BOILER MAINTENANCE (U# 8) DAILY MAINTENANCE LOG

DATE Work Descriptions


1. (a) ID Fan # 8A motor to Voith coupling alignment done:
22-12-2017 00
-0.03

-0.16 +0.07
+0.07 -0.12

-0.05
00

Axial1 Axial2

Axial Final (A1-A2) Radial


00 00.9

-0.04 00 5.36 5.36

-0.02 4.73

*(Coupling Gap: 10 MM)

(b) ID Fan # 8A Fan to Voith coupling alignment done:

00
00

-0.01 -0.01 00 00

-0.02
00

Axial1 Axial2

Axial Final (A1-A2) Radial


00
6. 00

5.36 5.35
-0.01 -0.01

-0.02 4.70

*(Coupling Gap: 220 MM)


BOILER MAINTENANCE (U# 8) DAILY MAINTENANCE LOG

DATE Work Descriptions


2. ID Fan # 8A coupling & necessary job is under progress.
3. Drum vent valve servicing & maintenance job under progress, lapping job under
progress, steam cutting observed.
4. Assisted at Oil transfer job from U #8 to U #7.
5. Coal feeder #8C discharge chute side scaffoldings job for the purpose of chute
dismantling is under progress.