All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.
NESPAK comments
Priority Status Com
Date Page Subject/item Comment
N°
SEPCOIII Transmittal Tr-No.
NESPAK Transmittal Tr-No.
Calculation The drawing shall be read in conjunction with all the approved
1 Not Approved 4/24/2018 1 Report and architectural, plumbing, equipment arrangement plan, piping plan, cable
Drawings routing plan and all other relevant drawings before execution at site.
All the levels mentioned in the drawing shall be as per relevant approved
2
drawings.
All the loads given in the design calculations/ computer model are
1 3 assumed to be correct and the authenticity of the loads and their
application is sole responsibility of the designer
It is assumed that all the employer requirements are fulfilled by the
1 4
designer.
Inclined bars around openings shall be added as per clause 4.4.8 of ACI
1 5
307. Please also ensure to follow clause 4.4.9
1 6 Dia 8 bar shall be replaced by Dia 10 bars as per clause 4.4.2 of ACI 307
1 7 Beam spcing criteria shall be as per ACI code
1 8 Embedment and fixing details of ladder is not shown in drawings
1 9 Bolt embedment depth is not mentioned. Please clearly show the same.
1 10 Steel sections sizes shall be clearly mentioned
1 11 Details in drawing 09 is not in our scope as it is dealth with earthing only.
Chimney bottom wall thickness is mentioned as 600mm in model and
1 12 drawing whereas in calculation book it is taken as 700mm. Please rectify
where necessary.
1 15 Please consider P-delta effect and change the related results accordingly.
Concrete strenght is reported as 5996.27 psi on page 27 of the report
1 16
whereas in design it is 5000 psi. Please rectify.
2
2
2
2
Page 1 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval
All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.
NESPAK comments
Priority Status Com
Date Page Subject/item Comment
N°
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Page 2 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval
All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.
NESPAK comments
Priority Status Com
Date Page Subject/item Comment
N°
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Page 3 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval
All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.
NESPAK comments
Priority Status Com
Date Page Subject/item Comment
N°
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
Page 4 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval
All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.
NESPAK comments
Priority Status Com
Date Page Subject/item Comment
N°
2
2
2
2
2
2
2
2
2
2
2
2
Page 5 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status
SPECOIII answer
Rev. A
Rev. A
Noted.
Noted.
Noted.
Noted.
Noted.
Noted.
Noted.
Noted.Embedment and fixing details of ladder is shown in d-07 and -08
drawings.
Noted.We have modified it
Steel sections sizes refer to section table in -12 drawing.
Noted.
Noted.
Noted.
Page 6 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status
SPECOIII answer
Page 7 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status
SPECOIII answer
Page 8 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status
SPECOIII answer
Page 9 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status
SPECOIII answer
Page 10 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date
N°
Page 11 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date
N°
Page 12 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date
N°
Page 13 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date
N°
Page 14 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date
N°
Comment on reply 3
Page 15 de 21
SPECOIII answer NESPAK comm
Page 16 de 21
SPECOIII answer NESPAK comm
Page 17 de 21
SPECOIII answer NESPAK comm
Page 18 de 21
SPECOIII answer NESPAK comm
Page 19 de 21
SPECOIII answer NESPAK comm
Page 20 de 21
NESPAK comments
Comment Name
Page 21 de 21