Sie sind auf Seite 1von 43

1 of 43

Khani Nirman Sewa


Baneswor,Kathmandu

Measurement Sheet
S.no of Bill : Final Bill
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n.Detail No L(ft) B(ft) H(ft) Quantity

Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works
as per design drawing,
specification and instruction
of site engineer.

1
Unnumbered Pole 1168 2 2 3 11680.25
11680.25

Providing, laying and


supplying 1:2:4 PCC works
on foundation in perfect line
and level all complete
works as per design
drawing, specification and
instruction of site engineer.

2
Unnumbered Pole 1168 2 2 2.5 11680.00
Less Pole -1168 0.42 0.42 2.5 -515.09
11164.91

Providing, laying and


supplying 1:1.5:3 RCC on
Pillar in perfect line and
level all complete works as
per design drawing,
specification and instruction
of site engineer.
3
Jammed Pillar 1168 0.42 0.42 10 2060.35
2 of 43

2060.35

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per
design drawing,
specification and instruction
of site engineer.
4 nos length l/m
Total No of Column 1168
10 mm 4672 3.00 0.62 8647.87
8 mm 24528 0.33 0.40 3197.22
11845.09
no of side

Providing Supplying and


fixing wooden/Ply formwork
for pillar as per design
drawing specification and
instruction of site engineer.

5 1168
3 0.42 10 14716.80
2 0.42 0.42 412.07
15128.87

Providing, laying and


supplying Hexagonal
Meshing of 10 swg wire with
7 swg selwage wire of 10cm
x 12cm mesh size with
fixing, tieing in pillar with
wire all complete works as
per design drawing,
specification and instruction
6 of site engineer.
On Remaining Pole 1 10637.5 7.5 79781.25
Total 79781.25
3 of 43

Site cleareance and


covering mesh base all
complete works as per
design drawing,
specification and instruction
of site engineer.
7 1 10804 3 32412.00
32412.00
4 of 43

Manual transportation from


boundary road to site (Mesh
and column material ) on
Per column basis as per
specification and instruction
of site engineer.
8
No of pillar 1168 1168.00
1168.00
5 of 43

Remarks

Cu ft
Cu ft

Cu ft
Cu ft
Cu ft

Cu ft
6 of 43

Cu ft

Kg
Kg
Kg

Sq ft
Sq ft
Sq ft

Sq.ft
Sq.ft
7 of 43

Sq ft
Sq ft
8 of 43

Nos
Nos
9 of 43

Khani Nirman Sewa


Baneswor,Kathmandu

Abstract of Cost
S.no of Bill : Final Bill
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n. Detail Qty Unit Rate Amount

Earthwork Excavation
in Foundation in soft
soil with horizontal and
vertical transport all
complete works as per
design drawing,
specification and
instruction of site
1 engineer. 11680.25 Cu ft 7.00 81761.75

Providing, laying and


supplying 1:2:4 PCC
works on foundation in
perfect line and level
all complete works as
per design drawing,
specification and
instruction of site
2 engineer. 11164.91 Cu ft 350.00 3907718.50

Providing, laying and


supplying 1:1.5:3 RCC
on Pillar in perfect line
and level all complete
works as per design
drawing, specification
and instruction of site
3 engineer. 2060.35 Cu ft 540.00 1112589.00

Providing, laying and


supplying
Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per
design drawing,
specification and
instruction of site
4 engineer. 11845.09 Kg 100.00 1184509.00
10 of 43

Providing Supplying
and fixing wooden/Ply
formwork for pillar as
per design drawing
specification and
instruction of site
5 engineer. 15128.87 Sq ft 70.00 1059020.90

Providing, laying and


supplying Hexagonal
Meshing of 10 swg wire
with 7 swg selwage
wire of 10cm x 12cm
mesh size with fixing,
tieing in pillar with wire
all complete works as
per design drawing,
specification and
instruction of site
6 engineer. 79781.25 Sq.ft 40.00 3191250.00

Site cleareance and


covering mesh base all
complete works as per
design drawing,
specification and
instruction of site
7 engineer. 32412.00 Sq ft 3.00 97236.00

Manual transportation
from boundary road to
site (Mesh and column
material ) on Per
column basis as per
specification and
instruction of site
8 engineer. 1168.00 Nos 100.00 116800.00
Total 10750885.15
Less 25 % 2687721.29
Sub total 8063163.86
VAT 13% 1048211.3
Grand Total 9111375.16
11 of 43

Remarks
12 of 43
13 of 43

Nepal Government
Ministry of Forests and Soli Conservation
Khani Nirman Sewa
Baneswor,Kathmandu
Contract Bill
S.N. of Bill : Final Bill Vaucher No:
Project : Boundary Fencing Works Payment Date :
Contractor's Name : Khani Nirman Sewa Page No of M.B.
Cont No :
S.N. of Prevoius bill: Project : Boundary Fencing Works
Previous Vaucher No:
Date of work Order:
Work Completition Date :
Completed date: :
Total Work Done Previous Work Done Current Work Done
I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works as
per design drawing,
specification and instruction of
1 site engineer. Cu ft 39331.06 7.00 275317.42 27650.81 7.00 193555.67 11680.25 7.00

Approved By:
14 of 43

Total Work Done Previous Work Done Current Work Done


I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Providing, laying and


supplying 1:2:4 PCC works on
foundation in perfect line and
level all complete works as
per design drawing,
specification and instruction of
2 site engineer. Cu ft 26013.86 350.00 9104851.00 14848.95 350.00 5197132.50 11164.91 350.00

Approved By:
15 of 43

Total Work Done Previous Work Done Current Work Done


I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Providing, laying and


supplying 1:1.5:3 RCC on
Pillar in perfect line and level
all complete works as per
design drawing, specification
3 and instruction of site engineer. Cu ft 6861.96 540.00 3705458.40 4801.61 540.00 2592869.40 2060.35 540.00

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per design
drawing, specification and
4 instruction of site engineer. Kg 34620.80 100.00 3462080.00 22775.71 100.00 2277571.00 11845.09 100.00

Providing Supplying and


fixing wooden/Ply formwork
for pillar as per design drawing
specification and instruction of
5 site engineer. Sq ft 49426.07 70.00 3459824.90 34297.20 70.00 2400804.00 15128.87 70.00

Approved By:
16 of 43

Total Work Done Previous Work Done Current Work Done


I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Providing, laying and


supplying Hexagonal Meshing
of 10 swg wire with 7 swg
selwage wire of 10cm x 12cm
mesh size with fixing, tieing in
pillar with wire all complete
works as per design drawing,
specification and instruction of
6 site engineer. Sq.ft 245606.28 40.00 9824251.20 165825.03 40.00 6633001.20 79781.25 40.00
Less on Mesh due to less
weight 25% 0.00 -2456062.80 0.00 0.00 -1658250.30

Site cleareance and covering


mesh base all complete works
as per design drawing,
specification and instruction of
7 site engineer. Sq ft 70179.75 3.00 210539.25 37767.75 3.00 113303.25 32412.00 3.00

Approved By:
17 of 43

Total Work Done Previous Work Done Current Work Done


I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Manual transportation from


boundary road to site (Mesh
and column material ) on Per
column basis as per
specification and instruction of
8 site engineer. Nos 7848.00 100.00 784800.00 6680.00 100.00 668000.00 1168.00 100.00

Provision of Insurance for


construction works ( Original
insurance copy should
submitted ) as per
governmental rules and
9 specification. Job 1.00 200000 200000.00 1.00 200000.00 200000.00 0.00 200000
Total 28571059.37 18617986.72
Less 25 % 7142764.84 4654496.68
Sub total 21428294.53 13963490.04
VAT 13% 2785678.29 1815253.71
Grand Total 24213972.82 15778743.75

Approved By:
18 of 43

F\y : 2073\074
rrent Work Done Re.
Amount

81761.75

Approved By:
19 of 43

rrent Work Done Re.


Amount

3907718.50

Approved By:
20 of 43

rrent Work Done Re.


Amount

1112589.00

1184509.00

1059020.90

Approved By:
21 of 43

rrent Work Done Re.


Amount

3191250.00

-797812.50

97236.00

Approved By:
22 of 43

rrent Work Done Re.


Amount

116800.00

0.00
9953072.65
2488268.16
7464804.49
970424.58
8435229.07

Approved By:
Nepal Government
Ministry of Forests and Soli Conservation
Khani Nirman Sewa
Baneswor,Kathmandu
Work Completition Report
Project : Establishment of National Zoological Garden(Fencing and Pole)
Estimated Figure : 34586560.58 (Without13% Vat)
Valuation figure : 28286382.72 (without 13% Vat)
M\L than Estimate :
Starting Date : 2073/2/24 Completed Date : 2073/6/27
Departmental Estimate Actual Work Done Difference
S.n Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate

Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works as
per design drawing,
specification and instruction of
1 site engineer. Cu ft 38900.00 13.50 525150.00 39331.06 7.00 275317.42 431.06 7.00

Providing, laying and


supplying 1:2:4 PCC works on
foundation in perfect line and
level all complete works as
per design drawing,
specification and instruction of
2 site engineer. Cu ft 37184.51 381.17 14173619.68 26013.86 350.00 9104851.00 -11170.65 350.00
Providing, laying and
supplying 1:1.5:3 RCC on
Pillar in perfect line and level
all complete works as per
design drawing, specification
3 and instruction of site engineer. Cu ft 6861.96 470.56 3228963.90 6861.96 540.00 3705458.40 0.00 540.00

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per design
drawing, specification and
4 instruction of site engineer. Kg 33841.81 116.60 3945955.52 34620.80 100.00 3462080.00 778.99 100.00

Providing Supplying and


fixing wooden/Ply formwork
for pillar as per design drawing
specification and instruction of
5 site engineer. Sq ft 32676.00 66.42 2170339.92 49426.07 70.00 3459824.90 16750.07 70.00

Providing, laying and


supplying Hexagonal Meshing
of 10 swg wire with 7 swg
selwage wire of 10cm x 12cm
mesh size with fixing, tieing in
pillar with wire all complete
works as per design drawing,
specification and instruction of
6 site engineer. Sq.ft 277162.50 35.45 9825410.63 245606.28 40.00 9824251.20 -31556.22 40.00
Less on Mesh due to less
0 weight 25% 0 0.00 0.00 0.00 -2456062.80 0.00 0.00
Site cleareance and covering
mesh base all complete works
as per design drawing,
specification and instruction of
7 site engineer. Sq ft 55432.50 1.41 78159.83 70179.75 3.00 210539.25 14747.25 3.00

Manual transportation from


boundary road to site (Mesh
and column material ) on Per
column basis as per
specification and instruction of
8 site engineer. Nos 3890.00 99.99 388961.10 7848.00 100.00 784800.00 3958.00 100.00

Provision of Insurance for


construction works ( Original
insurance copy should
submitted ) as per
governmental rules and
9 specification. Job 1.00 250000 250000.00 1.00 200000.00 200000.00 0.00 200000.00
Total 34586560.58 28571059.37
Less 25 % 7142764.84
Sub total 34586560.58 21428294.53
VAT 13% 4496252.88 2785678.29
Grand Total 39082813.46 24213972.82
F\y : 2073\074

Difference Remark
Amount

3017.42

-3909727.50
0.00

77899.00

1172504.90

-1262248.80

0.00
44241.75

395800.00

0.00
-3478513.23
-869628.31
-2608884.92
-339155.04
-2948039.96
29 of 43 29 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Abstract of Cost
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n. Description of Works Quantity Unit

Earthwork Excavation in
Foundation in soft soil
with horizontal and
vertical transport all
complete works as per
design drawing,
specification and
instruction of site
1 engineer. 11680.25 Cu ft

Providing, laying and


supplying 1:2:4 PCC
works on foundation in
perfect line and level all
complete works as per
design drawing,
specification and
instruction of site
2 engineer. 11164.91 Cu ft

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
30 of 43 30 of 43

Providing, laying and


supplying 1:1.5:3 RCC on
Pillar in perfect line and
level all complete works
as per design drawing,
specification and
instruction of site
3 engineer. 2060.35 Cu ft

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per
design drawing,
specification and
instruction of site
4 engineer. 11845.09 Kg

Providing Supplying and


fixing wooden/Ply
formwork for pillar as per
design drawing
specification and
instruction of site
5
Err: engineer. 15128.87 Sq ft
509 Err:509 Err:509 Err:509

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
31 of 43 31 of 43

Site cleareance and


covering mesh base all
complete works as per
design drawing,
specification and
instruction of site
7 engineer. 32412.00 Sq ft

Manual transportation
from boundary road to
site (Mesh and column
material ) on Per column
basis as per specification
and instruction of site
8 engineer. 1168.00 Nos

Provision of Insurance for


construction works
( Original insurance copy
should submitted ) as per
governmental rules and
9 specification. 1.00 Job
Sub Total

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
32 of 43 32 of 43

Provision of test of
construction materials
( concrete,
Reinforcement, Gabion
mesh wire etc) with
complete report of valid
company/firms under
nepal government
(payment is done under
valid actual bill as per
government rule after
verification of DNPWC)
10 as per specification. 1 Job
Total
VAT 13%
Contengency 5%
Grand Total

In words : NRs forty million, nine hundred thirty two thousand five hun
and forty nine paisa only.

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
33 of 43 33 of 43

rr:509
rr:509
Nirman Sewa
or,Kathmandu

act of Cost

yak, Bhaktpur.
Rate Amount Remarks

13.5 157683.38

381.17 4255728.74

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
34 of 43 34 of 43

470.56 969518.30

116.6 1381137.49

66.42 1004859.55
35.45 Err:509

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
35 of 43 35 of 43

1.41 45700.92

99.99 116788.32

250000 250000.00
Err:509

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
36 of 43 36 of 43

102000 102000.00
Err:509
Err:509
Err:509
Err:509

thirty two thousand five hundred one rupees

Estimated By: Checked By: By :


RameshForwarded Approved By:
Yogendra Bastakoti Kumar Mittal
Sub Engineer Senior Divisional Engineer
37 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity (BOQ)


Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Rate (Without VAT 13%)
S.n. Description of Works Unit Quantity Amount
In Fig In Word

Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete
works as per design
drawing, specification and
1 instruction of site engineer. Cu ft 11680.25

Contractor's Sign and Seal


38 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity (BOQ)


Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Rate (Without VAT 13%)
S.n. Description of Works Unit Quantity Amount
In Fig In Word

Providing, laying and


supplying 1:2:4 PCC works
on foundation in perfect
line and level all complete
works as per design
drawing, specification and
2 instruction of site engineer. Cu ft 11164.91

Providing, laying and


supplying 1:1.5:3 RCC on
Pillar in perfect line and
level all complete works as
per design drawing,
specification and instruction
3 of site engineer. Cu ft 2060.35

Contractor's Sign and Seal


39 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity (BOQ)


Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Rate (Without VAT 13%)
S.n. Description of Works Unit Quantity Amount
In Fig In Word

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per
design drawing,
specification and instruction
4 of site engineer. Kg 11845.09

Providing Supplying and


fixing wooden/Ply
formwork for pillar as per
design drawing
specification and instruction
5
Err: of site engineer. Sq ft 15128.87
509 Err:509 Err:50 Err:509

Contractor's Sign and Seal


40 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity (BOQ)


Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Rate (Without VAT 13%)
S.n. Description of Works Unit Quantity Amount
In Fig In Word

Site cleareance and


covering mesh base all
complete works as per
design drawing,
specification and instruction
7 of site engineer. Sq ft 32412.00

Manual transportation from


boundary road to site (Mesh
and column material ) on
Per column basis as per
specification and instruction
8 of site engineer. Nos 1168.00

Provision of Insurance for


construction works
( Original insurance copy
should submitted ) as per
governmental rules and
9 specification. Job 1.00

Contractor's Sign and Seal


41 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity (BOQ)


Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Rate (Without VAT 13%)
S.n. Description of Works Unit Quantity Amount
In Fig In Word
Total
VAT 13%
Grand Total
In Words :

Contractor's Sign and Seal


42 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.

S.n. Description of Works Unit Quantity Khani Nirman Sewa Remarks


Rate Amount

Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete
works as per design
drawing, specification and
1 instruction of site engineer. Cu ft 11680.25 7.00 81761.75

Providing, laying and


supplying 1:2:4 PCC works
on foundation in perfect
line and level all complete
works as per design
drawing, specification and
2 instruction of site engineer. Cu ft 11164.91 350.00 3907718.50

Providing, laying and


supplying 1:1.5:3 RCC on
Pillar in perfect line and
level all complete works as
per design drawing,
specification and instruction
3 of site engineer. Cu ft 2060.35 540.00 1112589.00

Providing, laying and


supplying Fe415/Fe500
Reinforcement works in
perfect line and level all
complete works as per
design drawing,
specification and instruction
4 of site engineer. Kg 11845.09 100.00 1184509.00
43 of 43

Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu

Bill of Quantity
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.

S.n. Description of Works Unit Quantity Khani Nirman Sewa Remarks


Rate Amount

Providing Supplying and


fixing wooden/Ply
formwork for pillar as per
design drawing
specification and instruction
5
Err: of site engineer. Sq ft 15128.87 70.00 1059020.90
509 Err:509 Err:50 Err:509 40.00 Err:509

Site cleareance and


covering mesh base all
complete works as per
design drawing,
specification and instruction
7 of site engineer. Sq ft 32412.00 3.00 97236.00

Manual transportation from


boundary road to site (Mesh
and column material ) on
Per column basis as per
specification and instruction
8 of site engineer. Nos 1168.00 100.00 116800.00

Provision of Insurance for


construction works
( Original insurance copy
should submitted ) as per
governmental rules and
9 specification. Job 1.00 200000.00 200000.00
Total Err:509
Less % 25% Less Err:509
Sub total Err:509
VAT 13% Err:509
Grand Total Err:509

Das könnte Ihnen auch gefallen