B/M # 8
U# 8 Tube lkg History
tube build
up
04-06-17 to Screen Tube 06-06-17 06-06-17
06-06-17 (04 nos), 04
nos SCW
insert, 01 no
WW tube
build up
(approx.. 47
mtr elevation)
27-07-17 to 06 nos Eco 02-08-17 02-08-17
02-08-17 tubes insert
(12 nos joint)
coil no.
1(1,2,3), coil
no 2 (1,2), coil
no 3 (1), 03
nos joint
SCW at LHS
manhole door,
buttering
welding at
soot blower
(LRSB 81 &
82 )mouth,
RHS manhole
door 03 nos
butter welding
done, Eco
lower bank
upper coil
(straight &
bend tubes)
coil no 2,8 & 9
from RHS
guard plate
fitted,
(Approx. 38.5
mtr elevation)
B/M # 8