Sie sind auf Seite 1von 1

Project Management - HORIZONTAL

CONCRETE PRE-PLACEMENT CHECKLIST


PROJECT : Mallorca Villas Phase 3 DATE : ____________________
LOCATION : Mallorca City Brgy. Maguyam, Silang Cavite CONTRACTOR : VJS Builders Corp.

STRUCTURE : ______________________________________________ SUPPLIER : ______________________________


LOCATION : ______________________________________________ STRENGTH : ______________________________
STATION : _____________________________________________ SLUMP : ______________________________
AREA (sq.m ) : _____________________________________________ NO.SPECIMEN : _____________________________
VOLUME (cu.m ) : _____________________________________________ NO.TRUCKS/TRIPS : _________________________
TIME STARTED : _____________________________________________ DATE SAMPLED : _________________________
TIME FINISHED : _____________________________________________ AGE IN DAYS : ______________________________

LINE & GRADE/ELEVATION


SUB-BASE COURSE
AGG.BASE COURSE
EXCAVATION/COMPACTION
SURFACE DEWATERING
FIELD DENSITY TEST (FDT)
FORMWORKS/SUPPORTS
REBARS/DOWELS
EMBEDDED ITEMS
- Water
- Sewer
- Drainage
- Electrical
Others ____________________
APPROVED POURING REQUEST FORM
CONCRETE TOOLS
- Finishing Broom/Rakes
- Shovel APPROVED FOR POURING :
- Short/Long Screeds
- Conc.floats Perry Sandoval
- Trowels Surveyor
- Conc.cutter
- Levelling Rod Herman Bibon
- Conc.Vibrator SE - Mallorca
- Supply of Water
- Pouring Lights Antonio Lovendino
- Traffic signs,warning devices,etc. SE - Mallorca

Prepared by: Henry Romero


PM - Mallorca City
Engr. Apollo Jimenez
PM - VJS Builders

Das könnte Ihnen auch gefallen