CHANGE LOG

REV. SECTION CHANGE DESCRIPTION


0 All Issued For Approval
1 All According to Following Comment Response Sheet
2 All According to Following Comment Response Sheet
3 All According to Following Comment Response Sheet
E.5 Calculation for compression area rebar
4 Anchor Bolt Support
5 All Update Reinforcing Bar Design

DOCUMENT HOLDS
Footer ada

Page of Pages
Rev. X

di pojok kanan bawa


TABLE OF CONTENTS

1. GENERAL ……………………………………………………………………………………………………………………..… 4
1.1 Introduction ………………………………………………………………………………………………….........
4
1.2 Objective …………………………………………………………………………………………………...........
4
1.3 Codes, Standards, and References ………………………………………………………………………
4
1.4 Material Quality …………………………………………………………………………………………………......
5
1.5 Material Properties …………………………………………………………………………………………………...
5
1.6 Abbreviations …………………………………………………………………………………………………........
5
2. DESIGN ANALYSIS ……………………………………………………………………………………………………….. 9
2.1 Design Criteria …………………………………………………………………………………………………......
8
2.2 Design Load ………………………………………………………………………………………………….........
10
2.3 Load Combination …………………………………………………………………………………………………....
10
3. CALCULATION ………………………………………………………………………………………………………………. 11
3.1 Pile Capacity …………………………………………………………………………………………………........
11
3.2 Vendor & Mechanical Data ……………………………………………………………………………………………
11
3.3 Centre Of Gravity Calculation …………………………………………………………………………………
11
3.4 Loading Calculation …………………………………………………………………………………………………...
11
3.5 Foundation Design …………………………………………………………………………………………………....
11
3.6 Settlement Calculation …………………………………………………………………………………………………
11
3.7 Punching Shear Check ………………………………………………………………………………………………….
11

4. SUMMARY …………………………………………………………………………………………………………………….
12

ATTACHMENT
A. PILE CAPACITY
B. VENDOR & MECHANICAL DATA
C. CENTRE OF GRAVITY CALCULATION
D. LOADING CALCULATION
E. FOUNDATION DESIGN
F. SETTLEMENT CALCULATION
G. PUNCHING SHEAR CHECK
1. GENERAL

1.1 Introduction

1.2 Objective
Concrete
pile 25x25

1.3 Codes, Standards, and References


The subject facilities will be designed ini accordance with, but not limited to the
following project documents, codes and standards.
1) Project Documents
a)
b)

c)
2) Codes and Standards
a) ASCE 7-10 "Minimum Design Loads for Buildings and Other
Structures".
b) SNI 03-1726-2012 "Tata Cara Perencanaan Ketahanan Gempa untuk
Struktur Bangunan Gedung dan Non Bangunan".
c) ACI 318-08M "Building Code Requirements for Structural Concrete
and Commentary".
3) Other References
a) Das, B.M., "Principles of Foundation Engineering", PWS Kent, 2007.
b) Das, B.M., "Principles of Geotechnical Engineering", 2006.
c) Bowles, J. E., " Foundation Analysis and Design: 4th edition",
McGraw-Hill,Inc, 1997.
d) Tomlinson, M.J., "Foundation Design and Construction".

1.4 Material Quality


Table 1.4 Quality Material
Material Strength (MPa)
Structural Concrete fc' = 22.83
Lean Concrete fc' = 22.83
Reinforcing Bar :
BJTD 40 Deformed Bar (>=13mm diameter) fy = 390.00
Plain Bar (<12mm diameter) fy = 240.00
Anchor Bolt ASTM A307 Grade C fy = 240.00
ft = 137.30
fv = 68.60

1.5 Material Properties


Table 1.5 Unit Weight of Material
Material Units (kN/m³)
Reinforced Concrete (gc) 23.52
Steel (gs) 76.93
Soil (gso) 19.60
Operating Liquid (gL(o)) 9.81
Water (gL) 9.81
Sand Dry (gd) 15.68

1.6 Abbreviations
A : effective tension area divided by number of rebar.
As : sum of reinforcement bars cross section needed
BCD : bolt circle diameter
BF : footing width
bob : bottom of base plate
bof : bottom of footing
Ca : seismic coefficient
Cf : force coefficient
D : dead load
d : effective depth of footing
db : bolt diameter
dc : thickness of concrete cover
DE : weight of machinery incl. appurtenances and it is clasiffied as
empty load
DO : operating load
ds : distance for outer of tension fibre to center of rebar
DT : testing load
e : excentricity
E : earthquake load
Es : young modulus of soil
f : reduction factor used for concrete design
F : minimum bolt pitch
fc' : characteristic concrete pressure strength
fs : reinforcement calculated stress at service load
ft : bolt tensile strength
fu : ultimate strength of reinforce steel
fv : bolt shear strength
fy : yield strength of reinforce steel
G : gust effect factor
h : height of structure from ground level
HF : footing height
HG : ground height
I : importance factor
ID : inside diameter
Kd : wind directionaly factor
Kz : velocity pressure exposure coefficient
Kzt : topographic factor
LC1 : factored load combination
LC2 : unfactored load combination
Le : minimum bolt embedment
m : poisson ratio
Mo : overturning moment
Mr : resistant moment
Mu : moment ultimate
nb : number of bolt
npile : number of pile
PCD : Pile Radius Diameter
qz : wind pressure
R : reduction factor
r : reinforcement ratio
s : spacing of rebar
SFH : sliding safety factor
SFM : overturning safety factor
T : tensile force
V : shear force
Vc : shear capacity due to concrete width
Vs : base shear
Vu : shear load ultimate
W : wind load
w : crack width
Wt : weight of equipment and/or structure
Zp : possible distance of imaginary couple moment
σ : soil pressure.
2. DESIGN ANALYSIS
START

DATA
1. Mechanical Data:
- Type of equipment
- Equipment Dimension
- Equipment weight as per condition (empty, operating, testing)
- Center of gravity of equipment
2. Soil Parameter
- Soil classification
- Soil parameter for settlement calculation
- Single pile capacity
3. Structural Parameter
- concrete specification
- pile specification
- rebar specification
4. environmental
- wind exposure
- earthquake
- rain exposure

Preliminary Design
1. Pile cap size
2. Pile number
3. Pile Arrangement
4. Pile length

Load Calculation
1. Dead Load
- Equipment weight (empty,
operating, test)
- Pile cap weight
2. Wind Load
3. Earthquake load
4. Vibrating Load for Dynamic
analysis

Load Combination
1. Factored Load
Combination for concrete
design
2. Unfactored Load
Calculation for pile design

1 2
1 2

Concrete Design Criteria Pile Design Criteria


1. Pile cap design 1. Axial pile capacity > max
- Flexural Reinforcement axial Load
- Shear Reinforcement 2. Laterall pile capacity >
2. Pedestal Design max laterall Load
- Vertical Reinforcement 3.Tension pile capacity >
- Shear Reainforcement max Tension Load
3. Punching Shear 4. Pile group settlement <
Checking max. limit settlement
- Piling Check
- Pedestal Check
4. Maximum cracking in
tension area

Foundation resist from:


Axial Check < 1
Lateral Check < 1 NOT OK
Flexural check as per code
Shear Check as per code
Settlement check < 25 mm for 25
years of design life

OK

FINISH

Foundation Design Flowchart

2.1 Design Criteria


- Unfactored loading combination is used for checking the axial and
horizontal capacity of pile foundation.
- Stability due to overturning moment is checked based on the axial and
horizontal capacity of pile.
- Factored loading combination is subsequently used for reinforced
concrete design.
- Earthquake load design combination refer to ASCE 7-10
2.2 Design Load Remarks
D : Dead Load Weight of foundaion
DE : Equipment Empty Load Weight of empty tank
DO : Equipment Operating Load Weight of Liquid Operating Load
without Tank Load
DT : Equipment Test Load Weight of Liquid Test Load without
Tank Load
W : Wind Load Load due to wind effect
E : Earthquake Load Load due to earthquake effect
R : Rain Load Load due to rain effect
2.3 Load Combination

Factored Load Combination


For Concrete Design
Empty Condition:
LC1-1 1.4D + 1.4DE Permanent
LC1-2 0.9D + 0.9DE + 1.0W Temporary
LC1-3 0.9D + 0.9DE + 1.0E(1.0 X+0.3Z) Temporary
Operating Condition:
LC1-4 1.2DE + 1.2DO + 0.5 R Temporary
LC1-5 1.4 (DE + DO) Permanent
LC1-6 1.2 (DE + DO) + 1.0W Temporary
LC1-7 1.2 (DE + DO) + 1.0E(1.0 X+0.3Z) Temporary
Test Condition:
LC1-8 0.9D + 0.9 (DE + DT) + 1.0W Temporary

Unfactored Load Combination


For Pile Design
Empty Condition:
LC2-1 (D + DE) Permanent
LC2-2 0.6(D + DE) + 0.6W Temporary
LC2-3 0.6(D + DE) + 0.7E(1.0X+0.3Z) Temporary
LC2-4 D + DE + R Temporary
Operating Condition:
LC2-5 D + DE + DO Permanent
LC2-6 D + DE + DO + R Temporary
LC2-7 D + DE + DO + 0.6W Temporary
LC2-8 D + DE +DO + 0.7E (1.0X+0.3Z) Temporary
Test Condition:
LC2-9 0.6(D + DE + DT) + 0.6W Temporary
3. CALCULATION

3.1 PILE CAPACITY


Soil data and pile capacity calculation shall refer to Attachement A

3.2 VENDOR & MECHANICAL DATA


Mechanical data shall refer to Attachment B.

3.3 CENTRE OF GRAVITY CALCULATION


Centre of Gravity calculation shall refer to Attachment C.

3.4 LOADING CALCULATION


Loading calculation shall refer to Attachment D.

3.5 FOUNDATION DESIGN


Foundation Design shall refer to Attachment E.

3.6 SETTLEMENT CALCULATION


Settlement Calculation shall refer to Attachment F.

3.7 PUNCHING SHEAR CHECK


Moment Strip Calculation Calculation shall refer to Attachment G.
4. SUMMARY
#REF!

Design Sketch
PCD 3
PCD 2

Dpp

A A

Tanks
PCD 1
Df

Fig. 4.1. Piling Plan

₠ tank 1
2

D1

Hf

hac
1 bac
1

Foundation Section
2-D19

Reinforcement Layout
Pile Data : Remarks :
n number of pile 43.00 ea
ODpi pile diameter 500.00 mm
Lpi pile length 17.50 m
PCD 1 Pile Circle Diameter 1 16.90 m
PCD 2 Pile Circle Diameter 2 13.16 m
PCD 3 Pile Circle Diameter 3 9.27 m
PCD 4 Pile Circle Diameter 4 6.18
PCD 5 Pile Circle Diameter 5 3.09
Dpp Minimum pile to pile 1.55 m
distance
Pile Cap Data : Remarks :
DF pilecap diameter 18.40 m
HF pilecap thickness 1.30 m
dp' Pilecap thickness above FGL 0.20 m
Reinforcement Data : Remarks :
1 Footing Top Reinforment D19 - 125
2 Footing Bottom Reinforment D19 - 125
Reinforcement Details for hook, splacing, and sump drain tank
1. Hook reinforcement

2. Splacing reinforcement
3. Sump drain tank reinforcement

1
4
1

D D

Reinforcement detrails
Reinforcement Data :
4 Cracking reinforcement 1 - D16
Sump details
ATTACHMENT A
PILE CAPACITY
ATTACHMENT A - PILE CAPACITY
A.1 Pile Capacity

Allowable pile capacity taken from the worst capacity on site

Spun Pile 500.00 mm


500.00 mm
Depth 17.50 m
the value of pile bearing capacity of Spun Pile D 500mm
Pile capacity shall be described as follows :
Condition Qcomp Qtens Qlat
Remarks
( kN ) ( kN ) ( kN )
Allowable Capacity :
Permanent 681.10 261.68 108.23 Ref. 1.b.
Temporary 905.86 348.04 143.94 Ref. 1.b.
ATTACHMENT B
VENDOR & MECHANICAL DATA
ATTACHMENT B - MECHANICAL DATA
B.2 Mechanical Data

Weight
Operating MDO = 1588920.63 kg 15,587.31 kN
Empty MDE = 88920.630046 kg 872.31 kN
Test MDT = 1785380.663 kg 17,514.58 kN
Estimated Weight: Value Units Remarks
DE Empty 872.31 kN
= MDE
DO Operating 14,715.00 kN
= MDO - MDE
=15587.31 - 872.31
DT Full of Water 16,642.27 kN
= MDT - MDE
=17514.58 - 872.31
r Liquid specific gravity 9.81 kN/m3
rw Water specific gravity 9.81 kN/m3
Equipment Size:
Hs Shell height 9.60 m
ID Inside diameter 15.00 m
ts Thickness of shell 6.00 mm
OD Outside diameter 15.01 m
HLL Maximum of liquid level 9.60 m
ATTACHMENT C
CENTRE OF GRAVITY CALCULATION
ATTACHMENT C - CENTRE OF GRAVITY CALCULATION

ID L Hs

ye, yo
Baseplate

Hf

Center of gravity of equipment.


C.2. Calculation
Hs Shell height 9.60 m
ID Inside diameter 15.00 m
ye Empty center of gravity 4.80 m
= Hs/2
DE Empty weight 872.31 kN
LO Design of operating liquid level 9.60 m
yLO Liquid center of gravity in operating condition 4.80 m
DO Operating weight 14,715.00 kN
yo Operating center of gravity 4.80 m
= Hs/2
LT Design of testing liquid level 9.60 m
yLT Liquid center of gravity in testing condition 4.80 m
DT Testing weight 16,642.27 kN
yT Test center of gravity 4.80 m
= Hs/2
Hf Thickness of footing 1.30 m

Centre of gravity for Base shear


Equipment Weight
Operating MDO = 1588920.63 kg 15,587.31 kN
Empty MDE = 88920.630046 kg 872.31 kN
Test MDT = 1785380.663 kg 17,514.58 kN
Foundation weight in base shear
Pedestal Dpdl 73.71 kN
y pdl Pedestal center of gravity 0.15 m
Calculation
yeb center of gravity empty condition 4.44 m

yob center of gravity operating condition 4.78 m

ytb center of gravity test condition 4.78 m


note : centre of gravity is calculated at ground level due to base shear load calculation.
ATTACHMENT D
LOADING CALCULATION
ATTACHMENT C - LOADING CALCULATION
C.1 Loading Design
C.1.1 Dead Load Remarks
Symbol Description Value Unit Remarks
D Wf+Wac 615.7 kN
Dfooting Footing 516.0 kN
= 515.97 * 1/7 73.7 kN *30 cm above FGL
C.1.2 Equipment Load
Symbol Description Value Unit Remarks
DE Empty weight 8,770.0 kN
DO Operating weight 40,780.0 kN
DT Test weight 73,310.0 kN

C.1.3 Wind Load Calculation


Symbol Description Value Unit Remarks
V Basic wind speed 35.00 m/s Mecha. Data Sheet
C Exposure D
Structure Category I
Kz wind directionality factor 1.00
Kzt velocity pressure coefficient 1.00
Kd topographic factor 1.00
qz Wind Pressure (qz) Ref. 1.a
= 0.613 Kz Kzt Kd V2 750.93 N/m2
= 0.613 * 1 * 1 * 1 * 35^2
G Gust Factor 0.85 Ref. 1.a 26.9.4
h Height above ground level 9.60 m
h/ID = 9.6/15 0.64
Cf Force Coefficient 0.70 Ref 1.a Figure 29.5-
1
h/D = 9.6/15 0.64
D√qz = 15*750.93^0.5 411.05
Af Equipment Projected Area 144.12 m2
= OD*h
=15.012 * 9.6
hw Projected wind height 4.80 m
= h/2
= 9.6/2
W Wind Load 64.40 kN
= qz*G*Cf *Af
= 750.925 * 0.85 * 0.7 * 144.1152)/1000

Symbol Description Value Unit Remarks


Mw Moment due to wind load
= W*(hw + (tf-dp)) 379.96 kN.m
= 64.4*(4.8 + (1.3 - 0.2)

C.1.4 Earthquake Load (E)


Symbol Description Value Unit Remarks
Risk Category IV Ref 2.a table 1
Ie Importance factor 1.50 unitless Ref 2.a table 2
R Response Modification 3.00 unitless Ref 2.a table 21
Factor

Site Class SD Ref 2


Soil Type Medium Soil Ref. 2
SS 0.282 g Ref 2 figure 9
The mapped MCE spectral
response acceleration at
short periods

S1 0.210 g Ref 2 figure 10


The mapped MCE spectral
response acceleration at a
period of 1 s

Fa Short period site coefficient 1.575 unitless Ref 1.a table 4


(at 0.2s-period)

Fv Long period site coefficient 1.980 unitless Ref 1.a table 5


(at 1.0s-period)
SMS 0.444 g
The MCE, 5 percent
damped, spectral response
acceleration at short period
adjusted for site class effect

= Fa * Ss Ref 2.a Eq. 5


= 1.575*0.282
SM1 0.416 g
The MCE, 5 percent
damped, spectral response
acceleration at a period 1 s
adjusted for site class effect

= Fv * S1 Ref 2.a Eq. 6


= 1.98*0.21
SDS 0.296 g
Spectral response
acceleration parameter at
short period
Spectral response
acceleration parameter at
short period

= 2/3 * SMS Ref 2.a Eq. 7


= 2/3*0.44415
Symbol Description Value Unit Remarks
SD1 0.277 g
Spectral response
acceleration parameter at a
period at 1

= 2/3 * SM1 Ref 2.a Eq. 8


= 2/3*0.4158
T Fundamental ≤ Cu . Ta 0.26 sec Ref 2.a Sect. 7.8.2
period

Cu.Ta 0.38 sec


= 1.4228*0.26
Cu (interpolating) 1.42 Ref 2.a table 14
Ta = Ct * hn x
0.26 sec Ref 2.a Eq. 26
= 0.0488*9.5^0.75
Ct Period coefficient 0.0488 unitless Ref 2.a table 15
x Period coefficient 0.75 unitless Ref 2.a table 15
hn Height from level to 9.50 m
base shear
T0 = 0.2*(SD1/SDS) 0.187 sec Ref 2.a Sect. 6.4
= 0.2*(0.2772/0.2961)
TS = (SD1/SDS) 0.936 sec Ref 2.a Sect. 6.4
= 0.2772/0.2961
Sa = SDS (0.4 + 0.6 T/To) (for T < TO)
Sa = SDS = 0.296 Govern (for TO ≤ T ≤ TS)
Sa = SD1/ T (for T > TS )
SDS = 0.296 sec
Cs Seismic response coefficient
= SDS / (R/Ie) 0.15 unitless Ref 2.a Eq.22
= 0.2961/(3/1.5)
Cs < SD1 / [T(R/Ie)] 0.52 OK Ref 2.a Eq. 27
0.2772/[0.26*(3/1.5)]
Cs > max(0.044SDSIe, 0.03) 0.03 OK Ref 2.a Eq. 77
MAX(0.044*0.2961*1.5,0.03)
_ _ _ _ _
_ _ _ __ _
0.5*0.21/(3/1.5)
V Base shear of structure
= Cs * W
Vempty = Cs * (Dfooting + DE) = 1,309.31 kN
= 0.14805 * 8843.71

Symbol Description Value Unit Remarks


Voperating = Cs * (Dfooting + DE + DO) = 7,346.79 kN
= 0.14805 * 49623.71
Empty center of gravity yE (bof) = 4.78 m (Att C)
Operating center of gravity yO (bof) = 4.78 m (Att C)

*note: earthquake load due to the structure above FGL


Symbol Description Value Unit Remarks
Moment
Empty Condition :
MEQ(E) = Vempty * yE (bof)
= 1309.32 * 4.78
= 6,256.04 kN.m
Operating Condition : = Voperating * yO (bof)
MEQ(O) = 7346.8 * 4.78
= 35,121.42 kN.m

Earthquake Load Summary


Empty Condition :
V = 1,309.31 kN
V Resultant for 1X + 0.3 Z = 1,366.96 kN.m Ref. 2.a
= 1309.31*SQRT(1^2+0.3^2)
MEQ(E) bof = 6,256.04 kN.m
M Resultant for 1X + 0.3 Z = 6,531.50 kN.m Ref. 2.a
= 6256.04*SQRT(1^2+0.3^2)
Operating Condition :
V = 7,346.79 kN
V Resultant for 1X + 0.3 Z = 7,670.27 kN.m Ref. 2.a
= 7346.79*SQRT(1^2+0.3^2)
MEQ(O) bof = 35,121.42 kN.m
M Resultant for 1X + 0.3 Z = 36,667.84 kN.m Ref. 2.a
= 35121.42*SQRT(1^2+0.3^2)
C.1.5 Rain Load (E)

As refer to ASCE 7-10


section 8.4 and the tank
is assumed no ponding
above the roof tank and
the drain system is not
blocked.
The value rain load is
calculated by 0
D.2 Load Combination
D.2.1. Loading data for pile and footing design
Axial Load:
D Wf+Wac 615.72 kN
DE Empty 872.31 kN
DO Operating 14,715.00 kN
DT Full of Water 16,642.27 kN
Lateral Load:
Wx Wind force at X direction 64.40 kN
Wz Wind force at Z direction 64.40 kN
Eex Base shear in empty cont'd at X dir. 1,366.96 kN
Eez Base shear in empty cont'd at Z dir. 1,366.96 kN
Eox Base shear in operating cont'd at X dir. 7,670.27 kN
Eoz Base shear in operating cont'd at Z dir. 7,670.27 kN
Overturning Moment:
Mwx Moment due to wind load in X dir. 379.96 kN.m
Mwz Moment due to wind load in Z dir. 379.96 kN.m
MEex Mom' due to EQ in emp' cond' in X dir. 6,531.50 kN.m
MEez Mom' due to EQ in emp' cond' in Z dir. 6,531.50 kN.m
MEox Mom' due to EQ in opr' cond' in X dir. 36,667.8 kN.m
MEoz Mom' due to EQ in opr' cond' in Z dir. 36,667.8 kN.m

D.2.2. Factored Load Combination For Concrete Design


Axial Horizontal (kN) Moment (kN.m)
LC Description or Formula
( kN ) Hx Hy Mx My
Empty Condition:
LC1-1 1.4D + 1.4DE 2,083.2 0.00 0.00 0.00 0.00
LC1-2 0.9D + 0.9DE + 1.0W 1,339.2 64.40 64.40 379.96 0.00
LC1-3 0.9D + 0.9DE + 1.0E(1.0 X+0.3Z) 1,339.2 1,366.96 1,366.96 6,531.50 6,531.50
Operating Condition:
LC1-4 1.2DE + 1.2DO + 0.5 R 1,785.6 0.00 0.00 0.00 0.00
LC1-5 1.4 (DE + DO) 22,684.2 0.00 0.00 0.00 0.00
LC1-6 1.2 (DE + DO) + 1.0W 19,443.6 64.40 64.40 379.96 0.00
LC1-7 1.2 (DE + DO) + 1.0E(1.0 X+0.3Z) 19,443.6 6,531.50 6,531.50 36,667.84 36,667.84
Test Condition:
LC1-8 0.9D + 0.9 (DE + DT) + 1.0W 16,317.3 64.40 64.40 379.96 0.00
D.2.3. Unfactored Load Combination For Pile Design
Axial Horizontal (kN) Moment (kN.m)
LC Description or Formula
( kN ) Hx Hy Mx My
Empty Condition:
LC2-1 (D + DE) 1,488.0 0.00 0.00 0.00 0.00
LC2-2 0.6(D + DE) + 0.6W 892.8199 38.64 38.64 227.98 227.98
LC2-3 0.6(D + DE) + 0.7E(1.0X+0.3Z) 892.8199 956.87 956.87 4,572.05 4,572.05
LC2-4 D + DE + R 1,488.0 0.00 0.00 0.00 0.00
Operating Condition:
LC2-5 D + DE + DO 16,203.0 0.00 0.00 0.00 0.00
LC2-6 D + DE + DO + R 16,203.0 0.00 0.00 0.00 0.00
LC2-7 D + DE + DO + 0.6W 16,203.0 38.64 38.64 227.98 227.98
LC2-8 D + DE +DO + 0.7E (1.0X+0.3Z)16203.03 5,369.19 5,369.19 25,667.49 25,667.49
Test Condition:
LC2-9 0.6(D + DE + DT) + 0.6W 10878.18 38.64 38.64 227.98 227.98

D.2.2. Factored Load Combination For Anchor Bolt Design


Axial Horizontal (kN) Moment (kN.m)
LC Description or Formula
( kN ) Hx Hy Mx My
Empty Condition:
LC1-1 1.4DE 1,221.2 0.00 0.00 0.00 0.00
LC1-2 0.9DE + 1.0W 785.1 64.40 64.40 379.96 0.00
LC1-3 0.9DE + 1.0E 785.1 1,366.96 1,366.96 6,531.50 6,531.50
Operating Condition:
LC1-4 1.4 (DE + DO) 21,822.2 0.00 0.00 0.00 0.00
LC1-5 1.2 (DE + DO) + 1.0W 18,704.8 64.40 64.40 379.96 0.00
LC1-6 1.2 (DE + DO) + 1.0E 18,704.8 6,531.50 6,531.50 36,667.84 36,667.84
Test Condition:
LC1-7 0.9 (DE + DT) + 1.0W 15,763.1 64.40 64.40 379.96 0.00
ATTACHMENT E
FOUNDATION DESIGN
ATTACHMENT E - FOUNDATION DESIGN
E.1 Pile Foundation Design

Pile Group Scr_7


Scr_6
Scr_ D3
Scr_5 D4Scr_2
Scr_
D2
D5
Scr_4 D6D7
D1 Scr_
D8
85 5 3 1
Dpp Pile to pile distance minimal 1.55 m >1.5 …..Ok
where, must be bigger than 3ODp
ODp Pile diameter 0.50 m
Footing
e Distance center pile to edge 0.75 m
= ODp * 1.5
= 0.5*1.5
D1 Outer radius of footing 9.20 m
Df Footing Diameter 18.40 m
D2 Outer radius of pile group 8.45 m
Hf Thickness of footing 1.30 m
Vf Pilecap volume 345.68 m3 22 m3
Wf Pilecap weight 515.97 kN
gc Unit weight of concrete 23.52 kN/m3
Pedestal
Anchor Bolt Splicer
Pcd AB Anchor Bolt Center Diameter 7.500 m
hac Anchor bolt splicer height 0.30 m
bac Anchor bolt splicer height 0.30 m
Vac splicer volume 4.24 m3
Wac splicer weight 99.75 kN

Pcd AB
Emb D1
FGL

PCD 3
PCD 2

PCD 1

Concrete sketch
PCD 3
PCD 2

A A

Tanks
Pedestal
PCD 1
Df

Piling Layout

Pcd AB
D1

Hf FGL

hac
bac

Concrete sketch Details

Modulus shape :
Zp = (( Σn1 * ( PCDn / 2 )^2 ) + (Σn2 * ( PCD 2 / 2 )^2 ) + ...) / most outer Pile)

PCD Diameter (m) Pile Nos (ea) ( Σ n * ( PCDn / 2 )^2 ) Radially Dpp
PCD 1 16.90 15.00 1,071.04 3.51
PCD 2 13.16 12.00 519.56 3.41
PCD 3 9.27 8.00 171.87 3.55
PCD 4 6.18 5.00 47.74 3.63
PCD 5 3.09 3.00 7.16 2.68
43.00 1,810.20
Summ Zp 107.11
E.2 Maximum Force due to Un-factored Load Combination

Unfactored LC (unit : meter, kN)


Axial (kN) Lateral (kN) Moment (kN.m)
Symbol Description or Formula
Px &Py Hx Hz Mx Mz

LC2-1 (D + DE) 1488.03 0.00 0.00 0.00 0.00

LC2-2 0.6(D + DE) + 0.6W 892.82 38.64 38.64 227.98 227.98

LC2-3 0.6(D + DE) + 0.7E(1.0X+0.3Z) 892.82 956.87 956.87 4572.05 4572.05

LC2-4 D + DE + R 1488.03 0.00 0.00 0.00 0.00

LC2-5 D + DE + DO 16203.03 0.00 0.00 0.00 0.00

LC2-6 D + DE + DO + R 16203.03 0.00 0.00 0.00 0.00

LC2-7 D + DE + DO + 0.6W 16203.03 38.64 38.64 227.98 227.98

LC2-8 D + DE +DO + 0.7E (1.0X+0.3Z) 16203.03 5369.19 5369.19 25667.49 25667.49

LC2-9 0.6(D + DE + DT) + 0.6W 10878.18 38.64 38.64 227.98 227.98

Pile group characteristics


LC Pile Nos Modulus of Shape

Symbol Description or Formula Σn ZPx Zpz

Unit nos

LC2-1 (D + DE) 43 107.11 107.11

LC2-2 0.6(D + DE) + 0.6W 43 107.11 107.11

LC2-3 0.6(D + DE) + 0.7E(1.0X+0.3Z) 43 107.11 107.11

LC2-4 D + DE + R 43 107.11 107.11

LC2-5 D + DE + DO 43 107.11 107.11

LC2-6 D + DE + DO + R 43 107.11 107.11

LC2-7 D + DE + DO + 0.6W 43 107.11 107.11

LC2-8 D + DE +DO + 0.7E (1.0X+0.3Z) 43 107.11 107.11

LC2-9 0.6(D + DE + DT) + 0.6W 43 107.11 107.11


Single pile forces due to un-factored LC
Pmax(in X&Z dir.) Hux & Huz Mux & Muz
LC P/Σn Govern Hx/Sn Hz/Sn Govern Mx/Zpy Mz/Zpx Govern
(kN) (kN) (kN) (kN) (kN) (kN) (kN) (kN)
2-1 34.61 34.61 0.00 0.00 0.00 0.00 0.00 0.00
2-2 20.76 20.76 0.90 0.90 0.90 2.13 2.13 2.13
2-3 20.76 20.76 22.25 22.25 22.25 42.68 42.68 42.68
2-4 34.61 34.61 0.00 0.00 0.00 0.00 0.00 0.00
2-5 376.81 376.81 0.00 0.00 0.00 0.00 0.00 0.00
2-6 376.81 376.81 0.00 0.00 0.00 0.00 0.00 0.00
2-7 376.81 376.81 0.90 0.90 0.90 2.13 2.13 2.13
2-8 376.81 376.81 124.86 124.86 124.86 239.63 239.63 239.63
2-9 252.98 252.98 0.90 0.90 0.90 2.13 2.13 2.13

Ultimate axial compressive and tension force of single pile


Symbol Pux or Tux Pux or Tux Puz or Tuz Puz or Tuz
Formula Pmax+Mux Pmax-Mux Pmax+Muz Pmax-Muz
Unit (kN) (kN) (kN) (kN)
LC2-1 34.61 34.61 34.61 34.61
LC2-2 22.89 18.63 22.89 18.63
LC2-3 63.45 -21.92 63.45 -21.92
LC2-4 34.61 34.61 34.61 34.61
LC2-5 376.81 376.81 376.81 376.81
LC2-6 376.81 376.81 376.81 376.81
LC2-7 378.94 374.69 378.94 374.69
LC2-8 616.45 137.18 616.45 137.18
LC2-9 255.11 250.85 255.11 250.85
Max. 616.45 -21.92 616.45 -21.92
Status Compression Tension Compression Tension

Conclusions :
Pu max = 616.45 kN
Pu min = -21.92 kN
Ultimate Single Pile Force
Ultimate Single Pile Force
Ultimate pile axial load, (Vu) Ult. lateral load Ult. bending moment
LC Pu max Pu min or Tu Hu Mu
kN kN kN kN.m
LC2-1 34.61 34.61 0.00 0.00
LC2-2 22.89 18.63 0.90 2.13
LC2-3 63.45 -21.92 22.25 42.68
LC2-4 34.61 34.61 0.00 0.00
LC2-5 376.81 376.81 0.00 0.00
LC2-6 376.81 376.81 0.00 0.00
LC2-7 378.94 374.69 0.90 2.13
LC2-8 616.45 137.18 124.86 239.63
LC2-9 255.11 250.85 0.90 2.13
Max. 616.45 -21.92 124.86 239.63
E.3 Maximum Forces due to Factored Load Combination
Factored LC (unit : meter, kN)
Axial Lateral Moment
Symbol Description or Formula
Px &Pz Hx Hz Mx Mz
LC1-1 1.4D + 1.4DE 2083.25 0.00 0.00 0.00 0.00
LC1-2 0.9D + 0.9DE + 1.0W 1339.23 64.40 64.40 379.96 0.00
LC1-3 0.9D + 0.9DE + 1.0E(1.0 X+0.3Z) 1339.23 1366.96 1366.96 6531.50 6531.50
LC1-4 1.2DE + 1.2DO + 0.5 R 1785.64 0.00 0.00 0.00 0.00
LC1-5 1.4 (DE + DO) 22684.25 0.00 0.00 0.00 0.00
LC1-6 1.2 (DE + DO) + 1.0W 19443.64 64.40 64.40 379.96 0.00
LC1-7 1.2 (DE + DO) + 1.0E(1.0 X+0.3Z) 19443.64 6531.50 6531.50 36667.84 36667.84
LC1-8 0.9D + 0.9 (DE + DT) + 1.0W 16317.28 64.40 64.40 379.96 0.00

Pile configuration characteristics


LC Leg Nos Modulus of Shape
Symbol Description or Formula
Σn
Unit ZPx Zpz
LC1-1 1.4D + 1.4DE 43.00 107.11 107.11
LC1-2 0.9D + 0.9DE + 1.0W 43.00 107.11 107.11
LC1-3 0.9D + 0.9DE + 1.0E(1.0 X+0.3Z) 43.00 107.11 107.11
LC1-4 1.2DE + 1.2DO + 0.5 R 43.00 107.11 107.11
LC1-5 1.4 (DE + DO) 43.00 107.11 107.11
LC1-6 1.2 (DE + DO) + 1.0W 43.00 107.11 107.11
LC1-7 1.2 (DE + DO) + 1.0E(1.0 X+0.3Z) 43.00 107.11 107.11
LC1-8 0.9D + 0.9 (DE + DT) + 1.0W 43.00 107.11 107.11

Single pile forces due to factored LC


Pmax(in X&Z dir.) Hux & Huz Mux & Muz
LC P/Σn Govern Hx/Sn Hz/Sn Govern Mx/Zpz Mz/Zpx Govern
(kN) (kN) (kN) (kN) (kN) (kN.m) (kN.m) (kN.m)
LC1-1 48.45 48.45 0.00 0.00 0.00 0.00 0.00 0.00
LC1-2 31.14 31.14 1.50 3.79 3.79 3.55 0.00 3.55
LC1-3 31.14 31.14 31.79 80.41 80.41 60.98 60.98 60.98
LC1-4 41.53 41.53 0.00 0.00 0.00 0.00 0.00 0.00
LC1-5 527.54 527.54 0.00 0.00 0.00 0.00 0.00 0.00
LC1-6 452.18 452.18 1.50 3.79 3.79 3.55 0.00 3.55
LC1-7 452.18 452.18 151.90 384.21 384.21 342.33 342.33 342.33
LC1-8 379.47 379.47 1.50 3.79 3.79 3.55 0.00 3.55
Ultimate axial compressive and tension force of single pile
Symbol Pux or Tux Pux or Tux Puz or Tuz Puz or Tuz
Formula Pmax+Mux Pmax-Mux Pmax+Muz Pmax-Muz
Unit (kN) (kN) (kN) (kN)
LC1-1 48.45 48.45 48.45 48.45
LC1-2 34.69 27.60 31.14 31.14
LC1-3 92.12 -29.83 92.12 -29.83
LC1-4 41.53 41.53 41.53 41.53
LC1-5 527.54 527.54 527.54 527.54
LC1-6 455.72 448.63 452.18 452.18
LC1-7 794.51 109.85 794.51 109.85
LC1-8 383.02 375.92 379.47 379.47
Max. 794.51 -29.83 794.51 -29.83
Status Compression Tension Compression Tension

Conclusions : Pu max = 794.51 kN


Pu min = -29.83 kN
E.4 Soil - Pile Interaction Capacity Check
E.4.1 Allowable Pile Capacity, Q
Soil - pile capacity for unfactored load combination (unit : kN)
LC Description or Formula Qcomp' Qtension Qlateral Remarks

LC2-1 (D + DE) 681.10 261.68 108.23 permanent


LC2-2 0.6(D + DE) + 0.6W 905.86 348.04 143.94 temporary
LC2-3 0.6(D + DE) + 0.7E(1.0X+0.3Z) 905.86 348.04 143.94 temporary
LC2-4 D + DE + R 681.10 261.68 108.23 permanent
LC2-5 D + DE + DO 905.86 348.04 143.94 temporary
LC2-6 D + DE + DO + R 905.86 348.04 143.94 temporary
LC2-7 D + DE + DO + 0.6W 905.86 348.04 143.94 temporary
LC2-8 D + DE +DO + 0.7E (1.0X+0.3Z) 905.86 348.04 143.94 temporary
LC2-9 0.6(D + DE + DT) + 0.6W 905.86 348.04 143.94 temporary

Single pile axial capacity check


LC Pu max Pu min
Ratio ≤ 0.85
Symbol
Unit (kN) (kN) Pumax/Q Pumin/Q Check
LC2-1 34.61 34.61 0.05 0.05 Pass,Ok!
LC2-2 22.89 18.63 0.03 0.02 Pass,Ok!
LC2-3 63.45 -21.92 0.07 0.06 Pass,Ok!
LC2-4 34.61 34.61 0.05 0.05 Pass,Ok!
LC2-5 376.81 376.81 0.42 0.42 Pass,Ok!
LC2-6 376.81 376.81 0.42 0.42 Pass,Ok!
LC2-7 378.94 374.69 0.42 0.41 Pass,Ok!
LC2-8 616.45 137.18 0.68 0.15 Pass,Ok!
LC2-9 255.11 250.85 0.28 0.28 Pass,Ok!
Maximum ratio 0.68 0.42
Single pile lateral capacity check
LC Hu
Ratio ≤ 0.85
Symbol
Unit (kN) H / Qlat' Check
LC2-1 0.00 0.00 Pass,Ok!
LC2-2 0.90 0.01 Pass,Ok!
LC2-3 22.25 0.15 Pass,Ok!
LC2-4 0.00 0.00 Pass,Ok!
LC2-5 0.00 0.00 Pass,Ok!
LC2-6 0.00 0.00 Pass,Ok!
LC2-7 0.90 0.01 Pass,Ok!
LC2-8 124.86 0.87 Fail..!!
LC2-9 0.90 0.01 Pass,Ok!
Maximum ratio 0.87
E.5. Footing Design

E.5.1 Material and Geometric Constant


f'c Ultimate compression strength of concrete 22.83 MPa
fy Ultimate tensile strength of deformed bars 390.00 MPa
Ø Flexural capacity reduction factor 0.90 unitless
Øv Shear capacity reduction factor 0.75 unitless
d' Embedment of pile to pile cap 0.10 m
c' Distance rebar to cut of pile 0.05 m
c Total concrete cover 0.15 m
b Strip width 1.00 m
h Pilecap thickness 1.30 m
L-a Span (maximum pile to pile distance) sect. A 3.89 m
d Effective depth of pilecap 1.12 m
= h - d -1.5*drebar
= 1.3 - 0.15 -1.5* 0.019
drebar designed rebar dia. 19.00 mm

Maximum bending moment, Mmax


Wide of tributary area = 1.00 m
Span = 3.89 m
Total load = Max. Axial Load
= 22684.25 kN
Area of tank = 177.00 m2
Load per m 2
= 128.16 kN/m2
Load per m = 128.16 kN/m
Mmax = 1/8 * q * L2
= 242.42 kN.m
qu

L-a L-b

As d
h

*note: Reinforcement design take sample from L-a section


E.5.2 Footing Flexural Reinforcement ( Top & Bottom Reinforcement )
Bottom Reinforcement
Mmax = 242.42 kN.m
Mu = f.Mmax
Max factored moment = 242.4 kN.m
d = 1.12 m
Ru = Mu / (f x b x d2)
= 0.214 MPa
m = fy / ( 0.85 * fc' )
= 20.10
ρ required = (1/m) x (1 - (1 - 2m Ru/fy)0.5)
= 0.055% 0.00001
ρ balanced = bi * 0.85 fc' * 600 0.00073
fy 600 + fy 0.00359
= 0.026 0.000
ρ max = 0.75 ρ balanced
= 1.92%
ρ min = 0.200% (ρ min = 1.4/fy if 1.33 x ρ required > 1.4/fy)
(ρ min = 0.2% if 1.33 x ρ required < 1.4/fy)
ρ need = 0.073%
(ρ need = ρ required if ρ required > 1.4/fy)
(ρ need = ρ required x 1.33 but not need to exceed 1.4/fy if ρ required < 1.4/fy)
ρ used = 0.200% < 1.93%……...OK
(ρ used = largest of ρ min or ρ need)
As req = ρ * b * d'
= 2,243.0 mm2
Diameter of reinf. Bars 19 mm
As = 283.53 mm2
No.of bars = As req / As
= 8.00
spacing = Width / no. of bars
= 0.125 m
= 125.00 mm => 125 mm

Define spacing = 125 mm

Asused = 2,268.23 mm2


a = As x fy
0.85 x fc' x b
= 2,268.23 x 390
19,405.50
= 45.586 mm

f Mn = f As x fy x (d - a/2)
= 0.9 x 2,268.23 x 390.00 x 1098.707
= 874,734,142.54 Nmm
f Mn = 874.73 kNm > Mu = 242.42 kNm …Ok

D19 - 125
Use D19 - 125 for bottom flexural reinforcement
Top Reinforcement
For top reinforcement area r used is r min due to compression area

ρ need = 0.200%
(ρ used = largest of ρ min or ρ need)
As req = ρ * b * d'
= 2,243.0 mm2
Diameter of reinf. Bars 19 mm
As = 283.53 mm2
No.of bars = As req / As
= 8.00
spacing = Width / no. of bars
= 0.125 m
= 125.00 mm => 125 mm

Define spacing = 125 mm

Asused = 2,268.23 mm2


a = As x fy
0.85 x fc' x b
= 2,268.23 x 390
19,405.50
= 45.586 mm

f Mn = f As x fy x (d - a/2)
= 0.9 x 2,268.23 x 390.00 x 1098.707
= 874,734,142.54 Nmm
f Mn = 874.73 kNm > Mu = 390.00 kNm …Ok

D19 - 125
Use D19 - 125 for top flexural reinforcement

Shear Reinforcement

b Pedestal length = 18.40 m


Vu Ultimate shear forces ( factored load hor x max ) = 6,531.5 kN
Leg of shear reinforcement = 1
bar diameter = 10 mm
area section of shear reinforcement ( Av ) 78.54 mm2
Ø Shear capacity reduction factor = 0.75

= = 16433.07 kN

Dimension requirement fc '


Vc  * bw * d
Vu<0,5fVc 6 No reinforcement required
0,5fVc<Vu<fVc use minimum reinforcement
(Vu - fVc )< 0,67*bw*d*√fc' pedestal dimension ok, if not, dimension need to be made larger

0,5fVc Vu fVc
6162.4 < 6,531.5 ==> need reinforcement
E.5.3 Maximum Crack Width on Tension Area

2dc

1.00 m

β Height factor (1.2 for beam,1.35 for slab) 1.35 unitless


fy Reinforcing steel strength 390.00 MPa
fs Reinforcement calculated stress at service 234.00 MPa
load shall be 0.6fy for maximum crack
dc single site cover (c) +0.5drebar 159.50 mm
Ae effective tension area of concrete around the 319000.00 mm2
rebar layment = 2*dc*b

A Effective tension area divided by number of 39875.00 mm2


bar (Ae/N)
N Number of rebar table K.4.2 8.00 ea
w Crack width 0.06 mm w < 0.33 mm,
= 1.11*10^-6*β*fs*(dc*A)^1/3 Ok..
E.6 Anchor Bolt Design

Use:Anchor Bolt ASTM A307


Bolt Circle Diameter, BCD = 7.50 m
db = 1 1/2 in
= 38.1 mm
Ab = 1140.1 mm2
Ft = 137.30 MPa
Fv = 68.60 MPa
Fy = 240.00 MPa
nb = 90 ea
min distance to edge (E) = 230 mm
BCD
min bolt pitch (F) = 160 mm
min bolt embedment (Le) = 640 mm

Zp bolt = ( S n * ( BCDn / 2 )^2 ) / most outer BCD


Zp bolt = (90 x (7.5/2)^2 )/7.5
= 168.75 m

Table E.6.1 Unfactored Load Combination for anchor bolt design


Axial Horizontal Moment
Load Combination Condition
( kN ) ( kN ) ( kN.m )
LC 2-1 872.3 0.0 0.0 Permanent
Empty LC 2-2 523.4 38.6 228.0 Temporary
LC 2-3 523.4 956.9 4,572.0 Temporary
LC 2-4 14,715.0 0.0 0.0 Permanent
Operation LC 2-5 8,829.0 38.6 228.0 Temporary
LC 2-6 8,829.0 5,369.2 25,667.5 Temporary
Testing LC 2-7 9,985.4 38.6 228.0 Temporary
Table E.6.2 Maximum Unfactored Forces Applied to Single Anchor Bolt:
P/n H/n M/Zp P/n - M/Zp
Load Combination Condition
( kN ) ( kN ) ( kN ) (kN)
LC 2-1 9.69 0.00 0.00 9.69 Permanent
Empty LC 2-2 5.82 0.43 1.35 4.46 Temporary
LC 2-3 5.82 10.63 27.09 -21.28 Temporary
LC 2-4 163.50 0.00 0.00 163.50 Permanent
OperationLC 2-5 98.10 0.43 1.35 96.75 Temporary
LC 2-6 98.10 59.66 152.10 -54.00 Temporary
Testing LC 2-7 110.95 0.00 0.00 110.95 Temporary

To simplify direct comparison between bolt maximum forces and bolt


capacity, maximum forces in temporary condition shall be divided by 1,3 and
in testing condition shall be divided by 1,2

(See attachment G for bolt capacity summary)


H/n max = 59.66 kN
Bolt Shear Strength = 62.20 kN
Shear SF = 1.04 > 1….. OK

Bolt shear and tension combination for A307:


Ft allowable = 26 - 1.8fv <= 20 (ksor (179 - 1.8fv < 137 [MPa])
fv = H/(n x Abolt)
Tall = Ft allowable x Abolt

Table E.6.2 Anchor bolt capacity check


fv Tall T
Load Combination Remark
( MPa ) ( kN ) ( kN )
LC 2-1 0.0 156 COMP. No Tension - OK
Empty LC 2-2 0.0 156 COMP. No Tension - OK
LC 2-3 0.0 156 -21.28 OK
LC 2-4 0.0 156 COMP. No Tension - OK
OperationLC 2-5 0.0 156 COMP. No Tension - OK
LC 2-6 0.1 156 -54.004 OK
Testing LC 2-7 0.0 156 COMP. No Tension - OK
Minimum Footing = BCD1 + 2E
Diameter
= 7.96 m < 18.40 m (ok)
ATTACHMENT F
SETTLEMENT CALCULATION
E
Attachment D - Settlement Calculation

The settlement of pile group was analyzed using elastic half-space theory proposed
by Timoshenko and Goodier (1951) and Poulos and Davis (1980) as known below:

Imaginary raft at the depth of 2/3 the length of pile was assumed with load spreading
of 4V : 1H. The settlement were estimated below.

4 D=2/3
Lp
h

1
B'
2
H

uncompressible soil

Scheme of load distribution.


Symbol Description and or Formula Unit Value Remarks
B Diameter of pile group m 17.40
PCD 1 + Odp
=16.9+0.5
L Diameter of pile group m 17.40
PCD 1 + Odp
=16.9+0.5
LP pile length m 17.50
e Distance pile to edge m 1.50
HF Thickness of footing m 1.30
Cc Compression Index According To ref
Cs Swell Index According To ref
e0 Initial void ratio According To ref
σc Consolidation Pressure According To ref
g Unit weight of soil According To ref
σo Preconsolidation pressure According To ref
Δσ Total pressure due to depth of soil
D depth of imaginary raft
D = 2/3LP m 11.67
= 2/3*17.5
B' imaginary diameter of pile
B' = B + 2*D/4 m 23.23
= 17.4+2*11.6666666666667/4
Symbol Description and or Formula Unit Value Remarks
L' imaginary diameter of pile
L' = L + 2*D/4 m 23.23
= 17.4+2*11.6666666666667/4
h Depth of uncompressible soil m 84.00
H distance from imaginary raft to hard soil
H=h-D m 72.33
= 84 - 11.6666666666667
imaginary raft shape: circle
Agp area imaginary raft
= 0.25*π*B'^2 m² 423.95
= 0.25*π*23.23^2
D/B' = 11.6666666666667/23.23 unitless 0.50
L'/B' = 23.23/23.23 unitless 1.00
H/B' = 72.3333333333333/23.23 unitless 3.11

- Load Design
DT Equipment Test Load kN 17,514.58
Dmax Working Load kN 16203.03 max. from LC
q1 Load due to Elastic Settlement kN/m2 41.31
= Equipment Test Load/Agp
= 17514.58 / 423.95
Dtot Load due to Consolidation kN 16203.03
Settlement
- Soil Properties
N-SPT N-SPT value on depth 2/3 L N-SPT 13 Based on BH-04
2/3 Lp = 11.6666666666667 m soil report
Cu soil cohession kN/m² 78.00
Cu = 6 * N-SPT
Es modulus elasticity of soil kN/m² 31200.00
Es = 400 * Cu

- Other Parameters
μ0 influence factored due to depth 0.91
μ1 influence factored due to width of foundation 0.41

- Pile Elastic Settlement (Se)


ri = group pile elastic settlement
μ0*μ1*q1*B'
=
Es
0.91*0.41*41.31*23.23*1000
=
31200

= 11.48 mm
Pile Consolidated Settlement

Stress on mid layer for the calculation of consolidation settlement of a pile group in clay
can be estimated by using the 2:1 stress distribution method.
The consolidation settlement (Sc) will be calculated by using the following formulas:
- Normally consolidated Clay (NC)
Sc = (Cc Hc)/(1+e0) log (σo+Δσ)/σo
- Over consolidated clay with σo+Dσ<σc (OC1)
Sc = (Cs Hc)/(1+e0) log (σo+Δσ)/σo
- Over consolidated with σo<σc<σo+Dσ (OC2)
Sc = (Cs Hc)/(1+e0) log (σc/σo) + (Cc Hc/1+e0) log (σo+Δσ)/σc

Table G.1.2 Consolidation Calculation


Cc Cs e0 σc g σo Bi=Li Δσ Cons Sc
Depth
kN/m2
kN/m kN/m m
3 2
kN/m Type
2
m
0.0 - 11.7 0.57 0.06 1.15 94.18 18.26 98.58 23.23
11.7 - 12.2 0.57 0.06 1.15 94.18 18.26 100.70 23.73 36.63 NC 0.0178
12.2 - 12.7 0.57 0.06 1.15 94.18 18.26 102.81 24.23 35.13 NC 0.0169
12.7 - 13.2 0.57 0.06 1.15 94.18 18.26 104.92 24.73 33.72 NC 0.0160
13.2 - 13.7 0.57 0.06 1.15 94.18 18.26 107.03 25.23 32.40 NC 0.0152
13.7 - 14.2 0.57 0.06 1.15 94.18 18.26 109.15 25.73 31.15 NC 0.0144
14.2 - 14.7 0.57 0.06 1.15 94.18 18.26 111.26 26.23 29.98 NC 0.0137
14.7 - 15.2 0.57 0.06 1.15 94.18 18.26 113.37 26.73 28.87 NC 0.0130
15.2 - 15.7 0.57 0.06 1.15 94.18 18.26 115.48 27.23 27.82 NC 0.0124
15.7 - 16.2 0.57 0.06 1.15 94.18 18.26 117.60 27.73 26.82 NC 0.0118
16.2 - 16.7 0.57 0.06 1.15 94.18 18.26 119.71 28.23 25.88 NC 0.0112
16.7 - 17.2 0.57 0.06 1.15 94.18 18.26 121.82 28.73 24.99 NC 0.0107
17.2 - 17.7 0.57 0.06 1.15 94.18 18.26 123.93 29.23 24.14 NC 0.0102
17.7 - 18.2 0.57 0.06 1.15 94.18 18.26 126.05 29.73 23.34 NC 0.0098
18.2 - 18.7 0.57 0.06 1.15 94.18 18.26 128.16 30.23 22.57 NC 0.0093
18.7 - 19.2 0.57 0.06 1.15 94.18 18.26 130.27 30.73 21.84 NC 0.0089
19.2 - 19.7 0.57 0.06 1.15 94.18 18.26 132.38 31.23 21.15 NC 0.0085
19.7 - 20.2 0.57 0.06 1.15 94.18 18.26 134.50 31.73 20.49 NC 0.0081
20.2 - 20.7 0.57 0.06 1.15 94.18 18.26 136.61 32.23 19.86 NC 0.0078
20.7 - 21.2 0.57 0.06 1.15 94.18 18.26 138.72 32.73 19.25 NC 0.0075
21.2 - 21.7 0.57 0.06 1.15 94.18 18.26 140.83 33.23 18.68 NC 0.0072
21.7 - 22.2 0.57 0.06 1.15 94.18 18.26 142.95 33.73 18.13 NC 0.0069
22.2 - 22.7 0.57 0.06 1.15 94.18 18.26 145.06 34.23 17.60 NC 0.0066
22.7 - 23.2 0.57 0.06 1.15 94.18 18.26 147.17 34.73 17.10 NC 0.0063
23.2 - 23.7 0.57 0.06 1.15 94.18 18.26 149.28 35.23 16.62 NC 0.0061
23.7 - 24.2 0.57 0.06 1.15 94.18 18.26 151.40 35.73 16.16 NC 0.0058
24.2 - 24.7 0.57 0.06 1.15 94.18 18.26 153.51 36.23 15.71 NC 0.0056
24.7 - 25.2 0.57 0.06 1.15 94.18 18.26 155.62 36.73 15.29 NC 0.0054
25.2 - 25.7 0.57 0.06 1.15 94.18 18.26 157.73 37.23 14.88 NC 0.0052
25.7 - 26.2 0.57 0.06 1.15 94.18 18.26 159.85 37.73 14.49 NC 0.0050
26.2 - 26.7 0.57 0.06 1.15 94.18 18.26 161.96 38.23 14.11 NC 0.0048
26.7 - 27.2 0.57 0.06 1.15 94.18 18.26 164.07 38.73 13.75 NC 0.0046
27.2 - 27.7 0.57 0.06 1.15 94.18 18.26 166.18 39.23 13.40 NC 0.0045
27.7 - 28.7 0.57 0.06 1.15 94.18 18.26 170.41 40.23 12.74 NC 0.0083
28.7 - 29.7 0.57 0.06 1.15 94.18 18.26 174.63 41.23 12.13 NC 0.0077
29.7 - 30.7 0.57 0.06 1.15 94.18 18.26 178.86 42.23 11.57 NC 0.0072
Cc Cs e0 σc g σo Bi=Li Δσ Cons Sc
Depth
kN/m2 kN/m3 kN/m2 m kN/m2 Type m
30.7 - 31.7 0.57 0.06 1.15 94.18 18.26 183.08 43.23 11.04 NC 0.0067
31.7 - 32.7 0.57 0.06 1.15 94.18 18.26 187.31 44.23 10.54 NC 0.0063
32.7 - 33.7 0.57 0.06 1.15 94.18 18.26 191.53 45.23 10.08 NC 0.0059
33.7 - 34.7 0.57 0.06 1.15 94.18 18.26 195.76 46.23 9.65 NC 0.0055
34.7 - 35.7 0.57 0.06 1.15 94.18 18.26 199.98 47.23 9.25 NC 0.0052
35.7 - 36.7 0.57 0.06 1.15 94.18 18.26 204.21 48.23 8.87 NC 0.0049
36.7 - 37.7 0.57 0.06 1.15 94.18 18.26 208.43 49.23 8.51 NC 0.0046
37.7 - 38.7 0.57 0.06 1.15 94.18 18.26 212.66 50.23 8.18 NC 0.0043
38.7 - 39.7 0.57 0.06 1.15 94.18 18.26 216.88 51.23 7.86 NC 0.0041
39.7 - 40.7 0.57 0.06 1.15 94.18 18.26 221.11 52.23 7.56 NC 0.0039
40.7 - 41.7 0.57 0.06 1.15 94.18 18.26 225.33 53.23 7.28 NC 0.0037
41.7 - 42.7 0.57 0.06 1.15 94.18 18.26 229.56 54.23 7.01 NC 0.0035
42.7 - 43.7 0.57 0.06 1.15 94.18 18.26 233.78 55.23 6.76 NC 0.0033
43.7 - 44.7 0.57 0.06 1.15 94.18 18.26 238.01 56.23 6.52 NC 0.0031
44.7 - 45.7 0.57 0.06 1.15 94.18 18.26 242.23 57.23 6.30 NC 0.0030
45.7 - 46.7 0.57 0.06 1.15 94.18 18.26 246.46 58.23 6.08 NC 0.0028
46.7 - 47.7 0.57 0.06 1.15 94.18 18.26 250.68 59.23 5.88 NC 0.0027
47.7 - 48.7 0.57 0.06 1.15 94.18 18.26 254.91 60.23 5.69 NC 0.0025
48.7 - 49.7 0.57 0.06 1.15 94.18 18.26 259.13 61.23 5.50 NC 0.0024
49.7 - 50.7 0.57 0.06 1.15 94.18 18.26 263.36 62.23 5.33 NC 0.0023
50.7 - 51.7 0.57 0.06 1.15 94.18 18.26 267.58 63.23 5.16 NC 0.0022
51.7 - 52.7 0.57 0.06 1.15 94.18 18.26 271.81 64.23 5.00 NC 0.0021
52.7 - 53.7 0.57 0.06 1.15 94.18 18.26 276.03 65.23 4.85 NC 0.0020
53.7 - 54.7 0.57 0.06 1.15 94.18 18.26 280.26 66.23 4.70 NC 0.0019
54.7 - 55.7 0.57 0.06 1.15 94.18 18.26 284.48 67.23 4.56 NC 0.0018
55.7 - 56.7 0.57 0.06 1.15 94.18 18.26 288.71 68.23 4.43 NC 0.0018
56.7 - 57.7 0.57 0.06 1.15 94.18 18.26 292.93 69.23 4.30 NC 0.0017
57.7 - 58.7 0.57 0.06 1.15 94.18 18.26 297.16 70.23 4.18 NC 0.0016
58.7 - 59.7 0.57 0.06 1.15 94.18 18.26 301.38 71.23 4.07 NC 0.0015
Total Sc (m) 0.4177
Total Sc (mm) 417.7095
note: Cs = 0.1 * Cc
as refer to B.M. Das the value of Cs is about 0.2-0.1 Cc

Total Settlement
Elastic Settlement 11.48 mm
Consolidation Settlement 417.71 mm
429.19 mm …> 100 mm …NOT OK

*According for mechanical criteria in piping arrangement


Time Rate of Consolidation
The Magnitude of x percent of total consolidation settlement calculation respect to time
was analyzed by Terzhagi equation has shown below :

𝑡�=𝑇𝑣�∗ 〖���〗 ^2
/𝐶𝑣

Value of U (percentage of consolidation settlement and total settlement) and Tv (time


factor of consolidation is shown at table and graphic below
T and U Table

T and U graphic
100
90
80
70
60
50
40
30
20
10
0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1
a. 90% of total settlement
Symbol Description & Formula Value Unit
Tv90 time factor of 90% consolidation 0.848 unitless
Hdr thickness of compressive layer
t90 time 90% consolidation

Depth Hdr P0 + Dp Cv t90


m m kN/m2 m2/yr year
0.0 - 11.7
11.7 - 12.2 0.50 137.32 0.95 0.22
12.2 - 12.7 0.50 137.94 0.95 0.22
12.7 - 13.2 0.50 138.64 0.95 0.22
13.2 - 13.7 0.50 139.43 0.95 0.22
13.7 - 14.2 0.50 140.30 0.95 0.22
14.2 - 14.7 0.50 141.24 0.95 0.22
14.7 - 15.2 0.50 142.24 0.95 0.22
15.2 - 15.7 0.50 143.30 0.95 0.22
15.7 - 16.2 0.50 144.42 0.95 0.22
16.2 - 16.7 0.50 145.59 0.95 0.22
16.7 - 17.2 0.50 146.81 0.95 0.22
17.2 - 17.7 0.50 148.07 0.95 0.22
17.7 - 18.2 0.50 149.38 0.95 0.22
18.2 - 18.7 0.50 150.73 0.95 0.22
18.7 - 19.2 0.50 152.11 0.95 0.22
19.2 - 19.7 0.50 153.53 0.95 0.22
19.7 - 20.2 0.50 154.98 0.95 0.22
20.2 - 20.7 0.50 156.46 0.95 0.22
20.7 - 21.2 0.50 157.98 0.95 0.22
21.2 - 21.7 0.50 159.51 0.95 0.22
21.7 - 22.2 0.50 161.08 0.95 0.22
22.2 - 22.7 0.50 162.66 0.95 0.22
22.7 - 23.2 0.50 164.27 0.95 0.22
23.2 - 23.7 0.50 165.90 0.95 0.22
23.7 - 24.2 0.50 167.55 0.95 0.22
24.2 - 24.7 0.50 169.22 0.95 0.22
24.7 - 25.2 0.50 170.91 0.95 0.22
25.2 - 25.7 0.50 172.61 0.95 0.22
25.7 - 26.2 0.50 174.34 0.95 0.22
26.2 - 26.7 0.50 176.07 0.95 0.22
Depth Hdr P0 + Dp Cv t90
m m kN/m2 m /yr
2
year
26.7 - 27.2 0.50 177.82 0.95 0.22
27.2 - 27.7 0.50 179.59 0.95 0.22
27.7 - 28.7 1.00 183.15 0.95 0.90
28.7 - 29.7 1.00 186.77 0.95 0.90
29.7 - 30.7 1.00 190.42 0.95 0.90
30.7 - 31.7 1.00 194.12 0.95 0.90
31.7 - 32.7 1.00 197.85 0.95 0.90
32.7 - 33.7 1.00 201.62 0.95 0.90
33.7 - 34.7 1.00 205.41 0.95 0.90
34.7 - 35.7 1.00 209.23 0.95 0.90
35.7 - 36.7 1.00 213.08 0.95 0.90
36.7 - 37.7 1.00 216.94 0.95 0.90
37.7 - 38.7 1.00 220.83 0.95 0.90
38.7 - 39.7 1.00 224.74 0.95 0.90
39.7 - 40.7 1.00 228.67 0.95 0.90
40.7 - 41.7 1.00 232.61 0.95 0.90
41.7 - 42.7 1.00 236.57 0.95 0.90
42.7 - 43.7 1.00 240.55 0.95 0.90
43.7 - 44.7 1.00 244.53 0.95 0.90
44.7 - 45.7 1.00 248.53 0.95 0.90
45.7 - 46.7 1.00 252.54 0.95 0.90
46.7 - 47.7 1.00 256.56 0.95 0.90
47.7 - 48.7 1.00 260.59 0.95 0.90
48.7 - 49.7 1.00 264.64 0.95 0.90
49.7 - 50.7 1.00 268.69 0.95 0.90
50.7 - 51.7 1.00 272.74 0.95 0.90
51.7 - 52.7 1.00 276.81 0.95 0.90
52.7 - 53.7 1.00 280.88 0.95 0.90
53.7 - 54.7 1.00 284.96 0.95 0.90
54.7 - 55.7 1.00 289.05 0.95 0.90
55.7 - 56.7 1.00 293.14 0.95 0.90
56.7 - 57.7 1.00 297.24 0.95 0.90
57.7 - 58.7 1.00 301.34 0.95 0.90
58.7 - 59.7 1.00 305.45 0.95 0.90
å t90 34.51

U = 90.00%
δc = U * δtotal + δe
= 0.9 * 417.71 + 11.48
= 387.42
From above calculation the time of settlement 90% consolidation is 34.51 years for total
settlement 387.42 mm
b. Settlement Calculation at 25 years of design lifetime
Symbol Description & Formula Value Unit
Tv58 time factor of 81.13% consolidation 0.614 unitless
Hdr thickness of compressive layer
t81.13 time 81.13% consolidation
=Tv81.13 * Hdr2/Cv

Depth Hdr P0 + Dp Cv t50


m m kN/m2 m /yr
2
year
0.0 - 11.7
11.7 - 12.2 0.50 137.32 0.95 0.16
12.2 - 12.7 0.50 137.94 0.95 0.16
12.7 - 13.2 0.50 138.64 0.95 0.16
13.2 - 13.7 0.50 139.43 0.95 0.16
13.7 - 14.2 0.50 140.30 0.95 0.16
14.2 - 14.7 0.50 141.24 0.95 0.16
14.7 - 15.2 0.50 142.24 0.95 0.16
15.2 - 15.7 0.50 143.30 0.95 0.16
15.7 - 16.2 0.50 144.42 0.95 0.16
16.2 - 16.7 0.50 145.59 0.95 0.16
16.7 - 17.2 0.50 146.81 0.95 0.16
17.2 - 17.7 0.50 148.07 0.95 0.16
17.7 - 18.2 0.50 149.38 0.95 0.16
18.2 - 18.7 0.50 150.73 0.95 0.16
18.7 - 19.2 0.50 152.11 0.95 0.16
19.2 - 19.7 0.50 153.53 0.95 0.16
19.7 - 20.2 0.50 154.98 0.95 0.16
20.2 - 20.7 0.50 156.46 0.95 0.16
20.7 - 21.2 0.50 157.98 0.95 0.16
21.2 - 21.7 0.50 159.51 0.95 0.16
21.7 - 22.2 0.50 161.08 0.95 0.16
22.2 - 22.7 0.50 162.66 0.95 0.16
22.7 - 23.2 0.50 164.27 0.95 0.16
23.2 - 23.7 0.50 165.90 0.95 0.16
23.7 - 24.2 0.50 167.55 0.95 0.16
24.2 - 24.7 0.50 169.22 0.95 0.16
24.7 - 25.2 0.50 170.91 0.95 0.16
25.2 - 25.7 0.50 172.61 0.95 0.16
25.7 - 26.2 0.50 174.34 0.95 0.16
26.2 - 26.7 0.50 176.07 0.95 0.16
26.7 - 27.2 0.50 177.82 0.95 0.16
27.2 - 27.7 0.50 179.59 0.95 0.16
27.7 - 28.7 1.00 183.15 0.95 0.65
28.7 - 29.7 1.00 186.77 0.95 0.65
Depth Hdr P0 + Dp Cv t50
m m kN/m2 m /yr
2
year
29.7 - 30.7 1.00 190.42 0.95 0.65
30.7 - 31.7 1.00 194.12 0.95 0.65
31.7 - 32.7 1.00 197.85 0.95 0.65
32.7 - 33.7 1.00 201.62 0.95 0.65
33.7 - 34.7 1.00 205.41 0.95 0.65
34.7 - 35.7 1.00 209.23 0.95 0.65
35.7 - 36.7 1.00 213.08 0.95 0.65
36.7 - 37.7 1.00 216.94 0.95 0.65
37.7 - 38.7 1.00 220.83 0.95 0.65
38.7 - 39.7 1.00 224.74 0.95 0.65
39.7 - 40.7 1.00 228.67 0.95 0.65
40.7 - 41.7 1.00 232.61 0.95 0.65
41.7 - 42.7 1.00 236.57 0.95 0.65
42.7 - 43.7 1.00 240.55 0.95 0.65
43.7 - 44.7 1.00 244.53 0.95 0.65
44.7 - 45.7 1.00 248.53 0.95 0.65
45.7 - 46.7 1.00 252.54 0.95 0.65
46.7 - 47.7 1.00 256.56 0.95 0.65
47.7 - 48.7 1.00 260.59 0.95 0.65
48.7 - 49.7 1.00 264.64 0.95 0.65
49.7 - 50.7 1.00 268.69 0.95 0.65
50.7 - 51.7 1.00 272.74 0.95 0.65
51.7 - 52.7 1.00 276.81 0.95 0.65
52.7 - 53.7 1.00 280.88 0.95 0.65
53.7 - 54.7 1.00 284.96 0.95 0.65
54.7 - 55.7 1.00 289.05 0.95 0.65
55.7 - 56.7 1.00 293.14 0.95 0.65
56.7 - 57.7 1.00 297.24 0.95 0.65
57.7 - 58.7 1.00 301.34 0.95 0.65
58.7 - 59.7 1.00 305.45 0.95 0.65
å t58 25.00

U = 81.13%
δc = U * δtotal + δe
= 0.81 * 417.71 + 11.48
= 350.37 mm
From above calculation the time of settlement at 25 years is 350.37 mm
ATTACHMENT G
PUNCHING SHEAR CHECK
G. Punching Shear Crack

G.1.1 Illustration
Critical section of punching shear is figured below :

Dpp
ODp/2
ODp ODp/2
ODp/2
ODp ODp

Pile

bo
bo

Fig. F.1.1
Critical section of pile punching shear.
(a) Single punching shear
(b) Group punching shear

G.1.2 Data and Assumption


Vu_max Max. pile force due to factored comb' 794.51 kN ref. Att. E.3
ODp Pile diameter 0.50 m
d Effective depth of footing 1,121.50 mm
Dpp Pile to pile distance 3.89 m
fc' Concrete strength 22.83 MPa

G.1.3 Pseudocritical Diameter


ODb Pseudocritical diameter 1.62 m
ODb = ODp + df
ODb < Dpp, Single punching shear will be occurred
where,
ODp Pile diameter 0.50 m
Dpp Pile to pile distance 3.89 m
d Effective depth of footing 1.12 m
Single punching shear occurred
k shall be the smallest of:
k1 (2 + 4/bc)/12 0.50 unitless
k2 ((as d/bo) + 2)/12 0.90 unitless
k3 4/12 0.33 unitless ..Govern!!
where,
bc Ratio of long side to short side of pile 1.00 unitless
will be 1 for circle area
as Constants 20.00 unitless
will be 20 for corner
will be 30 for edge
will be 40 for interior pile
d Effective depth of footing table M.2 1.12 m
ODp Pile diameter 0.50 m
bo_pl Pseudocritical perimeter 2.55 m
s assume as single pile failure
bo _ pl   (ODp d) *
40
G.1.4 Two Way Punching Shear of Pile
Vu Max. pile force due to factored comb' 794.51 kN
Vc Slab allow' punch' shear without rebar 4,549.5 kN
Vc = k * fc'^1/2 * bo_pl * df
fVc fVc = 0.75 * Vc 3,412.16 kN Vu<fVc, OK!
where, No Shear Reinforcement needed
k Punching shear coefficient table M.4 0.33 unitless
bo_pl Pseudocritical perimeter table M.3 2.55 m
d Effective depth of footing table M.2 1.12 m
fc' Concrete strength 22.83 MPa
ATTACHMENT H
BOLT CAPACITY TABLE
ATTACHMENT H - BOLT CAPACITY TABLE
H.1 Type-2 bolt capacity
- BOLT CAPACITY and boundaries are refer to MPP NIAS MECH DATA

- Type- 1 bolt is bolt selected for structures and other equipments

- All material shall be in accordance with project specification bolt ASTM A307 Grade C
Concrete with fc' = 35 MPa

Table G-1 Type-1 bolt capacity and boundaries


Dia. (in) db (mm) Le (mm) F (mm) E (mm) Tall (kN) Vall (kN)
1/2 12 290 50 80 12.00 5.70
5/8 16 320 70 100 20.00 9.70
3/4 18 360 80 110 29.30 14.60
7/8 22 410 90 140 40.90 20.40
1 26 480 110 160 53.80 26.60
1 1/4 32 530 130 200 85.80 42.70
1 1/2 38 640 160 230 124.90 62.20
1 3/4 44 700 180 270 168.50 84.00
2 50 800 200 300 221.90 110.70
2 1/4 58 840 240 350 288.60 144.10
2 1/2 64 870 260 390 355.40 177.40
2 3/4 70 920 280 420 438.50 219.20
3 76 990 310 460 530.60 265.10
Fig B.1
db = Bolt diameterEquipment List
Le = Minimum bolt embedment
F = Bolt pitch, minimum distance of bolt center to center
E = Minimum bolt distance from concrete block edge
Tall = Bolt allowable tension capacity
Vall = Bolt allowable shear capacity
ATTACHMENT I
QUANTITY OF MATERIAL CALCULATION
I.1 QUANTITY OF MATERIAL CALCULATION
I.1.2 Concrete requirement

Volume of Concrete = Volume of Footing


V.o.c = V.o.f
V.o.f = A footing x height of footing
Footing Concrete
Footing Diameter = 18.40 m
Height of Footing = 1.30 m
Volume of Footing = 345.68 m³

Lean concrete = Thickness*Area of Lean Concrete


0.05*0.25*PI()*18.4^2
5.19 m³
I.1.3 Steel Reinforcement requirement

Reinforcement Layout

Spacer Reinforcement Requirement


Loc n D L1 L2 L3 weight Bar Bending Remarks
Footing 222 16 0.8 1.964 0.8 1248.72

D = Diameter mm
L1 = Length 1 m
L2 = Length 2 m L2
L3 = Length 3 m L1
w = weight kg L3
n = Total Num ea L2
= 1 ea/1.2 m²
L3
Top & Bottom Flexural Reinforcement Requirement (Footing Side)
n D L/2 extra S weight Bar Bending Remarks
16 19 8.38 2.63 0.779 419.62
16 19 8.25 2.63 0.779 415.17
16 19 8.13 2.63 0.779 410.71
16 19 8.00 2.63 0.779 406.26
16 19 7.88 2.63 0.779 401.81
16 19 7.75 2.63 0.779 397.36
16 19 7.63 2.63 0.779 392.91
16 19 7.50 2.63 0.779 388.46
16 19 7.38 2.63 0.779 384.01
16 19 7.25 2.63 0.779 379.56 e
16 19 7.13 2.63 0.779 375.11
16 19 7.00 2.63 0.779 370.65
16 19 6.88 2.63 0.779 366.20 L
16 19 6.75 2.63 0.779 361.75
16 19 6.63 2.63 0.779 357.30 S
16 19 6.50 2.63 0.779 352.85
16 19 6.38 2.63 0.779 348.40 L = Length m
16 19 6.25 2.63 0.779 343.95 e = Extra m
16 19 6.13 2.63 0.779 339.50 S = Splices m
16 19 6.00 2.63 0.779 335.05 w = weight kg
16 19 5.88 2.63 0.779 330.59
16 19 5.75 2.63 0.779 326.14
16 19 5.63 2.63 0.779 321.69
16 19 5.50 2.63 0.779 317.24
16 19 5.38 2.63 0.779 312.79
16 19 5.25 2.63 0.779 308.34
16 19 5.13 2.63 0.779 303.89
16 19 5.00 2.63 0.779 299.44
16 19 4.88 2.63 0.779 294.99
16 19 4.75 2.63 0.779 290.53
16 19 4.63 2.63 0.779 286.08
16 19 4.50 2.63 0.779 281.63
16 19 4.38 2.63 0.779 277.18
16 19 4.25 2.63 0.779 272.73
16 19 4.13 2.63 0.779 268.28
16 19 4.00 2.63 0.779 263.83
16 19 3.88 2.63 0.779 259.38
16 19 3.75 2.63 0.779 254.93
16 19 3.63 2.63 0.779 250.47
16 19 3.50 2.63 0.779 246.02
16 19 3.38 2.63 0.779 241.57
16 19 3.25 2.63 0.779 237.12
16 19 3.13 2.63 0.779 232.67
Total 14024.16 kg
Fig B.1
Equipment
I.2 List
Foundation Properties
Dfo

dp
α tf

Df

Sym. Description Value Unit Remarks


Df Pilecap Diameter 18.4 m Att. E
Dfo Outer diameter 19.70 m
tf Pilecap Thickness 1.30 m Att. E
dp Pilecap above FGL 0.00 m
α Soil Excavation work degree 45

I.2.1 Excavation Work


VEW
Dfo

Df
VEW : Total Volume of Excavation Work
Volume Cone of Dfo - Volume Cone of Df
370.674 m³

VBW
I.2.2 Backfilling Work

VBW : Total Volume of Backfilling Work


Volume of excavation work - volume of pilecap under FGL
24.9979 m³
ATTACHMENT J
MATERIAL TAKE OFF
SUMMARY MATERIAL TAKE OFF
Equipment : Fuel Oil Day Tank
Tag Number : EG 03 BB 01
Number of Equipment : 1 ea
Dimension Value Units Remarks
Diameter : 15.00 m
Shell height : 9.60 m
Volume : 1696.46 m3 (test condition)

Steel Pipe Pile


Diameter : 500.00 mm
Pile length : 17.50 m
Point : 43.00 points
Total pile length : 752.50 m

Site preparation
Excavation : 370.67 m3
Back fill : 25.00 m3
Soil Disposal : 345.68 m3

Reinforcement Concrete
Lean Concrete : 5.19 m3 fc' = 22.8 MPa
Concrete : Err:509 m3 fc' = 22.8 MPa
Rebar : #REF! kg
Ratio : #REF! kg/m3
Rebar/Concrete

Anchor Bolt
Anchor bolt dia. : 1.50 in
Type of anchor : Type 1 - H
Number of : 90.00 ea
anchor