PT.

SINOMA Mechanical EngineerMechanical Manager

Weekly Mechanical Work Report Li Yongwen Zhang Guoxiao

Work Mechanical WORK Company PT.SINOMA


Date From: 2018/9/22 To:2018/9/28 Working Hour 06:30 - 15:00 8 hours
Date 22/Sep 23/Sep 24/Sep 25/Sep 26/Sep 27/Sep 28/Sep
Barometer day sunny sunny sunny sunny sunny sunny sunny
Weather
night raining raining raining raining raining raining raining

Mechanical Works Weekly Report from Sep.22 thto Sep.28th


Resource

Manpower on site Equipment


Description Scope Of Works
Chinese Indonesia Total Description type quantity Total Remark
1、contractor
pt.sinoma EPC 21 6 27 Excavator 480/330/920D
Securety 1 1 2 Dozer 8D/6R
2、sub-contractor Truck 22T
Sub-contractor1 formal workshop 12 15 27 Concrete mixing machine CD330
Sub-contractor2 formal workshop Rotary drilling rig 250D
Pile construction team Pile test and construction Breaker 330
Mechanical erection team Mechanical erection 100T crane
Electrical erection team Electrical erection 50T crane
Grid Construction Team Grid Construction Loading machine D35
Others 80T crawler crane
260T crawler crane
25T crane
car crane DONGFENG
Trailer
Fork lift
Tower crane
Portable pump
Mobile pump
Total 0 34 22 56 Total 0
Work Quantity & Progress
BOQ Work Quantity delayed/ (-)
Description / Activity
Total Qty Unit Plan Qty Actual Qty Add up Qty Weekly Progress Progress advance / (+)

1、Preheater fabrication 1,096.00 T 10.00 10.00 50.00 0.91% 4.56%


2、Installation of Preheater and Refractory and castable work T #DIV/0! #DIV/0!
3、Installation of Non-standard and steel structure(Preheater & Precaliner and Firing ) T #DIV/0! #DIV/0!
4、Non-standard and bin fabrication(Raw Material Grinding &Exhaust Treatment) T #DIV/0! #DIV/0!
5、Installation of Non-standard,steel structure Fan and bin(Raw Material Grinding &Exhaust Treatment)
T #DIV/0! #DIV/0!
6、Installation of Bag House (Raw Material Grinding &Exhaust Treatment) T #DIV/0! #DIV/0!
7、Installation of Raw Mill T #DIV/0! #DIV/0!
19、Tertiary air duct fabrication(Rotary Kiln & Tertiary Air Duct) T #DIV/0! #DIV/0!
20、Installation of Rotary kiln,Tertiary Air Duct and steel structure(Rotary Kiln & Tertiary Air Duct) T #DIV/0! #DIV/0!
21、Non-standard fabrication(Cooler and Exhausted gas treatment) T #DIV/0! #DIV/0!
22、Installation of EP and cooler(Cooler and Exhausted gas treatment) T #DIV/0! #DIV/0!
23、Installation of Non-standard(Cooler and Exhausted gas treatment) T #DIV/0! #DIV/0!
24、Equipment installation( Add/Corr. Preblending & Conveying) T #DIV/0! #DIV/0!
25、Equipment installation(Pre-Mix Material Preblending & Conveying) T #DIV/0! #DIV/0!
26、Installation of Coal Mill T #DIV/0! #DIV/0!
27、Ooudoor water pipe network T #DIV/0! #DIV/0!
30、Installation of Equipment ( Circulating Water Tanks & Pump Room) T #DIV/0! #DIV/0!
31、Installation of Equipment ( Water Treatment, Water Tanks &United Pump Room) T #DIV/0! #DIV/0!
32、Installation of steel structure( Clinker Storage & Conveying) T #DIV/0! #DIV/0!
Activity:

The Issue Needing Coordination By Owner

None
BOQ Work Quantity delayed / (-)
Description / Activity
Total Qty Unit Plan Qty Actual Qty Add up Qty Weekly Progress Progress advance / (+)

Preheater and duct fabrication


1、Preheater made 1,040.00 T 10.00 10.00 50.00 0.96% 4.81%

2、kiln dust weigh bin T #DIV/0! #DIV/0!

3、 Non-standard fabrication T #DIV/0! #DIV/0!

Preheater and others installation

1、Preheater and Other equipment installation T #DIV/0! #DIV/0!

2、 tower frame installation T #DIV/0! #DIV/0!

3、Installation of kiln dust weigh bin T #DIV/0! #DIV/0!

4、Non-standard installation T #DIV/0! #DIV/0!

6、Refractory and castable work T #DIV/0! #DIV/0!