Ex.1
known Data :
1.Vacuum package production capacity = 1200 tons heavy oil /day
2.steam vaopr consmption = 6% of feed
3. cooling water supply temp = 25 C
4. steam vapor & Gas mixture temp = 90 C @ inlet of vacuum condenser
5. Vacuum @ vacuum condenster = 710 mmHg
Find
1) cooling water consumption
2) cooling water pipe diameter
3) vacuum drip leg diameter
4) vacuum ejector performance
Step b) steam + gas will enter into the vacuum condenster, and amoumt of gas = 1% of the feed
6)Total mixed gas + steam vapor enter the condenster = (1) + (5) = 168.8 kg-mole/hr
in Eq1 Z(q-t_2) : the amount of heat requried to condensed the steam into vacuum condenster to t_2
As known the partial pressure of steam = 49.35 mmHg as entering the condenser
we find the coresspoinding temp = 38C
so the temperature difference of the steam after cooling = 90-38 =52C
From table , @ 38C 1kg steam = 613.9 kcal /kg heat so heatiing from 38 to 90C
q = 613.9 + 0.47 * (90-38) = 638.34 kcal/kg (where 0.47 is heat capacity of the superheat steam )
B = Z_steam * (q - t_2) + G_gas * 0.5 (t_3 - t_4) / (t_2- t_3) =(3000*(638.3-33) + 62*0.5*(90-25))/(33-25)
steam + gas
1% of the feed
kg-mole/hr
knapee: I don't quite
understand this
means, water
Cp=1kcal/kg-C
q = latent heat it
seems that total heat
required to
condensted steam to
t_2 shoud be Z * q +
Z*1*(100-t2)
denster to t_2
superheat steam )
essure fluctuation
cooling water supply 25C
vacuum condenser
tank