CALENDARIO DE ADQUISICIO

FORMULA
ENTIDAD
UBICACIÓN
PRESUPUESTO BASE Sin/IGV S/. 0.00 Inc/IGV
MONTO EN MATERIALES S/. 1,030,311.22 Sin/IGV S/. 1,215,767.24 Inc/IGV
PLAZO DE EJECUCION 180 DIAS CALENDARIOS

1° MES 2° MES 3° ME
ITEM DESCRIPCION Und
CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD

1 ALAMBRE NEGRO RECOCIDO # 8 kg 100.00 3.40 340.00 154.10 3.40 523.93 100.00
2 CLAVOS PARA MADERA C/C 3" kg 80.00 3.40 272.00 119.77 3.40 407.22 80.00
3 CLAVOS PARA MADERA S/C 2 1/2" kg 3.00 3.40 10.20 5.29 3.40 17.99 3.00
4 CLAVOS Fo No C/C 3/4" kg 3.00 3.40 10.20 7.05 3.40 23.97 3.00
5 ALAMBRE NEGRO N°16 kg 50.00 3.40 170.00 56.24 3.40 191.21 50.00
6 ALAMBRE NEGRO N°8 kg 50.00 3.40 170.00 85.45 3.40 290.54 50.00
7 PERNOS HEXAGONALES DE 3/4" X 6" INC.TUER und 12.00 2.20 26.40
8 CLAVOS DE ALAMBRE PARA MADERA C/C DE 3" kg 30.00 3.50 105.00 42.44 3.50 148.54 30.00
9 CLAVOS kg 0.37 3.40 1.25
10 CLAVOS PARA CALAMINA kg 4.97 3.40 16.91
11 ACERO FY= 4200 KG/CM2 kg 1,000.00 2.90 2,900.00 1,640.34
12 ARENA FINA m3 68.24 45.00 3,070.85
13 TIERRA DE CHACRA m3 308.56 15.00 4,628.34
14 PIEDRA CHANCADA DE 1/2" m3 300.00 73.00 21,900.00 300.00 73.00 21,900.00 300.00
15 AFIRMADO m3 200.00 25.00 5,000.00 200.00 25.00 5,000.00 200.00
16 ARENA DE RIO SELECIONADA m3 5.25 18.00 94.50
17 ARENA GRUESA m3 1,000.00 55.00 55,000.00 434.05
18 PIEDRA MEDIANA m3 23.45 45.00 1,055.44
19 PIEDRA GRANDE m3 17.50 45.00 787.50
20 GRIFO DE LAVADERO PESADO LISO 1/2" und 3.00 23.00 69.00
21 LLAVE CORPORATION DE 1/2" u 3.00 5.20 15.60
22 ASFALTO RC-250 gln 928.80 17.10 15,882.41
LADRILLO K.K. 18 HUECOS (TIPO IV) 9x12.5x23
23 und 6,948.00 0.30 2,084.40
CM
ADOQUINES DE CONCRETO DE 20X10X6 CM
24 und 5,044.00 1.20 6,052.80
TIPO 6
25 CEMENTO PORTLAND TIPO I (42.5KG) BOL 3,543.96 18.90 66,980.89
26 CEMENTO PORTLAND TIPO II MS BOL 2,170.12 20.35 44,161.94 2,748.22 20.35 55,926.18 4,056.00
27 CAJA DE CONCRETO P/MEDIDOR 1/2" - 3/4" und 3.00 34.00 102.00
28 MARCO Y TAPA DE CONCRETO D=0.60 und 23.00 120.00 2,760.00
29 PLACA DE BRONCE PARA INAUGURACION und
30 YESO EN BOLSAS DE 25 KG. BOL 666.04 3.10 2,064.72
31 YESO BOL 1.30 3.20 4.16
32 CINTA TEFLON und 3.00 1.00 3.00
33 CORDEL DE HILO OVL 55.37 3.00 166.11
34 BANCA DE GRANITO und 39.00 490.00 19,110.00
35 PEGAMENTO PARA PVC gln 0.023 120.00 2.81
36 GRASS sac 32.45
37 IMPRIMANTE gln 45.16
38 FLETE TERRESTRE GLB 1.00
39 KEROSENE gln 41.46
40 HORMIGON m3 80.83
41 HORMIGON DE CANTERA m3 2,154.49
42 LIJA PARA MADERA und 3.51
43 AGUA m3 189.70 7.00 1,327.93
44 CASETA DE GUARDIANIA Y OFICINA TECNICA GLB 1.00 800.00 800.00
45 ALQUILER DE ALMACEN mes 3.00 400.00 1,200.00 2.50 400.00 1,000.00 0.50
46 MADERA TORNILLO p2 500.00 5.50 2,750.00 553.38 5.50 3,043.60
47 MADERA TORNILLO CEPILLADA p2 345.80 7.00 2,420.60
48 REGLA DE MADERA p2 3,917.29 2.20 8,618.04
49 PLANTON und
CALENDARIO DE ADQUISICIO

FORMULA
ENTIDAD
UBICACIÓN
PRESUPUESTO BASE Sin/IGV S/. 0.00 Inc/IGV
MONTO EN MATERIALES S/. 1,030,311.22 Sin/IGV S/. 1,215,767.24 Inc/IGV
PLAZO DE EJECUCION 180 DIAS CALENDARIOS

1° MES 2° MES 3° ME
ITEM DESCRIPCION Und
CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD
50 HUMUS kg
51 MADERA PARA ENCOFRADOS p2 14,172.92
52 TRIPLAY DE 6 MM m2 17.28
53 LIMPIEZA FINAL DE OBRA GLB
54 MARCO Y TAPA DE FºFº 6" X 5" und 11.00 35.00 385.00
55 THINER gln 131.45 12.30 1,616.84
56 PINTURA LATEX gln 13.90 26.70 371.02
57 PINTURA ESMALTE SINTETICO gln 1.00 35.80 35.80
58 PINTURA TRANSITO gln
59 CALAMINA # 31 DE 1.83m x 0.83m x 2.7mm pza 198.90 21.00 4,176.98
60 TEKNOPOR DE 1" x 4' x 8' pln 300.00 21.20 6,360.00 529.28
61 TUBERIA PVC SAP C-10 DE 1/2" m 23.87 2.20 52.51
62 ABRAZADERA DE PVC DE 2" A 1/2" und 3.00 42.00 126.00
63 NIPLE PVC SAP A-10 3/4 x 4" und 3.00 1.50 4.50
64 CODO PVC SAP 1/2" X 90° und 6.00 1.40 8.40
65 MARCO Y TAPA TERMOPLASTICO u 3.00 135.00 405.00
66 PRECINTO DE SEGURIDAD DE MEDIDOR u 3.00 12.00 36.00
67 MEDIDOR DE AGUA ½" - ¾" u 3.00 3.20 9.60
68 UNION PVC P/AGUA C/ROSCA ؽ" u 3.00 2.30 6.90
69 VALVULA COMPUERTA DE BRONCE DE 1/2" und 3.00 43.00 129.00
70 LLAVE DE PASO PVC 1/2" (INC.TUER-NIPLE) und 6.00 39.00 234.00

SUBTOTAL 88,774.90 285,790.83


IGV 18.00% 15,979.48 51,442.35
TOTAL EN EL MES 104,754.39 337,233.18
TOTAL ACUMULADO 104,754.39 441,987.56
PORCENTAJE 8.62% 27.74%
PORCENTAJE ACUMULADO 8.62% 36.35%
DQUISICION DE MATERIALES

3° MES 4° MES 5° MES 6° MES

Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO

3.40 340.00
3.40 272.00
3.40 10.20
3.40 10.20
3.40 170.00
3.40 170.00

3.50 105.00 20.00 3.50 70.00

2.90 4,757.00

73.00 21,900.00 657.94 73.00 48,029.32


25.00 5,000.00 1,998.83 25.00 49,970.75 416.86 25.00 10,421.53

55.00 23,872.52

20.35 82,539.60 5,095.10 20.35 103,685.29 5,542.08 20.35 112,781.23 3,178.45 20.35 64,681.38

1.00 850.00 850.00

4.00 129.78 50.16 4.00 200.64 26.48 4.00 105.92


5.00 225.81
21749.16 21,749.16
13.20 547.33
22.00 1,778.19
20.00 43,089.81
1.20 4.21

400.00 200.00

31.00 12.00 372.00


DQUISICION DE MATERIALES

3° MES 4° MES 5° MES 6° MES

Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO CANTIDAD Prec.Unit MONTO
2,274.69 3.00 6,824.07
1.20 17,007.51
18.50 319.68
1.00 800.00 800.00

280.40 76.80 21,534.60

21.20 11,220.78

235,418.77 209,152.07 123,308.68 87,865.97


42,375.38 37,647.37 22,195.56 15,815.88
277,794.15 246,799.44 145,504.24 103,681.85
719,781.71 966,581.15 1,112,085.39 1,215,767.24
22.85% 20.30% 11.97% 8.53%
59.20% 79.50% 91.47% 100.00%
178.11
185.02
204.13
222.99
193.85
111.37
28.8
28.8
14.18
81.07
42
58.45
1348.77