Sie sind auf Seite 1von 11

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN

ADP NO : 281/160525 (2016-17)

SUB HEAD :-

CONSTRUCTION OF COMMON FACILITY CENTER

STRUCTURAL DRAWINGS

CONSULTANT:
GENERAL NOTES
1. BUILDING DESCRIPTION & DESIGN 8 CONC. PROTECTION & LAPS TO STEEL
a. MIN. COVER TO BARS SHALL BE AS UNLESS GIVEN ON DRAWINGS
16. HOOKED BAR EMBEDMENT
a. BUILDING IS 1 STOREY. DESIGNED AS FRAME STRUCTURE.
b. LAPS IN COLUMNS BE PREFFERED AT MID ( COMP. ZONE). LAP BE THE FOLLOWING EMBEDMENT LENGTHS SHALL BE
FOR ZONE -2B
AS TENSION SPLICE UBC 1997, ACI 2005 & B. CODE OF PAK. CONSIDERED FOR ALL HOOKED BARS WITH STANDARD HOOKS,

LAP 55 DIA
b- DESIGN OF STRUCTURE IS BASED ON PAKISTAN BUILDING CODE SP 2007. = fy' / 65 fc' UNLESS OTHERWISE SPECIFIED.

MID
(S.P- 2007) , ACI 318-2005 AND UBC 97. fy' = YIELD STRENGHT OF STEEL , fc' = CONC STRENGTH
Bar No. #3 #4 #5 #6 #7 #8
c- BEARING CAPACITY OF SOIL IS 0.30 T/SFT FOR RAFT FOUNDATION
Bar Dia (inches) 3/8 1/2 5/8 3/4 7/8 1
STRUCTURAL MEMBER COVER LAP TO BARS
Lap Length (inch) 9 9 10 12 13 15
2. BUILDING LAYOUT FOUNDATIONS 3" TO PCC GRADE -60 STEEL

H
a. BUILDING LAYOUT BE DONE WRT TO STRUCTURAL DRAWINGS SLABS , RCC WALLS 3/4" 55 DIA 17. ACCESSORIES
AND ARCH DRAWINGS COLUMNS & BEAMS 1.5"
a. BAR SUPPORTS , SPACERS & AND OTHER ACCESSORIES ARE
b. ANY DIFFERENCE BE DISCUSSED WITH STR. DESIGNER. NOT SHOWN IN DRAWINGS.
b. THE BAR SUPPORTS BE PROVIDES AS APPROVED
9. FORMWORK & REMOVEL BY ENGINEER
3. EXCAVATION AND TERMITE TREATMENT a. FORMWORK TO CONCRETE SHALL BE OF METAL SHEETS c. SUPPORTS TO BARS BE SUFFICIENT & STRONG
a. FOUNDATIONS TO BE PLACED ON COMPACTED SOIL OR PLY WOOD. SUCH THAT THE STEEL REMAIN IN POSITION
b. THE FORMWORK BE DONE AS PER STRUCTURAL FORMS DURING CONCRETING.
b. IN CASE OF FILL / OVERBURDEN REMOVE IT. c. FORMWORK BE WATER TIGHT.
c. IN CASE OF RAISED PLINTH, FILL WITH SAND / GRAVEL & d. FORMWORK BE REMOVED AS PER FOLLOWING SCHEDULE
COMPCAT BEFORE FLOORING. COLUMNS & SIDE OF BEAMS & WALLS 24 HOURS 18. BAR BENDING & HOOKS
SLAB, BOTTOM OF BEAMS 14 DAYS.
d. PROVIDE TERMITE TREATMENT IN FOUNDATIONS AND IN FLOOR
BEFORE LAYING PCC.

db
10. JOINTS

db
4db
4. W:C:S: AGGREGATES AND SIZES a. EXPANSION JOINTS BE FINALIZED AND GOT APPROVED 8db
BY THE RESIDENT ENGINEER.

12db
FRESH WATER: IN ACCORDANCE OF UBC 97 SECTION 1903.4 4db 4db
CEMENT: FRESH PORTLAND CEMENT TO BE USED FOR ALL WORKS. b. EXPANSION JOINT IN THE BUILDING BE PROVIDED AS SHOWN 2.5 in (mm)
ON THE DRAWIGS. 4db
SAND : LAWRANCEPUR / GHAZI.
AGGREGATES:IN ACCORDANCE OF UBC 97 SECTION 1903.3
11. STEEL BINDING (PRIMARY REINF.) (PRIMARY REINF.)

MARGALLA STONE CRUSHED AGGREGATES SHALL BE AS: a. STEEL BARS BE PLACED IN THE FORM AS PER DRAWINGS.
STRUCTURAL ELEMENTS MAXIMUM AGGREGATE SIZE b. ALL JUNCTION OF THE BARS / CROSS BE TIED WITH BINDING

H
WIRE. 2-#6
FOUNDATIONS 1.25 " DOWN GRADED

LAP 55 DIA
MID
COLUMNS & BEAMS 3/4 DOWN GRADED 12. DRAIN PIPES & SLEEVES

10
SLABS 3/4" DOWN GRADED

db
TYP. DETAIL OF RCC
a. TOILET WASHING & DRAIN PIPES BE PLACED IN SLAB AT PROPER 2-#6 2-#6 RETAINING WALL
3/4" DOWN GRADED MEANS 1/2" AND 3/8" MIX DESIGNED POSITION BEFORE CONCRETE.
1D=4db
b. WHERE PLUMBING AND OTHER PIPES ARE PLACES IN SLAB
ADDITIONAL STEEL BARS BE PROVIDED ABOVE AND BELOW db

5 REINFORCING STEEL TO COVER THE REDUCED STRENGTH. 2-#6

DUCT OPEN
a. DESIGN OF STRUCTURE IS BASED ON STEEL DEFORMED 13. WALL TIES (STIRRUPS & TIE REINF.) TYP DUCT OPENING DETAIL

MAIN STEEL FOR ASTM A 706 a. WALL TIES OF #3 (10MM) BARS BE PLACED IN COLUMNS AS
FOUNDATION, COLUMNS, BEAMS, SLABS GRADE - 40 WALL TIES AT 2' CC TO ANCHOR THE WALLS
BEAMS > 30'-0" SPAN ARE DESIGNED AS GRADE - 60
14. BRICK , CONC BLOCK MASONRY
b. SAMPLES OF STEEL BE GOT TESTED BEFORE USE.
a. FIRST CLASS BRICKS BE USED FOR MASONRY WORK.
b. BRICKS BE SOACKED IN WATER A DAY BEFORE USE.
c. CONCRETE BLOCKS BE MOISED JUST BEFORE USE. RAFT
6 CONC. MIXING & PLACING d. JOINTS BE 3/8" FILLED WITH CEMENT SAND MORTAR.
e. ALL MORTAR BE MACHINE MIXED. TYP COL. ELE.
a. CONCRETE BE WELL MIXED, VIBRATED, COMPACTED , CURED,
TESTED AND RECORD TO BE MAINTAINED AS PER f. MORTAR FOR WALLS 8" , 9" SHALL BE 1:5
ACI 318 AND UBC 1997 CHAPTER 19 FOR 4" & 4.5" SHALL BE 1:4
g. ALL INTERNAL PARTITIONS 4.5" BRICKS / 6" HOLLOW BLOCKS /
b. MIXED CONCRETE BE PLACED IN POSITION WITHIN 15 MINUTES WOODEN PARTITION OUTER 8" HOLLOW / 9" BRICKS OR 12" CAVITY WALLS.
c. MIN WATER IN CONC. GIVES MORE STRENGHT. h. ALL ABOVE ITEM TO BE EXECUTED ,TESTED AND MAITAINED IN ACCORDANCE
OF UBC 1997 CODE STANDARD CHAPTER 21.
d. TRY 5 TO 6 GALLONS OF WATER / BAG OF CEMENT
e. MIXING TIME OF CONCRETE PER BATCH 1.5 MINUTES AFTER 15. STEEL BAR SPACING
ADDING WATER.
a. FIRST & LAST BAR IN WALLS & SLAB BE PLACED AT 1/2 OF
THE SPACING OF BARS.OR JUST GIVE COVER AND PLACE THE BAR
7 CONC. STRENGTHS b. FIRST AND THE LAST HOOP/TIE IN BEAMS & COLUMNS BE
a. CONCRETE BE TESTED AT IMPORTANT PLACES & STRENGTH BE AS BE PLACED AT 2" FROM THE SUPPORT.
FOUND. WALLS, BEAMS, SLAB 3000 PSI 28 DAYS CYLINDER STRENGTH c. COLUMN TIES TO BE PROVIDED THROUNGHOUT FROM
COLUMNS MIN 1:1.5:3 4000 PSI 28 DAYS CYLINDER STRENGTH FOUNDATION TO TOP.

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


GENERAL DETAILS

R.C.C. COLUMN BEAM HOOPS


#3@6"c/c
1 1/2" CL.COVER
TO END OF HOOKS
ON BEAM BARS BEAM BARS

COL. HOOPS
Y Y
#3@12"c/c LB
#4 dowel bars @ 18"c/c
BRICK/BLOCK MASONRY Column ties are
necessary in
this region INTERIOR BEAM HOOPS
2#4
DETAIL OF COLUMN WALL TIE DETAIL OF WINDOW
PROJECTION

PLAN SECTION
BEAM TOP BARS TYPICAL SEISMIC-RESISTANT JOINT DETAILS
SECTION AT X-X
PRIMARY BEAM
BEAM HOOPS

1 1/2" CL.
TO END OF HOOKS BEAM BARS
COLUMN HOOPS
ON BEAM BARS

1 1/2" CL.
TO END OF HOOKS
M ON BEAM BARS

INTERIOR BEAM HOOPS


BEAM BOTTOM BARS
(SMALLER SECTION BEAM) X X
INTERIOR BEAM HOOPS SECONDARY BEAM SECTION AT M-M
Column ties are
necessary in
NOTE:- this region

BEAM HOOPS
1. SHRINKAGE STRIPS MUST BE PROVIDED AT A SPACING OF 2#4

NOT MORE THAN 100ft.


PLAN OF BEAM TO BEAM DETAIL 2. PREFERABLY SHRINKAGE STRIP BE PROVIDED AT
CONSTRUCTION JOINT.
COLUMN AND BEAM JOINT FOR SEISMIC FORCE CONTROL
3. LOCATION OF SHRINKAGE STRIP BE KEPT AT A DISTANCE SECTION AT Y-Y
OF SPAN/3 FROM THE COLUMN SUPPORT.
4. 3ft WIDE PORTION OF SHRINKAGE STRIP BE KEPT OPEN FOR
BEAM
AT LEAST 3 WEEKS.THE OPENED PORTION SHOULD BE
6" THICH POURED AFTERWARDS.
FLOOR SLAB 2#3@AFTER EIGHT COURSE 5. REINFORCEMENT BE LAPPED IN SHRINKAGE STRIPS.
ALTERNATIVELY BARS MAY BE SLIGHTLY BENT IN PLAN #3@36"C/C
PARALLEL TO FACE OF SLAB. (ANCHOR BAR)

WATER
STOPPER
PARTITION WALL
OPEN OPEN

1 #3@36"C/C
3
(ANCHOR BAR) COLUMN

12"X18" 1#4 (VERTICAL BARS)


PLINTH BEAM BOTH SIDE OF OPENING TYP. DETAIL OF CONNECTION OF
TYP. DETAIL OF CONSTRUCTION
PARTITION WALL WITH BEAM
JOINT IN RAFT & SLABS
SECTIONAL ELEVATION OF WALL & COLUMN FOR SEISMIC LOADING

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'

2'

2'
1'

BOTTOM #4@10"C/C
16'-6"

B
51'-712"

BOTTOM #4@10"C/C
16'-712"

TOP #4@10"C/C

2'-9"
A 2'-9" A

2'-9"
C
2'-9" 2'-9"
17'-6"

BOTTOM #4@10"C/C
TOP #4@10"C/C
1'

D
2'

2'
FOUNDATION LAYOUT PLAN

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'
1'

C1 C1 C1 C1 C1 C1 C1 C1
A
17'-6"

B C1 C1 C1 C1 C1 C1 C1 C1
10'

10'
51'-712"

16'-712"

9'-412" 6'-714" 15'-1134" 15'-1134" 15'-1134" 6'-714" 9'-412"

C1 C1 C1 C1
6'-712"

6'-712"
C C1 C1 C1 C1
17'-6"

18'-112"

17'-9"
C1 C1
C1 C1 C1 C1

9"
1'

1'

6" 8'-10" 9'-214" 9'-412" 1' 1' 9'-412" 9'-214" 8'-10" 6"
28'-1012" 28'-1012"

COLUMN LAYOUT PLAN

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'
1'

PB-1 PB-1 PB-1 PB-1 PB-1 PB-1 PB-1 PB-1


A
17'-6"

PB-1 PB-1

B PB-1 PB-1 PB-1 PB-1 PB-1 PB-1


10'

10'
51'-712"

16'-712"

9'-412" 6'-714" 15'-1134" 15'-1134" 15'-1134" 6'-714" 9'-412"

PB-1 PB-1 PB-1 PB-1


6'-712"

6'-712"
C
17'-6"

17'-6"

17'-6"
1'

1'

6" 8'-10" 9'-214" 9'-412" 1' 1' 9'-412" 9'-214" 8'-10" 6"
1 1
28'-10 " 2 28'-10 " 2

PLINTH BEAMS KEY PLAN

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


#4@10"c/c
BW

15" TH. RAFT


FACE BRICK 4.5" 9" TH. 3" TH. P.C.C (1:4:8) #4@10"c/c 9" TH. FACE BRICK 4.5"
9" TH.
THICK WALL BRICK WALL 12" TH. SHINGAL/GRAVEL BRICK WALL BW BRICK WALL THICK WALL
BLOW UP
F.F.L DETAIL-1
SEE BLOW UP-1
P-B P-B P-B
9" X 18" 9" X 18" 9" X 18"

G.L
F.R.L F.R.L

12" TH. SHINGAL/GRAVEL

SECTION AT A-A

3-#6 3-#6

#3@4"c/c #3@8"c/c
2'
9"

9"
16-#6
#3@6"CC

1'-3"

2'
12-#6

2'

1'-3"
3-#6 3-#6 1.5" COVER
EDGE MID
SECTION SECTION
P-B 1 9"

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'
1'

B-1 B-1 B-1 B-1 B-1 B-1 B-1 B-1


A
17'-6"

B-1 B-1

B-1 B-1
B B-1 B-1 B-1 B-1 B-1 B-1
10'

10'
51'-712"

16'-712"

9'-412" 6'-714" 15'-1134" 15'-1134" 15'-1134" 6'-714" 9'-412"

B-1 B-1 B-1 B-1


6'-712"

6'-712"
B-1 B-1
C
17'-6"

17'-6"

17'-6"
GROUND FLOOR
SLAB BEAMS KEY PLAN
1'

1'

6" 8'-10" 9'-214" 9'-412" 1' 1' 9'-412" 9'-214" 8'-10" 6"
1 1
28'-10 " 2 28'-10 " 2

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


L

L/3 L/3
5-#6 3-#6 5-#6
5-#6 3-#6
6"

#3@6"CC
#3@6"c/c #3@6"c/c
1'

6-#6 4-#6 6-#6


4-#6 E M 4-#6
3/4*L EDGE SECTION MID SECTION

LONG SECTION OF B-1 DETAIL OF B-1

SLAB BEAMS X-SECTION DETAILS AT END SUPPORTS


AT END SUPPORT (L-BEAM)
BEAM BEAM
TAG-# SIZE
SECTION AT EDGE SECTION AT MID

5-#6 3-#6

0'-9"
B-1 X
1'-6" #3@7"c/c #3@7"c/c

4-#6 6-#6

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'
1'

#4@6"c/c

#4@6"c/c

#4@6"c/c

#4@6"c/c
#4@6"c/c #4@6"c/c
17'-6"

#4@6"c/c

#4@6"c/c
#4@6"c/c
B

#4@6"c/c
#4@6"c/c #4@6"c/c
51'-712"

16'-712"

#4@6"c/c

#4@6"c/c
9"c/c

9"c/c
#4@

#4@
C
6"c/c

6"c/c
#4@

#4@
#4@6"c/c #4@6"c/c
17'-6"

#4@ #4@
#4@6"c/c

#4@6"c/c
9"c/c 9"c/c
1'

1'

6" 8'-10" 9'-214" 9'-412" 1' 1' 9'-412" 9'-214" 8'-10" 6"
1 1
28'-10 " 2 28'-10 "
2

BOTTOM REINF. DETAIL OF


GROUND FLOOR SLAB
SLAB THICKNESS = 6"

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER


1 2 3 4 5 6 7 8

116'-1034"
6" 6"
18' 15'-1134" 15'-1134" 15'-1134" 15'-1134" 15'-1134" 18'
1'

A
#4@6"c/c #4@6"c/c

4'

4'
4'

4'
17'-6"

4' 4' 4' 4' 4' 4'

#4@6"c/c #4@6"c/c
4'

4'
4'

4'
B

2'

2'
4'

4'
#4@6"c/c

#4@6"c/c

#4@6"c/c

#4@6"c/c
51'-712"

16'-712"

#4@6"c/c

2'

2'
4'

4'
C
4'

4'
#4@6"c/c #4@6"c/c
#4@6"c/c

#4@6"c/c
4' 4'
17'-6"

#4@6"c/c #4@6"c/c
4'

4'
1'

1'

6" 8'-10" 9'-214" 9'-412" 1' 1' 9'-412" 9'-214" 8'-10" 6"
1 1
28'-10 " 2 28'-10 " 2

TOP REINF. DETAIL OF


GROUND FLOOR SLAB
SLAB THICKNESS = 6"

ESTABLISHMENT OF GIRLS CADET COLLEGE AT MARDAN.

CONSTRUCTION OF COMMON FACILITY CENTER

Das könnte Ihnen auch gefallen