FOUNDATION
BY
RIMPI BARO
LECTURER, CIVIL ENGINEERING DEPARTMENT
PANDIT DEENDAYAL PETROLEUM UNIVERSITY,
GANDHINAGAR
Foundation
• The foundation is the most
critical part of any
structure and most of the
failure is probably due to
faulty foundations rather
than any other cause. The
purpose of foundation is to
transmit the anticipated
loads of the superstructure
safely to the soil
Basic functions:
• To distribute the total load coming on the structure over
a large bearing area so as to prevent it from any
movement.
• To load the bearing surface or area at a uniform rate so
as to prevent any unequal or relative settlement.
• To prevent the lateral movement of the structure
• To secure a level or firm natural bed, upon which to lay
the courses of masonry and also support the structure.
• To increase the suitability of the structure as a whole, so
as to prevent it from overturning or sliding against such
as wind, rain, frost etc.
Design loads
The basic requirement of any building is that it should be able to carry all possible types of
loads to which it is subjected. Loads coming on a structure are:
i. Dead Load: Comprises of weight of all walls, partitions, floors, and roofs and all other
permanent construction.
ii. Live Load or Imposed Loads: Produced by intended use or occupancy. Usually
unstable or moving loads.
Occupancy classification UDL (KN/m^2)
Dwelling houses 2-3
Combined footing
Supports two columns; provided when columns are very near to each other so that
their footings overlap; bearing capacity of soil is less
If footing supports more than two columns, then it is known as Continuous footing.
Grillage foundation
Grillage foundation
• The grillage foundation helps in distributing the load over a
wider area of subsoil.
• Pile Foundations
• Caisson Foundation
• Well foundation
Pile Foundations
Based on function
• End bearing pile: In end bearing piles, the bottom end of the pile rests on a
layer of especially strong soil or rock. The load of the building is transferred
through the pile onto the strong layer.
• Friction pile: Transfer loads by means of skin friction along the length of
piles
• Compaction pile: Used to compact loose granular soils, thus increasing their
bearing capacity; don’t carry any loads; hence may be of weaker material
such as sand
• Tension pile or uplift pile: Anchor down the structures subjected to uplift
due to hydrostatic pressure or due to overturning moment.
• Sheet pile: Used as impervious cut off to reduce seepage and uplift under
hydraulic structure.
• End Bearing Piles
Friction Piles
Every pile has a zone of influence on the soil around it. Care
must be taken to space the piles far enough apart so that
loads are distributed evenly over the entire bulb of soil that
carries them, and not concentrated into a few areas.
• Engineers will usually group a few piles together, and top
them with a pile cap. A pile cap is a very thick cap of concrete
that extends over a small group of piles, and serves as a base
on which a column can be constructed. The load of this
column is then distributed to all the piles in the group.
Cabezal de pilote
How piles are constructed
During boring for pile, the side of the bore hole is subjected to various types of
forces & pressure like active earth pressure, overburden pressure, hydrostatic
pressure, pore pressure due to underground water, etc. due to which the side of
bore becomes unstable and start collapsing if the soil strata is weak.
In order to stabilize the side of bore the supporting fluid is to be used to counter
the above pressure. The commonly USED SUPPORTING FLUID FOR
STABILIZING IS BENTONITE.
Bentonite is commonly used as support fluid. In its natural form as sodium
montmorillonite exhibits thixotropic properties, where by it forms a gel under
quiescent /static conditions & regains its fluidity under dynamic conditions.
Casing
Pile cages
The tremie concrete placement method uses a pipe,
through which concrete is placed below water level.
• Precast Driven Piles are first cast at ground level and then
hammered or driven into the ground using a pile driver. This is
a machine that holds the pile perfectly vertical, and then
hammers it into the ground blow by blow. Each blow is is
struck by lifting a heavy weight and dropping it on the top of
the pile - the pile is temporarily covered with a steel cap to
prevent it from disintegrating.
• The pile driver thus performs two functions - first, it acts as a
crane, and lifts the pile from a horizontal position on the
ground and rotates it into the correct vertical position, and
second, it hammers the pile down into the ground.
Helical piles are steel tubes that have helical (spiral) blades
attached to them. These can be drilled into the ground,
meaning that the pile acts as a giant drill bit, and is rotated
and pushed into the ground from above, much like a screw
drills into wood. Once the steel pile is driven into the ground,
a pile cap is poured on top of the pile to prepare it for the
construction above.
Helical pile
Micropiles
• Size : 100mm to 350mm Diameter
• Lengths : Varies
• Structural Capacity : 20Ton to 250Ton
• Material : Grade 25MPa to 35MPa
• Sonic Echo Testing (IS 14893:2001) has been used successfully
for checking integrity of piles after installation. In piles
integrity test, a small metal / hard rubber hammer is used to
produce a light tap on the top of the pile. The shock travels
down the length of the pile and is reflected back from the toe
of the pile and recorded through a suitable transducer /
accelerometer (also held on the top of the pile close to the
point of impact)in a computer disk for subsequent analysis.
• The primary shock wave which travels down the length of the
shaft is reflected from the toe by change in density between
the concrete and the sub strata. However, if the pile has any
defects or discontinuities within its length these will set up
secondary reflections which will be added to the return signal.
• All piles shall be tested at a minimum age of five days after
casting, unless instructions to the contrary shall be given by
The Engineer.
A synthetic pile and the reflectogram
Based on Materials and composition
• Concrete piles
– Pre cast: Manufactured off site; Max design load 800 KN; require more
time to set; high cost; require heavy pile driving machinery, 30-50 cm
dia, 20 m or more
– Cast in situ: Max design load 750 KN;
i. Driven: driven into the ground by machinery
ii. Bored: under reamed piles, bored compaction piles
• Timber piles: Made from trees deodar, babul, teak; treated with creosote
oil as preservative; low bearing capacity; shouldn’t be driven through hard
stratum.
• Steel piles:
– H-pile: desirable in hard rock stratum; high bearing capacity; very high
cost; construction of bridges
– Sheet pile: prevent seepage of water below dams; driven into the
ground
– Box pile: driven pile; deep beams; Great lateral strength; support sea
structures.
• Composite piles: Lower portion of timber or steel and upper portion of
concrete; used
– Concrete and timber
– Concrete and steel
• Size : 250mm to 2000mm
• Lengths : 6m, 9m and 12m (Typical)
• Structural Capacity : 45Ton to 1000Ton
• Material : Grade 60MPa & 80MPa Concrete
Caisson Foundation
The choice of a particular shape of well depends upon the size of the pier,
the care and cost of sinking, the considerations of tilt and shift during
sinking and the vertical and horizontal forces to which well is subjected.
Description of Parts (Elements) of Well:
1. Steining:
It is the wall or shell of the well, made of
R.C.C. and which transfer the load to the
curb. It acts as a enclosure for excavating
the soil for the penetration of well.
Minimum grade of concrete used in
steining is M20
2. Curb:
It is a R.C.C. ring beam with steel cutting
edge below. The cross- section of the
curb is wedge shaped which facilitates
the sinking of the well. The curb
supports well steining. The curb is kept
slightly projected from the steining to
reduce the skin friction.
• 3. Cutting edge:
• It is the lowest part of the well curb which cuts the soil during
sinking. Well curb carries cutting edge for the well and is
made up of reinforced concrete using controlled concrete of
grade M25. The cutting edge usually consists of a mild steel
equal angle of side 150 mm.
• 4. Bottom plug:
• After completion of well sinking the bottom of well is pluged
with concrete. The bottom plug which is confined by the well
curb acts as a raft against soil pressure from below. Minimum
grade of concrete used in bottom plug is M15
• 5. Back fill:
• The well is dewatered after setting of the bottom plug and it is
backfilled by sand or excavated material.
The space inside the well between the bottom of the top plug
and the top of bottom plug is usually filled with clean sand, so
that the stability of the well against overturning is increased.
While this practice is good in case of wells resting on sand or
rock, the desirability of sand filling for wells resting on clayey
strata is doubtful, as this increases the load on the foundation
and may lead to greater settlement. In the latter case, the
sand filling is done only for the part of well up to scour level,
and remaining portion is left free.
6. Top plug:
• It is a concrete plug provided over the filling inside the well.
The top plug is an unreinforced concrete plug, generally
provided with a thickness of about 600 mm beneath the well
cap to transmit the loads from the pier to the steining.
Minimum grade of concrete used in top plug is M15.
7. INTERMEDIATE PLUG
• As discussed above, for wells resting on clayey strata, it is
not preferable to fill the space inside the well completely
with sand. In such cases, sand filling is not done or sand is
filled up to the scour level. A concrete plug covering the
filling is usually provided, known as intermediate plug.
Usually, thickness of intermediate plug is taken as 500 mm.
8. Well cap:
• It is a R.C.C. slab provided at the top of stening to transmit
the load of superstructure to the stening and over which
pier is laid. The minimum thickness of the slab is about 750
mm.
cofferdams
• A cofferdam is a structure that retains water and soil
that allows the enclosed area to be pumped out and
excavated dry. Cofferdams are commonly used for
construction of bridge piers and other support
structures built within water. Cofferdams walls are
usually formed from sheet piles that are supported
by internal braces, and cross braces. Cofferdams are
typically dismantled after permanent works are
completed. Since cofferdams are usually constructed
within water, the sheet piles are installed using
preconstructed templates that permit the correct
positioning of each sheet pile from a barge.
Factors affecting design of foundation
• Construction requirements .
• Economy etc.
Requirements of a good foundation