S.no of Bill : Final Bill
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n.Detail No L(ft) B(ft) H(ft) Quantity
Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works
as per design drawing,
specification and instruction
of site engineer.
1
Unnumbered Pole 1168 2 2 3 11680.25
11680.25
2
Unnumbered Pole 1168 2 2 2.5 11680.00
Less Pole -1168 0.42 0.42 2.5 -515.09
11164.91
2060.35
5 1168
3 0.42 10 14716.80
2 0.42 0.42 412.07
15128.87
Remarks
Cu ft
Cu ft
Cu ft
Cu ft
Cu ft
Cu ft
6 of 43
Cu ft
Kg
Kg
Kg
Sq ft
Sq ft
Sq ft
Sq.ft
Sq.ft
7 of 43
Sq ft
Sq ft
8 of 43
Nos
Nos
9 of 43
Abstract of Cost
S.no of Bill : Final Bill
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n. Detail Qty Unit Rate Amount
Earthwork Excavation
in Foundation in soft
soil with horizontal and
vertical transport all
complete works as per
design drawing,
specification and
instruction of site
1 engineer. 11680.25 Cu ft 7.00 81761.75
Providing Supplying
and fixing wooden/Ply
formwork for pillar as
per design drawing
specification and
instruction of site
5 engineer. 15128.87 Sq ft 70.00 1059020.90
Manual transportation
from boundary road to
site (Mesh and column
material ) on Per
column basis as per
specification and
instruction of site
8 engineer. 1168.00 Nos 100.00 116800.00
Total 10750885.15
Less 25 % 2687721.29
Sub total 8063163.86
VAT 13% 1048211.3
Grand Total 9111375.16
11 of 43
Remarks
12 of 43
13 of 43
Nepal Government
Ministry of Forests and Soli Conservation
Khani Nirman Sewa
Baneswor,Kathmandu
Contract Bill
S.N. of Bill : Final Bill Vaucher No:
Project : Boundary Fencing Works Payment Date :
Contractor's Name : Khani Nirman Sewa Page No of M.B.
Cont No :
S.N. of Prevoius bill: Project : Boundary Fencing Works
Previous Vaucher No:
Date of work Order:
Work Completition Date :
Completed date: :
Total Work Done Previous Work Done Current Work Done
I.N. Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate
Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works as
per design drawing,
specification and instruction of
1 site engineer. Cu ft 39331.06 7.00 275317.42 27650.81 7.00 193555.67 11680.25 7.00
Approved By:
14 of 43
Approved By:
15 of 43
Approved By:
16 of 43
Approved By:
17 of 43
Approved By:
18 of 43
F\y : 2073\074
rrent Work Done Re.
Amount
81761.75
Approved By:
19 of 43
3907718.50
Approved By:
20 of 43
1112589.00
1184509.00
1059020.90
Approved By:
21 of 43
3191250.00
-797812.50
97236.00
Approved By:
22 of 43
116800.00
0.00
9953072.65
2488268.16
7464804.49
970424.58
8435229.07
Approved By:
Nepal Government
Ministry of Forests and Soli Conservation
Khani Nirman Sewa
Baneswor,Kathmandu
Work Completition Report
Project : Establishment of National Zoological Garden(Fencing and Pole)
Estimated Figure : 34586560.58 (Without13% Vat)
Valuation figure : 28286382.72 (without 13% Vat)
M\L than Estimate :
Starting Date : 2073/2/24 Completed Date : 2073/6/27
Departmental Estimate Actual Work Done Difference
S.n Descriptions Unit Quantity Rate Amount Quantity Rate Amount Quantity Rate
Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete works as
per design drawing,
specification and instruction of
1 site engineer. Cu ft 38900.00 13.50 525150.00 39331.06 7.00 275317.42 431.06 7.00
Difference Remark
Amount
3017.42
-3909727.50
0.00
77899.00
1172504.90
-1262248.80
0.00
44241.75
395800.00
0.00
-3478513.23
-869628.31
-2608884.92
-339155.04
-2948039.96
29 of 43 29 of 43
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Abstract of Cost
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
S.n. Description of Works Quantity Unit
Earthwork Excavation in
Foundation in soft soil
with horizontal and
vertical transport all
complete works as per
design drawing,
specification and
instruction of site
1 engineer. 11680.25 Cu ft
Manual transportation
from boundary road to
site (Mesh and column
material ) on Per column
basis as per specification
and instruction of site
8 engineer. 1168.00 Nos
Provision of test of
construction materials
( concrete,
Reinforcement, Gabion
mesh wire etc) with
complete report of valid
company/firms under
nepal government
(payment is done under
valid actual bill as per
government rule after
verification of DNPWC)
10 as per specification. 1 Job
Total
VAT 13%
Contengency 5%
Grand Total
In words : NRs forty million, nine hundred thirty two thousand five hun
and forty nine paisa only.
rr:509
rr:509
Nirman Sewa
or,Kathmandu
act of Cost
yak, Bhaktpur.
Rate Amount Remarks
13.5 157683.38
381.17 4255728.74
470.56 969518.30
116.6 1381137.49
66.42 1004859.55
35.45 Err:509
1.41 45700.92
99.99 116788.32
250000 250000.00
Err:509
102000 102000.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete
works as per design
drawing, specification and
1 instruction of site engineer. Cu ft 11680.25
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Bill of Quantity
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.
Earthwork Excavation in
Foundation in soft soil with
horizontal and vertical
transport all complete
works as per design
drawing, specification and
1 instruction of site engineer. Cu ft 11680.25 7.00 81761.75
Err:509
Err:509
Khani Nirman Sewa
Baneswor,Kathmandu
Bill of Quantity
Project : Boundary Fencing Works
Site : National Zoological Garden,Surya Binayak, Bhaktpur.