Total: 976.58 m3
2 Excavation in foundations
Deduction Footings
Total: 1650.14 m3
at beds
Deduction Footings
Sides
Deduction Footings
Under floors
Total: 4047.30 m2
Deduction Footings
Under floors
Ground Floor
First Floor
Second Floor
Total: 183.99 m3
Ground Floor
First Floor
Second Floor
Total: 27.31 m3
Total: 304.53 m3
Ground floor
Plinth Beams
Beams
extra thick slab for dining hall 1 1400.00 Sft 0.08 112.00
Lintels
First floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 10
MEASUREMENT SHEET
Beams
extra thick slab for dining hall 1 1400.00 Sft 0.08 112.00
Lintels
Second floor
Beams
Lintels
Mumty floor
Lintel
Total: 601.97 m3
8 Horizontal D.P.C
Ground Floor
Total: 71.45 m2
9 Vertical D.P.C
Total: 47.88 m2
Total: 251.03 m3
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 15
MEASUREMENT SHEET
Ground Floor
Lintels doors
Lintels Windows
Doors
Windows
Total: 221.68 m3
First Floor
Lintels doors
Lintels Windows
Doors
Windows
Total: 203.38 m3
Second Floor
Lintels doors
Lintels Windows
Doors
Windows
Mumty Floor
Lintel Door
Doors
Total: 230.01 m3
Ground Floor
Lintels doors
Doors
Lintels Windows
Windows
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 20
MEASUREMENT SHEET
Total: 87.56 m3
First Floor
Lintels doors
Doors
Lintels Windows
Windows
Total: 87.63 m3
Second Floor
Lintels doors
Doors
Lintels Windows
Windows
Total: 91.38 m3
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 23
MEASUREMENT SHEET
Ground Floor
Total: 42.33 m3
Total: 144.94 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 24
MEASUREMENT SHEET
Ground Floor
First Floor
Second Floor
Mumty Floor
Total: 777.09 m2
Ground Floor
First Floor
Second Floor
Mumty Floor
Total: 132.40 m2
Ground Floor
First Floor
Second Floor
Total: 81.25 m2
Ground Floor
First Floor
Second Floor
Total: 568.75 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 28
MEASUREMENT SHEET
12" x 12"x 3/4" Supper white marble Flooring
28
with Black Marble Border
Ground Floor
First Floor
Second Floor
Total: 586.28 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 29
MEASUREMENT SHEET
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 30
MEASUREMENT SHEET
Ground Floor
First Floor
Second Floor
Total: 61.66 m2
Ground Floor
On walls
Total: 284.52 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 31
MEASUREMENT SHEET
Ground Floor
First Floor
Second Floor
Mumty Floor
Total: 1372.06 m2
Internal Plaster
Ground Floor
First Floor
Second Floor
Mumty Floor
External Plaster
Total: 635.23 m2
34 Distemper Paint
Total: 6094.97 m2
Ground floor
First floor
Second floor
Mumty floor
Total: 250.19 m2
Total: 500.37 m2
First floor
Second floor
Mumty floor
Total: 1178.06 m2
Total: 10.80 m2
39 Stair Railing
2 25.00 50.00
3 26.00 78.00
1 22.00 22.00
Total: 45.72 m
40 Aluminium Windows
Ground floor
First floor
Second floor
Mumty floor
Total: 161.39 m2
1 33.00 33.00
Total: 10.06 m
1 36.00 36.00
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 39
MEASUREMENT SHEET
Total: 10.97 m
Ground floor
First floor
Second floor
Mumty floor
Total: 161.39 m2
Total: 668.96 m2
Total: 648.75 m2
44 Glass Blocks
Total: 42.74 m2
Ground Floor
ded
First Floor
ded
Second Floor
ded
Mumty Floor
Mumty floor
Total: 1999.16 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 42
MEASUREMENT SHEET
46 Wardrobe
Total: 135.42 m2
Ground floor
First floor
Second floor
Mumty floor
Total: 214.42 m2
Ground floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD
19-A, GULBERG - II, LAHORE M. 43
MEASUREMENT SHEET
First floor
Second floor
Total: 35.77 m2
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU44
19-A GULBERG II, LAHORE
GIRLS HOSTEL
Engineer's Cost Estimate
AS PER COMPOSITE SCHEDULE OF RATES 1999
(GOVERNMENT OF THE NWFP)
(Civil Works)
Chapter-3
Earthwork
Borrow pit excavation undressed lead upto 50m in
03-04-b m3 33.18 976.58 32402.98
Hard soil
Extra for every 25 m extra lead or part thereof for
03-17-a m3 11.60 976.58 11328.35
earthwork soft, ordinary, hard & very hard
Dressing & levelling earth to designed sections
03-19-a m3 1.67 976.58 1630.89
Ashes,k sand, sitt or soft soil
Excavation in foundation of building. bridges etc
03-23-c m3 47.47 1650.14 78332.09
complete : In hard soil
Chapter-6
Concrete
Cement Concrete (brick/stone ballast) in foundations
06-03-b m3 1420.17 183.99 261291.28
& Plinth (Ratio 1:4:8)
Plain Cement Concrete incl. Placing, compacting,
06-05-f m3 2528.02 27.31 69047.90
finishing & curing (Ratio 1:2:4)
RCC in raft foundation slab, base slab of column
06-06-b-02 m3 3249.37 304.53 989514.78
& ret.wall etc, not I/c in 06-06. Type B (1:1.5:3)
RCC in roof slab, beam, column & other structural
06-06-a-02 m3 3717.26 601.97 2237670.20
members, insitu or precast. Type B (1:1.5:3)
Supply & fabricate M.S. reinforcement for
06-07-b tonne 29517.84 112.04 3307225.95
cement concrete (Deformed bars)
Damp proof of cem. Conc. 1:2:4 i/c bitumen coat,
06-22-a-02 m2 185.66 71.45 13265.90
1 layer polythene& 1 coat bitumen (2" thick)
Damp proof in c/s plaster, 1 layer polythene ,
06-23-a-06 m2 128.79 47.88 6166.44
1 coat bitumen Ratio 1:2 (0.75" thick)
Chapter –7
Brick Masonry
Pacca brick work in foundation and plinth in
07-04-a-04 m3 1739.8 251.03 436746.99
Cement, sand mortar 1:5
Pacca brick work in ground floor
07-05-a-04 m3 1859.19 221.68 412145.37
Cement, sand mortar 1:5
Pacca brick work in first floor
07-05-a-04 m3 1859.19 203.38 378118.50
Cement, sand mortar 1:5
Add extra labour on item No. 07-05 for brickwork in
07-06-a m3 63.50 203.38 12914.51
First floor
Pacca brick work in second floor
07-05-a-03 m3 1859.19 230.01 427623.51
Cement, sand mortar 1:4
Add extra labour on item No. 07-05 for brickwork in
07-06-b m3 1934.25 230.01 444887.70
Second floor
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU45
19-A GULBERG II, LAHORE
Distempering
11-23-a-03 m2 22.03 6094.97 134272.22
New surface: Three coats
Chapter-12
Wood work
First class deodar wood wrought joinery in doors
12-07-b m2 1638.98 250.19 410050
and windows, etc. complete 1-3/4" thick
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU46
19-A GULBERG II, LAHORE
Chapter-13
Painting & Varnishing
Prepare & paint new surface. Doors & windows
13-06-c-01 m2 23.01 500.37 11513.55
Priming coat
Prepare & paint new surface. Doors & windows
13-06-c-02 m2 30.64 500.37 15331.39
Each subsequent coat of paint (2 coats)
Preparing surface and painting with snowcem /
13-38-a m2 43.13 1178.06 50809.89
weathersheild paint : First coat
Preparing surface and painting with snowcem /
13-38-b m2 46.58 1178.06 54874.21
weathersheild paint : 2nd & 3rd coat
Chapter-25
Iron Work
P&F terrace railing of 2"I/d conduit pipe 16 SWG
25-33 m2 785.7 10.80 8486.26
welded with 5/8"x5/8" sq bar 2.75' high complete
P&F stair railing of 2.5" I.d GI pipe, welded with
25-37 m 410.78 45.72 18781.09
5/8"x5/8" MS bars 2'-9" high, fixed in each step
Chapter-26
Miscellaneous
Spraying anti-termite liquid mixed with water in m2/
26-15 9.58 4047.30 38773.16
the ratio of 1:40 spray
Chapter-14
Plumbing, Sanitary Installations & Gas Fittings
14-16-a P&F CP towel rail : 24" long, 3/4" dia Each 184.59 7 1292.13
14-17 P&F best quality 5mm mirror 22"x16" size Each 588.86 22 12954.92
14-24-b P&F CP bib- cock, heavy type : 1/2" Each 244.91 16 3918.56
14-27 P&F CP mixing valve for WHB, sink or shower Each 811.89 30 24356.70
14-42-a P&F rubber plug with chain : 1.25" Each 23.59 23 542.57
14-46-a P&F angle iron brackets for : WHB and cistern Each 80.66 44 3549.04
14-46-b P&F angle iron brackets for : Sink Each 97.11 4 388.44
GIRLS HOSTEL
Engineer's Cost Estimate
NON SCHEDULE ITEMS
Civil Works
RATE AMOUNT
S.NO DESCRIPTION UNIT QUANTITY
(Rs.) (Rs.)
1 Providing / laying Kitchen counter cabinet with 7/8"
thick China Verona marble top with half round top
edge as per design / drawing comprising with 3/4"
thick laminated board with deodar wood lipping 1/2"
wide on all edges duly lacquer polish of approved
shade complete in all respects as per approval of the
Engineer.
m 3550.00 10.06 35707.75
2 Providing / laying Kitchen wall mounted cabinet as
per design / drawing comprising of 3/4" thick
laminated board with deodar wood lipping 1/2"x3/4"
on all edges duly lacquer polished of approved shade
complete in all respects as per approval of the
Engineer.
m 2565.00 10.97 28145.57
3 Providing / fabricating and erection of M.S. Solid Bar
grill for windows, duly antirust painted and complete
in all respect as per instruction / approval of the
Engineer.
m2 1345.00 161.39 217064.48
4 Providing and fixing Coloured pre cast PCC
Khapprial tiles fixed over base of ¾” thick cement
plaster 1:4 and Sika Lite Chemical or equivalent @ 1
Kg/ bag, rough surface to protect the external
moisture, complete as per drawings, as per
specifications and as directed by the Engineer-in-
Charge. m2 750.00 668.96 501718.85
5 Providing /Laying Precast R.C.C. 1:2:4 coloured Fair
Face Cladding 1.50" thick all as per architectural
design specifications, instructions of manufacturer and
engineer incharge. m2 810.00 648.75 525487.78
6 Providing /Laying glass block 75mm thick as per
architectural design specifications, instructions of
manufacturer and engineer incharge. m2 1900.00 42.74 81204.13
7 Providing / laying Wardrobe as per design / drawing
comprising of 3/4" thick laminated board box and
shutters with deodar wood lipping 1/2"x3/4" on all
edges, deodar wooden 1"x3"frame for shutter fixing,
locks, handles, caturs etc. duly lacquer polished to
wooden surface of approved shade complete in all
respects as per approval of the Engineer. m2 4015 135.42 543701.80
8 Providing and fixing M.S. pressed sheet 16 SWG
Chowcket 10"x 2" filled with 1:3:6 cement concrete
and deodar wooden border 2.50"x3/4" around frame
as per design including , including polish/painting
complete in all respect.
m2 1510.00 214.42 323766.84
ALLIED ENGINEERING CONSULTANTS (PVT) LTD PSU50
19-A GULBERG II, LAHORE
Civil work
Non-schedule items
IE-9 Supply & erection of Philips tube light i/c rod choke.
Starter with frame, flexible wire including connection
for ceiling rose etc. complete.
a) double rod TMS-240
2x40 Watts.EBE Ballast 8 Set 768.13 6,145.04 c-15,p-81,
b) Single rod TMS - 140 i-24-a
1x40 Watts.EBE Ballast 234 Set 314.02 73,480.68 i-24-b
IE-10 Supply and erection of copper tape including copper
staple & nails etc. c-15,p-83
size 2" wide 1/8" thick 40 Per. M 231.36 9,254.40 i-43-b
Based on Govt. of NWFP Schedule of Rates, 1999
TOTAL 868,065.96
Based on Govt. of NWFP Schedule of Rates, 1999
g) SAFETY FUSES
Safety fuses before the electrical measuring indicating
quantity meters (Voltmeter, ammeter etc.) must be
provided.
h) SELECTOR SWITCH Breter (Italy)
Selector switch will be provided to select the phase with
each ammeter and voltmeter.
(A) Main Panel Board, MPB 1 Job 72,500.00 72,500.00
IE-05 DISTRIBUTION BOARD