Sie sind auf Seite 1von 4

MR No

MATERIAL REQUISITION FOR GAS TURBINE GENERATOR PACKAGE #REF!


D6897-MR-ME-MMP41-04

MATERIAL REQUISITION
DOCUMENTATION LIST
Item Document No. Document Name Rev/Issue Date Status
A)

B) DATASHEETS

Applicable for this


1
Project (Y/N)
39-91-ME-DS-NA-0002 Datasheet for Gas Turbine Generator Package F Yes

C) SPECIFICATIONS & STANDARDS


1 30-20-PI-SP-NA-0001 Valve Material Specification B Yes
2 30-20-PI-SP-NA-0002 Piping Component Specifications A Yes
3 30-20-PI-SP-NA-0003 Technical Requirement for Pipes F Yes
4 30-20-PI-SP-NA-0004 Technical Requirement for Fittings F Yes
5 30-20-PI-SP-NA-0005 Specification for Flanges F Yes
6 30-20-PI-SP-NA-0006 Specification for Gaskets F Yes
7 30-20-PI-SP-NA-0007 Specification for Fasteners F Yes
8 30-20-PM-SP-NA-0001 Noise Control Not provided in RFQ Yes. Required
9 30-20-PM-SP-NA-0003 Specification for Welding, Inspection, and Welder Qualifications A
10 30-20-PM-SP-NA-0004 Material Criticality Rating – Engineering & Procurement Not provided in RFQ Yes. Required
11 30-20-PM-SP-NA-0005 Project Design Specification F YES
Specification for Preservation & Protection During Shipping, Construction and Pre-Startup
12 30-20-PM-SP-NA-0007 A YES
Activities

13 30-20-PM-SP-NA-0008 Specification for Non Destructive Examination (NDE) A YES

14 30-20-PM-SP-NA-0009 Specification for Positive Materials Identification B YES


15 30-20-PM-SP-NA-0010 Materials Traceability and Documentation Requirements A YES
16 30-20-PM-SP-NA-0013 Quality Management System Requirement for Vendors and Subcontractor F YES
17 30-20-PM-SP-NA-0014 Instructions for Recommended Spare Parts and Operating Supplies Recommendation Not provided in RFQ Yes. Required
18 30-20-PM-SP-NA-0017 Building Specification A YES
19 30-20-PM-SP-NA-0019 Specification - Materials and Corrosion Requirements for Sour Service A1 YES
20 30-20-PM-SP-NA-0020 Project Quality Assurance - General Requirements F YES
21 30-20-ST-SP-NA-0001 Specification for Structural Material F YES
22 30-20-ST-SP-NA-0003 Specification, Protective Coating A YES
23 30-20-ST-SP-NA-0008 Specification, Vendor Weight Data Requirements F YES
24 30-20-ST-SP-NA-0010 Offshore Steel Structures, Welding and Inspection A YES
25 30-20-ST-SP-NA-0011 Skid Mounted Assemblies - Structural Requirements A1 YES
26 30-20-ST-SP-NA-0014 Hot Dip Galvanising of Structural Steelwork A1 YES
27 30-20-ST-SP-NA-0016 Design of Deck Structures for Offshore Platforms Not provided in RFQ Yes. Required
28 30-42-HV-SP-NA-0001 HVAC Equipment Specifications B Yes
29 30-51-IN-SP-NA-0004 Fire & Gas System Specifications A Yes
30 30-51-IN-SP-NA-0005 Instrumentation - Requirements for Packaged Equipment B Yes
31 30-51-IN-SP-NA-0006 Field Instruments Specification B Yes
32 30-51-IN-SP-NA-0008 Fire and Gas Detection Specification A Yes
33 30-51-IN-SP-NA-0011 Control Valve Specification A Yes
34 30-51-IN-SP-NA-0012 Instrument Cable Specification A Yes
35 30-91-EL-SP-NA-0002 Electrical Specification – Wire and Cable Material Selection and Installation Method B Yes
36 30-91-EL-SP-NA-0003 Electrical specification- Equipment Grounding and Bonding A Yes
37 30-91-EL-SP-NA-0006 Electrical specification- Low-Voltage Motor Control B Yes
38 30-91-EL-SP-NA-0007 Electrical specification - LV Motor B Yes
39 30-91-EL-SP-NA-0008 Electrical specification - Stationary Batteries and Chargers A Yes
40 30-91-EL-SP-NA-0009 Electrical specification - AC Uninterruptible Power Systems A Yes
41 30-91-EL-SP-NA-0012 Electrical Specification – Packaged Equipment B Yes
42 30-91-ME-SP-NA-0002 Specification for Gas Turbine Generator Package B Yes

D) DRAWINGS
1 39-91-PR-DR-PI-0003 P&ID - Gas Turbine Generator F Yes
2 30-91-EL-DR-SD-0002 Overall One Line Diagram - QG NFB, PRQ1, WHPQ10 & WHPQ11 A Yes
3 DW-C005-PU-U-50-60-46-0001 One Line Synchronozation Diagram GTG A Yes
4 30-91-EL-DR-BD-0002 PDCS - System Block diagram F Yes

Additional Docs/Specifications Required from Client


1 30-91-EL-DB-NA-0001 Electrical Design Basis
2 39-91-EL-DR-PL-0004 Electrical Lighting Plan PRQ1(Lighting type / description)

Unrestricted Page 1 of 4
MR No
MATERIAL REQUISITION FOR GAS TURBINE GENERATOR PACKAGE #REF!
D6897-MR-ME-MMP41-04

MATERIAL REQUISITION
DOCUMENTATION LIST
Item Document No. Document Name Rev/Issue Date Status
3 30-91-EL-SP-NA-0011 Electrical Specification – Distribution Board
4 39-91-EL-DR-HC-0001 Area Classification Plan PRQ1
5 30-42-HV-DB-NA-001 HVAC Basis of Design
6 30-20-SA-DB-NA-0001 Technical safety Basis of Design

Unrestricted Page 2 of 4
1 30-91-EL-DB-NA-0001
2 39-91-EL-DR-PL-0004
3 30-91-EL-SP-NA-0011
4 39-91-EL-DR-HC-0001
5 30-42-HV-DB-NA-001
6 30-20-SA-DB-NA-0001
7 30-20-PM-SP-NA-0001
8 30-20-PM-SP-NA-0004
9 30-20-PM-SP-NA-0014
10 30-20-ST-SP-NA-0016
Electrical Design Basis
Electrical Lighting Plan PRQ1(Lighting type / description)
Electrical Specification – Distribution Board
Area Classification Plan PRQ1
HVAC Basis of Design
Technical safety Basis of Design
Noise Control
Material Criticality Rating – Engineering & Procurement
Instructions for Recommended Spare Parts and Operating Supplies Recommendation
Design of Deck Structures for Offshore Platforms

Das könnte Ihnen auch gefallen