Sie sind auf Seite 1von 8

OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ
CERT

UFA
ENG

AKP
ISSUED FOR REVIEW
DESCRIPTION

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME


INDUSTRIES AND SERVICES (MYP)
25-00053-0006
JO/EWO

PACKAGE # 4, 5 & 6
Contract No: 6600042822 (OOK)
14/04/19
DATE
REV NO.

A-1

DATASHEET – ANTI-
DISC. ENGR.

DATE 14-APR-19
AKP
SCALE & ANTI-
PROJ. ENGR.
ASK
CORROSION INJECTION
DATE 14-APR-19
PACKAGE – PACKAGE 5
CERTIFIED
UFA
DATE 14-APR-19

CONST. AGENCY
SEPCO
ISSUED FOR REVIEW
DATE 14-APR-19

OPERATIONS
IMI
DATE _________

REVIEWED BY:

___________________
Comments in this document are also applic-
APPROVED BY:
able to RE-622762 and RE-622763.
___________________
VERIFICATION

____________

__________
CONTROL
NUMBER

DATE:
EDSD

BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___
REVISION CERTIFICATION

(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 1
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Hold Register
CERT

ID Description Section Required Actions Target Closing Date


UFA
ENG

AKP
ISSUED FOR REVIEW
DESCRIPTION

25-00053-0006
JO/EWO

14/04/19
DATE
REV NO.

A-1

DISC. ENGR.
AKP
DATE 14-APR-19

PROJ. ENGR.
ASK
DATE 14-APR-19

CERTIFIED
UFA
DATE 14-APR-19

CONST. AGENCY
SEPCO
DATE 14-APR-19

OPERATIONS
IMI
DATE _________

REVIEWED BY:

___________________

APPROVED BY:

___________________
VERIFICATION

____________

__________
CONTROL
NUMBER

DATE:
EDSD

BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___
REVISION CERTIFICATION

(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 2
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Applicable for: Proposal


Customer: Saudi Aramco Oil Company
Project: King Salman Complex for Marine Industries & Services
CERT

UFA
ENG

AKP

Equipment: Anti-scale & Anti-corrosion Injection Package Notes 1 & 3


Item Nos.: Part of packages as below -
ISSUED FOR REVIEW

For compressor station C403-1, 963-U-021


DESCRIPTION

For compressor station C403-2, 963-U-031


For compressor station C403-4, 963-U-041
Quantity: 3 nos.
Location: Package 5 Compressor Stations (C403-1, C403-2 & C403-4)
25-00053-0006
JO/EWO

Manufacturer: VTA________________________________
Sl. Nos.: VTA________________________________
14/04/19
DATE

Site Data:
REV NO.

A-1

Location: Indoor, Under Roof, Partial sides


Mounted at: Grade
DISC. ENGR.
AKP Environment: Industrial with Heavy Sand Storms
DATE 14-APR-19 Elevation: Sea Level
PROJ. ENGR.
ASK
Electrical area classification: Safe (Non-hazardous)
DATE 14-APR-19 Range of ambient temperatures: Minimum: 2oC Maximum: 47oC
CERTIFIED Relative humidity: Normal: 50%
UFA
DATE 14-APR-19

CONST. AGENCY
SEPCO
DATE 14-APR-19
Utilities:
OPERATIONS
IMI Electricity:
DATE _________

REVIEWED BY:
Drivers
___________________ Heating Control Shutdown
(LV)
APPROVED BY:
Voltage V 400 / 230 400 240 240
___________________
Frequency Hz 60 60 60 60
Phase 3/1 3 1 1
VERIFICATION

____________

__________
CONTROL
NUMBER

DATE:
EDSD

BY:

Process Water: Note 2

Properties of “Process Water” are as below –


APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___

Property Unit Value


pH --- 6.5 – 9.0
REVISION CERTIFICATION

Total Suspended Solids mg/l 25


(DCC) NO. 25-00053-0006-333

Total Dissolved Solids mg/l 1500

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 3
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Conductivity µΩ/cm 2400


Alkalinity as CaCO3 mg/l 500
Calcium Hardness as CaCO3 mg/l 50 – 600
CERT

UFA

Chloride mg/l 250


Sulphate mg/l 250
ENG

AKP

Silica mg/l 150


ISSUED FOR REVIEW
DESCRIPTION

Required Performance:

Design life: 25 Years


25-00053-0006

Application: Scale & corrosion inhibition in cooling / make-up water in the


JO/EWO

compressor cooling system.

Parameter Unit Details


Dosing Liquid
14/04/19
DATE

Type / Name -- Scale & corrosion inhibitor


o
Temperature Min / Normal / Max C VTA / VTA / VTA
Vapour pressure Bar @ oC VTA @ VTA
REV NO.

A-1

Specific gravity -- VTA


DISC. ENGR.
Viscosity Min / Max cP VTA / VTA
AKP Specific heat kJ/kg oC VTA
DATE 14-APR-19
Dosing Rate
PROJ. ENGR.
ASK Dosing rate Min / Normal / Max LPM VTA / VTA / VTA
DATE 14-APR-19
Injection pressure barg VTA
CERTIFIED
UFA
DATE 14-APR-19
Maximum allowable sound pressure level: 85 dBA @ 1 m
CONST. AGENCY
SEPCO
DATE 14-APR-19

OPERATIONS
IMI
Equipment Design & Construction:
DATE _________

REVIEWED BY: Chemical Tank Item No.: 963-D-021/031/041


___________________

APPROVED BY:
Parameter Unit Details
___________________ Volume Total / Working m3 VTA / VTA
Design code -- Manufacturer’s
Standard
VERIFICATION

____________

__________
CONTROL
NUMBER

DATE:
EDSD

Design pressure barg Atmospheric + Full of


BY:

Liquid
o
Design temperature C VTA
o
MDMT C 2
APPROVAL / CERTIFICATION REQUIREMENTS,

Operating pressure / temperature barg / oC Atmospheric / Ambient


OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___

Dimensions (L X B X W or Dia. X H) m VTA


REVISION CERTIFICATION

Wall thickness mm VTA


Material -- VTA
(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 4
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Corrosion allowance mm VTA


CERT

UFA
ENG

AKP

Connection No. Size Type Facing Rating


Pump suction VTA VTA Flanged RF #150
ISSUED FOR REVIEW
DESCRIPTION

Vent VTA VTA Flanged RF #150


Drain VTA VTA Flanged RF #150
Manhole VTA VTA Flanged RF #150
Level gauge VTA VTA Flanged RF #150
Level transmitter VTA VTA Flanged RF #150
25-00053-0006

Filling VTA VTA Flanged RF #150


JO/EWO

Overflow VTA VTA Flanged RF #150


14/04/19
DATE
REV NO.

Metering Pump: Item Nos.: 963-G-021/031/041


A-1

DISC. ENGR.
Parameter Unit Details
AKP
Configuration -- 2 X 100 %
DATE 14-APR-19
Applicable specification -- Manufacturer’s standard
PROJ. ENGR.
ASK Make -- VTA
DATE 14-APR-19
Model -- VTA
CERTIFIED
UFA Sl. Nos. -- VTA
DATE 14-APR-19
Driver -- Electric Motor
CONST. AGENCY
SEPCO Hydraulically Operated
Type of pump --
DATE 14-APR-19 Double Diaphragm
OPERATIONS
IMI
No. of feeds no. VTA
DATE _________ Plunger speed SPM VTA
REVIEWED BY: Plunger diameter / stroke mm / mm VTA / VTA
___________________ Diaphragm diameter / no. mm / no. VTA / 2
APPROVED BY: MAWP barg @ oC VTA
o
___________________ MDMT C 2
Suction valve - no. per feed / type no. / -- VTA / VTA
VERIFICATION

____________

Disch. valve - no. per feed / type no. / -- VTA / VTA


__________
CONTROL
NUMBER

DATE:
EDSD

Internal relief valve -- Required.


BY:

External relief valve -- Required.


Pulsation dampener - Suction -- VTA
Pulsation dampener - Discharge -- Required.
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE

Type of pulsation dampener -- VTA


THIS INDICATES THAT REV. NO. ___A-1___
REVISION CERTIFICATION

(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 5
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Pump Performance:

Parameter Unit Details


CERT

UFA

Rated capacity LPM VTA


NPIPa / NPIPr bara VTA / VTA
ENG

AKP

Suction pressure barg VTA


Discharge pressure barg VTA
ISSUED FOR REVIEW
DESCRIPTION

Rated power kW VTA


Power at relief valve set point kW VTA
Turndown ratio -- VTA
Steady state accuracy /
% VTA / VTA / VTA
Repeatability / Linearity
25-00053-0006

Automatic
JO/EWO

Capacity control --
(Electronic) / Local
Capacity control actuator -- Motorized
Relief valve set point barg VTA
14/04/19
DATE

Pump Material of Construction:

Component Material
REV NO.

A-1

Liquid end VTA


Counter plate VTA
DISC. ENGR.
AKP Plunger VTA
DATE 14-APR-19
Process diaphragm VTA
PROJ. ENGR.
ASK Hydraulic diaphragm VTA
DATE 14-APR-19
Valve seat VTA
CERTIFIED
UFA Valve guide VTA
DATE 14-APR-19
Valve body VTA
CONST. AGENCY
SEPCO
Valve gasket VTA
DATE 14-APR-19 Frame VTA
OPERATIONS
IMI
Pulsation dampener VTA
DATE _________

REVIEWED BY:

___________________

APPROVED BY:
Drive Motor: Item Nos.: 963-GM-021/031/041
___________________

Parameter Unit Details


VERIFICATION

Type -- Induction Motor


____________

__________
CONTROL
NUMBER

DATE:
EDSD

Make / Model -- VTA / VTA


BY:

Rating kW VTA
Speed RPM VTA
Electric supply V/Ph/Hz 400 / 3 / 60 or
APPROVAL / CERTIFICATION REQUIREMENTS,

230 / 1 / 60
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___

Enclosure -- IP55
REVISION CERTIFICATION

Degree of protection -- VTA


Method of cooling -- VTA
(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 6
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

Type of bearings -- VTA


Type – Lubrication -- VTA
CERT

UFA

Piping:
ENG

AKP

Material of Process Piping: VTA


ISSUED FOR REVIEW
DESCRIPTION

(If required)
Chemical Unloading Pump:

Parameter Unit Details


Configuration -- 1 X 100 %
25-00053-0006

Manufacturer’s
JO/EWO

Applicable specification --
standard
Make -- VTA
Model -- VTA
Sl. Nos. -- VTA
14/04/19
DATE

Driver -- Electric Motor


Type of pump -- VTA
Capacity / Head LPM / m VTA / VTA
REV NO.

A-1

Material of construction -- VTA


Motor rating kW VTA
DISC. ENGR.
AKP On Skid / Portable
Pump mounting --
DATE 14-APR-19
(VTA)
PROJ. ENGR.
ASK
DATE 14-APR-19
Complete Package:
CERTIFIED
UFA
DATE 14-APR-19 Parameter Unit Details
CONST. AGENCY Skid size – L X W X H m VTA
SEPCO
DATE 14-APR-19 Weight kg VTA
OPERATIONS
IMI
DATE _________

REVIEWED BY:
Interfaces:
___________________

APPROVED BY:
Connection No. Size Type Facing Rating
___________________
Dosing outlet VTA VTA Flanged RF #150
Tank fill VTA VTA Flanged RF #150
Tank drain VTA VTA Flanged RF #150
VERIFICATION

____________

__________
CONTROL
NUMBER

Drip pan outlet VTA VTA Flanged RF #150


DATE:
EDSD

BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___

Notes:
REVISION CERTIFICATION

1. Applicable specification – “Specification for Chemical Injection Packages” (Doc. no. RE-
(DCC) NO. 25-00053-0006-333

622701)

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 7
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3


OPRNS

IMI ARAMCO OVERSEAS COMPANY

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

2. “Process Water” is being used as cooling media in closed circuit cooling system for air
compressors. It is also used as “Circulation Fluid” (cooling water) in the cooling tower. Any
losses in circulation fluid in cooling tower / process water in closed circuit cooling system are
CERT

UFA

also made up by the “Process Water”.


3. Water flow-based corrosion inhibition & scale inhibition injection shall be provided in the
ENG

AKP

common make-up water header catering to all compressors / cooling towers in a station. Water
meter in common make-up water header shall be provided by the VENDOR.
ISSUED FOR REVIEW

4. All other applicable control / monitoring instrumentation like water flow meter, metering pump
DESCRIPTION

stroke actuator, diaphragm rupture device, etc. shall be wired upto skid edge junction box(s).
Package shall be controlled & monitored by a common master controller / PLC panel in the
compressor station.
5. IP rating for all electrical components shall be minimum IP55.
6. All vents & drains shall be manifolded into a single flanged connection brought upto the edge
25-00053-0006
JO/EWO

of the package skid.


7. This is a sample data sheet. VENDOR shall also supply water flow-based oxidized biocide
injection package for the common make-up water header catering to all compressors / cooling
towers in a station. Similar data sheet shall be filled in & submitted by the VENDOR for the
14/04/19
DATE

package.
8. Water meter in common make-up water header can be common for oxidized biocide injection
package & anti-scale / anti-corrosion injection package.
REV NO.

A-1

DISC. ENGR.
AKP
DATE 14-APR-19

PROJ. ENGR.
ASK
DATE 14-APR-19
Abbreviations used:
CERTIFIED
UFA
VTA – VENDOR to fill-up / advise
DATE 14-APR-19
MDMT – Minimum metal design temperature
CONST. AGENCY
SEPCO SPM – Strokes per minute
DATE 14-APR-19
MAWP – Maximum allowable working pressure
OPERATIONS
IMI
RPM – Rotations per minute
DATE _________

REVIEWED BY:

___________________

APPROVED BY: Insert a Note after Note-3:


___________________

Dosing rates shall be provided by chemical injection vendor


VERIFICATION

____________

considering in consultation with cooling tower vendor. Subjec-


__________
CONTROL
NUMBER

DATE:
EDSD

BY:

ted to review and approval by COMPANY/CONTRACTOR.


APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL

BY DOCUMENT COMPLETION CERTIFICATE


THIS INDICATES THAT REV. NO. ___A-1___
REVISION CERTIFICATION

(DCC) NO. 25-00053-0006-333

DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 8
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 3

Das könnte Ihnen auch gefallen