P1
E-W Dim (mm) 2800.00
N-S Dim (mm) 2800.00
Height above grade (mm) 150.00
E-W Offset (mm) 0.00
N-S Offset (mm) 0.00
Requested Reinft. Ratio
Provided Reinft. Ratio
Long Bar Size (mm)
Top Steel
19 12 150 7.67 0
19 12 150 7.67 0
Bottom Steel
Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\
UTPUT UNITS SI
G STEEL PARAMETERS:
460
78.5
city (kN/sq mm) 210
75
ar Spacing (mm) 75
ar Spacing (mm) 200
tical Bar Spacing Limit No
20
12
10
10
16
12
0.0013
No
No
0
Page 5 of 30
Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\
ATERIAL QUANTITIES
5.88
Kilograms (KG) 253.2
8.4
11.26
Moment Direction
(kN m/m)
0 E-W
0 N-S
Moment Direction
(kN m/m)
0 E-W
0 N-S
Page 6 of 30
Date 28/05/2018
Time 10:34:05 AM
Checker DJK
& calcs\01_HRSG\
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
PROJECT INFORMATION
APPLIED LOADS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Case (kN) (kN) (kN m) (kN) (kN m)
1 - Dead Load 0.00 0.00 0.00 0.00 0.00
2 - OP Load 80.22 0.00 0.00 0.00 0.00
3 - EMP Load 50.22 0.00 0.00 0.00 0.00
4 - Test Load 230.22 0.00 0.00 0.00 0.00
5 - WIND (X) 0.00 0.00 0.00 4.00 6.00
6 - WIND (Z) 0.00 4.00 6.00 0.00 0.00
7 - Diagonal Wind 0.00 2.83 4.24 2.83 4.24
8 - Seismic Load SLX 0.00 0.00 0.00 56.00 76.00
9 - Seismic Load SLZ 0.00 56.00 76.00 0.00 0.00
10 - Diagoanal Seismic load 0.00 39.59 53.73 39.59 53.73
UNFACTORED (ALLOWABLE) LOAD COMBINATIONS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
1 Dead Load + EMP Load + 50.22 0.00 0.00 2.40 3.60
2 Dead Load + EMP Load + 50.22 2.40 3.60 0.00 0.00
3 Dead Load + EMP Load + 50.22 1.70 2.55 1.70 2.55
4 Dead Load + EMP Load + 50.22 0.00 0.00 4.00 6.00
5 Dead Load + EMP Load + 50.22 4.00 6.00 0.00 0.00
6 Dead Load + EMP Load + 50.22 2.83 4.24 2.83 4.24
7 0.9Dead Load + 0.9EMP Loa 45.20 0.00 0.00 4.00 6.00
8 0.9Dead Load + 0.9EMP Loa 45.20 4.00 6.00 0.00 0.00
9 0.9Dead Load + 0.9EMP Loa 45.20 2.83 4.24 2.83 4.24
10 Dead Load + EMP Load + 50.22 0.00 0.00 6.00 9.00
11 Dead Load + EMP Load + 50.22 6.00 9.00 0.00 0.00
12 Dead Load + EMP Load + 50.22 4.24 6.36 4.24 6.36
13 Dead Load + OP Load + 80.22 0.00 0.00 2.40 3.60
14 Dead Load + OP Load + 80.22 2.40 3.60 0.00 0.00
15 Dead Load + OP Load + 0 80.22 1.70 2.55 1.70 2.55
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
16 Dead Load + OP Load + 80.22 0.00 0.00 4.00 6.00
17 Dead Load + OP Load + 80.22 4.00 6.00 0.00 0.00
18 Dead Load + OP Load + D 80.22 2.83 4.24 2.83 4.24
19 Dead Load + Test Load + 230.22 0.00 0.00 1.32 1.98
20 Dead Load + Test Load + 230.22 1.32 1.98 0.00 0.00
21 Dead Load + Test Load + 230.22 0.93 1.40 0.93 1.40
22 Dead Load + EMP Load + 50.22 16.80 22.80 56.00 76.00
23 Dead Load + EMP Load + 50.22 56.00 76.00 16.80 22.80
24 Dead Load + EMP Load + 50.22 39.59 53.73 39.59 53.73
25 Dead Load + OP Load + 80.22 16.80 22.80 56.00 76.00
26 Dead Load + OP Load + 80.22 56.00 76.00 16.80 22.80
27 Dead Load + OP Load + D 80.22 39.59 53.73 39.59 53.73
FACTORED (ULTIMATE) LOAD COMBINATIONS
P1
Load Axial Shear E-W Mom N-SShear N-S Mom E-W
Comb (kN) (kN) (kN m) (kN) (kN m)
1 1.35Dead Load + 1.35EMP L 67.80 0.00 0.00 6.00 9.00
2 1.35Dead Load + 1.35EMP L 67.80 6.00 9.00 0.00 0.00
3 1.35Dead Load + 1.35EMP L 67.80 4.24 6.36 4.24 6.36
4 1.35Dead Load + 1.35EMP L 67.80 0.00 0.00 3.60 5.40
5 1.35Dead Load + 1.35EMP L 67.80 3.60 5.40 0.00 0.00
6 1.35Dead Load + 1.35EMP L 67.80 2.55 3.82 2.55 3.82
7 Dead Load + EMP Load + 50.22 0.00 0.00 6.00 9.00
8 Dead Load + EMP Load + 50.22 6.00 9.00 0.00 0.00
9 Dead Load + EMP Load + 50.22 4.24 6.36 4.24 6.36
10 1.35Dead Load + 1.35OP Lo 108.30 0.00 0.00 3.60 5.40
11 1.35Dead Load + 1.35OP Lo 108.30 3.60 5.40 0.00 0.00
12 1.35Dead Load + 1.35OP Lo 108.30 2.55 3.82 2.55 3.82
13 1.35Dead Load + 1.35OP Lo 108.30 0.00 0.00 6.00 9.00
14 1.35Dead Load + 1.35OP Lo 108.30 6.00 9.00 0.00 0.00
15 1.35Dead Load + 1.35OP Lo 108.30 4.24 6.36 4.24 6.36
16 1.35Dead Load + 1.35Test L 310.80 0.00 0.00 2.00 3.00
17 1.35Dead Load + 1.35Test L 310.80 2.00 3.00 0.00 0.00
18 1.35Dead Load + 1.35Test L 310.80 1.41 2.12 1.41 2.12
19 Dead Load + EMP Load + 50.22 16.80 22.80 56.00 76.00
20 Dead Load + EMP Load + 50.22 56.00 76.00 16.80 22.80
21 Dead Load + EMP Load + 50.22 39.59 53.73 39.59 53.73
22 Dead Load + OP Load + 80.22 16.80 22.80 56.00 76.00
23 Dead Load + OP Load + 80.22 56.00 76.00 16.80 22.80
24 Dead Load + OP Load + D 80.22 39.59 53.73 39.59 53.73
BEARING CAPACITY - LINEAR SOIL PRESSURE METHOD
Load Max All Ecc Ecc Moment Moment
Comb Pressure Pressure N/S Dir E/W Dir N/S axis E/W axis
(kN/sq m) (kN/sq m) (cm) (cm) (kN-m) (kN-m)
1 Dead Load + EMP Load + 26.63 161.40 2.74 0.00 0.00 5.40
2 Dead Load + EMP Load + 26.63 161.40 0.00 2.74 5.40 0.00
3 Dead Load + EMP Load + 27.24 161.40 1.94 1.94 3.82 3.82
4 Dead Load + EMP Load + 27.62 161.40 4.56 0.00 0.00 9.00
5 Dead Load + EMP Load + 27.62 161.40 0.00 4.56 9.00 0.00
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
6 Dead Load + EMP Load + 28.63 161.40 3.23 3.23 6.36 6.36
7 0.9Dead Load + 0.9EMP Loa 25.10 161.40 5.07 0.00 0.00 9.00
8 0.9Dead Load + 0.9EMP Loa 25.10 161.40 0.00 5.07 9.00 0.00
9 0.9Dead Load + 0.9EMP Loa 26.12 161.40 3.58 3.58 6.36 6.36
10 Dead Load + EMP Load + 28.85 161.40 6.85 0.00 0.00 13.50
11 Dead Load + EMP Load + 28.85 161.40 0.00 6.85 13.50 0.00
12 Dead Load + EMP Load + 30.37 161.40 4.84 4.84 9.54 9.54
13 Dead Load + OP Load + 30.46 161.40 2.38 0.00 0.00 5.40
14 Dead Load + OP Load + 30.46 161.40 0.00 2.38 5.40 0.00
15 Dead Load + OP Load + 0 31.07 161.40 1.68 1.68 3.82 3.82
16 Dead Load + OP Load + 31.44 161.40 3.96 0.00 0.00 9.00
17 Dead Load + OP Load + 31.44 161.40 0.00 3.96 9.00 0.00
18 Dead Load + OP Load + D 32.46 161.40 2.80 2.80 6.36 6.36
19 Dead Load + Test Load + 48.93 161.40 0.79 0.00 0.00 2.97
20 Dead Load + Test Load + 48.93 161.40 0.00 0.79 2.97 0.00
21 Dead Load + Test Load + 49.26 161.40 0.56 0.56 2.10 2.10
22 Dead Load + EMP Load + 70.83 161.40 59.83 17.95 35.40 118.00
23 Dead Load + EMP Load + 70.83 161.40 17.95 59.83 118.00 35.40
24 Dead Load + EMP Load + 75.25 161.40 42.30 42.30 83.43 83.43
25 Dead Load + OP Load + 72.43 161.40 51.93 15.58 35.40 118.00
26 Dead Load + OP Load + 72.43 161.40 15.58 51.93 118.00 35.40
27 Dead Load + OP Load + D 76.69 161.40 36.72 36.72 83.43 83.43
STABILITY RATIO / SLIDING SAFETY FACTOR
Load S.R. S.R. All Sliding Sliding All
Comb N/S Dir E/W Dir S.R. FS - N/S FS - E/W FS
1 Dead Load + EMP Load + 51.13 100.00 1.50 35.36 100.00 1.50
2 Dead Load + EMP Load + 100.00 51.13 1.50 100.00 35.36 1.50
3 Dead Load + EMP Load + 72.32 72.32 1.50 50.02 50.02 1.50
4 Dead Load + EMP Load + 30.68 100.00 1.50 21.22 100.00 1.50
5 Dead Load + EMP Load + 100.00 30.68 1.50 100.00 21.22 1.50
6 Dead Load + EMP Load + 43.39 43.39 1.50 30.01 30.01 1.50
7 0.9Dead Load + 0.9EMP Loa 27.61 100.00 1.50 19.25 100.00 1.50
8 0.9Dead Load + 0.9EMP Loa 100.00 27.61 1.50 100.00 19.25 1.50
9 0.9Dead Load + 0.9EMP Loa 39.05 39.05 1.50 27.22 27.22 1.50
10 Dead Load + EMP Load + 20.45 100.00 1.50 14.15 100.00 1.50
11 Dead Load + EMP Load + 100.00 20.45 1.50 100.00 14.15 1.50
12 Dead Load + EMP Load + 28.93 28.93 1.50 20.01 20.01 1.50
13 Dead Load + OP Load + 58.91 100.00 1.50 40.36 100.00 1.50
14 Dead Load + OP Load + 100.00 58.91 1.50 100.00 40.36 1.50
15 Dead Load + OP Load + 0 83.32 83.32 1.50 57.09 57.09 1.50
16 Dead Load + OP Load + 35.35 100.00 1.50 24.22 100.00 1.50
17 Dead Load + OP Load + 100.00 35.35 1.50 100.00 24.22 1.50
18 Dead Load + OP Load + D 49.99 49.99 1.50 34.25 34.25 1.50
19 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
20 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
21 Dead Load + Test Load + 100.00 100.00 1.50 100.00 100.00 1.50
22 Dead Load + EMP Load + 2.34 7.80 1.50 1.52 5.05 1.50
23 Dead Load + EMP Load + 7.80 2.34 1.50 5.05 1.52 1.50
24 Dead Load + EMP Load + 3.31 3.31 1.50 2.14 2.14 1.50
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
25 Dead Load + OP Load + 2.70 8.99 1.50 1.73 5.77 1.50
26 Dead Load + OP Load + 8.99 2.70 1.50 5.77 1.73 1.50
27 Dead Load + OP Load + D 3.81 3.81 1.50 2.45 2.45 1.50
FOOTING DESIGN INFORMATION
E-W Dim (mm) 2800.00
N-S Dim (mm) 2800.00
Thickness (mm) 750.00
Top Steel
Governing No of Bar Bar Area Area Moment
Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m) (kN m/m)
19 12 150 7.67 0 0
19 12 150 7.67 0 0
Bottom Steel
Governing No of Bar Bar Area Area Moment
Combination Bars Size Spac Prov Req
(mm) (mm) (sq cm/m) (sq cm/m) (kN m/m)
19 16 150 13.65 12.26 0
19 16 150 13.65 12.56 0
PUNCHING SHEAR
P1
Control Net Ult Punch. All Rem
Comb Load Stress Stress
(kN) (N/sq mm)(N/sq mm)
17 : 1.35Dead Load + 1.35Test Load 0.00 0.00 0.40
MAXIMUM SHEAR - E-W DIRECTION
Load Left Max Shear All Rem
Comb Dist Shear Stress Stress
(m) (kN)(N/sq mm)(N/sq mm)
1 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
2 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
3 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
4 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
5 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
6 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
7 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
8 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
9 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
10 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
11 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
12 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
13 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
14 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
15 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
16 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
17 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
18 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
19 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
20 Dead Load + EMP Load + 0.00 0.00 0.00 0.40
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
Dimensional Solutions FOUNDATION3D Version 6.5.0 Date
Foundation Name BLOW DOWN TANK
Designed By: TR Engineering Consultancy Engineer PRS Checker
Filename: Analysis and Deisgn of HRSG Blow Down Tank Foundation
21 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
22 Dead Load + OP Load + 2.80 0.00 0.00 0.40
23 Dead Load + OP Load + 2.80 0.00 0.00 0.40
24 Dead Load + OP Load + D 2.80 0.00 0.00 0.40
MAXIMUM SHEAR - N-S DIRECTION
Load Bottom Max Shear All Rem
Comb Dist Shear Stress Stress
(m) (kN)(N/sq mm)(N/sq mm)
1 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
2 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
3 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
4 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
5 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
6 1.35Dead Load + 1.35EMP L 2.80 0.00 0.00 0.40
7 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
8 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
9 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
10 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
11 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
12 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
13 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
14 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
15 1.35Dead Load + 1.35OP Lo 2.80 0.00 0.00 0.40
16 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
17 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
18 1.35Dead Load + 1.35Test L 2.80 0.00 0.00 0.40
19 Dead Load + EMP Load + 0.00 0.00 0.00 0.40
20 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
21 Dead Load + EMP Load + 2.80 0.00 0.00 0.40
22 Dead Load + OP Load + 2.80 0.00 0.00 0.40
23 Dead Load + OP Load + 2.80 0.00 0.00 0.40
24 Dead Load + OP Load + D 2.80 0.00 0.00 0.40
BDN
SI
20
12
10
10
16
12
0.0013
No
No
0
SECTION NUMBER
BDN
(9.2.1.1(3))
BDN
Rem
BDN
Remarks
BDN
Direction
E-W
N-S
Direction
E-W
N-S
BDN
BDN
BDN
BDN
BDN
Allowable
Stress
N/sq mm
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
Allowable
Stress
N/sq mm
0.397
0.397
0.397
0.397
LNG-75-102961-CS-1206-00007-0000 Appendix - IV Revision:02
06/04/2019
28/05/2018
BDN
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
0.397
SECTION NUMBER
(9.2.1.1(3))
EW DIRECTION - FACTORED LOAD COMBINATION 1
BDN