DEEP-WATER EXPLORATION
& DEVELOPMENT IN INDONESIA
by:
Yunan Muzaffar
HEAD OF EXPLORATION DIVISION
Subsea Conference
October 3rd, 2012
AGENDA
© DJMIGAS 03102012
SHIFTING PARADIGM WITHIN OIL &
GAS SECTOR
© DJMIGAS 03102012
FROM REVENUE TO
ECONOMIC GROWTH MACHINE (FEEDSTOCK-
(FEEDSTOCK-FUEL)
FUEL)
DOMESTIC
High Risk SUSTAINABLE
FUEL
NATIONAL
SOURCE OF
High Cost STATE DEVELOPMENT
REVENUE
© DJMIGAS 03102012
FROM WEST TO EAST
More reserves found
M f d and
d exploration
l ti activities
ti iti occureed
d
in the eastern part of Indonesia mainly deepwater project
Discoveries in
Mostly Tertiery Jurrasic Plays
1998-2008
Western part
Eastern part
EASTERN INDONESIA CONTRACT SIGNED
10 9 9
8
Deep Water Area
6 5
4 3
2 2
2
0 0
0
2003 2004 2005 2006 2007 2008 2009 2010 Most of bidding acreage located
EASTERN INDONESIA CONTRACT SIGNED in eastern side of Indonesia
© DJMIGAS 03102012
ent
quivale
barel oil eq FROM OIL TO
TO GAS
© DJMIGAS 03102012
INCREASED OF DOMESTIC GAS ALLOCATION
BASED ON CONTRACTS/ GSA
EXPORT
6,11 TCF
24%
Comparison of Accumulation Volume Contract
Domestic vs. Exports During 2001 – Nov 2011
TCF
30
25
DOMESTIC 20
20
5
‐
2003 2004 2005 2006 2007 2008 2009 2010 2011
domestik ekspor
© DJMIGAS 03102012
DEEP WATER BLOCKS
IN INDONESIA
© DJMIGAS 03102012
DEEP WATER SPECULATIVE SURVEY OF INDONESIA
The distance between seismic line relatively far 20-50 km ideally for O&G bidding 5 km
© DJMIGAS 03102012
PRESENT DEEP WATER BLOCKS OF INDONESIA
© DJMIGAS 03102012
INDONESIA DEEEPWATER
EXPLORATION & DEVELOPMENT
© DJMIGAS 03102012
DRILLING ACTIVITIES IN DEEP WATER BLOCKS OF
INDONESIA
3 South East Ganal I Plan to Drill 1 well (2013) Ocean Monarch • Worldwide Deep Water Drilling
Rig
g Availability
y is Limited
4 Pasangkayu Drilled 4 Well (Bravo-1, Romeo-1, GSF Explorer
Romeo-B1, Romeo-C1)
5 Kuma Drilled 1 well (Kaluku-1) GSF Explorer
• Regional Autonomy should
support & be partner in
6 Karama Drilled 2 Well ( Gatotkaca
Gatotkaca-1
1 & Anoman
Anoman-1)
1) GSF Explorer maintaining the investment for
regional area of Indonesia
7 Mandar Drilled 3 well (Sultan-1,Kris-1 & Kris-1 St) West Aquarius
8 West Sageri Plan to Drill 1 well (2013) Ocean Monarch • More Petroleum system Studies
in deep water are needed to
9 Sageri Drilled 1 well (Lempuk-1) GSF Explorer
determine potential estimates
10 Kofiau Plan to Drill 1 well (2013) Ocean Monarch
• Successful exploration will
11 West Papua IV Plan to Drill 1 well (2013) Ocean Monarch
require additional rig time to
appraise discoveries
© DJMIGAS 03102012
MAKASSAR STRAIT DEEP WATER DRILLING PROGRAM
D
Deepwater
t Rigs
Ri
(GSF Esplorer)
Business Opportunity
The downside to all
¾ The 7 companies have a combined 12 of this interest
deepwater well commitments in the
Makassar Straits
¾ Total drilling
g investment of over US$700MM
$
Barrier:
Rig availability, contract
length and day rates
Solution:
7 companies working
together with one rig
together,
© DJMIGAS 03102012
DISCOVERIES IN DEEP WATER AREAS
OF INDONESIA
JAMBU AYE UTARA FIELD,
FIELD KRUENG MANE BLOCK
POD I : 2012
Water Depth : 600 – 650 M
Gas Rate : 100 MMSCFD,
plateau 3 years
On Stream : 2014
POD I : 2008
Water Depth : 1000 - 2000 M
Gas Rate : 120 - 600 MMSCFD
On Stream : 2013
POD I : 2010
Water Depth : 300 – 1000 M
Gas Rate : first stage
g 2.5 MTPA
equal to 130 MMSCFD
On Stream : 2018
© DJMIGAS 03102012
EXISTING DEEP WATER DEVELOPMENT IN INDONESIA
© DJMIGAS 03102012
ONGOING INDONESIA DEEP WATER DEVELOPMENT
Kapasitas
Capacity 150 150 mmscfd
mmscfd
Current
Current prod
prod’’nn 60-70
60-70 mmscfd
mmscfd
Pada 2013 pp
2013app.pp2020 mmscfd
app. mmscfd
G 16 ”
Gas
Gas 20 ” 79 Km
Cond ’t 8”
Cond ’t 8” The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it
again.
120 mmscfd
85 Km
60 Km
The image cannot be display ed. Your computer may not hav e enough memory to open the image, or the image may hav e been corrupted. Restart y our computer, and then open the file again. If the red x still appears, y ou may hav e to delete the image and then insert it
again.
(~ 5,200 ’ WD)
700
00 mmscfd
sc d Bangka
g Field (tie ( in Existing g West Seno FPU))
25,000 bcpd Gehem Hub To delivery 150 mmscfd and 2,880 bcpd.
To delivery 420 mmscfd and 27,000 bcpd. Facility built consist of Subsea wellhead and
Facility built consist of Subsea wellhead and Umbilical Risser and Flow Lines (SURF) tie in to
Umbilical Risser and Flow Lines (SURF) and West Seno FPU
Floating Production Unit (FPU), Export P/L
© DJMIGAS 03102012
INDONESIA DEEPWATER DEVELOPMENT
SUMMARY OVERVIEW
At 6,000
6 000 water depth in the Gehem Field,
Field IDD has the deepest
Ship-shaped floating structure
Subsea production trees
Suction pile installation
Flowline installation
Export pipeline and SCR
Largest offshore natural gas processing facility (700 mmcf/d)
Largest single subsea umbilical order
Longest mooring lines - 2.4
2 4 mi (3.9
(3 9 km)
Heaviest SCR load on a deepwater floating facility at 650 tons (590 metric tons)
© DJMIGAS 03102012
CHALLENGES AND
OPPORTUNITIES
© DJMIGAS 03102012
CHALLENGES IN
OFFSHORE & DEEPWATER ACTIVITIES
More Petroleum
M P l system Studies
S di i deep
in d water are needed
d d to
determine potential estimates
© DJMIGAS 03102012
OPPORTUNITIES IN
OFFSHORE & DEEPWATER ACTIVITIES
LESS COMPETITION
© DJMIGAS 03102012
www.migas.esdm.go.id
© DJMIGAS 03102012