reservoir
Volume = 80m3
Freeboard = 0.5m
Clear water pump
Depth of water = 2m Pumping hour = 8h
Area of reservoir = 40m2 Pumping capacity = 30m3/h
Pumping head: as per actual
situation of each specific area
Ventilation
Section B - B
Flow controlling valve
Chlorination
Drawing not to scale
3rd
Roughing filter (optional)
2nd Average suspended solid in raw water: Medium
st Horizontal flow: 1.0m/h
1 Depth: 1.0m
Width 2.0m
Length:
1st compartment (15 – 25mm) : 3.0m
2nd compartment (8 – 15mm) : 2.5m
3rd compartment (4 – 8mm) : 2.0m
Raw water balancing tank
Sedimentation tank
Detention time = 8h
Depth of water = 2m
Area of tank = 60m2
Depth = 2m
Freeboard = 0.5m
Volume = 120m3
Width = 3m
Length = 13.5m
Surface loading Q/A = 6m/d Pumping hour = 8h
Pumping capacity =
30m3/h
Raw water pump Pumping head: as
the per the design of
the specific area