Sie sind auf Seite 1von 61

FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 1801 MetroCable Picacho
PROJECT/JOB NAME Metrocable Picacho
CLIENT NAME Metro Medellin
SITE NAME Medellin
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME 1801_01 ESTACION ACEVEDO
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
P 1 F1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 SUBSOIL CONDITION & SAFETY FACTORS
1.4 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN & DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
3.2 PIER DATA
3.3 LOAD CASE
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
5.2 REQUIRED REINFORCEMENT
5.3 ONE WAY SHEAR FORCE
5.4 TWO WAY SHEAR FORCE
5.5 PILE PUNCHING SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318) [Metric]
Horizontal Force for Wind INTERNATIONAL BUILDING CODE [IBC 2006]
Horizontal Force for Seismic INTERNATIONAL BUILDING CODE [IBC 2006]
Unit System Input : MKS, Output : MKS, Calculation Unit : IMPERIAL

1.2 MATERIALS & UNIT WEIGHT


Items Value
2
Concrete (f'c : compressive strength) 280.000 kgf/cm
2
Lean Concrete (Lf'c : compressive strength) 0.000 kgf/cm
2
Reinforcement (#3 ~ #5 , yield strength) 4200.000 kgf/cm
2
Reinforcement (#6 ~ , yield strength) 4200.000 kgf/cm
3
Rs (Soil unit weight) 10.000 ton/m
3
Rc (Concrete unit weight) 2.400 ton/m
2.000 106 kgf/cm
2
Es (Steel Modulus of Elasticity)
2.527 106 kgf/cm
2
Ec (Concrete Modulus of Elasticity)

- Pile Capacity
Items Value
Pile Name PHC-12
Footing List F1
Diameter 1500 mm
Length 30 m
Thick 20 mm
Shape Circle
Capacity ( Ha , Ua , Va ) 144 , 144 , 655 tonf

1.3 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Allowable Increase of Pile Horizontal (Wind) 0%
Allowable Increase of Pile Horizontal (Seismic) 0%
Allowable Increase of Pile Horizontal (Test) 0%
Allowable Increase of Pile Vertical (Wind) 0%
Allowable Increase of Pile Vertical (Seismic) 0%
Allowable Increase of Pile Vertical (Test) 0%

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 4

Allowable Increase of Pile Uplift (Wind) 0%


Allowable Increase of Pile Uplift (Seismic) 0%
Allowable Increase of Pile Uplift (Test) 0%
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 1.5
Safety factor against overturning for OVM4(FO4) 1.9
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against sliding for the SL2(FS2) 1.8
Safety factor against sliding for the SL3(FS3) 1.5
Safety factor against sliding for the SL4(FS4) 1.5
Friction factor (m) 0.35

1.4 LOAD COMBINATION


Index Load Case Name Load Case Description
1 SW SELF WEIGHT
2 DL DEAD LOAD
3 SLx1 SEISMIC LOAD (Empty) X Direction
4 SLy1 SEISMIC LOAD (Empty) Y Direction
5 LL LIVE LOAD

Comb . ID Load Combination for stability


1 1.0 SW + 1.0 DL
10 1.0 SW + 1.0 DL + -.21 SLx1 + .7 SLy1
11 1.0 SW + 1.0 DL + -.21 SLx1 + .7 SLy1
12 1.0 SW + 1.0 DL + 1.0 LL + .525 SLx1 + .158 SLy1
13 1.0 SW + 1.0 DL + 1.0 LL + -.525 SLx1 + .158 SLy1
14 1.0 SW + 1.0 DL + .75 LL + .525 SLx1 + -.158 SLy1
15 1.0 SW + 1.0 DL + .75 LL + -.525 SLx1 + -.158 SLy1
16 1.0 SW + 1.0 DL + .75 LL + .158 SLx1 + .525 SLy1
17 1.0 SW + 1.0 DL + .75 LL + -.158 SLx1 + .525 SLy1
18 1.0 SW + 1.0 DL + .75 LL + .158 SLx1 + -.525 SLy1
19 1.0 SW + 1.0 DL + .75 LL + -.158 SLx1 + -.525 SLy1
2 1.0 SW + 1.0 DL + 1.0 LL
3 1.0 SW + 1.0 DL + .75 LL
4 1.0 SW + 1.0 DL + .7 SLx1 + .21 SLy1
5 1.0 SW + 1.0 DL + -.7 SLx1 + .21 SLy1
6 1.0 SW + 1.0 DL + .7 SLx1 + -.21 SLy1
7 1.0 SW + 1.0 DL + -.7 SLx1 + -.21 SLy1
8 1.0 SW + 1.0 DL + .21 SLx1 + .7 SLy1
9 1.0 SW + 1.0 DL + .21 SLx1 + -.7 SLy1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 5

30 .6 SW + .6 DL + .7 SLx1 + .21 SLy1


31 .6 SW + .6 DL + -.7 SLx1 + .21 SLy1
32 .6 SW + .6 DL + -.7 SLx1 + .21 SLy1
33 .6 SW + .6 DL + .7 SLx1 + -.21 SLy1
34 .6 SW + .6 DL + -.7 SLx1 + -.21 SLy1
35 .6 SW + .6 DL + .21 SLx1 + .7 SLy1
36 .6 SW + .6 DL + .21 SLx1 + -.7 SLy1
37 .6 SW + .6 DL + .21 SLx1 + -.7 SLy1
38 .6 SW + .6 DL + -.21 SLx1 + .7 SLy1
39 .6 SW + .6 DL + -.21 SLx1 + .7 SLy1
40 .6 SW + .6 DL + -.21 SLx1 + -.7 SLy1
Comb . ID Load Combination for Reinforcement
20 1.2 SW + 1.2 DL + 1.6 LL
21 1.2 SW + 1.2 DL + 1.0 LL + 1.0 SLx1 + -.3 SLy1
22 1.2 SW + 1.2 DL + 1.0 LL + -1.0 SLx1 + .3 SLy1
23 1.2 SW + 1.2 DL + 1.0 LL + 1.0 SLx1 + -.3 SLy1
24 1.0 SW + 1.2 DL + 1.0 LL + -1.0 SLx1 + -.3 SLy1
25 1.2 SW + 1.2 DL + 1.0 LL + .3 SLx1 + 1.0 SLy1
26 1.0 SW + 1.2 DL + 1.0 LL + .3 SLx1 + 1.0 SLy1
27 1.2 SW + 1.2 DL + 1.0 LL + -.3 SLx1 + 1.0 SLy1
28 1.2 SW + 1.2 DL + 1.0 LL + .3 SLx1 + -1.0 SLy1
29 1.2 SW + 1.2 DL + 1.0 LL + -.3 SLx1 + -1.0 SLy1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018 Page 6

2. DRAWING REFERENCE DWGS


NO. DWG NO. DWG TITLE

NOTES
A01
* OUTPUT UNIT : mm

01

1
Metrocable Picacho PROJECT

F1

FOUNDATION LOCATION PLAN


1801_01 ESTACION ACEVEDO

SQUAD CHECK
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN
1801 MetroCable Picacho

Copyright (c) GS E&C. All Rights Reserved


24/09/2018 Page 7

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


24/09/2018 Page 8

REFERENCE DWGS
NO. DWG NO. DWG TITLE

7800 CL FOOTING
3900 TOP BOTTOM

#10@100 TYP.
3
1050
1250

#10@100
2500

1450
NOTES
900 900 #8@200
* PILE
6000 #8@200 2-¥õ1500 PHC-12
* ANCHOR BOLT
1X4-M12 ANC. BOLTS (TYPE TYPE L)
FOUNDATION PLAN FOOTING REINF. PLAN
* OUTPUT UNIT : mm
75 PROJ.

Metrocable Picacho PROJECT


30 GR.

TOG EL. + 1500


2 3

1400
450 450
1500

500
@200

#6 1.5
#5

TYP.
250
100

FOUNDATION DETAIL FOR


1000
3

500

F1
#5
250
2000

SQUAD CHECK
8-#6
PEDESTAL
6

PROCESS PIPING VESSELS STRUCT. ELEC. INST.


LEAN CONC. 50 THK

SECTION
SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN
1801 MetroCable Picacho

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 9

3. FOUNDATION DATA
3.1 FOOTING AND SECTION DATA
( mm ) Ft. Name F1
Ft. Type ISO
2
Area 19.500 m
Ft. Thickness 2000.00 mm
3
Ft. Volume 39.000 m
Ft. Weight 93.600 tonf
7800 Soil Height 0.00 mm
3
Soil Volume 0.000 m
1400 1000 Soil Weight 0.000 tonf
2500

Buoyancy Not Consider


Self Weight (except Pr.SW) 93.600 tonf

1500
2000

The Origin coordinate


The Center of Gravity (0,0) mm
The Center of Pile (0,200) mm

Section Data
( mm )
Ft.Name Direction Ft. Volume Soil Volume Pier Wt
3 3
F1 All Direct 39.000 m 0.000 m 5.040 tonf

Sec.Name Section Area Ft. Weight Soil Weight Total Weight


2
S1 19.500 m 93.600 tonf 0.000 tonf 98.640 tonf

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : tonf , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
F1 1 Rectangle 1400.000 1000.000 1500.000 1.400 5.040 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 10

3.3 LOAD CASE


Fz
Fy
Mz
Input the point loads in the global coordinate system direction. Positive directions of moments (shown in the sketch) are
My based on the right hand rule.
Fx
Mx

Index Load Case Name Load Case Description


1 SW SELF WEIGHT
2 DL DEAD LOAD
3 SLx1 SEISMIC LOAD (Empty) X Direction
4 SLy1 SEISMIC LOAD (Empty) Y Direction
5 LL LIVE LOAD

Unit( tonf , tonf-m )


Ft.Name Pr.Name Load Case Fx Fy Fz Mx My
1 0 0 -5.04 0 0
2 -7.8 -16 -377 37 -24
1 3 -45 -8 -74 -64 -321
F1
4 -5 -43 -122 -295 -21
5 -3 4 -121 -12 -9
Footing SW 0.000 0.000 -93.600 0.000 0.000

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F1 1 -7.800 -16.000 -377.000 37.000 -24.000
10 -1.850 -44.420 -446.860 -156.060 28.710
11 -1.850 -44.420 -446.860 -156.060 28.710
12 -35.212 -22.972 -556.065 -55.062 -204.832
1
13 12.037 -14.573 -478.365 12.137 132.217
14 -32.888 -10.428 -487.385 40.863 -195.967
15 14.362 -2.028 -409.685 108.062 141.082
16 -19.763 -36.835 -543.455 -136.955 -92.333

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 11

17 -5.588 -34.315 -520.145 -116.795 8.782


18 -14.513 8.315 -415.355 172.795 -70.283
19 -0.338 10.835 -392.045 192.955 30.832
2 -10.800 -12.000 -498.000 25.000 -33.000
3 -10.050 -13.000 -467.750 28.000 -30.750
4 -40.350 -30.630 -454.420 -69.750 -253.110
5 22.650 -19.430 -350.820 19.850 196.290
6 -38.250 -12.570 -403.180 54.150 -244.290
7 24.750 -1.370 -299.580 143.750 205.110
8 -20.750 -47.780 -477.940 -182.940 -106.110
9 -13.750 12.420 -307.140 230.060 -76.710
30 -37.230 -24.230 -303.620 -84.550 -243.510
31 25.770 -13.030 -200.020 5.050 205.890
32 25.770 -13.030 -200.020 5.050 205.890
33 -35.130 -6.170 -252.380 39.350 -234.690
34 27.870 5.030 -148.780 128.950 214.710
35 -17.630 -41.380 -327.140 -197.740 -96.510
36 -10.630 18.820 -156.340 215.260 -67.110
37 -10.630 18.820 -156.340 215.260 -67.110
38 1.270 -38.020 -296.060 -170.860 38.310
39 1.270 -38.020 -296.060 -170.860 38.310
40 8.270 22.180 -125.260 242.140 67.710
20 -14.160 -12.800 -646.000 25.200 -43.200
21 -55.860 -10.300 -610.800 56.900 -352.500
22 31.140 -20.100 -536.000 7.900 276.900
23 -55.860 -10.300 -610.800 56.900 -352.500
24 34.140 5.700 -462.800 184.900 289.500
25 -30.860 -60.600 -717.600 -281.800 -155.100
26 -30.860 -60.600 -717.600 -281.800 -155.100
27 -3.860 -55.800 -673.200 -243.400 37.500
28 -20.860 25.400 -473.600 308.200 -113.100
29 6.140 30.200 -429.200 346.600 79.500

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Unit( tonf , tonf-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F1 1 -7.800 -16.000 -382.040 93.000 -51.300
10 -1.850 -44.420 -451.900 -0.590 22.235
11 -1.850 -44.420 -451.900 -0.590 22.235
12 -35.212 -22.972 -561.105 25.341 -328.076
13 12.037 -14.573 -483.405 63.141 174.349
14 -32.888 -10.428 -492.425 77.359 -311.074
1 15 14.362 -2.028 -414.725 115.159 191.351
16 -19.763 -36.835 -548.495 -8.032 -161.501
17 -5.588 -34.315 -525.185 3.308 -10.774
18 -14.513 8.315 -420.395 143.693 -121.076
19 -0.338 10.835 -397.085 155.033 29.651
2 -10.800 -12.000 -503.040 67.000 -70.800
3 -10.050 -13.000 -472.790 73.500 -65.925

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 12

4 -40.350 -30.630 -459.460 37.455 -394.335


5 22.650 -19.430 -355.860 87.855 275.565
6 -38.250 -12.570 -408.220 98.145 -378.165
7 24.750 -1.370 -304.620 148.545 291.735
8 -20.750 -47.780 -482.980 -15.710 -178.735
9 -13.750 12.420 -312.180 186.590 -124.835
30 -37.230 -24.230 -306.644 0.255 -373.815
31 25.770 -13.030 -203.044 50.655 296.085
32 25.770 -13.030 -203.044 50.655 296.085
33 -35.130 -6.170 -255.404 60.945 -357.645
34 27.870 5.030 -151.804 111.345 312.255
35 -17.630 -41.380 -330.164 -52.910 -158.215
36 -10.630 18.820 -159.364 149.390 -104.315
37 -10.630 18.820 -159.364 149.390 -104.315
38 1.270 -38.020 -299.084 -37.790 42.755
39 1.270 -38.020 -299.084 -37.790 42.755
40 8.270 22.180 -128.284 164.510 96.655
20 -14.160 -12.800 -652.048 70.000 -92.760
21 -55.860 -10.300 -616.848 92.950 -548.010
22 31.140 -20.100 -542.048 78.250 385.890
23 -55.860 -10.300 -616.848 92.950 -548.010
24 34.140 5.700 -467.840 164.950 408.990
25 -30.860 -60.600 -723.648 -69.700 -263.110
26 -30.860 -60.600 -722.640 -69.700 -263.110
27 -3.860 -55.800 -679.248 -48.100 23.990
28 -20.860 25.400 -479.648 219.300 -186.110
29 6.140 30.200 -435.248 240.900 100.990

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F1 p 1 -7.800 -16.000 -475.640 188.128 -51.300 3900.0 , 1250.0
10 -1.850 -44.420 -545.500 108.510 22.235 3900.0 , 1250.0
11 -1.850 -44.420 -545.500 108.510 22.235 3900.0 , 1250.0
12 -35.212 -22.972 -654.705 156.282 -328.076 3900.0 , 1250.0
13 12.037 -14.573 -577.005 178.542 174.349 3900.0 , 1250.0
14 -32.888 -10.428 -586.025 194.564 -311.074 3900.0 , 1250.0
15 14.362 -2.028 -508.325 216.824 191.351 3900.0 , 1250.0
16 -19.763 -36.835 -642.095 120.387 -161.501 3900.0 , 1250.0
17 -5.588 -34.315 -618.785 127.065 -10.774 3900.0 , 1250.0
18 -14.513 8.315 -513.995 246.492 -121.076 3900.0 , 1250.0
19 -0.338 10.835 -490.685 253.170 29.651 3900.0 , 1250.0
2 -10.800 -12.000 -596.640 186.328 -70.800 3900.0 , 1250.0

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 13

3 -10.050 -13.000 -566.390 186.778 -65.925 3900.0 , 1250.0


4 -40.350 -30.630 -553.060 148.067 -394.335 3900.0 , 1250.0
5 22.650 -19.430 -449.460 177.747 275.565 3900.0 , 1250.0
6 -38.250 -12.570 -501.820 198.509 -378.165 3900.0 , 1250.0
7 24.750 -1.370 -398.220 228.189 291.735 3900.0 , 1250.0
8 -20.750 -47.780 -576.580 99.606 -178.735 3900.0 , 1250.0
9 -13.750 12.420 -405.780 267.746 -124.835 3900.0 , 1250.0
30 -37.230 -24.230 -362.804 72.816 -373.815 3900.0 , 1250.0
31 25.770 -13.030 -259.204 102.496 296.085 3900.0 , 1250.0
32 25.770 -13.030 -259.204 102.496 296.085 3900.0 , 1250.0
33 -35.130 -6.170 -311.564 123.258 -357.645 3900.0 , 1250.0
34 27.870 5.030 -207.964 152.938 312.255 3900.0 , 1250.0
35 -17.630 -41.380 -386.324 24.355 -158.215 3900.0 , 1250.0
36 -10.630 18.820 -215.524 192.495 -104.315 3900.0 , 1250.0
37 -10.630 18.820 -215.524 192.495 -104.315 3900.0 , 1250.0
38 1.270 -38.020 -355.244 33.259 42.755 3900.0 , 1250.0
39 1.270 -38.020 -355.244 33.259 42.755 3900.0 , 1250.0
40 8.270 22.180 -184.444 201.399 96.655 3900.0 , 1250.0

Load Combination of Ultimate Condition


p : PileType
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( tonf , tonf-m )
Ft.Name Sec.Na L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
20 -14.160 -12.800 -764.368 222.874 -92.760 3900.0 , 1250.0
21 -55.860 -10.300 -729.168 238.784 -548.010 3900.0 , 1250.0
22 31.140 -20.100 -654.368 209.124 385.890 3900.0 , 1250.0
23 -55.860 -10.300 -729.168 238.784 -548.010 3900.0 , 1250.0
24 34.140 5.700 -561.440 277.238 408.990 3900.0 , 1250.0
F1 p S1
25 -30.860 -60.600 -835.968 97.494 -263.110 3900.0 , 1250.0
26 -30.860 -60.600 -816.240 93.548 -263.110 3900.0 , 1250.0
27 -3.860 -55.800 -791.568 110.214 23.990 3900.0 , 1250.0
28 -20.860 25.400 -591.968 337.694 -186.110 3900.0 , 1250.0
29 6.140 30.200 -547.568 350.414 100.990 3900.0 , 1250.0

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 14

4. CHECK OF STABILITY
4.1 CHECK OF PILE REACTION (Uni-Axial)
4.1.1 Formula
if footing is checked in Buoyancy SFz means SFz - Fb
SFz SMy X SFz SMx Y
- Uni Axial : Rx = , Ry =
Np S Xi2 Np S Yi2
- Ru = Max[ Rxmax , Ry max ]
- Uf = Min[ 0 , Rxmin , Ry min ]
- Ru < Va -> OK
Max(SHxi , SHyi)
b. Horizontal - Hmax = < Ha -> OK
Np
c. Uplift - Uf < Ua -> OK
Ver. / Uf. = Vertical / Uplift

4.1.2 Check of Vertical & Uplift Reaction


SXi (m ) SYi (m )
2 2 2 2
Ft.Name Np(EA) Fl (mm) Fw (mm)
F1 2 7800 2500 18 0

Unit( tonf )
Ft.Name L.Comb. Pile R Max R Min Ru Uf Ra Ua Result
X-Dir 382.032 272.673
F1 12 PHC-12 382.032 0 655 144 OK
Y-Dir 327.353 327.353

4.1.3 Check Of Horizontal Reaction


Ft.Name L.Comb. Pile Hmax (tonf) Ha (tonf) Result
F1 8 PHC-12 23.89 144 OK

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 15

5. DESIGN OF FOOTING
5.1 DESIGN MOMENT AND SHEAR FORCE
Footing design is in accordance with unltimate strength method at footing bottom.
Calculated total pier load as
SQ = SFz - Self Weight Factor (Soil Weight + Footing Weight)
Ft.Name : Footing Name , Sec.Name : Strip Name for Footing Reinforcement Design
Dir. : Direction , L.Comb. : Load Combination Index , Sl or Sw : Strip X or Y width

5.1.1 Data Unit( mm , tonf , tonf-m )


Ft.Name Sec.Na Dir. L.Comb. Fl or Fw Sl or Sw SFz SM SQ
F1 p 20 7800.00 2500.00 764.368 -92.76 652.048
21 7800.00 2500.00 729.168 -548.01 616.848
22 7800.00 2500.00 654.368 385.89 542.048
23 7800.00 2500.00 729.168 -548.01 616.848
24 7800.00 2500.00 561.440 408.99 467.840
S1 X
25 7800.00 2500.00 835.968 -263.11 723.648
26 7800.00 2500.00 816.240 -263.11 722.640
27 7800.00 2500.00 791.568 23.99 679.248
28 7800.00 2500.00 591.968 -186.11 479.648
29 7800.00 2500.00 547.568 100.99 435.248
20 2500.00 7800.00 764.368 222.874 652.048
21 2500.00 7800.00 729.168 238.784 616.848
22 2500.00 7800.00 654.368 209.124 542.048
23 2500.00 7800.00 729.168 238.784 616.848
24 2500.00 7800.00 561.440 277.238 467.840
S1 Y
25 2500.00 7800.00 835.968 97.494 723.648
26 2500.00 7800.00 816.240 93.548 722.640
27 2500.00 7800.00 791.568 110.214 679.248
28 2500.00 7800.00 591.968 337.694 479.648
29 2500.00 7800.00 547.568 350.414 435.248

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 16

5.1.2 Design Parameters


Yield Strength - #3 ~ #5 : fy1 , #6 ~ : fy2
f_cl : Clear Cover for edge of footing reinforcement
f_clt : Clear Cover for top of footing reinforcement
fp_clb : Clear Cover for bottom of footing reinforcement (Pile Foundation)
Loc. : Location of Critical Point from left side of footing

2
Unit(kgf/cm ,mm)
f(Flexure) f(Shear) f'c fy1 fy2 f_cl f_clt fp_clb
0.85 0.8 280.00 4200.00 4200.00 3.0 3.0 6.0

5.2 REQUIRED REINFORCEMENT


5.2.1 Reinforcement Formula
- Shrinkage and temperature reinforcement ---- ACI CODE 7.12.2
As = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used .....................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used.................................0.0018
(c) Slabs where reinforcement with yield stress exeeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used ....................................................................................................
fy
- Required Reinforcement by Analysis
As As2
- At every section of flexural members where tensile reinforcement is required
As As5 As4 ---- ACI Eq (10-3)
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As2 = r.req b d
As3 = 1.333 r.req b d
200
As4 = bd
fy
3 fck
As5 = bd
fy
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.85 , r.req =
fy
1- 1- (
0.85fck )

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 17

5.2.2 Check of Footing Reinforcement


Footing Name : F1 GroupType : Isolated
- X direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2

29 top 26 - #10 @ 100 3.900 2.500 198.087 212.490


S1
25 botom 26 - #10 @ 100 3.200 2.500 197.787 212.490

Sec.Nam L.Comb. Mu (tonf-m) Rn r.Req


29 top - - -
S1
25 bottom 1062.221 12.778 0.0031

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

29 top 45.000 - - 165.796 156.945 1052.338


S1
25 bottom 45.000 154.708 206.226 165.545 156.707 1050.744

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
29 top 212.490 45.000 OK
S1
25 bottom 212.490 165.545 OK

- Y direction (All Width)

Sec.Nam L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (cm) As (cm )
2

29 top 40 - #8 @ 200 1.250 7.800 195.204 202.683


S1
25 botom 40 - #8 @ 200 1.750 7.800 194.904 202.683

Sec.Nam L.Comb. Mu (tonf-m) Rn r.Req


29 top - - -
S1
25 bottom 56.428 0.224 0.0001

Sec.Nam L.Comb. As1(cm )


2
As2(cm )
2
As3(cm )
2
As4(cm )
2
As5(cm )
2
Asmax(cm )
2

29 top 140.400 - - 509.756 482.541 3235.510


S1
25 bottom 140.400 8.114 10.816 508.973 481.799 3230.537

Sec.Nam L.Comb. Using As(cm )


2
Select As(cm )
2
Result
29 top 202.683 140.400 OK
S1
25 bottom 202.683 140.400 OK

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 18

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 20 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-764.368 tonf -92.760 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 914.581 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

265.1 244.48

[B.M.D] [ tonf-m ]

-914.6
-685.9
-457.3
-228.6
0 152.37 140.52
228.6
457.3
685.9
914.58
914.6

[B/L.M.D] [ tonf-m / ft ]

-365.8
-274.4
-182.9
-91.5
0 60.95 56.21
91.5
182.9
274.4
365.83
365.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 19

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 21 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-729.168 tonf -548.010 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 1048.614 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

182.17
303.95

[B.M.D] [ tonf-m ]

-1048.6
-786.5
-524.3
-262.2
0 174.7 104.7
262.2
524.3
786.5
1048.61
1048.6

[B/L.M.D] [ tonf-m / ft ]

-419.4
-314.6
-209.7
-104.9
0 69.88 41.88
104.9
209.7
314.6
419.45
419.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 20

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 22 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-654.368 tonf 385.890 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 900.447 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

175.25
261

[B.M.D] [ tonf-m ]

-900.4
-675.3
-450.2
-225.1
0 100.73 150.01
225.1
450.2 604.6
675.3
900.45
900.4

[B/L.M.D] [ tonf-m / ft ]

-360.2
-270.1
-180.1
-90
0 40.29 60
90
180.1 241.84
270.1
360.18
360.2

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 21

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 23 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-729.168 tonf -548.010 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 1048.614 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

182.17
303.95

[B.M.D] [ tonf-m ]

-1048.6
-786.5
-524.3
-262.2
0 174.7 104.7
262.2
524.3
786.5
1048.61
1048.6

[B/L.M.D] [ tonf-m / ft ]

-419.4
-314.6
-209.7
-104.9
0 69.88 41.88
104.9
209.7
314.6
419.45
419.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 22

Title

Foundation name
Bending Moment DiagramSection name Direction L/C ID
F1 S1 X 24 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-561.440 tonf 408.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 802.436 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

141.7
232.59

[B.M.D] [ tonf-m ]

-802.4
-601.8
-401.2
-200.6
0 81.45 133.68
200.6
401.2 488.88
601.8
802.44
802.4

[B/L.M.D] [ tonf-m / ft ]

-321
-240.7
-160.5
-80.2
0 32.58 53.47
80.2
160.5 195.55
240.7
320.97
321

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 23

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 25 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-835.968 tonf -263.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 1062.221 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

249.42
307.89

[B.M.D] [ tonf-m ]

-1062.2
-796.7
-531.1
-265.6
0 176.96 143.36
265.6
531.1
796.7
1062.22
1062.2

[B/L.M.D] [ tonf-m / ft ]

-424.9
-318.7
-212.4
-106.2
0 70.79 57.34
106.2
212.4
318.7
424.89
424.9

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 24

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 26 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-816.240 tonf -263.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 1039.534 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

242.85
301.31

[B.M.D] [ tonf-m ]

-1039.5
-779.7
-519.8
-259.9
0 173.18 139.58
259.9
519.8
779.7
1039.53
1039.5

[B/L.M.D] [ tonf-m / ft ]

-415.8
-311.9
-207.9
-104
0 69.27 55.83
104
207.9
311.9
415.81
415.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 25

Title

Foundation name
Bending Moment Diagram Section name Direction L/C ID
F1 S1 X 27 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-791.568 tonf 23.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 919.501 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

261.19 266.52

[B.M.D] [ tonf-m ]

-919.5
-689.6
-459.8
-229.9
0 150.12 153.19
229.9
459.8
689.6
901.11 919.5
919.5

[B/L.M.D] [ tonf-m / ft ]

-367.8
-275.8
-183.9
-91.9
0 60.05 61.27
91.9
183.9
275.8
360.44 367.8
367.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 26

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 X 28 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-591.968 tonf -186.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 752.107 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

176.64
218

[B.M.D] [ tonf-m ]

-752.1
-564.1
-376.1
-188
0 125.3 101.53
188
376.1
564.1
752.11
752.1

[B/L.M.D] [ tonf-m / ft ]

-300.8
-225.6
-150.4
-75.2
0 50.12 40.61
75.2
150.4
225.6
300.84
300.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 27

Title

Foundation name
Bending Moment DiagramSection name Direction L/C ID
F1 S1 X 29 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-547.568 tonf 100.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 668.417 tonf-m , Mutop = 0 tonf-m

00

00

0908
32

46

787
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

171.3 193.74

[B.M.D] [ tonf-m ]

-668.4
-501.3
-334.2
-167.1
0 98.46 111.36
167.1
334.2
501.3 590.99
668.42
668.4

[B/L.M.D] [ tonf-m / ft ]

-267.4
-200.5
-133.7
-66.8
0 39.38 44.54
66.8
133.7
200.5 236.4
267.37
267.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 28

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 20 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-764.368 tonf 222.874 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 51.595 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

509.58

[B.M.D] [ tonf-m ]

-51.6
-38.7
-25.8
-12.9
0
12.9
25.8
38.7
51.6
51.6

[B/L.M.D] [ tonf-m / ft ]

-6.6
-5
-3.3
-1.7
0
1.7
3.3
5
6.61
6.6

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 29

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 21 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-729.168 tonf 238.784 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 49.219 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

486.11

[B.M.D] [ tonf-m ]

-49.2
-36.9
-24.6
-12.3
0
12.3
24.6
36.9
49.22
49.2

[B/L.M.D] [ tonf-m / ft ]

-6.3
-4.7
-3.2
-1.6
0
1.6
3.2
4.7
6.31
6.3

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 30

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 22 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-654.368 tonf 209.124 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 44.17 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

436.25

[B.M.D] [ tonf-m ]

-44.2
-33.1
-22.1
-11
0
11
22.1
33.1
44.17
44.2

[B/L.M.D] [ tonf-m / ft ]

-5.7
-4.2
-2.8
-1.4
0
1.4
2.8
4.2
5.66
5.7

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 31

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 23 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-729.168 tonf 238.784 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 49.219 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

486.11

[B.M.D] [ tonf-m ]

-49.2
-36.9
-24.6
-12.3
0
12.3
24.6
36.9
49.22
49.2

[B/L.M.D] [ tonf-m / ft ]

-6.3
-4.7
-3.2
-1.6
0
1.6
3.2
4.7
6.31
6.3

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 32

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 24 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-561.440 tonf 277.238 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 37.897 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

374.29

[B.M.D] [ tonf-m ]

-37.9
-28.4
-18.9
-9.5
0
9.5
18.9
28.4
37.9
37.9

[B/L.M.D] [ tonf-m / ft ]

-4.9
-3.6
-2.4
-1.2
0
1.2
2.4
3.6
4.86
4.9

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 33

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 25 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-835.968 tonf 97.494 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 56.428 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

557.31

[B.M.D] [ tonf-m ]

-56.4
-42.3
-28.2
-14.1
0
14.1
28.2
42.3
56.43
56.4

[B/L.M.D] [ tonf-m / ft ]

-7.2
-5.4
-3.6
-1.8
0
1.8
3.6
5.4
7.23
7.2

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 34

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 26 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-816.240 tonf 93.548 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 55.096 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

544.16

[B.M.D] [ tonf-m ]

-55.1
-41.3
-27.5
-13.8
0
13.8
27.5
41.3
55.1
55.1

[B/L.M.D] [ tonf-m / ft ]

-7.1
-5.3
-3.5
-1.8
0
1.8
3.5
5.3
7.06
7.1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 35

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 27 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-791.568 tonf 110.214 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 53.431 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

527.71

[B.M.D] [ tonf-m ]

-53.4
-40.1
-26.7
-13.4
0
13.4
26.7
40.1
53.43
53.4

[B/L.M.D] [ tonf-m / ft ]

-6.8
-5.1
-3.4
-1.7
0
1.7
3.4
5.1
6.85
6.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 36

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 28 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-591.968 tonf 337.694 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 39.958 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

394.65

[B.M.D] [ tonf-m ]

-40
-30
-20
-10
0
10
20
30
39.96
40

[B/L.M.D] [ tonf-m / ft ]

-5.1
-3.8
-2.6
-1.3
0
1.3
2.6
3.8
5.12
5.1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 37

Title

Foundation name
Bending Moment Diagram
Section name Direction L/C ID
F1 S1 Y 29 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-547.568 tonf 350.414 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Mubottom = 36.961 tonf-m , Mutop = 0 tonf-m

50

050
0

257
75

17

24
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

365.05

[B.M.D] [ tonf-m ]

-37
-27.7
-18.5
-9.2
0
9.2
18.5
27.7
36.96
37

[B/L.M.D] [ tonf-m / ft ]

-4.7
-3.6
-2.4
-1.2
0
1.2
2.4
3.6
4.74
4.7

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 38

5.3 ONE WAY SHEAR FORCE


5.3.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.8 2 fck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!

5.3.2 Check of One-Way Shear


Footing Name : F1 GroupType : Isolated PileType : True

Unit : mm

7800
2500

1222

- X direction One-Way Shear (All Width)


Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (tonf) Vu (tonf) Result
S1 25 1222 1977.9 2500 351.018 330.058 OK
- Y direction One-Way Shear (All Width)
Sec.Nam L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (tonf) Vu (tonf) Result
S1 20 0 1949 7800 1079.213 0 OK

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 39

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 20 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-764.368 tonf -92.760 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 284.183 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

265.1 244.48

[S.F.D] [ tonf ]
397.64
397.6
298.2 284.18
198.8
99.4
0
-99.4
-198.8 -262.09
-298.2
-397.6

[S/L.F.D] [ tonf / ft ]
159.06
159.1
119.3 113.67
79.5
39.8
0
-39.8
-79.5 -104.83
-119.3
-159.1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 40

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 21 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-729.168 tonf -548.010 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 325.83 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

182.17
303.95

[S.F.D] [ tonf ]
455.92
455.9
341.9 325.83
228
114
0
-114 -195.28
-228
-341.9
-455.9

[S/L.F.D] [ tonf / ft ]
182.37
182.4
136.8 130.33
91.2
45.6
0
-45.6 -78.11
-91.2
-136.8
-182.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 41

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 22 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-654.368 tonf 385.890 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = -279.791 tonf

00

00

78

00
32

46

65

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

175.25
261

[S.F.D] [ tonf ]

391.5
293.6 262.87
195.7 187.86
97.9
0
-97.9
-195.7
-279.79
-293.6
-391.5

[S/L.F.D] [ tonf / ft ]

156.6
117.4 105.15
78.3 75.14
39.1
0
-39.1
-78.3
-111.92
-117.4
-156.6

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 42

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 23 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-729.168 tonf -548.010 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 325.83 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

182.17
303.95

[S.F.D] [ tonf ]
455.92
455.9
341.9 325.83
228
114
0
-114 -195.28
-228
-341.9
-455.9

[S/L.F.D] [ tonf / ft ]
182.37
182.4
136.8 130.33
91.2
45.6
0
-45.6 -78.11
-91.2
-136.8
-182.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 43

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 24 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-561.440 tonf 408.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = -249.337 tonf

00

00

78

00
32

46

65

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

141.7
232.59

[S.F.D] [ tonf ]

348.9
261.7 212.55
174.4 151.9
87.2
0
-87.2
-174.4
-249.34
-261.7
-348.9

[S/L.F.D] [ tonf / ft ]

139.6
104.7 85.02
69.8 60.76
34.9
0
-34.9
-69.8
-99.73
-104.7
-139.6

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 44

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 25 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-835.968 tonf -263.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 330.058 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

249.42
307.89

[S.F.D] [ tonf ]
461.83
461.8
346.4 330.06
230.9
115.5
0
-115.5
-230.9 -267.38
-346.4
-461.8

[S/L.F.D] [ tonf / ft ]
184.73
184.7
138.6 132.02
92.4
46.2
0
-46.2
-92.4 -106.95
-138.6
-184.7

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 45

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 26 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-816.240 tonf -263.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 323.009 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

242.85
301.31

[S.F.D] [ tonf ]
451.97
452
339 323.01
226
113
0
-113
-226 -260.33
-339
-452

[S/L.F.D] [ tonf / ft ]
180.79
180.8
135.6 129.2
90.4
45.2
0
-45.2
-90.4 -104.13
-135.6
-180.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 46

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 27 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-791.568 tonf 23.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = -285.711 tonf

00

00

78

00
32

46

65

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

261.19 266.52

[S.F.D] [ tonf ]

399.8 391.79
299.8 280
199.9
99.9
0
-99.9
-199.9
-285.71
-299.8
-399.8

[S/L.F.D] [ tonf / ft ]

159.9 156.71
119.9 112
80
40
0
-40
-80
-114.28
-119.9
-159.9

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 47

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 28 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-591.968 tonf -186.110 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 233.698 tonf
22

00

00

00
12

32

46

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

176.64
218

[S.F.D] [ tonf ]
327
327
245.3 233.7
163.5
81.8
0
-81.8
-163.5 -189.36
-245.3
-327

[S/L.F.D] [ tonf / ft ]
130.8
130.8
98.1 93.48
65.4
32.7
0
-32.7
-65.4 -75.74
-98.1
-130.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 48

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 X 29 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMy Moment intia 4 1 2
-547.568 tonf 100.990 tonf-m 98.8650 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = -207.694 tonf

00

00

78

00
32

46

65

78
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

171.3 193.74

[S.F.D] [ tonf ]

290.6 256.95
218 183.63
145.3
72.7
0
-72.7
-145.3
-207.69
-218
-290.6

[S/L.F.D] [ tonf / ft ]

116.2 102.78
87.2 73.45
58.1
29.1
0
-29.1
-58.1
-83.08
-87.2
-116.2

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 49

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 20 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-764.368 tonf 222.874 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

509.58

[S.F.D] [ tonf ]

229.3
172
114.7
57.3
0
-57.3
-114.7
-172
-229.3

[S/L.F.D] [ tonf / ft ]

29.4
22
14.7
7.3
0
-7.3
-14.7
-22
-29.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 50

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 21 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-729.168 tonf 238.784 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

486.11

[S.F.D] [ tonf ]

218.8
164.1
109.4
54.7
0
-54.7
-109.4
-164.1
-218.8

[S/L.F.D] [ tonf / ft ]

28
21
14
7
0
-7
-14
-21
-28

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 51

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 22 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-654.368 tonf 209.124 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

436.25

[S.F.D] [ tonf ]

196.3
147.2
98.2
49.1
0
-49.1
-98.2
-147.2
-196.3

[S/L.F.D] [ tonf / ft ]

25.2
18.9
12.6
6.3
0
-6.3
-12.6
-18.9
-25.2

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 52

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 23 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-729.168 tonf 238.784 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

486.11

[S.F.D] [ tonf ]

218.8
164.1
109.4
54.7
0
-54.7
-109.4
-164.1
-218.8

[S/L.F.D] [ tonf / ft ]

28
21
14
7
0
-7
-14
-21
-28

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 53

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 24 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-561.440 tonf 277.238 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

374.29

[S.F.D] [ tonf ]

168.4
126.3
84.2
42.1
0
-42.1
-84.2
-126.3
-168.4

[S/L.F.D] [ tonf / ft ]

21.6
16.2
10.8
5.4
0
-5.4
-10.8
-16.2
-21.6

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 54

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 25 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-835.968 tonf 97.494 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

557.31

[S.F.D] [ tonf ]

250.8
188.1
125.4
62.7
0
-62.7
-125.4
-188.1
-250.8

[S/L.F.D] [ tonf / ft ]

32.2
24.1
16.1
8
0
-8
-16.1
-24.1
-32.2

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 55

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 26 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-816.240 tonf 93.548 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

544.16

[S.F.D] [ tonf ]

244.9
183.7
122.4
61.2
0
-61.2
-122.4
-183.7
-244.9

[S/L.F.D] [ tonf / ft ]

31.4
23.5
15.7
7.8
0
-7.8
-15.7
-23.5
-31.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 56

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 27 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-791.568 tonf 110.214 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

527.71

[S.F.D] [ tonf ]

237.5
178.1
118.7
59.4
0
-59.4
-118.7
-178.1
-237.5

[S/L.F.D] [ tonf / ft ]

30.4
22.8
15.2
7.6
0
-7.6
-15.2
-22.8
-30.4

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 57

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 28 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-591.968 tonf 337.694 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

394.65

[S.F.D] [ tonf ]

177.6
133.2
88.8
44.4
0
-44.4
-88.8
-133.2
-177.6

[S/L.F.D] [ tonf / ft ]

22.8
17.1
11.4
5.7
0
-5.7
-11.4
-17.1
-22.8

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 58

Title

Foundation name
Shear Force Diagram Section name Direction L/C ID
F1 S1 Y 29 7800

Analysis Method
Conventional Rigid Method with reaction (Method 1)

2500
SFz SMx Moment intia 4 1 2
-547.568 tonf 350.414 tonf-m 10.1563 m
Area 2 Contact Area Critical Point Method
19.500 m Critical Max Point
Critical Value
Vu = 0 tonf

50

00
0
75

17

25
0

[ mm ]

[Loading]

[ tonf , tonf/m ]

365.05

[S.F.D] [ tonf ]

164.3
123.2
82.1
41.1
0
-41.1
-82.1
-123.2
-164.3

[S/L.F.D] [ tonf / ft ]

21.1
15.8
10.5
5.3
0
-5.3
-10.5
-15.8
-21.1

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 59

5.4 TWO WAY SHEAR FORCE


5.4.1 Two-Way Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.8 2 (1 + 2/b c) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.8 2 (1 + as d / 2 bo) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.8 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
bo = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

5.4.2 Check of Two-WayShear

2
Ft.Name F1 Punching Area 84446.820 cm

Pr.Name 1 Pile effect 2/2

Shape Rectangle f Vc1 1704.944 tonf


7800

L.Comb. 25 f Vc2 3479.109 tonf


2500

Pl 1400 mm f Vc3 1404.072 tonf


1

Pw 1000 mm f Vc 1404.072 tonf

bo / d 5000 / 1977.87 mm Vu 723.648 tonf

bc / as 1.4 / 20 Result OK

5.5 PILE PUNCHING SHEAR FORCE


5.5.1 Pile Punching Shear Formula
Vu = SFz Shade Ratio
(a) f Vc1 = 0.8 2 (1 + 2/bc) fck bo d (eq 11-33) <- Vc1
(b) f Vc2 = 0.8 2 (1 + as d / 2 b o) fck bo d (eq 11-34) <- Vc2
(c) f Vc3 = 0.8 4 fck bo d (eq 11-35) <- Vc3
f Vc = Min(f Vc1 , f Vc2 , f Vc3) ACI 318-05 CODE 11.12.2.1
Vu f Vc , then OK
where
b = ratio of long side to short side of the column, concentrated load or reaction area
as = 40 for interior colimns
= 30 for edge columns
= 20 for corner columns
b o = perimeter of critical section
Footing Area - Punching Area
Shade Ratio =
Footing Area

Copyright (c) GS E&C. All Rights Reserved


24/09/2018

Project Na. : Metrocable Picacho


Calculation Sheet
of Project No. : 1801 MetroCable Picacho

Foundation Client : Metro Medellin Page 60

5.5.2 Check of Pile Punching Shear


2
Ft.Name F1 Punching Area 61289.840 cm

Pile No. 1 bc / as 1 / 20

Shape Circle f Vc1 1198.131 tonf


7800

L.Comb. 25 f Vc2 3176.450 tonf


2500

PileName PHC-12 f Vc3 798.754 tonf


1 2

Diameter 1500mm f Vc 798.754 tonf

bo 2844.42mm Vu 461.836 tonf

d 1977.87mm Result OK

Copyright (c) GS E&C. All Rights Reserved

Das könnte Ihnen auch gefallen