3. Which website can you get information about green buildings and the Indian Green Building
Council?
http://www.igbc.in
4. Which credit and how many points are awarded to a project with IGBC AP as a principal
design team member
Innovation , one point
6. Which member of the team needs to be a IGBC member for the project to claim the discount?
Owner
7. Name the 4 Green rating systems available in India through IGBC, and which year these were
launched?
LEED India New construction -2007
LEED India core & shell in 2007
IGBC green Homes-2009
IGBC Green Factories -2009
8. What is the most recommended time for a project register for rating through IGBC?
Initial Design Stage
9. At which stage should a project select the rating system the project will be following?
Feasibility study
10. Where can the fees be found for registration / certification for an IGBC rating system?
http://www.igbc.in and Particular rating page
12. What is the next stage after the registration form is submitted on IGBC website?
CIR - Credit Interpretation Ruling
13. What does the project team receive after a project is registered with IGBC?
Reference guide & Leed India templates
14. What is a CIR?
Credit Interpretation Ruling
16. With registration, how many CIR’s does project receive for free and how much do
subsequent CIRS cost?
2 free & beyond this 5000 per CIR
19. Which rating systems can you apply for Pre certification?
Leed India Core & shell & IGBC Green homes
21. If a project achieves “Gold” rating in pre certification, can it apply for Platinum in final
certification?
Yes
22. How often should project team update IGBC on status of project after pre certification?
Every 6 months
23. If a project is achieving 45 credits and missing one pre requisite, can it still apply for
certification?
No
24. What items should be submitted with the application for certification?
All building drawings,
Filled in Leed india Templates
Calculations
Fees
28. Where are the fees available for certification and what are the fees based on?
http://www.igbc.in & fees based on Sq.ft.
30. How much time is given for project team to respond to Preliminary review?
30 working days
31. How many credits / prerequisites does the IGBC verify on site?
Up to six credits and/or prerequisites
33. On receiving the final review, what are the options for a project team?
Accept or appeal
39. On which website can you find the information on certified projects and accredited
individuals of IGBC in India?
http://www.igbc.in
40. How many copies (soft & hard) of documents need to be sent to IGBC?
2 sets Soft copy