Month of April
2015
SN Plant/Location Equipment Description SWL(Kg) Owner ID Remarks
Satisfactory
Yes No
Runway beam c/w Trolley & Chain Block Not handed over
PS
1 PS -2 500 PS-2-LE
(SN:GD 69330) Manually operated/Morris
Runway beam c/w Trolley & Chain Block Not handed over
PS
3 PS - 4 1000 PS-4-LE
(SN:GD 30106) Manually operated/Morris
4 1000 PS 7-LE1
Hoist (SN:36441A )/ Morris
5 PS - 7 1000 PS 7-LE2
Chain Block (SN: GD 63480)/ Morris
6 1000 PS 7-LE3
Chain Block (SN: GD 63478)/ Morris
CRANE(S3 SERIES/DG0073710/KD)/
√ PM was done
PS
11 3000 PS 17-LE1
Hoist (SN:1248313917)/ Kone
12 PS - 17 3000 PS 17-LE2
Hoist (SN:HMY96762)/ Kone
13 3000 PS 17-LE3
Hoist (SN:1248313918)/ Kone
Runway beam c/w geared Trolley & Chain Not handed over
PS
√ PM was done
PS
Over head beam c/w under Slung Electric Not handed over
PS
17 3000 PS 31/LE1
Hoist (SN:08-0120)/ Pelloby
18 PS - 31 1000 PS 31/LE2
Hoist (SN:16-0168 )/ Pelloby
19 500 PS 31/LE3
chain block(SN:61778) Pelloby
√ PM was done
PS
22 PS 52 500 PS 52-LE
Chain Block (SN: GD 48132)
23 PS 53 500 PS 53-LE
Chain Block (SN: GD 48130)
24 PS 54 1000 PS 54-LE
Chain Block (SN: GD 63429)
√
Runway beam c/w Gear Trolley and Electric
PM was done
PS
01-04-2015 1 of 5 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Preventive Maintenance Monthly Summary - April 2015
Update as of 8th April 2015
Month of April
2015
SN Plant/Location Equipment Description SWL(Kg) Owner ID Remarks
Satisfactory
Yes No
√
Runway beam c/w Gear Trolley and Electric
PM was done
PS
√
Runway Beam c/w Chain Block Liftingear
PM was done
PS
34 1000 PS 5-LE1
chain block(S/n0.29536)/Morris
35 PS - 5 1000 PS 5-LE2
chain block(S/n0.Y.B13099)/Felco
36 1000 PS 5-LE3
chain block(S/n0.B.D33839)/Morris
37 1000 PS 6-LE1
chain block (SN:GD 29537)/Morris
38 PS - 6 2000 PS 6-LE2
Chain Block and Trolley (SN:338005)/Kito
39 1000 PS 6-LE3
chain block (SN:GD 29533)/Morris
√ PM was done
PS
47 5000 PS 40-LE1
Hoist (SN:QAT/C/2475)/ Krone
48 5000 PS 40-LE2
Hoist (SN:QAT/C/2498)/ Krone
PS - 40
Over head beam c/w under Slung Electric
√ PM was done
PS
49 5000 PS 40-LE3
Hoist (SN:QAT/C/2499)/ Krone
50 3000 PS 40-LE4
Hoist (SN:)/ Krone
01-04-2015 2 of 5 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Preventive Maintenance Monthly Summary - April 2015
Update as of 8th April 2015
Month of April
2015
SN Plant/Location Equipment Description SWL(Kg) Owner ID Remarks
Satisfactory
Yes No
Over head beam c/w under Slung Electric Not handed over
PS
51 1600 PS 50-LE1
Hoist (SN:83593)/ Morris
√ PM was done
PS
√ PM was done
PS
60
Runway beam c/w under Slung Electric
Hoist (SN:36441A )/ Morris
1000 PS 8-LE1 √ PM was done
61 PS-8
Runway beam c/w geared Trolley and
Chain Block (SN: GD 63485)/ Morris
1000 PS 8-LE2 √ PM was done
62 1000 PS 8-LE3
Chain Block (SN: GD 63486)/ Morris
√ PM was done
PS
01-04-2015 3 of 5 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Preventive Maintenance Monthly Summary - April 2015
Update as of 8th April 2015
Month of April
2015
SN Plant/Location Equipment Description SWL(Kg) Owner ID Remarks
Satisfactory
Yes No
√ PM was done
PS
79 PS - 41 500 PS 41-LE
operated/Morris
√ PM was done
PS
√ PM was done
PS
√ PM was done
PS
83 PS - 10 1000 PS 10-LE
Hoist (SN:36371Q)/ Morris
84 PS - 11 1000 PS 11-LE
Hoist (SN:36441A)/ Morris
85 5000 PS 30-LE1
Hoist (SN:12537310817)/ Kone
86 5000 PS 30-LE2
Chain Block (SN: 12537310823)/ Kone
PS - 30
Chain Block (SN: 1237310818) Manually
√ PM was done
PS
87 3000 PS 30-LE3
operated/Kone
88 5000 PS 30-LE4
operated/Kito
Over head beam c/w under Slung Electric Not handed over
PS
89 3200 PS W1-LE1
Hoist (SN:94281490)/ Demag
PS - W1
Over head beam c/w geared Trolley and Not handed over
PS
90 2000 PS W1-LE2
Chain Block (SN: GD 3157)/ Morris
√ PM was done
PS
92 PS - W3 1000 PS W3-LE
Geared trolley (SN:GD 47805)/Morris
93 PS - W5 500 PS W5-LE
Manually operated/Morris
94 PS - W6 500 PS W6-LE
Manually operated/Morris
√ PM was done
PS
√ PM was done
PS
√ PM was done
PS
√ PM was done
PS
√ PM was done
PS
√ PM was done
PS
01-04-2015 4 of 5 WBQ/F/143
Rev01 13th February 2012
Lifting Equipment Preventive Maintenance Monthly Summary - April 2015
Update as of 8th April 2015
Month of April
2015
SN Plant/Location Equipment Description SWL(Kg) Owner ID Remarks
Satisfactory
Yes No
√ PM was done
PS
01-04-2015 5 of 5 WBQ/F/143
Rev01 13th February 2012