White Paper

Pole Foundation Design

Introduction
plate. Geographical location may
Pole installation is a common
contribute to this type of vibration;
requirement of all the smart city
furthermore open lands are most
development projects. Installation
susceptible to harmonic vibration
of WiFi Hotspots and access
due to wind speed.
points, Smart lighting systems,
CCTV surveillance camera and 2.Cement Concrete
various types of sensors make use Consideration
of poles for installations. To make Typical poles have a setting depth
the process of pole installation based on a definite empirical formula
easy and optimized in terms of cost which comes out to be approx.
of installation and time taken for designs for construction purposes 21% of pole buried and rest aerial.
installation of the same, the white must be validated by a certified Assuming Wind load that pole may
paper is written to give details of professional engineer. be accustomed to additional support
various options and the finalize 1. Wind Load Assumptions for grouting pole base by anchor
the optimum design for smart city Under certain circumstances, fastener or HILTI may be provided
applications extra assumptions are necessary for additional strengthening purpose
to prevent wind induced vibrations based on actual site condition
Criteria for Pole Foundation Selection on poles. In steady low wind
This guide is prepared for speed situations (70-90kmph) with Concrete Grade & Mix:
conceptual purpose and preliminary poles 7 meter or higher have a As per IS 456:2000, the code of
estimating of foundation design for higher probability of wind induced practice for normal and reinforced
pole installation only. Determination harmonic vibrations. This may cause concrete, Letter M represents mix
of suitability should be based on poles to fall because of fracture (Concrete Mix) and number followed
actual conditions at site and final between the weld and the base after M represents the compressive
strength to be attained in N/sq.mm to hold the base plate. Pole is later to the Cast in situ option, muff design
at 28 days age when a standard fastened to the base plate on the is better as it involves lesser labor
cube of 150X 150 X 150 mm is anchor bolts. and time for installation. RCC takes
subjected to standard compressive a curing time 5-6 days before the
strength. Thus a concrete of M20 Precast Muff Design pole can be installed whereas the
grade should attain a compressive Pre cast RCC Muff is fixed in the muff design takes 2-3 days
strength of 20N/sq.mm at 28 days of ground and the pole is mounted
age. Generally grades of concrete inside the Muff with PCC all around
2. Cost of Installation – Comparison
lower than M20 are not to be used the pole inside the muff. This gives a
is given below.
for RCC work. Here N = Newton, mm faster and economical way to install
= millimeter. the average sized poles upto a
length of 6-12 m poles.
Concrete Grade:
General expression for the 360 MM
Table 1
proportions of cement, sand and Contents Annexure Muff Design RCC structure
coarse aggregate is 1: n : 2n by (600 X 600 X 500)
volume. Concrete Mix Cost M 25 300 1000
1.25 MTR

M5 = 1:4:8 (1 portion of cement,


Material Cost 800 1500
4 portion of sand and 8 portion of
Labor 1200 2000
coarse aggregate)
M10 = 1:3:6 ;M15 = 1:2:4; M20 = Transportation 200 700
1:1.5:3; M25 = 1:1:2 Approximate Installation Cost 2500 5200
300 MM

3. Foundation designs and


installation method
Cast in Situ foundation: Basis the 4. Comparison between the 5. Recommended Pole
selection of the concrete mix, pole above designs Foundation:
foundation is cast with anchor bolts 1. Ease of installation- As compared Basis the above analysis and
business requirements, we
recommend to use the Muff design
POLE AS SPECIFIED
of pole foundation for all smart city
applications in Smart lighting, CCTV
Camera Installation, WiFi Hotspot
and Access point Installation.
30” - 0”

HAND HOLE
Crade at Jitin Rao
BASE COLLAR EXTENSION
Facility FINISH CRADE Business Excellence
3” - 0”

5/8”x10”-0o COPPER
CLAD GROUND RCO FIXTURE SUPPLIED WITH ANCHOR
W/ BOLTS. SET ANCHOR BOLTS PER
MANUFACTURER’S RECOMMENDATIONS
PROVIDE 24” DIAMETER FOUNDATION
PROVIDE 6/6 VERTICAL REBAR AND
3” - 6”

TIES AT 12” ON CENTER. PROVIDE 3”


CLEARANCE FROM EDGE OF
FOUNDATION TO TIES.
MIN. 3/4” PVC (TYP). (IN & OUT).
ROUNDED 24” MIN, BELOW CRADE.

Copyright© 2017 Sterlite Technologies Limited. All rights reserved. The word and design marks set forth
herein are trademarks and/or registered trademarks of Sterlite Technologies and/or related affiliates and
subsidiaries. All other trademarks listed herein are the property of their respective owners.
www.sterlitetech.com

Das könnte Ihnen auch gefallen