Any Damage to legs or Vessel recorded Repair of one rack-tooth of Port Leg carried out. All the
in past and any repairs /rectification Jacking Gear Boxes repaired. Hence no hindrance for Rig
carried out : move.
Distance: -
1. Leg Length – 425.8 Feet (TOC 4.5 ft. below hull
bottom)
2. Centre of Forward Leg to Centre of Aft Legs – 129
ft 10 ⅞ inches.
3. Centre to centre of Aft Legs – 150 ft.
Design Conditions: -
1. Lifting Capacity – 15873 Kips
2. Max. Holding Capacity – 28571 Kips
3. Assigned Load Line – 15 feet
3 Operating Water Depth Capability Operating Water Depth Capability.
Minimum operating water depth: 30Ft.
Maximum operating Water depth: 250Ft. Minimum operating water depth: 30 Ft.(9.14 m)
Assume 50Ft. of leg penetration Maximum operating Water depth :300Ft (91.44 m)
DECK
Mooring
1. Anchor – 4 no.(n.a)
2. Anchor Winches -3 no.(not-operational)
3. Make : Amcon Conmaco Inc.
4. Wire/ chain : Wire rope type
2)ELEVATOR LINKS
5)MANUAL TONGS
9)LIFTING SUBS
NAVIGATIONAL EQUIPMENT
Not required as it is a non-propelled drilling unit.
LIFE RAFTS
4 numbers of 25 men capacity life rafts four (2) each on
port & star board side with HRU fitted.
31 Miscellaneous
Inside BOP (Drop in sub ) , drill pipe Inside BOP For 5” Drill Pipe
safety valves ----- two required for each
drill pipe size. Make :PACKARD INTERNATIONAL:
Drift indicator (Tatco 0-16 Deg) with Model :DCV-043 ,Size OD: 6 3/8” ,ID : 2 5/8”
baffle plates and complete with wire line Connection :NC-50 , Rating :10000 Psi
retrieving tool. Quantity :1 No
Wire line winch for carrying out
directional survey.
Rig Instrumentation like ,weight
indicator complete with suitable wire Deviation Instrument
line anchor , Mud gauge assy.,Tong
torque indicating system, Rotary RPM a) Drift Indicator
,Rotary torque , Mud pump SPM Make : Martin Decker
tachometer system , Mud volume b)Wire line Winch : available
totalizer ,mud flow fill , and stroke
indicating system, Pit level indicator , DRILLING INSTRUMENTATION
pen recorder to record weight ,mud
pressure ,Rotary torque and RPM, Mud ( Listed Drilling recorders etc. ,installed)
pump SPM and Rate of Penetration. (provide complete details category wise as per rig
All necessary mud testing equipment specification)
required as per international practices
i.e., Fan VG meter,.H2s detection Kit, Rig is equipped with advanced Instrumentation system.
Hamilton Batch mixer, Methiline Blue
test kit, Mud balance , Centrifuge 12 or Make : RIGSERV.
110 V and Marsh Funnel with measuring Model :Drillview21
cup
Consisting of Following,
Digital balance 300 grams, Readability
0.01Gram. Weight Indicator ,Two Mud pressure Gauge Assembly,
Tong Torque indicating system,rotary RPM,rotary torque.
Calibrated flow meters for Diesel ,Drill Mud pump SPM,Pit Volume Totaliser Pit volume Indicator ,
and potable Water. sensor based Return Flow type sensor,,Rate of Penetration.
Rig Serv storing : All the parameters are continuously
Welding Genset, Gas cutters, torches and monitored and stored on the computer . In addition to the
accessories. above requirement the following extra parameters can be
monitored viz Ton mile Indicator , Bit position , Block
Cargo nets , Cargo Boxes, personnel Height , Hole depth .
Baskets , Towing lins , Hosee for
trasfering Barite ,Cement ,potable Gas Watch : Model : Gas Watch XC detect the presence of
water,Drill water , diesel ,etc., as H2s Gas and Hydrocarbon coming with mud in shale shaker
required should be provided. area.
Wiper for tubing to be used for well : Ultra-sonic type Volume sensor installed
testing.
All other miscellaneous equipments MUD WATCH : MD TOTCO a separate display is given in
required for rig and drilling operations. driller’s console which shows all mud related parameters
which takes data from AOI system.
Cargo Net : 1 no
Cargo Boxes :
Personal Baskets : 1 No
Towing Lines : 6 No(including spare)
Wipers
1. 5” Drill Pipe : available
2. 3 ½” Drill Pipe: Available
Storage Equipments
1) Drill water capacity : 824 MT
2) Potable Water capacity :316 MT
3) Fuel oil capacity : 489 Cu. M.
4) Dry Bulk Storage
AVAILABLE
Monitor – H2S
Mfgr : Dragger , MODEL-3200
33 Ventilation & Air Conditioning System VENTILATION SYSTEM
MUD PIT ROOM SUPPLY AND EXHAUST FAN
Suitable ventilation and air conditioning MOTORS (2nos each)
system
Make : Reliance,
Type P
Cap : 10 Hp
Volts : 460
RPM : 1755 rpm, 6 Pole
Exhaust Fan at mud pit room
Make: Reliance
Cap: 15 Hp
Type: P
3. Exhaust Fan Galley
Make: Reliance, Type :P, Cap:2.2 hp,
4. Supply Fan Gally
Make: Reliance,
Type :P, 1 HP,
5. Mud Pump Room Exhaust Fan
Make: Reliance
20 KW 440V,
6. Mud Pump Room Supply Fan
Make : Reliance
25 KW , 460V,
7. Engine Room Exhaust Fan
Make : Reliance,
20 hp,
8. Engine Room Supply Fan
Make: Reliance, 25 hp ,440V, 1755
RPM
9. Sack Room Supply fan
Make: Reliance
Type: B
Cap: 5 hp,1160 rpm
Motor
Make :USElectrical
Capacity : 100 HP
RPM : 1750
Frequency : 60 Hz
Diesel /Electric driven Horizontal twin Electric driven (with 900HP DC Motors) Horizontal Twin
pump cementing unit with RCM /PSM HT-400 pump cementing unit with RCM recirculation
or equivalent recirculating system system. (Presently RCM is U/R and N/W. It will be repaired
complete with all accessories including at the earliest as soon as the spares received. )
Cmtg unit complete with all accessories including.
a) Two numbers Triplex plunger pumps a) Two numbers Horizontal Triplex Plunger pumps having
having 10000 psi. WP and Max. 4 ½”size plungers, Rated Pressure: 11200 Psi,
Discharge rate of 10-12BBL per minute Max.WP:10000 Psi. Max.discharge rate: 10 -12 BPM along
along with supercharger. with Booster Pump (make: Deming, Model: 5MD) Coupled
with A-20series Sundstrand Hyd Pump and Gear Box
Powered by 100HP Ac Motor.
Cementing line to rig floor Minimum Cementing line and Test line to rig floor, rating: 10000 Psi.
rating 5000 psi, Test line to rig floor
minimum rating 10000 psi.
c) One high pressure mixing manifold c) One high pressure mixing manifold with suitable hoses
with suitable hoses and valves. and valves available.
d) Provision of ground mixing unit with d) Ground mixing unit with hoses /hoper and accessories
hoses /hoper and accessories. available.
2)Mooring line and its replacement 2)65mm nylon Mooring line 2 numbers each on port and
star board side available .Spare Mooring ropes available for
3) Oil and Gas Burner Boom Assembly replacement.
(of Flaningo Model 10 or equivalent) on 3)Oil and Gas Burner Boom Assembly(of Flaningo, Model
port and star Board side complete with 10 or equivalent) on star Board side complete with King
King post ,Burner head ,Base plate ,Tie- post ,Burner head ,Base plate ,Tie-back rod and wire rope
back rod and wire rope slings slings available.(the port side unit is under repair)
Mfgr:Cauvery Engg.Ltd. India.
37 All the Rig Equipment like Draw works Yes.
,Mud Pump ,Main Generator sets and
Main Engines etc., should be in perfect
working condition and should be capable
of operating on its full rated capacity
38 Spare parts for contractor provided tools
and equipment of replacement of Necessary Spares for operational /Maintenance requirement
contractor provided equipments /tools for equipment and tools will be provided.
are to be provided by the contractor
Table –1
ENVIRNOMENTAL CAPABILITY OF OFFERED RIG(SAGAR GAURAV)
BOP DETAILS
BOP DETAILS(SAGAR GAURAV)
Size Mfgrs. & type Rating Response Gallons Gallons Closi Openin
Psi Time to Close to Open ng g Ratio
Ratio
21 ¼” HYDRILL MSP, 2000 42Sec/38Sec 34.3 18.5 -- --
ANNULAR
13 5/8” N L SHAFFER, 5000 25 Sec 26.5 19.8 -- --
ANNULAR
13 5/8” CAMERRON, 5000 7Sec/6Sec 5.8 5.4 7.00:1 2.3:1
VARRIABLE P/RAM
13 5/8” CAMERRON, 5000 13Sec/11Sec 10.9 10.5 10.8:1 4.5:1
SHEAR P/RAM
13 5/8” CAMERRON, 5000 6Sec 5.8 5.4 7.00:1 2.3:1
PIPE RAM
ATTACHMENT NO:2
7 7 3/4” OD OIL JAR complete BOWEN 6 5/8 Reg Box & N.A.
Assembly Z-type Pin
********
To Rotary Hose
CmtgManifold
Linediagram foe n terconnection
of Choke,Standpipe
andcementing
manifoldsat
Sagar Gaurav
Standby
To overboard To MGS
bli To
nd wellmouth
To To
fill Tri
lin p
e Ta Ov
nk erb
Kill line From cementing Pumps oar
Choke Line d
From MP# 1 MP# 2 lin
e
to
& 2Stand pipe Manifold Choke Manifold sea
1#1
Cmtg Manifold