Sie sind auf Seite 1von 1

The

engineer is often presented with inadequate information on the soil properties. He then has to decide
whether to base his
designs on conservative values with an appropriate safety factor without any check by load testing, or
merely to use the
design methods to give a preliminary guide to pile diameter and length and then to base the final designs
on an extensive
field testing programme with loading tests to failure.

Das könnte Ihnen auch gefallen