Sie sind auf Seite 1von 42

Ramasawmy & Ramasawmy Co ltd

MAIN SUMMARY FOR STEEL BLOCK ABC


Project : Songes Secondary School
MAIN SUMMARY

Item Description Steel Qty

1 Reinforcement to bases 4,377.08

2 Reinforcement to strip footing 1,352.12

4 Reinforcement to Ground beam 1,298.12

5 Reinforcement to column 22,467.20

6 Reinforcement to beam 21,405.90

7 Reinfrcement to slab 22,156.59

8 Reinforcement to worktop 76.06

9 Reinforcement to stairs 1,669.63

10 Reinforcement to tie columns 5,992.22

11 Reinforcement to conopy 7,407.67

12 Parapet,cills, lintels,jambs, block tie 1,700.00

TOTAL KG 85,525.53

06/03/19 M:S ALL SUMMARY


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Column Base
DATE: 21/12/18
BARBENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
CONC
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length
member (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

200
1900
Base B1 2500 x 2000
B1 b2 48 Y12 14 648 200 1900 2300 1,490

200
Base B1 2500 x 2000
B1 b1 48 Y16 12 597 200 2400 2800 2400 1,670

200
Base B2- 1100 x 1100
B2 T12 BW 24 Y12 14 336 200 1000 1400 1000 470

TOTAL Bases Total length for each size - - 1,960.80 1,670.40 -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 1,741.19 2,635.89 -
Total Mass 4,377.08 Prepared by: Pinky
Mild Steel - Checked by: Rikesh
High Tensile Bars 4,377.08 Approved by: Rikesh

06/03/19 M:S 1. Reinf Bases


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: strip footing Dwg no : 16708-WD-3ST01
DATE: 15/11/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50
1 600mm wide 3300 long 46 Y10 Y10 3 138 0.050 3.30 3.35 3300 462.30

50
46 Y8 Y8 30 1,380 0.050 0.50 0.50 1.05 500 1,449.00

1000
lap 46 Y8 Y10 3 138 1.00 1.00 138.00

50
2 600mm wide 8000 long 12 Y10 Y10 3 36 50.000 8,000.00 8,050.00 8000 289.80

50
500
12 Y8 Y8 54 649 0.050 500.00 50.00 550.05 356.98

1000
lap 12 Y8 Y10 3 36 1.00 1.00 36.00

50
3 825mm wide 8000 long 2 Y10 Y10 4 8 50.000 8,000.00 8,050.00 8000 64.40

50
2 Y8 Y8 54 109 0.050 500.00 50.00 550.05 500 59.96

1000
lap 2 Y8 Y10 4 8 1.00 1.00 8.00

Total Mass for each size - 1,865.94 998.50 - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 737.05 615.08 - - - -
Total Mass 1,352.12 Prepare by: BM - - -
Mild Steel - Checked by:
High Tensile Bars - Approved by:

06/03/19 M:S 2.strip footing


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Ground Beam ABC Dwg no : 16706-ET-3ST08
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

main bars Y8 along G/L : A- 50 50


1 B/1&24 section 1-1 2 Y8 4 8 0.050 8.00 0.05 8.10 8000 64.80

75
2 Stirrups Y8 @ 200 section 1-1 2 Y8 41 82 0.075 0.15 0.15 0.59 100 48.38

main bars Y8 along G/L : A/1&24 9000


3 section 1-1 8.9 Y8 4 36 - 9.00 9.00 320.00

main bars Y8 along G/L : A/1&24 50


4 section 1-1 8 Y8 4 32 0.050 8.00 8.05 8000 257.60

main bars Y8 along G/L : A/1&24 800


5 section 1-1 laps 7 Y8 4 28 - 0.80 0.80 22.40

75
6 Stirrups Y8 @ 200 section 1-1 15 Y8 41 615 0.075 0.15 0.15 0.59 100 362.85

main bars Y8 along G/L : A-B/1- 50 50


7 24 section 3-3 15 Y8 4 60 0.050 8.00 0.05 8.10 8000 486.00

75
8 Stirrups Y8 @ 200 section 3-3 15 Y8 41 615 0.075 0.15 0.15 0.59 100 362.85

main bars Y8 along G/L : B/1&24 9000


9 section 2-2 8.9 Y8 4 36 - 9.00 9.00 320.00

main bars Y8 along G/L : B/1&24 50


10 section 2-2 8 Y8 4 32 0.050 8.00 8.05 8000 257.60

main bars Y8 along G/L : B/1&24 800


11 section 2-2 laps 7 Y8 4 28 - 0.80 0.80 22.40

12 Stirrups Y8 @ 200 section 2-2 1 Y8 41 41 0.175 0.14 0.14 0.77 140 175 31.57

main bars Y8 along G/L : C/1&24 9000


13 section 4-4 8.9 Y8 4 36 - 9.00 9.00 320.00

main bars Y8 along G/L : C/1&24 50


14 section 4-4 8 Y8 4 32 0.050 8.00 8.05 8000 257.60

main bars Y8 along G/L : C /1&24 800


15 section 4-4 laps 7 Y8 4 28 - 0.80 0.80 22.40

06/03/19 M:S 4.ground beam


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Ground Beam ABC Dwg no : 16706-ET-3ST08
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

140
16 Stirrups Y8 @ 200 section 4-4 1 Y8 41 41 0.240 0.14 0.14 0.90 240 36.90

Mainbars Y8 along G/L : 1 & 50 50


17 24/B-C section 4-4 2 Y8 4 8 0.050 2.10 0.05 2.20 2100 17.60

140
Stirrups Y8 @ 200 along G/L : 1
18 & 24/B-C section 4-4 2 Y8 41 82 0.240 0.15 0.15 0.92 240 75.44

- 3,286.39 - - - - -
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 1,298.12 - - - - -
Location Ground beams Total Mass 1,298.12 Prepare by:
foundation Mild Steel - Checked by:
High Tensile Bars
1,298.12 Approved by:

06/03/19 M:S 4.ground beam


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Columns BLOCK A,B & C
DATE: 15/11/18 Dwg no : 16708-WD-3ST01-04/01-0,084
BAR BENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
No. per Shape Length cut
Ref Location Bar Mark Size Total No. A/mm B/mm C/mm D/mm
member Code (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

40
0
Block
ABC-C1 400x400, 4Y25 BM 01 Y25 4 152 37 400 2,600 - - 3000 2600 456.00

400
400x400, 4Y16 BM 01 Y16 2 76 37 400 2,600 - - 3000 2600 228.00

4550

2675
1250
Ground Ground floor & First
625
& First Floor 400x400, 4Y25 BM 01 Y25 4 304 1,250 625 2,675 - 4550 1,383.20

4100

2900
800
400
400x400, 4Y16 BM 01 Y16 4 152 800 400 2,900 - 4100 623.20

3750

1875
1250 200
625
400x400, 4Y25 BM 01 Y25 4 160 1,250 625 1,875 200 3950 632.00
4150

2950
800
400 200
400x400, 4Y16 BM 01 Y16 2 80 800 400 2,950 200 4350 348.00

340
Gridlines:
340
Links Y08@200c/c BM 02 Y8 70 2,800 61 340 340 - - 1600 4,480.00

400
Block
ABC-C3 300x200, 4Y16 BM 01 Y16 4 96 37 400 2,600 - - 3000 2600 288.00
4100

2900
800
400
300x200, 4Y16 BM 01 Y16 8 192 800 400 2,900 - 4100 787.20

3675

2475
800
400
300x200, 4Y16 BM 01 Y16 4 96 800 400 2,475 200 3875 200 372.00

06/03/19 M:S 5. Reinf Columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Columns BLOCK A,B & C
DATE: 15/11/18 Dwg no : 16708-WD-3ST01-04/01-0,084
BAR BENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
No. per Shape Length cut
Ref Location Bar Mark Size Total No. A/mm B/mm C/mm D/mm
member Code (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

140
Gridlines: 240
Links Y08@200c/c BM 02 Y8 86 1,855 61 140 240 - - 1000 1,855.00

06/03/19 M:S 5. Reinf Columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Columns BLOCK A,B & C
DATE: 15/11/18 Dwg no : 16708-WD-3ST01-04/01-0,084
BAR BENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
No. per Shape Length cut
Ref Location Bar Mark Size Total No. A/mm B/mm C/mm D/mm
member Code (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

400
Block
2600
ABC-C1A 400x400, 4Y25 BM 01 Y25 4 20 37 400 2,600 - - 3000 60.00

400
300x200, 4Y16 BM 01 Y16 3 15 37 400 2,600 - - 3000 2600 45.00

4550

2675
1250 625
400x400, 4Y25 BM 01 Y25 4 40 1,250 625 2,675 - 4550 182.00
4100

2900
800
300x200, 4Y16 BM 01 Y16 3 30 800 400 2,900 - 4100 400 123.00

3750

1875
1250
625 200
400x400, 4Y25 BM 01 Y25 4 28 1,250 625 1,875 200 3950 110.60

4150

2950
800
300x200, 4Y16 BM 01 Y16 3 21 800 400 2,950 200 4350 400 200 91.35

340
Gridlines:
340
Links Y08@200c/c BM 02 Y8 87 609 61 340 340 - - 1600 974.40

Gridlines: 140
Links Y08@200c/c BM 02 Y8 87 304 61 140 640 - - 1800 640 547.20

06/03/19 M:S 5. Reinf Columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Columns BLOCK A,B & C
DATE: 15/11/18 Dwg no : 16708-WD-3ST01-04/01-0,084
BAR BENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
No. per Shape Length cut
Ref Location Bar Mark Size Total No. A/mm B/mm C/mm D/mm
member Code (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

400
Block 2600
ABC /C2 400x200, 4Y25 BM 01 Y25 4 24 37 400 2,600 - - 3000 72.00

400
300x200, 4Y16 BM 01 Y20 2 12 37 400 2,600 - - 3000 2600 36.00

4550

1250 2675
625
400x400, 4Y25 BM 01 Y25 4 48 1,250 625 2,675 - 4550 218.40

4800

2800
1000 500
400x400, 4Y20 BM 01 Y20 2 24 1,000 500 2,800 - 4300 103.20

3750

1875
1250
625 200
400x400, 4Y25 BM 01 Y25 4 48 1,250 625 1,875 200 3950 189.60

3750

1000 2250
500 200
400x400, 4Y20 BM 01 Y20 4 48 1,000 500 2,250 200 3950 189.60

Gridlines: 340 140


Links Y08@200c/c BM 02 Y8 87 1,044 61 340 140 - - 1200 1,252.80
140

Gridlines:
Links Y08@200c/c BM 02 Y8 87 1,044 61 140 640 - - 1800 640 1,879.20

06/03/19 M:S 5. Reinf Columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Ramasawmy & Ramasawmy Ltd


TITLE: Steel Reinforcement to Columns BLOCK A,B & C
DATE: 15/11/18 Dwg no : 16708-WD-3ST01-04/01-0,084
BAR BENDING SCHEDULE STEEL REINFORCEMENT TOTAL LENGTH FOR EACH SIZE
No. per Shape Length cut
Ref Location Bar Mark Size Total No. A/mm B/mm C/mm D/mm
member Code (m) Bending Dimension 6mm 8mm 10mm 12mm 16mm 20mm 25mm

TOTAL Columns Total length for each size - 10,988.60 - - 2,905.75 328.80 3,303.80
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 4,340.50 - - 4,585.27 811.48 12,729.95
Total Mass 22,467.20 Prepared by:MOODALY BEN
Mild Steel - Checked by: Rikesh Ramchurn
High Tensile 22,467.20 Approved by:

06/03/19 M:S 5. Reinf Columns


Ramasawmy & Ramasawmy Co ltd

Steel to Beams ABC


Project : Songes secondaryschool
MAIN SUMMARY

Item Description Steel Qty

MAIN SUMMARY
First floor beam
Beam 700 * 200 1,852.44

Beam 700*200 2,090.01

Beam 400 *200 1,131.54

Beam 400*300 563.28

Beam 400*300 side 198.37

Second floor Beam


5,434.03
Beam 700*200
1,131.54
Beam 400 *200
563.28
Beam 400*300

Beam 400*300 side 198.37

Roof Beam

Beam 700*200 3,722.77

Beam 400*300 1,609.59

Beam 400*300 side 198.37


Beam 800*200 1,941.66

Roof Beam staircase


Beam along grid line A&B 232.98
Beam Along grid line 7&8 537.65

TOTAL KG 21,405.90

06/03/19 M:S 6.beam summary


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: staircase Beam ABC Dwg no : SI 04/10/18 p2
DATE: 23/11/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1375
650
1 u bars 4 Y16 4 16 0.650 1.37 1.38 3.50 1375 55.92

1 B2 4 Y16 2 8 - 7.60 7.60 7600 60.80

1 B1 4 Y25 2 8 7.60 7.60 7600 60.80

150
7 Stirrups 4 Y8 41 164 0.150 0.65 0.65 1.84 650 301.76
-

Total length for each size - 301.76 - - 116.72 - 60.80


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 119.20 - - 184.18 - 234.27
Location Beams Sec AA & BB Total Mass 537.65 Prepare by:
Mild Steel - Checked by:
High Tensile Bars 537.65 Approved by:

06/03/19 M:S beams (700x200)staircase 7&8


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: staircase Beam ABC Dwg no : SI 04/10/18 p1
DATE: 23/11/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1375
650
1 u bars 4 Y16 4 16 0.650 1.37 1.38 3.50 1375 55.92

1 B2 4 Y16 2 8 - 2.90 2.90 2900 23.20

1 B1 4 Y20 2 8 2.90 2.90 2900 23.20

150
7 Stirrups 4 Y8 18 70 0.150 0.65 0.65 1.84 650 128.80
-

Total length for each size - 128.80 - - 79.12 23.20 -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 50.88 - - 124.85 57.26 -
Location Beams Sec AA & BB Total Mass 232.98 Prepare by:
Mild Steel - Checked by:
High Tensile Bars 232.98 Approved by:

06/03/19 M:S beams (700x200)staircase


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST21
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1 Y8 B1/T1 69 Y12 4 276 - 3.00 3.00 3000 828.00

1 Y8 T2 69 Y12 4 276 1.40 1.40 1400 386.40

350
1 35 Y10 -05 -200 B1 12 Y12 2 24 0.350 0.65 0.65 1.65 600 39.60

240
7 8- Y8 -07 -200 UB 69 Y8 13 897 0.240 0.34 0.34 1.40 340 1,255.80

Total length for each size - 1,255.80 - 1,254.00 - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 496.04 - 1,113.55 - - -
Location Beams Sec AA & BB Total Mass 1,609.59 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
1,609.59 Approved by:

06/03/19 M:S beams (400x300) roof


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST21
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm
1875
650
1175
1 u bars 18 Y25 4 72 0.650 1.88 1.38 4.00 288.00
1875
650
1 u bars 18 Y16 2 36 0.650 1.88 1.38 4.00 1375 144

1 B1 18 Y12 2 36 - 5.80 5.80 5800 208.80

1 B2 18 Y20 2 36 7.60 7.60 7600 273.60

1 B3 18 Y25 2 36 7.60 7.60 7600 273.60

150
7 Stirrups 18 Y8 36 648 0.150 0.65 0.65 1.84 650 1,192.32
12 -

Total length for each size - 1,192.32 - 208.80 144.00 273.60 561.60
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 470.97 - 185.41 227.23 675.24 2,163.92
Location Beams Sec AA & BB Total Mass 3,722.77 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars3,722.77 Approved by:

06/03/19 M:S beams (700x200) roof


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST21
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm
1875
750
1175
1 u bars 8 Y25 4 32 0.750 1.88 1.38 4.10 131.20
1875
750
1 u bars 8 Y16 2 16 0.750 1.88 1.38 4.10 1375 65.6

1 B1 8 Y12 2 16 - 5.80 5.80 5800 92.80

1 B2 8 Y20 2 16 7.60 7.60 7600 121.60

1 B3 8 Y25 2 16 7.60 7.60 7600 121.60

150
7 Stirrups 8 Y8 36 288 0.150 0.75 0.75 2.04 750 587.52
12 - - -
600
150
u clips 8 Y8 36 288 0.150 0.60 0.60 1.50 600 432.00
-
8000
main bar 8 Y10 2 16 8.00 8.00 128

Total length for each size - 1,019.52 128.00 92.80 65.60 121.60 252.80
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 402.71 78.85 82.41 103.52 300.11 974.07
Location Beams Sec AA & BB Total Mass 1,941.66 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
1,941.66 Approved by:

06/03/19 M:S beams (800x200) roof


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1 main bars 8 Y12 4 32 - 2.10 2.10 2100 67.20

250
7 Stirrups 8 Y8 8 64 0.250 0.35 0.35 1.44 350 92.16

lap 1800
8 Y12 8 64 1.80 1.80 115.20

- 92.16 - 182.40 - - -
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 36.40 - 161.97 - - -
Location Beams Sec AA & BB Total Mass 198.37 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars 198.37 Approved by:

06/03/19 M:S beams (400x300) side


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm
1875
650
1175
1 u bars 26 Y25 4 104 0.650 1.88 1.38 4.00 416.00
1875
650
1 u bars 26 Y16 2 52 0.650 1.88 1.38 4.00 1375 208

1 B1 26 Y12 2 52 - 5.80 5.80 5800 301.60

1 B2 26 Y20 2 52 7.60 7.60 7600 395.20

1 B3 26 Y25 2 52 7.60 7.60 7600 395.20

150
7 Stirrups 26 Y8 39 1,014 0.150 0.65 0.65 1.84 650 1,865.76
12 -

Total length for each size - 1,865.76 - 301.60 208.00 395.20 811.20
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 736.98 - 267.82 328.22 975.35 3,125.66
Location Beams Sec AA & BB Total Mass 5,434.03 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
5,434.03 Approved by:

06/03/19 M:S beams (700x200) s.f


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1 main bar 23 Y12 4 92 - 3.10 3.10 3100 285.20

1 laps 23 Y12 4 92 1.40 1.40 1400 128.80

350
1 u bar 6 Y12 2 12 0.350 0.65 0.65 1.65 600 19.80

240
7 stirrups 23 Y8 14 322 0.240 0.34 0.34 1.40 340 450.80

Total length for each size - 450.80 - 433.80 - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 178.07 - 385.21 - - -
Location Beams Sec AA & BB Total Mass 563.28 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars 563.28 Approved by:

06/03/19 M:S beams (400x300)


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

1 Y8 main bars 48 Y12 4 192 - 3.10 3.10 3100 595.20

1 Y8 lap 48 Y12 4 192 1.40 1.40 1400 268.80

350
1 u bars 12 Y12 2 24 0.350 0.65 0.65 1.65 600 39.60

150
350
7 stirrups 48 Y8 14 672 0.150 0.35 0.35 1.24 833.28

Total length for each size - 833.28 - 903.60 - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 329.15 - 802.40 - - -
Location Beams Sec AA & BB Total Mass 1,131.54 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
1,131.54 Approved by:

06/03/19 M:S beams (400x200)


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm
1875
650
1175
1 u bars 10 Y25 4 40 0.650 1.88 1.38 4.00 160.00
1875
650
1 u bars 10 Y16 2 20 0.650 1.88 1.38 4.00 1375 80

1 B1 10 Y12 2 20 - 5.80 5.80 5800 116.00

1 B2 10 Y20 2 20 7.60 7.60 7600 152.00

1 B3 10 Y25 2 20 7.60 7.60 7600 152.00

150
7 Stirrups 10 Y8 39 390 0.150 0.65 0.65 1.84 650 717.60
12 -

Total length for each size - 717.60 - 116.00 80.00 152.00 312.00
Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 283.45 - 103.01 126.24 375.14 1,202.18
Location Beams Sec AA & BB Total Mass 2,090.01 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
2,090.01 Approved by:

06/03/19 M:S beams (700x200)


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Beam ABC Dwg no : 16708-WD-3ST17
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm
1875
650
1175
1 u bars 16 Y20 4 64 0.650 1.88 1.18 3.70 236.80

1 B1 16 Y12 4 64 - 2.40 2.40 2400 153.60

1 B2 16 Y20 2 32 2.20 2.20 2200 70.40

1 B3 16 Y16 4 64 4.00 0.60 4.60 4600 294.4

1 B4 16 Y12 2 32 1.40 1.40 1400 44.80

150
650
7 Stirrups 16 Y8 39 624 0.150 0.65 0.65 1.84 1,148.16
12 -

Total length for each size - 1,148.16 - 198.40 294.40 307.20 -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 453.52 - 176.18 464.56 758.17 -
Location Beams Sec AA & BB Total Mass 1,852.44 Prepare by:
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
1,852.44 Approved by:

06/03/19 M:S beams(700x200)


Ramasawmy & Ramasawmy Co ltd

Steel to slab
Project : Songes Secondary School
MAIN SUMMARY

Item Description Steel Qty

MAIN SUMMARY

SLAB BLOCK A GROUNG FLOOR 2,018.09

SLAB BLOCK B GROUND FLOOR 2,617.85

Slab Block C Ground floor 2,617.85

SLAB BLOCK A FIRST FLOOR 2,018.09

SLAB BLOCK B FIRST FLOOR 2,617.85

SLAB BLOCK C FIRST FLOOR 2,617.85

SLAB BLOCK A SECOND FLOOR 2,018.09

SLAB BLOCK B SECOND FLOOR 2,617.85

SLAB BLOCK C SECOND FLOOR 2,617.85

SLAB For both staircase 395.22

TOTAL KG 22,156.59

06/03/19 M:S 7.slab summary


Ramasawmy & Ramasawmy Co ltd

BARBENDING SCHEDULE

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABCDwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50 50
1 Y8 B2 @250 2 Y8 18 35 0.050 8.35 0.05 8.45 8350 295.75

50 50`
3650
2 Y8 B1 @ 200 2 Y8 57 114 0.050 3.65 3.70 210.90

100
5 Y8 T1B1 u bars 2 Y8 64 128 0.100 0.78 0.68 1.65 775 105.60

3400
Y8 T1 2 Y8 38 76 3.40 3.40 258.40

50
6 Y8 T2 @ 250 2 Y8 28 56 0.050 2.88 2.93 2875 81.90

7 Y8 T1 2 Y8 6 12 8.00 8.00 8000


3390 48

Total length for each size - 1,000.55 - - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 395.22 - - - - -
Location
SLAB BLOCK A GROUNG FLOOR Total Mass 395.22 Prepare by: MOODALY BEN
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars 395.22 Approved by: Rikesh

06/03/19 M:S Slab Staircase


Ramasawmy & Ramasawmy Co ltd

BARBENDING SCHEDULE

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50 50
1 Y8 B2 @250 1 Y8 106 106 0.050 8.35 0.05 8.55 8350 902.88

50
2 Y8 B1 @ 200 2 Y8 123 246 0.050 8.95 9.00 8950 1,107.00

3 Y8 B1 @ 200 laps 1 Y8 82 82 0.80 0.80 3390


800 66

100
5 Y8 T1B1 u bars 1 Y8 120 120 0.100 0.68 0.68 1.55 675 186.00

8000
Y8 T2 1 Y8 7 7 8.00 8.00 56.00

50
6 Y8 T2 @ 250 1 Y8 211 211 0.050 2.88 2.93 2875 617.76

7 Y8 T1 1 Y8 102 102 9.00 9.00 9000


3390 918

3 Y8 T1 laps 1 Y8 68 68 0.80 0.80 3390


800 54

2200
8 Y8 T1 7 Y8 47 327 2.20 2.20 719

8000
9 Y8 T2 7 Y8 14 98 8.00 8.00 784

1700
9 Y8 T1 1 Y8 18 18 1.70 1.70 31

10 1 chairs Y8 165 165 0.06 0.60 0.60 1.26 208


50 50
2255
11 Y8 B2T2 1 Y8 16 16 0.050 2.26 0.05 2.36 37.68

06/03/19 M:S SLAB BLOCK C


Ramasawmy & Ramasawmy Co ltd

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

3500
12 Y8 B1 1 Y8 22 22 3.50 3.50 77

50
8950
13 Y8B2 1 Y8 13 13 0.050 8.95 9.00 117

14 Y8 B2 1 Y8 39 39 9.00 9.00 9000


3390 351

50
800
3 Y8 B2 @ 200 laps 1 Y8 19.50 20 0.85 0.85 17

50 50
2450
15 Y8 B1 1 Y8 149 149 0.050 2.45 0.05 2.55 378.68

Total length for each size - 6,627.47 - - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 2,617.85 - - - - -
Location
SLAB BLOCK A GROUNG FLOOR Total Mass 2,617.85 Prepare by: MOODALY BEN
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
2,617.85 Approved by: Rikesh

06/03/19 M:S SLAB BLOCK C


Ramasawmy & Ramasawmy Co ltd

BARBENDING SCHEDULE

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50 50
1 Y8 B2 @250 1 Y8 106 106 0.050 8.35 0.05 8.55 8350 902.88

50
2 Y8 B1 @ 200 2 Y8 123 246 0.050 8.95 9.00 8950 1,107.00

3 Y8 B1 @ 200 laps 1 Y8 82 82 0.80 0.80 3390


800 66

100
5 Y8 T1B1 u bars 1 Y8 120 120 0.100 0.68 0.68 1.55 675 186.00

8000
Y8 T2 1 Y8 7 7 8.00 8.00 56.00

50
6 Y8 T2 @ 250 1 Y8 211 211 0.050 2.88 2.93 2875 617.76

7 Y8 T1 1 Y8 102 102 9.00 9.00 9000


3390 918

3 Y8 T1 laps 1 Y8 68 68 0.80 0.80 3390


800 54

2200
8 Y8 T1 7 Y8 47 327 2.20 2.20 719

8000
9 Y8 T2 7 Y8 14 98 8.00 8.00 784

1700
9 Y8 T1 1 Y8 18 18 1.70 1.70 31

10 1 chairs Y8 165 165 0.06 0.60 0.60 1.26 208


50 50
2255
11 Y8 B2T2 1 Y8 16 16 0.050 2.26 0.05 2.36 37.68

06/03/19 M:S SLAB BLOCK B


Ramasawmy & Ramasawmy Co ltd

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

3500
12 Y8 B1 1 Y8 22 22 3.50 3.50 77

50
8950
13 Y8B2 1 Y8 13 13 0.050 8.95 9.00 117

14 Y8 B2 1 Y8 39 39 9.00 9.00 9000


3390 351

50
800
3 Y8 B2 @ 200 laps 1 Y8 19.50 20 0.85 0.85 17

50 50
2450
15 Y8 B1 1 Y8 149 149 0.050 2.45 0.05 2.55 378.68

Total length for each size - 6,627.47 - - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 2,617.85 - - - - -
LocationSLAB BLOCK A GROUNG FLOOR Total Mass 2,617.85 Prepare by: MOODALY BEN
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars2,617.85 Approved by: Rikesh

06/03/19 M:S SLAB BLOCK B


Ramasawmy & Ramasawmy Co ltd

BARBENDING SCHEDULE

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50 50
1 Y8 B2 @250 1 Y8 80 80 0.050 8.35 0.05 8.45 8350 676.00

50
2 Y8 B1 @ 200 2 Y8 82 164 0.050 8.95 9.00 8950 738.00

3 Y8 B1 @ 200 laps 1 Y8 41 41 3.00 3.00 3000


3390 123

100
5 Y8 T1B1 u bars 1 Y8 120 120 0.100 0.68 0.68 1.55 675 186.00

8000
Y8 T2 1 Y8 7 7 8.00 8.00 56.00

50
6 Y8 T2 @ 250 1 Y8 162 162 0.050 2.88 2.93 2875 473.85

7 Y8 T1 1 Y8 68 68 9.00 9.00 9000


3390 612

3 Y8 T1 laps 1 Y8 34 34 3.00 3.00 3000


3390 102

2200
8 Y8 T1 5 Y8 47 234 2.20 2.20 514

8000
9 Y8 T2 5 Y8 14 70 8.00 8.00 560

1700
9 Y8 T1 1 Y8 18 18 1.70 1.70 31

10 1 chairs Y8 125 125 0.06 0.60 0.60 1.26 158


50 50
2255
11 Y8 B2T2 1 Y8 16 16 0.050 2.26 0.05 2.36 37.68

06/03/19 M:S SLAB BLOCK A


Ramasawmy & Ramasawmy Co ltd

PROJECT: SONGES SECONDARY SCHOOL


TITLE:slab reinforcement block ABC Dwg no : 16708-WD-3ST18
DATE: 9/4/18
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

3500
12 Y8 B1 1 Y8 22 22 3.50 3.50 77

50
8950
13 Y8B2 1 Y8 13 13 0.050 8.95 9.00 117

14 Y8 B2 1 Y8 26 26 9.00 9.00 9000


3390 234

3 Y8 B2 @ 200 laps 1 Y8 13 13 6.00 6.00 6000


3390 78

50 50
2450
15 Y8 B1 1 Y8 132 132 0.050 2.45 0.05 2.55 336.60

Total length for each size - 5,109.09 - - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 2,018.09 - - - - -
LocationSLAB BLOCK A GROUNG FLOOR Total Mass 2,018.09 Prepare by: MOODALY BEN
First floor Mild Steel - Checked by:
Rev08 High Tensile Bars
2,018.09 Approved by: Rikesh

06/03/19 M:S SLAB BLOCK A


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Worktop ABC Worktop (1725*600*100)
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

50
1 main bar for 12 worktop in toilet 12 Y8 4 48 0.050 1.83 1.95 1825 93.36

50
Distributions for 12 worktop in
1 toilet 12 Y8 12 132 0.050 0.70 0.75 700 99.19

Total length for each size - 192.55 - - - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size - 76.06 - - - - -
Location Worktop ABC Total Mass 76.06 Prepare by:
Mild Steel - Checked by:
Rev08 High Tensile Bars 76.06 Approved by:

06/03/19 M:S 8.Worktop ABC


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Stairs ABC Dwg no : 16708-WD-3ST25
DATE: 20//11/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

150
150
500
500
1 T8 @ 150 BASES 1 Y8 4 4 0.150 0.50 0.15 0.80 3.20

150
500
2 T10 @ 200 BASES 1 Y10 3 3 0.150 0.50 0.15 0.80 2.40

150
2200
3 T10 @ 200 1 Y10 4 4 0.150 1.05 0.15 1.42 150 5.68

4 T 8 @ 150 1 Y8 12 12 1.60 1.60 1600 19.20

900
5 T10 @ 200 1 Y10 9 9 0.63 0.90 1.53 625 13.73
3400
500
6 T 10 @ 200 1 Y10 9 9 0.500 3.40 0.50 4.40 500 39.60

1600
7 T8 @ 150 1 Y8 25 25 1.60 1.60 40.00
900
100 2940
8 T10 @ 200 1 Y10 9 9 0.100 2.94 0.90 3.94 35.46

100 3000
500
9 T10 @ 200 1 Y10 9 9 0.100 3.00 0.50 3.60 32.40

3500
10 T12 FOR BEAM 1 Y12 4 4 3.50 3.50 14.00

140
440
11 R6 @ 125 LINKS 1 R6 29 29 0.140 0.44 0.44 1.40 40.60

3500
12 T8 @ 150 1 Y8 18 18 3.50 3.50 63.00

100 2940
1000
13 T10 @ 200 1 Y10 9 9 0.100 2.94 1.00 4.04 36.36
3000
500
14 T10 @ 200 1 Y10 9 9 0.100 3.00 0.50 3.60 100 32.40

3600
500 500
15 T10 @ 200 1 Y10 9 9 0.500 3.60 0.50 4.60 41.40

06/03/19 M:S STAIRS ABC


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary school BARBENDING SCHEDULE


TITLE: Stairs ABC Dwg no : 16708-WD-3ST25
DATE: 20//11/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm 12mm 16mm 20mm 25mm

900
500
16 T10 @ 200 1 Y10 9 9 0.50 0.90 1.40 12.60

1600
17 T8 @ 150 1 Y8 27 27 1.60 1.60 43.20

150 150

18 T10 @ 200 1 Y10 9 9 0.150 2.86 0.15 3.16 2860 28.44

150 150

19 T10 @ 200 1 Y10 9 9 0.150 2.85 0.15 3.15 2850 28.35


-

Total length for each size 40.60 168.60 308.82 14.00 - - -


Unit Mass (KG/N) for each size 0.222 0.395 0.616 0.888 1.578 2.468 3.853
Total Mass for each size 9.01 66.60 190.23 12.43 - - -
Total Mass 278.27 Prepare by:
Location Mild Steel 9.01 Checked by:
High Tensile Bars 269.26 Approved by:

06/03/19 M:S STAIRS ABC


Ramasawmy & Ramasawmy Co ltd

Steel to Stairs ABC

MAIN SUMMARY

Item Description Steel Qty

MAIN SUMMARY
STAIRS A&B
Stairs for block A&B G.F to F.F 278.27

Stairs for block A&B F.F to S.F 278.27

Stairs for block A&B S.F to ROOF 278.27

STAIRS B&C
Stairs for block B&C G.F to F.F 278.27

Stairs for block B&C F.F to S.F 278.27

Stairs for block B&C S.F to ROOF 278.27

TOTAL KG 1,669.63

06/03/19 M:S 9.sumarry stairs


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary School BARBENDING SCHEDULE


TITLE: Tie column + cill + lintel + canopy Block
Dwg
ABCno :
DATE: 25//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm

Y12 tie columns 35 columns for


1 block wall 3 Y12 140 420 - 1.23 1.23 1230

100
2 r6 @150 3 r6 315 945 0.100 0.10 0.10 0.50 100 472.50

150
225
3 y10 u clips 3 y10 140 420 0.150 0.23 0.23 0.60 252.00

600
4 r6 block ties 3 r6 280 840 0.60 0.60 504.00

6900
5 Y 12 beam/copping 3 y12 48 144 6.90 6.90

100
6 r6 beam 3 r6 396 1188 0.100 0.10 0.10 0.50 100 594.00

1200
7 y10 lintel( 4 windows x 23 panel) 3 y10 368 1104 1.20 1.20 1,324.80

15
0
8 R6 beam lintel 3 R6 828 2484 0.150 0.15 0.50 0.90 150 2235.60

9000
9 Parapet above roof 6 y12 30 179 9.00 9.00

1200
1200
9 Parapet above roof lap 6 y12 30 180 1.20 1.20

9000
10 parapet copping 4 y8 30 120 9.00 9.00 1,080.00

1000
10 parapet copping lap 4 y8 30 120 1.00 1.00 120.00

11 beam for parapet 1 y8 886 886 0.540 0.14 1.46 140 540 1,293.56

06/03/19 M:S 10.tie columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary School BARBENDING SCHEDULE


TITLE: Tie column + cill + lintel + canopy Block
Dwg
ABCno :
DATE: 25//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm

100
12 beam for copping 1 r6 886 886 0.100 0.14 1.18 140 1045.48

Total length for each size 4,851.58 2,493.56 1,576.80


Unit Mass (KG/N) for each size 0.222 0.395 0.616
Total Mass for each size 1,077.05 984.96 971.31
Total Mass 5,992.22 Prepare by: BM
Mild Steel Checked by:
High Tensile Bars Approved by:

06/03/19 M:S 10.tie columns


Ramasawmy & Ramasawmy Co ltd

12mm 16mm 20mm 25mm

514.50

993.60

1,608.00

216.00

06/03/19 M:S 10.tie columns


Ramasawmy & Ramasawmy Co ltd

12mm 16mm 20mm 25mm

3,332.10 - - -
0.888 1.578 2.468 3.853
2,958.90 - - -

06/03/19 M:S 10.tie columns


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary School BARBENDING SCHEDULE


TITLE: Tie column + cill + lintel + canopy Block
Dwg
ABCno :
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm

Y10 tie columns for partion of class


1 room 60 Y10 4 240 - 2.75 2.75 2750 660.00

150
2 y8 @ 150 tie columns 60 Y8 19 1,160 0.150 0.15 0.15 0.74 150 858.40

600
3 r6 block ties partition 3 r6 800 2,400 0.60 0.60 1440.00
600
4 r6 block ties back 3 r6 460 1,380 0.60 0.60 828.00
600
5 r6 block ties front 3 r6 460 1,380 0.60 0.60 828.00
600
6 r6 block ties toilet block 3 r6 140 420 0.60 0.60 252.00
3000
7 y8 for door jamb 3 y8 18 54 3.00 3.00 162.00
3000
8 Y8 for windows 3 y8 146 438 3.00 3.00 1,314.00
1200
9 y10 cill 3 y10 146 438 1.20 1.20 525.60

50 50
150
10 r6 cill 3 r6 657 1971 0.050 0.15 0.05 0.25 492.75

3200
11 y12 beam lintel 3 y12 292 876 3.20 3.20

150
12 y8 beam lintel 3 y8 657 1971 0.150 0.15 0.50 0.90 150 1,773.90

170 450
550
13 y8 canopy 3 y8 391 1173 0.450 0.02 0.64 1.21 1,415.81

170 450
550
13 y8 canopy in beam omitted 3 y8 391 1173 0.450 0.17 0.64 1.36 1,595.28

14 y8 canopy 3 y8 138 414 3.20 3.20 3200 1,324.80

06/03/19 M:S 11.conopy


Ramasawmy & Ramasawmy Co ltd

PROJECT: Songes Secondary School BARBENDING SCHEDULE


TITLE: Tie column + cill + lintel + canopy Block
Dwg
ABCno :
DATE: 10//07/2018
TOTAL LENGTH FOR EACH SIZE
Qty No. per Length cut
Ref Location Bar Mark Size Total No. Height Length Length
member (m) 6mm 8mm 10mm

Total length for each size 3,840.75 8,444.19 1,185.60


Unit Mass (KG/N) for each size 0.222 0.395 0.616
Total Mass for each size 852.65 3,335.46 730.33
Total Mass 7,407.67 Prepare by: BM
Mild Steel 852.65 Checked by:
High Tensile Bars 6,555.03 Approved by:

06/03/19 M:S 11.conopy


Ramasawmy & Ramasawmy Co ltd

12mm 16mm 20mm 25mm

2,803.20

06/03/19 M:S 11.conopy


Ramasawmy & Ramasawmy Co ltd

12mm 16mm 20mm 25mm

2,803.20 - - -
0.888 1.578 2.468 3.853
2,489.24 - - -

06/03/19 M:S 11.conopy