Date: 07.01.

2019

A. For attending the defect of Line-3 (Bhadravati – DIL Ckt.) panto isolator (4-1389B), first Main Bus-B
of CTU section needs to be completely dead. The steps which need to be followed are mentioned
below.
1. Line-4 Isolator-'B' (4-1289B) open
2. GT-2 Isolator-'B' (4-289B) open
3. ST-2 Isolator-'B' (4-189B) open
B. In next step for transferring of Line-3 on TBC bay for non-interruption of power flow, following steps
need to be followed which are mentioned below.
1. NIT switch of Line-3 in I (Intermediate) mode
2. Line-3 transfer isolator (4-1389T) close
Interlock Permissive for closing of Transfer Bus Isolator:-

a) 4-1489TTransfer Bus Isolator of TBC bay open


b) 4-289T Transfer Bus Isolator of GT-2 bay open
c) 4-189T Transfer Bus Isolator of ST-2 bay open
d) 4-1289T Transfer Bus Isolator of Line-4 bay open
e) 4-1389TE earth switch open
f) 4-1489TE2 Earth Switch for Bus-1 & Bus-2open
g) 4-1489TE1 Earth Switch for TBC Bus open
h) NTI switch of Line-3 in I (Intermediate) mode
i) 4-1389T isolator selector switch in remote
3. TBC bay Transfer Isolator (4-1489T) close
Interlock Permissive for closing of Transfer Bus Isolator:-

a) 4-1489T isolator selector switch in remote


b) 4-1489TE1 earth switch open
c) 4-1489TE2 earth switch open
d) 4-1452 breaker open
4. TBC bay Isolator-‘A’ (4-1489A) close
Interlock Permissive for closing of Bus A Isolator:-

a) 4-1489TE2 earth switch open


b) 4-1489AE earth switch open
c) 4-1489A isolator selector switch in remote
5. TBC bay Isolator-‘B’ (4-1489B) open
6. TBC bay breaker (4-1452) close
Interlock Permissive for closing of TBC circuit breaker for any bays except GT-2:-

a) 4-1452 breaker selector switch in remote


b) 86X lock out rely of TBC bay not operate
c) 86Y lock out rely of TBC bay not operate
d) 86 LO lock out rely of TBC bay not operate
e) TC-1 of 4-1452 CB healthy
f) TC-2 of 4-1452 CB healthy
g) Bus zone protection relay (A/B) or Transfer zone protection relay (C) of
CTU section not operate

h) Check zone protection relay (CH) of CTU section not operate


i) Over current & Earth fault relay of TBC bay not operate
j) 4-1489A isolator or 4-1489B isolator close
k) 4-1489T isolator close
l) Check synch permissive ok (i.e., Live Bus-Live Line), for Line-3 & Line-4
m) Line-3 or Line-4 or ST-2 or GT-2 locked, i.e., at a time anyone bay can be
charged through TBC Bay
7. NIT switch of Line-3 bay in T (Transfer) mode
8. Line-3 breaker (4-1352) open
9. Line-3 Isolator-‘A’ (4-1389A) open
10. Line-3 Line Isolator (4-1389L1) open
11. Line-3 AE earth switch (4-1389AE) close

C. After completion of the work normalization procedure needs to be followed. The steps are mentioned
below.
1. Line-3 AE earth switch (4-1389AE) open
2. Line-3 Line Isolator (4-1389L1) close
3. Line-3 Isolator-‘A’ (4-1389A) close
4. NIT switch of Line-3 bay in I (Intermediate) mode
5. Line-3 breaker (4-1352) close
Interlock Permissive for closing of circuit breaker in Intermediate mode:-

a)
4-1352 breaker selector switch in remote
b)
86X lockout relay of Line-3 bay not operate
c)
86Y lockout relay of Line-3 bay not operate
d)
86LO lock out relay of Line-3 bay not operate
e)
TC-1 of 4-1352 CB healthy
f)
TC-2 of 4-1352 CB healthy
g)
Bus zone protection relay (A/B) or Transfer zone protection relay (C) of
CTU section not operate
h) Check zone protection relay (CH) of CTU section not operate
i) 4-1389A Isolator or 4-1389B isolator close
j) 4-1489A Isolator or 4-1489B Isolator of TBC bay close
k) 4-1452 breaker of TBC close
l) NIT switch of Line-3 bay in I mode
6. TBC bay breaker (4-1452) open
7. TBC