ange in scope of the project is the rehabilitation works in Derajat C
, profile of project is given at Annexure-II.
eOb{_g_[ygt
The project objectives Include the following;
• Improvement of main dellvery system through rehabilitation of Jhang branch (Upper
Lower).
.
" ' Detailed compar tive statement of approved scope and 2n revised scope
• Water Scarcit •
• Seepage loss s in irrigation system
• Lack of Privat sector participation
• Deteriorating i stitut onal capacities of key water sector instit
• Increased p erty in backward irrigated areas.
• Protection of Infrastructure from onslaught of floods.
0) (a)S6CtOF IS8U62
Water 9carcit
• Seepage loss‹is in irfigation system
• Lack of Privat‹i sector participation
• Deteriorating i zstitutf,onal capacities of key water sector institutions.
• Increased poverty in backward irrigated areas.
• Protection of Infrastructure from onslaught of floods.
(b) Sector Strat‹ gy
Water Sector St ategy centers around five important elements i.e. w
conservat on, groundwater management, protection of infrastructure
9alinity Z floods and institutional reforms.
Relationship of the project wlth the sector issues:
The project is related to the issue of water scarcity, seepage losses in Irrigatlon
sector participation.
), 10. Environmental Impact Asseaament
IU.IA has been carried out.
11. Lxlstlng Facllltlea:
The project area comprises of three Irrigation zone namely Bahawalpur, DG
irrigation zone. The agriculture land of thë project area is being served
For operati
I
s9lonal urÎdtechnica 3500 1 100 1 3800 80 l -
inistrativo, Executive 4000 ] 300 ) 4300 55 I -1
6000 800 6900 75 )
I - ” I - 430 )
800 - É 800
150,000 17000 167000
Cos
7› age
'
ltnm 1-' Rsvised Z"* re•z ed
. PC-I
(iv) Brñlges/Falls (Repairs / New
! 1128 ! -
1147 t
w
{ii) Rehabilitation (Kms 587 o
(ill) Out lets (Nose A 5173 ) +
Constnxñion Replacement 8493 T
9 7
(vii) Buildings 8 5
(a) Repair (Sft) 72709 48372
(b) Replacem
e•• ‹mL
169807 153?47
289.9 2 40
174.62 j -5.38
g
g
6
g
41 41 g 0
4325 ### )
1800
1541 ### o
100 0
7.ŒI ###
“" 5 Capac"xy Building & Tzaining
(a) Capacity BuZding & Trainîng Special staff (Versons)
(b) Capacité Building & Training Support staff Pensons
(c) Area fer LASER Land Levefing (Acrœ)
(d)AœafœBedand Funow(Amæ)
(e) Area under High Eff«üency lrñgation
S Awes
6 Aud“ztor fôr SOE Consutlancy Chargœ '*
in Rs. Millions
178.402 26£95
+•+'+°+°* 8,¥01.820 ^+•*^*-**
Subtotai Prfce contingencie
6.5% sæ.æ 1,001.03
Total including Price
Conöngencie
s 9.092.400 11,221.42
Financial charges @ 1s and
l UtlOrl
*/ O
** Wed
e tąq
t nd
äJ¢pe
reform
the er »un; s O
^ ^igh side. iture øq q *SUltan
Mem
(W
eterj ț › b «„„,^a
* evelo
/Tło nt re
work PBCÎtØ ge s,
res
uitíng Pment B gpg in
ns. o
*+ negot ation,s
ć6CO mended
11, 5/4.
08
Ation løøj f Rs. 10
,17 st
thaş 6^Pend
itur», .
/ Ofjg
^/un ø
1- Civil Works-A (23 en-going Civil Wor'x Packages)
DJT7OGK — 1
LCOØ gÆSD — 1
LCCOAgÆSD — 2
LCCOAgÆSD — 9
LCCgAg/JMG — 1
LCC{VU}/JNG — 3
Final Bdls
Defect Liability Pertod
NOTIFICATION
SO(Evl)lRRl/ Z /2010: In order to improve the procurement process for
transparency, efficiency and economy in the implementation of developm
Central Procurement Office (CPC) is hereby established in Irrigation and Pow
Secretariat for procurement of all development projects / cbntracts costing Rs
Further a Centrsl Procurement Commlttee (CPC) comprising the following me
to carry out the procurement process for the above contracts:
i. Additional Secretary (Technical) Convener
ii. Chief Engineer (Concerned Zone) Member
iii. Chief PMIU ‘Member
iv. Director Procurement, PMO, P&R Zone Member/Secretary
v. Executive Engineer (Concerned Division) Membat
vi. Team Leader - Consultants Member
Tender
SN-2669/09 24 ftov 08
S8-2880f00 26 N«y 09
” " elevation, 166,00,000/• ¥á ›0áorh, lueh glean lawri, 03 l¥cs. Levele ' and , jun lora, A9 oefendant•
B fa there 042•111•574•574. YOUsAF Bhał¢ 042•11 l·l23•609. 0333•4/063736. Shahant. hsa already bea,n țen
(26023066238) (25023066236) Pfooaas bÿ ” 4rrí›af at hb
QOVBRNMBNT OP 7HB PUNJAC ze¥eflt Sit O IgSte 6 O t eftł
pre•quaIlfled, will be required to suhmlt alo
IRRIQAYION AND POWER D£PARYMBN7 PUNJAB IRRITATION agreement conxtltutkig the "Joint Yenture", All
6Y6TCM IMPROV¥MBN¥' PROJECT • PIØIP oln ly вnd зcvcrslly responslbla/ Ilahle fbr e
łNVI7ATION FOR PRGQUALIFI• CATION OF Twiden fbr 4 No. PacMges ofDO Khtn C 1 System ki DO
ard
ecI‹lon:
atleoal Econamlc Counsll consjąq/aą \ q p (qy\ \\t yd
ent hro)a<t (PIęlP) PK-Pss (2^° red lsad P‹:-i)' a›
ent Dlv'lelort In thełr aummary dated 1" Octob yi',
ab.
d Dralnage Authority (PIDA)
nt, Government of the Pun ab.
Rs. Lillian OiUn 1 007
ects I to Ill)
oject IV)
cope is given at
ector institutions.
s.
'
„
osses in Irrigatlon system ‹ Lacd of Private
47.3°/
54^/
HAS9AN NAWAZ
TARAI
SEGRETARY
d Difference !
%
The cost increases due to inclusion of additional
scope of work that was not induded due to paucity
of funds in the approved PC-I to over come the
operational management issue i.e heavy water
theft, cuts, breaches due to vulnerable banks.
25.13 To cater for the inflation of Civil Work from
Quarter 2010 to Bi-annual August 2012 to January
2013
-5.90 Rationalized
37.61 Rationalized cost alter inclusicn of 3 years in
"ect com letion date
-0.95 Raâonalized
27.5s
Rationalîzed cost due to extension of Co
-3.08
February 2016 for Civil Works-B
-2.06 RagonaFized
0.00 No Change
25.12
Increase as per Civil Works-A & Civil Woks
17.o3
41.00
lncrease as per extension in project co
-B
mpletion
rnpleüon
27.55 Increase as per extension in project completion
date from June 30, 2013 to June 30, 2015
tal. 9,Z97.241 11,M4.080 15.39 Increase as per extension in project
on
m June 30, 2013 to June 30.2015
T Annexure
-
evised PC JICA Assisted.
'11,634.08
n Bahawalpur, DG Khan a
-341
-3
0 No Change
0 No Change
29.M
57.71 No Change No Change
R
e
a
400.18 110.2?8 Rationafized œs: due to exiension of Consultancy Services upto s
I June 2G1 . for Civil o
ne 2fl15 fer Civil Works-B n
s
w
i
-5.38 Works-A and Ju
No Change
0 No Change
) Saying Uölized
1800
o No Change
0 No Change
No Change
11,221.42 2,129.02
Increase as per extension in Project
7
CNEg in its m eti
ng / ct
w
e‹
Proje t once
the ClU
d g «e ncy r
ing
zic ¡ ,
iture øq q *SUltancy
wice
techn
ical øąy¡ ,
ful iø ț@
t ation,s
st
/sed
gl6 [
lO
• n eз
Jan Feb
nment of I e Pun)ab,
on & Power epartment,
srkali, Lnhore
:rJ- 07 - 2010
OCESS
epartment’s Notification No. SO (Evl)
nt of procurement process for your
AB
nt Committee are
s / Agencies
to the concerned
uthority
cure nt procedures and guidelines of
A
nt, Lahore.
S
nment of Punjab, Lahore.
e
c
r
e
ment, Lahore
t
a
r
y