S10 Página 1

Presupuesto
Presupuesto 0102004 LOCAL DE USOS MULTIPLES SECTOR ATAHUALPA
Cliente S10 S.A.C. Costo al 02/05/2018
Lugar SAN MARTIN - RIOJA - RIOJA

Item Descripción Und. Metrado Precio S/. Mano de Obra Material Equipo Subcontrato Parcial S/.
01 OBRAS PROVISIONALES Y OBRAS PRELIMINARES 46,386.28 2,851.41 6,139.26 750.00 56,125.36
01.01 OBRAS PROVISIONALES 24,759.30 2,773.60 16.79 750.00 28,299.43
01.01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60x2.40 und 1.00 1,783.93 839.44 927.70 16.79 1,783.93
01.01.02 CASETA DE GUARDIAN Y ALMACEN m2 50.00 515.31 23,919.86 1,845.90 25,765.50
01.01.03 ENERGIA ELECTRICA PROVISIONAL PARA LA OBRA glb 1.00 750.00 750.00 750.00
01.02 OBRAS PRELIMINARES 21,626.98 77.81 6,122.47 27,825.93
01.02.01 DEMOLICION DE ESTRUCTURAS DE CONCRETO m2 37.08 703.73 20,119.61 5,974.70 26,094.31
01.02.02 TRAZO, NIVELES Y REPLANTEO m2 374.00 4.63 1,507.37 77.81 147.77 1,731.62
02 ESTRUCTURAS 240,680.56 46,681.07 14,437.19 114,836.00 416,673.55
02.01 MOVIMIENTO DE TIERRAS 6,386.66 3,069.94 2,426.85 11,883.35
02.01.01 EXCAVACION MANUAL PARA CIMIENTOS - ZAPATAS m3 64.71 11.15 282.30 439.43 721.52
02.01.02 RELLENO COMPACTADO MANUAL CON MATERIAL PROPIO m3 12.31 84.44 867.66 36.37 135.44 1,039.46
02.01.03 ELIMINACION DE MATERIAL DE EXCAVACION CON EQUIPO PESADO m3 52.40 31.70 171.51 1,489.47 1,661.08
02.01.04 RELLENO Y COMPACTADO CON MATERIAL DE PRESTAMO m3 78.60 107.65 5,065.19 3,033.57 362.51 8,461.29
02.02 OBRA DE CONCRETO SIMPLE 25,197.54 9,578.08 1,993.76 36,769.88
02.02.01 CIMIENTO CORRIDO MEZCLA PC= 140 KG/CM2 + 30%PG m3 22.13 349.59 4,341.02 3,088.43 307.27 7,736.43
02.02.02 SOBRECIMIENTOS MEZCLA PC= 140 KG/CM2 + 25%PG m3 6.12 459.56 2,501.04 134.41 177.04 2,812.51
02.02.03 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 40.78 119.22 4,267.63 465.80 128.03 4,861.79
02.02.04 FALSO PISO DE 4" DE CONCRETO 1:8 m2 372.50 57.34 14,087.85 5,889.44 1,381.42 21,359.15
02.03 OBRA DE CONCRETO ARMADO 145,520.46 34,033.05 6,837.82 186,429.65
02.03.01 ZAPATAS 8,050.18 3,052.16 454.48 11,557.24
02.03.01.01 CONCRETO EN ZAPATAS f'c=210 kg/cm2 m3 9.38 482.03 1,996.08 2,376.52 149.03 4,521.44
02.03.01.02 ACERO DE REFUERZO fy=4200 Kg/cm2. kg 186.28 37.77 6,054.10 675.64 305.45 7,035.80
02.03.02 VIGA DE CIMENTACION 43,108.35 6,976.32 2,034.28 52,129.79
02.03.02.01 CONCRETO EN VIGAS DE CIMENTACION f'c=210 kg/cm2 m3 7.70 558.11 2,234.23 1,950.97 112.31 4,297.45
02.03.02.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 36.35 180.71 6,086.44 299.57 182.59 6,568.81
02.03.02.03 ACERO DE REFUERZO fy=4200 Kg/cm2 VIGA DE CIMENTACION kg 1,070.39 38.55 34,787.68 4,725.78 1,739.38 41,263.53
02.03.03 COLUMNAS 43,150.46 5,736.70 1,959.79 50,854.32
02.03.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 6.12 604.04 2,056.57 1,501.00 139.18 3,696.72
02.03.03.02 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS m2 69.96 189.84 11,714.10 1,215.85 351.42 13,281.21
02.03.03.03 ACERO DE REFUERZO fy=4200 Kg/cm2 COLUMNAS kg 790.95 42.83 29,379.79 3,019.85 1,469.19 33,876.39
02.03.04 COLUMNETAS 37,035.19 3,985.78 1,860.24 42,889.44
02.03.04.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 3.43 319.90 382.85 686.96 27.44 1,097.26
02.03.04.02 ENCOFRADO Y DESENCOFRADO DE COLUMNETAS m2 73.20 145.86 8,867.74 1,366.17 443.37 10,676.95
02.03.04.03 ACERO ESTRUCTURAL TRABAJO PARA COLUMNAS kg 660.06 47.14 27,784.60 1,932.65 1,389.43 31,115.23
02.03.05 VIGAS 8,883.33 8,112.00 323.15 17,330.00
02.03.05.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 9.54 597.32 3,205.83 2,339.81 152.84 5,698.43

Fecha : 21/05/2018 10:22:15p.m.


S10 Página 2

Presupuesto
Presupuesto 0102004 LOCAL DE USOS MULTIPLES SECTOR ATAHUALPA
Cliente S10 S.A.C. Costo al 02/05/2018
Lugar SAN MARTIN - RIOJA - RIOJA

Item Descripción Und. Metrado Precio S/. Mano de Obra Material Equipo Subcontrato Parcial S/.
02.03.05.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 4.28 74.61 258.83 52.72 7.77 319.33
02.03.05.03 ACERO ESTRUCTURAL TRABAJO PARA VIGAS kg 1,400.03 8.08 5,418.67 5,719.47 162.54 11,312.24
02.03.06 MURO ARMADO EN ESCENARIO 1,788.33 5,957.84 99.57 7,845.54
02.03.06.01 CONCRETO f'c=175 kg/cm2 PARA MURO ARMADO m3 4.21 321.57 469.89 850.19 33.68 1,353.81
02.03.06.02 ENCOFRADO Y DESENCOFRADO EN MURO ARMADO m2 42.62 52.87 342.14 1,894.73 17.09 2,253.32
02.03.06.03 ACERO ESTRUCTURAL TRABAJO PARA MURO kg 193.27 21.93 976.30 3,212.92 48.80 4,238.41
02.03.07 LAVATORIO DE CONCRETO REV/MAYOLICA 3,504.62 212.25 106.31 3,823.32
02.03.07.01 CONCRETO f'c=175 kg/cm2 PARA LAVATORIO m3 0.25 324.19 27.90 51.16 2.00 81.05
02.03.07.02 ENCOFRADO Y DESENCOFRADO DE LAVATORIO m2 5.26 10.67 31.86 23.27 0.96 56.12
02.03.07.03 ACERO ESTRUCTURAL TRABAJO PARA LAVATORIO kg 32.83 112.28 3,444.86 137.82 103.35 3,686.15
02.04 ESTRUCTURA METALICA Y COBERTURAS 63,575.90 3,178.76 114,836.00 181,590.67
02.04.01 FABRICACION DE ARCO PRINCIPAL (0.25 x 0.40) m 134.61 200.00 26,922.00 26,922.00
02.04.02 FABRICACION DE ARCO PRINCIPAL (0.25 x 0.30) m 134.61 200.00 26,922.00 26,922.00
02.04.03 FABRICACION DE VIGUETAS m 304.96 200.00 60,992.00 60,992.00
02.04.04 MONTAJE DE COBERTURA m2 399.98 44.07 16,787.96 839.36 17,627.12
02.04.05 MONTAJE TOTAL DE ARMADURAS m2 399.98 63.60 24,227.59 1,211.34 25,438.73
02.04.06 COLOCACION DE APOYOS DE ARCO PRINCIPAL und 8.00 254.40 1,938.30 96.92 2,035.20
02.04.07 COLOCACION DE TENSOR DE ARCO PRINCIPAL und 4.00 254.40 969.15 48.46 1,017.60
02.04.08 COLOCACION DE ARRIOSTRE ENTRE VIGUETAS und 96.00 159.00 14,537.28 726.86 15,264.00
02.04.09 TENSORES DE FIERRO @ 3/8 PARA LUMINARIAS m 100.00 36.35 3,461.49 173.10 3,635.00
02.04.10 CANALETA SEMICIRCULAR DE CALAMINA GALV. 10" m 41.60 25.44 1,007.92 50.40 1,058.30
02.04.11 MONTAJE CIRCULAR @ 4" m 24.00 28.28 646.21 32.32 678.72
03 ARQUITECTURA 159,647.52 23,875.55 23,801.98 3,150.00 210,474.56
03.01 MURO Y TABIQUES 31,639.65 8,576.36 9,569.82 49,784.29
03.01.01 MUROS ASENTADO DE SOGA m2 247.72 200.97 31,639.65 8,576.36 9,569.82 49,784.29
03.02 REVOQUES ENLUCIDOS Y MOLDADURAS 80,139.39 5,307.27 12,015.80 97,455.65
03.02.01 TARRAJEO DE VIGAS Y COLUMNAS MEZCLA MORTERO C:A, 1:5 m2 183.59 142.31 21,430.97 1,025.05 3,672.54 26,126.69
03.02.02 TARRAJEO DE MUROS INTERIORES Y EXTERIORES MEZCLA MORTERO m2 417.08 142.31 48,686.89 2,328.73 8,343.26 59,354.65
C:A,1:5
03.02.03 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS m 175.68 55.10 8,202.98 1,477.73 9,679.97
03.02.04 TIMPANO CON PANEL SUPERBOARD 4mm EN TIJERAL m2 12.31 186.38 1,818.55 475.76 2,294.34
03.03 PISOS Y PAVIMENTOS 21,092.78 5,184.65 1,798.34 28,078.02
03.03.01 CONTRAPISO DE CEMENTO PULIDO E=2 m2 372.50 68.00 19,444.50 4,166.12 1,717.23 25,330.00
03.03.02 CONCRETO EN VERDA FC= 140 KG/CM2 E=0.10M m2 46.80 55.91 1,582.59 954.72 79.14 2,616.59
03.03.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS DE CONCRETO m2 7.80 16.85 65.69 63.81 1.97 131.43
03.04 PINTURA 18,684.34 2,693.69 28.89 21,412.24
03.04.01 PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES m2 417.08 17.74 6,500.74 896.51 7,399.00
03.04.02 PINTURA LATEX EN COLUMNAS Y VIGAS m2 46.80 33.37 962.96 569.37 28.89 1,561.72
Fecha : 21/05/2018 10:22:15p.m.
S10 Página 3

Presupuesto
Presupuesto 0102004 LOCAL DE USOS MULTIPLES SECTOR ATAHUALPA
Cliente S10 S.A.C. Costo al 02/05/2018
Lugar SAN MARTIN - RIOJA - RIOJA

Item Descripción Und. Metrado Precio S/. Mano de Obra Material Equipo Subcontrato Parcial S/.
03.04.03 PINTURA DE ESTRUCTURAS METALICAS m 654.31 19.03 11,220.64 1,227.81 12,451.52
03.05 CARPINTERIA DE MADERA 7,319.72 1,879.58 365.98 3,150.00 12,715.48
03.05.01 PUERTA DE MADERA P-1 und 1.00 350.00 350.00 350.00
03.05.02 PUERTA DE MADERA P-2 und 1.00 350.00 350.00 350.00
03.05.03 PUERTA DE MADERA P-3 und 2.00 350.00 700.00 700.00
03.05.04 PUERTA DE MADERA P-4 und 3.00 350.00 1,050.00 1,050.00
03.05.05 PUERTA DE MADERA P-5 und 2.00 350.00 700.00 700.00
03.05.06 VENTANA DE MADERA CEDRO Y FIERRO LISO 1/2" V-1 m2 14.36 236.01 2,593.42 665.95 129.67 3,389.10
03.05.07 VENTANA DE MADERA CEDRO Y FIERRO LISO 1/2" V-2 m2 5.39 236.01 973.43 249.96 48.67 1,272.09
03.05.08 VENTANA DE MADERA CEDRO Y FIERRO LISO 1/2" V-3 m2 20.78 236.01 3,752.87 963.67 187.64 4,904.29
03.06 CERRAJERIA 771.64 234.00 23.15 1,028.88
03.06.01 CERRADURA TIPO PESADA 02 GOLPES pza 9.00 8.00 72.00 72.00
03.06.02 MANIJA DE BRONCE PARA PUERTAS und 9.00 8.00 72.00 72.00
03.06.03 BISAGRA ALUMINIZADA CAPUCHINA 4"x4" pza 18.00 49.16 771.64 90.00 23.15 884.88
04 INSTALACIONES SANITARIAS 7,871.65 7,908.99 102.72 250.00 16,133.38
04.01 APARATOS Y ACCESORIOS SANITARIOS 870.04 409.59 26.10 250.00 1,555.72
04.01.01 INODORO TANQUE BAJO BLANCO pza 2.00 203.00 406.00 406.00
04.01.02 URINARIO CORRIDO CON CERAMICA und 1.00 250.00 250.00 250.00
04.01.03 COLOCACION DE APARATOS pza 2.00 304.93 590.94 1.20 17.73 609.86
04.01.04 COLOCACION DE ACCESORIOS pza 2.00 144.93 279.10 2.39 8.37 289.86
04.02 SISTEMA DE AGUA FRIA 2,723.05 699.40 76.62 3,499.10
04.02.01 SALIDA DE PVC SAL PARA DESAGUE pto 2.00 477.83 590.94 347.00 17.73 955.66
04.02.02 SALIDA DE PVC SAL PARA VENTILACIÓN DE 2" pto 2.00 112.69 169.38 56.00 225.38
04.02.03 REGISTRO DE BRONCE 4" und 2.00 248.75 443.20 41.00 13.30 497.50
04.02.04 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 1.00 40.00 40.00 40.00
04.02.05 SALIDA DE AGUA FRIA CON TUBERIA DE PVC - SAP 1/2" pto 6.00 296.76 1,519.53 215.40 45.59 1,780.56
04.03 SISTEMA DE DRENAJE PLUVIAL 4,278.56 6,800.00 11,078.56
04.03.01 TUBERIA MONTANTE DE AGUA DE LLUVIA DE 4" m 17.00 651.68 4,278.56 6,800.00 11,078.56
05 INSTALACIONES ELECTRICAS 53,806.58 8,235.90 219.68 62,262.08
05.01 SALIDAS 9,745.16 513.90 219.68 10,478.60
05.01.01 SALIDA PARA CENTRO DE LUZ pto 18.00 227.44 3,757.50 223.78 112.73 4,093.92
05.01.02 SALIDA PARA INTERRUPTOR DOBLE pto 4.00 252.68 886.40 80.00 44.32 1,010.72
05.01.03 SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PVC pto 10.00 236.02 2,087.50 210.12 62.63 2,360.20
05.01.04 LUMINARIA FLUORESENTE TIPO E2 PARA COLGAR und 17.00 177.28 3,013.76 3,013.76
05.02 CONDUCTORES Y/O CABLES 14,872.32 2,700.00 17,573.40
05.02.01 ACOMETIDA DE CAJA DE PASO TD-01 m 180.00 29.44 5,299.20 5,299.20
05.02.02 CABLE ELECTRICO 12mm2 THW m 540.00 22.73 9,573.12 2,700.00 12,274.20

Fecha : 21/05/2018 10:22:15p.m.


S10 Página 4

Presupuesto
Presupuesto 0102004 LOCAL DE USOS MULTIPLES SECTOR ATAHUALPA
Cliente S10 S.A.C. Costo al 02/05/2018
Lugar SAN MARTIN - RIOJA - RIOJA

Item Descripción Und. Metrado Precio S/. Mano de Obra Material Equipo Subcontrato Parcial S/.
05.03 CANALIZACIONES Y/O TUBERIAS 28,534.18 4,872.00 33,405.16
05.03.01 TUBERIAS PVC SAP - ELECTRICAS (20 mm) D3/4" m 256.00 20.86 2,269.18 3,072.00 5,340.16
05.03.02 TUBERIAS PVC SAP - ELECTRICAS (25 mm) D=1" m 150.00 187.10 26,265.00 1,800.00 28,065.00
05.04 TABLEROS Y CUCHILLAS 654.92 150.00 804.92
05.04.01 TABLERO ELECTRICO P/DISTRIBUCION DE CIRCUITOS TD-01 und 1.00 804.92 654.92 150.00 804.92
06 EQUIPAMIENTO Y MOVILIARIO 300.00 4,500.00 4,800.00
06.01 EQUIPAMIENTO 300.00 300.00
06.01.01 EQUIPO DE SONIDO glb 1.00 300.00 300.00 300.00
06.02 MOVILIARIO 4,500.00 4,500.00
06.02.01 MOVILIARIO PARA OFICINA glb 1.00 500.00 500.00 500.00
06.02.02 MOVILIARIO PARA LOCAL DE ESPECTACULOS glb 1.00 4,000.00 4,000.00 4,000.00
07 VARIOS 3,959.16 198.03 4,158.88
07.01 LIMPIEZA FINAL DE LA OBRA m2 374.00 11.12 3,959.16 198.03 4,158.88
COSTO DIRECTO 770,627.81

Fecha : 21/05/2018 10:22:15p.m.