Structure Submission / Revised Status Structure is
Volume Submission Date Under
S5201 CIVIL CONSTRUCTION DRAWING 2019-5-6 NESPAK Responded SEPCO III OF CIRCULATING WATER PIPE - Response From SEPCO III is awaited S5319 CIVIL CONSTRUCTION DRAWING 2019-5-12 Under Review by NESPAK OF FLOCCULATE AND NESPAK SEDIMENTATION POND S5322 CIVIL CONSTRUCTION DRAWING 2019-5-12 NESPAK Responded SEPCO III OF CHEMICAL DOSING ROOM - Response From SEPCO III is awaited S5501 CIVIL CONSTRUCTION DRAWING 2019-5-9 Under Review by NESPAK OF POTABLE WATER, SERVICE NESPAK WATER AND FIRE-FIGHTING WATER BASINS T0211 CONSTRUCTION DRAWING OF 2019-5-11 Under Review by NESPAK UNDERGROUND FACILITY AND NESPAK ANCILLARY EQUIPMENT OF MAIN POWER HOUSE T0214 FLOORS OF DEAERATOR BAY 2019-5-4 NESPAK Responded SEPCO III - Response From SEPCO III is awaited T0227 CONSTRUCTION DRAWING OF 2019-5-3 NESPAK Responded SEPCO III BOILER FRONT PLATFORM - Response From SEPCO STRUCTURE III is awaited T0305 STEEL FLUE DUCT SUPPORT IN 2019-5-15 Under Review by NESPAK REAR OF BOILER NESPAK T0702 STRUCTURAL DRAWING OF 2019-5-7 NESPAK Responded SEPCO III BOILER MAKE-UP WATER - Response From SEPCO TREATMENT ROOM III is awaited T0236 STRUCTURAL DRAWINGS OF 2019-5-3 Already Approved on SEPCO III BOILER ROOF 13-05-2019 Current Status of 660 MW Lucky Power Plant Project Overall Status of the Project
Total Submitted Structures = 43
Approved Structures = 34
Under Review Structures = 9 (Please refer to the following table for detailed status)