Sie sind auf Seite 1von 62

ALLIED ENGINEERING CONSULTANTS (PVT) LTD

19-A, GULBERG - II, LAHORE M. 1


MEASUREMENT SHEET
Name of Project: Construction of Girls Hostel at Abbottabad Campus University of
Engineering and Technology N.W.F.P. Peshawar

Engineer's Cost Estimate


GIRLS HOSTEL
MEASUREMENT
SI. No. DESCRIPTION NO. Contents
Length Breadth Height
1. Excavation undressed

area P-1 1 370.00 Sft 7.00 2590.00

area P-2 1 271.00 Sft 5.00 1355.00

area P-3 1 554.00 Sft 3.00 1662.00

area P-3a 1 319.00 Sft 3.00 957.00

area P-4 1 1923.00 Sft 1.00 1923.00

Open area P-8 1 5200.00 Sft 5.00 26000.00

Total: 34487.00 Cft

Total: 976.58 m3

2 Excavation in foundations

F1 28 18.50 9.50 6.00 29526.00

F2 25 9.50 9.50 6.00 13537.50

strip footing 1 142.00 5.50 6.00 4686.00

external wall 1 515.00 3.50 6.00 10815.00

dinning hall, Kitchen 1 37.00 3.00 6.00 666.00

Kitchen 1 26.75 3.00 6.00 481.50

Oven 2 14.33 3.00 6.00 515.88

two seaters 6 13.00 2.50 5.00 975.00

sh 9 5.00 2.50 5.00 562.50

toilets 2 11.63 2.50 5.00 290.63

Stair Footing 2 5.50 3.00 4.00 132.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 2
MEASUREMENT SHEET

Plinth Toe Wall 1 520.00 2.00 3.00 3120.00

Steps 3 18.00 4.00 2.00 432.00

" 2 3.00 4.00 2.00 48.00

Deduction Footings

F2 -25 9.50 3.00 6.00 -4275.00

strip footing -1 180.00 3.00 6.00 -3240.00

Total: 58273.01 Cft

Total: 1650.14 m3

3 Termite proofing under foundations

at beds

F1 28 18.50 9.50 4921.00

F2 25 9.50 9.50 2256.25

strip footing 1 142.00 5.50 781.00

external wall 1 515.00 3.50 1802.50

dinning hall, Kitchen 1 37.00 3.00 111.00

Kitchen 1 26.75 3.00 80.25

Oven 2 14.33 3.00 85.98

two seaters 6 13.00 2.50 195.00

sh 9 5.00 2.50 112.50

toilets 2 11.63 2.50 58.13

Stair Footing 2 5.50 3.00 33.00

Plinth Toe Wall 1 520.00 2.00 1040.00

Steps 3 18.00 4.00 216.00

" 2 3.00 4.00 24.00

Deduction Footings

F1 -28 9.50 3.00 -798.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 3
MEASUREMENT SHEET

F2 -25 9.50 3.00 -712.50

strip footing -1 142.00 3.00 -426.00

Sides

F1 56 18.50 6.00 6216.00

F1 56 18.50 6.00 6216.00

F2 100 9.50 6.00 5700.00

strip footing 2 142.00 6.00 1704.00

external wall 2 515.00 6.00 6180.00

dinning hall, Kitchen 2 37.00 6.00 444.00

Kitchen 2 26.75 6.00 321.00

Oven 4 14.33 6.00 343.92

two seaters 12 13.00 5.00 780.00

sh 18 5.00 5.00 450.00

toilets 4 11.63 5.00 232.50

Stair Footing 4 5.50 5.00 110.00

Plinth Toe Wall 2 520.00 3.00 3120.00

Steps 6 18.00 3.00 324.00

" 4 3.00 3.00 36.00

Deduction Footings

F1 -56 9.50 6.00 -3192.00

strip footing -2 142.00 6.00 -1704.00

Under floors

two seaters 15 126.00 Sft 1890.00

" 1 139.50 Sft 139.50

office 1 154.25 Sft 154.25

visitor room 1 125.50 Sft 125.50


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 4
MEASUREMENT SHEET

dress 1 39.33 Sft 39.33

bath 1 30.00 Sft 30.00

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00

shower 2 17.50 Sft 35.00

dining hall 1 1256.50 Sft 1256.50

bearers 1 114.33 Sft 114.33

Oven 1 104.50 Sft 104.50

Pantry 1 127.25 Sft 127.25

kitchen 1 340.75 Sft 340.75

Bath 1 27.00 Sft 27.00

corridor/ent lobby/stair area 1 1368.18 Sft 1368.18

Plinth Protection 1 520.00 Sft 520.00

Total: 43561.12 Sft

Total: 4047.30 m2

Cement Concrete (brick/stone ballast) in


4.
foundations & Plinth (Ratio 1:4:8)

F1 28 18.50 9.50 0.25 1230.25

F2 25 9.50 9.50 0.25 564.06

strip footing 1 142.00 5.50 0.25 195.25

external wall 1 515.00 3.50 0.50 901.25

dinning hall, Kitchen 1 37.00 3.00 0.50 55.50

Kitchen 1 26.75 3.00 0.50 40.13

Oven 2 14.33 3.00 0.50 42.99

two seaters 6 13.00 2.50 0.50 97.50

sh 9 5.00 2.50 0.50 56.25


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 5
MEASUREMENT SHEET

toilets 2 11.63 2.50 0.50 29.06

Stair Footing 2 5.50 3.00 0.25 8.25

Plinth Toe Wall 1 520.00 2.00 0.25 260.00

Steps 3 18.00 4.00 0.25 54.00

" 2 3.00 4.00 0.25 6.00

Deduction Footings

F1 -28 9.50 3.00 0.25 -199.50

strip footing -1 182.00 3.00 0.25 -136.50

Under floors

Ground Floor

two seaters 15 126.00 Sft 0.25 472.50

" 1 139.50 Sft 0.25 34.88

office 1 154.25 Sft 0.25 38.56

visitor room 1 125.50 Sft 0.25 31.38

dress 1 39.33 Sft 0.25 9.83

bath 1 30.00 Sft 0.25 7.50

toilet 1 157.50 Sft 0.25 39.38

wc 4 17.50 Sft 0.25 17.50

shower 2 17.50 Sft 0.25 8.75

dining hall 1 1256.50 Sft 0.25 314.13

bearers 1 114.33 Sft 0.25 28.58

Oven 1 104.50 Sft 0.25 26.13

Pantry 1 127.25 Sft 0.25 31.81

kitchen 1 340.75 Sft 0.25 85.19

Bath 1 27.00 Sft 0.25 6.75

corridor/ent lobby/stair area 1 1368.18 Sft 0.25 342.05


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 6
MEASUREMENT SHEET

Plinth Protection 1 520.00 Sft 0.25 130.00

First Floor

two seaters 17 126.00 Sft 0.17 364.14

warden 1 186.00 Sft 0.17 31.62

dress 1 33.13 Sft 0.17 5.63

bath 1 30.00 Sft 0.17 5.10

common room 1 1256.50 Sft 0.17 213.61

toilet 1 157.50 Sft 0.17 26.78

wc 4 17.50 Sft 0.17 11.90

shower 2 17.50 Sft 0.17 5.95

corridor/ent lobby/stair area 1 1191.25 Sft 0.17 202.51

Terrace 1 813.25 Sft 0.17 138.25

Second Floor

two seaters 17 126.00 Sft 0.17 364.14

toilet 1 157.50 Sft 0.17 26.78

wc 4 17.50 Sft 0.17 11.90

shower 2 17.50 Sft 0.17 5.95

corridor/ent lobby/stair area 1 1032.00 Sft 0.17 175.44

Terrace 1 460.00 Sft 0.17 78.20

Total: 6497.28 Cft

Total: 183.99 m3

5 1:2:4 under floor

Ground Floor

visitor room 1 125.50 Sft 0.13 15.69

dress 1 39.33 Sft 0.13 4.92


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 7
MEASUREMENT SHEET

bath 1 30.00 Sft 0.13 3.75

toilet 1 157.50 Sft 0.13 19.69

wc 4 17.50 Sft 0.13 8.75

shower 2 17.50 Sft 0.13 4.38

dining hall 1 1256.50 Sft 0.13 157.06

Oven 1 104.50 Sft 0.13 13.06

Pantry 1 127.25 Sft 0.13 15.91

kitchen 1 340.75 Sft 0.13 42.59

Bath 1 27.00 Sft 0.13 3.38

corridor/ent lobby/stair area 1 1368.18 Sft 0.13 171.02

First Floor

bath 1 30.00 Sft 0.13 3.75

common room 1 1256.50 Sft 0.13 157.06

toilet 1 157.50 Sft 0.13 19.69

wc 4 17.50 Sft 0.13 8.75

shower 2 17.50 Sft 0.13 4.38

corridor/ent lobby/stair area 1 1191.25 Sft 0.13 148.91

Second Floor

toilet 1 157.50 Sft 0.13 19.69

wc 4 17.50 Sft 0.13 8.75

shower 2 17.50 Sft 0.13 4.38

corridor/ent lobby/stair area 1 1032.00 Sft 0.13 129.00

Total: 964.53 Cft

Total: 27.31 m3

6 R.C.C. Footing Concrete


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 8
MEASUREMENT SHEET

F1 28 18.00 9.00 1.50 6804.00

F2 25 9.00 9.00 1.50 3037.50

strip footing 1 142.00 5.00 1.25 887.50

Stair Footing 2 5.00 2.50 1.00 25.00

Total: 10754.00 Cft

Total: 304.53 m3

RCC in roof slab, beam, column &


7
other structural members

Ground floor

Stair footing walls 2 4.50 0.75 8.00 54.00

Column C1 28 1.25 1.00 20.75 726.25

C2 26 1.50 1.50 20.75 1213.88

Plinth Beams

external wall 1 515.33 1.25 1.25 805.20

corridor walls 1 420.00 0.75 1.25 393.75

dinning hall, Kitchen 1 37.00 0.75 1.25 34.69

Kitchen 1 26.75 0.75 1.25 25.08

Oven 2 14.33 0.75 1.25 26.87

two seaters 9 11.00 0.75 1.25 92.81

Beams

external wall 1 515.33 1.00 1.25 644.16

corridor walls 1 420.00 0.75 1.25 393.75

dinning hall, Kitchen 1 37.00 0.75 1.25 34.69

Kitchen 1 26.75 0.75 1.25 25.08

Oven 2 14.33 0.75 1.25 26.87


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 9
MEASUREMENT SHEET

two seaters 9 11.00 0.75 1.25 92.81

dinning hall 2 36.00 1.25 2.00 180.00

Stair Flights 4 12.50 4.50 0.50 112.50

Landings 2 44.50 sft 0.50 44.50

Steps 25 4.00 1.00 0.50 50.00

RCC slab 1 7226.0 Sft 0.42 3034.92

extra thick slab for dining hall 1 1400.00 Sft 0.08 112.00

Deductions. Stair area -1 97.85 Sft 0.50 -48.93

" -1 66.90 Sft 0.50 -33.45

Lintels

external wall 1 515.33 1.25 0.50 322.08

corridor walls 1 420.00 0.75 0.50 157.50

dinning hall, Kitchen 1 37.00 0.38 0.50 6.94

two seaters 9 11.00 0.38 0.50 18.56

" 6 13.00 0.38 0.50 14.82

toilets 2 11.63 0.38 0.50 4.42

Kitchen 1 26.75 0.75 0.50 10.03

Oven 2 14.33 0.75 0.50 10.75

two seaters 9 11.00 0.75 0.50 37.13

W1 9 18.00 1.50 0.50 121.50

W2 1 17.00 1.50 0.50 12.75

W3 2 16.00 1.50 0.50 24.00

W4 20 15.00 1.50 0.50 225.00

V1 7 7.00 1.50 0.50 36.75

V2 2 9.00 1.50 0.50 13.50

First floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 10
MEASUREMENT SHEET

Column C1 28 1.25 1.00 12.50 437.50

C2 23 1.50 1.50 12.50 646.88

Beams

external wall 1 506.75 1.00 1.25 633.44

corridor walls 1 380.25 0.75 1.25 356.48

two seaters 9 11.00 0.38 1.25 46.41

Common hall 2 36.00 1.25 2.00 180.00

Stair Flights 4 12.50 4.50 0.50 112.50

Landings 2 44.50 sft 0.50 44.50

Steps 25 4.00 1.00 0.50 50.00

Stair Flights 1 12.50 4.50 0.50 28.13

Landings 1 22.00 sft 0.50 11.00

Steps 6 4.00 1.00 0.50 12.00

RCC slab 1 6450.0 Sft 0.42 2709.00

extra thick slab for dining hall 1 1400.00 Sft 0.08 112.00

Deductions. Stair area -1 97.85 Sft 0.50 -48.93

" -1 66.90 Sft 0.50 -33.45

Lintels

external wall 1 506.75 1.00 0.50 253.38

corridor walls 1 380.25 0.75 0.50 142.59

two seaters 9 11.00 0.75 0.50 37.13

Common hall 2 36.00 1.25 0.50 45.00

Parapet 1 82.00 0.33 3.00 81.18

Planters Parapet 8 9.00 0.33 3.00 71.28

W1 7 18.00 1.50 0.50 94.50

W4 21 15.00 1.50 0.50 236.25


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 11
MEASUREMENT SHEET

V1 6 7.00 1.50 0.50 31.50

V2 2 9.00 1.50 0.50 13.50

Second floor

Column C1 27 1.25 1.00 12.50 421.88

C2 20 1.50 1.50 12.50 562.50

Beams

external wall 1 474.75 1.00 1.25 593.44

corridor walls 1 338.00 0.75 1.25 316.88

two seaters 9 11.00 0.75 1.25 92.81

Stair Flights 2 12.50 4.50 0.50 56.25

Landings 1 44.50 sft 0.50 22.25

Steps 13 4.00 1.00 0.50 26.00

RCC slab 1 7100.0 Sft 0.42 2982.00

Deductions. Stair area -1 97.85 Sft 0.50 -48.93

Lintels

external wall 1 474.75 1.25 0.50 296.72

corridor walls 1 338.00 0.75 0.50 126.75

two seaters 9 11.00 0.38 0.50 18.56

W4 18 15.00 1.50 0.50 202.50

V1 5 7.00 1.50 0.50 26.25

V2 2 9.00 1.50 0.50 13.50

Mumty floor

Slab 1 386.00 Sft 0.42 162.12

Lintel

D1 1 68.00 0.75 0.50 25.50

W3 2 16.00 1.50 0.50 24.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 12
MEASUREMENT SHEET

Total: 21257.89 Cft

Total: 601.97 m3

8 Horizontal D.P.C

Ground Floor

External Wall 1 515.33 1.25 644.16

dinning hall, Kitchen 1 37.00 0.75 27.75

Kitchen 1 26.75 0.75 20.06

Oven 2 14.33 0.75 21.50

two seaters 6 13.00 0.38 29.64

sh 9 5.00 0.38 17.10

toilets 2 11.63 0.38 8.84

Total: 769.05 Sft

Total: 71.45 m2

9 Vertical D.P.C

External Wall 1 515.33 1.00 515.33

Total: 515.33 Sft

Total: 47.88 m2

10 Brick Masonry in foundation

external wall 1 515.33 1.50 6.00 4637.97

dinning hall, Kitchen 1 37.00 2.26 0.50 41.81

2nd step 1 37.00 1.88 0.50 34.78

3rd step 1 37.00 1.51 0.50 27.94

4th step 1 37.00 1.13 0.50 20.91

5th step 1 37.00 0.75 5.50 152.63


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 13
MEASUREMENT SHEET

Kitchen 1 26.75 2.26 0.50 30.23

2nd step 1 26.75 1.88 0.50 25.15

3rd step 1 26.75 1.51 0.50 20.20

4th step 1 26.75 1.13 0.50 15.11

5th step 1 26.75 0.75 5.50 110.34

Oven 2 14.33 2.26 0.50 32.39

2nd step 2 14.33 1.88 0.50 26.94

3rd step 2 14.33 1.51 0.50 21.64

4th step 2 14.33 1.13 0.50 16.19

5th step 2 14.33 0.75 5.50 118.22

two seaters 6 13.00 1.88 0.50 73.32

2nd step 6 13.00 1.51 0.50 58.89

3rd step 6 13.00 1.13 0.50 44.07

4th step 6 13.00 0.75 0.50 29.25

5th step 6 13.00 0.38 5.00 148.20

sh 9 5.00 1.88 0.50 42.30

2nd step 9 5.00 1.51 0.50 33.98

3rd step 9 5.00 1.13 0.50 25.43

4th step 9 5.00 0.75 0.50 16.88

5th step 9 5.00 0.38 5.00 85.50

toilets 2 11.63 1.88 0.50 21.86

2nd step 2 11.63 1.51 0.50 17.55

3rd step 2 11.63 1.13 0.50 13.14

4th step 2 11.63 0.75 0.50 8.72

5th step 2 11.63 0.38 5.00 44.18

Plinth wall 1 520.00 1.13 0.50 293.80


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 14
MEASUREMENT SHEET

2nd step 1 520.00 0.75 4.00 1560.00

Steps 3 18.00 3.75 4.00 810.00

2nd step 3 18.00 2.75 0.50 74.25

3rd step 3 18.00 1.75 0.50 47.25

4th step 3 18.00 0.75 0.50 20.25

Steps 2 3.00 4.00 2.00 48.00

2nd step 2 3.00 2.75 0.50 8.25

3rd step 2 3.00 1.75 0.50 5.25

4th step 2 3.00 0.75 0.50 2.25

Total: 8864.97 Cft

Total: 251.03 m3
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 15
MEASUREMENT SHEET

11 Brick masonry in S/S 9"thick

Ground Floor

external wall 1 515.33 0.75 12.00 4637.97

corridor walls 1 420.00 0.75 12.00 3780.00

dinning hall, Kitchen 1 37.00 0.75 12.00 333.00

Kitchen 1 26.75 0.75 12.00 240.75

Oven 2 14.33 0.75 12.00 257.94

Lintels doors

D1 -5 6.50 0.75 0.50 -12.19

D2 -22 5.00 0.75 0.50 -41.25

D3 -2 4.50 0.75 0.50 -3.38

D5 -1 5.00 0.75 0.50 -1.88

Lintels Windows

W1 -9 7.50 0.75 0.75 -37.97

W2 -1 6.50 0.75 0.75 -3.66

W3 -2 5.50 0.75 0.75 -6.19

W4 -20 4.50 0.75 0.50 -33.75

V1 -7 3.50 0.75 0.50 -9.19

V2 -2 5.50 0.75 0.50 -4.13

Doors

D1 -5 5.00 0.75 8.50 -159.38

D2 -22 3.50 0.75 8.50 -490.88

D3 -2 3.00 0.75 8.50 -38.25

D5 -1 3.50 0.75 8.50 -22.31

Windows

W1 -9 6.00 0.75 5.50 -222.75


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 16
MEASUREMENT SHEET

W2 -1 5.00 0.75 5.50 -20.63

W3 -2 4.00 0.75 5.50 -33.00

W4 -20 3.00 0.75 5.50 -247.50

V1 -7 2.00 0.75 2.00 -21.00

V2 -2 4.00 0.75 2.00 -12.00

Total: 7828.41 Cft

Total: 221.68 m3

12 Brick masonry in S/S 9"thick

First Floor

external wall 1 506.75 0.75 12.50 4750.78

corridor walls 1 380.25 0.75 12.50 3564.84

Lintels doors

D1 -4 6.50 0.75 0.50 -9.75

D2 -18 5.00 0.75 0.50 -33.75

D3 -1 4.50 0.75 0.50 -1.69

Lintels Windows

W1 -7 7.50 0.75 0.75 -29.53

W4 -21 4.50 0.75 0.50 -35.44

V1 -6 3.50 0.75 0.50 -7.88

V2 -2 5.50 0.75 0.50 -4.13

Doors

D1 -4 5.00 0.75 8.50 -127.50

D2 -18 3.50 0.75 8.50 -401.63

D3 -1 3.00 0.75 8.50 -19.13

Windows

W1 -7 6.00 0.75 5.50 -173.25


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 17
MEASUREMENT SHEET

W4 -21 3.00 0.75 5.50 -259.88

V1 -6 2.00 0.75 2.00 -18.00

V2 -2 4.00 0.75 2.00 -12.00

Total: 7182.09 Cft

Total: 203.38 m3

13 Brick masonry in S/S 9"thick

Second Floor

external wall 1 474.75 0.75 12.50 4450.78

corridor walls 1 338.00 0.75 14.00 3549.00

Lintels doors

D1 -1 6.50 0.75 0.50 -2.44

D2 -18 5.00 0.75 0.50 -33.75

D3 -1 4.50 0.75 0.50 -1.69

Lintels Windows

W4 -18 4.50 0.75 0.50 -30.38

V1 -5 3.50 0.75 0.50 -6.56

V2 -2 5.50 0.75 0.50 -4.13

Doors

D1 -1 6.50 0.75 0.50 -2.44

D2 -18 5.00 0.75 0.50 -33.75

D3 -1 4.50 0.75 0.50 -1.69

Windows

W4 -18 3.00 0.75 5.50 -222.75

V1 -5 2.00 0.75 2.00 -15.00

V2 -2 4.00 0.75 2.00 -12.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 18
MEASUREMENT SHEET

Mumty Floor

external wall 1 68.00 0.75 10.00 510.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 19
MEASUREMENT SHEET

Lintel Door

D1 -1 4.50 0.75 0.50 -1.69

Doors

D1 -1 3.00 0.75 8.50 -19.13

Total: 8122.41 Cft

Total: 230.01 m3

14 Brick Masonry S/S 4½ thick 1:4

Ground Floor

external wall 1 515.33 0.38 12.50 2415.61

two seaters 9 11.00 0.38 12.50 464.06

" 6 13.00 0.38 12.50 370.50

sh 9 5.00 0.38 7.50 128.25

toilets 2 11.63 0.38 12.50 110.44

Lintels doors

D4 -9 4.00 0.38 0.50 -6.84

Doors

D4 -9 2.50 0.38 7.00 -59.85

Lintels Windows

W1 -9 7.50 0.38 0.75 -19.24

W2 -1 6.50 0.38 0.75 -1.85

W3 -2 5.50 0.38 0.75 -3.14

W4 -20 4.50 0.38 0.50 -17.10

V1 -7 3.50 0.38 0.50 -4.66

V2 -2 5.50 0.38 0.50 -2.09

Windows
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 20
MEASUREMENT SHEET

W1 -9 6.00 0.38 5.50 -112.86

W2 -1 5.00 0.38 5.50 -10.45

W3 -2 4.00 0.38 5.50 -16.72

W4 -20 3.00 0.38 5.50 -125.40

V1 -7 2.00 0.38 2.00 -10.64

V2 -2 4.00 0.38 2.00 -6.08

Total: 3091.95 Cft

Total: 87.56 m3

15 Brick Masonry S/S 4½ thick 1:4

First Floor

external wall 1 506.75 0.38 12.50 2375.39

two seaters 9 11.00 0.38 12.50 464.06

" 6 13.00 0.38 12.50 370.50

sh 7 5.00 0.38 7.50 99.75

toilets 2 11.63 0.38 12.50 110.44

Lintels doors

D4 -7 4.00 0.38 0.50 -5.32

Doors

D4 -7 2.50 0.38 7.00 -46.55

Lintels Windows

W1 -7 7.50 0.38 0.75 -14.96

W4 -21 4.50 0.38 0.50 -17.96

V1 -6 3.50 0.38 0.50 -3.99

V2 -2 5.50 0.38 0.50 -2.09

Windows

W1 -7 6.00 0.38 5.50 -87.78


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 21
MEASUREMENT SHEET

W4 -21 3.00 0.38 5.50 -131.67

V1 -6 2.00 0.38 2.00 -9.12

V2 -2 4.00 0.38 2.00 -6.08

Total: 3094.62 Cft

Total: 87.63 m3

16 Brick Masonry S/S 4½ thick 1:4

Second Floor

external wall 1 474.75 0.38 12.50 2225.39

two seaters 9 11.00 0.38 14.00 519.75

" 6 13.00 0.38 14.00 414.96

sh 7 5.00 0.38 7.50 99.75

toilets 2 11.63 0.38 14.00 123.69

Lintels doors

D4 -6 4.00 0.38 0.50 -4.56

Doors

D4 -6 4.00 0.38 0.50 -4.56

Lintels Windows

W4 -18 4.50 0.38 0.50 -15.39

V1 -5 3.50 0.38 0.50 -3.33

V2 -2 5.50 0.38 0.50 -2.09

Windows

W4 -18 3.00 0.38 5.50 -112.86

V1 -5 2.00 0.38 2.00 -7.60

V2 -2 4.00 0.38 2.00 -6.08

Total: 3227.08 Cft


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 22
MEASUREMENT SHEET

Total: 91.38 m3
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 23
MEASUREMENT SHEET

17 Sand filling under floor

Ground Floor

two seaters 15 126.00 Sft 0.25 472.50

" 1 139.50 Sft 0.25 34.88

office 1 154.25 Sft 0.25 38.56

visitor room 1 125.50 Sft 0.25 31.38

dress 1 39.33 Sft 0.25 9.83

bath 1 30.00 Sft 0.25 7.50

toilet 1 157.50 Sft 0.25 39.38

wc 4 17.50 Sft 0.25 17.50

shower 2 17.50 Sft 0.25 8.75

dining hall 1 1256.50 Sft 0.25 314.13

bearers 1 114.33 Sft 0.25 28.58

Oven 1 104.50 Sft 0.25 26.13

Pantry 1 127.25 Sft 0.25 31.81

kitchen 1 340.75 Sft 0.25 85.19

Bath 1 27.00 Sft 0.25 6.75

corridor/ent lobby/stair area 1 1368.18 Sft 0.25 342.05

Total: 1494.90 Cft

Total: 42.33 m3

23 Floor topping of concrete 1:2:4

Plinth Protection 1 520.00 3.00 1560.00

Total: 1560.00 Sft

Total: 144.94 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 24
MEASUREMENT SHEET

24 Terrazzo Flooring in grey cement

Ground Floor

two seaters 15 126.00 Sft 1890.00

" 1 139.50 Sft 139.50

office 1 154.25 Sft 154.25

dress 1 39.33 Sft 39.33

bearers 1 114.33 Sft 114.33

First Floor

two seaters 17 126.00 Sft 2142.00

warden 1 186.00 Sft 186.00

dress 1 33.13 Sft 33.13

Terrace 1 813.25 Sft 813.25

Second Floor

two seaters 17 126.00 Sft 2142.00

Terrace 1 460.00 Sft 460.00

Mumty Floor

1 250.00 Sft 250.00

Total: 8363.79 Sft

Total: 777.09 m2

25 Terrazzo Skirting in grey cement

Ground Floor

two seaters 15 47.25 Rft 0.50 354.38

" 1 49.00 Rft 0.50 24.50

office 1 53.25 Rft 0.50 26.63

dress 1 25.75 Rft 0.50 12.88


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 25
MEASUREMENT SHEET

bearers 1 43.25 Rft 0.50 21.63

First Floor

two seaters 17 47.25 Rft 0.50 401.63

warden 1 58.00 Rft 0.50 29.00

dress 1 23.25 Rft 0.50 11.63

Terrace 1 121.75 Rft 0.50 60.88

Second Floor

two seaters 17 47.25 Rft 0.50 401.63

Terrace 1 92.50 Rft 0.50 46.25

Mumty Floor

1 68.00 Rft 0.50 34.00

Total: 1425.00 Sft

Total: 132.40 m2

26 Coloured Ceramic Tiles

Ground Floor

bath 1 30.00 Sft 30.00

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00

shower 2 17.50 Sft 35.00

Bath 1 27.00 Sft 27.00

First Floor

bath 1 30.00 Sft 30.00

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 26
MEASUREMENT SHEET

shower 2 17.50 Sft 35.00

Second Floor

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00

shower 2 17.50 Sft 35.00

Total: 874.50 Sft

Total: 81.25 m2

27 Coloured ceramic Tiles Dado

Ground Floor

bath 1 30.00 Sft 7.00 210.00

toilet 1 157.50 Sft 7.00 1102.50

wc 4 17.50 Sft 7.00 490.00

shower 2 17.50 Sft 7.00 245.00

Bath 1 27.00 Sft 7.00 189.00

First Floor

bath 1 30.00 Sft 7.00 210.00

toilet 1 157.50 Sft 7.00 1102.50

wc 4 17.50 Sft 7.00 490.00

shower 2 17.50 Sft 7.00 245.00

Second Floor

toilet 1 157.50 Sft 7.00 1102.50

wc 4 17.50 Sft 7.00 490.00

shower 2 17.50 Sft 7.00 245.00

Total: 6121.50 Sft


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 27
MEASUREMENT SHEET

Total: 568.75 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 28
MEASUREMENT SHEET
12" x 12"x 3/4" Supper white marble Flooring
28
with Black Marble Border

Ground Floor

visitor room 1 125.50 Sft 125.50

corridor/ent lobby/stair area 1 1368.18 Sft 1368.18

Riser 48 4.00 0.50 96.00

Tread 48 4.00 1.17 224.64

Landing 2 32.00 Sft 64.00

Steps 3 18.00 4.00 216.00

" 9 18.00 0.50 81.00

First Floor

common room 1 1256.50 Sft 1256.50

corridor/ent lobby/stair area 1 1191.25 Sft 1191.25

Riser 48 4.00 0.50 96.00

Tread 48 4.00 1.17 224.64

Landing 2 32.00 Sft 64.00

Riser 12 3.00 0.50 18.00

Tread 12 3.00 1.17 42.12

Landing 1 18.00 Sft 18.00

Second Floor

corridor/ent lobby/stair area 1 1032.00 Sft 1032.00

Riser 24 4.00 0.50 48.00

Tread 24 4.00 1.17 112.32

Landing 1 32.00 Sft 32.00

Total: 6310.15 Sft

Total: 586.28 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 29
MEASUREMENT SHEET
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 30
MEASUREMENT SHEET

29 Supper white marble 3/8"x6"x12" Skirting

Ground Floor

visitor room 1 47.00 Rft 0.50 23.50

corridor/ent lobby/stair area 1 420.00 Rft 0.50 210.00

First Floor

common room 1 142.00 Rft 0.50 71.00

corridor/ent lobby/stair area 1 380.25 Rft 0.50 190.13

Second Floor

corridor/ent lobby/stair area 1 338.00 Rft 0.50 169.00

Total: 663.63 Sft

Total: 61.66 m2

30 1'X1' Tiles flooring

Ground Floor

dining hall 1 1256.50 Sft 1256.50

Oven 1 104.50 Sft 104.50

Pantry 1 127.25 Sft 127.25

kitchen 1 340.75 Sft 340.75

On walls

dining hall 1 142.00 Rft 4.00 568.00

Oven 1 43.58 Rft 4.00 174.32

Pantry 1 47.25 Rft 4.00 189.00

kitchen 1 75.50 Rft 4.00 302.00

Total: 3062.32 Sft

Total: 284.52 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 31
MEASUREMENT SHEET

31 Slab Plaster 3/8" thick 1:3 to R.C.C. Slabs

Ground Floor

two seaters 15 126.00 Sft 1890.00

" 1 139.50 Sft 139.50

office 1 154.25 Sft 154.25

visitor room 1 125.50 Sft 125.50

dress 1 39.33 Sft 39.33

bath 1 30.00 Sft 30.00

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00

shower 2 17.50 Sft 35.00

dining hall 1 1256.50 Sft 1256.50

bearers 1 114.33 Sft 114.33

Oven 1 104.50 Sft 104.50

Pantry 1 127.25 Sft 127.25

kitchen 1 340.75 Sft 340.75

Bath 1 27.00 Sft 27.00

corridor/ent lobby/stair area 1 1368.18 Sft 1368.18

First Floor

two seaters 17 126.00 Sft 2142.00

warden 1 186.00 Sft 186.00

dress 1 33.13 Sft 33.13

bath 1 30.00 Sft 30.00

common room 1 1256.50 Sft 1256.50

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 32
MEASUREMENT SHEET

shower 2 17.50 Sft 35.00

corridor/ent lobby/stair area 1 1191.25 Sft 1191.25

Second Floor

two seaters 17 126.00 Sft 2142.00

toilet 1 157.50 Sft 157.50

wc 4 17.50 Sft 70.00

shower 2 17.50 Sft 35.00

corridor/ent lobby/stair area 1 1032.00 Sft 1032.00

Mumty Floor

1 250.00 Sft 250.00

Total: 14767.47 Sft

Total: 1372.06 m2

32 Wall Plaster (1:4)

Internal Plaster

Ground Floor

two seaters 15 47.25 Rft 12.00 8505.00

" 1 49.00 Rft 12.00 588.00

office 1 53.25 Rft 12.00 639.00

visitor room 1 47.00 Rft 12.00 564.00

dress 1 25.75 Rft 12.00 309.00

bath 1 22.00 Rft 5.00 110.00

toilet 1 66.25 Rft 5.00 331.25

wc 4 17.00 Rft 5.00 340.00

shower 2 17.00 Rft 5.00 170.00

dining hall 1 142.00 Rft 18.00 2556.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 33
MEASUREMENT SHEET

bearers 1 43.25 Rft 12.00 519.00

Oven 1 43.58 Rft 12.00 522.96

Pantry 1 47.25 Rft 12.00 567.00

kitchen 1 75.50 Rft 12.00 906.00

Bath 1 21.00 Rft 5.00 105.00

corridor/ent lobby/stair area 1 420.00 Rft 12.00 5040.00

First Floor

two seaters 17 47.25 Rft 12.00 9639.00

warden 1 58.00 Rft 12.00 696.00

dress 1 23.25 Rft 12.00 279.00

bath 1 22.00 Rft 5.00 110.00

common room 1 142.00 Rft 18.00 2556.00

toilet 1 66.25 Rft 5.00 331.25

wc 4 17.00 Rft 5.00 340.00

shower 2 17.00 Rft 5.00 170.00

corridor/ent lobby/stair area 1 380.25 Rft 12.00 4563.00

Second Floor

two seaters 17 47.25 Rft 14.00 11245.50

toilet 1 66.25 Rft 5.00 331.25

wc 4 17.00 Rft 5.00 340.00

shower 2 17.00 Rft 5.00 170.00

corridor/ent lobby/stair area 1 338.00 Rft 14.00 4732.00

Mumty Floor

1 68.00 Rft 10.00 680.00

Sub Total: 57955.21 Sft

1/2" thick Total: 2692.34 m2


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 34
MEASUREMENT SHEET

3/4" thick Total: 2692.34 m2


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 35
MEASUREMENT SHEET

33 Wall Plaster (1:4)

External Plaster

External wall 1 506.00 13.00 6578.00

" 1 474.00 13.00 6162.00

" 1 64.00 10.00 640.00

Planters Parapet 2 9.00 3.00 54.00

Parapet 1 62.00 3.00 186.00

Planters Parapet 2 9.00 3.00 54.00

Total: 13674.00 Sft

Total: 635.23 m2

34 Distemper Paint

Qty as per internal plaster of walls 57955.21

Qty as per internal plaster of roof 14767.47

Deduction Doors -2 2692.75 -5385.50

Deduction Windows -1 1737.00 -1737.00

Total: 65600.18 Sft

Total: 6094.97 m2

35 Deodar Wooden Panel doors

Ground floor

D1 5 5.00 8.50 212.50

D2 22 3.50 8.50 654.50

D3 2 3.00 8.50 51.00

D4 9 2.50 7.00 157.50

D5 1 3.50 8.50 29.75


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 36
MEASUREMENT SHEET

First floor

D1 4 5.00 8.50 170.00

D2 18 3.50 8.50 535.50

D3 1 3.00 8.50 25.50

D4 7 2.50 7.00 122.50

Second floor

D1 1 5.00 8.50 42.50

D2 18 3.50 8.50 535.50

D3 1 3.00 8.50 25.50

D4 6 2.50 7.00 105.00

Mumty floor

D3 1 3.00 8.50 25.50

Total: 2692.75 Sft

Total: 250.19 m2

36 Paint doors & windows

Qty as per doors 2 2692.75 5385.50

Total: 5385.50 Sft

Total: 500.37 m2

37 painting with snowcem / weathersheild

Qty as per External Plaster 1 13674.00 13674.00

First floor

W1 -7 6.00 5.50 -231.00

W4 -21 3.00 5.50 -346.50

V1 -6 2.00 2.00 -24.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 37
MEASUREMENT SHEET

V2 -2 4.00 2.00 -16.00

Second floor

W4 -18 3.00 5.50 -297.00

V1 -5 2.00 2.00 -20.00

V2 -2 4.00 2.00 -16.00

Mumty floor

W3 -2 4.00 5.50 -44.00

Total: 12679.50 Sft

Total: 1178.06 m2

38 M.S. Grill railing

1 19.50 2.50 48.75

1 27.00 2.50 67.50

Total: 116.25 Sft

Total: 10.80 m2

39 Stair Railing

2 25.00 50.00

3 26.00 78.00

1 22.00 22.00

Total: 150.00 Rft

Total: 45.72 m

40 Aluminium Windows

Ground floor

W1 9 6.00 5.50 297.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 38
MEASUREMENT SHEET

W2 1 5.00 5.50 27.50

W3 2 4.00 5.50 44.00

W4 20 3.00 5.50 330.00

V1 7 2.00 2.00 28.00

V2 2 4.00 2.00 16.00

First floor

W1 7 6.00 5.50 231.00

W4 21 3.00 5.50 346.50

V1 6 2.00 2.00 24.00

V2 2 4.00 2.00 16.00

Second floor

W4 18 3.00 5.50 297.00

V1 5 2.00 2.00 20.00

V2 2 4.00 2.00 16.00

Mumty floor

W3 2 4.00 5.50 44.00

Total: 1737.00 Sft

Total: 161.39 m2

41 Kitchen Counter Cabinet

1 33.00 33.00

Total: 33.00 Rft

Total: 10.06 m

42 Kitchen Wall Mounted Cabinet

1 36.00 36.00
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 39
MEASUREMENT SHEET

Total: 36.00 Rft

Total: 10.97 m

43 M.S. Solid Bar grill

Ground floor

W1 9 6.00 5.50 297.00

W2 1 5.00 5.50 27.50

W3 2 4.00 5.50 44.00

W4 20 3.00 5.50 330.00

V1 7 2.00 2.00 28.00

V2 2 4.00 2.00 16.00

First floor

W1 7 6.00 5.50 231.00

W4 21 3.00 5.50 346.50

V1 6 2.00 2.00 24.00

V2 2 4.00 2.00 16.00

Second floor

W4 18 3.00 5.50 297.00

V1 5 2.00 2.00 20.00

V2 2 4.00 2.00 16.00

Mumty floor

W3 2 4.00 5.50 44.00

Total: 1737.00 Sft

Total: 161.39 m2

44 PCC Khapprial Tiles


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 40
MEASUREMENT SHEET

Roof 1 7200.0 7200.00

Total: 7200.00 Sft

Total: 668.96 m2

Precast PCC 1:2:4 coloured


44
tiles cladding
External walls 1 515.0 15.00 7725.00

W1 -9 6.00 5.50 -297.00

W2 -1 5.00 5.50 -27.50

W3 -2 4.00 5.50 -44.00

W4 -20 3.00 5.50 -330.00

V1 -7 2.00 2.00 -28.00

V2 -2 4.00 2.00 -16.00

Total: 6982.50 Sft

Total: 648.75 m2

44 Glass Blocks

46 2.00 5.00 460.00

Total: 460.00 Sft

Total: 42.74 m2

Insulation between cavity walls, 20mm


45
jambolon sheet

Ground Floor

external wall 1 515.33 15.00 7729.95

ded

W1 -9 6.00 5.50 -297.00


ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 41
MEASUREMENT SHEET

W2 -1 5.00 5.50 -27.50

W3 -2 4.00 5.50 -44.00

W4 -20 3.00 5.50 -330.00

V1 -7 2.00 2.00 -28.00

V2 -2 4.00 2.00 -16.00

First Floor

external wall 1 506.00 13.00 6578.00

Parapet 1 62.00 3.00 186.00

ded

W1 -7 6.00 5.50 -231.00

W4 -21 3.00 5.50 -346.50

V1 -6 2.00 2.00 -24.00

V2 -2 4.00 2.00 -16.00

Second Floor

external wall 1 474.75 16.00 7596.00

Parapet 1 76.00 1.00 76.00

ded

W4 -18 3.00 5.50 -297.00

V1 -5 2.00 2.00 -20.00

V2 -2 4.00 2.00 -16.00

Mumty Floor

external wall 1 68.00 16.00 1088.00

Mumty floor

W3 -2 4.00 5.50 -44.00

Total: 21516.95 Sft

Total: 1999.16 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 42
MEASUREMENT SHEET

46 Wardrobe

17 5.00 12.00 1020.00

18 5.00 2.50 225.00

17 5.00 2.50 212.50

Total: 1457.50 Sft

Total: 135.42 m2

47 M.S. pressed sheet Chowcket 10"x 2"

Ground floor

D1 5 5.00 8.50 212.50

D2 22 3.50 8.50 654.50

D3 2 3.00 8.50 51.00

D5 1 3.50 8.50 29.75

First floor

D1 4 5.00 8.50 170.00

D2 18 3.50 8.50 535.50

D3 1 3.00 8.50 25.50

Second floor

D1 1 5.00 8.50 42.50

D2 18 3.50 8.50 535.50

D3 1 3.00 8.50 25.50

Mumty floor

D3 1 3.00 8.50 25.50

Total: 2307.75 Sft

Total: 214.42 m2

48 M.S. pressed sheet Chowcket 6"x 2"

Ground floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 43
MEASUREMENT SHEET

D4 9 2.50 7.00 157.50

First floor

D4 7 2.50 7.00 122.50

Second floor

D4 6 2.50 7.00 105.00

Total: 385.00 Sft

Total: 35.77 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU44
19-A GULBERG II, LAHORE

Name of Project: Construction of Girls Hostel at Abbottabad Campus University of Engineering


and Technology N.W.F.P. Peshawar

GIRLS HOSTEL
Engineer's Cost Estimate
AS PER COMPOSITE SCHEDULE OF RATES 1999
(GOVERNMENT OF THE NWFP)
(Civil Works)

S.No. DESCRIPTION UNIT RATE QUANTITY AMOUNT

Chapter-3
Earthwork
Borrow pit excavation undressed lead upto 50m in
03-04-b m3 33.18 976.58 32402.98
Hard soil
Extra for every 25 m extra lead or part thereof for
03-17-a m3 11.60 976.58 11328.35
earthwork soft, ordinary, hard & very hard
Dressing & levelling earth to designed sections
03-19-a m3 1.67 976.58 1630.89
Ashes,k sand, sitt or soft soil
Excavation in foundation of building. bridges etc
03-23-c m3 47.47 1650.14 78332.09
complete : In hard soil
Chapter-6
Concrete
Cement Concrete (brick/stone ballast) in foundations
06-03-b m3 1420.17 183.99 261291.28
& Plinth (Ratio 1:4:8)
Plain Cement Concrete incl. Placing, compacting,
06-05-f m3 2528.02 27.31 69047.90
finishing & curing (Ratio 1:2:4)
RCC in raft foundation slab, base slab of column
06-06-b-02 m3 3249.37 304.53 989514.78
& ret.wall etc, not I/c in 06-06. Type B (1:1.5:3)
RCC in roof slab, beam, column & other structural
06-06-a-02 m3 3717.26 601.97 2237670.20
members, insitu or precast. Type B (1:1.5:3)
Supply & fabricate M.S. reinforcement for
06-07-b tonne 29517.84 112.04 3307225.95
cement concrete (Deformed bars)
Damp proof of cem. Conc. 1:2:4 i/c bitumen coat,
06-22-a-02 m2 185.66 71.45 13265.90
1 layer polythene& 1 coat bitumen (2" thick)
Damp proof in c/s plaster, 1 layer polythene ,
06-23-a-06 m2 128.79 47.88 6166.44
1 coat bitumen Ratio 1:2 (0.75" thick)
Chapter –7
Brick Masonry
Pacca brick work in foundation and plinth in
07-04-a-04 m3 1739.8 251.03 436746.99
Cement, sand mortar 1:5
Pacca brick work in ground floor
07-05-a-04 m3 1859.19 221.68 412145.37
Cement, sand mortar 1:5
Pacca brick work in first floor
07-05-a-04 m3 1859.19 203.38 378118.50
Cement, sand mortar 1:5
Add extra labour on item No. 07-05 for brickwork in
07-06-a m3 63.50 203.38 12914.51
First floor
Pacca brick work in second floor
07-05-a-03 m3 1859.19 230.01 427623.51
Cement, sand mortar 1:4
Add extra labour on item No. 07-05 for brickwork in
07-06-b m3 1934.25 230.01 444887.70
Second floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU45
19-A GULBERG II, LAHORE

Pacca brick work in ground floor


07-05-a-03 m3 1934.25 87.56 169355.02
Cement, sand mortar 1:4
Pacca brick work in first floor
07-05-a-03 m3 1934.25 87.63 169501.47
Cement, sand mortar 1:4
Add extra labour on item No. 07-05 for brickwork in
07-06-a m3 63.50 87.63 5564.61
First floor
Pacca brick work in second floor
07-05-a-03 m3 1934.25 91.38 176756.27
Cement, sand mortar 1:4
Add extra labour on item No. 07-05 for brickwork in
07-06-b m3 149.64 91.38 13674.45
Second floor
Supplying and filling sand under floor or
07-30 m3 557.96 42.33 23619.33
plugging in wells
Chapter-10
Flooring
Provide & lay topping of concrete 1:2:4, incl
10-15-b surface finishing & dividing in panels : 1.5" thick m2 151.99 144.94 22029.58

Extra labour for each storey above ground for mosaic,


10-18 m2 11.76 1444.62 16988.72
conglomerate,tiles,stone & wood floor
1.5" thick mosaic flooring including rubbing &
10-22-a m2 333.39 777.09 259072.96
polishing complete : using grey cement
Mosaic dado or skirting complete as per specs
10-40-a-02 m2 463.56 132.40 61374.43
Using grey cement : 1/2" thick
Lay floor of approved coloured glazed tiles1/4"
10-25 m2 579.75 81.25 47105.02
thick laid in white cement & pigment complete
Glazed tile 1/4" thick dado jointed in white cement
10-38-b m2 629.58 568.75 358076.18
complete : Coloured Plain tiles
Provide & lay marble fine dressed stone flooring
10-26-a m2 1,052.49 586.28 617055.63
on surface in white cement complete: 3/4" thick
Provide & lay marble fine dressed stone dado or
10-41-a m2 952.53 61.66 58731.09
skirting in white cement complete : 3/8" thick
Provide & fix glass strip 1.5" wide for dividing
10-43-a m 9.35 777.09 7265.76
the floors into panels : 5mm thick
P/F ceramic floor Tiles (Emco,National or eq)
10-46-a m2 682.79 284.52 194269.39
Size : 12"x12"
Chapter-11
Surface Rendering
Cement plaster 1:3 upto 20' height:
11-08-a m2 46.01 1372.06 63128.41
3/8" thick
Cement plaster 1:4 upto 20' height:
11-09-b m2 48.33 2692.34 130120.57
1/2" thick
Cement plaster 1:4 upto 20' height:
11-09-b m2 48.33 635.23 30700.75
1/2" thick
Cement plaster 1:4 upto 20' height:
11-09-c m2 68.17 2692.34 183536.50
3/4" thick

11-22 Priming coat of chalk under distemper. m2 7.35 6094.97 44798.04

Distempering
11-23-a-03 m2 22.03 6094.97 134272.22
New surface: Three coats
Chapter-12
Wood work
First class deodar wood wrought joinery in doors
12-07-b m2 1638.98 250.19 410050
and windows, etc. complete 1-3/4" thick
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU46
19-A GULBERG II, LAHORE

S&F aluminium door/window, Premium 4" sect


12-53-d-01 m2 3032.72 161.39 489439
Sliding window
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU47
19-A GULBERG II, LAHORE

Chapter-13
Painting & Varnishing
Prepare & paint new surface. Doors & windows
13-06-c-01 m2 23.01 500.37 11513.55
Priming coat
Prepare & paint new surface. Doors & windows
13-06-c-02 m2 30.64 500.37 15331.39
Each subsequent coat of paint (2 coats)
Preparing surface and painting with snowcem /
13-38-a m2 43.13 1178.06 50809.89
weathersheild paint : First coat
Preparing surface and painting with snowcem /
13-38-b m2 46.58 1178.06 54874.21
weathersheild paint : 2nd & 3rd coat
Chapter-25
Iron Work
P&F terrace railing of 2"I/d conduit pipe 16 SWG
25-33 m2 785.7 10.80 8486.26
welded with 5/8"x5/8" sq bar 2.75' high complete
P&F stair railing of 2.5" I.d GI pipe, welded with
25-37 m 410.78 45.72 18781.09
5/8"x5/8" MS bars 2'-9" high, fixed in each step
Chapter-26
Miscellaneous
Spraying anti-termite liquid mixed with water in m2/
26-15 9.58 4047.30 38773.16
the ratio of 1:40 spray

Total C/O to Summary of Cost: 13005368.10

Chapter-14
Plumbing, Sanitary Installations & Gas Fittings

P&F glazed earthen ware WC European type


14-01-b Each 1297.64 9 11678.76
excl cost of seat & cover Coloured
P&F double seat & cover only : Bakelite
14-02-a Each 303.83 9 2734.47
Bakelite
P&F glazed earthen ware WC squatting type
14-03-b Each 1208.18 7 8457.26
with blut-in foot rests Coloured
P&F glazed earthen ware WHB complete
14-05-b-02 Each 1392.16 22 30627.52
Size 25"x18" : Coloured with pedestal
P&F stainless steel sink with drain board size
14-06 Each 1331.84 2 2663.68
48"x25" incl. Set of brackets waste pipe etc
P&F glazed earthen ware low down flushing
14-10-b Each 936.16 16 14978.56
cistern 3 gallons capacity : Coloured

14-13 P&F CP soap dish. Each 130.31 10 1303.10

14-15 P&F CP toilet paper holder Each 160.46 12 1925.52

14-16-a P&F CP towel rail : 24" long, 3/4" dia Each 184.59 7 1292.13

14-17 P&F best quality 5mm mirror 22"x16" size Each 588.86 22 12954.92

P&F best quality 5mm glass shelf 24"x5"


14-18-a Each 235.08 22 5171.76
with chromium plated brackets & railing

14-24-b P&F CP bib- cock, heavy type : 1/2" Each 244.91 16 3918.56

14-25 P&F 1/2" CP tee stop cock Each 250.94 80 20075.20

14-26-a P&F CP shower rose : 1/2" x 4" Each 297.99 6 1787.94


ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU48
19-A GULBERG II, LAHORE

14-27 P&F CP mixing valve for WHB, sink or shower Each 811.89 30 24356.70

P&F CI floor trap incl. CI grating & concrete


14-31-b Each 160.02 28 4480.56
chamber all round : 4"x3"
P&F 4" gully trap with PCC, incl. Masonry
14-33 Each 171.87 8 1374.96
chamber 1'x1' and PVC grating 6"x6"
Providing and fitting CI soil pipe with:
14-34-a-01 m 295.12 190 56072.80
Lead & yarn caulked joint : 4" dia
P&F CI specials, such as tees, bends etc
14-36-a Each 331.21 180 59617.80
Lead caulked joint

14-42-a P&F rubber plug with chain : 1.25" Each 23.59 23 542.57

14-43-a P&F waste pipe of PVC : 1.25" Each 30.18 23 694.14

14-46-a P&F angle iron brackets for : WHB and cistern Each 80.66 44 3549.04

14-46-b P&F angle iron brackets for : Sink Each 97.11 4 388.44

P&F 1/2" dia connection incl. Check nuts etc


14-47-a Each 29.65 60 1779.00
Plastic rubber connection
P&F GI pipe & incl. Specials complete
14-55-d m 138.91 72 10001.52
1" dia
P&F GI pipe & incl. Specials complete
14-55-e m 103.23 112 11561.76
3/4" dia
P&F GI pipe & incl. Specials complete
14-55-f m 80.02 54 4321.08
1/2" dia
P&F approved best quality gas water heaters
14-62-a Each 5319.67 1 5319.67
20 gallons capacity
P&F approved best quality gas water heaters
14-62-b Each 7498.00 2 14996.00
30 gallons capacity
P&F approved best quality gas water heaters
14-62-c Each 8705.50 3 26116.50
50 gallons capacity
Chapter-23
Sewerage
P&L RCC pipe, moulded with cement concrete
23-01-a m 146.3 15.00 2194.50
1:1.5:3, incl, cost of reinfcnt, testing etc : 4"
Chapter-24
Tube well and water supply
P&L cut, joint, test & disinfect GI pipe line
24-16-c-06 m 233.05 10.00 2330.50
Using light quality GI pipe : 2"i/d

Total C/O to Summary of Cost: 349266.92


ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU49
19-A GULBERG II, LAHORE

GIRLS HOSTEL
Engineer's Cost Estimate
NON SCHEDULE ITEMS
Civil Works
RATE AMOUNT
S.NO DESCRIPTION UNIT QUANTITY
(Rs.) (Rs.)
1 Providing / laying Kitchen counter cabinet with 7/8"
thick China Verona marble top with half round top
edge as per design / drawing comprising with 3/4"
thick laminated board with deodar wood lipping 1/2"
wide on all edges duly lacquer polish of approved
shade complete in all respects as per approval of the
Engineer.
m 3550.00 10.06 35707.75
2 Providing / laying Kitchen wall mounted cabinet as
per design / drawing comprising of 3/4" thick
laminated board with deodar wood lipping 1/2"x3/4"
on all edges duly lacquer polished of approved shade
complete in all respects as per approval of the
Engineer.
m 2565.00 10.97 28145.57
3 Providing / fabricating and erection of M.S. Solid Bar
grill for windows, duly antirust painted and complete
in all respect as per instruction / approval of the
Engineer.
m2 1345.00 161.39 217064.48
4 Providing and fixing Coloured pre cast PCC
Khapprial tiles fixed over base of ¾” thick cement
plaster 1:4 and Sika Lite Chemical or equivalent @ 1
Kg/ bag, rough surface to protect the external
moisture, complete as per drawings, as per
specifications and as directed by the Engineer-in-
Charge. m2 750.00 668.96 501718.85
5 Providing /Laying Precast R.C.C. 1:2:4 coloured Fair
Face Cladding 1.50" thick all as per architectural
design specifications, instructions of manufacturer and
engineer incharge. m2 810.00 648.75 525487.78
6 Providing /Laying glass block 75mm thick as per
architectural design specifications, instructions of
manufacturer and engineer incharge. m2 1900.00 42.74 81204.13
7 Providing / laying Wardrobe as per design / drawing
comprising of 3/4" thick laminated board box and
shutters with deodar wood lipping 1/2"x3/4" on all
edges, deodar wooden 1"x3"frame for shutter fixing,
locks, handles, caturs etc. duly lacquer polished to
wooden surface of approved shade complete in all
respects as per approval of the Engineer. m2 4015 135.42 543701.80
8 Providing and fixing M.S. pressed sheet 16 SWG
Chowcket 10"x 2" filled with 1:3:6 cement concrete
and deodar wooden border 2.50"x3/4" around frame
as per design including , including polish/painting
complete in all respect.
m2 1510.00 214.42 323766.84
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU50
19-A GULBERG II, LAHORE

9 Providing and fixing M.S. pressed sheet 16 SWG


Chowcket 6"x 2" filled with 1:3:6 cement concrete
and deodar wooden border 2.50"x3/4" around frame
as per design including , including polish/ painting
complete in all respect.
m2 1310.00 35.77 46859.61
10 Providing and fitting CI soil pipe with, Lead & yarn
caulked joint : 3" dia m 254 125.00 31750.00
11 Providing / installing Fire Extinguishers of dry
chemical 6 kg powder type. Each 2300 6.00 13800.00
12 Providing / installing Fire Extinguishers of 10 liters
water type. Each 2200 6.00 13200.00

Total C/O to Summary of Cost: 2362407


GS51

ALLIED ENGINEERING CONSULTANTS (PVT) LTD


19-A GULBERG II,LAHORE
Name of Project: Construction of Girls Hostel at Abbottabad Campus University of
Engineering and Technology N.W.F.P. Peshawar
Engineer's Cost Estimate
GIRLS HOSTEL
AS PER COMPOSITE SCHEDULE OF RATES 1999
(GOVERNMENT OF THE NWFP)
SUMMARY OF COST
Schedule Items

S.NO DESCRIPTION AMOUNT (RS) AMOUNT (RS)

Civil work

1 Civil work 13005368.10

2 Internal Water S & SI. 349266.92

Sub total 13354635.02

Add Premium 75% 10015976.26 23370611.28

3 Electrical work 868065.96

Add Premium 58% 503478.26 1371544.22

Non-schedule items

1 Civil work 2362406.82 2362406.82

2 Electrical work 443077.00 443077.00

Total C/O to Grand Summary of Cost: 27,547,639


N.W.F.P University of Engineering & Technology,
Abbotabad.
100-GIRL'S HOSTEL
Engineer's Cost Estimate
INTERNAL ELECTRICAL WORKS
(Schedule Items)
CSR-1999 (GOVT OF NWFP)
DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT Ref: SOR
(Rs) (Rs) Item/Page
(1) (2) (3) (4) (5) (6) (7)
General
All items of electrical works described under title
"Description" unless specifically indicated otherwise,
shall be deemed to be read in terms of supply, storing,
protecting, making, assembling, installing, applying,
laying, fixing, testing, commissioning, clearing etc. of
the same inclusive of but not limited to all materials,
labour, tools, plants equipments, appliances etc. as
required for the completion and maintenance 'of the
electrical work as per drawings, specifications, and/or
as directed by the Engineer Incharge.

a. All wiring to be done in R.C.C./PVC conduits


Trenches or otherwise specified/appropriate sizes,
underground, concealed in walls, columns, ceiling
and/or wherever required or directed under floor.

b. All back boxes to be of 16 SWG sheet steel concealed


in walls, columns or ceiling with provisions for
connection of earth wires, wherever specified or
directed black boxes to be installed on surface.

c. Install insulated earth conductor of specified size for


each lighting and power ccts.
d. All fan/light points, switches outlets DB's etc. shall be
earthed.
e. All light fixtures shall be approved.
IE-1 Supply and erection of PVC pipe for wiring purpose
including inspection boxes pull boxes, hooks, bend
tees etc. complete recessed in walls c-15, p-77
a) 1/2" i/d 18 Per. M 37.45 674.10 i-02b-01
b) 3/4" i/d 43 Per. M 43.73 1,880.39 i-02b-02
c) 1" i/d 2030 Per. M 46.98 95,369.40 i-02b-03
d) 11/2" i/d 13 Per. M 66.58 865.54 i-02b-05
e) 2" i/d 28 Per. M 87.27 2,443.56 i-02b-06
f) 3" i/d 61 Per. M 120.02 7,321.22 i-02b-07
g) 4" i/d 20 Per. M 150.58 3,011.60 i-02b-08
Based on Govt. of NWFP Schedule of Rates, 1999

BOQ- EXT-ELECT (52)


(1) (2) (3) (4) (5) (6) (7)

IE-2 Supply and erection of single core PVC insulated


copper conductor 250/440 volts grade BSS-2004)
cable in pre-land pipes etc. c-15, p-78
a) 3/0.029" (1.0mm ) 2
11 Per. M 9.16 100.76 i-05(a)
b) 3/0.036" (1.5mm ) 2
24 Per. M 11.34 272.16 i-05(b)
c) 7/0.029" (2.5mm2) 3598 Per. M 14.73 52,998.54 i-05(c)
d) 7/0.036" (4.0mm2) 46 Per. M 19.80 910.80 i-05(d)
e) 7/0.044" (6.0mm2) 1707 Per. M 31.79 54,265.53 i-05(e)
e) 7/0.064" (16mm ) 2
21 Per. M 58.95 1,237.95 i-05(f)
f) 19/0.064 (35mm2) 120 Per. M 83.61 10,033.20 i-05(g)

IE-3 Supply and erection of single core PVC insulated


sheated copper conductor 660/1100 volts grade cable
(BSS-2004) in preland pipes etc. c-15, p-78
a) 7/0.064" (16mm ) 2
60 Per. M 69.83 4,189.80 i-07(a)
b) 19/0.052" (25mm2) 130 Per. M 119.02 15,472.60 i-07(b)
c) 19/0.064" (35mm2) 6 Per. M 159.31 955.86 i-07(c)
d) 19/0.083" (70mm ) 2
28 Per. M 255.42 7,151.76 i-07(d)
e) 37/0.072" (95mm ) 2
15 Per. M 410.85 6,162.75 i-07(e)
f) 37/0.083" (120mm2) 25 Per. M 467.54 11,688.50 i-07(f)
g) 37/0.103 (185mm ) 2
183 Per. M 621.95 113,816.85 i-07(g)
IE-4 Supply and erection of M.S sheet boxes of 16 SWG 4"
deep with 3/16" thick backbite sheet top for recessed
wiring including making holes for regulator, switch,
plug etc.
c-15, p-79
a) 4"x4" 190 Per. M 77.58 14,740.20 i-09(a)
b) 7"x4" 54 Per. M 109.47 5,911.38 i-09(b)
c) 9"x4" 8 Per. M 135.32 1,082.56 i-09(c)
d) 10"x12" 6 Per. M 236.84 1,421.04 i-09(e)
IE-5 Supply and erection of call bell 220/250 volts fixed on
shall wood board 7"x4". 1 Each 51.20 51.20 c-15,p-80, i-16
IE-6 Supply and erection of bell Push or bed switch with 5
meter twin flexible wire 23/0.0076. 1 Each 54.82 54.82 c-15,p-80, i-17

IE-7 Supply and erection of switches 10/15 Amp. Recessed


(Piano) type. 3 Each 40.85 122.55 c-15,p-81, i-18

IE-8 Supply and erection of 3 pin switch and plug


combined recessed type. c-15,p-81,
a) 5 Amp. 344 Each 34.30 11,799.20 i-20-a
b) 10/15 Amp. 56 Each 43.95 2,461.20 i-20-b

IE-9 Supply & erection of Philips tube light i/c rod choke.
Starter with frame, flexible wire including connection
for ceiling rose etc. complete.
a) double rod TMS-240
2x40 Watts.EBE Ballast 8 Set 768.13 6,145.04 c-15,p-81,
b) Single rod TMS - 140 i-24-a
1x40 Watts.EBE Ballast 234 Set 314.02 73,480.68 i-24-b
IE-10 Supply and erection of copper tape including copper
staple & nails etc. c-15,p-83
size 2" wide 1/8" thick 40 Per. M 231.36 9,254.40 i-43-b
Based on Govt. of NWFP Schedule of Rates, 1999

BOQ- EXT-ELECT (53)


(1) (2) (3) (4) (5) (6) (7)
IE-11 Supply and erection of 1" dia and 1 meter long
lightning conductor copper rod with 5" spikes balls
and base etc. complete. 2 Each 1,232.58 2,465.16 c-15,p-83 , i-44
IE-12 Wiring light/fan/call bell point in 3/0.029" PVC
insulated bare cable (BSS-2004) in PVC pipe recessed
in wall and complete with wooden boxes and housing
switch with 3/16" thick white plastic sheet covering
upto 30' length with piano switch
only i/c cost of making and filling chase complete
finish. 321 Each 398.98 128,072.58 c-15,p-84 , i-50
IE-13 Wiring of 2/3-pin 5-Amp. plug point in 3/0.029" PVC
insulated bare cable (BSS-3004) in PVC pipe recessed
in the wall and complete with wooden boxes for
housing plug unit with 3/16" thick white
plastic sheet covering upto 20' length with combined/
separate wall socket & switch i/c cost of making and
filling chase complete to finish. 60 Each 307.01 18,420.60 c-15,p-84 , i-51
IE-14 Wiring of light point in 3/0-029" PVC insulated bare
cable (BSS-2004) in PVC pipe recessed in wall and
complete with wooden boxes for housing switch with
3/16" thick white plastic, sheet covering upto 45'
length with 5 AMP double control piano type

switch i/c cost of making and filling chase complete to


finish. 6 Each 651.43 3,908.58 c-15,p-84 , i-52
IE-15 Supply and erection of fancy wall type bracket light
with brass holder and fancy shade complete. c-15,p-84
a) Single 21 Each 264.55 5,555.55 i-55-a
b) Double 2 Each 453.94 907.88 i-55-b
IE-16 Supply and erection of double fluorescent tube light
fitting 2 Nos. 4' long, 40' watt with 2 Nos. chokes, 2
Nos. starters and cover with polystyrene louvre and
fixing with brass hooks and chain complete.
4 Each 943.57 3,774.28 c-15,p-84 , i-60
IE-17 Supply and erection of fluorescent tube light fitting i/c
4' rod, choke, starter, flexible wire and cover of
opalescent prospect in plain finish complete. c-15,p-84
a) Single 4 Each 453.27 1,813.08 i-61-a
b) Double 2 Each 972.00 1,944.00 i-61-b
IE-18 Supply and erection of flood light fitting with holder,
heat resistant clear glass and incandescent filament
lamp complete. c-15,p-85
a) 14" dia with 500-W lamp. 2 Each 1,259.85 2,519.70 i-66-a
b) 19.5" dia with 1000-W lamp. 2 Each 1,730.33 3,460.66 i-66-b
IE-19 Supply and erection of best quality AC ceiling fan
complete with G.I. rod, canopy blades and regulator.
c-15,p-85
a) 36" sweep 1 Each 1,491.26 1,491.26 i-68-a
b) 48" sweep 2 Each 1,744.59 3,489.18 i-68-b
c) 56" sweep 82 Each 1,769.93 145,134.26 i-68-c
IE-20 Supply and erection of best quality complete with
shutter and regulator Exhaust Fan. c-15,p-85
a) 12" sweep 4 Each 1,177.08 4,708.32 i-69-a
b) 16" sweep 1 Each 1,478.67 1,478.67 i-69-b
c) 18" sweep 13 Each 1,659.62 21,575.06 i-69-c

TOTAL 868,065.96
Based on Govt. of NWFP Schedule of Rates, 1999

BOQ- EXT-ELECT (54)


N.W.F.P University of Engineering & Technology,
Abbotabad.
100-GIRL'S HOSTEL
ENGINEER'S COST ESTIMATES
ELECTRICAL WORKS
(Non-Schedule Items)
Sr. DESCRIPTION QUANTITY UNIT UNIT RATE AMOUNT
No. (Rs.) (Rs.)
(1) (2) (3) (4) (5) (6)
General
All items of Electrical works described under title
"Description" unless specifically indicated other wise,
shall be deemed to be read in terms of supply, storing,
protecting, making, assembling, 'installing, applying,
laying, fixing, testing commissioning, clearing etc. of the
same inclusive of but not limited to all materials, labour,
tools, plants equipments, appliances etc. as required for
the completion and maintenance of the Electrical work as
per drawings specifications, and/or as directed by the
Engineer Incharge.

IE-01 LIGHT FITTINGS AND FIXTURES


Supply, installation, fixing, wiring, connection, testing and
commission of flauorescent fittings and fixtures, ceiling
mounted or ceiling suspended or installed in the false
ceiling or wall mounted, pole mounted, weather proof,
adjustable or non-adjustable, complete with

chokes, spring loaded rotary holders starter, power factor


correction capcitors, antiradio interference starters, ballast
with brackets and down rod, industrial
shade, brass lamp holder proper gasketting necessary
fixing accessories internal wiring, connection, earthing
terminal etc. These are to be installed as and where shown
on drawings or as required as per site conditions.
Complete in all respects. These will be
made of approved manufactures.
(A) Fluorescent Lights
These will consist of as described and equipped as above
but specified as under:-
i) Philips TMS-015/136 (EBE BALLAST) with 1x36 W 5 Nos 640.00 3,200.00
ii) Philips TMS-240 (EBE BALLAST) with 2x40 watt
lamps. 2 Nos 1,160.00 2,320.00
iii) Philips GKD-140 with 1x40 watt lamps 2 Nos 715.00 1,430.00
with proper shade (complete).
iv) Philips GKD-240 with 2x40 watt lamps. 1 Nos 1,250.00 1,250.00
v) Philips GMS-120 with 1x20 watt lamps. 24 Nos 340.00 8,160.00
vi) Philips Energy Saver Light with 1x18 watt 116 Nos 510.00 59,160.00
PLC-E lamp.
vii) Philips TBS-300 E/240 M1 2x40 watt.EBE Ballast 1 Nos 2,460.00 2,460.00
viii)Philips , TBS-300 E/420 M1 with 4x20 w.EBE 1 Nos 2,740.00 2,740.00
Ballast
ix) Philips HDK-463 with 1x100 watt GLS 1 Nos 3,010.00
x) Adjustable light with 1x150 Watts GLS lamps 1 Nos 500.00 500.00

BOQ-ELECT (N) (55)


xi) Adjustable spot light with 1x100 Watts GLS lamps 24 Nos 430.00 10,320.00

BOQ-ELECT (N) (56)


(1) (2) (3) (4) (5) (6)
xii) Ceiling mounted Halogen light 21 Nos 615.00 12,915.00
Incandescent Lights
These will consist of as described and equipped as above
but specified as under:-
i) Philips NCD-533 transparent glass cover 12 Nos 300.00 3,600.00
with 1x60 watt lamps.
ii) Philips Flood Light OKF-500 with 1x500 1 Nos 4,000.00 4,000.00
watt HPL-N lamp. (wall bracket type),.
vi) Lamp post light (10') with 1 x 100W GLS Lamp 7 Nos 2,760.00 19,320.00
vii) Garden Light bollard type 1 x 100W GLS lamp . 3 Nos 680.00 2,040.00
viii) Wall bracket Fancy Light 1 x 100W GLS lamp 23 Nos 630.00 14,490.00
ix) Niche Light 1 x 60W GLS lamp . 6 Nos 125.00 750.00
x) XGC-532 Light with 1 x 100W GLS lamp . 13 Nos 280.00 3,640.00
IE-02 CEILING FANS & BRACKET FANS
Supply, installation, fixing, wiring, testing and
commissioning of fans with required requisite sweep
including cost of blades, hanging rod, canopy, capacitor,
stepless dimmer/regulator, bracket, nuts, bolts and all
mounting arrangement, complete in all
respects. These items will be approved quality and make.
These will consist of as described and equipped as above
but specified as under:-
i) Fancy circo wall bracket louvre fan 24" sweep. 1 Nos 2,000.00 2,000.00
IE-03 CABLES
Supply, installation, wiring, fixing, laying, connecting,
jointing, testing and commissioning of single core/3.5
core/4-comre, PVC insulated, PVC sheathed,
armoured/unarmoured, copper conductor (Pakistan Cables
Newage, Pioneer) 2501/440 volts or 600/100
volts grade cables, in pre-laind PVC pipes/MS
conduits/G.I pipe/wooden strip batten/wooden casing and
caping/RCC pipes/trenches/on cable clamps etc. as and
where shown on drawings or as required as per site
conditons.
(A) Single Core Cables
i) 10mm (sq) (7/1.32mm) 65 Per M 26.00 1,690.00
ii) 50mm2 36 Per M 138.00 4,968.00
iii) 150mm 2
17 Per M 408.00 6,936.00
iv) 240mm 2
6 Per M 648.00 3,888.00
(B) Multi-Core Power Cables
3-core/3.5 core/4-core PVC insulated, PVC sheathed un-
armoured, copper conductor, requisite grade cables.
These are described as above but specified as follow:
i) 4-core, 240mm (sq) 10 Per M 2,530.00 25,300.00
IE-04 L.T. SWITCHEAR SYSTEM
MAIN PANEL BOARD, MPB.
Supply, installation, testing and commissioning of Main
Panel Board MPB, installed as and where shown on
drawing, made of M.S sheet 14 SWG metal clad totally
enclosed, indoor, floor mounting, cubicle with front
access, in free standing design including

BOQ-ELECT (N) (57)


BOQ-ELECT (N) (58)
(1) (2) (3) (4) (5) (6)
all auxiliaries, internal wiring, circuit labels, earthing bar,
suitable for system voltage 220/500 volts, A.C. 50 Hertz, 3
phase, neutral and earth air insulated bus bars of hard
drawn 99% electrolytic copper, duly painted with antitrust
paint & 2 coats of stove enameled paint of approved
colour, equipped as under and manufactured by any one of
the approved manufacturers, and complete in all respects,
including cost of all necessary accessories and conforming
to the consultant single line diagram' The following
material and auxiliary equipments shall be provided.

a) BUS BARS SYSTEM


3-Phase, neutral & earth air insulated bus-bars of hard
drawn 99% electrolytic copper conductor requisite rating
500 volts, A.C. 500 volts, A.C. 50 Hertz, duly painted with
antitrust paint and 2 coats of stove enamaled paint of
approved colour.
b) PROTECTION SYSTEM (THERMAL &
MAGNETIC RELAY).
Under voltage and over load short circuit protection with
adjustable thermal and magnetic release shall be provided.

c) NEON PHASE INDICATIONS Marayusa/Fuji


Main Panel Board, MPB, should have neon phase
indications in Red, Yellow and Blue colours on respective
phases.
d) CURRENT TRANSFORMERS. C.Ts.
3 Nos. Air cooled ring type current transformers, C.Ts
with primary to secondary requisite ratio on incoming and
one C.T. on each outgoing circuit for protection and
metering purposes.
e) AMMETER
Ampermeter scale 0-400 AMPS rane A.C 50 CPS with
dial face of 96x96mm shall be provided on incomming &
outgoing MCCB/ACB slong with selector switch on
incoming. (96x96)
f) VOLTMETER
Voltmeter scale 0-500 volts range, A.C, 50 CPS with dial face of
96x96mm shall be provided on incoming MCCB/ ACB along
with the selector switch. (96x96)

g) SAFETY FUSES
Safety fuses before the electrical measuring indicating
quantity meters (Voltmeter, ammeter etc.) must be
provided.
h) SELECTOR SWITCH Breter (Italy)
Selector switch will be provided to select the phase with
each ammeter and voltmeter.
(A) Main Panel Board, MPB 1 Job 72,500.00 72,500.00
IE-05 DISTRIBUTION BOARD

BOQ-ELECT (N) (59)


Supply, installation and connection of wires/cables, testing
& commissioning of 500 volts, 50 Hz, 3 phase and neutral
distribution boards, (DBs) concealed type, wall mounted
to be installed as & concealed type, wall mounted to be
installed as

BOQ-ELECT (N) (60)


(1) (2) (3) (4) (5) (6)
and where shown on drawings, made of M.S. Sheet 16
SWG with hinged door, handle, catcher earthing bar,
neutral strip, internal wiring of Pakistan Cable/Pioneer
Newage from MCCBs terminating on cable terminal
blocks. One coat of anti-rust paint
with further two coats of enameled paint of approved
colour, all necessary materials complete in all respects and
manufactured by any one of the approved manufactures
and conforming to single line diagram. D.B shall be
equipped with the following
equipment as shown on drawings.
1. DB-F, (8-WAYS Distribution) (3-Phase) 3 Job 12,000.00 36,000.00
2 DB-G (9-WAYS Distribution) (3-Phase) 7 Job 13,000.00 91,000.00
IE-06 TELEPHONE & INTERCOM OUTLET POINTS &
WIRING.
Supply, installation, fixing, wiring, testing and
commissioning of telephone & intercom outlet points
wired with two pair / required requisite pair
telecommunication cable (approved colours) as per PTC
Formerly T&T Department) standards and specifications
run in ¾” (20mm) dia PVC heavy guage conduits recessed
in walls, slabs, columns, floor or as per required as per site
conditions including the cost of PVC conduit accessories,
junction boxes, pull boxes, steel pull wire etc. M.S. sheet
box of 16 SWG requisite size for flush mounting to house
this and cover of approved type, material, quality and
make with the two coats of enamelled paint to the back
box . It includes telephone rosette with jacks etc.
Complete in all respects.

4 Job 550.00 2,200.00


IE-07 TV SOCKET OUTLET UNIT.
Supply, installation testing & Commissioning of TV and
Dish Point, Conduiting, Wiring, Sockets, etc Complete in
all respects as per PTV Standards & Specifications. 2 Job 650.00 1,300.00
IE-09 EARTHING OF ELECTRICAL SYSTEM
Supply, installation erection, connecting, testing &
commissioning of complete earthing system including the
cost of the following materials labour charges, excavation
& refilling of the earthing pit upto 16 feet, 1 copper plate
of size 24"x24"x1/4" (600x600x3mm),
and (2x50mm Sq) stranded copper conductor in G.I pipe
2" dia from earth plate to test link in Manhole charcoal
and lime mixture of 9" thick to be placed all around the
vertically installed copper plate, all necessary, G.I pipe
accessories,for water arrangements etc.

lugs, terminals brass nuts washers and bolts including all


necessary materials for complete earthing system.
Excavation of pit shall be done 8 ft. away from the
foundation, whereas distance between earthing plates shall
not be less 10 ft.

The resistance of the earthing set shall be as per


Recommended British Standard Specifications. 2 Job 14,500.00 29,000.00
Earth Rod 4 Job 3,500.00 14,000.00

BOQ-ELECT (N) (61)


SUB- TOTAL 443,077.00

BOQ-ELECT (N) (62)

Das könnte Ihnen auch gefallen