Document/Drawing Title Chimney Shaft

Owner's Document No.


Owner's Revision No.
Approval Type For Approval

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments
Priority Status Com
Date Page Subject/item Comment

SEPCOIII Transmittal Tr-No.
NESPAK Transmittal Tr-No.
Calculation The drawing shall be read in conjunction with all the approved
1 Not Approved 4/24/2018 1 Report and architectural, plumbing, equipment arrangement plan, piping plan, cable
Drawings routing plan and all other relevant drawings before execution at site.
All the levels mentioned in the drawing shall be as per relevant approved
2
drawings.
All the loads given in the design calculations/ computer model are
1 3 assumed to be correct and the authenticity of the loads and their
application is sole responsibility of the designer
It is assumed that all the employer requirements are fulfilled by the
1 4
designer.
Inclined bars around openings shall be added as per clause 4.4.8 of ACI
1 5
307. Please also ensure to follow clause 4.4.9
1 6 Dia 8 bar shall be replaced by Dia 10 bars as per clause 4.4.2 of ACI 307
1 7 Beam spcing criteria shall be as per ACI code
1 8 Embedment and fixing details of ladder is not shown in drawings
1 9 Bolt embedment depth is not mentioned. Please clearly show the same.
1 10 Steel sections sizes shall be clearly mentioned
1 11 Details in drawing 09 is not in our scope as it is dealth with earthing only.
Chimney bottom wall thickness is mentioned as 600mm in model and
1 12 drawing whereas in calculation book it is taken as 700mm. Please rectify
where necessary.

Please check the criteria of shedding effect as required by ACI 307-08. If it


1 13
is not required then please state reason.

1 15 Please consider P-delta effect and change the related results accordingly.
Concrete strenght is reported as 5996.27 psi on page 27 of the report
1 16
whereas in design it is 5000 psi. Please rectify.

There is discrepancy between the reinforcement provided as mentioned in


1 17
the drawing and in the calculations. Please check and rectify.

1 18 Please ensure to follow the clause 4.1.3.2


1 19 Please ensure to follow the clause 4.7.7
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

2
2
2
2

Page 1 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments
Priority Status Com
Date Page Subject/item Comment

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Page 2 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments
Priority Status Com
Date Page Subject/item Comment

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Page 3 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments
Priority Status Com
Date Page Subject/item Comment

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

Page 4 de 21
Document/Drawing Title Chimney Shaft
Owner's Document No.
Owner's Revision No.
Approval Type For Approval

All conditions of the Contract apply, including but not limited to GC 3.9.2, GC 4.2, GC 18.2 and GC 21.3.

NESPAK comments
Priority Status Com
Date Page Subject/item Comment

2
2
2
2
2
2
2
2
2
2
2
2

Page 5 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status

SPECOIII answer

Name Date Answer

Rev. A
Rev. A

Noted.

Noted.

Noted.

Noted.

Noted.

Noted.
Noted.
Noted.Embedment and fixing details of ladder is shown in d-07 and -08
drawings.
Noted.We have modified it
Steel sections sizes refer to section table in -12 drawing.
Noted.

Noted.We have modified it

Vcr=22.0m/s.V(zcr)=52.3m/s,4.2.3.1 Across-wind loads due to vortex


shedding in the first and second modes shall be considered
in the design of all chimney shells when the critical wind
speed V cr is between 0.50 and 1.30 V(z cr ). Across-wind loads
need not be considered outside this range.
The site soil type is Sc.According to the ACI 307 article 4.3.6, no need to
consider P - Δ effect.

Noted.We have modified it

As for the reinforcement problem, considering the actual construction error


and other factors, the actual reinforcement is slightly larger than the
calculated .We have add instructions in calcualtions.

Noted.
Noted.

Page 6 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status

SPECOIII answer

Name Date Answer

Page 7 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status

SPECOIII answer

Name Date Answer

Page 8 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status

SPECOIII answer

Name Date Answer

Page 9 de 21
Contractor's Document No. F09211S-T0303
Contractor's Revision No.
Document Status

SPECOIII answer

Name Date Answer

Page 10 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date

Page 11 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date

Page 12 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date

Page 13 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date

Page 14 de 21
NESPAK comments
Com
Name Date Page Subject/item Comment Name Date

Comment on reply 3

Page 15 de 21
SPECOIII answer NESPAK comm

Answer Name Date Com N° Page Subject/item

Page 16 de 21
SPECOIII answer NESPAK comm

Answer Name Date Com N° Page Subject/item

Page 17 de 21
SPECOIII answer NESPAK comm

Answer Name Date Com N° Page Subject/item

Page 18 de 21
SPECOIII answer NESPAK comm

Answer Name Date Com N° Page Subject/item

Page 19 de 21
SPECOIII answer NESPAK comm

Answer Name Date Com N° Page Subject/item

Page 20 de 21
NESPAK comments

Comment Name

Page 21 de 21