Beruflich Dokumente
Kultur Dokumente
PROJECT :
- Temperature Standard Procedure Each Bend Temp. Range :- 850° To 1050°C (±25º PBM Parameter
Shall be freezed after MPQT) Bend Forming Report
Temperature Shall be Selected in such a way
so that Mechanical & Metallurgical properties
are Maintained after bend forming operation.
- Speed Standard Procedure Each Bend 25 ± 15 mm /Min. (To be freezed ± 25 mm
after Test bend results)
- Cooling Standard Procedure Each Bend Instant cooling with air & water jet distributed
uniformly across the circumference to heated
annular Zone.
- Radius Fixing …………….. Each Bend ± 1 % of Bending Nominal Radius
- Pyrometer Cust. Spec.4.5 Each BendUsing an Temp. Against Speed Record Chart
Setting optical pyrometer
and temperature
chart recorder.
…………… ……..
4.1 Post Bending Heat ---------------------- Not Required. Bends Are Fabricated Under NA NA
Treatment / Stress Controlled Process Parameters. The
Relieving Required Mechanical & Chemical Properties
are achieved during bending process.
The gauge shall consist of Two Gauging
5.0 Pig Test ……….. Each Bend Dimensional H W
Plates. Having A Diameter Equal to 90% of
Inspection Report
the Nominal Internal Diameter of the Pipe,
Connected Rigidly Together at a Distance
Equal to 500 mm.
6.0
6.1 Manual Ultrasonic Cust. Spec. Each Bend both Full Circumference of both ends shall be MUT Report H
W
Testing ( Bevel Ends ) ends of Bevel Manual Ultrasonically Tested for Laminations
surface Over a Length of 50mm. Laminar
UP TO 50 mm max.
imperfections shall not exceed the limits
given in the respective clauses of EN 10208-
2 and Specification for Main Line Pipe,
Document No
6.2 Manual Ultrasonic Cust. Spec. Each bend, All seam welds of bend manufactured from MUT Report H RW
Testing (100% Weld LSAW pipes shall be 100% MUT Tested.
100 % weld length
seam
Acceptance criteria as per API 5L & EN
10208-2 and Specification for Main Line
Pipe, Document No. shall apply.
Acceptance criteria as per accordance with
6.3 Magnetic Particle Cust. Spec. Each bend MPI Report H W
ISO 13665 & client spec.
Inspection
(Both transition zones
and the arc of the bend)
7.1 Bend Angle Cust Spec Each Bend ± 1˚ of The Specified Angle H 10 % RW
7.3 - Out Of Cust Spec Each Bend 2.0 % of Nominal outside diameter. Dimensional H 10 % RW
Roundness At Body More than 100 mm from bend end. Inspection Report
…… At Ends Over a As per Mother pipe Spec
Length of 100 mm
7.4 Bend Radius Cust Spec Each Bend ±1% of The Nominal Bend Radius Dimensional H 10 % RW
Inspection Report
7.5 Off Plane (Plane Of Cust Spec Cl 5.2.2 Each Bend As per client spec 5.2.2 H 10% RW
Bend)
The minimum length shall be 1D.
7.6 Tangent Length Cust Spec. Cl. 4.6 Each Bend at Both Dimensional H 10% RW
Ends Inspection Report
8.0 End Preparation API 5L Each Bend Bevel Angle - 30˚ (+ 5˚, - 0˚) Dimensional H 10% RW
Root Face - 1.6 mm (± 0.8 mm) Inspection Report
Squareness - 1.6 mm Max
9.0 WORKMANSHIP
As per Client Spec. 5.2.2
9.1 Bend Irregularity Cust Spec 5.2.2 If any H M
9.2 Inside Weld Bead Standard Procedure Each Bend Weld Material Shall Be Ground Flush Up to H M
Grinding 100 mm Minimum from Inside at Both Ends.
9.3 End Protector Cust Spec Cl-6.1 Each Bend Bend Shall Be Suitably Protected To Avoid H M
Any Damage During Transit By Means Of
Metallic Bevel Protectors.
M
Bend number shall be Cust Spec ………… The height of the figures shall be in the H
hard stamped on one range from 5 mm to 7 mm with a minimum
bevel of the bend, using impression of 0.2 mm. Only Bend No. shall
round steel stamps. be hard stamped.
Certificate
9.6 Release documents Standard Procedure Final Acceptance Release Note/ Inspection Certificate & H H
Material test certificate
9.7 Documentation / Cust Spec & All Documentation As Per Client Certificate H R
Certification StandardProcedure Specification
………….
9.8 Packing …… NA NA
B.0 Manufacturing Procedure Qualification Test(Proto Type Bends)- one finished pipeline bend per wall pressure class, preferably 45° shall be
tested
B.1 Pig Test Test Bend As Per Cl. 5.0 Of This QAP. Visual &Dim. Report H H
B.2 Non-Destructive Testing Test Bend As Per Cl. 6.0 Of This QAP Test Report H H
B.3 Visual & Dimension Test Bend As Per Cl. 7.0 & 9.0 Of This QAP Visual & Dim.Report H RW 10%
Acceptance Shall Be As Per CLIENT SPEC. &
B.4 Tensile test (base) Cust Spec Test Bend Mother Pipe MTC. Test Report H H
transverse one sample
each from following
location.bend arc, transition
zone and tangent section.