Beruflich Dokumente
Kultur Dokumente
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
CERT
UFA
ENG
AKP
ISSUED FOR REVIEW
DESCRIPTION
PACKAGE # 4, 5 & 6
Contract No: 6600042822 (OOK)
14/04/19
DATE
REV NO.
A-1
DATASHEET – ANTI-
DISC. ENGR.
DATE 14-APR-19
AKP
SCALE & ANTI-
PROJ. ENGR.
ASK
CORROSION INJECTION
DATE 14-APR-19
PACKAGE – PACKAGE 5
CERTIFIED
UFA
DATE 14-APR-19
CONST. AGENCY
SEPCO
ISSUED FOR REVIEW
DATE 14-APR-19
OPERATIONS
IMI
DATE _________
REVIEWED BY:
___________________
Comments in this document are also applic-
APPROVED BY:
able to RE-622762 and RE-622763.
___________________
VERIFICATION
____________
__________
CONTROL
NUMBER
DATE:
EDSD
BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 1
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
Hold Register
CERT
AKP
ISSUED FOR REVIEW
DESCRIPTION
25-00053-0006
JO/EWO
14/04/19
DATE
REV NO.
A-1
DISC. ENGR.
AKP
DATE 14-APR-19
PROJ. ENGR.
ASK
DATE 14-APR-19
CERTIFIED
UFA
DATE 14-APR-19
CONST. AGENCY
SEPCO
DATE 14-APR-19
OPERATIONS
IMI
DATE _________
REVIEWED BY:
___________________
APPROVED BY:
___________________
VERIFICATION
____________
__________
CONTROL
NUMBER
DATE:
EDSD
BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 2
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
UFA
ENG
AKP
Manufacturer: VTA________________________________
Sl. Nos.: VTA________________________________
14/04/19
DATE
Site Data:
REV NO.
A-1
CONST. AGENCY
SEPCO
DATE 14-APR-19
Utilities:
OPERATIONS
IMI Electricity:
DATE _________
REVIEWED BY:
Drivers
___________________ Heating Control Shutdown
(LV)
APPROVED BY:
Voltage V 400 / 230 400 240 240
___________________
Frequency Hz 60 60 60 60
Phase 3/1 3 1 1
VERIFICATION
____________
__________
CONTROL
NUMBER
DATE:
EDSD
BY:
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 3
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
UFA
AKP
Required Performance:
A-1
OPERATIONS
IMI
Equipment Design & Construction:
DATE _________
APPROVED BY:
Parameter Unit Details
___________________ Volume Total / Working m3 VTA / VTA
Design code -- Manufacturer’s
Standard
VERIFICATION
____________
__________
CONTROL
NUMBER
DATE:
EDSD
Liquid
o
Design temperature C VTA
o
MDMT C 2
APPROVAL / CERTIFICATION REQUIREMENTS,
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 4
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
UFA
ENG
AKP
DISC. ENGR.
Parameter Unit Details
AKP
Configuration -- 2 X 100 %
DATE 14-APR-19
Applicable specification -- Manufacturer’s standard
PROJ. ENGR.
ASK Make -- VTA
DATE 14-APR-19
Model -- VTA
CERTIFIED
UFA Sl. Nos. -- VTA
DATE 14-APR-19
Driver -- Electric Motor
CONST. AGENCY
SEPCO Hydraulically Operated
Type of pump --
DATE 14-APR-19 Double Diaphragm
OPERATIONS
IMI
No. of feeds no. VTA
DATE _________ Plunger speed SPM VTA
REVIEWED BY: Plunger diameter / stroke mm / mm VTA / VTA
___________________ Diaphragm diameter / no. mm / no. VTA / 2
APPROVED BY: MAWP barg @ oC VTA
o
___________________ MDMT C 2
Suction valve - no. per feed / type no. / -- VTA / VTA
VERIFICATION
____________
DATE:
EDSD
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 5
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
Pump Performance:
UFA
AKP
Automatic
JO/EWO
Capacity control --
(Electronic) / Local
Capacity control actuator -- Motorized
Relief valve set point barg VTA
14/04/19
DATE
Component Material
REV NO.
A-1
REVIEWED BY:
___________________
APPROVED BY:
Drive Motor: Item Nos.: 963-GM-021/031/041
___________________
__________
CONTROL
NUMBER
DATE:
EDSD
Rating kW VTA
Speed RPM VTA
Electric supply V/Ph/Hz 400 / 3 / 60 or
APPROVAL / CERTIFICATION REQUIREMENTS,
230 / 1 / 60
OF THIS DOCUMENT IS COVERED, FOR ALL
Enclosure -- IP55
REVISION CERTIFICATION
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 6
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
UFA
Piping:
ENG
AKP
(If required)
Chemical Unloading Pump:
Manufacturer’s
JO/EWO
Applicable specification --
standard
Make -- VTA
Model -- VTA
Sl. Nos. -- VTA
14/04/19
DATE
A-1
REVIEWED BY:
Interfaces:
___________________
APPROVED BY:
Connection No. Size Type Facing Rating
___________________
Dosing outlet VTA VTA Flanged RF #150
Tank fill VTA VTA Flanged RF #150
Tank drain VTA VTA Flanged RF #150
VERIFICATION
____________
__________
CONTROL
NUMBER
BY:
APPROVAL / CERTIFICATION REQUIREMENTS,
OF THIS DOCUMENT IS COVERED, FOR ALL
Notes:
REVISION CERTIFICATION
1. Applicable specification – “Specification for Chemical Injection Packages” (Doc. no. RE-
(DCC) NO. 25-00053-0006-333
622701)
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 7
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN WHOLE OR PART SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
2. “Process Water” is being used as cooling media in closed circuit cooling system for air
compressors. It is also used as “Circulation Fluid” (cooling water) in the cooling tower. Any
losses in circulation fluid in cooling tower / process water in closed circuit cooling system are
CERT
UFA
AKP
common make-up water header catering to all compressors / cooling towers in a station. Water
meter in common make-up water header shall be provided by the VENDOR.
ISSUED FOR REVIEW
4. All other applicable control / monitoring instrumentation like water flow meter, metering pump
DESCRIPTION
stroke actuator, diaphragm rupture device, etc. shall be wired upto skid edge junction box(s).
Package shall be controlled & monitored by a common master controller / PLC panel in the
compressor station.
5. IP rating for all electrical components shall be minimum IP55.
6. All vents & drains shall be manifolded into a single flanged connection brought upto the edge
25-00053-0006
JO/EWO
package.
8. Water meter in common make-up water header can be common for oxidized biocide injection
package & anti-scale / anti-corrosion injection package.
REV NO.
A-1
DISC. ENGR.
AKP
DATE 14-APR-19
PROJ. ENGR.
ASK
DATE 14-APR-19
Abbreviations used:
CERTIFIED
UFA
VTA – VENDOR to fill-up / advise
DATE 14-APR-19
MDMT – Minimum metal design temperature
CONST. AGENCY
SEPCO SPM – Strokes per minute
DATE 14-APR-19
MAWP – Maximum allowable working pressure
OPERATIONS
IMI
RPM – Rotations per minute
DATE _________
REVIEWED BY:
___________________
____________
DATE:
EDSD
BY:
DATA SHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV.NO.
`
ANTI-SCALE & ANTI-CORROSION INJECTION PACKAGE - PKG. 5 DAT 8
963 K RE-622761
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF A-1
RAS AL KHAIR SAUDI ARABIA JO: 25-00053-0006 8