Rated fuel
164.8g/ps.h at 1950rpm
consumption
* Left method
1-4-2-6-3-5
After service department 2
2) Engine for R220LC-9S & 9
Fuel Injection
Mechanical HPCR
Pump
1) Structure
(MCU)
1) Structure
(MCU)
Specification Remarks
Unload Loaded
4) Check Table
36mm
24mm
17or13mm
24mm
36mm
1) Function
: when the pressure is different between Mode Eng’ RPM EPPR
the target and real, the current is re- Unload Relief Hi Idle Relief
adjusted to be equal (mA) (Kg/㎠) (Kg/㎠)
P 2150 1950 330 10 10
S 2050 1850 360 12 12
E 1950 1750 360 12 12
2) System Outline
2) Checking Items
Ⓐ Power shift Press : 0 bar Ⓑ Real Power shift Press : 30 bar
4) Check Table
STD Opt
Mode Application
Unload Load Current Pressure Current Pressure
(mA) (Kg/㎠) (mA) (Kg/㎠)
P Heavy Duty 2150 1950 330 10 366 13
S Standard 2050 1850 360 12 400 15
Starting
Starting
Position
1000 - 700 38 ←
GND
TR
Electric Circuit for Solenoid After service department Electric Circuit for Starting 18
Normal Power
error
Communication
4) Communication of MCU
error
3) HHI Comments
- Shut off valve is return by Spring Force
- If it doesn’t return,
it should be caused by physical fixedness of Shut off Valve
1) Work Mode
: General operation
Work Tool
Solenoid General
Breaker Crusher
Flow Level Max 7 step, Reduced 10ℓper step Max 4 step, reduced 20ℓper step
Safety Sol’ On On Off
Press Sol’ Off On Off
Conflux Sol’ Off On/off Off
After service department 21
10. For Breaker Mode
1) Selection
EPPR
Valve for
Breaker
2) Function
Ⓐ When the breaker mode selected, the safety sol’ is energized
Ⓑ The press of EPPR valve is controlled by MCU to control Flow for Breaker
Ⓒ MCU can realize breaker is operated or not through the press sensor
After service department 22
* Trouble Shooting 1
2) Dealer’s Decision
(1) after checking Press, the results is both RH and LH pressure is almost the same
(2) the main cause of it is the EPPR Valve in Main Pump (not Working anymore) resulting
to unbalance performance of travel
It is an EPPR valve
for breaker
Not for Main Pump
4) Comments
1) Machine List
Model S/No Hour Description Dealer’s action
R220LC-9S B809 302 1) Deviation to the Left side
B810 90 - The Spool was scratched/burned
B909 198
B910 165
B917 177/447
B919 143
38∼3bar
1) Selection
2) Function of Sol’
Ⓐ When the Crusher mode selected, the safety
sol’ is energized
Ⓑ The press of EPPR valve is controlled by
MCU to control Flow for Crusher
Ⓒ Conflux Sol’ is energized by MCU to join
P1 and P2
Ⓓ Press Sol’ is energized to increase the
system Press for Crusher
Attach EPPR
28
Customer Support Dep’t
12. Auto Idle System
1) Structure
; Optimized Flow division between Boom and Swing by calculating RCV 2nd pressure
and Load condition to control the EPPR Valve current.
- Calculate Boom up Pilot Press and Swing one and control Boom Up or Swing Speed by Swing EPPR
Shock
- Smooth movement of Logic valve open-area.
Reduction
PO3
1P 2P Gear Pump
주행직진
좌 주행
스윙
붐
34
Customer Support Dep’t
•Working pressure compared
( Boom, Arm, Swing complex operation)
압력
시간
35
Customer Support Dep’t
14. Auto Power Boost system
1) Conditions
- P Mode only
- Set to ‘Enable’ on the cluster
-Location: Main pump room
-Spec: 24V, 15~25Ω
2) Output
- Boost Pressure: 350 → 380bar
- Duration: 8 sec
P
mode
1) Structure
Small Large
Chamber Chamber
2) Test Result
- P1 80.4bar
- P2 : 83.6bar during Traveling
(2) Remedy
Reason Remedy
Lack of lubrication
1) Hydro Circuit
1) Function
-Boom is stopped by a Boom spool when
boom downing
-Boom holding valve will be closed 3∼4
seconds later after RCV lever in neutral
Pilot
Drain
Orifice
¢0.4
1) The Function
When the boom come down very slowly,
Oil from boom cyl’ flow into Boom Cyl
Head to prevent cavitation
Holding
Valve
Pb4
49
Customer Support Dep’t
20. Swing Priority Valve
암1
P2측 병렬 통로 암1측 병렬 통로
51
Customer Support Dep’t
21. Bucket Summation
1) Description
When opened the port relief valve,
a port relief valve needs more time
to close than a main relief valve
2) Moving Parts
1) Description
When opened the port relief valve,
a port relief valve needs more time
to close than a main relief valve
2) Moving Parts
1) Structure
1) Mechanism
2) Principle of operation
1) Structure
The part of
polished
¢3.0
¢0.8
1) How to measure
- Rotate 1 turn and then measure
time taken for next 3 revolution
2) Test result
1 speed 28.8±2.0
2 speed 19.0±2.0
3) Test Result
- you can decide which the travel motor is more faster or slower
After service department 72
18. Idler worn out