Sie sind auf Seite 1von 7

MEL80664

Professional Resume

NAME : NORAINI BT MOHD NOOR

NATIONALITY : MALAYSIAN

DATE OF BIRTH : 01/10/1969

TERTIARY BACHELOR DEGREE IN ELECTRICAL ENGINEERING


EDUCATION : - UNIVERSITY TECHNOLOGY MALAYSIA, 1991

EMPLOYMENT

PERIOD COMPANY POSITION HELD

01/2002 - PRESENT TECHNIP GEOPRODUCTION (M) SENIOR ELECTRICAL


SDN BHD ENGINEER

03/1997 - 12/2001 TECHNIP GEOPRODUCTION (M) ELECTRICAL ENGINEER


SDN BHD

07/1993 - 07/1996 DEWAN BANDARAYA KUALA LUMPUR ELECTRICAL ENGINEER

08/1991 - 07/1993 NEMIC LAMBDA (M) SDN BHD AUTOMATION SYSTEMS


ENGINEER

Rev. Date Checked Approved


“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
05/2005
Noraini Bt Mohd Noor
Page 2 of 7

PROFESSIONAL Graduate member of Board of Engineers, Malaysia


REGISTRATION :

Written and spoken English


LANGUAGES : Written and spoken Bahasa Malaysia

QuickBasic, Fotran, Lotus, Microsoft Word, Word Perfect,


EXPERIENCE IN
EDSA, Microsoft Excel, Dbase, Calculux, Chalmit Lotus, Lotus Smartsuite.
SOFTWARE :

SPECIAL SKILLS :

- Two (2) years experience in electronic design.


SYNOPSIS OF - Three (3) years experience in evaluation, management.
PROFESSIONAL
- More than five (5) years experience in oil and gas industry.
EXPERIENCE :

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
Noraini Bt Mohd Noor
Page 3 of 7

WORKING EXPERIENCE:

01/2002 - PRESENT TECHNIP GEORPODUCTION (M) SDN BD


Senior Electrical Engineer

01/2004 - 09/2004 Client : SARAWAK SHELL BERHAD


Project : Design Services for E11P-B Platform and Pipelines

- Prepare all specifications for electrical equipment i.e. 6.6 kV switchgear,


415 LV switchboard, AC & DC UPS aux. diesel generator, power
transformer, sola r power system etc.
- Prepare electrical reports for above project i.e. electrical design basis,
power generation and distribution philosophy, electrical load analysis &
equipment sizing etc.
- Review electrical design works.
- Review electrical design (single line diagram, cable routings, layout
etc.).
- Review vendor data for SSB supplied items.
- Provide technical support for fabrication of platforms.
- Incorporate vendor data.
- Prepare power management system design report.
- Prepare load shedding report.

10/2003 - 12/2004 Client : CHIYODA CORPORATION


Project : CSPC Nanhai Petrochemical Project

- Vendor data review and technical evaluation of heat tracing design.

04/2003 - 08/2003 Client : CHINA NATIONAL OFFSHORE OIL LTD.


Project : Chunxiao Gas Complex Development

- Review specifications for HV, MV, LV switchgear/MCC, transformers, AC


UPS, cable specification.
- Review offshore installation, precommissioning and testing procedure
specifications.
- Prepare single line diagrams, equipment sizing, electrical room layout.
- Review all electrical study reports.

08/2002 – 12/2002 Client : CHINA NATIONAL OFFSHORE OIL LTD.


Project : Chunxiao Gas Complex Development

- Doing FEED design for the project.


- Prepare specification for HV, MV and LV switchgears, HV and LV
transformers, AC and DC UPS, cable specification inclusive of
submarine cables, electric motors.
- Prepare offshore installation, pre-commissioning and testing procedure.
- Prepare workscope for living quarters and topsides.
- Prepare requisitions for HV switchgears, transformers and submarine
cable.
- Prepare turbine and emergency generator and electrical equipment
sizing.

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
Noraini Bt Mohd Noor
Page 4 of 7

WORKING EXPERIENCE:

03/2002 – 08/2002 Client : PETRONAS CARIGALI SDN BHD


Project : ANGSI-A Complex Facility Upgrade

- Review of existing generators and electrical equipment size and


propose upgrading where required due to increased in production.
- Prepare job specification for HV and LV switchgear upgrade.
- Prepare electrical portions of turbine generator for purchase of new
generator.
- Prepare schematics diagrams and interconnection diagrams.
- Upgrade existing single line diagrams to accommodate new facility due
to upgrade project.
- Review and update load shedding philosophy and logic diagram.

01/2002 – 03/2002 Client : BASF


Project : THF/PolyTHF Plant

- Prepare all electrical requisitions (UPS, switchgears, transformers etc.).


- Review bidders offer.
- Prepare single line diagrams.
- Assist Proposal Lead Engineer in technical write-up.

03/1997 - 12/2001 TECHNIP GEORPODUCTION (M) SDN BD


Electrical Engineer

03/2001 - 08/2001 Client : SARAWAK SHELL BERHAD


Project : E11K-A Compression Detailed Design

- Review specifications for electrical long lead items i.e. HV and LV


switchgear, UPS, etc.
- Review Vendor data and wiring diagram on HV and LV switchgear,
generator sets and compressor.
- Prepare/ review electrical design works i.e. single line diagrams,
interconnection diagram, schematic diagrams, cable routing, lighting
design, cable sizing, load analysis, etc.
- Prepare/review operating procedures of E11K-A Complex.

09/1999 - 05/2001 Client : PETLIN (MALAYSIA) SDN BHD


Project : Low Density Polyethylene LDPE Project

- Prepare specifications for electrical equipment.


- Prepare requisition for all electrical long lead items and bulk materials
for the project.
- Doing bid evaluation for all electrical equipments to be purchased (i.e.
HV & LV transformer, swithgears, lightning systems, motors, VSDS etc.).
- Doing load analysis, cable sizing and other electrical calculations for
selection of equipments.
- Review vendor data.
- Checking electrical design works.

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
Noraini Bt Mohd Noor
Page 5 of 7

WORKING EXPERIENCE:

- Prepare all schematics, protective diagrams, single line diagrams for the
project using intelligent motor control system - sound knowledge for
intelligent MCC propose by vendor for the project.
- Design public address and alarm system for the plant.
- Select VSDS to be use for the project.
- Prepare electrical works specifications for the sub-contract.
- Select high voltage and low voltage busducts for the project.
- Went for Factory Acceptance Test for electrical equipment.
- Prepare relay coordination study for the project.
- Review vendor's design of starting 19MW motor via VSD.
- Review vendor's design of controlling plant power factor via
synchronous motor excitation.
- Review vendor data book.

10/1998 - 12/1999 Client : TITAN POLYETHLENE (M) SDN BHD


Project : Titan Polyethylene 100 KTA HDPE Plant

Assist Lead Engineer


- Prepare specifications for electrical equipments
- Prepare requisitions for all electrical equipments e.g. switchgear, motor
control center, transformers, motors, variable speed drives, cables,
glands, local control station, etc.
- Doing bid tabulations for all electrical equipment/accessories.
- Check electrical design works.
- Do load analysis, cable sizing, fault calculations etc for selection of
equipments.
- Prepare/check MTOs, cable schedule.
- Assist lead engineer with selection of motor for electrical driver
equipments.

10/1998 Client : SARAWAK SHELL BERHAD


Project : Detail Design of D35JT-C Topsides and Tie-Ins Modifications

- Prepare technical requisition package for Solar Power Generation And


Distribution System
- Prepare technical requisition package for Solar Powered Navigational
Aids System.

08/1998 Client : SARAWAK SHELL BERHAD


Project : Design of The Topsides And Substructure of LMJT-A Satellite
Platform (Phase II)

- Prepare technical requisition package for Solar Power Generation And


Distribution System.
- Prepare technical requisition package for Navigational Aids Solar Power
System.

08/1998 - 10/1998 Client : BRUNEI SHELL PETROLEUM


Project : Detailed Design For Champion-7 Das Replacement Project

- Updating the conventional Unit Control Panel to a PLC based control


panel for compressor package.

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
Noraini Bt Mohd Noor
Page 6 of 7

WORKING EXPERIENCE:

- Responsible for identifying the demolition and/or modifications to be


done for the electrical works, update drawings.
- Identify the best solution to remove and/or place the existing and new
equipments due to the project.
- Update/modify existing motor control center
- Prepare all specifications for demolition works, installation works and tie-
ins works.
- Prepare electrical auxiliary cabinet specification.
- Review existing UPS capacity.

04/1997 - 11/1997 Client : MALAYSIAN NEWSPRINT INDUSTRIES SDN BHD


Project : Detailed Design of Waste Paper Warehouse

- Responsible for electrical design and preparing specifications for


switchboard, lighting, electrical installation etc.
- Prepare all lighting calculations for cable sizing, busbar / switchboard
sizing etc and review all electrical drawings.
- Prepare documents for tender bid.

10/1997 - 04/1998 Client : SARAWAK SHELL BERHAD


Project : F6K-A, Substructure Detailed Design (F6K-A Jacket)

- Sizing of MCC, switchgear room layout.


- Sizing of new power generator for the new F6 Compression Platform.
- Doing load analysis, cable sizing, UPS and Battery Sizing.
- Prepare TRPs for new MCC, LV Swichboard, UPS.
- Doing short circuit study, motor starting stability study.
- Prepare all single line diagrams, control schematic, wiring diagram,
earthing and lighting protection layout, cable routings.
- Updating all drawings for existing F6 production platform to tie-ins to
new compression platform such as cable routings, MCTs, lighting
layout/loop diagram, installation details, using diagram, motor control
schematic.
- Prepare material take-off for the above detail design.
- Assist lead engineer preparing reports for switchgear modifications,
offshore hook-up scope of work, commissioning manual etc.

11/1997 - 02/1998 Client : ESSO PRODUCTION MALAYSIA INC.


Project : Larut-A Development Engineering

Assist Lead Engineer


- Sizing of new power generator & emergency power generator, prepare
load tabulation, sizing of motor control centre, prepare switchgear room
layout.
- Prepare single line diagrams, load forecast chart.

03/1998 - 06/1998 Client : PETRONAS CARIGALI SDN BHD


Project : ANDRA & Pipeline Detail Design

Assist Lead Engineer


- Sizing of new power generator for the drilling platform.
- Prepare all single line diagrams.
- Prepare switchgear room layout.

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.
Noraini Bt Mohd Noor
Page 7 of 7

WORKING EXPERIENCE:

- Navaids and distribution panels specifications.


- Design lighting layout / loop diagram.
- Prepare / check installation details drawings.
- Load analysis.

06/1997 - 10/1997 Client : SARAWAK SHELL BERHAD


Project : F6 Compression Platform

- Prepare single line diagrams.


- Responsible for preparing switchgear room layout, sizing of motor
control center, cables sizing, involved in conceptual design, calculation
of voltage drop, short circuit, UPS sizing.
- Prepare requisition for UPS, switchboard, etc.
- Prepare scope of work for electrical interface.

04/1997 Client : LUNDIN MALAYSIA LIMITED


Project : Bunga Kekwa -C Central Processing & Export Facility

- Responsible for preparing switchgear room and equipment layout, all


electrical design calculation i.e. short circuit analysis, sizing of
generator, prepare load tabulation etc.

07/1993 - 07/1996 DEWAN BANDARAYA KUALA LUMPUR


Electrical Engineer

- Responsible as a client for all lighting projects for DBKL, review all
design by contractor, prepare and evaluate tenders, assist the traffic
and civil works department in all electrical jobs / specification.
- Responsible for all complaints from public involving street lighting and
design decorations lighting for Kuala Lumpur.
- Liase with TNB for power supply for street lighting.
- Liase with Prime Minister for approval of decorative lightings.

08/1991 - 07/1993 NEMIC LAMBDA (M) SDN BHD


Automation Systems Engineer

To reduce production cost, automate all testing equipments, design new


testing equipment, select components to purchase for bulk production of
tests equipments.

Rev. Date
“This document is confidential and the property of Technip. Unauthorized copying and disclosure prohibited”.

Das könnte Ihnen auch gefallen