Grant:

Admn.Sanction: G.O.Rt.No.1393 , dt: 15-09-2010 of P.R & R.D (PROGS.I A) Department.

Sl,No Village Name of the work


1 Varahapuram Providing CC Raod From K Subba Rao (H) to P Venkateswara Rao (H) in
Varahapuram (V).

2 Providing CC Raod From G.Lakshmi(H) to Y Vasantha Rao (H) in


Varhapuram (V).

3 Providing CC Raod From Y.Raju (H) to Y Vasantha Rao (H) in Varahapuram


(V).

4 Providing CC Raod From G.Babu (H) to M Ajit (H) in Varahapuram (V).

5 Providing CC Raod From S.Kotaiah to G Nageswara Rao (H) in Varahapuram


(V).

6 Providing CC Raod From M.Hanumanthu Rao (H) to J.Ganapathi (H) in


Varahapuram(V).

7 Providing CC Raod From M.Subba Rao (H) to Anganwadi Centre in


Varahapuram(V).

8 Providing CC Raod From J.Nagamalleswara Rao (H) to G.Neelambaram (H)


in Varahapuram(V).

9 Providing CC Raod From A.Yesuratnam (H) to P.Abraham (H) in


Varahapuram(V).

10 Providing CC Raod From A.Jakraiah (H) to Y.James (H) in Varahapuram (V).

1 Kuchellapadu Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

2 Providing CC road from Ramalayam Temple to P.T Office via., K Srinu (H) in
Kuchellapadu.

1 Zampani Providing CC road from A Gangaraju (H) to G Channaiah(H) in Zampani (V).

2 Providing CC road from R.Lokanadha Rao(H) to Ch.Venkateswara Rao (H)


Zampani(V).

3 Providing CC road from D Salmon (H) to K Subba Rao (H) in Zampani (V).

1 Peravali Providing internal CC roads in Peravali Vilalge.

2 Providing CC roads in B.C colony of Peravali Village

3 Providinng CC roads in B.C Colony of Peravali Village.


1 Vemuru Constuction of Meeting hall in MPP Compound of Vemuru (V&M).
Est.cost
5.00

4.60

4.60

3.00

3.00

2.60

2.20

4.80

3.00

3.00

5.00

5.00

2.75

3.00

4.90

5.00

5.00

3.00
30.00
ORIGINAL ESTIMATE

NAME OF THE WORK: Providing CC road from P.T Office (South side) to Z.P Raod in
Kuchellapadu

ESTIMATE COST:- 5.00 Lakhs

GRANT: M.N.P

ADMN SANCTION:- Vide GO.Rt.No:1393 , dt:15-09-2010, of P.R&R.D (progs. I A)


Dept.,HYD.

TECH SANCTION:-

PANCHAYAT RAJ DEPARTMENT

DIVISION:TENALI SUB-DIVISION:- VEMURU


MANDAL:- Vemuru
SPECIFICATION REPORT

Name of the WorK : Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

Est.cost : Rs 5.00 Lakhs

Grant : M.N.P

Ref. to Admn.Sanction : Vide GO.Rt.No:1393 , dt:15-09-2010, of P.R&R.D (progs. I A) Dept.,HYD.

1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m,
dressing of side

2 Filling in foundation trenches with sand as per drawing and technical specification Clause 305.3.9 MORD & 304
MORTH

3 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size Graded hard stone
aggregate, mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete
as per drawings and techni

4 Providing CC pavement of 170 mm thickness with M30 grade concrete by providing Contraction and Expansion joints
with Joint fillers ( sand and B.T) and Mastic pads of 25.40 mm thickness as per technical specifications.

Filling the side berms with gravel including cost and conveyance of all materials and labour charges and drawings and
5
technical specifications etc, complete for side berms

6 Q.C.Charges at 0.5%

7 Provsion for VAT at 4%.

8 Provision for Insurance charges at 0.37%.

9 Unfore seen items such as filling the low laying areas with gravel etc complete.

Nessasary provisions are made in this estimate for un foreseen items and the work will be executed as per APDSS and the
estimate is prepared with SSR 2009-10

Deputy Executive Engineer Asst.Executive Engineer


P.R.I Sub division Vemuru P.R.I Sub division Vemuru.
DETAILED CUM ABSTRACT ESTIMATE

Name of the work:Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

Grant M.N.P Est.Cost: Rs. 5.00 Lakhs


Sl. Measurements
Description of item Nos Quantity Rate/Per Amount
No L B D
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of side
From Ramalayam to P.T office 2 77.00 0.23 0.45 15.94
for cros wall at the end of road 1 3.29 0.23 0.45 0.34

Abutments for slab culvert 2 7.50 0.60 0.75 6.75

23.03 122.70 2826


Cum 1Cum
2 Filling in foundation trenches with sand as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH

From Ramalayam to P.T office 2 77.00 0.23 0.15 5.31


for cros wall at the end of road 1 3.29 0.23 0.15 0.11
for levelling of surface 1 77.00 3.29 0.150 38.00
Abutments for slab culvert 2 7.50 0.60 0.15 1.35
44.77 386.40 17299
Cum 1Cum
3 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal
size Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted
by vibration including curing for 14 days complete as per drawings and techni

Shoe wall for cc pavement Below GL 2 77.00 0.23 0.30 10.63


for cros wall at the end of road 1 3.29 0.23 0.30 0.23
Abutments for slab culvert 2 7.50 0.60 0.15 1.35
12.21 3365.50 41093
Cum 1Cum

Shoe wall for cc pavement Above GL 2 77.00 0.23 0.150 5.31


for cros wall at the end of road 1 3.29 0.23 0.150 0.11
5.42 3500.10 18971
Cum 1Cum

5 Plain/reinforced cement concrete in substructure complete as per drawings and technical


specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH

P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer
(MORD)
Abutments for slab culvert 2 7.50 (0.45+0.30)/2 0.45 2.53

2.53 3968.90 10046


Cum 1Cum

Main_Est
Sl. Measurements
Description of item Nos Quantity Rate/Per Amount
No L B D
1 2 3 4 5 6 7 8 9
6 Providing and laying reinforced cement concrete in superstructure as per drawing and
technical specifications Clauses 800, 1205.4 and 1205.5 MORD / Sections 1500, 1600 &
1700 MORTH
R.C.C. Grade M 30 Design Mix
For solid slab 1 7.50 1.20 0.20 1.80
1.80 5556.50 10002
Cum 1Cum

7 Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per
drawing and technical specifications Clauses 1002, 1010 and 1202 MORD / 1600 MORTH,
for Bars below 36 mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding VAT

Steel for solid slab 1 300.00 300.00


300.00 45.01 13502
Kgs 1Kgs

4 Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain
cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade
cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and
appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork
(steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates
including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and finished in continuous operation
including provision of contraction and expansion, construction joints, applying debonding
strips, primer, sealant, dowel bars, near approaches to bridge / culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14- days, curing compound (where
specified) and water finishing to lines and grade as per drawing and Technical Specification
Clause 1501 MORD.

From Ramalayam to P.T office 1 77.00 3.75 0.17 49.09


49.09 5273.20 258861
Cum 1Cum
5 Filling the side berms with gravel including cost and conveyance of all materials
and labour charges and drawings and technical specifications etc, complete for
side berms

2 77.00 0.60 0.25 23.10 403.80 9328


Cum 1Cum

6 Provision for CD Works: 61360


C/0 Pipe culvert: As per sub estimate

7 Provision for Retaining Wall:


As per sub estimate 33445

476733

8 Add VAT @ 4 % 19069

Main_Est
Sl. Measurements
Description of item Nos Quantity Rate/Per Amount
No L B D
1 2 3 4 5 6 7 8 9
9 Q.C.Charges at 0.5% 2384
10 Provision for insurance charges 0.37% 1764
11 Unfore seen items if any 50
500000

Deputy Executive Engineer


P R I: sub-division : Assistant Executive Engineer
Vemuru P R I: Spl Works : Vemuru

Main_Est
Sub-Estimate-Pipe Culvert

Name of the work:Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

Est.Cost: Rs. 5.00 Lakhs


Sl. Measurements
Description of item Nos Quantity Rate/Per Amount
No L B D
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1
including setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto a lead of 50 m, dressing of side

Body wall on both sides of the pipe 2 3.00 0.90 1.05 5.67

Below 600 mm dia., pipes 1 6.15 1.00 0.40 2.46


8.13 122.70 998
Cum 1Cum

2 Filling in foundation trenches with sand as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH

Body wall on both sides of the pipe 2 3.00 0.90 0.15 0.81

Below 600 mm dia., pipes 1 6.30 1.00 0.15 0.95


1.76 386.40 680
Cum 1Cum

3 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and techni

Levelling course below body 2 3.00 0.90 0.15 0.81


walls(Bed concrete)
0.81 3365.50 2726
Cum 1Cum

4 Providing concrete for plain/reinforced concrete in open foundations using 40 mm nominal size
Graded hard stone aggregate, mechanically mixed, placed in foundation and compacted by
vibration including curing for 14 days complete as per drawings and techni

Bedding for Pipe


(i) Type A (Concrete Cradle)
Bedding
P.C.C grade M 15 (MORD)
Below 600 mm dia., pipes 1 6.30 1.00 0.10 0.63
0.63 3372.10 2124
Cum 1Cum

5 Plain/reinforced cement concrete in substructure complete as per drawings and technical


specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200
MORTH

P.C.C grade M 15
Nominal mix (1:2.5:5) using CC
Mixer (MORD)
Body wall on both sides of the pipe 2 3.00 (0.75+0.60)/2 0.60 2.43
upto G.L

Sub_Est_PC
Sl. Measurements
Description of item Nos Quantity Rate/Per Amount
No L B D
1 2 3 4 5 6 7 8 9
Alround the pipe for 600 mm dia., 1 6.30 1.00 0.60 3.78
pipe
Above GL 2 3.00 (0.60+0.45)/2 0.600 1.89
Parapet wall on both sides of the 2 3.00 0.30 0.600 1.08
pipe
9.18 3968.90 36435
Cum 1Cum

6 Cost and supply of 600 mm dia RCC NP3 Pipes including cost and conveyance of
all materials and labour charges etc, complete for road crossing of drainage water

1 7.50 - - 7.50 2284.70 17135


RM 1RM

8 Laying and jointing of RCC 600mm dia pipes including collars and labour charges
etc, complete for road crossing of drainage water

1 7.50 - - 7.50 52.70 395


RM 1RM

10 Plastering with cement mortar (1:5), 12 mm thickness as per technical specification


1300 & 2200 MORTH

On both sides of the body walls 2 3.00 1.50 9.00


Front faces 4 0.30 0.60 0.72
4 0.53 0.45 0.95
10.67 61.90 660
Sqm 1Sqm

11 White washing two coats with whiting of approved quality to give an even shade
after thoroughly brushing the surface to remove all dirt and remains of loose
powdered materials including cost of all materials, labour charges and incidental
such as scaffolding, lift charges etc., complete for finished item of work, but
excluding conveyance charges of materials for inside portion of the culvert body
walls/retaing walls.

On both sides of the body walls 2 3.00 1.50 9.00


Front faces 4 0.30 0.60 0.72

4 0.53 0.45 0.95

10.67 19.40 207


Sqm 1Sqm

Total Rs. 61360

Deputy Executive Engineer


P R I: sub- Assistant Executive Engineer
division : Vemuru P R I: Spl Works : Vemuru

Sub_Est_PC
Sub - Estimate - Retaining Wall
Name of the work:Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

Est.Cost: Rs. 5.00 Lakhs


Sl.N Measurements
Description of item Nos Quantity Rate/Per Amount
o L B D
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for structures as per drawing and technical specifications Clause
305.1 including setting out, construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto a lead of 50 m, dressing of side

Retailing wall 1 12.00 0.65 1.20 9.36

9.36 122.70 1148


Cum 1Cum

2 Filling in foundation trenches with sand as per drawing and technical specification Clause
305.3.9 MORD & 304 MORTH

Sand filling:
Retaining wall 1 12.00 0.65 0.15 1.17

1.17 386.40 452


Cum 1Cum

3 Providing concrete for plain/reinforced concrete in open foundations using 40 mm


nominal size Graded hard stone aggregate, mechanically mixed, placed in foundation and
compacted by vibration including curing for 14 days complete as per drawings and techni

VCC M10 concrete, CC(1:3:6).


Leveling course (Bed concrete). 1 12.00 0.65 0.15 1.17
1.17 3365.50 3938
Cum 1Cum

4 Plain/reinforced cement concrete in substructure complete as per drawings and technical


specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 &
2200 MORTH

VCC M15 Concrete, CC(1:2.5:5).


Below GL 1 12.00 (0.50+0.35)/2 0.90 4.59
Above GL 1 12.00 (0.35+0.23)/2 0.600 2.09
6.68 3968.90 26512
Cum 1Cum

5 Plastering with cement mortar (1:5), 12 mm thickness as per technical specification 1300
& 2200 MORTH
Above G.L 1 12.00 1.43 17.16

17.16 61.90 1062


sqm 1sqm

Sub_Est_RW
Sl.N Measurements
Description of item Nos Quantity Rate/Per Amount
o L B D
1 2 3 4 5 6 7 8 9
6 White washing two coats with whiting of approved quality to give an even shade after
thoroughly brushing the surface to remove all dirt and remains of loose powdered
materials including cost of all materials, labour charges and incidental such as
scaffolding, lift charges etc., complete for finished item of work, but excluding
conveyance charges of materials for inside portion of the culvert body walls/retaing walls.

Above G.L 1 12.00 1.43 17.16

17.16 19.40 333


sqm 1sqm

Total: 33445

Deputy Executive Engineer


P R I: sub-division : Assistant Executive Engineer
Vemuru P R I: Spl Works : Vemuru

Sub_Est_RW
DETAILED DATAS
Name of the work:Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu

Est.Cost: Rs. 5.00 Lakhs


Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6

1 Excavation for Structures


RBR-FNDN-1

Earthwork in excavation for structures as per drawing and technical


specifications Clause 305.1 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious material and disposal
upto a lead of 50 m, dressing of sides and bottom and backfilling in
trenches with excavated suitable material as per Technical Specification
305 MORD / 304 MORTH

Note : Classifications of Earth Work


Specification are as per 302.2.1(a) of
MORD and 301.2.1 of MORT&H

(I) Ordinary soil


(A) Manual Means
(i) Upto 3 m depth
Unit = cum
Taking output = 10 cum
a) Labour
Mazdoor (Unskilled) day 3.64 196.00 713.44
Add 20% MAA on Labour 142.69
. Add seignorage charges 1.00Cum 10.00 22.00 220.00
Cost for 10 cum = a+b+c 1076.13
Contractors profit 14% 150.66
1226.79
Rate per cum = (a+b+c)/10 122.68
122.70
2 Filling in foundation trenches with sand as per drawing and technical
RBR-FNDN-2

specification Clause 305.3.9 MORD & 304 MORTH


I Sand filling Sand
Unit = cum
a) Labour
Mazdoor (Unskilled) day 0.31 196.00 60.76
Add 20% MAA on Labour 12.15
b) Material
Sand /Gravel cum 1.00 265.97
Rate per cum = a+b+c+d 338.88
Contractors profit 14% 47.44
386.32
386.40
./cum
3 Providing concrete for plain/reinforced concrete in open foundations using
40/20/10 mm nominal size Graded hard stone aggregate, mechanically
mixed, placed in foundation and compacted by vibration including curing
RBR-FNDN-4

for 14 days complete as per drawings and techni

I P.C.C grade M 10
RBR-FNDN-4
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
(i) Nominal mix 1:3:6 below GL
Unit = cum
(a) Material
Cement t 0.22 4600.00 1012.00
Coarse sand cum 0.45 415.97 187.18
40mm HBG Metal cum 0.6 1110.27 666.16
20mm HBG Metal cum 0.3 1540.27 462.08
Water kl 1.2 70.00 84.00
(b) Labour
Mason (1st Class) day 0.1 258.00 25.80
Mazdoor (Unskilled) day 1.39 196.00 272.44
Add 20% MAA on Labour 59.65
(c) Machinery
Mechanical concrete mixer 0.4/0.28 cum
capacity fitted with water measuring
device and preferably also with load cell. hour 0.40 345.00 138.00

Water tanker 6 kl capacity hour 0.13 345.00 44.85


(d) Formwork @ 4% on cost of 4.00%
material, labour and machinery (a+b+c)

2952.16
Contractors profit 14% 413.30
Rate per cum = a+b+c+d+e+f 3365.46
Cement Concrete Pavement 3365.50
./cum

4 4) II Bedding for Pipe


iii (i) Type A (Concrete Cradle) Bedding
RBR-FNDN-4

P.C.C grade M 15 (MORD)


Nominal mix (1:2.5:5) (Mechanical
Mixer)
Unit = cum
(a) Material
Cement t 0.275 4600.00 1265.00
Coarse sand cum 0.48 415.97 199.66
40 mm aggregate cum 0.48 1110.27 532.93
20 mm aggregate cum 0.24 1540.27 369.66
10 mm aggregate cum 0.08 1185.27 94.82
(b) Labour
Mate day -
Mason (1st Class) day 0.10 258.00 25.80
Mazdoor (Unskilled) day 1.39 196.00 272.44
Add 20% MAA on Labour 59.65
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 345.00 138.00
2957.96
d) Formwork @ 4% on cost of material, 4.00% 0.00
labour and machinery (a+b+c)

2957.96

e&f) Overheads & Contractors Profit 414.12


Rate per cum = a+b+c+d+e+f 3372.08
3372.10
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6

5 5) I) i Plain/reinforced cement concrete in


substructure complete as per drawings
and technical specification Clauses 802,
804, 805, 806, 807, 1202 and 1204
MORD and 1500, 1700 & 2200
MORTH
RBR-SBST-5

Note : Water for concrete : A provision


for cost of water may be added at 1.2 kl / 1
cum (including curing purpose) keeping
the site conditions

Coarse Aggregate : Single grade nominal


size can also be used instead of graded
metal, keeping the site conditions in view

For height upto 5 m


Unit = cum
P.C.C grade M 15
Nominal mix (1:2.5:5) using CC Mixer
(MORD)
Unit = cum
(a) Material
Cement t 0.275 4600.00 1265.00
Coarse sand cum 0.480 415.97 199.66
40 mm aggregate cum 0.480 1110.27 532.93
20 mm aggregate cum 0.240 1540.27 369.66
10 mm aggregate cum 0.080 1185.27 94.82
(b) Labour
Mate day -
Mason (1st Class) day 0.100 258.00 25.80
Mazdoor (Unskilled) day 1.390 196.00 272.44
Add 20% MAA on Labour 59.65
(c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.400 345.00
3164.96
(d) Formwork @ 10% on cost of 10.00% 316.50
material, labour and machinery (a+b+c)

3481.46
e&f) Overheads & Contractors Profit 487.40
Rate per cum = a+b+c+d+e+f 3968.87
3968.90
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
6 Construction of un-reinforced, dowel jointed at expansion and
construction joint only, plain cement concrete pavement, thickness as per
design, over a prepared sub base, with 43 grade cement or any other type
as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS : 383, maximum in a concrete mixer of not less than 0.2
cum capacity and appropeiate weigh batcher using approved mix design,
laid in approved fixed side formwork (steel channel, laying and fixing of
125 mictron thick polythene film, wedges, steel plates including levelling
RBR-CCPV-5

the formwork as per drawing), spreading the concrete with sholvels, rakes,
compacted using needle, scareed and plate vibrators and finished in
continuous operation including provision of contraction and expansion,
construction joints, applying debonding strips, primer, sealant, dowel bars,
near approaches to bridge / culvert and construction joints, admixtures as
approved, curing of concrete slabs for 14- days, curing compound (where
specified) and water finishing to lines and grade as per drawing and
Technical Specification Clause 1501 MORD.

Unit = cum
Taking output = 75 cum (172.50 t)
(100 x 3.75 x 0.200)
a) Labour
Mason (1st class) day 5.00 258.00 1290.00
Mason (2nd class) day 5.00 237.00 1185.00
Mazdoor (Unskilled) day 150.00 196.00 29400.00
Mazdoor (Skilled) day 6.00 196.00 1176.00
Surveyor day 2.00 350.00 700.00
Mazdoor (Semi-Skilled) day 6.00 196.00 1176.00
Blacksmith for cutting of dowel bars day 1.00 237.00 237.00
including removal of burrs , fabrication
and fixing of dowel bars.
Add 20% on Labour 7032.80
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 hour 36.00 345.00 12420.00
mixers) with weigh batcher and suitable
capacity calibrated water tank
Needle vibrator hour 9.00 108.60 977.40
Plate vibrator hour 9.00 40.00 360.00
Water tanker 6 kl capacity hour 5.00 345.00 1725.00
Air compressor (1 hour initial+1 hour hour 2.00 370.00 740.00
final)
c) Material
Crushed stone coarse aggregates, grading
will be as per Clause 1501.2.4.1 (Table
1500.1) of specifications @ 0.90 cum/cum
of concrete (25 mm & 12.5 mm
blending)
25mm HBG Metal 45.00 1520.27 68411.97
12mm HBG Metal 22.50 1345.27 30268.49
Sand as per IS:383 and conforming to cum 33.75 415.97 14038.86
Clause 1500.2.4.2 @ 0.45 cum/cum of
concrete
Cement @ 390 kg/cum of concrete t 29.25 4600.00 134550.00
Polythene sheet 125 micron sqm 412.50 7.00 2887.50
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
Mild steel dowel bar 25mm dia of grade S
240.500 mm long 20 Nos. at
culvert/bridge slab and at construction
joint including 5 percent wastage
(4x20x0.500) + 5 per cent wastage = 42m Kg 0.118 34000.00 4012.00
@ 2.80 Kg per m = 117.6 kg.
Bitumen primer @ 200ml.Per joint for 23 t 0.005 32453.43 162.27
joints(SS-1)
Bituminous sealant 800 ml. Per joint for Liter 19.00 26.00 494.00
23 joints
Jute rope 12mm dia including 5 per cent m 90.00 5.00 450.00
wastage
Debonding strips 3.75m. (length) x 10mm m 90.00 9.00 810.00
(width) x 5 mm (thick) cut-out of rubber
filter board of similar material including 5
per cent wastage
Polythene sheathing, covering 2/3rd dowel No 483.00 0.50 241.50
bars (20x23) and tight fit including 5 per
cent wastage
Plasticizer 0.5 per cent by weight of litre 122.00 57.00 6954.00
cement
Curing compound (if used) @ 0.33 litre litre 131.25 95.00 12468.75
per sqm
Water for curing kl 18.00 70.00 1260.00
Joint filler board 20 mm thick as per sqm 3.00 461.00 1383.00
IS:1838
(4 x 3.75 x 0.200 = 3 sqm)
336811.54
d) Formwork @ 3% of (a+b+c) 10104.35
Cost for 75 cum = a+b+c+d+e+f 346915.88
Rate per cum = (a+b+c+d+e+f)/75 4625.55
Add C P @ 14% 647.58
5273.13
5273.20

7 Cost of 30mm RCC Pipes


Supply and delivery of RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,
complete
Unit = 1Rm
Cost of pipes as per SSR RM 7.50 763.70 5727.75
Cost of collars RM 2.00 112.00 224.00
Cost for 7.50 Rm =a+b+c+d 5951.75
Rate per RM is ( a+b+c+d )/7.50 793.57
Add C P @ 14% 111.10
Rate per RM 904.67
904.70
8 Cost of 450 mm RCC Pipes
Supply and delivery of RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,
complete
Unit = 1Rm
Cost of pipes as per SSR RM 7.50 1182.30 8867.25
Cost of collars RM 2.00 214.00 428.00
Cost for 7.50 Rm =a+b+c+d 9295.25
Rate per RM is ( a+b+c+d )/7.5 1239.37
Add C P @ 14% 173.51
Rate per RM 1412.88
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
1412.90
9 Cost of 600 mm RCC Pipes
Supply and delivery of RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,
complete
Unit = 1Rm
Cost of pipes as per SSR RM 7.50 1915.00 14362.50
Cost of collars No 2.00 334.00 668.00
Cost for 7.50 Rm =a+b+c+d 15030.50
Rate per RM is ( a+b+c+d )/7.50 2004.07
Add C P @ 14% 280.57
Rate per RM 2284.64
2284.70

10 Laying 300 mm Cement Concrete Pipe NP3 on first class bedding of


RBR-PCVT-5

granular material including fixing collar with cement sand mortar 1:2
but excluding excavation, protection works, backfilling, concrete and
masonry work in head wall and parapet as per Tech Specification No.
1100 MORTH

Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a) Labour
Mate day -
Mason (1st Class) day 0.30 258.00 77.40
Mazdoor (Unskilled) day 2.51 196.00 491.96
Add MAA @ 20% 113.87
b) Material
Sand at site cum 0.04 415.97 16.64
Cement at site t 0.036 4600.00 165.60
865.47
c&d) Overheads & Contractors Profit 121.17
Cost for 7.5 m = a+b+c+d 986.64
Rate per m = (a+b+c+d)/7.5 131.55
Note : The labour rate for 300 mm dia shall be decreased by 20% 105.24
105.30

11 Laying 450 mm Cement Concrete Pipe NP3 on first class bedding of


RBR-PCVT-5

granular material including fixing collar with cement sand mortar 1:2
but excluding excavation, protection works, backfilling, concrete and
masonry work in head wall and parapet as per Tech Specification No.
1100 MORTH

Unit = m
Taking output = 7.5 m
(3 pipes of 2.5 m length each)
500 mm dia
a) Labour
Mate day -
Mason (1st Class) day 0.30 258.00 77.40
Mazdoor (Unskilled) day 2.51 196.00 491.96
Add MAA @ 20% 113.87
b) Material
Sand at site cum 0.04 415.97 16.64
Cement at site t 0.036 4600.00 165.60
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
865.47
c&d) Overheads & Contractors Profit 121.17
Cost for 7.5 m = a+b+c+d 986.64
Rate per m = (a+b+c+d)/7.5 131.55
131.55
131.60

12 Laying 600 mm Cement Concrete Pipe NP3 on first class bedding of


RBR-PCVT-5

granular material including fixing collar with cement sand mortar 1:2
but excluding excavation, protection works, backfilling, concrete and
masonry work in head wall and parapet as per Tech Specification No.
1100 MORTH

(C) 750 mm dia


a) Labour
Mate day -
Mason (1st Class) day 0.15 258.00 38.70
Mazdoor (Unskilled) day 1.25 196.00 245.00
Add MAA @ 20% 56.74
b) Material
Sand at site cum 0.024 415.97 9.98
Cement at site t 0.018 4600.00 82.80
433.22
c&d) Overheads & Contractors Profit 60.65
Cost for 7.5 m = a+b+c+d 493.87
Rate per m = (a+b+c+d)/7.5 65.85
Note : The labour rate for 600 mm dia Hume pipe may be derived from the 52.68
rates for 750 dia by decreasing 20 per cent
52.70

13 Sub Analysis:
5 Cement Mortar (1 : 5)
RBR-FNDN-5

Unit : 1cum
A. MATERIALS:
Cement kg. 288.00 4.60 1324.80
Sand (including 5% wastage) cum 1.05 415.97 436.76
B. MACHINERY
- Nil - -
C. LABOUR:
Man mazdoor for mixing mortar day 0.20 196.00 39.20
Add Municipal allowance on labour at 20% 7.84
Grand Total 1808.60
1808.70

14 Plastering with cement mortar (1:5), 12 mm thickness as per technical


3)c) specification 1300 & 2200 MORTH
RBR-SBST-3

Unit = 10 sqm
Taking output = 10 sqm
(a) Material
Cement mortar 1:5 (Rate as in item 11.5 II cum 0.144 1808.70 260.45
)
(b) Labour
Mate day -
Mason 1st Class day 0.500 258.00 129.00
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
Mazdoor (Unskilled) day 0.540 196.00 105.84
46.97
542.26
c&d) Overheads & Contractors Profit 75.92
Rate per 10 sqm = (a+b+c+d) 618.18
61.90

15 Providing and laying reinforced cement


concrete in superstructure as per
drawing and technical specifications
Clauses 800, 1205.4 and 1205.5 MORD /
Sections 1500, 1600 & 1700 MORTH
RBR-SPST-1

Note : 1. Water for CC works : A


provision for cost of water may be added
at 1.2 kl / 1 cum (including curing
purpose) keeping the site conditions

2. Coarse aggregate : Single grade


nominal size can also be used instead of
graded metal, keeping the site conditions
in view.

III R.C.C. Grade M 30 Design Mix


Unit =cum
Case 1: Using Concrete Mixer
(a) Material
Cement t 0.41 4600.00 1872.20
Coarse sand cum 0.45 415.97 187.18
20 mm aggregate cum 0.54 1540.27 831.74
10 mm aggregate cum 0.36 1185.27 426.70
(b) Labour
Mate day -
Mason (1st Class) day 0.10 258.00 25.80
Mazdoor (Unskilled) day 1.39 196.00 272.44
59.65
c) Machinery
Concrete mixer 0.4/0.28 cum capacity hour 0.40 345.00 138.00
Generator 33 KVA hour 0.40 620.00 248.00
d) For formwork and stagings refer to 4061.71
sub-item (d) of I (II) above
(I) For solid slab super-structure
(i) Height upto 5m
Basic Cost of Labour, Material & cum 1.00 4061.71 4061.71
Machinery (a+b+c)
d) Formwork and staging of (a+b+c) 20.00% 812.34
4874.05
e&f) Overheads & Contractors Profit 682.37
Rate per cum = (a+b+c+d+e+f) 5556.42
5556.50
Index- Quantit Amount
S. No Description Unit Rate Rs.
code y Rs.
1 2 3 4 5 6
16 Supplying, fitting, and placing HYSD bar reinforcement in
superstructure complete as per drawing and technical specifications
RBR-SPST-2

Clauses 1002, 1010 and 1202 MORD / 1600 MORTH, for Bars below
36 mm dia including over laps and wastage, where they are not welded
,including overhead charges & Contractors profit but excluding VAT

Unit = t
(a) Material
HYSD bars including 5 per cent for laps t 1.05 34500.00 36225.00
and wastage
Binding wire kg 8.00 52.00 416.00
(b) Labour for cutting, bending, tying
and placing in position
Mate day -
Blacksmith/ Rod Binder day 3.00 237.00 711.00
Mazdoor (Unskilled) day 8.44 196.00 1654.24
Add : 20% M.A 473.05
c). 39479.29
Add 14% for Over head charges & Contractors profit (excl. 4% 5527.10
VAT ) t = a+b+c
Rate per Rs 45006.39
45006.40

17 134 White washing two coats with whiting of approved quality to give an
even shade after thoroughly brushing the surface to remove all dirt
and remains of loose powdered materials including cost of all
BLD-CSTN-9-5

materials, labour charges and incidental such as scaffolding, lift


charges etc., complete for finished item of work, but excluding
conveyance charges of materials for inside portion of the culvert body
walls/retaing walls.

Unit: 10 sqm
A. MATERIALS :
Whiting / White Cement cum / kg 2.00 14.00 28.00
Gum, conjee water, or prickly pear juice L.S
including necessary fire wood
B. LABOUR
Brick Layers / Painter day 0.210 258.00 54.18
Mazdoor (unskilled) day 0.320 196.00 62.72
Sundries including brushes, ladders, etc., 1.00% 1.17

Add Municipal allowance on labour at 20% 23.38


Total cost for 10 sqm 169.45
e&f) Overheads & Contractors Profit 23.72
Rate per cum = (a+b+c+d+e+f) 193.17
19.40

Certified that work spot is with in 12KM radious from Tenali Muncipal limits only

Deputy Executive Engineer Assistant Executive Engineer


P R I: sub-division : Vemuru P R I: Spl Works : Vemuru
DETAILED DATAS
m P.T Office (South side) to Z.P Raod in Kuchellapadu

Rs. 5.00 Lakhs

Remarks
7

./cum

Gravel

60.76
12.15

281.27
354.19
49.59
403.77
403.80
./cum
Remarks
7
Above GL

1012.00
187.18
666.16
462.08
84.00

25.80
272.44
59.65

138.00

44.85
118.09

3070.25
429.84
3500.09
3500.10
./cum

./cum
Remarks
7

./cum
./cum
Remarks
7
Remarks
7

./cum

RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,

./Rmt

RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,
Remarks
7
./Rmt

RCC NP3 pipes of 300mm dia including collars and conveyance charges etc,

./Rmt

./Rmt
Remarks
7

./Rmt

./Rmt

./cum
./cum
Remarks
7

./10sqm
./sqm

./cum
./cum
Remarks
7

./M.T

./10 sqm
./sqm

Assistant Executive Engineer


P R I: Spl Works : Vemuru
LEAD STATEMENT
Name of the work: Providing CC road from P.T Office (South side) to Z.P Raod in Kuchellapadu
Est.Cost: Rs. 5.00 Lakhs Grant: M.N.P SSR: 2010-11
Conveyance Cost Basic Cost

Add Seigniorage
Deduct Stacking

Deduct Stacking
Net Conveyance

charges @ 25%
Initial Charges

Net basic cost


Deduct CP &
OH (12.28%)

Add Blasting
Conveyance
Sl.

crushing
Machine
Charges

Charges

Charges

Charges

Charges
charges
Discription of Item Name of Quarry Lead in KM Total Cost
No

Add
1 2 3 4 9 10 11 12 13 14 15 16 17 18 19
1 Sand for mortar Krishna River 18.40 177.80 -21.83 0.00 155.97 220.00 0.00 0.00 40.00 0.00 260.00 415.97

2 Sand for filling Krishna River 18.40 177.80 -21.83 0.00 155.97 70.00 0.00 0.00 40.00 0.00 110.00 265.97

3 Gravel Vejendala 25.80 238.00 -29.23 0.00 208.77 50.50 0.00 0.00 22.00 0.00 72.50 281.27

4 Aggregates 40 mm nominal size SS5 Lam 49.80 416.40 -51.13 0.00 365.27 500.00 70.00 125.00 50.00 0.00 745.00 1110.27

5 Aggregates 25 mm nominal size SS5 Lam 49.80 416.40 -51.13 0.00 365.27 828.00 70.00 207.00 50.00 0.00 1155.00 1520.27

6 Aggregates 20 mm nominal size SS5 Lam 49.80 416.40 -51.13 0.00 365.27 844.00 70.00 211.00 50.00 0.00 1175.00 1540.27

7 Aggregates 12 mm nominal size SS5 Lam 49.80 416.40 -51.13 0.00 365.27 688.00 70.00 172.00 50.00 0.00 980.00 1345.27

8 Aggregates 10 mm nominal size SS5 Lam 49.80 416.40 -51.13 0.00 365.27 560.00 70.00 140.00 50.00 0.00 820.00 1185.27

9 Aggregates 6 mm nominal sizes SS5 Lam 49.80 416.40 -51.13 0.00 365.27 428.00 70.00 107.00 50.00 0.00 655.00 1020.27

10 Quarry dust(Stone dust 2.36 mm below) Lam 49.80 416.40 -51.13 0.00 365.27 236.00 0.00 0.00 50.00 0.00 286.00 651.27

11 Cement Tenali 13.80 0.00 0.00 0.00 0.00 4.60 0.00 0.00 0.00 0.00 4.60 4.60

12 steel (HYSD) Tenali 13.80 0.00 0.00 0.00 0.00 34500.00 0.00 0.00 0.00 0.00 34500.00 34500.00

13 steel (Mild Steel) Tenali 13.80 0.00 0.00 0.00 0.00 34000.00 0.00 0.00 0.00 0.00 34000.00 34000.00

14 Bitumen 60/70 grade Chennai 448.80 1346.40 -165.34 0.00 1181.06 30069.58 Add 4% CST 1202.78 0.00 31272.36 32453.43

15 300 dia. RCC NP3 class Plain ended pipes Tenali 13.80 35.70 0.00 0.00 35.70 728.00 0.00 0.00 0.00 0.00 728.00 763.70

16 450 dia. RCC NP3 class Plain ended pipes Tenali 13.80 46.30 0.00 0.00 46.30 1136.00 0.00 0.00 0.00 0.00 1136.00 1182.30

17 600 mm dia., RCC NP3 class Plain ended pipes Tenali 13.80 70.00 0.00 0.00 70.00 1845.00 0.00 0.00 0.00 0.00 1845.00 1915.00

Certificates :
1. Certified that the above leads are shortest and correct to the best of my knowledge and belief.
2. Certified that the metal is obtained by blasting.
3. Certified that the seigniorage charges and TOT charges are actually payable.

Deputy Executive Engineer Assistant Executive Engineer


P R I: sub-division : Vemuru P R I: Spl Works : Vemuru

Lead _cc road


AD STATEMENT
South side) to Z.P Raod in Kuchellapadu

Units

20
./cum

./cum

./cum

./cum

./cum

./cum

./cum

./cum

./cum

./cum

./kg

./M.Tons

./M.Tons

./M.Tons

./cum

./cum

./cum

Lead _cc road


Standard Schedule of Rates For the YEAR 2010-11
R&B SSR Unit Rate Builiding SSR Unit Rate
HBG (R&B SSR) Gravel/Quarry spoil excluding seignorage (50.50+22.00) cum 50.50
SS items Coarse Sand for filling excluding seignorage (70+40) cum 70.00
- do - 6mm size (SS 5) 1 428.00 Coarse Sand for Mortor( Un-Screened ) (90+40) cum 90.00
- do - 10mm size (SS 5) cum
1 560.00 Fine Sand for mortor( Screened ) ( 220+40) cum 220.00
- do - 12mm size (SS 5) cum
1 688.00 Bricks 2nd class of size 230x110x70mm 1000No 3100.00
- do - 20mm size (SS 5) cum
1 844.00 TEAK WOOD
- do - 25mm size (SS 5) cum
1 828.00 Medium Teak wood planks of any thick cum 102414.00
- do - 40mm size (SS 5) cum
1 500.00 Medium Teak wood Scantlings upto 2 mts cum 54738.00
- do - 50mm size (SS 5) cum
1 390.00 Average Rate of Medium Teak Wood cum 78576.00
- do - 60mm size (SS 5) cum
1 360.00 Best Teak wood of any thick cum 116540.00
- do - 65mm size (SS 5) cum
1 325.00 Best Teak wood scantlings upto 2 meters cum 77693.00
- do - 75mm size (SS 5) cum
1 260.00 Average Rate of Best Teak Wood cum 97116.50
- do - 75 to 100mm size (SS 5) cum
1 210.00 L/C for fixing of doors and windows grills 1kg 3.00
IRC cum SAL WOOD
-do- 2.36 to 5 mm size (IRC&MORTH) 1 260.00 Sal wood scantlings upto 2 mts cum 38847.00
-do- 5 to 7mm size (IRC&MORTH) cum
1 430.00 Sal wood Planks of any thick cum 49441.00
-do- 9.5 to 11.2mm size (IRC&MORTH) cum
1 560.00 Average Rate of Sal wood cum 44144.00
-do- 12mm to 14 mm size ( IRC and MORTH ) cum
1 690.00 FLOORING ITEMS
-do- 19 mm to 22 mm size ( IRC and MORTH ) cum
1 950.00 Ceramic Tiles 73mm thick first quality 1sqm 374.00
-do- 25 mm to 27 mm size ( IRC and MORTH ) cum
1 830.00 Glazed triles of any size 1sqm 332.00
-do- 40 mm to 45 mm size ( IRC and MORTH ) cum
1 500.00 White glazed tiles of any size first quality 1sqm 280.00
-do- 50 mm to 55 mm size ( IRC and MORTH ) cum
1 390.00 Decorated white glazed tiles 200x152mm 1sqm 459.00
-do- 60 mm to 63 mm size ( IRC and MORTH ) cum
1 360.00 Kadapah Slabs 40mm thick of size not less than 457x457mm 1sqm 75.00
cum

-do- 65 mm size ( IRC and MORTH ) 1 325.00 Kadapah Slabs 50mm thick of size not less than 457x457mm 1sqm 86.00
cum
-do- 75 mm size ( IRC and MORTH ) 1 260.00 Polished Bethamcherla slabs pure colour minimum 25mm 10sqm 2152.00
cum thick(0.254x0.254M)
ROUGH STONE/REVETMENT STONE/SOLING STONE Polished Black kjadapah slabs minimum 15mm thick 10sqm 1076.00
457x457mm
For SS Revetment work 225 mm(OG) 1 71.00 Polished shabad/thandur slabs 15-18mm thick (0.457x0.304) 10sqm 1291.00
For SS Revetment work 300 mm(OG) cum
1 95.00 Shabad/Thandur Rough stone slabs 25 mm thick 10sqm 750.00
Granite for SS revetment 225 mm cum
1 117.00 Shabad/Thandur Rough stone slabs40 mm thick 10sqm 968.00
Granite for SS revetment 300 mm cum
1 136.00 Polished Bethamcherla pure(marble type) white stone 10sqm 3012.80
cum 25mm thick(0.254Mx0.254M)
For R.R Masonary Work (other than Granite, Dolomite and 1 133.00 FIXTURES
Trap)
For R.R.Masonry works ( granite, dolamite and trap cum
1 155.00 Door fixtures
variety)
CRS Granite, Dolamite and trap cum
1 218.00 Tower bolt Aluminium 150 mm Each 69.00
CRS For other varieties cum
1 152.00 Tower bolt MS power coated 150mm Each 27.00
Soling stone of 150 mm size of granite, trap and Dolamite cum
1 82.00 Butt hinges Aluminium 150mm Each 100.00
varieties.
Soling stone of 150 mm size other than granite variety Cum
1 57.50 Butt hinges MS power coated 150mm Each 31.00
Cum Aldrop MS power coated 300 mm Each 124.00
ROAD SSR Wind cleats Door stoppers Each 38.00
Gravel including stacking 1 50.50 Window fixtures
Quarry rubbish Cum
1 50.50 Cabin hook and eyes Each 40.00
HBG Stone Chips 2.36mm and below Cum
1 236.00 Butt hinges Aluminium 75mm Each 68.00
Sand for mortar, ceiling coat including washing screening Cum
1 220.00 Butt hinges MS power coated 75mm Each 8.00
etc.,
Sand for filling and blindage Cum
1 70.00 Tower bolts 100 mm long Alluminium Each 57.00
White cement Cum
1kg 25.00 Tower bolts 100 mm long MS power coated Each 18.00
Clearing heavy Jungle 1 2.20 GLASS
Clearing light Jungle Sqm
1 2.00 Plain Float Glass 4 mm thick 1sqm 334.00
Clearing Scrub Jungle Sqm
1 2.00 Plain Float Glass 5 mm thick 1sqm 427.00
Clearing Juliflora (Prosafis) jungle including up-rooting and Sqm
1 3.30 Frosted / Ground Glass 4 mm 1sqm 485.00
removing of Juliflora stumps. Sqm
Uprooting and clearing prickly pear jungle 1 1.90 Frosted / Ground Glass 5 mm 1sqm 609.00
- do - under 2.5 meters height including burning and Sqm
1 2.40 Tinted-Bronze/Green Glass 4mm 1sqm 453.00
burrying as directed. Sqm
- do - over 2.5 meters height including burning and 1 2.90 Tinted-Bronze/Green Glass 5mm 1sqm 570.00
burrying with an initital lead of conveyance Sqm
Screening sand and gravel 1 6.30 Pin headed Glass 4 mm thick 1sqm 220.00
Screening chips and metal cum
1 13.00 Pin headed Glass 5 mm thick 1sqm 376.00
Removing and refixing Hectometre or Demarcation stones cum
each 9.50 Toughened Plain Glass 5mm(including Glass) 1sqm 962.00
PICKING AND SPREADING AND HRR
40 mm thickness 10 57.20 WATER PROOFING CHEMICALS & ADMIXTURES
50 mm thickness sqm
10 60.50 Imperivious water proofing compound kg 24.00
75 mm thickness sqm
10 66.00 Super Plasticizer lit 78.00
100 mm thickness sqm
10 71.50 Air entraining Agent lit 56.00
PICKING AND SPREADING AND 8-10 ROLLER sqm Tile Adhesive kg 20.00
40 mm thick ness 10 150.70 Concrete Plasticizer HI PLAST 02 lit 57.00
50 mm thick ness sqm
10 170.50 Super Plasticizer HI PLAST SP lit 57.00
sqm
75 mm thick ness 10 187.00 Air entraining Agent HI PLAST A>E lit 45.00
100 mm thick ness sqm
10 203.50 Surface treatment curing compound HI CURE 01 lit 57.00
150 mm thick excluding hire charges sqm
10 363.00 Bitimineous Hot sealing compound Grade A kg 26.00
sqm Curing compound lit 95.00

****
****
Standard Schedule of Rates For the YEAR 2010-11 Standard Schedule of Rates For the YEAR 2010-11 HIRE CHARGES OF PLANT& MACHNIERY FOR
CENTERING CHARGES CEMENT & STEEL RCC Pipes ( Plain ended ) NP2 NP3 ROAD & BRIDGE WORKS FOR THE YEAR 2010-11 SoRate for
chajjas-sunshades sqm 180.00 Cement 1MT 3500.00 Convey charges/KM/RM Conv charges/KM/RM Description 2010-11
coloumns cum 770.00 Cost of Steel 1MT 34000.00 initial Cost upto 5KM Beyond 5KM initial Cost upto 5KM Beyond 5KM Sl. No. Machine Activity Unit ( Rupees)
Footings ( 49+303 ) cum 352.00 Fabrication of heavy steel & strusses 1 kg 12.00 300MM dia 317.00 9.20 0.40 728.00 24.20 0.60 1 2 3 4 5
Lintels 1cum 1017.00 fabrication window and ventilator grills 1 kg 14.00 350MM dia 394.00 12.00 0.70 896.00 26.10 0.70 1 Dozer( D 80 ) Spreading Per Hour
Pedastals ( 58+481 ) cum 539.00 Structural steel angle/channel /beam bars 1MT 34000.00 400MM dia 453.00 13.90 0.80 992.00 30.80 1.00 Cutting
Plinth beams cum 1556.00 Structural steel plate / flats 1MT 40000.00 450MM dia 556.00 17.60 1.00 1136.00 33.80 1.20 Cleaning 1729.9
slabs above 150 to 300mm thick sqm 161.00 PAINTS Unit Rate 500MM dia 608.00 19.20 1.20 1286.00 37.00 1.20 2 Mortor Grader Clearing Per Hour
slabs above 300mm thick sqm 168.00 Snow cem paint 25Kg 820.00 600MM dia 905.00 27.70 1.80 1845.00 55.40 2.50 Spreading
slabs upto 150mm thick sqm 154.00 Surya cem(Janata cem) 25Kg 350.00 700MM dia 1155.00 35.40 2.50 2277.00 61.50 3.00 GSB
beams cum 1375.00 Water based cement Paint Lits 80.00 800MM dia 1410.00 41.60 2.50 3003.00 73.80 3.00 WMM 2600
GI PIPES Water proof cement paint Kg 35.00 900MM dia 1767.00 47.70 2.50 3755.00 96.90 5.60 3 Hydraulic Excavator Soil Ordinary Per Hour
G.I.Pipe 15mm A Class 1RM 75.00 Water Proofing Compound Kg 50.00 1000MM dia 2152.00 70.80 5.30 4686.00 117.00 5.60 Soil Marshy
G.I.Pipe 25 mm A Class 1RM 110.00 Synthitic enamil paint in all shades grade-I 1 lit 170.00 1100MM dia 2560.00 77.70 5.30 5499.00 126.10 6.10 Soil unsuitable 1808.5
G.I.Pipe 40 mmB Class 1RM 180.00 Synthitic enamil paint in all shades grade-II 1 lit 130.00 1200MM dia 3049.00 87.70 5.60 6465.00 141.50 6.10 4 Front end loader Soil loading Per Hour
G.I.Pipe 50 mm A Class 1RM 220.00 Synthetic Enamel paint 1st quality 1 lit 175.00 RCC Collors and Rings NP2 NP3 Aggregate loading Per Hour 1320
G.I.Pipe 80 mm B Class 1RM 280.00 Dry powder distemper Kg 30.00 Collors Rings Collors Rings 5 Tipper- 5.5 Cum Transportation of soil, Per Hour 629.8
GI Bolts@nuts and washers 1Kg 75.00 Wood primer 1lit 100.00 300MM dia 80 80 112 80 GSB,WMM, Hot mix etc Per tonne Km 4.5
GI Pipe 100mm B Class 1RM 525.00 Red Oxide Iron Primer Paint Grade-1 1lit 90.00 350MM dia 99 95 141 95 Per Km 45
GI Sheet Plain 1Kg 44.00 White Lead Kg 72.00 400MM dia 108 109 160 109 6 Vibratory roller 8 tonne Earth/Soil, GSB, Per Hour
AC Sheets corrugated 6mm thick 1sqm 188.00 Varnish 1lit 100.00 450MM dia 172 124 214 124 WMM 1704.6
Labour charges Spirit 1lit 70.00 500MM dia 196 142 255 142 7 Smooth wheeled roller 8 tonne Soil compaction ,BM Per Hour 746.5
Heavy/Light mazdoor ,watchman Day 196.00 Linseed Oil 1lit 40.00 600MM dia 262 206 334 206 8 Water tanker 6 Kilolitre compaction
Water transport Per Hour 345
Mason Cl- I / Brick layer Cl- I/Painter Cl- I Day 258.00 Dismantling Unit Rate 700MM dia 340 247 445 247 9 Tractor Pulling Per Hour
345
Mason Cl- ll / Brick layer Cl-II Day 237.00 Stone masonry in cement mortar 1Cum 239.00 800MM dia 475 300 568 300 10 Tractor with rotavator Scarifying Per Hour
345
Sarang / Khalasi Day 258.00 Dry rough stone revetment for aprons 1Cum 40.00 900MM dia 572 405 663 405 11 Tractor with ripper attachment Scarifying Per Hour

Maistry / Work Inspector with Non-technical Day 250.00 Kadapa slabs/Shahabad stone slabs on sand 10sqm 42.00 1000MM dia 669 489 828 489
345
Diploma Engineer / Surveyor Day 350.00 Pan tiled or Mangalore tiled roof without roof timbers. 10 Sqm 75.00 1100MM dia 815 626 1045 626 12 Air Compressor General purpose Per Hour 370
Graduate Engineer/ Geologist Day 400.00 Wrought and framed timber in roofs or floors 1 Cum 125.00 1200MM dia 987 787 1309 787 13 Wet mix plant 60 TPH Wet mix Per Hour 1320
ITI certificate holder /Tracer/Printer Day 288.00 Brick Masonary in CM including 14% OH 1Cum 205.88 RCC Pipes(S/S) NP2 NP3 14 Mechanical broom Hydraulic Surface cleaning Per Hour 290
Typist / Job Typist Day 288.00 PCC items including 14% OH 1Cum 201.55 Convey charges/KM/RM Conv charges/KM/RM 15 Bitumen Pressure Distributor Applying bitumen tack coat Per Hour

OTHERS RCC items including 14% OH 1Cum 709.31 initial Cost upto 5KM Beyond 5KM initial Cost upto 5KM Beyond 5KM 940
Water KL 70.00 Fly ash Solid BLOCKS CL 7.50 300MM dia 384 10.5 0.7 935 28.9 0.9 16 Emulsion Pressure Distributor Applying emulsion tack coat Per Hour 690
Petrol 1L 53.00 (ex-quarry price -excluding conveyance, loading &unloading) 350MM dia 494 13.1 0.8 1191 30.8 1.1 17 Hot mix Plant – 120 TPH capacity DBM/BM/SDC Per Hour
Diesel 1L 38.50 290 x 225 x 140 MM each 15.00 400MM dia 544 15.9 1 1320 38.4 2 /Premix 23000
Rabhit wire mesh 1sqm 12.00 290 x 200 x 140 MM each 13.00 450MM dia 678 18.2 1.1 1457 42.3 2 18 Hot mix Plant – 100 TPH capacity DBM/BM/SDC Per Hour
Unslaked Lime 1T 1800.0 290 x 150 x 140 MM each 9.00 500MM dia 780 20.4 1.2 1661 46.2 2.1 /Premix 19550
Impervious water proof compound Kg 24.00 290 x 112/100 x 140 MM each 8.00 600MM dia 1101 26.9 2 2325 63.1 3 19 Hot mix Plant – 60 TPH capacity DBM/BM/SDC Per Hour
MS steel tubes/pipes of any size 1kg 45.00 225 x 100 x 60 MM each 4.00 700MM dia 1424 32.7 2.1 2954 84.6 5.9 /Premix 17250
GI(M.S) fly proof wire mesh 16x20gauge 1Sqm 155.00 MASTIC PADS 800MM dia 1820 45.4 3.2 3902 100 5.9 20 Hot mix Plant – 40 to 60 TPH capacity DBM/BM/SDC Per Hour
Barbed wire KG 60.00 mastric pad 12.7mm thick 1sqm 461.00 900MM dia 2291 67.7 5.8 4889 115.4 5.9 /Premix 15525
Binding Wire KG 52.00 mastsric pad 25.4mm 1sqm 805.00 1000MM dia 2783 77 5.8 5529 121.6 5.9 21 Paver Finisher Hydrostatic with sensor control DBM/BM/SDC Per Hour
J Bolts 30 cm long Each 22.00 BALINIGOUT OF WATER - L / CHARGES 1100MM dia 3271 86.9 5.9 6496 130.7 5.9 100 TPH /Premix 2530
CEMENT JOLLIES E/W /Concrete for foundation below water level.(For building items only) 1200MM dia 3701 96.9 5.9 7652 146.2 6.1 22 Paver finisher Mechanical 100 Paving of WMM, paving of Per Hour 1090
Cement jollies 25mm thick 1sqm 189.00 0.0 M to 1.0 M 1Cum 127.00 23 Hydraulic Chip Spreader DLC
Surface dressing Per Hour 2070
Cement jollies 40mm thick 1sqm 245.00 1.0 M to 2.0 M 1Cum 150.00 24 Tandem Road roller Rolling of Asphaltic surface Per Hour 1320
Cement jollies 50mm thick 1sqm 335.00 2.0 M to 3.0 M 1Cum 175.00 G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm 1 RM 65 25 Pneumatic Road roller Rolling of Asphaltic surface Per Hour 1035
MISCELLANEOUS Sandy soil - 0.0 M to 1.0 M 1Cum 201.00 GI - Precoated - T-Sec- 24 mm x 38 mm x 0.7 mm thick 1 RM 47 26 Pot-Hole repair machine Repair of pot-holes Per Hour 750
Material hire charges for Acces scaffolding for Brick work: 1sqm 5.29 Sandy soil - 1.0 M to 2.0 M 1Cum 312.00 4 mm Dia GI Connecting Rod 1 RM 10 27 Bitumen boiler oil fired Bitumen Spraying Per Hour
170
for labour charges 1sqm 33.54 Sandy soil - 2.0 M to 3.0 M 1Cum 377.00 Universal Holding Clips 1 Each 2.5 28 GSB Plant 50 Cum Producing GSB Per Hour 920
Vitrified polished floor tiles of size not less than 400 x 400 x7mm 1sqm 542.00 Gypsum Board Plain sheet 12.5 mm thick as per 1 Sqm 200 29 Mastic Cooker Mastic wearing coat Per Hour
thickness normal colours IS 2095 -1993 52
Blasting charges cum 70.00 G.I. Ceiling Angle - 25 mm x 10 mm x 0.55 mm 1 RM 65 30 Batching and Mixing Plant (a) 30 Cum capacity Concrete mixing Per Hour
2130
Bitumen M.T 32000 G.I. Ceiling Section 51.5 mm x 26 mm x 10.5 mm 1 RM 74 (b) 15 - 20 Cum capacity Concrete mixing Per Hour 1670
Emulsion (SS - 1) M.T 34000 x 0.55
G.I. mm thick Section 45 mm x 15 mm x 15
Intermediate 1 RM 73 31 Transit mixer Transportation of concrete Per Hour 1336.8
Emulsion (RS - 1) M.T 34000 mm x 0.9 mm Channel - 20 mm x 27 mm x 30
G.I. Perimeter 1 RM 65 32 Concrete pump of 45 and 30 cum mix
Pumping of Concrete Per Hour 630
Labour hire charges for centering the building items mm(web) ofClips
Connecting 0.55 mm thick 1 Each 2 33 Cranes
Footings sqm 303.00 Rawl Plug 1 Each 1.5 (a) 80 tonnes Lifting purpose Per Hour 950
Pedastals sqm 481.00 Soffit Cleats 1 Each 1.5 (b) 35 tonnes 630
Plinth beams sqm 729.00 Drywall Screws - 25 mm 1 Each 1.5 (c) 3 tonnes 280
Lintels sqm 492.00 Jointing Compound 1 Kgs 25 (d)Crane with grab bucket 0.75 cum Well foundation Per Hour 1725
chajjas-sunshades sqm 76.00 Jointing Paper Tape 1 RM 5 (e)Crane with grab bucket 1 cum Well foundation Per Hour 2875
coloumns sqm 691.00 Drywall Top Coat 1 Litre 125 34 Concrete bucket For pouring concrete Per Hour 12
beams sqm 580.00 Chlorpyriphos/ Lindane emulsifiable concentrate 1 Litre 200 35 Kerb casting machine Kerb making Per Hour
of 20% (BMS-W.09)
250
slabs upto 150mm thick sqm 65.00 36
Glazed colourd tiles of any size 1st quality sqm 332.00 Concrete mixer
slabs from 150mm - 300mm thick sqm 68.00
(a)0.28 cum Concrete mixing Per Hour 345
(b) 1.0 cum Concrete mixing Per Hour
520
37 Piling rig with bantonite pump 0.75 m dia to 1.20 m dia Per Hour
4485
boring attachment
38 Concrete paver finisher with 40 HP motor Paving of concrete surface Per Hour
2360
39 Integrated stone crusher Crushing of spalls 100 TPH Per Hour
7070
Crushing of spalls 200 TPH Per Hour
14880
40

Pre stressing jack with pump and access


Stressing of steel wires/
stands Per Hour 110
41 Generator

250 KVA Generation of electric energy per hour


1550
125 KVA per hour
1090
100 KVA per hour
920
35 KVA per hour
620
42 Pneumatic sinking of Plants Pneumatic sinking of wells Per K.m.
3740
43 Truck 5.5 cum per 10 tonnes Material transport Per Km.
45
Material transport Per tonne per km
4.5
44 Road marking machine Road marking Per Hour
90
45 Mobile slurry seal equipment Mixing and laying slurry seal Per Hour
920
46 Plate compacter For compacting in medians Per Hour
40
47 Drilling equipment For drilling Per Hour
1035
Note: The above hire charges of machinery & plant includes crew, oils, conveyance of machinery to site and
all other incidental charges.

HIRE CHARGES OF PLANT & MACHINERY


FOR THE YEAR : 2010-11

Fuel charge in
Sl.No Description of machinery Unit Hire charge in Rs Rs
1 2 3 4 5
1 Agitator car / Transit mixer 2 cum Hour 594.1 582.3
2 Air compressor 5 cmm ( electric ) Hour 67.4 129.9
3 Air compressor 7 cmm ( diesel ) Hour 165.8 476.4
4 Air compressor 7 cmm ( electric ) Hour 96.5 173.2
5 Air compressor 8.5 cmm ( diesel) Hour 191.3 595.5
6 Air compressor 8.5 cmm ( electric) Hour 109.3 216.5
7 Air compressor 15 cmm ( electric) Hour 91.5 481.2
8 Angle Dozer 90 hp Hour 1193.8 407.4
9 Batching plant 0.5 cum ( 6 Cum/hr) Hour 91 57.7
10 Batching plant 2 x 1.00 cum ( 15 Cum/hr) Hour 239.6 173.2
11 Batching plant 2 x 1.50 cum ( 50 Cum/hr) Hour 306.7 211.7
12 Bending machine 3000 x 12 mm Hour 14.5 57.7
13 Clamp shell and hoisting ropes Hour 3.8 0
14 Concrete bucket 1.5 cum Hour 12 0
15 Concrete hand mixer 45 / 30 ltr Hour 3.8 0
16 Concrete mixer 300 / 200 ( diesel) Hour 41.2 52.9
17 Concrete mixer 300 / 200 ltr ( electric) Hour 37.6 19.2
18 Concrete mixer 600 / 400 ( diesel) Hour 69.9 105.9
19 Concrete mixer 600 / 400 ltr ( electric) Hour 57.3 38.5
20 Concrete paver 100 sqm / hr Hour 257.6 0
21 Convey mucker Hour 619 134
22 Core drilling machine Hour 233 158.8
23 Diesel generating set 30 KVA Hour 45.4 423.5
24 Diesel generating set 50 KVA Hour 60.1 635.3
25 Diesel Loco 45 hp Hour 225.8 357.3
26 Dewatering pump 5 hp ( diesel ) Hour 7.7 52.9
27 Dewatering pump 5 hp ( electric ) Hour 1.9 19.2
28 Dewatering pump 10 hp ( diesel ) Hour 11.5 105.9
29 Dewatering pump 10 hp ( electric Hour 3 38.5
30 Dewatering pump 20 hp ( diesel ) Hour 33.2 211.8
31 Dewatering pump 20 hp ( electric Hour 5.5 77
32 Drifter Hour 201.5 0
33 Drilling jumbo Hour 272.5 28.6
34 Dumper 4.5 cum Hour 366.2 266.8
35 Geophysical Electric resistivity meter Hour 60.3 0
36 Grouting pump Hour 17.9 19.2
37 Guniting / sand blast equipment Hour 78.2 0
38 Ice plant & accessories 30 t / day Hour 129.7 548.5
39 Jack hammer Hour 12.3 0
40 Needle vibrator 40 mm ( petrol ) Hour 5.4 10.6
41 Needle vibrator 40 mm ( electric ) Hour 6.1 3.8
42 Needle vibrator 60 mm ( petrol ) Hour 5.6 15.9
43 Needle vibrator 60 mm ( electric ) Hour 7.3 5.8
44 Planing machine 4 m stroke Hour 83.8 57.7
45 Plate shearing machine up to 12 mm Hour 29.2 77
46 Pneumatic placer 0.5 cum Hour 124.4 0
47 Pneumatic tamper Hour 12.5 0
48 Pug cutting machine Hour 5.5 1.9
49 Pusher leg Hour 7.7 0
50 Road roller diesel 10 t Hour 146.8 476.4
51 Shovel 0.50 cum 75 hp Hour 644 317.6
52 Shovel 0.85 cum 110 hp Hour 1097.5 582.3
53 Stationery derrick crane Hour 62.3 0
54 Tipper 5 cum Hour 329.5 200.1
55 Tipping tub 1.5 cum Hour 30.9 0
56 Tower crane 5 tonne Hour 663.1 100.1
57 Transformer 250 KVA Hour 3575 0

****
58 Truck 10 t Hour 260.7 200.1
59 Truck mounted derrick crane 5 t Hour 396.2 200.1
60 Upright drilling machine/grinder Hour 16.9 19.2
61 Ventilation fan 20 hp Hour 5.8 77
62 Vibratory pad foot roller 8 t Hour 862.3 688.2
63 Wagon drill Hour 136.9 0
64 Water tanker 8000 ltr Hour 260.7 200.1
65 Welding set Hour 12.2 46.2
66 Winch 35 hp ( electric ) Hour 92.8 94.3

****
HIRE CHARGES OF PLANT & MACHINERY
FOR THE YEAR : 2010-11

Crew
Charge
in Rs.
6
160.4
96.5
123.6
96.5
123.6
96.5
103
128.7
185.3
185.3
185.3
77.2
0
0
0
128.7
128.7
128.7
128.7
247.1
103
154.4
77.2
77.2
96.5
64.4
48.3
64.4
48.3
64.4
48.3
193.1
103
128.3
0
154.4
128.7
77.2
193.1
92.6
92.6
92.6
92.6
123.6
77.2
50.3
154.4
0
0
123.3
128.7
128.7
0
100.2
0
103
0

****
96.3
96.3
100.6
16.7
154.1
154.4
96.3
0
154.4

****
Total in
Rs
7
1336.8
293.8
765.8
366.2
910.4
422.3
675.7
1729.9
334
598.1
703.7
149.4
3.8
12
3.8
222.8
185.5
304.5
224.5
504.7
856
546.2
546.1
772.6
679.6
125
69.4
181.8
89.8
309.4
130.8
394.6
404.1
761.3
60.3
191.5
206.9
755.4
205.4
108.6
102.5
114.1
105.7
265.1
183.4
174.7
166.9
7.4
7.7
746.5
1090.3
1808.5
62.3
629.8
30.9
866.2
3575

****
557.1
692.6
136.7
99.5
1704.6
291.3
557.1
58.4
341.5

****
****
****
****
****
****
****
****
****
3730.5
34840.00
1548.40
4311.40
39130.50
43301.60
107129.60
58563.40
82614.40
122528.90
85214.20
104278.20
8557.20
11388.90
39242.00
50385.80
44675.50
1090.00
2686.60
1254.00
1838.50
2056.00

1966.00

2560.00

4851.00

3843.00
5210.00
6478.00
1765.88

4457.35
709.31
2136.00
24869.80
2001.80
21891.60
4350.90
20946.00
4590.30
21576.50
7935.80
11998.30
10026.40
12777.10
2427.00
1739.00
1969.00
1451.00

1009.29
1970.04

1276.00

2865.00
33964.00
35816.80
35689.00
35.00
1254.50
1136.50

****
****