Beruflich Dokumente
Kultur Dokumente
PIT D2
2
i. Monitoring Area by Instrument
Rata Deformasi Prismas Monitoring per day
3
ii. Geotechnical Section of Critical Area
SEC A
- IPDD2 Side Wall = Tinggi 124,2 m, Overall Slope 12 °
- High Wall = Tinggi 69,8 m, Overall Slope 23 °
SEC B
- IPDD2 Low Wall = Tinggi 90,7 m, Overall Slope 15 °
- High Wall = Tinggi 69,8 m, Overall Slope 23 °
SEC C
- Low Wall = Tinggi 80,2 m, Overall Slope 14 °
- High Wall = Tinggi 67,1 m, Overall Slope 17 °
SEC D
- IPDD2 Low Wall = Tinggi 67,7 m, Overall Slope 18 °
- Side Wall = Tinggi 77,2 m, Overall Slope 9 °
4
iii. Safety Factor
Sec_A
FK = 1.336 (Aman)
Sec_B
FK = 1,578 (Aman)
5
iii. Safety Factor
Sec_C
FK = 1.319 (Aman)
Sec_D
FK = 1,653 (Aman)
6
iii. Photo Drone
Sec_A
7
iii. Photo Drone
Sec_B
8
iii. Photo Drone
Sec_C
9
iii. Photo Drone
Sec_D
10
Terimakasih