ABSTACT ESTIMATE
SI.NO DESCRIPTION OF WORK QUANTITY RATE PER AMOUNT
EARTHWORK EXCAVATION OF HARD
1
GRAVEL SOIL 44 350 M3 15400.00
SAND FILLING FOR COLOUMN USING RIVER
2
SAND 28 800 M3 22400.00
P.C.C 1:5:10 USING HBG METAL FOR
3 FOUNDATION CONCRETE AND FLOORING
CONCRETE 17 2000 M3 34000.00
SUPPLYING AND FILLING THE BASEMENT
WITH WELL GRAVEL FILLING IN LAYERS NOT
4
MORE THAN 15CM THICK WELL RAMMED
WATER AND COMPACTED ETC.. 37 500 M3 18500.00
CENTRING FOR SOFFITS OF RCC SLAB OF
PLANE SURFACE LIKE LILNTELS,
5
BEAMS,ETC.., INCLUDING STRUTTING 3M
HIGH USING MILD STEEL 326 240 M2 78240.00
REINFORCED CEMENT CONCRETE 1:1.5:3
USING 20MM GAUGE HAND BROKEN
GRANITE STONES FOR ALL RCC ITEMS OF
WORKS EXCLUDING CENTERING
6 SHUTTERING AND COST OF
REINFORCEMENTS INCLUDING CURING
ETC..,COMPLETE AND ALSO INCLUDING
FIXING FAN CLAMPS AND FIXTURES IN RCC
WORKS WHEREVER NECESSARY. 36 5000 M3 180000.00
SUPPLYING AN11D FABRICATING AND
PLACING IN POSITION MS (OR) R.T.S BAR OF
REINFORCEMENT TO ALL R.C.C WORKS AS
7
PER THE DESIGN GIVEN INCLUDING COST OF
STEEL BINDING WIRE ALSO IN ALL FLOORS A
PER STANDARD SPECIFICATIONS. 3.7 52000 MT 192400.00
BRICK WORK IN C:M 1:5 (ONE CEMENT AND
FIVE SAND) USING II CLASS GROUND
MOULDED BRICKS OF SIZE 9"X43/8"X4"
8 STANDARD SPECIFICATION INCLUDING
FINISHING,CURING,ETC.., COMPLETE AS PER
COMPLYING WITH STANDARD
SPECITICATION. 59 2600 M3 153400.00