Sie sind auf Seite 1von 3

COMPANY

S/N
RIG SURVEY REPORT.

Services Rig Survey Report


Revision# Date Written/Revised By Approved By Description of Changes

Rig Name: Date of Rig Survey:

Document ID:

Customer: Rig Owner:

Report Prepared By: Signature:

Position: Date:

Destini Oil Services Position:


Contact(s):

CUSTOMER’S REPRESENTATIVE
Name: Signature:

Position: Date:

All Rights Reserved Proprietary and Confidential – Trade Secret


COMPANY
S/N
RIG SURVEY REPORT.

Table of Contents

1.0 Introduction ..........................................................................................................................3


3.4 Top Drive Pipe Handler Details (summary of section 4.5) ......Error! Bookmark not defined.
3.5 Pipe Racking System (PRS) or Pipe Handling System & Offline Capability Error! Bookmark
not defined.
3.6 Iron Roughneck .....................................................................Error! Bookmark not defined.
3.7 Stabbing Board / Stabbing Arm Information ...........................Error! Bookmark not defined.
3.8 Rotary Table ..........................................................................Error! Bookmark not defined.
3.9 Fill-up and Circulation Details ................................................Error! Bookmark not defined.
3.10 Electrical Supply – Power Unit (400 – 480 V) ........................Error! Bookmark not defined.
3.11 Alternate Hydraulic Supply ....................................................Error! Bookmark not defined.
3.12 Electrical Supply – Other Electrical Equipment (TMS) (110 / 220V) ..... Error! Bookmark not
defined.
3.13 Compressed air information...................................................Error! Bookmark not defined.
3.14 Various Dimensions / Capacities ...........................................Error! Bookmark not defined.
3.15 Elevator Bails Currently Available on Rig ...............................Error! Bookmark not defined.
4.0 Drawing .................................................................................Error! Bookmark not defined.
4.1 Rig Floor Dimensions ............................................................Error! Bookmark not defined.
4.2 Top Drive Dimensions ...........................................................Error! Bookmark not defined.
4.3 Top Drive Elevator Details & Dimensions ..............................Error! Bookmark not defined.
4.4 Rig Floor Layout ....................................................................Error! Bookmark not defined.
5.0 Rig Survey Notes ..................................................................Error! Bookmark not defined.
5.1 Action Items ..........................................................................Error! Bookmark not defined.
6.0 Attachments ..........................................................................Error! Bookmark not defined.

All Rights Reserved Proprietary and Confidential – Trade Secret


COMPANY
S/N
RIG SURVEY REPORT.

1.0 Introduction
Tubular running involves the provision of equipment that requires interface with equipment currently
available on the rig. This rig survey is important to ensure safe, seamless start-up to operations and
to allow for evaluation on further improvements to tubular running efficiencies. This report highlights
the findings from this Rig Survey for further actions.

2.0 Purpose of the Tubular Running Rig Survey


This form is developed to identify key aspects on the execution of casing running services with
conventional equipment. This will allow selecting the proper equipment and mitigate the risks
associated to the specific rig application.

2.1 This rig survey will identify the following:


 Interface and location for:
 Handling equipment
 Safe operation
 Various measurements (from well center to top drive rails, rig floor to topdrive etc.).
 Assess suitability for offline operations

3.0 Rig Survey Details

All Rights Reserved Proprietary and Confidential – Trade Secret

Das könnte Ihnen auch gefallen