6 NO. CODE DESCRIPTION SHEET NO.


GOING TO GOING TO
AREA 400A AREA 400B HOT WATER 1 100-PC PRIMARY CRUSHER 2
COMING FROM 2 100-PC-C CONVEYOR 2
3 100-CY COAL YARD 2
CONDENSER 4 100-TC TRANSPORTATION CONVEYOR 2
5 100-SR SCRAPPER 2
6 200A-CP COOLING POND 2
1 8 7 200A-SP SEA WATER PUMP 2
8 200A-CT COOLING TOWER 2
9 200A-B BAFFLES 2
10 300A-01-SCR SELECTIVE CATALYTIC REDUCTION 10
SP 11 300A-01-ACI ACTIVATED CARBON INJECTION UNIT 11
2
12 300A-01-ESP ELECTROSTATIC PRECIPITATOR 11
5 13 300A-01-FGD FLUE GAS DE-SULFURIZATION UNIT 10
14 300A-01-CHM CHIMNEY 2
9

3 7

SEA AREA
Area 1100B
Area 1100A
Area 1500
COOLED WATER SP Area 1200
Area 1300
4 GOING BACK TO Area 1400 Area 1600

SP Area 1700
RESERVOIR Area 1000A Area 1000B

Area 1800
Area 700A Area 800A Area 800B Area 700B

Area 900A Area 900B


Unit 1 Unit 2 Unit 3 Unit 4
Area 500A Area 500B

Area 600A Area 600B


Area 400A Area 400B

AREA100 COAL HANDLING UNIT


AREA 200A COOLING POND
SCALE: Area 200A
Area 300A Area 300B
Area 200B

SCALE:

Area 100

10
NO. OF EQUIP. CODE DESCRIPTION LENGTH(m) WIDTH(mm) CAPACITY(KW)

2 100-PC-C CONVEYOR 15 100 1


2 100-TC TRANSPORTATION
CONVEYOR 30 650 1.9
11

NO. OF CODE DESCRIPTION CAPACITY(m^3/h) HEAD(m) ROTATION NET POSITIVE MOTOR POWER
EQUIP. SPEED(rpm) SUCTION HEAD(m) (KW)
12
56 200A-CPA-CP CONDENSATE PUMP 315 80 3000 1,4 85
16 200A-FWPA-FWP BOILER FEED PUMP 51 425 3000 132
59 200A-SP SEA WATER PUMP 700 23 3000 155

NO. OF EQUIP. CODE DESCRIPTION HEIGHT(m) DIAMETER(m) TEMP.(deg C)

2 300A-CHM CHIMNEY 760 2 52.55-149


13

14

AREA 300A FLUE GAS TREATMENT FACILITY


SCALE:
PROJECT LEADER INSTRUCTOR PROJECT / LOCATION: OWNER PREPARED BY: No. REVISIONS DATE
STATE U

BatStateU 1 1 SHEET CONTENT SHEET NO. 2


05/22/18
950 MW COAL FIRED
S

NI
TANGA

JOHN ALBERT L. TENORIO


VE

JOHN ALBERT L. TENORIO ENGR. ALLAN B. DE VILLA PGT POWER BUILDER CORP.
POWER PLANT IN SANTA AREA100 COAL HANDLING UNIT
RSITY

MECHANICAL ENGINEER PROFESSIONAL MECHANICAL ENGINEER


BATANGAS STATE UNIVERSITY ASEAN ENGINEER AREA 200A COOLING POND A
RITA BATANGAS CITY
BA

Gov. Pablo Borbon Main Campus II 2


190 3 Alangilan, Batangas City
PRC Reg No.: SECTION: ME - 5206 PRC Reg No. PTR No. AREA 300A FLUE GAS
PH
I L I PPI NES
TIN: GROUP NO: 03 TIN: Issued on: BatStateU Main Campus 2
CRISUS JOHN PADILLA TREATMENT FACILITY
MECHANICAL ENGINEERING DEPARTMENT DATE SUB: MAY 22, 2018 Issued at: Alangilan Batangas City PRESIDENT