit to the installation that
already comply to the EMEER
Energy Management 2008 to ensure project reported
Information System (EMIS) are correct.

Currently being developed by


consultant from Croatia for the
purpose of monitoring of EMEER Amendment of EMEER 2008
2008. Expected to be completed
Currently in progress to amend the
end of this year.
regulation which include:
• Increase of general penalty from
MYR 5,000 to MYR 20,000.
• Registration of Energy Service
Company (ESCO) by law.
REGISTERED ELECTRICAL ENERGY
MANAGER (REEM)
QUALIFICATION REQUIREMENTS

1. Malaysian citizen aged 23 years and above;


and

5. Demonstrates knowledge of 2. is a Professional Engineer and


QUALIFICATION
the requirements of the Act and REQUIREMENTS
possesses at least six months working
these Regulations that satisfies experience in the efficient
[REGULATIONS
the Commission 12] management of electrical energy, or

4. holds a certificate of competency as an


Electrical Services Engineer or as a Competent 3. holds a degree in Science, Engineering,
Electrical Engineer as in the Electricity Architecture or its equivalent and possesses at
Regulations 1994 and possesses at least nine least one year working experience in the
months working experience in the efficient efficient management of electrical energy; or
management of electrical energy; and
FUNCTIONS AND DUTIES OF REEM
Audit and analyse
Advise in developing
and implementing
measures
Monitor the In the process of
upgrading to Online
implementation of the Monitoring and
measures Reporting System.

Supervise the keeping of records


and verify its accuracy; and

Ensure the timely submission


of information and reports.
22
REEM APPLICATION PROCESS

ENERGY
Certification COMMISSION

Higher
Energy
Medium Commission
Training
Institution
Education
Institution

Organization Energy
Commission MAESCO AEMAS UTM UTeM
REEM APPLICATION PROCESS
• Direct • Beginning from • Beginning from •MASTER OF • BACHELOR OF
application to 2014. 2013. SCIENCE: ENERGY ENGINEERING

UNIVERSITY TECHNICAL MALAYSIA (UTeM)


MAESCO
ENERGY COMMISSION (EC)

AEMAS

UNIVERSITY TECNOLOGY MALAYSIA (UTM)


Energy • Conducted by • Program under MANAGEMENT • Approved in
Commission Malaysia ASEAN Centre •Approved in 2017
• Two main Association of for Energy (ACE) 2016 • 4 Years
stages: Energy Service conducted by •Full time : 1 year engineering
• Stage 1: Companies Malaysian (2 semesters & 1 course with
Submission of (MAESCO). Green short semester) Energy
the complete • Candidate must Technology •Part time : 2 Management
application complete and Corporation years (4 program
form through pass the 5-day (MGTC) in semesters & 1 syllabus
Energy training collaboration short semester)
• Student must
Commission program which with Malaysian •Four courses: pass the Energy
Online System consist of test Energy 1. Core (8 Management
(ECOS) and and individual Professionals courses) subject with
supporting project Association 2. Elective (4 min B+ and
documents; presentation. (MEPA). courses) must achieve a
• Stage 2: • Candidate must 3. General (1 CGPA of 2.5 and
Interview complete and course) above
• 30 minutes pass the 5-day 4. Research • Must have 1
short training project year experience
written quiz program which •Degree in in EE related
consist of test Science, Project field
• 20-30
and team must be related
minutes oral
project to energy
interview
presentation. efficiency,
including the
case studies from
industry.
Minimum 1 year.

Successful candidate from the program need to submit complete application form through ECOS
and supporting documents; they are not required to be interviewed by the EC
Application of REEM

Apply through online


system Energy Processing fee
Completed application
Commission Online Information and (payment online
form, FORM Report on energy
System (ECOS) supporting documents through ECOS or
ST(DSM/PTE/2009) efficiency project (can
available at as stated in the Cheque/Money Order
which is printed out be EMGS report)
www.st.gov.my or application form in the name of
from the system
directly Suruhanjaya Tenaga)
http://ecos.st.gov.my/
Flow chart for applying REEM through EMTC
Scheme
APPLICATION REGISTRATION FOR REEM

• Log in to ECOS Online (http://ecos.st.gov.my/). Click on “Daftar Pengguna” for first time user.
• Fill in the Online Application Form (Menu → Permohonan → Permohonan Pendaftaran Pengurus
Tenaga Elektrik).
• Submit to us:
• Printed online application form.
• Report on Energy Efficiency Project*
• Information and Supporting Documents as stated in the Online Application Form.
• Application fee (Payment is through online/manual)
• Online Payment (FPX or Visa/Mastercard) – Print the receipt of the payment
• Manual Payment (Money Order or Cheque)

*Report on Energy Efficiency Project


▪ At least one project report (the report shall be submitted in accordance with the format provided in the application form
▪ Only projects related to electrical energy (thermal energy related projects may be submitted as a supplementary)
Types of Project
▪ Projects that have been carried out - from concept idea, implementation and report on savings achieved , or
▪ Energy audits / feasibility studies

• Guideline for Online Application:


▪ ECOS Online (http://ecos.st.gov.my/) → Bantuan → Manual Pengguna → Individu → PTE
APPLICATION REGISTRATION FOR REEM
Permohonan Atas Talian

Permohonan
Atas Talian
APPLICATION RENEWAL FOR REEM

Dokumen Sokongan:
Bayaran fi untuk proses sebanyak RM 20 (Sila
gunakan Cek/Wang Pos diatas nama Suruhanjaya
Tenaga atau menyertakan resit bayaran atas talian
(FPX atau Visa/Mastercad).

Tiga keping gambar warna berukuran pasport


yang bertulis nama dan No. KP di belakangnya.

Satu salinan KP (depan dan belakang) yang telah


disahkan.

Salinan Ijazah/kelulusan setaraf yang disahkan.

Salinan Perakuan Kekompetenan ST yang sedia


ada yang disahkan.

Senarai dan penerangan lengkap pengalaman


kerja.

Senarai dan penerangan lengkap pengalaman


kerja dan latihan berkaitan pengurusan tenaga
elektrik dengan cekap.

Aliran Kerja
Surat pengesahan yang berkenaan daripada
Utama
majikan/pihak pepasangan.
Energy Commission Online System
(ECOS)
Register ECOS Account
Register ECOS Account (Klik OK)
Register ECOS Account (Klik SINI)
Register ECOS Account (Pilih Individu)
Register ECOS Account (Isi mengikut IC)
Register ECOS Account
Register ECOS Account (Klik Saya Setuju)
Register ECOS Account
Register ECOS Account
Register ECOS Account
LAMAN UTAMA
Application of REEM (Klik Permohonan PTE)
Application of REEM
Application of REEM
Application of REEM
Application of REEM
Application of REEM (Klik Lampiran A)
Application of REEM
Application of REEM
Application of REEM
Application of REEM
Application of REEM
Application of REEM
Application of REEM
Application of REEM
BAYARAN WANG POS, CEK
ATAS NAMA
SURUHANJAYA TENAGA ATAU
MELALUI ONLINE
SEMAKAN PERMOHONAN
SEMAKAN PERMOHONAN
Sum of Registered EEM

250 1,200

1,060

1,000
200 191

165
800
150
150
137

600
111 111

100 93

400

48
50
32 200
22

0 0
2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Tahun Kumulatif
Appointment Letter
Thank you
Energy Commission Malaysia
Energy Efficiency & Conservation Unit
Industry Operations Department
No12, Jalan Tun Hussein, Precinct 2
62100, Putrajaya
Malaysia

Tel: 03-8870 8762


Fax: 03-8888 8641
Email: reem@st.gov.my
Website address : www.st.gov.my

Das könnte Ihnen auch gefallen