6. Date of Commencement
7. Date of Completion :
Doctors Qtrs
Earth work excuated Qty Cum 244.19
Above NGL
Bed room 1 6 4.13 3.28 0.7 56.89
kitchen 1 2 3.45 3.5 0.7 16.91
living 1 2 5.62 3.55 0.7 27.93
staircase&lobby 1 4 4.76 2.5 0.7 33.32
1 2 2.56 1.65 0.7 5.91
cum 385.15
Dudect Qty
Footing P C C Qty Cum 18.61
Nurse Qtrs
Excavation in Soil with Dozer KSRRB M300-11.Excavation for road way in soil by mechanical
means including cutting and pushing the earth to site of embankment upto a including
trimming bottom and side slopes in accordance with requirements of lines, grades and cross
sections complete as per specifications. MORTH Specification No. 301 ---- etc., complete with
138 all lead & lift, as per specifications and as per directions of the Engineer in charge of the work.
Lead charges for conveying excavated soil from borrow pits to the work spot with a total lead
of 5.0 kms etc as per the directions of Engineer-in-charge of work. ---- etc., complete with all
139 lead & lift, as per specifications and as per directions of the Engineer in charge of the work.
KSRRB M400- Wet Mix Macadam KSRRB M400-17. Providing, laying, spreading and
compacting crushed stone aggregates of granite / trap / basalt to wet mix macadam
specifications including pre mixing the material with water at OMC in mechanical mix plant
carriage of mixed method of tipper to site, laying in uniform layers with paver in sub-
base/base course on well prepared surface and compacting with vibratory roller to achieve
73 the desired density complete as per specifications. MORTH Specification No. 406 ---- etc.,
complete with all lead & lift, as per specifications and as per directions of the Engineer in
charge of the work.
KSRRB 500-9. Providing and applying tack coat using 80/100 grade bitumen (VG10) on
granular base such as WBM surfaces hot bitumen primed at 4 kg per 10 sqm, heating bitumen
in boiler fitted with spray set (excluding cleaning of road surface) including cost of all
materials, labour, HOM of machineries complete as per specifications. MORTH / Chapter 5 ----
74 etc., complete with all lead & lift, as per specifications and as per directions of the Engineer in
charge of the work.
KSRRB M500-18. Providing and laying semi dense bituminous concrete using crushed
aggregates of specified grading, premixed with bituminous binder and filler, transporting the
hot mix to work site, laying with a paver finisher to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction
as per MORTH specification clause No. 508 complete in all respects complete as per
specifications. - using 100/120 TPH capacity H.M.P. with sensor paver Gr-II (25 mm to 30 mm)
76 with 5 % VG-30 Bitumen ---- etc., complete with all lead & lift, as per specifications and as per
directions of the Engineer in charge of the work.
50 ###
1500 ###
9000 ###
Contractor's signature.
( For use in the Executive Engineer's Office )
Received Rs …………………….(in words)……………………………..
…………………………………………………………………………………..
……………………………………...…………..by cash and by adjustment.
of payment as per memorandum :
( in final settlement of all demands )
Witness
1 Reciept
Stamp
2
BENGALURU
Name of Work:Upgradation of 60 to 100 Beds at Sira,Sira
Taluk,Tumkur
Name District.M/s Balajikrupa projects pvt ltd.,
of the Agency:
Contractor, Bengaluru
Head of Account: Deposit contribution
Contract Agreement No 34/2018-19 Dated 10/12/2018
Contract Amount : Rs:103490869.75 /-
Date of Commence:
Period of Completion: 15 months
Date of Completion:
437.875
4702.5
1132.625
1062.5
361.875
2156.25
166.25
384.2
2229.05
5891.25
5087.5
1062.5
310.15
150
1437.5
150
211.25
12146.25
12.5
1779.4625
2598.75
11213.75
3743.75
58.75
211.6625
686.2
250
1313.75
1864.275
3923.75
125
1530
955
956.25
9557.5
240
119.475
3500
2389.375
2418.75
500
4437.5
2000
1000
500
500
43.75
1.25
RA Bill No:2nd RA and Part bill
Name of the Work:Upgradation of MCH from 60 beds to 100 beds at Sira,Sira Taluk .,
Head of Account: NABARD RIDF XXII
Estimated Cost : Rs.. Lakhs
Agency:- M/s Balajikrupa Projects Pvt Ltd, Bangalore
Tender Amount: Rs:10,34,90,869.75 above 13.99% SR 2016-17
Authority:- Agreement No 34/2018-19 Dated 10/12/2018
Sl No Description Unit. No L B D Qnty
1 2 3 4 5 6 7 8
KSRB 2-2.2 : Earthwork excavation by manual means for foundation of buildings, culverts, water supply and
sanitary lines and electrical conduits etc, either in pits or in trenches 1.5m and above in width, in hard soil not
exceeding 1.5 m. in depth including dressing the bottom and sides of pits and trenches, stacking the excavated
3 soil clear from edges of excavation with lead upto 50 m. including breaking of clods complete as per
specifications. No. KBS 2.1(a) / 2.3.5 ---- etc., complete with all lead & lift, as per specifications and as per
directions of the Engineer in charge of the work.
Drain
old hospital to septic tank 1 1 87.00 1.20 0.15 15.66
1 1 31.00 1.20 0.15 5.58
septic tank to mortaury 1 1 19.70 2.70 0.20 10.64
1 1 43.00 3.00 0.15 19.35
Total qty Cum 108.68
KSRB 5.2-3 : Providing and constructing granite / trap / basalt size stone masonry in foundation with cement
mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each
8 course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 ---- etc., complete
with all lead & lift, as per specifications and as per directions of the Engineer in charge of the work.
Compound wall
old hospital front 1 1 41.60 0.45 0.60 11.23
old hospital and old qtrs b/w 1 1 139.40 0.45 0.60 37.64
Total qty Cum 48.87
KSRB 4.2.2 : Providing and laying in position reinforced cement concrete of Design mix M20 with OPC cement
@ 320kgs, with 20mm and down size graded granite metal coarse aggregates @0.69cum and fine aggregtes
@ 0.460 cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008, machine mixed,
concrete laid in layers not exceeding 15 cms thick, vibrated for all works in
10 foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached
pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all
materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per
specifications. Specification No. KBS 4.1, 4.6 ---- etc., complete with all lead & lift, as per specifications and as
per directions of the Engineer in charge of the work.
Doctors Quarters
GF Columns
A8,A3,B1,B11 4 1 0.23 0.38 2.55 0.89
H1,H11,C3,C8,G8,G3 6 1 0.23 0.38 2.55 1.34
H2,H9,A2,A10 4 1 0.23 0.38 2.55 0.89
D11,F11,D1,F1,C4,C7 6 1 0.23 0.38 2.55 1.34
E3,E8 2 1 0.23 0.38 2.55 0.45
F2,D2 2 1 0.23 0.45 2.55 0.53
D10,F10 2 1 0.23 0.45 2.55 0.53
F4 1 1 0.23 0.45 2.55 0.26
G5 1 1 0.23 0.38 2.55 0.22
G6 1 1 0.23 0.38 2.55 0.22
F7 1 1 0.23 0.45 2.55 0.26
Group D Quarters
GF Columns
B1,B8,D1,D8 4 1 0.23 0.38 2.55 0.89
A2,A7,A3,A6 4 1 0.23 0.38 2.55 0.89
E2,E7 2 1 0.23 0.38 2.55 0.45
F4,F5 2 1 0.23 0.38 2.55 0.45
C7,C2 4 1 0.23 0.38 2.55 0.89
C3,C6 2 1 0.23 0.45 2.55 0.53
Staircase 1 st Fligh
Waist slab 1 1 2.70 1.10 0.15 0.45
steps 9 0.5 1.10 0.30 0.15 0.22
Slab 1 1 2.25 0.90 0.15 0.30
Beam 1 1 2.25 0.23 0.30 0.16
Nurse Quarters
GF Columns
F7,A2,A7,F2,E8,D8,D1,E1 8 1 0.23 0.38 2.55 1.78
A6,A3,F6,F3,C2,C7 6 1 0.23 0.38 2.55 1.34
B5,B4,F4,F5 4 1 0.23 0.38 2.55 0.89
C6,C3 2 1 0.23 0.38 2.55 0.45
E6,E3,E4,E5 4 1 0.23 0.45 2.55 1.06
Ground Floor Staircase
1 st Flight
Waist slab 1 1 2.70 1.10 0.15 0.45
steps 9 0.5 1.10 0.30 0.15 0.22
slab 1 1 2.40 0.90 0.15 0.32
Beam 1 1 2.40 0.23 0.30 0.17
MCH Rear block (left side)
Columns (G.F)
C1,C2,C3,C11,C12,C13,C25 1 7 0.75 0.23 3.05 3.68
C21 1 1 0.6 0.23 3.05 0.42
C10,C24,C20,C26,C27 1 5 0.45 0.23 3.05 1.58
Nurse Qtrs Ground Floor Roof Slab
Ground Floor Roof slab
Slab 1 2 3.46 3.51 0.13 3.16
1 2 3.27 1.353 0.12 1.06
1 2 4.1 1.93 0.13 2.06
1 2 3.27 3.23 0.13 2.75
1 2 3.27 5.23 0.15 5.13
1 2 3.27 2.33 0.13 1.98
1 1 2.33 2.82 0.13 0.85
2 nd Flight waist slab 1 1 2.70 1.10 0.15 0.45
steps 9 0.5 1.10 0.30 0.15 0.22
Beams
X-Direction
A2-A3 1 1 3.05 0.23 0.17 0.12
A6-A7 1 1 3.03 0.23 0.17 0.12
B3-B4 1 1 3.04 0.23 0.17 0.12
B5-B6 1 1 3.04 0.23 0.17 0.12
C'4-C'5 1 1 2.33 0.23 0.17 0.09
C2-C3 1 1 3.05 0.23 0.32 0.22
C6-C7 1 1 3.05 0.23 0.32 0.22
D1-D3 1 1 3.73 0.23 0.32 0.27
D6-D8 1 1 3.73 0.23 0.32 0.27
E1-E3 1 1 3.73 0.23 0.25 0.21
E3-E4 1 1 3.04 0.23 0.25 0.17
Group D Quarters
FF Columns
B1,B8,D1,D8 4 1 0.23 0.38 2.55 0.89
A2,A7,A3,A6 4 1 0.23 0.38 2.55 0.89
E2,E7 2 1 0.23 0.38 2.55 0.45
F4,F5 2 1 0.23 0.38 2.55 0.45
C7,C2 4 1 0.23 0.38 2.55 0.89
C3,C6 2 1 0.23 0.45 2.55 0.53
D Group Qtrs
Staircase First Floor
1 st Flight
Waist slab 1 1 2.70 1.10 0.15 0.45
steps 9 0.5 1.10 0.30 0.15 0.22
Slab 1 1 2.25 0.90 0.15 0.30
Beam 1 1 2.25 0.23 0.30 0.16
MCH
First floor Columns
C1,C2,C3,C11,C12,C13,C25 1 7 0.75 0.23 3.05 3.68
C21 1 1 0.60 0.23 3.05 0.42
C10,C24,C20,C26,C27 1 5 0.45 0.23 3.05 1.58
Nurse Qtrs First Floor Roof Slab
Slab 1 2 3.46 3.51 0.13 3.16
1 2 3.27 1.353 0.12 1.06
1 2 4.1 1.93 0.13 2.06
1 2 3.27 3.23 0.13 2.75
1 2 3.27 5.23 0.15 5.13
1 2 3.27 2.33 0.13 1.98
1 1 2.33 2.82 0.13 0.85
2 nd Flight waist slab 1 1 2.70 1.10 0.15 0.45
steps 9 0.5 1.10 0.30 0.15 0.22
Beams
X-Direction
A2-A3 1 1 3.05 0.23 0.17 0.12
A6-A7 1 1 3.03 0.23 0.17 0.12
B3-B4 1 1 3.04 0.23 0.17 0.12
B5-B6 1 1 3.04 0.23 0.17 0.12
C'4-C'5 1 1 2.33 0.23 0.17 0.09
C2-C3 1 1 3.05 0.23 0.32 0.22
C6-C7 1 1 3.05 0.23 0.32 0.22
D1-D3 1 1 3.73 0.23 0.32 0.27
D6-D8 1 1 3.73 0.23 0.32 0.27
E1-E3 1 1 3.73 0.23 0.25 0.21
E3-E4 1 1 3.04 0.23 0.25 0.17
E5-E6 1 1 3.04 0.23 0.25 0.17
E6-E7 1 1 3.73 0.23 0.25 0.21
F'3-F'4 1 1 3.04 0.23 0.17 0.12
Nurse Qtrs
Ground Floor Beams
X-Direction
A2-A3 Bottom 1 1 3.05 0.23 0.70
Sides 1 1 3.05 0.17 0.52
outsides 1 1 3.05 0.3 0.92
A6-A7 Bottom 1 1 3.03 0.23 0.70
Sides 1 1 3.03 0.17 0.52
outsides 1 1 3.03 0.3 0.91
B3-B4 Bottom 1 1 3.04 0.23 0.70
Sides 1 1 3.04 0.17 0.52
outsides 1 1 3.04 0.3 0.91
B5-B6 Bottom 1 1 3.04 0.23 0.70
Sides 1 1 3.04 0.17 0.52
outsides 1 1 3.04 0.3 0.91
C'4-C'5 Bottom 1 1 2.33 0.23 0.54
Sides 1 1 2.33 0.17 0.40
outsides 1 1 2.33 0.3 0.70
C2-C3 Bottom 1 1 3.05 0.23 0.70
Sides 1 2 3.05 0.32 1.95
C6-C7 Bottom 1 1 3.05 0.23 0.32 0.98
Sides 1 2 3.05 0.32 1.95
D1-D3 Bottom 1 1 3.73 0.23 0.86
Nurse Qtrs
First Floor Beams
X-Direction
Drain work
Shuttering work
P.C.C side
old hospital to seeptic tank
1 2 87.00 0.15 26.10
1 2 31.00 0.15 9.30
septic tank to mortaury 1 2 19.70 0.15 5.91
1 2 43.00 0.15 12.90
Staircase
Doctors Qtrs
Ground Floor
staircase 1 st Flight
Waist slab bottom 1 1 2.70 1.20 3.24
sides 1 2 3.00 0.30 1.80
Riser 1 10 1.20 0.15 1.80
Slab bottom 1 1 2.55 1.10 2.81
sides 1 2 0.90 0.15 0.27
1 1 1.35 0.15 0.20
Nurse Qtrs
staircase 1 st Flight
Waist slab bottom 1 1 2.70 1.10 2.97
sides 1 2 2.90 0.30 1.74
riser 1 10 1.10 0.15 1.65
slab Bottom 1 1 2.40 0.90 2.16
sides 1 2 0.90 0.15 0.27
1 1 1.30 0.15 0.20
Beams Bottom 1 1 2.40 0.23 0.55
side 1 1 2.40 0.30 0.72
1 1 2.40 0.15 0.36
First Floor
D Group Qtrs
staircase 1 st Flight
waist slab bottom 1 1 2.70 1.10 2.97
Side 1 2 3.10 0.30 1.86
Riser 1 10 1.10 0.15 1.65
Slab Bottom 1 1 2.25 0.90 2.03
sides 1 2 0.90 0.15 0.27
1 1 1.00 0.15 0.15
Beams Bottom 1 1 2.25 0.23 0.52
sides 1 1 2.25 0.30 0.68
1 1 2.25 0.15 0.34
First Floor
Nurse Qtrs
staircase 1 st Flight
Waist slab bottom 1 1 2.70 1.10 2.97
sides 1 2 2.90 0.30 1.74
riser 1 10 1.10 0.15 1.65
slab Bottom 1 1 2.40 0.90 2.16
sides 1 2 0.90 0.15 0.27
1 1 1.30 0.15 0.20
Beams Bottom 1 1 2.40 0.23 0.55
side 1 1 2.40 0.30 0.72
1 1 2.40 0.15 0.36
First Floor
D Group Qtrs
staircase 1 st Flight
waist slab bottom 1 1 2.70 1.10 2.97
Side 1 2 3.10 0.30 1.86
Riser 1 10 1.10 0.15 1.65
Slab Bottom 1 1 2.25 0.90 2.03
sides 1 2 0.90 0.15 0.27
1 1 1.00 0.15 0.15
Ground floor
Doctors Quarters
unit 1
External wall 1 1 3.95 0.23 2.77 2.52
-1 1 1.35 0.23 1.35 -0.42
1 1 3.5 0.23 2.77 2.23
-1 1 1.8 0.23 1.35 -0.56
1 1 3.25 0.23 2.85 2.13
1 1 0.6 0.23 2.85 0.39
-1 1 1.35 0.23 1.35 -0.42
1 1 3.25 0.23 2.7 2.02
-1 2 0.9 0.23 0.6 -0.25
1 1 3.25 0.23 2.85 2.13
1 1 0.6 0.23 2.85 0.39
-1 1 1.35 0.23 1.35 -0.42
1 1 5.93 0.23 2.55 3.48
-1 1 1.35 0.23 1.35 -0.42
-1 1 0.9 0.23 0.6 -0.12
1 1 1.5 0.23 2.7 0.93
1 1 3.95 0.23 2.7 2.45
-1 1 1.35 0.23 1.35 -0.42
1 1 1.51 0.23 3.02 1.05
1 1 1.51 0.23 3.02 1.05
1 1 2.507 0.23 2.77 1.60
-1 1 0.9 0.23 2.1 -0.43
1 1 4.93 0.23 2.62 2.97
-1 1 1.35 0.23 0.9 -0.28
1 1 2.35 0.23 2.85 1.54
-1 1 1.35 0.23 0.9 -0.28
1 1 3.41 0.23 2.77 2.17
1 1 0.6 0.23 2.77 0.38
-1 1 1.05 0.23 2.1 -0.51
-1 1 0.9 0.23 2.1 -0.43
1 1 1.95 0.23 2.85 1.28
Innerwall 0.00
1 1 3.63 0.23 2.77 2.31
1 1 3.95 0.23 2.7 2.45
-1 1 0.9 0.23 2.1 -0.43
1 1 2.5 0.23 2.77 1.59
-1 1 0.75 0.23 2.1 -0.36
1 1 3.58 0.23 2.7 2.22
1 1 3.95 0.23 2.7 2.45
-1 1 0.9 0.23 2.1 -0.43
1 1 1.29 0.23 2.7 0.80
1 1 3.25 0.23 2.7 2.02
-1 1 0.9 0.23 2.1 -0.43
-1 1 0.75 0.23 2.1 -0.36
unit 2
External wall 1 1 3.95 0.23 2.77 2.52
-1 1 1.35 0.23 1.35 -0.42
1 1 3.5 0.23 2.77 2.23
-1 1 1.8 0.23 1.35 -0.56
1 1 3.25 0.23 2.85 2.13
1 1 0.6 0.23 2.85 0.39
existing doctor qtrs to existing group D qtrs 1 40 3.00 0.23 1.80 27.60
coping
ssm coping
old hospital front 1 1 41.60 0.45 0.10 1.87
old hospital and old qtrs b/w 1 1 139.40 0.45 0.10 6.27
brick coping
old hospital front 1 1 41.60 0.23 0.08 0.77
pillar 1 11 0.30 0.22 0.08 0.06
Entrance gate to existing doctor qtrs 1 10 3.00 0.45 0.08 1.08
1 1 2.40 0.45 0.08 0.09
1 1 5.50 0.45 0.08 0.20
piller 0.00
1 11 0.45 0.45 0.08 0.18
1 2 0.45 0.45 0.08 0.03
0.00
existing doctor qtrs to existing group D qtrs 1 40 3.00 0.45 0.08 4.32
0.00
piller 1 1 0.45 0.45 0.08 0.02
1 6 0.60 0.45 0.08 0.13
Total Qty cum 15.01
KSRB 6-7.4 : Construction of partition wall 11.2 cms thick with non-modular ground moulded burnt bricks of
class designation 5.0 Newton per sqmm with cement mortar 1:4 including cost of materials, labour charges,
23 scaffolding, curing complete as per specifications. Specification No. KBS 6.2 ---- etc., complete with all lead &
lift, as per specifications and as per directions of the Engineer in charge of the work.
including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding,
38
including cost of materials, labour, curing complete as per specifications. ---- complete with all lead and lift
loading and un loading charges etc,. complete as per the direction of the engineer in charge of work.
Wall plastering
First floor (Mid block - Right side)
SPI ward 1 2 6.00 1.95 23.40
1 2 5.17 1.95 20.16
SPI ward 1 2 6.00 1.95 23.40
1 2 5.17 1.95 20.16
1 2 3.90 1.35 10.53
Ceramic tiles
Mid block (Right side)
First floor
Toilet 1 2 2.68 6.00 32.16
N/s s/n 1 1 1.35 1.50 2.03
spl ward 1 2 1.50 2.40 7.20
Door jambs 1 2 1.00 0.20 0.40
1 3 0.90 0.20 0.54
Rear block (left side)
Ground floor
vetrified tiles
Mid block right side (first floor)
wards 1 1 6.00 6.00 36.00
1 1 7.86 6.00 47.16
ward store 1 1 6.00 6.00 36.00
spl wards 1 2 5.17 6.00 62.04
N/s s/n 1 1 2.40 3.00 7.20
1 1 2.02 3.00 6.06
1 1 1.58 1.40 2.21
Door jambs 1 5 1.50 0.20 1.50
1 2 1.00 0.10 0.20
Rear block (Left side)
Ground floor
outborn unit and inborn unit 1 2 6.00 6.00 72.00
control room 1 1 3.00 6.00 18.00
Nurses rest 1 1 2.89 2.40 6.94
Pathology 1 1 4.00 2.10 8.40
wash area 1 1 2.39 1.32 3.15
Doctors room 1 1 2.77 3.53 9.78
step down/ breast feeding 1 1 3.00 3.53 10.59
kangroo (mother care) 1 1 3.00 3.53 10.59
Clt room 1 1 2.17 1.80 3.91
Door jambs 1 3 1.50 0.20 0.90
1 6 1.00 0.20 1.20
1 2 0.90 0.20 0.36
First floor
seminar hall 1 1 9.23 6.00 55.38
library 1 1 6.00 6.00 36.00
skill station 1 1 10.23 6.16 63.02
pantry 1 1 3.00 3.53 10.59
post operative ward 1 1 6.00 3.53 21.18
Door jambs 1 3 1.50 0.20 0.90
1 1 1.00 0.20 0.20
TOTAL sqm 531.45
KSRB 9-27.1 : Fixing of door frame in an existing opening including embeeding frame in floor and walls after
cutting masonry for holdfasts for embedding holdfast in cement concrete 1:3:6 of 20mm and down size granite
metal painting two coats of coal tar to sides of frame, making good the damages to walls and floor as required
57 and disposal of the debries with lead upto 50 m. including cost of materials, labour charges, complete as per
specifications. ---- etc., complete with all lead & lift, as per specifications and as per directions of the Engineer
in charge of the work.
Doors Frames
MCH rear block
D {1.50*2.40) 1 3 3.00
D1 (1.00*2.40) 1 6 6.00
D2 (0.90*2.40) 1 2 2.00
Mid block
D(1.5*2.4) 1 5 5.00
D1(1*2.4) 1 4 4.00
D2(0.9*2.4) 1 2 2.00
TOTAL Nos 22.00
For roof slab & terraces Providing & applying water proofing to roof slab, terraces, landscape area, podium
etc., using modified polyurethane cures (conforming to ASTM C836-84) to give a tough elastomeric
waterproof membrane on the surface. The surface shall be cleaned free from dust and other particle before
58 usage. standards & methodology : This compound has a medium viscosity grade with 620% of
elongation and shall be done either by roller application/brush application/ spray. This will be applied for a
thickness of 1.3mm first layer 0.5mm & 2nd layer 0.8mm. After applying the 2nd layer sand sprinkle shall be
done to provide mechanical key. ---- etc., complete with all lead & lift, as per specifications and as per
directions of theMid Block in
Engineer Right Sideof the work.
charge
Water proof work Sqm 1 1 18.69 15.32 286.33
Grooves
H 3 2 34.00 204.00
2 1 13.50 27.00
V 1 26 3.95 102.70
TOTAL Rmt 333.70
Supplying of 1.1 KV LT UG cable having aluminum conductor PVC insulated, extruded inner sheathed,
galvanized, steel strip (except 2CX10Sq.mm wire armoured) confirming to IS-3975:1990 (No. of Strip indicated
205 in GTP) & extruded PVC outer sheathed armoured cable with specified IS-1554 Part-1:1988 & confirming to
GTP of GROUP-A. - 2 core 10 sqmm ---- etc., complete with all lead & lift, as per specifications and as per
directions of the Engineer in charge of the work.
1500 ###
20 ###
9000 ###
50 ###
50 ###
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in
position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever
11 necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of
machinery complete as per Specification etc., complete as per specification with all lead and lift and as per directions of the
Engineer-in-charge of the work.
D Group Qtrs Stair case
1st Flight
Waist slab Bottom 10 1 10 4.65 46.50
Dist 8 1 17 1.1 18.70
top Bar 10 1 10 0.7 7.00
Dist 8 1 4 1.1 4.40
top Bar 10 1 10 2.05 20.50
Dist 8 1 5 1.1 5.50
Slab Bottom 10 1 10 1.35 13.50
Dist 8 1 5 2.25 11.25
top 10 1 10 1.35 13.50
8 1 4 2.25 9.00
Beams
Bottom 16 1 2 3.1 6.20
extra 12 1 2 2.7 5.40
top Bar 16 1 2 3.1 6.20
extra 16 2 2 1.1 4.40
Stirrups 8 1 13 0.95 12.35
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
D qtrs Ground Floor
x-direction
D8-B8(230*450)
Bottom bars 16 2 2 5.5 22.00
extra 16 2 1 2.60 5.20
top bars 12 2 2 5.50 22.00
extra 16 2 2 1.90 7.60
stirrups 8 2 20 1.20 48.00
A7-C7-
E7(230*300,230*450)
Bottom bars 16 2 2 4.25 17.00
extra 12 2 1 2.00 4.00
Bottom bars 12 2 2 4.25 17.00
extra 12 2 2 2.10 8.40
top bars 12 2 2 7.85 31.40
extra 12 2 2 1.6 6.40
extra 12 2 2 1.4 5.60
extra 12 2 2 2.10 8.40
stirrups 8 2 16 1.30 41.60
8 2 18 0.95 34.20
C'7-E'7(230*450)
Bottom bars 12 2 2 4.25 17.00
extra 12 2 2 2.1 8.40
top bars 12 2 2 4.25 17.00
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
stirrups 8 2 16 1.20 38.40
A6-C6(230*450)
Bottom bars 16 2 2 4.35 17.40
extra 12 2 1 2.2 4.40
top bars 12 2 2 4.35 17.40
extra 12 2 2 1.60 6.40
stirrups 8 2 19 1.20 45.60
C'6-F5(230*450)
Bottom bars 16 2 2 4.95 19.80
extra 16 2 2 2.65 10.60
top bars 12 2 2 4.80 19.20
extra 16 2 1 1.80 3.60
stirrups 8 2 22 1.20 52.80
Y-direction
F5-F7(230*450)
Bottom bars 16 2 2 5.95 23.80
extra 16 2 2 3.15 12.60
top bars 16 2 2 2.9 11.60
extra 16 2 2 2.00 8.00
stirrups 8 2 26 1.20 62.40
D'8-D8(230*300)
Bottom bars 12 2 2 3.20 12.80
extra 12 2 1 1.7 3.40
top bars 12 2 2 3.2 12.80
extra 12 2 2 1.30 5.20
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
stirrups 8 2 11 0.95 20.90
B'8-B8(230*300)
Bottom bars 12 2 2 3.20 12.80
extra 12 2 1 1.70 3.40
top bars 12 2 2 3.2 12.80
extra 12 2 2 1.3 5.20
stirrups 8 2 12 0.95 22.80
F4-F5(230*300)
Bottom bars 12 1 2 3.20 6.40
top bars 12 1 2 3.20 6.40
stirrups 8 1 13 0.95 12.35
A6-A7(230*380)
Bottom bars 16 2 2 4.65 18.60
extra 12 2 1 2.50 5.00
top bars 12 2 2 4.65 18.60
extra 12 2 4 1.60 12.80
stirrups 8 2 18 1.10 39.60
B3-B6(230*450)
Bottom bars 16 1 2 5.75 11.50
extra 16 1 1 3.1 3.10
top bars 12 1 2 5.75 11.50
stirrups 8 1 22 1.20 26.40
C1-
C8(230*300,230*450,230*3
00)
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
Bottom bars 16 1 2 3.35 6.70
16 1 3 13.50 40.50
extra 12 1 2 2.5 5.00
16 1 2 3.2 6.40
12 1 2 2.50 5.00
top bars 12 1 2 17.75 35.50
extra 12 1 2 1.75 3.50
16 2 2 2.60 10.40
stirrups 8 1 22 0.95 20.90
Slab
D'8-D8&C7-C8&B'8-B8
main Bar 8 2 11 4.80 105.60
dist 8 2 10 2.50 50.00
8 2 8 3.50 56.00
8 2 9 2.50 45.00
top bars 8 2 7 4.8 67.20
extra 8 2 4 1 8.00
8 2 4 1.20 9.60
dist 8 2 4 2.50 20.00
extra 8 2 4 0.80 6.40
dist 8 2 8 2.50 40.00
extra 8 2 3 0.80 4.80
S1(C6-C7&A6-A7
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
Bottom bars 8 2 6 3.85 46.20
8 2 6 3.7 44.40
8 2 6 3.70 44.40
8 2 6 4.60 55.20
dist 8 2 5 5.20 52.00
8 2 6 4.60 55.20
8 2 9 4.10 73.80
top bars 8 2 5 5.70 57.00
8 2 5 4.10 41.00
extra 8 2 6 1.60 19.20
dist 8 2 6 3.60 43.20
8 2 6 3.60 43.20
extra 8 2 8 1.00 16.00
S4 (E'7-E7&C'7C7)
Bottom bars 8 2 8 3.40 54.40
dist 8 2 17 2.10 71.40
top bars 8 2 8 3.40 54.40
dist 8 2 17 2.10 71.40
S1(F5-E'7-C'6-C'7
Bottom bars 8 2 18 3.50 126.00
dist 8 2 15 4.30 129.00
top bars 8 2 11 3.50 77.00
extra 8 2 11 1.00 22.00
top dist 8 2 9 4.00 72.00
extra 8 2 7 1.00 14.00
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
S5(C3-C6,B3-B6
Bottom bars 8 1 13 2.65 34.45
8 1 17 3.40 57.80
dist 8 1 11 6.00 66.00
8 1 9 6.80 61.20
extra 8 1 3 2.10 6.30
dist 8 1 15 2.70 40.50
extra 8 1 9 0.85 7.65
10 1 43 1.00 43.00
staircase
Bottom bars 10 1 10 4.50 45.00
dist 8 1 16 1.05 16.80
top bars 10 1 10 0.75 7.50
dist 8 1 8 1.05 8.40
10 1 10 2.00 20.00
Bottom bars 10 1 10 1.20 12.00
top 10 1 10 1.30 13.00
Total Length in Metres 2521.25 241.50 376.50 273.20 0.00 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 995.89 149.01 334.33 431.66 0.00 0.00 0.00
GRAND TOTAL 1910.89 kgs
1.91 MT
Dia of bars in mtrs
BOQ
No Dia in Lengt
Description mm Nos h 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in
position, lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever
11 necessary complete as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of
machinery complete as per Specification etc., complete as per specification with all lead and lift and as per directions of the
Engineer-in-charge of the work.
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
top Bar 16 1 2 3.1 6.20
Top extra 16 2 2 1.1 4.40
Stirrups 8 1 14 0.95 13.30
Nurse qtrs Ground
Floor Roof Beams
x-direction
A7-A6(230*300)
Bottom Bar 12 2 2 3.95 15.80
Bottom extra 12 2 1 2.20 4.40
top bar 12 2 2 3.95 15.80
top extra 12 2 2 1.40 5.60
stirrups 8 2 15 0.95 28.50
C7-C6(230*450)
Bottom Bar 12 2 2 4.15 16.60
Bottom extra 12 2 1 2.20 4.40
top bar 12 2 2 4.15 16.60
top extra 12 2 2 1.40 5.60
stirrups 8 2 15 1.20 36.00
D8-D6(230*450)
Bottom Bar 16 2 2 5.05 20.20
Bottom extra 12 2 2 2.55 10.20
top bar 16 2 2 5.05 20.20
stirrups 8 2 19 1.20 45.60
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
E7-E6-E5(230*380)
Bottom Bar 16 2 2 8.30 33.20
Bottom extra 12 2 1 2.1 4.20
12 2 2 2.6 10.40
top bar 12 2 2 8.35 33.40
top extra 16 2 2 1.50 6.00
16 2 2 2.10 8.40
16 2 1 1.1 2.20
stirrups 8 2 38 1.20 91.20
F7-F6(230*300)
Bottom Bar 12 2 2 3.90 15.60
extra 12 2 1 2.60 5.20
top bar 12 2 2 3.90 15.60
top extra 12 2 2 1.10 4.40
stirrups 8 2 15 0.95 28.50
F'5-F'6(230*300)
Bottom Bar 16 2 2 4.05 16.20
Bottom extra 12 2 1 2.10 4.20
top bar 12 2 2 4.05 16.20
stirrups 8 2 16 0.95 30.40
B5-B'5(230*300)
Bottom Bar 12 2 2 4.05 16.20
Bottom extra 12 2 1 2.10 4.20
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
top bar 12 2 2 4.05 16.20
top extra 12 2 1 1.15 2.30
stirrups 8 2 16 0.95 30.40
C'4-C'5(230*300)
Bottom Bars 12 1 2 3.3 6.60
Bottom extra 12 1 1 1.80 1.80
top bar 12 1 2 3.30 6.60
stirrups 8 1 13 0.95 12.35
E'4-E'5(230*300)
Bottom bars 16 1 2 3.30 6.60
Bottom extra 12 1 1 1.65 1.65
top bar 12 1 2 3.3 6.60
stirrups 8 1 14 0.95 13.30
F4-F5(230*300)
Bottom Bar 12 1 2 3.30 6.60
extra 12 1 1 1.65 1.65
top bar 12 1 2 3.30 6.60
extra 12 1 9 1 9.00
stirrups 8 1 14 0.95 13.30
y-direction
B5-E5-
F5(230*450,230*300)
Bottom Bars 16 1 2 5.95 11.90
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
Bottom extra 16 1 2 3.10 6.20
Bottom bars 12 1 2 4.30 8.60
Bottom extra 12 1 1 2.2 2.20
top bar 12 1 2 8.9 17.80
top extra 12 1 1 1.20 1.20
top extra 16 1 2 2.50 5.00
top extra 16 1 2 1.60 3.20
stirrups 8 1 33 1.20 39.60
8 1 19 0.95 18.05
A6-C6-E6-F6
(230*300,230*450,230*3
00)
Bottom bar 16 1 2 4.5 9.00
bottom extra 16 1 1 2.10 2.10
Bottom Bar 16 1 2 4.10 8.20
Bottom extra 16 1 1 2.00 2.00
E6-F6 bottom bar 16 1 2 4.50 9.00
Bottom extra 12 1 1 2.20 2.20
top bar 12 1 2 10.45 20.90
top extra 12 1 2 1.2 2.40
top extra 16 1 1 2.1 2.10
top extra 16 1 1 2.10 2.10
stirrups 8 1 29 0.95 27.55
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
8 1 19 1.20 22.80
A7-C7-D7
(230*300,230*450)
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
F6-F7,E6-E7
Main bars 8 2 10 3.75 75.00
8 2 10 3.95 79.00
dist 8 2 5 4.60 46.00
8 2 5 3.60 36.00
8 2 9 3.60 64.80
top 8 2 9 3.95 71.10
8 2 5 1.10 11.00
top dist 8 2 5 3.60 36.00
8 2 7 0.95 13.30
E6-E8,D6-D8
Main bars 8 2 10 2.70 54.00
8 2 3 1.90 11.40
8 2 10 1.90 38.00
8 2 3 1.90 11.40
8 2 5 4.50 45.00
8 2 5 4.50 45.00
top bar 8 2 13 1.90 49.40
8 2 7 0.60 8.40
top dist 8 2 5 5.20 52.00
8 2 3 1.10 6.60
D6-D7,C6-C7
Bottom main 8 2 18 3.50 126.00
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
dist 8 2 8 1.80 28.80
top main 8 2 18 3.50 126.00
dist 8 2 8 1.80 28.80
C6-C7,A6-A7
Bottom main 8 2 6 3.50 42.00
8 2 9 3.50 63.00
8 2 5 4.40 44.00
dist 8 2 9 3.40 61.20
8 2 9 3.45 62.10
top main 8 2 9 3.45 62.10
8 2 7 1.00 14.00
dist 8 2 5 3.50 35.00
8 2 4 4.50 36.00
extra 8 2 9 1.00 18.00
S1 (E5-E6) (B5-B'5)
Bottom main 8 2 6 4.60 55.20
8 2 8 3.60 57.60
8 2 7 4.50 63.00
8 2 6 3.60 43.20
8 2 10 4.60 92.00
8 2 4 3.60 28.80
dist 8 2 5 5.80 58.00
8 2 6 5.30 63.60
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
8 2 11 5.30 116.60
top main 8 2 5 5.80 58.00
8 2 4 1.40 11.20
dist 8 2 10 4.60 92.00
8 2 9 4.60 82.80
8 2 7 1.00 14.00
8 2 2 1.60 6.40
S3(F'5-F'6,E5-E6
Bottom main 8 2 10 3.80 76.00
8 2 10 2.55 51.00
dist 8 2 4 3.50 28.00
8 2 4 4.30 34.40
8 2 7 3.50 49.00
top bar 8 2 7 3.50 49.00
extra 8 2 4 1.00 8.00
dist 8 2 9 2.50 45.00
8 2 5 0.70 7.00
chair 10 2 21 1.00 42.00
S5(E'4-E'5,C'4-C'5)
Bottom main 8 1 15 2.80 42.00
8 1 9 3.60 32.40
dist 8 1 7 2.80 19.60
top main 8 1 8 4.30 34.40
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
dist 8 1 7 2.80 19.60
8 1 7 0.70 4.90
Staircase Bottom 10 1 11 1.40 15.40
dist 8 1 2 1.60 3.20
top 10 1 11 1.40 15.40
dist 8 1 2 1.60 3.20
main 10 1 11 4.60 50.60
dist 8 1 18 1.00 18.00
top 10 1 11 0.60 6.60
dist 8 1 3 1.00 3.00
top bar 10 1 11 2.30 25.30
dist 8 1 5 1.00 5.00
chair 10 1 6 1.00 6.00
Total Length in Metres 3421.90 277.35 413.75 0.00 0.00 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 1351.65 171.12 367.41 0.00 0.00 0.00 0.00
GRAND TOTAL 1890.19
MT 1.89
Dia of bars in mtrs
BOQ
Description Dia in
No
mm Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
H1-F1(230*300),F1-
D1(230*450),D1B1(230*300)
Bottom bar 12 1 2 4.30 8.60
16 1 2 4.40 8.80
12 1 2 4.30 8.60
Bottom extra 12 1 2 2.20 4.40
16 1 2 2.2 4.40
top bars 12 1 2 11.2 22.40
top extra 12 1 2 1.30 2.60
16 1 4 2.00 8.00
stirrups 8 1 34 0.95 32.30
8 1 28 1.20 33.60
H'2-E2(230*450),F2-D2(230*450),D2-
A2(230*380)
Bottom bar 16 1 2 8.3 16.60
16 1 2 4.95 9.90
Bottom extra 16 1 1 2.45 2.45
16 1 2 2.22 4.44
12 1 1 2.20 2.20
Top bars 12 1 2 12.85 25.70
top extra F2 16 1 3 2.15 6.45
D2 16 1 3 2.15 6.45
H2 16 1 2 1.60 3.20
stirrups 8 1 22 1.12 24.64
8 1 50 1.30 65.00
C'3-E3-C3(230*380) C3-A3(230*300)
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping
and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design
11
(laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per Specification etc.,
complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
B24(230*600)
Bottom bar 16 1 3 7.00 21.00
extra 16 1 2 5.00 10.00
Top bar 12 1 2 7.00 14.00
Top extra bar 16 1 3 2.20 6.60
16 1 3 2.20 6.60
Stirrups 8 1 43 1.56 67.08
B46(230*600)
Bottom bar 20 1 3 13.20 39.60
extra 16 1 2 5.00 10.00
Top bar 16 1 2 13.20 26.40
Top extra bar 16 1 2 2.50 5.00
20 1 4 3.90 15.60
C25 16 1 2 2.10 4.20
Stirrups 10 1 8 1.56 12.48
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
B47(230*600)
Bottom bar 20 1 3 13.20 39.60
extra 16 1 2 4.75 9.50
Top bar 16 1 2 4.70 9.40
Top extra bar 20 1 2 13.20 26.40
20 1 4 3.40 13.60
Stirrups 10 1 90 1.56 140.40
B48(230*600)
Bottom bar 16 1 2 8.10 16.20
16 1 3 6.80 20.40
extra 16 1 3 4.40 13.20
16 1 2 2.60 5.20
Top bar 16 1 2 13.20 26.40
extra 16 1 2 1.40 2.80
16 1 2 2.20 4.40
16 1 3 3.00 9.00
16 1 2 1.90 3.80
Stirrups 8 1 42 1.56 65.52
10 1 47 1.15 54.05
B50(230*600)
Bottom bar 16 1 3 6.80 20.40
extra 16 1 2 4.40 8.80
Top bar 16 1 2 6.80 13.60
Top extra bar 16 1 3 2.40 7.20
16 1 3 2.45 7.35
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Stirrups 8 1 38 1.56 59.28
B51(230*600)
Bottom bar 16 1 3 6.80 20.40
extra 16 1 2 4.95 9.90
Top bar 16 1 2 6.80 13.60
Stirrups 8 1 44 1.56 68.64
B49(230*600)
Bottom bar 16 1 2 4.30 8.60
extra 16 1 2 4.30 8.60
Top bar 16 1 2 4.30 8.60
Top extra bar 12 1 2 1.35 2.70
Stirrups 8 1 25 1.15 28.75
X- direction
A7-A6 & A2-A3 (230*300)
Bottom bar 12 2 2 3.80 15.20
extra 12 1 2 2.10 4.20
Top bar 12 2 2 5.80 23.20
Top extra bar 12 2 2 1.30 5.20
Stirrups 8 2 14 0.95 26.60
C6-C7 & C2-C3 (230*450)
Bottom bar 12 2 2 4.05 16.20
extra 12 2 1 2.10 4.20
Top bar 12 2 2 4.05 16.20
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Top extra bar 12 2 2 1.30 5.20
Stirrups 8 2 14 1.20 33.60
D8-D6 & D1-D3 (230*450)
Bottom bar 16 2 2 4.90 19.60
extra 12 2 2 2.50 10.00
Top bar 16 2 2 4.90 19.60
Stirrups 8 2 18 1.20 43.20
E1-E3-E4 & E5-E6-E7
(230*380)
Bottom bar 16 2 2 8.20 32.80
extra 12 2 1 2.00 4.00
12 2 2 2.50 10.00
Top bar 12 2 2 8.20 32.80
extra bar 16 2 2 1.40 5.60
16 2 2 2.00 8.00
16 2 1 1.00 2.00
Stirrups 8 2 38 1.10 83.60
F7-F6 & F2-F3 (230*300)
Bottom bar 12 2 2 3.80 15.20
extra 12 2 1 2.50 5.00
Top bar 12 2 2 3.80 15.20
12 2 2 1.00 4.00
Stirrups 8 2 14 0.95 26.60
F'5-F'6 & F'3-F'4 (230*300)
Bottom bar 16 2 2 3.90 15.60
extra 12 2 1 2.00 4.00
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Top bar 12 2 2 3.90 15.60
Stirrups 8 2 15 0.95 28.50
B5-B'5 & B'4-B4 (230*300)
Bottom bar 12 2 2 3.90 15.60
extra 12 2 1 2.00 4.00
Top bar 12 2 2 3.90 15.60
extra 12 2 1 1.10 2.20
Stirrups 8 2 15 0.95 28.50
C'4-C'5 (230*300)
Bottom bar 12 1 2 3.15 6.30
extra 12 1 1 17.00 17.00
Top bar 12 1 2 3.15 6.30
Stirrups 8 1 12 0.95 11.40
E'4-E'5 (230*300)
Bottom bar 16 1 2 3.15 6.30
extra 12 1 1 1.55 1.55
Top bar 12 1 2 3.15 6.30
Stirrups 8 1 13 0.95 12.35
F4-F5 (230*300)
Bottom bar 12 1 2 3.15 6.30
extra 12 1 1 1.55 1.55
Top bar 12 1 2 3.15 6.30
12 1 2 1.00 2.00
Stirrups 8 1 13 0.95 12.35
Y- direction
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
B5-E5-F5 & B4-E4-F4
(230*450, 230*300)
Bottom bar 16 2 2 5.80 23.20
extra 16 2 2 3.00 12.00
Bottom bar 12 2 2 4.20 16.80
extra 12 2 1 2.00 4.00
Top bar 12 2 2 8.80 35.20
extra 12 2 1 1.10 2.20
extra 16 2 2 2.40 9.60
16 2 2 1.50 6.00
Stirrups 8 2 32 1.20 76.80
8 2 18 0.95 34.20
A6-C6-E6-F6 & A3-C3-E3-F3
(220*300, 230*450, 230*300)
Bottom bar 16 2 2 4.35 17.40
extra 16 2 1 2.00 4.00
Bottom bar 16 2 2 4.00 16.00
extra 16 2 1 1.90 3.80
Bottom bar 16 2 2 4.30 17.20
extra 12 2 1 2.10 4.20
Top bar 12 2 2 10.30 41.20
extra 12 2 2 1.10 4.40
16 2 1 2.00 4.00
16 2 1 2.00 4.00
Stirrups 8 2 28 0.95 53.20
8 2 18 1.20 43.20
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
A7-C7-D7 & A2-C2-D2
(230*450, 230*300)
Bottom bar 12 2 2 4.10 16.40
extra 12 2 1 1.80 3.60
Bottom bar 12 2 3 2.30 13.80
Top bar 12 2 2 5.60 22.40
extra 12 2 1 1.50 3.00
extra 12 2 2 1.20 4.80
Stirrups 8 2 7 1.20 16.80
8 2 14 0.95 26.60
D8-E8 & D1-E1 (230*300)
Bottom bar 12 2 2 2.30 9.20
Top bar 12 2 2 2.30 9.20
Stirrups 8 2 9 0.95 17.10
E7-F7 & E2-F2 (230*300)
Bottom bar 12 2 2 3.80 15.20
extra 12 2 1 2.00 4.00
Top bar 12 2 2 3.80 15.20
extra 12 2 2 1.00 4.00
Stirrups 8 2 13 0.95 24.70
Slab reinforcement
C10 to C11 ,C24-C25
Bottom main bar 12 1 31 4.45 137.95
crank Distribution plain 12 1 30 5.20 156.00
Distribution plain 12 1 14 6.60 92.40
crank 12 1 13 6.70 87.10
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Top bar 12 1 28 4.45 124.60
Distribution 12 1 12 6.60 79.20
Top bar extra 12 1 17 1.20 20.40
12 1 16 1.70 27.20
C11 to C25 ,C12-C26
Bottom main bar 8 1 61 7.16 436.76
plain 8 1 18 6.45 116.10
crank 8 1 17 8.30 141.10
top bar 8 1 20 7.16 143.20
8 1 16 1.50 24.00
extra 12 1 16 2.10 33.60
C20 to C21 ,C26-C27
8 1 10 3.95 39.50
bottom bar 8 1 8 5.30 42.40
distribution 8 1 11 3.46 38.06
crank 8 1 10 5.80 58.00
top bar 8 1 10 5.20 52.00
8 1 12 5.70 68.40
extra 8 1 12 1.80 21.60
8 1 6 1.20 7.20
8 1 7 1.70 11.90
C21 to C22 ,C27-C28
bottom bar 10 1 52 3.96 205.92
crank 10 1 50 4.7 235.00
distribution 10 1 21 6.45 135.45
crank 10 1 20 7.45 149.00
top bar 10 1 32 4.7 150.40
distribution 10 1 12 7.35 88.20
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
top extra 10 1 9 2.60 23.40
10 1 9 1.20 10.80
10 1 20 1.20 24.00
10 1 20 1.70 34.00
C1 to C4 ,C11-C14
bottom bar 8 1 82 6.45 528.90
distribution 8 1 33 15.65 516.45
8 1 31 16.45 509.95
top bar 8 1 30 15.65 469.50
top extra 8 1 115 2.10 241.50
8 1 58 1.20 69.60
Total chairs 10 1 100 1.20 120.00
spear bar 25 1 35 0.20 7.00
Terson mat
bottom bar 10 8 11 1.50 132.00
distribution 10 8 11 1.50 132.00
bottom bar 10 2 21 1.50 63.00
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
distribution 10 2 11 1.50 33.00
Total Length in Metres 5558.50 1852.84 1315.15 810.00 367.75 79.10 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 2195.61 1143.20 1167.85 1279.80 908.34 288.72 0.00
GRAND TOTAL QTY IN KGS 6983.52 kgs
GRAND TOTAL QTY IN MT 6.98 MT
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping
and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per
11
design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per Specification
etc., complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
NURSE Quarters
Column Ground floor top to
First Floor roof top
A2,A3,A6,A7,F2,F3,F4,F5,F6,F
7,C2,C7 (230*380)
main 12 12 8 3.15 302.40
stirrups 8 12 14 1.1 184.80
8 12 14 0.85 142.80
B4,B5,D8,E8,D1,E1(230*380)
main 16 6 8 3.15 151.20
stirrups 8 6 14 1.1 92.40
8 6 14 0.85 71.40
C3,C6(230*380)
main 16 2 8 3.15 50.40
stirrups 8 2 14 1.1 30.80
stirrups 8 2 14 0.85 23.80
E3,E4,E5,E6(230*450)
main 20 4 4 3.15 50.40
16 4 4 3.15 50.40
stirrups 8 4 14 1.25 70.00
Dia of bars in mtrs
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
8 4 14 1 56.00
Nurse Qtrs stairecase 1 st
flight
Waist slab Bottom 10 1 11 4.7 51.70
Dist 8 1 18 1.15 20.70
top Bar 10 1 11 1.05 11.55
Dist 8 1 4 1.15 4.60
top Bar 10 1 11 2.1 23.10
Dist 8 1 5 1.15 5.75
Slab
Bottom 10 1 11 1.35 14.85
dist 8 1 5 2.25 11.25
top 10 1 11 1.35 14.85
Dist 8 1 4 2.25 9.00
Beams
Bottom 16 1 2 3.1 6.20
extra 12 1 2 2.7 5.40
top Bar 16 1 2 3.1 6.20
Top extra 16 2 2 1.1 4.40
Stirrups 8 1 14 0.95 13.30
Total Length in Metres 736.60 116.05 307.80 268.80 50.40 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 290.96 71.60 273.33 424.70 124.49 0.00 0.00
GRAND TOTAL in KG 1185.08
GRAND TOTAL in MT 1.19
D Group Qtrs
Column Ground Floor roof
top to First Floor roof top
C2,C7(230*380)
Main 16 2 8 3.15 50.40
stirrups 8 2 14 1.1 30.80
stirrups 8 2 14 0.85 23.80
B1,A2,A3,A6,A7,A8,D1,D8(230*380)
Main 12 8 8 3.15 201.60
stirrups 8 8 14 1.1 123.20
stirrups 8 8 14 0.85 95.20
B1,A2,A3,A6,A7,A8,D1,D8(230
*380)plinth top G.F=8-2=6nos
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as
11
per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per
Specification etc., complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
Doctors Qtrs
Staircase
1 st Flight
Waist slab Bottom 10 1 12 4.75 57.00
Dist 8 1 18 1.15 20.70
top Bar 10 1 12 1.05 12.60
Dist 8 1 5 1.15 5.75
top Bar 10 1 12 2.1 25.20
Dist 8 1 5 1.15 5.75
Slab Bottom 10 1 12 1.4 16.80
Dist 8 1 6 2.4 14.40
Top 10 1 12 1.4 16.80
Dist 8 1 6 2.4 14.40
Beams
Bottom 16 1 2 3.3 6.60
extra 12 1 2 2.9 5.80
top 16 1 2 3.3 6.60
extra 16 2 2 1.2 4.80
Stirrups 8 1 16 0.95 15.20
Dia of bars in mtrs
Doctors quarters
column Ground floor Roof top
to First Floor Roof top
B1,B11,H1,H11(plint top to G.F
top)
main bar 20 4 8 3.15 100.80
stirrups 8 4 14 1.12 62.72
8 4 14 0.85 47.60
B1,B11,H1,H11
main bar 20 4 8 3.15 100.80
stirrups 8 4 14 1.12 62.72
8 4 14 0.85 47.60
A8,A3,C3,C8,G8,G3(230*380)
main bar 12 6 8 3.15 151.20
stirrups 8 6 14 1.12 94.08
8 6 14 0.85 71.40
A2,A10,G5,G6(230*380)
main bar 16 4 4 3.15 50.40
12 4 4 3.15 50.40
stirrups 8 4 14 1.1 61.60
8 4 14 0.85 47.60
H2,H9,F1,D1,F11,D11(230*380)
main 16 6 6 3.15 113.40
12 6 2 3.15 37.80
stirrups 8 6 14 1.1 92.40
8 6 14 0.85 71.40
E3,E8(230*380)
Dia of bars in mtrs
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete
11
as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per
Specification etc., complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
A6-C6-E6-F6
(230*300,230*450,230*300)
Slab
D'8-D8&C7-C8&B'8-B8
main Bar 8 2 11 4.80 105.60
dist 8 2 10 2.50 50.00
8 2 8 3.50 56.00
8 2 9 2.50 45.00
top bars 8 2 7 4.8 67.20
extra 8 2 4 1 8.00
8 2 4 1.20 9.60
dist 8 2 5 2.50 25.00
extra 8 2 5 0.80 8.00
Dia of bars in mtrs
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
dist 8 2 9 2.50 45.00
extra 8 2 4 0.80 6.40
S1(C6-C7&A6-A7
Bottom bars 8 2 6 3.60 43.20
8 2 6 3.6 43.20
8 2 6 3.60 43.20
8 2 6 4.60 55.20
dist 8 2 5 5.20 52.00
8 2 6 4.60 55.20
8 2 9 4.10 73.80
top bars 8 2 5 5.70 57.00
8 2 5 4.10 41.00
extra 8 2 6 1.60 19.20
dist 8 2 6 3.60 43.20
8 2 6 3.60 43.20
extra 8 2 8 1.00 16.00
S4 (E'7-E7&C'7C7)
Bottom bars 8 2 8 3.40 54.40
dist 8 2 17 2.10 71.40
top bars 8 2 8 3.40 54.40
dist 8 2 17 2.10 71.40
S1(F5-E'7-C'6-C'7
Bottom bars 8 2 18 3.50 126.00
dist 8 2 15 4.30 129.00
top bars 8 2 11 3.50 77.00
extra 8 2 11 1.00 22.00
top dist 8 2 9 4.00 72.00
extra 8 2 7 1.00 14.00
S5(C3-C6,B3-B6
Bottom bars 8 1 13 2.65 34.45
8 1 17 3.40 57.80
dist 8 1 11 6.00 66.00
8 1 9 6.80 61.20
Dia of bars in mtrs
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
extra 8 1 3 2.10 6.30
dist 8 1 15 2.70 40.50
extra 8 1 9 0.85 7.65
10 1 43 1.00 43.00
staircase
Bottom bars 10 1 10 4.50 45.00
dist 8 1 16 1.05 16.80
top bars 10 1 10 0.75 7.50
dist 8 1 8 1.05 8.40
10 1 10 2.00 20.00
Bottom bars 10 1 10 1.20 12.00
top 10 1 10 1.30 13.00
Total Length in Metres 2463.70 140.50 0.00 0.00 0.00 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 973.16 86.69 0.00 0.00 0.00 0.00 0.00
GRAND TOTAL 1059.85 kgs
1.06 MT
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping
and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design
11
(laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per Specification etc.,
complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
B51(230*600)
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Bottom bar 16 1 3 6.80 20.40
extra 16 1 2 4.95 9.90
Top bar 16 1 2 6.80 13.60
Stirrups 8 1 44 1.56 68.64
B49(230*600)
Bottom bar 16 1 2 4.30 8.60
extra 16 1 2 4.30 8.60
Top bar 16 1 2 4.30 8.60
Top extra bar 12 1 2 1.35 2.70
Stirrups 8 1 25 1.15 28.75
X- direction
A7-A6 & A2-A3 (230*300)
Bottom bar 12 2 2 3.80 15.20
extra 12 1 2 2.10 4.20
Top bar 12 2 2 5.80 23.20
Top extra bar 12 2 2 1.30 5.20
Stirrups 8 2 14 0.95 26.60
C6-C7 & C2-C3 (230*450)
Bottom bar 12 2 2 4.05 16.20
extra 12 2 1 2.10 4.20
Top bar 12 2 2 4.05 16.20
Top extra bar 12 2 2 1.30 5.20
Stirrups 8 2 14 1.20 33.60
D8-D6 & D1-D3 (230*450)
Bottom bar 16 2 2 4.90 19.60
extra 12 2 2 2.50 10.00
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Top bar 16 2 2 4.90 19.60
Stirrups 8 2 18 1.20 43.20
Slab reinforcement
C10 to C11 ,C24-C25
Bottom main bar 12 1 31 4.45 137.95
crank Distribution plain 12 1 30 5.20 156.00
Distribution plain 12 1 14 6.60 92.40
crank 12 1 13 6.70 87.10
Top bar 12 1 28 4.45 124.60
Distribution 12 1 12 6.60 79.20
Top bar extra 12 1 17 1.20 20.40
12 1 16 1.70 27.20
C11 to C25 ,C12-C26
Bottom main bar 8 1 61 7.16 436.76
plain 8 1 18 6.45 116.10
crank 8 1 17 8.30 141.10
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
top bar 8 1 20 7.16 143.20
8 1 16 1.50 24.00
extra 12 1 16 2.10 33.60
C20 to C21 ,C26-C27
8 1 10 3.95 39.50
bottom bar 8 1 8 5.30 42.40
distribution 8 1 11 3.46 38.06
crank 8 1 10 5.80 58.00
top bar 8 1 10 5.20 52.00
8 1 12 5.70 68.40
extra 8 1 12 1.80 21.60
8 1 6 1.20 7.20
8 1 7 1.70 11.90
C21 to C22 ,C27-C28
bottom bar 10 1 52 3.96 205.92
crank 10 1 50 4.7 235.00
distribution 10 1 21 6.45 135.45
crank 10 1 20 7.45 149.00
top bar 10 1 32 4.7 150.40
distribution 10 1 12 7.35 88.20
top extra 10 1 9 2.60 23.40
10 1 9 1.20 10.80
10 1 20 1.20 24.00
10 1 20 1.70 34.00
C12 -C13 -C14 ,C20-C21-C22
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
bottom bar 8 1 25 2.85 71.25
crank 8 1 24 5.35 128.40
distribution 8 1 24 9.45 226.80
crank 8 1 8 10.25 82.00
top bar 8 1 20 2.40 48.00
top extra 8 1 20 2.60 52.00
C1 to C4 ,C11-C14
bottom bar 8 1 82 6.45 528.90
distribution 8 1 33 15.65 516.45
8 1 31 16.45 509.95
top bar 8 1 30 15.65 469.50
top extra 8 1 115 2.10 241.50
8 1 58 1.20 69.60
Total chairs 10 1 100 1.20 120.00
spear bar 25 1 35 0.20 7.00
Terson mat
bottom bar 10 8 11 1.50 132.00
distribution 10 8 11 1.50 132.00
bottom bar 10 2 21 1.50 63.00
distribution 10 2 11 1.50 33.00
Total Length in Metres 5558.50 1852.84 1315.15 810.00 367.75 79.10 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 2195.61 1143.20 1167.85 1279.80 908.34 288.72 0.00
GRAND TOTAL QTY IN KGS 6983.52 kgs
GRAND TOTAL QTY IN MT 6.98 MT
Dia of bars in mtrs
BOQ Dia in Lengt
Description Nos 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm h
Assistant Executive
Contractor PMC Assistant Engineer
Engineer
KHSDRP Sub-Division,
Bangalore
STEEL PREMEASUREMENT
Dia of bars in mtrs
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position,
lapping and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete
11 as per design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per
Specification etc., complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
Total Length in Metres 774.15 1013.16 0.00 0.00 0.00 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 305.79 625.12 0.00 0.00 0.00 0.00 0.00
GRAND TOTAL 930.91 kgs
GRAND TOTAL 0.93 MT
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including straightening, cutting, bending, hooking, placing in position, lapping
and / or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per
design (laps, hooks and wastage shall not be measured and paid) cost of materials, labour, HOM of machinery complete as per Specification
11 etc., complete as per specification with all lead and lift and as per directions of the Engineer-in-charge of the work.
Drain work
Reinforcement work
87 X 0.6 X 0.6 m ( old hospital to
septic tank)
Main bar 10 1 435 2.10 913.50
10 1 4 1.50 6.00
Distribution 8 1 11 87.50 962.50
Slab
Main bar 10 2 37 0.80 59.20
Distribution 8 2 4 5.45 43.60
31 X 0.6 X 0.8 m
Main bar 10 1 207 2.55 527.85
Distribution 8 1 13 32.50 422.50
BOQ Dia in
Description Nos Length 8mm 10mm 12mm 16mm 20mm 25mm 32mm Remarks
No mm
Main bar 10 1 99 4.80 475.20
Distribution 8 1 24 20.50 492.00
43 X 2.4 X 1.8 m
Main bar 10 1 216 6.10 1317.60
Distribution 8 1 31 44.50 1379.50
Total Length in Metres 3300.10 3299.35 0.00 0.00 0.00 0.00 0.00
Weight Coefficient in Kg/Mtr 0.395 0.617 0.888 1.58 2.47 3.650 6.320
Total in Kgs. 1303.54 2035.70 0.00 0.00 0.00 0.00 0.00
GRAND TOTAL 3339.24 kgs
GRAND TOTAL 3.34 MT