SLAB DEPTH
ES EN 1992:2014, the new Ethiopian code proposes the following equations to calculate depth
that would be adequate to prevent deflection problems.
[ ) ] if ρ ≤ ρ EQUATION 7.16 a
3
ρ ρ
l
d ρ ρ (
=k 11+1.5 √ f ck o +3.2 o −1 2
o
[ ( )]
1
l ρ 1 ρ'
=k 11+1.5 √ f ck o ' + √ f ck 2
if ρ> ρo EQUATION 7.16 b
d ρ− ρ 12 ρO
Where:
ρo =
√ f ck and k depends on the span type. The different values of k are shown in the table
1000
below.
Page 1 of 19
Span type K value
Simply supported 1
End span 1.3
Interior span 1.5
Flat slab 1.2
cantilever 0.4
Table: k value
For end span with 4.5m.
slabs are classified as lightly stressed concrete structures. The code assumes the value of ρ for
this case to be 0.5%.
For C20/25 concrete class
ρo =
√ f ck = √ 20 ∗100 =0.447
1000 1000
For S3[End span]
K=1.3
And ρ=0.5% is greater than ρo=0.447%
ρ'=0 since slabs are seldom reinforced doubly
[ ( )] [ ( ) ]=23.02
1
ρ' 1
l ρ 1 0.5 1 0
=k 11+1.5 √ f ck o ' + √ f ck 2
=1.3 11+1.5 √ 20 + 2
d ρ− ρ 12 ρO 0.5−0 12 1.5
Since S400 Steel is used adjustment for steel grade should be made.
l 23.02∗500
= =28.77
d 400
Since the lx for S3 is 4.0 m or 4000 mm
4000
=28.77
d
d=139.0055 mm
∅l 20
D=d+ cover +∅ s+ =139.0055+25+8+ =182.0055 mm
2 2
Take D=190 mm
For S2 and S4[Interior span]
K=1.5
And ρ=0.5% is greater than ρo=0.447%
Page 2 of 19
ρ'=0 since slabs are seldom reinforced doubly
[ ( )] [ ( ) ]=26.56
1
ρ' 1
l ρ 1 0.5 1 0
=k 11+1.5 √ f ck o ' + √ f ck 2
=1.5 11+1.5 √ 20 + 2
d ρ− ρ 12 ρO 0.5−0 12 1.5
Since S400 Steel is used adjustment for steel grade should be made.
l 26.56∗500
= =33.202
d 400
Since the lx for S3 is 3.0 m or 3000 mm
4000
=33.202
d
d=120.47 mm
∅l 20
D=d+ cover +∅ s+ =120.47+25+8+ =163.47 mm
2 2
Take D=170 mm
For S1[Cantilever]
K=0.4
And ρ=0.5% is greater than ρo=0.447%
ρ'=0 since slabs are seldom reinforced doubly
[ ( )] [ ( ) ]=7.083
' 1 1
l ρo 1 ρ 0.5 1 0
=k 11+1.5 √ f ck '
+ √ f ck 2
=0.4 11+1.5 √20 + 2
d ρ− ρ 12 ρO 0.5−0 12 1.5
Since S400 Steel is used adjustment for steel grade should be made.
l 7.083∗500
= =8.85
d 400
Since the lx for S3 is 1.0 m or 1000 mm
1000
=8.85
d
d=112.94 mm
∅l 20
D=d+ cover +∅ s+ =112.94+ 25+8+ =155.94 mm
2 2
Take D=160 mm
End span governs, i.e., D=180 mm.
Page 3 of 19
Load calculation
Dead load calculation
Dead Load (Gk)
Material Thicknes Unit Weight Load (KN/m2)
s
Floor Finish 0.02 27 0.54
Cement screed 0.03 23 0.69
RCC Slab 0.18 25 3.75
Plastering 0.03 23 0.69
Partition - 1.5
Gk 7.92 KN/m2
Live load
q k =1.6 KN /m2
Design Load
2
pd =1.35∗Gk +1.5 Qk =1.35∗7.92+1.5∗1.6=13.092 KN /m
Page 4 of 19
Strip 1 Analysis and Design
Page 5 of 19
15.8
4 4
BAL 9.9 -9.9
-
3.56 6.33 3.56
4 6 -6.336 4
-
3.16
DIST 8 3.168
-
3.16 3.16
8 8
-
1.14 2.02 1.14
BAL 05 75 -2.0275 05
-
1.01
DIST 38 1.0138
-
0.36 0.64 0.36
BAL 5 88 -0.6488 5
-
0.32
DIST 44 0.3244
-
0.11 0.20 0.11
BAL 68 76 -0.2076 68
-
0.10
DIST 38 0.1038
-
0.03 0.06 0.03
BAL 74 64 -0.0664 74
-
10.6 10.6 10.6
sum 0 16 16 -10.616 16 0
Shear Maximum
s Moment
Span END i END j span xmax Mmax
13.1 18.4 1.66
AB 86 94 AB 49 10.977
11.8 11.8
BC 8 8 BC 1.5 -1.7064
18.4 13.1 2.33
CD 94 86 CD 51 10.977
Page 6 of 19
0.18
w1 1.6 L1 4 K1 75
0.33
w2 1.6 L2 3 K2 33
0.18
w3 1.6 L3 4 K3 75
Joint A B C D
memb
er AB BA BC CB CD DC
DF 1 0.36 0.64 0.64 0.36 1
FEM 0 -3.2 1.2 -1.2 3.2 0
BAL 2 -2
0.72 1.28 -1.28 -0.72
DIST -0.64 0.64
0.64 -0.64
-
0.23 0.40 0.23
BAL 04 96 -0.4096 04
-
0.20
DIST 48 0.2048
-
0.07 0.13 0.07
BAL 37 11 -0.1311 37
-
0.06
DIST 55 0.0655
-
0.02 0.04 0.02
BAL 36 19 -0.0419 36
-
0.02
DIST 1 0.021
-
0.00 0.01 0.00
BAL 75 34 -0.0134 75
-
2.14 2.14 2.14
sum 0 47 47 -2.1447 47 0
Shear Maximum
s Moment
xma
Span END i END j span x Mmax
2.66 3.73 1.66 2.217
AB 38 62 AB 49 5
-
0.344
BC 2.4 2.4 BC 1.5 7
Page 7 of 19
3.73 2.66 2.33 2.217
CD 62 38 CD 51 5
Joint A B C D
memb
er AB BA BC CB CD DC
DF 1 0.36 0.64 0.64 0.36 1
-
26.1 9.81 26.1
FEM 0 84 9 -9.819 84 0
-
16.3 16.3
BAL 65 65
-
5.89 10.4 5.89
14 74 -10.474 14
-
5.23
DIST 68 5.2368
-
5.23 5.23
68 68
-
1.88 3.35 1.88
BAL 52 16 -3.3516 52
-
1.67
DIST 58 1.6758
-
0.60 1.07 0.60
BAL 33 25 -1.0725 33
DIST - 0.5362
Page 8 of 19
0.53
62
-
0.19 0.34 0.19
BAL 3 32 -0.3432 3
-
0.17
DIST 16 0.1716
-
0.06 0.10 0.06
BAL 18 98 -0.1098 18
-
17.5 17.5 17.5
sum 0 49 49 -17.549 49 0
Shear Maximum
s Moment
Span END i END j span xmax Mmax
21.7 30.5 1.66
AB 97 71 AB 49 18.145
19.6 19.6 -
BC 38 38 BC 1.5 2.8207
30.5 21.7 2.33
CD 71 97 CD 51 18.145
b=1000 mm
d=D-cover-Φ/2=180-25-12/2=149 mm
M sd 17.549∗10 6
μsd = 2
= =0.069
f cd b d 11.33∗1000∗149 2
z=K z d=0.96∗149=143.66 mm
Msd 17.549∗106
As= = =351.19 mm2
z f yd 143.66∗347.83
Page 9 of 19
Using diameter 12 bars:
a s=0.25 π ϕ2=0.25∗π∗122=113 m m2
as 113
ϕ= b= ∗1000=322.04 mm
As 351.19
S max ≤ {3 h=3∗180=540
400 mm
mm
Take Smax=400 mm.
Provide Φ12 c/c 400 mm.
For span moment:
M sd=18.14 KN −m
b=1000 mm
d=D-cover-Φ/2=180-25-12/2=149 mm
M sd 18.14∗106
μsd = 2
= =0.072
f cd b d 11.33∗1000∗149 2
z=K z d=0.962∗149=143.43 mm
Msd 18.14∗10 6
As= = =223.35 mm2
z f yd 143.43∗347.83
a s=0.25 π ϕ2=0.25∗π∗122=113 m m2
as 113
ϕ= b= ∗1000=505.93 mm
As 223.35
S max ≤ {3 h=3∗180=540
400 mm
mm
Take Smax=400 mm.
Provide Φ12 c/c 400 mm.
Analysis of strip 2
Page 10 of 19
Load transfer to beam
Dead load transfer
spa leng support
n th load reactions
7.9 10.
Ab 3 2 Rby 56
7.9 21.
BC 1 2 Rcy 12
Shears
Spa End End
n I J Xmax Mmax
10.5 10.
Ab 6 56
7.9 1.33
BC 13.2 2 3 8.8
Live load transfer
suppor
t
spa leng reactio
n th load ns
2.13
Ab 3 1.6 Rby 3
4.26
BC 1 1.6 Rcy 7
shears
spa End End Xma Mma
n I J x x
2.13 2.13
Ab 3 3
2.66 1.33 1.77
BC 7 1.6 3 8
Page 11 of 19
9 91
shears
spa End
n End I J Xmax Mmax
17.4 17.4
Ab 6 6
21.8 13.0 1.33 14.5
BC 2 9 3 5
BMD
10.00
6.55
6.55
5.00
-5.00
-10.00
-15.00
-14.55
-20.00
b=1000 mm
d=D-cover-Φ/2=180-25-12/2=149 mm
M sd 6.55∗10
6
μsd = 2
= 2
=0.026
f cd b d 11.33∗1000∗149
z=K z d=0.986∗149=146.914 mm
Msd 6.55∗10 6
As= = =128.177 m m2
z f yd 146.914∗347.83
Page 12 of 19
2 2 2
a s=0.25 π ϕ =0.25∗π∗12 =113 m m
as 113
ϕ= b= ∗1000=881.59 mm
As 128.177
S max ≤ {3 h=3∗180=540
400 mm
mm
Take Smax=400 mm.
Provide Φ12 c/c 400 mm.
For span moment:
M sd=14.155 KN −m
b=1000 mm
d=D-cover-Φ/2=180-25-12/2=149 mm
M sd 14.155∗10 6
μsd = 2
= =0.056
f cd b d 11.33∗1000∗149 2
z=K z d=0.971∗149=144.68 mm
Msd 14.155∗106
As= = =281.277 mm2
z f yd 144.68∗347.83
a s=0.25 π ϕ2=0.25∗π∗122=113 m m2
as 113
ϕ= b= ∗1000=401.73 mm
As 281.277
S max ≤ {3 h=3∗180=540
400 mm
mm
Take Smax=400 mm.
Provide Φ12 c/c 400 mm.
Page 13 of 19
Design of Beam between S3 and S4
Dead load reaction from strip 1 load transfer
Gk =30.374 KN / m
[ ( )] [ ( ) ]=23.02
1
ρ' 1
l ρ 1 1.5 1 0
=k 11+1.5 √ f ck o ' + √ f ck 2
=1.3 11+1.5 √ 20 + 2
d ρ− ρ 12 ρO 1.5−0 12 1.5
Since S400 Steel is used adjustment for steel grade should be made.
l 23.02∗500
= =28.77
d 400
Since the lx for S3 is 10.0 m or 10,000 mm
10000
=28.77
d
d=347.58 mm
∅l 20
D=d+ cover +∅ s+ =347.58+25+8+ =390.58 mm
2 2
Take D=400 mm
Assume beam width b=300 mm
self-weight of beam: 25*0.4*0.3=3KN/m
design load on beam: Pd =1.35∗( 30.374 +3 ) +1.5∗6.14=54.26 KN /m
since the beam is simply supported the maximum design moment would be:
2
P l 54.26∗102
M max= d = =678.25 KN −m
8 8
54.26∗10
V max = =271.3 KN
2
Page 14 of 19
Beam design for flexure
∅l 20
d=D−cover−∅ s− =400−25−8− =357 mm
2 2
M sd 678.25∗106
μsd = = =0.8869>0.2 1∧way exagurated
f c k b d 2 20∗300∗357 2
x−d 2
f sc =700[ ]≤ f yd
x
d−z 357−91.78
Where x= = =663.05>400 the section can’t carry this much stress, revise
0.4 0.4
depth.
d=
√ M sd
f ck b k
'
=
√
678.25∗106
20∗300∗0.21
=733.685 mm
∅l 20
D=d+ cover +∅ s + =733.685+25+8+ =776.685 mm
2 2
Take D=780 mm.
Revise beam weight: 25*0.78*0.3=5.85 KN/m
design load on beam: Pd =1.35∗( 30.374 +5.85 ) +1.5∗6.14=58.11 KN /m
Pd l 2 58.11∗102
M max= = =726.41 KN −m
8 8
58.11∗10
V max = =285.55 KN
2
∅l 20
d=D−cover−∅ s− =780−25−8− =737 mm
2 2
M sd 726.41∗10
6
μsd = 2
= 2
=0.222>0.21 design section as doubly reinforced
f ck b d 20∗300∗737
d 737
z=
2
[ 1+ √ 1−3.53 k ]=
'
2
[ 1+ √ 1−3.53∗0.21 ] =555.93 mm
Page 15 of 19
x−d 2
f sc =700[ ]≤ f yd
x
d−z 737−555.93
Where x= = =452.67
0.4 0.4
∅l 20
d 2=cover +∅ s + =25+8+ =43 mm
2 2
f sc =700
[ 452.67−43
452.67 ]
=633.505 ≤ f yd=347.83 take f sc =347.83 Mpa
Page 16 of 19
α cw b w z v 1 f cd
V rd ,max =
cot (θ ) +tan ( θ)
v 1=v=0.6 1− [ f ck
250 ] [
=0.6 1−
20
250
=0.552 ]
z=0.9 d=0.9∗737=663.3 mm
α cw =1
Design shear force, the maximum shear from case I of rib 1 analysis, is 22.68 KN
V rd ,max (429.14)>V ed (232.03 KN ) depth is OK!
2. check Ved<Vrd,c
[ ]
1
V rd ,c = C rd ,c k ( 100 ρ1 f ck ) 3 bw d
0.18 0.18
Crd , c = = =0.12
γc 1.5
k =1+
√ 200
d
≤2
k =1+
√ 200
737
=1.52 ≤2 ok !
A s [tension] ( 3701.318 )
ρ1= = =0.016
bd 300∗737
[ ]
1
V rd ,c = 0.12∗1.52∗( 100∗0.016∗20 ) 300∗737∗10−3 KN=128.03 KN
3
k =1+
√ 200
737
=1.52 ≤2 ok !
3 1 3 1
2 2 2 2
v min =0.035 k f =0.035∗( 1. 52 ) ∗( 2 0 ) =0. 293
ck
Page 17 of 19
V rd ,c =( v min ) b w d=0. 293∗300∗737∗10−3 KN=64.85 KN
A sw 100.53 −3
s= Z f ywd cot ( θ )= ∗663.3∗347.83∗2.5∗10 mm=249.901 mm
V rd ,s 232.03
Take s=240 mm
Check minimum shear reinforcement
ρw = A sw / ( s bw sin ( α ) )
100.53
ρw = =0.0 01396
300∗240∗sin ( 90 )
0.08 √ f ck
ρw , min=
f yk
0.08 √ 20
ρw , min= =0.00 0894
400
ρw > ρw , min ok.
Maximum shear reinforcement spacing
s max =0.75 d=0.75∗737=552.75 mmtake 550 mm
Page 18 of 19
Provide ∅ 8 c /c 24 0 mm