Sr.No. Name of Scheme Estimated Cost Expenditure UPTO Financial Physical Remarks
30.06.2018 Percentage % Percentage %
1 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.9500000/- 9298567/- 98% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C No.2.3.4.5.6.8.10.11.17.18.
2 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.9500000/- 9116282/- 96% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C.21,23,28,29,30,33,34,35,36,37.
3 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.90,00,000/- 8387100/- 93% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C No.38,40,41,43,44,45,46,47.48,49
4 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.10000000/- 9683935/- 97% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C.No.51,56,57,59,60,61.62.63,65,69,70
5 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.10000000/- 9797471/- 98% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C.No.71,73,74,76,77,78,79,80,81,82
6 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Diggies/RCC: Rs.10000000/- 9917902/- 99% 100% Completed
Pipeline/Water Supply Pipeline/Cattle Pond/Boundary Wall/Janazgah/Musafar Khana.
Const/Repair of Mettled Roads etc in U/C No.83.84,88,89,90,91,93,95,96,97.
7 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Rs.10000000/- 9950613/- 99% 100% Completed
Diggies/RCC: Pipeline/Water Supply Pipeline/Cattle Pond/Boundary
Wall/Janazgah/Musafar Khana. Const/Repair of Mettled Roads etc in U/C
No.98.99.101,102,107,108,106,105,104,103
8 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Rs.10000000/- 9937885/- 99% 100% Completed
Diggies/RCC: Pipeline/Water Supply Pipeline/Cattle Pond/Boundary
Wall/Janazgah/Musafar Khana. Const/Repair of Mettled Roads etc in U/C
No.109,10,111,113,114,115,116.
9 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Rs.11000000/- 10926808/- 100% 100% Completed
Diggies/RCC: Pipeline/Water Supply Pipeline/Cattle Pond/Boundary
Wall/Janazgah/Musafar Khana. Const/Repair of Mettled Roads etc in U/C
No.122,124,126,127,129,131,132,133,134,135.
10 Const: of Soling/Drains/Nalas/Tuff Tile/ Sewer line/culverts/Bridges/Water Rs.8000000/- 7894370/- 98% 100% Completed
Diggies/RCC: Pipeline/Water Supply Pipeline/Cattle Pond/Boundary
Wall/Janazgah/Musafar Khana. Const/Repair of Mettled Roads For Special
Seats etc
11 Const: of Pull Canal 9/R Chak No.205/9R,235/9R with cattle Pond,Const: Rs.3300000/- 3300000/- 100% 100% Completed
of Soling,Pulli,Room,Veranda for Graveyard Chak 235/9R,Const: of
Welcome Gate U/C No.131
12 (i) Const/Repair of Metalled Road Noraywala Bund(1st Phase) Rs.8000000/- 7635742/- 100% 100% Completed
(ii) Const/Repair of Metalled Road Adda Takhat Mohal
to Qasimka(1st Phase).
(iii) Const/Repair of Metalled Road Arifwala Road to
Kaku Bodla.
(iv) Const/Repair of Metalled Road Arifwala Road
to Kaku Bodla
13 Const:/Repair of Metalled Road Chishtian Dahranwala Road to Chowk Rs.8000000/- 7165567/- 90% 100% Completed
210/F via Chak No.133/M,213/F(Jattanwala),213/F Araian Wala
Dahranwala Road to Cha 99/F Boys High School (Work No.14)
14 (i) Const: of Soling Chak No.63/4R(Work No.15) Rs.2860000/` - 2839311/- 99% 100% Completed
(ii) Const: of Boundary Wall Water Diggi Chak No.25/3R.
(iii) Const: of Soling from Main Road to Ali Ghar
Public School Chak No.29/3R.
(iv) Const: of Sewerage line Chak Dadu Mamonka.
(v) P/L of RCC Pipeline 18” Dia Chak 23, 24/Lalika.
(vi) Const: of Boundary Wall Chak 46/3R Cattle Pond.
(vii) Const: of Soling Durs Stop to Chak 23/3R.
15 Const/Repair Kothian/Building, Office, Block Vice-Chairman, Rest House, Rs.6700000/- 6359576/- 95% 100% Completed
Lying of Sewer line Office District Council Bahawalnagar.
16 Const/Extension of Masque District Council Bahawalnagar. Rs.5000000/- 4947863/- 99% 100% Completed
17 Const/Repair Residences District Council Colony, Boundary Wall Front Rs.5000000/- 3178156/- 64% 64% Work in Progress
Part of Office, Fiber Glass Shed for Vehicles, Gate Pillor etc District
Council Bahawalnagar.
18 (i) Repair of Water Course Water Works No.2 near Govt: Rs.7141000/- 7001144/- 98% 98% Work in Progress
H/School Faqirwali.
(ii) Const: of Boundary wall, 9 ft Hight Water Works No.1 City
Faqirwali near Chak No.119/6R.
(iii) Special Repair Office Building Urban Union Council No.108,
109 Faqirwali.
(iv) Special Repair of Office Building Urban Union Council No.79
Dahranwala.
(v) Special Repair of Office Building Urban Union Council Mandi
Sadiq Gunj.
Total Rs.143001000/- 137338292/- 96% 98%
SUMMERY OF ANNUAL DEVELOPMENT PROGRAMMEPHASE-II (2017-18)DISTRICT
COUNCIL, BAHAWALNAGAR
1 (i) Const: of soling,Drains,Nala Jat, Tuff, 3000000/- 2204420/- 73% 100% Completed
Sewerline,Culverts,water Supply Pipe line, Cattle Pond, Water
Diggies, Boundary Walls,Janazgah,Mussafar Khana Jat,
Metalled Roads etc in Union Council No. 11. Rs.1000000/-,
U/C No. 15.Rs.500000/- U/C No.13. Rs.500000/-
No.12.Rs.500000/-
(ii) Const: of Soling Mouza Dona Qatab Sarhu
U/C Hasil Sarhu. Rs.500000/-
2 (i) Const: of soling,Drains,Nala Jat, Tuff, 2500000/- 2443003/- 98% 100% Complete
Sewerline,Culverts,water Supply Pipe line, Cattle Pond, Water
Diggies, Boundary Walls,Janazgah,Mussafar Khana Jat,
Metalled Roads etc in Union Council No. U/C
No.14.RS.1000000/ U/C No.1 Rs.1500000
3 (i) Const: of soling,Drains,Nala Jat, Tuff 2500000/- 2441160/- 98% 100% Complete
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No. U/C No.27.
Rs.1000000/- U/C No.37.Rs.500000/- U/C 52 Rs.1000000/-
4 (i) Const: of soling,Drains,Nala Jat, Tuff 3000000/- 1468204/- 49% 95% Work in Progress
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No.53. Rs.500000/-
U/C No.54 Rs.1000000/- U/C No.55.Rs.1000000/-
(ii) Cons: of Soling drains etc U/C No.50. Rs.500000/-
5 (i) Const: of soling,Drains,Nala Jat, Tuff 2500000/- 2314795/- 92% 100% Completed
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No.58.Rs.1000000/-,
U/C No.65.Rs.500000/- U/C 67.Rs.1000000/-
6 (i) Const: of soling,Drains,Nala Jat, Tuff 2500000/- 1834148/- 73% 75% Work in Progress
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No. 10.
(ii) Const: of Soling Basti Punna to Maddrissa Islamia
Rs.500000/-
(iii) Const: of Pulli Abadi Muhammad Yar Vazirka Rs.400000/-
(iv) Const: of Soling Drains etc Basti Rohana Rs.600000/-
7 (i) Const: of soling,Drains,Nala Jat, Tuff 2500000/- 1562353/- 62% 100% Completed
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No.130
Rs.1000000/-
(II) Const of Soling Drains Culverts Sewerage Pipeline etc U/C
120. Rs.500000/-
(III) Const: of Park Chowk Chak No.234/9R
Rs.1000000/-
8 (i) Const: of soling,Drains,Nala Jat, Tuff 2300000/- 1810774/- 79%- 100% Completed
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No.49. Rs.500000/-
U/C.No.52. Rs.1000000/-
(ii) Const: of Soling Basti Nasrera. Rs.400000/-
(iii) Const/Repair of Soling Chak Tehsildar Rs.400000/-
9 (i) Const: of soling,Drains,Nala Jat, Tuff 2700000/- 1398272/- 52% 100% Completed
Tiles,Sewerline,Culverts,water Supply Pipe line, Cattle Pond,
Water Diggies, Boundary Walls,Janazgah,Mussafar Khana
Jat, Metalled Roads etc in Union Council No. U/C
No.6.Rs.500000/- U/C 25 Rs.500000/-U/C
(ii) Const: of Soling Chak Mousamwala Rs. 500000/-
(iii) Const/Repair of Metalled Road U/C Hassan Wala Basti
DewanAzmatChishti. Rs.700000/-
(iv) Const: of Soling Mouza Dongianwala
U/CMatWala. Rs.500000/-
10 (i) Const/Repair of Metalled Road Punjab College Road 2552000/- 2394139/- 94% 100% Completed
Chak12/G Rs. 1160000/-
(ii) Const: of Boundary Wall Graveyard Chak No.50/F
Rs.1392000/-
11 (i) P/L RCC Pipe 18”Dia Chak No.185/7R Khichiwala 2300000/- 1898903/- 82% 100% Completed
Rs.600000/-
(ii) Const/Repair of Metalled Road Ali House Khichiwala
Rs.500000/-
(iii) Providing of RCC Pipe 18” Dia Teh; Haroonabad
Rs.1200000/-
12 (i) Const: of Soling Chak No.194/7R Rs. 1500000/- 3000000/- 2999800/- 99% 100% Completed
(ii) Const: of Soling Chak No.156/HB
Rs. 1500000/-
13 (i) Const of Boundary Wall Graveyard Chak No.93/6R Rs. 2700000/- 2100743/- 92% 95% Work in Progress
1100000/-
(ii) Const: of Metalled Road Chak No.149/6R(East) Rs. 1600000/
14 (i) Const: of Tuff Tile Street Noman Shah Advocate Khichiwala Work in Progress
Rs.500000/-
(ii) Const: of Soling Street Ustad Bhola wali. Khichiwala 2300000/- 1985464/- 86% 88%
Rs.1000000/-
(iii) Const: of Soling in Chak No.258/HL Rs.800000/-
15 (i) Const: of Boundary Wall Chak No.235/9R Rs.2500000/- 2500000/- 1847723/- 74% 100% Completed
16 (i) Const: of Water Diggi Chak No.126/6R 2400000/- 1828537/- 76% 90% Completed
(Izafi Abadi) Rs. 1900000/-
(ii) Providing PVC Pipe U/C No.96 Rs. 500000/-
17 Const: of Soling Drain Chak No.56/4R 3500000/- 3492999/- 99% 100% Completed
18 (i) Const of Soling Dera Baba Nazir Sindhi 2125000/- 2049472/- 96% 98% Work in Progress
To Basti Sheikh Rs.1500000/-
(ii) Providing of RCC Pipe 18” Dia Teh; Fortabbas
Rs.625000/-
19 (i) Const: of Bridge Canal 3/R Near Chak46/3R Rs.900000/- 2850000/- 2812051/- 99% 100% Completed
(ii) Const: of Soling Chak No.63/4R Rs.450000/-
(iii) Const: of Soling Chak No.39/3R Rs.150000/-
(i) Const: of Soling Chak No.39/3R Rs.400000
(ii) Const of Soling Chak No.44/3R Rs.300000/-
(iii) Const: of Soling Basti Fazal Lalika
(Bhawan Shah) Rs.650000
20 (i) Const: of Boundary Wall Cattle Pond Chak No.11/1R 2500000/- 1795893/- 72% 100% Completed
Rs.200000/-
(ii) Const: of Soling Chak No.26/3R Rs.450000/-
(iii) P/L Sewerage Pipeline Chak 25/3R
Rs.300000/-
(iv) Const: of Boundary Wall Cattle Pond Chak No.8/1R
Rs.250000/-
(v) Const: of Soling Chak Kasrian Street Iqbal Kasri
Rs.250000/-
(vi) Const/Extension of Janazgah Chak 60/4R Rs.300000/-
(vii) Const: of Soling Chak No.60/4R Rs.250000/-
(viii) Providing of RCC Pipe 18”Dia U/C 94 Rs.500000/-
21 (i) Const: Metalled Road Lumbran Wali Ghal Bhani Mehranwali 3000000/- 2921764/- 97% 100% Completed
(First Phase).
22 (i) Const: of Metalled Road Basti Musla U/C Kalyia Shah.(1st 2200000/- 2099284/- 95% 100% Completed
Phase).
23 (i) Const of Metalled Road Bara Qamer Din(1st Phase) 2200000/- 1944835/- 88% 100% Completed
24 (i) Const: of Soling U/C Behkanwala. Rs.1000000/- 2200000/- 728075/- 33% 45% Work in Progress
(ii) Const: of Soling Chak Vazirka Rs.400000
(iii) Const: of Soling Chak Ranghay Wala Rs.800000/-
25 Const/Extension of Mosque District Council Bahawalnagar 5000000/- 4813993/- 96% 98% Work in Progress
27 Const/Special Repair of Office District Council Bahawalnagar 2500000/- 2329872/- 93% 95% Work in Progress
28 Const/Repair of Metalled Road Ratti Ram Pura 3000000/- 2170574/- 72% 100% Completed
44 (i) Const: of Soling Basti Dr.Amir Rs.500000/- 2500000/- 2388893/- 95% 98% Work in Progress
(ii) Const/Repair of Metalled Road Chak Phogan
Rs.1000000/-
(iii) Const of Soling from Bahawalnagar By-pass to Chak Matran.
Rs.500000/-
(iv) Const: of Soling Shadi Wala Road to Basti Haji Iqbal Chohan
Rs.500000/-
45 (i) Const: of Soling Shadi Wala Road to Basti Abbas Chohan 2300000/- 2205690/- 96% 100% Completed
Rs.300000/-
(ii) Const: of Soling Chah Haji Qayyum
Rs.500000/-
(iii) Const: of Metalled Road Shahi Road to Chak Muqeem Shaha
Rs.1500000/-
46 (i) Const: of Soling U/C Mussa Bhoota Rs.800000/- 2800000/- 2786000/- 100% 100% Completed
(ii) Const: Soling of Rojhanwali Road to Basti Rojhanwali
Rs.1000000/-
(iii) Const of Soling Basti Riaz Baitu U/C Muhammad Pur
Rs.500000/-
(iv) Const: of Soling /Drain Main Road Haroonabad to Boys
School Swaiwala. Rs.500000/-
47 2500000/- 2169165/- 87% 99% Work in progress
(i) Const/Repair of Metalled Road Jhulan Araian to Pull Sikandar
Arif Wala Road.(1st Phase)
48 (i) Const: of Soling Drain Chak Jhulan Chishti, Muzafat 2200000/- 712918/- 32% 35% Work in Progress
Rs.500000/-
(ii) Const/Repair of Metalled Road Bridge Chak Slamat to
Pir Shah U/C Mari Mian Sahib Rs.500000/-
(iii) Const: of Soling Pulli Basti Sukheran
(iv) Wali Mouza Tobba Qalandar Shah Rs.500000/-
(v) Const: of Soling Drain Basti Ali Ahmad Wattoo Khiraj Pura
Rs.400000/-
(vi) Const: of Soling Chak Achhareki Rs.300000/-
49 (i) Const:L of Soling Basti Jananka Rs.500000/- 2500000/- 2430451/- 100% 100% Completed
(ii) Const: of Soling Drain Chak Kot Makhdoom Rs.500000/-
(iii) Const:ofSoling/Drains,culverlts,Boundary Wall etc U/CNo.38
Rs.1000000/-
(iv) Const: of Soling Basti Ch:Shafique(Agricultural Allaat)
Rs.500000/-
50 (i) Const: of Soling Basti Jorana Rs.500000/- 2100000/- 1327581/- 63% 70% Work in Progress
(ii) Const: of Soling Basti Mian Nawaz Vazirka Advocate
Rs.300000/-
(iii) Const: of Soling Basti Chaha Muhammad Yar Vazirka
Rs.300000/-
(iv) Const: of Soling Basti Mian Nazir Khan Akuka
Rs.1000000/-
51 (i) Const: of soling /Drains chak No.187/7R 2500000/- 2088027/- 84% 100% Completed
Rs. 500000/-
(ii) Const: of Soling Graveyard Chak 187/7R Rs.700000/-
(iii) Const: of Soling Amin Colony Chak 187/7R Rs.200000/-
(iv) Const: of Soling Drain Chak No.186/7R (West) Rs.400000/-
(v) Const: of Soling Drain Chak No.188/7R(East) Rs.400000/-
(vi) Const: of Soling/Drains Chak No.190/7R. Rs.300000/-
52 (i) Const: of Soling Chak No.319/HR via Basti Baluchan to 3000000/- 2994000/- 100% 100% Completed
319/HR (Alf) Rs.1500000/-
(ii) Const/Extension Water supply pipe line 319/HR to 319/HR(Alf)
Rs.500000/-
(iii) Const/Repair of Metalled Road Dahranwala Fortabbas Abbass
Road to Chak No.175/7R Rs.1000000/-
53 (i) Const: of Soling Basti Qalandar Nagar Rs.400000/- 2400000/- 2350789/- 100% 100% Completed
(ii) Const: of Soling Basti Arshad Gill Near Kashif Faimly Park
Rs.500000/-
(iii) Const: of Soling Basti Muhammad
Akram Joyia near Sikandar Baluchan Rs.500000/-
(iv) Const: of Metalled Road Basti Moueen Shah Rs.1000000/-
54 (i) Const: of Janazgah Chak Fatwera Rs.1050000/- 2100000/- 1931816/- 100% 100% Completed
(ii) Const of Soling Basti Musla U/C Tobba Qalandar Shah
Rs.1050000/-
55 (i) Const: of Soling Bhukan Pattan to Basti Chatta Bhuk 2500000/- 2280170/- 91% 100% Completed
Rs.500000/-
(ii) Const Of Soling Basti Hazoora Kot Ghulam
Muhammad Shah Rs.1000000/-
(iii) P/Lying of Water supply Pipe Line Basti Jalwala.1000000/-
56 (I) Const: of Soling Drain Basti Amir Chawayka Rs.500000/- 2500000/- 2166089/- 87% 100% Completed
(II) Const/Repair of Soling Graveyard Baba Said Shah
Rs.1000000/-
(III) Const: of Soling Green Town Near Bahawalnagar City
Rs.500000/-
(IV) Const: of Saim Pulli Basti Aftab Ahmad Joyia Rs.500000/-
67 (i) Const/Repair of Metalled Road Link Road Hafiz Abad 2500000/- 1787542/- 72% 75% Work in Progress
Rs.500000/-
(ii) Const: of Boundary Wall Graveyard Basti Hanif Bhatti.
Rs.1000000/-
(iii) Const: of Soling Fordwah Canal to Basti Dr: Dewan Wali Mouza
Ali Gohar. Rs.1000000/-
68 2500000/- 2431566/- 97% 100% Completed
(i) Const: of Soling/Drains Basti Mamooka Rs.550000/-
(ii) Const: of Soling Mouza Girya Abad Rs.550000/-
(iii) Const: of Metalled Road Minchinabad Road to Basti Sharjeel
Paracha. Rs.1000000/-
(iv) Providing& fixing of Manhole Covers Slab etc Urban Union
Council Mandi Sadiq Gung Rs.400000/-
69 (i) Const: of Soling Muhammad Pur to Rafique Kot 2500000/- 1371481/- 55% 60% Work in Progress
Rs.1000000/-
(ii) Const: of Culverts Saim Nala Basti Suleman Arain(Mohlan
Wala Galla) Rs.500000/-
(iii) Const: of Foot Bridge Saim Nala Bahadarka (East)
Rs.500000/-
(iv) Const: of Soling Chak Said Ali. Rs.500000/-
70 (i) Const: of Soling U/C Ganga Nagar Basti Malik Arif. 2500000/- 1718000/- 69% 70% Work in Progress
Rs.1000000/-
(ii) Const: of Soling Basti Doulat Chak Chawayka.
Rs.1000000/-
(iii) Const: of Soling Basti Zafar Bhatti U/C Tobba Qalandar Shah.
Rs.500000/
71 (i) Const/Repair of Metalled Road Chak No.30/3R 2500000/- 2494750/- 99% 100% Completed
Rs.1250000/-.
(ii) Const:/repair of Metalled Road Chak No.37/3R
Rs.1250000/-
72 (i) Const: of Boundary Wall Graveyard Chak No.152/2.L 2200000/- 2195160/- 99% 100% Completed
Rs.1000000/-
(ii) Const: of Water Diggi Chak No.133/6R(Izafi Abadi)
Rs.1200000/-
73 (i) Const: of Culverts Mohar Sharief Rs.500000/- 2500000/- 2282923/- 91% 95% Work in Progress
(ii) Const: of Soling /culverts, Nala Jat, Diggies, sewer line,
metalled roads etc in U/CNo.64. Rs.500000/-
(iii) Const: of Soling/Drains, Culverts, Musafar Khana,
Diggies,SewerPipe line, Water Supply Pipe line etc Chak
No.112/M U/C No.75 Rs.1000000/-
(iv) Const: of Soling/Drains, culverts, Nala Jat, Musafar Khana jat,
sewer Pipeline, Diggies Boundary walls etc Basti Mian Irshad
U/C No.64. Rs.500000/-
74 (i) Const/Repair of Metalled Road Phatak Mumtaz wala to 2500000/- 2446984/- 100% 100% Completed
Sharief Lukhan. Rs.2000000/-
(ii) Const: of Soling Basti Bashir Jhaluka. Rs.500000/-
75 (i) Const: of Soling Basti Darbar Khadim ShahRs.1000000/- 2500000/- 2483603/- 99% 100% Completed
(ii) Const: of Soling/Culverts Basti Shah Muhammad to Basti
Ashraf Lukhan.
Rs.1000000/-
(iii) Const: of Soling/Drains Basti Muhammad Aslam
NehalkaRs.500000/-
76 (i) Const: of Soling Union Council No.26 Kalyia Shah 2650000/- 2058915/- 78% 100% Completed
Rs.1000000/-
(ii) Const: of Musafar Khana Main Road Zahir Abad.
Rs.500000/-
(iii) Const: of Soling /Water Supply Pipe Line Galli Noi.2 Khalid
Ghouri wali Main Road Jattuwala. Rs.150000/-
(iv) Const: of Soling Drains etc U/C No.40 Rs.500000Const of
Soling/Drain Basti Abdul Hamid Khan Mouza Kaku Bodla
Rs. 500000/-
77 (i) Providing of RCC Pipe water supply People Colony 2100000/- 1816000/- 86% 90% Work in Progress
Khichiwala. Rs.300000/-
(ii) Const: of Boundary Wall Graveyard Chak No.288/HR
Rs.1000000/-
(iii) Const: of Soling Madina Colony Mosque
Street Khichi wala Rs.800000/-
78 (i) Const: of Soling Faqirwali 2300000/- 1318775/- 57% 70% Work in Progress
Rs.500000/-
(ii) Const/Repair of Metalled Road from Qaziwala Road to Basti
Qureshian Rs.1000000/-
(iii) Const/Repair of Metalled Road Chak No.115/6R
Rs.500000/-
(iv) Const of Cattle Pond Chak No.429/6R
Rs.300000/-
79 (i) Const: of soling,Drains,Nala Jat, Tuff, Sewerline,Culverts,water 2500000/- 1982000/- 79% 80% Work in Progress
Supply Pipe line, Cattle Pond, Water Diggies, Boundary
Walls,Janazgah,Mussafar Khana Jat, Metalled Roads etc in Union
U/C 79 Rs.1000000/- U/C No.75.
Rs.1000000/-
(ii) Const: of Soling Chak Mehatta Jhedu Road to Girls High School
Mehatta Jhedu Rs.500000/-
80 Const: of Metalled Road Lala Amer Singh(Phase-1 2500000/- - - - Work not Started
81 Const/Repair of Metalled Road Shadi Wala Road 2500000/- 2494500/- 100% 100% Completed
82 Const: of Multi Purpose Hall Police Line Bahawalnagar 3000000/- - - - Cancelled
(Phase-1)
83 Construction of Metalled Road Chak No.174/7R to Latif 3000000/- 2950915/- 100% 100% Completed
Abad.(Phase-1)
84 Const/Repair of Metalled Road More Amin Khan Bhedera to 3000000/- 3000000/- 100% 100% Completed
Main Road(Pase-I)
85 Const: of Metalled Road Chak No.8/Fordwah(Jattanwala 3000000/- 2413343/- 80% 92% Work in Progress
Sohni Jatt)(Phase-I)
86 Const of Metalled Road Kachi Kothi Pull to 52/F to More 95/F 3000000/- 2979821/- 100% 100% Work in Progress
( Naiwala)(Phase-I)
87 Const: of Metalled Road Chak 9/Fordwah(Jattanwala) 3000000/- 2045985/- 68% 70% Work in Progress