DATE :- 26/11/09
SR SHUTTERING SHUTTERING TOTAL COST IN
NO PROJECT NAME BUA (SFT) QTY (SFT) QTY/BUA RATE/SFT LACS RATE/BUA REMARKS
1 BEAU MONDE
TOWER A
A SHUTTERING WORK 182000
TOWER B
A SHUTTERING WORK 207605
TOWER C
A SHUTTERING WORK 159858
3 VASANT GALAXY-POLARIS
A SHUTTERING WORK 120562
WING -B
A SHUTTERING WORK 101193
5 VASANT LAWNS
SHUTTERING WORK
A BLOCK - 1 154042
B BLOCK - 3 93634
C BLOCK - 4 93634
D BLOCK - 5 97465.76
E BLOCK - 6 97,465.76
F BLOCK - 7 154042.79
6 VASANT PRIDE
SHUTTERING WORK
B-WING 38350
C-WING 32633
D-WING 35204
E-WING 28575
7 VASANT SAGAR
A SARASWATI
SHUTTERING WORK
9 CORPORATE OFFICE
SUBSTATION, DG, ELECTRIC LOWSIDE 47390
10 V-SILVER BELL
SHUTTERING WORK
A-WING 22862
B-WING 22620
C-WING 33040
10 V-CLARION
SHUTTERING WORK
B-WING 45477.6581
C-WING 32474.8626
D-WING 32474.8626
E-WING 40965.5711
10 V-FIONA
SHUTTERING WORK
A-WING 32714.0022
B-WING 30987.6014
C-WING 31298.2924
D-WING 43806.8234
E-WING 32671.4005