Summary of Cost

Cost of civil works without all Steel Items = 541956


Marble, Tile, Alumminium, Doors and Windows,
Ply Doors ,Paving Blocks

Add Premium on Item 1 10% = 54195.621

Total Amount = 596152

Cost Of Fabrication = 309347

Add Premium 15% = 46402

Total Amount = 355749

Cost Of Tile = 119598

Part B

Cost of GI RCC UPVC (pipes) = 35975

Add Premium 20% = 7195

Total Amount = 43170

Carriage = 48663

Contigency Lum Sum =

Total Amount = 1163331

Say =

SUB-ENGINEER ASSISSTANT ENGINEER


BUILDINGS SUB-DIVISION BUILDINGS SUB-DIVISION
KOTRI KOTRI
NA-231

1163331
NA-231

4 Excavation in foundation of building, bridges and other

structure including dag belling dressing refilling around

structure with excavated earth watering and ramming lead up

to 5' in hard soil or soft moorum (SI no.18©/Pg no.4)

Room
Footing 1x 4x 7.0 x 8.0 x 3.0 =
Footing 1x 3x 6.0 x 7.0 x 3.0 =
long Wall 1x 2x 24.25 x 2.0 x 3.0 =
Short Wall 1x 2x 12.00 x 2.0 x 3.0 =
Steps 1x 1x 8.00 x 2.0 x 3.0 =

Deduction
long Wall 3x 0.5 x 7.00 x 2.0 x 3.0 =
3x 0.5 x 8.00 x 2.0 x 3.0 =
Short Wall 3x 0.5 x 6.00 x 2.0 x 3.0 =
Short Wall 3x 0.5 x 7.00 x 2.0 x 3.0 =
long Wall 1x 1x 8.00 x 2.0 x 3.0 =
1x 1x 7.00 x 2.0 x 3.0 =

Net Quantity
1533 - 342 =
Total =

1191 x 3176.25 %0cft Rs:

5 Cement concrete brick or stone ballast1.5 inch to2 inch guage.

(b) Ratio 1:4:8(S.I.No.4 (b) /Pg no.15)

Room
Footing 1x 4x 7.0 x 8.0 x 0.5 =
long Wall 1 2x 24.25 x 2.0 x 0.5 =
Short Wall 1 2x 12.00 x 2.0 x 0.5 =
1 1x 8.00 x 2.0 x 0.5 =

Deduction

long Wall 3 0.5 x 7.00 x 2.0 x 0.5 =


3 0.5 x 6.00 x 2.0 x 0.5 =
Short Wall 3 0.5 x 7.00 x 2.0 x 0.5 =
Short Wall 1 1x 8.00 x 2.0 x 0.5 =
long Wall 1 1x 7.00 x 2.0 x 0.5
NA-231

Net Quantity
192.5 - 45 =
Total =

147.5 x 9416.28 %Cft Rs:

6 Erection and removal of centering for RCC or Plain cement


concrete works of Partial Wood 2nd Class Vertical (SI no 19b
pg-17)
Room Long Wall 2x 2x 24.25 x 4.5 x 1.0 =
Room Short Wall 2x 2x 12.00 x 4.5 x 1.0
2x 1x 8.00 x 4.5 x 1.0

Deductions
Footing 2x 3x 0.50 x 7.00 x 1.5 =
2x 3x 0.50 x 6.00 x 1.5 =
2x 3x 0.50 x 7.00 x 1.5 =
2x 1x 1.00 x 8.00 x 1.5 =
2x 1x 1.00 x 7.00 x 1.5 =
Pedastal Column 2 7x 1.00 x 1.5 x 3.0 =

Net Quantity 724.5 - 198 =


526.5 x 3127.41 %Sft Rs

7 Cement Concrete plain including placing, compacting, finishing


and curing complete including screening and washing stone
aggregate Ratio 1:2:4 (Sl no 5(f) pg-
17)

Room
long Wall 1 2x 24.25 x 1.0 x 4.5 =
Short Wall 1 2x 12.00 x 1.0 x 4.5 =
Flooring 1 1x 8.00 x 1.0 x 4.5 =

Deductions
Footing 3x 0.5 x 7.00 x 1x 1.5 =
3x 0.5 x 6.00 x 1x 1.5 =
3x 0.5 x 7.00 x 1x 1.5 =
1x 1x 8.00 x 1x 1.5 =
1x 1x 7.00 x 1x 1.5 =
Pedastal 7x 1x 1.5 x 1x 3.0 =

Net Quantity 362.3 - 99 =


263.3 x 14429.25 %Cft Rs

8 RCC work 1:2:4 i/c all labour and material except the cost of steel
reinf: & its labour for bending & binding which will be paid
separately. This rate also i/cs all kinds of forms moulds lifting
NA-231

RCC work 1:2:4 i/c all labour and material except the cost of steel
reinf: & its labour for bending & binding which will be paid
separately. This rate also i/cs all kinds of forms moulds lifting
shuttering curing rendering and finishing the exposed surface (i/c
screening & washing of shingle) (a) RCC work in roof slabs
beams, coloumns, rafts lintels and other structural members laid
in situ or precast laid in position complete in all respects.
(SI.No:6(a)/Pg no.16/17)

Footing 1x 3x 6.00 x 7.0 x 1.5 =


1x 3x 5.00 x 6.0 x 1.5 =
Pedestal Column 1x 6x 1.00 x 1.5 x 3.0 =
Plinth Beam 1x 2x 24.25 x 1.00 x 1.5 =
Plinth Beam 1x 2x 12.00 x 1.00 x 1.5 =
1x 1x 8.00 x 1.00 x 1.5
Super Column 1x 6x 1.00 x 0.75 x 10 =
Roof Beam 1x 2x 24.25 x 0.75 x 2=
1x 2x 12.00 x 0.75 x 2=
1x 1x 8.00 x 0.75 x 2
Slab 1x 1x 15.13 x 13.50 x 0.5 =
1x 1x 8.375 x 9.50 x 0.5 =

779 x 337 P.cft Rs:

9 Fabrication of Mild Steel Rienforcement for cement concrete including


cutting bending laying in postion making joints and fastenings including
cost of binding wires (S.I.No.8(b)/Pg no.17)

1x 1x 779 x 7 =
Total =

5455.63 / 112

48.71 x 5001.7 p.cwt Rs:

12 Filling watering and ramming earth in floors with surplus


earth from foundation lead up to one chain and lift upto
5 feet Item 21 Pg 4 Chapter Excavation

Same Quantity Item no 1


1x 1x 1191 x 2/ 3= 794

794 x 1512.5 %0cft Rs:

13 Filling watering and ramming earth in floors with new


earth excavated from outside up to one chain and lift
upto 5 feet Item 22 Pg 4 Chapter Excavation
NA-231

Filling watering and ramming earth in floors with new


earth excavated from outside up to one chain and lift
upto 5 feet Item 22 Pg 4 Chapter Excavation

1 x 1 22.75 x 12.00 x 3.5 = 955.5

955.5 x 3630 %0cft Rs:

14 Compaction by Rolling this does not include the charges


of the roller in ordinary soft soil Item no 13C-iii GSI

1 x 1 22.75 x 12.00 x 3.5 = 955.5


###

955.5 x 756 %0cft Rs:

15 Pucca Brick work in ground floor in cement mortar 1:6 (SI no 5(Ie) pg no-20

Room
Inner Wall 1x 2x 24.25 x 0.75 x 10 =
Short Wall 1x 2x 12.00 x 0.75 x 10 =
Step 2x 3x 8.00 x 0.75 x 10 =

Deduction
Super Column 1x 6x 1.0 x 0.8 x 10.0 =
Window 1x 2x 5.0 x 0.75 x 5.0 =
Door 1x 1x 4.0 x 0.75 x 7.0 =
Door 1x 1x 2.5 x 0.75 x 7.0 =
ventilator 1x 1x 2.5 x 0.75 x 1.0 =

Net Quantity
903.8 - 118.5 =
Total =

###785.3 x 12674.36 %cft Rs:

16 Cement plaster 1:6 upto 20' hieght 1/2" (SI no 13b pg no-)

Room
Wall 1x 2x 12.0 x 1x 10 =
Wall 1x 2x 14.0 x 1x 10 =
Outer Wall 2x 1X 13.5 x 1x 13.5 =
Outer Wall 1X 1X 15.5 X 1X 13.5 =
Washroom 2x 2x 8.0 x 1x 10 =
Outer Wall 2x 2 9.5 x 1x 13.5

Deduction
Window 1x 2x 5.0 x 1x 5.0 =
Door 1x 1x 4.0 x 1x 7.0 =
NA-231

1x 1x 2.5 x 1x 7.0
1x 1x 2.5 x 1x 1.0

Net Quantity
1927 - 98 =
Total =

1829 x 2206.6 %Sft Rs:

17 Cement plaster 1:4 upto 20'ft: height 3/8" thick.(S.I.No:11(a)/P-52)

Quantity same as Item number'16'


Total =

1829 x 2197.52 %sft Rs:

18 Providing & laying tiles glazed 6"x6"x1/4" on floor or walls facing in


required colour and pattern of STILE specification jointed in white cement
and pigment over a base of 1:2 grey cement mortar 3/4" thick i/c washing
and filling of joints with slurry of white cement and pigment in desired
shape with finishing cleaning and cost of wax polish etc, complete i/c
cutting tiles to proper profile. (SI No:60/P-47)

Room 1x 1x 12.0 x 14.0 x 1=


washroo 1x 1x 8.0 x 8.0 x 1
m
Dado 1x 4x 8.0 x 5.0 x 1
Total =

392 x 30509.77 %sft Rs: =

19 Distempering c-3 coats (SI no.24/P-53)


NA-231

Quantity same as Item number'16'


Total =

1829 x 1079.65 %sft Rs:

20 Making and fixing steel grated door with 1 1/6" thick sheeting includind
angle iron frame 2"x2" 3/8" sqaure bars 4" center to center with locking
arrangements(SI no 24 /P-92)
Room
Gate 1x 1x 4.0 x 7.0 =
Window 1 2x 5.0 x 5.0 =
Total =

78 x 726.72 p.sft Rs:

21 Preparing new surface and Painting Guard bars of gates of iron bars gratin
railing (including standeders brasses etc )and similar works 3 coats

Room
Gate 2x 1x 4.0 x 7 =
Window 2 2x 5.0 x 5.0
Total =

156 x 1270.83 p%sft Rs:

22 Supplying and fixing in position iron and steel grill of 3/4" x 1/4" size flat
iron of approved design including painting 3 coats etc complete ( wieght
not to be less than 3.7 lbs/sq foot of finished grill item no 26 pg 93 chapte
iron works

2x 1x 1x 5.0 x 5.0 =
verandah Window
###
50 x 180.5 p.sft Rs:

SUB-ENGINEER ASSISSTANT E
BUILDINGS SUB-DIVISION BUILDINGS SUB
KOTRI KOTR
NA-231

672
378
291
144
48
1533

63
72
54
63
48
42
342

1191
1191

3783

112
48.5
24
8

192.5

10.5
9
10.5
8
7
NA-231

45

147.5
147.5

13889

437
216
72
725

31.5
27
31.5
24
21
63
198

526.5
Rs 16466

218.25
108
36
362.25

15.75
13.5
15.75
12
10.5
31.5
99
263.25
37985
NA-231

189.00
135.00
27.00
72.75
36.00
12.00
45.00
72.75
36.00
12.00
102.09
39.78
779

262649

cement for cement concrete including


n making joints and fastenings including
)/Pg no.17)

5456
5456

49

243637

1201
NA-231

3468

722

in cement mortar 1:6 (SI no 5(Ie) pg no-20)

363.75
180
360
904

45
37.5
21
13.125
1.875
118.5

785
785

99525

ght 1/2" (SI no 13b pg no-)

240
280
364.5
209.25
320
513
1926.75

50
28
NA-231

17.5
2.5
98

1828.75
1828.75

40353

eight 3/8" thick.(S.I.No:11(a)/P-52)

1828.75
1828.75

40187

"x6"x1/4" on floor or walls facing in


TILE specification jointed in white cement
grey cement mortar 3/4" thick i/c washing
f white cement and pigment in desired
d cost of wax polish etc, complete i/c
I No:60/P-47)

168
64
160
392

= 119598

/P-53)
NA-231

1828.75
1828.75

19744

oor with 1 1/6" thick sheeting includind


re bars 4" center to center with locking

28
50
78

56684

ing Guard bars of gates of iron bars grating


asses etc )and similar works 3 coats

56
100
156

1982.495

n iron and steel grill of 3/4" x 1/4" size flat


ng painting 3 coats etc complete ( wieght
ot of finished grill item no 26 pg 93 chapter
iron works

50

50
9025

970901

ASSISSTANT ENGINEER
BUILDINGS SUB-DIVISION
KOTRI
NA-231

Err:509
Err:509

Sr.# Description Qty: Cement Hill Sand Stone Metal Stone Bajri Steel

01 C.C S/Ballast (1:4:8) 148 9.6 14 48 71 96 142 - - - -

02 C.C S/Ballast (1:5:10) 0 7.80 0 49 0 98 0 - - - -

03 Feb: Of M/Steel 48.71 - - - - - - - - - 2

04 R.C.C Work (1:2:4) 779 17.6 137 44 343 - - 88 686 - -

05 P.B.Work plinth 785 3.44 27 25.7 202 - - - - -

06 P.B.Work G/Floor 0 3.44 0 25.7 0 - - - - -

07 C.Plaster (1:6) 3/4" Thick 1829 0.8 15 6 110 - - - - -

08 C.Plaster (1:4) 3/8" Thick 1829 0.57 10 3 55 - - - - -

09 C.C.Plain 1:2:4 263 17.6 46 44 116 88 232 - - -

10 Gola Type A Drain 0 17.6 0 48 0 88 0

11 Gola Type B Drain 0 17.6 0 48 0 88 0

12 Gola Type C Drain 0 17.6 0 48 0 88 0

13 Paver 0 0

14 Marble 0 2.16 0 5.2 0 - - - - - -

15 L/Floor app:glazed 392 2.16 8 5.2 20 - - - - - -

16 P/LC.CToping2" thick 0 3 0 7.4 0 - - 14.7 0 - -

Total Quantity: - - 258 - 916 - 373 - 686 - 2.435547

Rate as per R.A.A 44.73 1130.12 1292.92 674.28 1130.12

Amount 11549 10356 4826 4625 2752.46


NA-231

Total Rs 48663 /=

ASSISSTANT ENGINEER
SUB-ENGINEER BUILDINGS SUB-DIVISION
BUILDINGS SUB-DIVISION KOTRI
KOTRI
NA-231

Bricks Pavers

- - - -
- - - -
- - - -
- - - -
1350 10601 - -
1350 0 - -
- - - -
- - - -
- - - -
- -
- -
- -
435 0
- - - -
- - - -
- - - -
- 10600.875 0
1372.99 3279.08
14555 0
NA-231

ANT ENGINEER
GS SUB-DIVISION
NA-231

Cartage Material

1 Cement Luky Miles 64


Ist & 2nd 7.53
3rd & Sbsequent Mile 62 0.6 37.20
= 44.73

2 Hill Sand Bolhari Miles 17


Ist & 6th 771.96
7th & Sbsequent Mile 11 32.56 358.16
= 1130.12

3 Crush Paetaro Miles 3


Ist & 6th 771.96
7th & Sbsequent Mile -3 32.56 -97.68
= 674.28

4 Stone Metal Ongar Miles 22


Ist & 6th 771.96
7th & Sbsequent Mile 16 32.56 520.96
= 1292.92

5 Steel / Tile Hyderabad Miles 17


Ist & 6th 771.96
7th & Sbsequent Mile 11 32.56 358.16
= 1130.12

7 Sand Land Source Miles 6


Ist & 4th 649.86
7th & Sbsequent Mile 0 32.56 0.00
= 649.86

8 Bricks Tando Fazal Miles 35


Ist & 4th 617.54
7th & Sbsequent Mile 29 26.05 755.45
= 1372.99

9 Paver
Ist & 6th Karachi Miles 83 771.96
7th & Sbsequent Mile 77 32.56 2507.12
3279.08
NA-231

SUB-ENGINEER ASSISSTANT ENGINEER


BUILDINGS SUB-DIVISION BUILDINGS SUB-DIVISION
KOTRI KOTRI
NA-231

Part B

1
Providing RCC pipes and collars of class C and fixing in trench
including in cutting and fitting and joining with maxphalt
composition and cement mortar 1:1 i/c testing with water to a
head of 45 meter or 150 ft Item no 3Pg 16 Public health schedule
6" Dia 1 x 1 x 12.00 x 189.00 PRft = 2268
9" Dia 1 x 1 x 12.00 x 194.00 PRft = 2328
12" Dia 1 x 1 x 11.00 x 330.00 PRft = 3630
15" Dia 1 x 1 x 10.00 x 434.00 PRft = 4340
18" Dia 1 x 1 x 6.00 x 481.00 PRft = 2886

2 Providing Laying and joining PVC pipes with ' Z' joints

Providing laying UPVC pressure pipes of class D fixing in trench including


cutting fitting and joining with 'Z 'joint with one rubber ring i/c testing with
water to a head of 122 meter or 400 ft Item E3 Pg 23 Public Health Schedule

2" Dia 1 x 1 x 4.00 x 66.00 PRft 264.00


3" Dia 1 x 1 x 5.00 x 137.00 PRft 685.00
4" Dia 1 x 1 x 8.00 x 226.00 PRft 1808.00
6" Dia 1 x 1 x 7.00 x 486.00 PRft 3402.00
8" Dia 1 x 1 x 6.00 x 742.00 PRft 4452.00
10" Dia 1 x 1 x 3.00 x 1,375.00 PRft 4125.00
12" Dia 1 x 1 x 3.00 1,929.00 PRft 5787.00

Total Part B 35975

SUB-ENGINEER ASSISSTANT ENGINEER


BUILDINGS SUB-DIVISION BUILDINGS SUB-DIVISION
KOTRI KOTRI
SSSSSSSS S
SSSS SS SSSS

SSS:SSS

SSSS S

SSSS SSSSSSSS SSSS


SS SSSSSSSSSSS SS SS SSSS SS SS SSSSSSSS SS SSSS
S SSS:SSS SSS:SSS SSS:SSS

S SSS:SSS SSS:SSS SSS:SSS

S SSS:SSS SSS:SSS SSS:SSS

SSSSSSSSSS SS SSSSSSSSSS SS SSSSSSSS, SSSSSSS


SSS SSSSS SSSSSSSSS SSSSSSSSS SSS SSSSSSS
SSSSSSSS SSSSSSSSS SSSSSS SSSSSSSSS SSSS
S SSSS SSSS.SS
SSSSSSSSS SSSSS SSSSSSSS SSS SSSSSSS SSSS SS
SS SS SS SSSS SSSS SS SSSS SSSSSS (SS
SS.SSS/SS SS.S)

SSSSSS SSSSSSSS SSSSS SS SSSSS SSSSSSSS.S SSSS


S SSS SSS SSSS SSSSS.(S) SSSSS S:S:S(S.S.SS.S (S) /SS SSSS.SS
SS.SS)

SSSSSSSS SSS SSSSSSS SS SSSSSSSSS SSS SSS SS


S SSS SSSSS SSSSSS SSSSSSSS SSSSS SS SSSSSSS SSSS SSSS.SS
SSS SSSSS SSSSSSSS (SS SS SSS SS-SS)

SSSSSS SSSSSSSS SSSSS SSSSSSSSS SSSSSSS,


SSSSSSSSSS, SSSSSSSSS SSS SSSSSS SSSSSSSS
SSSSSSSSS SSSSSSSSS SSS SSSSSSS SSSSS
S SSS SSSSS.SS
SSSSSSSSS SSSSS S:S:S
(SS SS S(S) SS-
SS)
SSSSSSSSSS, SSSSSSSSS SSS SSSSSS SSSSSSSS
SSSSSSSSS SSSSSSSSS SSS SSSSSSS SSSSS
S SSS SSSSS.SS
SSSSSSSSS SSSSS S:S:S
(SS SS S(S) SS-
SS)

SSS SSSS S:S:S S/S SSS SSSSSS SSS SSSSSSSS


SSSSSS SSS SSSS SS SSSSS SSSSS: & SSS SSSSSS
SSS SSSSSSS & SSSSSSS SSSSS SSSS SS SSSS
SSSSSSSSSS. SSSS SSSS SSSS S/SS SSS SSSSS SS
SSSSS SSSSSS SSSSSSS SSSSSSSSSS SSSSSS
S SSS SSSSSSSSS SSS SSSSSSSSS SSS SSSSSSS SSSSSSS SSS.SS
(S/S SSSSSSSSS & SSSSSSS SS SSSSSSS) (S) SSS
SSSS SS SSSS SSSSS SSSSS, SSSSSSSS, SSSSS
SSSSSSS SSS SSSSS SSSSSSSSSS SSSSSSS SSSS SS
SSSS SS SSSSSSS SSSS SS SSSSSSSS SSSSSSSS SS
SSS SSSSSSSS.(SS.SS:S(S)/SS SS.SS/SS)

SSSSSSSSSSS SS SSSS SSSSS SSSSSSSSSSSSS SSS


SSSSSS SSSSSSSS SSSSSSSSS SSSSSSS SSSSSSS
S SS SSSSSS SS SSSSSSS SSSSSS SSSSSS SSS SSSSSSSSSS SSSS.SS
SSSSSSSSS SSSS SS SSSSSSS SSSSS (S.S.SS.S(S)/SS
SS.SS)

SS SSS:SSS SSS:SSS SSS:SSS

SS SSS:SSS SSS:SSS SSS:SSS

SSSSSSS SSSSSSSS SSS SSSSSSS SSSSS SS SSSSSS


SSSS SSSSSSS SSSSS SSSS SSSSSSSSSS SSSS SS SS
SS SSS SSSS.SS
SSS SSSSS SSS SSSS SSSS S SSSS SSSS SS SS S
SSSSSSS SSSSSSSSSS
SSSSSSS SSSSSSSS SSS SSSSSSS SSSSS SS SSSSSS
SSSS SSS SSSSS SSSSSSSSS SSSS SSSSSSS SS SS
SS SSS SSSS.SS
SSS SSSSS SSS SSSS SSSS S SSSS SSSS SS SS S
SSSSSSS SSSSSSSSSS
SSSSSSSSSS SS SSSSSSS SSSS SSSS SSS SSSSSSS
SS SSS SSS SSSSSSS SS SSS SSSSSS SS SSSSSSSS SSSS SSS.SS
SSSS SSSS SS SSS-SSS SSS

SSSSS SSSSS SSSS SS SSSSSS SSSSS SS SSSSSS


SS SSS SSSSS.SS
SSSSSS S:S (SS SS S(SS) SS SS-SS)

SSSSSS SSSSSSS S:S SSSS SSS SSSSSS S/S" (SS SS


SS SSSS SSSS.SS
SSS SS SS-)

SSSSSS SSSSSSS S:S SSSS SSSSS: SSSSSS S/S"


SS SSSS SSSS.SS
SSSSS.(S.S.SS:SS(S)/S-SS)

SSSSSSSSS & SSSSSS SSSSS SSSSSS S"SS"SS/S" SS


SSSSS SS SSSSS SSSSSS SS SSSSSSSS SSSSSS SSS
SSSSSSS SS SSSSS SSSSSSSSSSSSS SSSSSSS SS
SSSSS SSSSSS SSS SSSSSSS SSSS S SSSS SS S:S
SSSS SSSSSS SSSSSS S/S" SSSSS S/S SSSSSSS SSS
SS SSS SSSSS.SS
SSSSSSS SS SSSSSS SSSS SSSSSS SS SSSSS SSSSSS
SSS SSSSSSS SS SSSSSSS SSSSS SSSS SSSSSSSSS
SSSSSSSS SSS SSSS SS SSS SSSSSS SSS, SSSSSSSS
S/S SSSSSSS SSSSS SS SSSSSS SSSSSSS. (SS
SS:SS/S-SS)

SS SSSS SSSSSSSSSSSS S-S SSSSS (SS SS.SS/S-SS) SSSS.SS

SSSSSS SSS SSSSSS SSSSS SSSSSS SSSS SSSS S


S/S" SSSSS SSSSSSSS SSSSSSSSS SSSSS SSSS SSSSS
SS SS SSS.SS
S"SS" S/S" SSSSSS SSSS S" SSSSSS SS SSSSSS
SSSS SSSSSSS SSSSSSSSSSSS(SS SS SS /S-SS)

SSSSSSSSS SSS SSSSSSS SSS SSSSSSSS SSSSS SSSS


SS SSSSS SS SSSS SSSS SSSSSSS SSSSSSS
SS SSS SSSS.SS
(SSSSSSSSS SSSSSSSSSS SSSSSSS SSS )SSS SSSSSSS
SSSSS S SSSSS

SSSSSSSSS SSS SSSSSS SS SSSSSSSS SSSS SSS


SSSSS SSSSS SS S/S" S S/S" SSSS SSSS SSSS SS
SSSSSSSS SSSSSS SSSSSSSSS SSSSSSSS S SSSSS SSS
SS SS SSS.S
SSSSSSSS ( SSSSSS SSS SS SS SSSS SSSS S.S
SSS/SS SSSS SS SSSSSSSS SSSSS SSSS SS SS SS
SS SSSSSSS SSSS SSSSS
SSSSS SSSSS SS S/S" S S/S" SSSS SSSS SSSS SS
SSSSSSSS SSSSSS SSSSSSSSS SSSSSSSS S SSSSS SSS
SS SS SSS.S
SSSSSSSS ( SSSSSS SSS SS SS SSSS SSSS S.S
SSS/SS SSSS SS SSSSSSSS SSSSS SSSS SS SS SS
SS SSSSSSS SSSS SSSSS

SS SSS:SSS SSS:SSS SSS:SSS

SSSSS SSSSSSS

SSSSS SSSSSS (S)

SSSSS/SSSSS SS SSS SSS SSSS SS SSS


SSSSSS SS SS SSSSS/ SSSSSSSS SS SSS
SSSSS SS SSSSSSS SSSSSS SSSSS S

SSSSS SSSS SS (S) SS(+)

SSSS/SSSSSS SS (S) SS(-)

SSSSSSSSSSS SS (S) SS(+)

SSS SSSSSSSS SSSS SS (S) SS(-)

SSSSS SSSSS

SSSSS=S+S+S+S SS SSSSS SSS SSSSSSS

SSSSSSSSSS SSSSSSSSS SSSSSSSS


SSSSSSSSS SSSSSSSS SSSSSSSS
SSSS SSSSSS SS
SSSSSSS
%SSS SSS:SSS

%SSS SSS:SSS

%SSS SSS:SSS

S%SSS SSSS

%SSS SSSSS

%SSS SSSSS

%SSS SSSSS
%SSS SSSSS

SSS SSSSSS

SSSS SSSSSS

%SSS SSS:SSS

%SSS SSS:SSS

%SSS SSSS

S%SSS SSSS.SSS
S%SSS SSS.SSS

S%SSS SSSSS.SSSS

%SSS SSSSS.SSSS

%SSS SSSSS.SSS

SSSSSS.SSSS

%SSS
SSSSS.SSSSSS
%SSS

SSSSS.SS

SSSS

SSSS.SSSS

%SSS

SSSS

SSSS
SSSS

SSSS

SSS:SSS

SSSS

SSS:SSS

SSS
SSSS/ SSSSSSSS SS SSS
S

SSSS SSSSSSSS
SSSS SSSSSSSS SSSSSSSS
SSSSSSSS S
SSSS SS SSSS

SSS:SSS

SSSS S

SSSSSSSS
SSSS SS SSSSSSSSSSS SS SS SSSS SS SS SSSSSSSS SS SSSS
SS SSSSSSSSS SSS SSSSS SSS SSSSSSS SS SSSSS S SSS SSSSSS SS
SS SSSSSS SSSSSSSSS SS SSSSSSS SSS SSSSSSS SSS SSSSSSS SSSS
SS SSSSSSSS SSSSSSSSSSS SSS SSSSSS SSSSSS S:S S/S SSSSSSS SSSS
S
SS SSSSS SS S SSSS SS SS SSSSS SS SSS SS SSSS SS SSS SS SSSSSS
S SSSSSS SSSSSSSS

S.SS
S.SS
S.SS SSSSSSSSS SSSSSS SSSS SSSSSSS SSSSS SS SSSSS S ( SSSSSSSSSS SSSS )
SSSSSS SS SSSSSS S/S SSSSSSS, SSSSSSS SSS SSSSSSSS SSSS S SSSSS
S.SS
SSSS SSS SSSSSS S/S SSSSSSS SSSS SSSSS SS S SSSS SSS SSSSS SS SSS
S.SS SS SSSS S (S) SSSS SS SSSSSSS SSSSSSSS SSSS SSSSSS SSSSSS
S.SS
S S.SS

SSSSS SSSSSS (S)

%
SSSSS/SSSSS SS SSS SSS SSSS SS SSS
SSSSSSSS SS SSS SSSSS SS SSSSSSS SSSSSS

S/S SSSS SS (S) SS(+)

SS/SSS SSSSS SS (S) SS(-)

SSS SSSSSSSS SSSS SS (S) SS(+)


SSSSS SSSSS

SSSSS=S+S+S SS SSSSS SSS SSSSSSS

SSSSSSSSSS
SSSS SSSS SSSSSS SS
SSS SS SSSS SSSSSSS
S" SSS SSS.SS SSSS SSSS
S" SSS SSS.SS SSSS SSSS
SS" SSS SSS.SS SSSS SSSS
SS" SSS SSS.SS SSSS SSSS
SS" SSS SSS.SS SSSS SSSS

S" SSS SS SSSS SSS


S" SSS SSS SSSS SSS
S" SSS SSS SSSS SSSS
S" SSS SSS SSSS SSSS
S" SSS SSS SSSS SSSS
SS" SSS SSSS SSSS SSSS
SS" SSS SSSS SSSS SSSS
SSSSS SSSSSS SSSSS

S SSS SSSS SS SSS SSSSSS SS SS SSSSS/


S SS SSS SSSSS SS SSSSSSS SSSSSS SSSSS S

=
SSSSS SSSSS

SSSSSSSSS SSSSSSSS
SSSSSSSSS SSSSSSSS SSSSSSSS

Das könnte Ihnen auch gefallen